PROPOSED RECOVERY FACILITY BY IMZ AGRITRADE SDN BHD EXECUTIVE SUMMARY

EXECUTIVE SUMMARY

(A) INTRODUCTION

The proposed Project is titled the "PROPOSED SCHEDULED WASTE RECOVERY FACILITY AT NO. 162, JALAN PERIGI NENAS 8/13, KAWASAN INDUSTRI PULAU INDAH, 42920, PORT , ”. Hereafter, it will be known as ‘the Project’.

(B) PROJECT INITIATOR AND CONSULTANT

The details are shown in below:-

PROJECT INITIATOR

IMZ AGRITRADE SDN BHD No. 21B, Jalan Rasmi 7, Taman Rasmi Jaya, 68000, Ampang, Selangor Tel: 03-42522252 Fax: 03-42522252 Contact Person: En Ibnu Mohd Zaki B. Arshad (Executive Director)

EIA CONSULTANT

GREEN EARTH CONSULTANCY & SERVICES 20, Jalan Indah 1/4, Taman Universiti Indah, 43300, , Selangor Tel: 013-3518102 Fax: 03-89381585 Contact Person: Loh Tong Loy (DOE Registered Consultant)

(C) LOCATION

The Recovery Facility will be sited on existing factory building at No. 162, Jalan Perigi Nenas 8/13, Kawasan Industri Pulau Indah, 42920, , Selangor. Its location is at latitude N2°57’18.9” and longitude E101°19’28.0”. The location plan is shown in Figure ES.1.

(D) STATUTORY REQUIREMENT

The proposed Project involves construction of off-site recovery facility. Therefore it is considered a prescribed activity according to the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order, 1987 under Activity 18(a)(ii). Based on this Schedule, a Preliminary EIA is mandatory and approval by the Department of Environment (DOE) is a prerequisite before implementation of the Project. This Preliminary EIA is carried out in compliance with the above requirement.

GE ES-1 PROPOSED RECOVERY FACILITY BY IMZ AGRITRADE SDN BHD EXECUTIVE SUMMARY

Project Location

Figure ES-1: Project Location Plan

GE ES-2 PROPOSED RECOVERY FACILITY BY IMZ AGRITRADE SDN BHD EXECUTIVE SUMMARY

(E) STATEMENT OF NEED

The Project will satisfy the following needs: a) it will contribute significantly to waste reduction and environmental conservation; b) it will help optimize the use of material resources and prevent wastage; c) it will create job opportunities; and d) it will generate economic activities.

(F) PROJECT CONCEPT

The Recovery Facility is proposed to provide recovery services for scheduled waste as shown in table below.

No. Code Type of Waste Maximum Quantity/month (MT) 1 SW 305 Spent Lubricating Oil 100 2 SW 306 Spent Hydraulic Oil 100 3 SW 307 Spent Mineral Oil – Water Emulsion 50 4 SW 311 Waste of Oil (Slop Oil) 100

(G) PROJECT DESCRIPTION

There is existing covered factory building in rectangular shaped of 24.4 m long and 12.2 m wide. The covered area for factory is about 297.7 m2. The factory will be renovated to accomplish for the proposed Project. The proposed layout is shown in Chapter 4 which will include the areas allocated for recovery machines, storage of scheduled waste raw materials, finished products, residue wastes storage area, office and etc.

Waste Acceptance Criteria

Before the scheduled wastes are accepted for recovery at the plant, they will first be inspected and sampled at source of origin to satisfy the waste acceptance criteria set up by the project initiator. A list of the waste acceptance is shown in Chapter 4.

The Recovery Processes

The recovery process for the spent oil (SW 305, SW 306, SW 307 & SW 311) is via heating and distillation processes. The process flow and mass balance for the recovery are described in detail in Chapter 4.

Storage

The incoming scheduled wastes will be transported from waste generators using truck. They will be stored into respective storage drums at the storage area. Upon completion of recovery process, the recovered product will be stored at the finished product storage area

GE ES-3 PROPOSED RECOVERY FACILITY BY IMZ AGRITRADE SDN BHD EXECUTIVE SUMMARY

before sold to customer. Residue produced from the recovery processes will be kept at the residue storage area pending disposal to KA.

Recovered Products

The summary of all Recovered Products is presented in Table ES.1.

