2020/21 Arterial Road Maintenance Program - South Shire

Internal use only - Subject to final funding announcements

Pavement Reconstruction Sites

Pavement Resurfacing Sites

Community Gateways Program

Foster Sites Council Alliance Update - June 2020

Internal use only - subject to final funding announcements Pavement Reconstruction Sites - Road • Ch 14.10 to 14.42

$6.2 million South Gippsland The Alliance will be delivering $6.2 million of pavement • Ch 84.56 to 85.32 reconstruction works at eight sites within South Gippsland • Ch 99.13 to 101.96 (three sites) Shire in the 2020/21 financial year. These sites include: Tarwin Lower Road Buffalo-Tarwin Lower Road • Ch 10.75 to 10.96 • Ch 1.64 to 3.07 In all, 66,204m2 of arterial roads totalling 7.20km in length will Fish Creek-Foster Road be reconstructed in South Gippsland Shire in 2020/21. This • Ch 3.30 to 4.95 represents 65% of the Region’s total pavement reconstruction program for 2020/21.

Community Gateways Program High-Risk, High-Speed Rural Intersection Program Eight sites

The Alliance completed works at eight sites under the High-Risk, High-Speed Rural Intersection Program in South Gippsland Shire during 2019/20, including:

/ Simons Lane • Bass Highway / Wares Road • Boolarra South-Mirboo North Road / Limonite Road • Korumburra-Inverloch Road / Stewarts Road • Meeniyan-Promontory Road / Savages Road / Samman Road Nine towns / 25 sites • / Samson Road • South Gippsland Highway / Whitelaws Track Community Gateways signs have now been installed at 23 • / Samson Road sites across eight towns within South Gippsland Shire during 2019/20, and the Alliance will be delivering two more in The picture below shows the improvements delivered at the 2020/21: Strzelecki Highway / Samson Road intersection, with dragon’s teeth perceptual line marking and new warning signs on Completed 2019/20 approach to the intersection. • Korumburra (four sites) • (four sites) • Meeniyan (three sites) • Mirboo North (four sites) • (two sites) • Poowong (three sites) • Tarwin Lower (two sites) • Venus Bay (one site)

To be delivered 2020/21 • Foster (two sites)

The Alliance was able to fund the Nyora, Poowong, Tarwin Lower and Venus Bay sites through savings from the initial rollout. This was a great outcome that allowed us to respond to the community following feedback from both Tarwin Lower and Venus Bay residents. Associated line marking and vegetation trimming will be completed at gateway sites in the coming weeks. South Gippsland Shire Council Alliance Update - June 2020

Internal use only - subject to final announcements Pavement Resurfacing Sites $10.2 million

46 pavement resurfacing jobs will be completed by the Alliance on arterial roads in South Gippsland Shire in the 2020/21 financial year. These sites include:

Bass Highway South Gippsland Highway • Ch 73.03 to 76.57 • Ch 56.74 to 57.18 (two sites) • Ch 80.14 to 83.08 • Ch 57.78 to 58.08 • Ch 60.86 to 61.86 (two sites) Drouin-Korumburra Road • Ch 83.35 to 85.32 • Ch 21.11 to 23.12 (four sites) • Ch 95.59 to 96.28 • Ch 97.95 to 99.13 Inverloch-Venus Bay Road • Ch 99.13 to 101.26 • Ch 14.48 to 16.53 • Ch 101.44 to 101.96 • Ch 16.95 to 18.05 • Ch 104.91 to 106.14 (three sites) • Ch 20.32 to 23.42 (five sites) • Ch 157.99 to 160.88 Korumburra-Inverloch Road Strzelecki Highway • Ch 1.65 to 3.13 • Ch 45.19 to 45.50 Korumburra- Road • Ch 49.79 to 51.68 (two sites) • Ch 0.64 to 2.40 Tarwin Lower Road Korumburra-Wonthaggi Road • Ch 11.10 to 13.54 • Ch 7.74 to 8.84 Waratah Road Lang Lang-Poowong Road • Ch 0.66 to 1.11 (two sites) • Ch 4.97 to 8.73 • Ch 2.94 to 6.38

Meeniyan-Promontory Road Wilsons Promontory Road • Ch 0.03 to 1.12 • Ch 28.15 to 28.67 • Ch 10.30 to 11.27 (three sites) A further eight roads that were reconstructed last year will • Ch 14.87 to 16.68 also receive their final seals this financial year. In all, over • Ch 21.49 to 22.63 505,000m2 of arterial roads totalling 59.12km in length will be • Ch 26.79 to 27.37 resurfaced in South Gippsland Shire in 2020/21.