Table ES.1: Summary Of The Products and Their Specifications

Monthly Yield Type of Waste Waste Code Recovered Product Product Characteristics (MT)

Spent Lubricating Oil SW 305 Recovered oil Free of solid particle and 95 water. Fulfill the 100 TPM specification as shown in Table 4.9 Spent Hydraulic Oil SW 306 Recovered oil Free of solid particle and 97 water. Fulfill the 100 TPM specification as shown in Table 4.9 Spent mineral SW 307 Recovered oil Free of solid particle and 30 oil-water emulsion water. Fulfill the specification as shown in 50 TPM Table 4.9 Waste of Oil / Slop oil SW 311 Recovered oil Free of solid particle and 70 water. Fulfill the 100 TPM specification as shown in Table 4.9

(H) OPERATION OF THE PLANT

The plant operates 25 days each month and 12 months in the year. The project will draw its power supply from the current electricity provider, TNB and potable water at the office is tap water supplied by Sybas.

(I) PROJECT OPTIONS

The proposed Project is a preferred option to the status quo for the following reasons:  The illegal dumping of spent oil will be reduced.  Manufacturers will benefit, as it will help them to reduce potential environmental liability.  The Project will create more jobs and business opportunities for the region.  Can promote the strategy of wastes reduction by recycling.

(J) EXISTING ENVIRONMENT

Parameters Description Physical Environment

Topography The Project site is located at latitude N2°57’18.9” and longitude E101°19’28.0”. It is sited on existing factory building within the developed Pulau Indah Industrial Park. Geology Quaternary age. Made up of marine and continental deposits Soils Belong to Keranji type

GE ES-4 PROPOSED RECOVERY FACILITY BY IMZ AGRITRADE SDN BHD EXECUTIVE SUMMARY

Parameters Description

Hydrology Currently there is no river flowing through the Project site. The surface runoff water from the Project site will discharge to the monsoon drainage system at the boundary of Project site and then to the nearby Sg Chondong Kecil and eventually lead to Selat Kelang. Climate Humid tropical with heavy seasonal monsoonal rains. (Meteorological station at Subang Airport) Average Annual Rainfall (2003-2007) Between 2,270 mm and 3,455 mm Annual 24-hour mean temperatures 27.2 to 27.9°C Environmental Quality

Water Quality Water were sampled from drain at the upstream (W1) and Sg Chendong Kecil at the downstream (W2) of Project site. The water qualities were compared with NWQS Class llI limits. The samples were classified as slightly polluted for both W1 & W2 based on DOE WQI.

Air Quality The air quality was good and the parameter PM10, NO2, and SO2 measured at A1 & A2 was well within the Recommended Air Quality Guideline. Noise Level The noise level recorded at N1 was within the DOE recommended limit of 70 dB(A) at the plant boundary for daytime and 60 dB(A) for night time. The noise level recorded at N2 was within the recommended limit for daytime but slightly exceeded the limit during nighttime. Biological Resource Ecosystems The proposed Project site is located within Pulau Indah Industrial Park, on a piece of flat land with factory building. Neither vegetation nor significant biological habitat was found at the site. Existing Landuse

3-km Land Use The existing landuse of the Project site is a flat land with an existing factory building located in Pulau Indah Industrial Park. The nearby landuse (within 0.5km) comprises of only Industrial area. The nearest residential area is Kg Sg Pinang which is about 700 m east of the Project site.

(K) POTENTIAL IMPACTS AND PROPOSED MITIGATION MEASURES

Sources of Degree of Impact Proposed Mitigation Measures Impacts Impact

1. Water pollution Spillage and Can be Safe Storage and Handling of Spent Oil due to handling accidental significant discharge  Use durable drums /tanks with liners for containment. Drums/tanks to be clearly labeled.  Inspect all equipment for hydraulic and oil leaks prior to use on site and have regular inspection schedules.  Have absorbent pads, booms, and other materials available to moped up oil, hydraulic fluid, and other hazardous material spills.  Store all hazardous materials in compliance with DOE regulations.  Storage areas to be designed with impermeable floors to contain and recover spillage. Concrete bunds to be constructed with 110% capacity of the largest storage tank.  Check incoming feedstock to ensure acceptance based on waste acceptance criteria.  Adopt the "just-in-time" inventory approach to optimize the inventory level of flammable

GE ES-5 PROPOSED RECOVERY FACILITY BY IMZ AGRITRADE SDN BHD EXECUTIVE SUMMARY

Sources of Degree of Impact Proposed Mitigation Measures Impacts Impact chemicals. 2. Water pollution Spillage or The volume Transport of Spent Oil due to accidental transported at transportation discharge of any one time  Prepare a logistic and routing plan. spent oil during is limited,  All vehicles to be equipped with mopping up transportation. impact is also equipment and fire extinguishers limited.  Provide information in accordance with the Seventh Schedule.  Inform the transport contractor of the purpose and use of the Seventh Schedule.  Contractor should be made to understand the Seventh Schedule and comply with the instructions contained therein.  Check condition of the truck before use. Accidental Spillage or Discharge of Spent Oil  Use appropriate personnel protective equipment (PPE) to provide protection for workers in handling any accidental spillage of hazardous wastes.  The contractor/Project Initiator to contain, clean and abate any accidental spillage or discharge of the waste as soon as possible.  To inform DOE and other relevant agencies of the occurrence as soon as possible.  Remedial activities to be in accordance with approved work plan by the regulatory agency.  Transport route to avoid densely populated areas, water catchment areas and other environmentally sensitive areas.

3. Water pollution Discharge of Not significant  Practice zero discharge for the premise due to distilled waste generation of into public drain.  Distilled water will be reuse for cooling system and distilled water excess will be evaporated using evaporator 4. Fire/explosion Accidental Can be  Have a well-rehearsed ERP that can be put into hazard in the ignition of significant effect at short notice. plant flammable chemicals  A central automatic fire-fighting system with sirens to be installed.  The system to be regularly inspected and maintained.  No smoking and prohibition of matches, lighters and other ignition devices in the Plant.  Firefighters, when required, to wear proper protective equipment and self-contained breathing apparatus.  To move containers within the fire zone to a safe area, and to cool exposed containers by spraying with water.  To call the fire stations when needed.  All enclosed rooms should be fitted with fire rated doors of at least one hour.

GE ES-6 PROPOSED RECOVERY FACILITY BY IMZ AGRITRADE SDN BHD EXECUTIVE SUMMARY

Sources of Degree of Impact Proposed Mitigation Measures Impacts Impact

 Fire extinguishers should be placed at various strategic locations for easy access.  Install explosion-proof electrical devices to minimize damage by fire. 5. Residual Waxy sludge Can be  All sludge shall be stored in suitable container and waste/sludge with total organic significant labeled accordingly as required by the Third carbon Schedule of the Environmental Quality (Schedule Wastes) Regulations 2005.  Maintain an up-to-date inventory of the quantity of sludge and submit regularly to the DOE.  The storage area must be roofed to prevent entry of rainwater and must be ventilated adequately.  The waste will be sent to Kualiti Alam for disposal. 6. Solid waste Domestic waste Not significant  Domestic waste will be collected by Majlis Perbandaran Klang and disposed at their designated dumpsite 7. Noise pollution During Not significant  Ensure that all construction equipment has Renovation functional exhaust/muffler systems. phase and also caused by transport vehicles during the operation. 8. Air pollution Evaporation of Significant  Installation of proper air ventilation system to fumes from reduce vapor concentration thereby preventing

flammable unwanted flare-up, fire or explosion. chemicals  The whole distillation system is enclosed to Odour pollution Significant prevent any leakage of gas to atmosphere during during distillation distillation process. Any leakage will be detected proces by control panel and the process will be stopped automatically and rectification work will be carried Movement of Not significant out immediately. transport vehicles 9. Health and During Not significant  To adopt Industrial safety procedures given in the Safety hazards operation. OSHA Regulation 1994.  Safety Data Sheets to be kept on site for inspection.  Emergency procedures, action plans and regular drills to be available.  No smoking allowed within the plant.  Workers, when necessary, to wear chemical resistant gloves, safety goggles and other protective clothing.  Train certain workers to provide first aid and have available easily accessible first aid kits.  Intensive training on safety procedures should be provided for all personnel

GE ES-7 PROPOSED RECOVERY FACILITY BY IMZ AGRITRADE SDN BHD EXECUTIVE SUMMARY

(L) ENVIRONMENTAL MANAGEMENT PLAN

An environmental management plan, with an environmental management system will be drawn up. This plan will be included and used in the development and management of this Project to reflect the commitment of management in environmental conservation.

As part of the EMP, monitoring of water quality, noise and air pollution will be regularly and continuously carried out and periodic audits made.

(M) EMERGENCE RESPONSE PLAN

The ERP will establish procedures to deal with events and accidents that happen during the construction and operation phases of the Project. The objectives of the ERP are to enable management to respond quickly, timely and effectively to accidents so as to minimize their impacts on the environment, workers and public health and safety. Included in the ERP will be lists of essential and relevant people to contact for their services.

(N) CONCLUSION

The proposed Project will help to reduce unnecessary pollution due to illegal disposal of scheduled waste. In the process of waste recovery, it will also help reduce the final waste load for disposal at landfills and incinerators. The commercial viability of the Project, the job opportunities created, and the low environmental, health and safety impacts associated with it, will without doubt justify the Project to be recommended for adoption.

GE ES-8