Vijayawada Delhi Lucknow Bhopal Raipur Chandigarh Commission to J&K Re-Skilling, Up-Skilling: Pm in England Bhubaneswar Ranchi Dehradun Hyderabad *Late City Vol

Total Page:16

File Type:pdf, Size:1020Kb

Vijayawada Delhi Lucknow Bhopal Raipur Chandigarh Commission to J&K Re-Skilling, Up-Skilling: Pm in England Bhubaneswar Ranchi Dehradun Hyderabad *Late City Vol Follow us on: @TheDailyPioneer facebook.com/dailypioneer RNI No.APENG/2018/764698 Established 1864 ANALYSIS 7 MONEY 8 SPORTS 11 Published From VISIT OF THE DELIMITATION HUGE DEMAND FOR SKILLING, PANT TESTS COVID +VE VIJAYAWADA DELHI LUCKNOW BHOPAL RAIPUR CHANDIGARH COMMISSION TO J&K RE-SKILLING, UP-SKILLING: PM IN ENGLAND BHUBANESWAR RANCHI DEHRADUN HYDERABAD *LATE CITY VOL. 3 ISSUE 241 VIJAYAWADA, FRIDAY, JULY 16, 2021; PAGES 12 `3 *Air Surcharge Extra if Applicable SHRUTI HAASAN: I HAVE BEEN IN THERAPY WHEN I WAS YOUNGER { Page 12 } www.dailypioneer.com MAMATA TO VISIT DELHI THIS MONTH ANALYSE INFRA NEEDS FOR EMERGENCY PENSIONERS TO GET PENSION SLIP FROM WHATSAPP BANNED OVER 20 L INDIAN AMID FRESH BUZZ OVER ANTI-BJP FRONT COVID RESPONSE PACKAGE, STATES TOLD BANKS THROUGH WHATSAPP ALSO ACCOUNTS BETWEEN MAY 15 - JUNE 15 est Bengal Chief Minister Mamata Banerjee is likely to he Centre on Thursday asked states and union territories to he Centre has told banks they can use social media apps such as ore than 20 lakh WhatsApp accounts were banned between visit New Delhi later this month where she will hold talks conduct a quick gap analysis for various infrastructure WhatsApp alongside SMS and email to send pension slips to May 15 and June 15 in India to prevent online abuse and keep Wwith leaders of non-BJP parties, TMC sources said on Tcomponents under the Emergency COVID-19 Response Package Tpensioners after their account is credited, according to an official Musers safe, the company said on Thursday in its monthly Thursday, amid the renewed buzz over formation of an anti-BJP and stressed on effective advance preparations for efficient clinical order. It said the decision was taken in order to ensure ease of living compliance report. The report, mandated with the country's new IT front ahead of the 2024 Lok Sabha polls. management of the infection. The Union of the pensioners. “Banks may also use Rules, has to list details of actions taken by According to reports, she will be in New health ministry reviewed preparations under social media apps WhatsApp etc in addition social media and communication platforms Delhi on July 25. Sources said Mamata’s the recently approved Rs 23,123 crore "India to sms and email,” said the order issued by like WhatsApp and Twitter. "Our top focus is visit could happen any day after the COVID-19 Emergency Response and Health the Department of Pension and Pensioners' preventing accounts from sending harmful Martyr's Day rally in Kolkata on July 21. Systems Preparedness Package (ECRP): Welfare. A meeting was held with the or unwanted messages at scale. We mai- The TMC holds a rally every year to Phase II" with health secretaries and senior Central Pension Processing Centres (CPPCs) ntain advanced capabilities to identify these commemorate the killing of 13 people in officials of all states and UTs through a of pension-disbursing banks last month accounts sending a high or abnormal rate of police firing on Youth Congress workers video conference. The Cabinet approved the wherein the issue of providing the breakup messages and banned 2 million accounts in on July 21, 1993, during a protest led by new scheme for financial year 2021-22 on of the monthly pension to the pensioners India alone from May 15 - June 15 attemp- Mamata who was then its leader. July 8. (Report on page 5) was discussed, it said. ting this kind of abuse," WhatsApp said. PARLIAMENT MONSOON SESSION YSRCP govt to implement EWS quota Water disputes, SCS for upper castes in ‘open category’ figure high on agenda SNV SUDHIR n VIJAYAWADA of YSRCP MPs In a major decision, the State gov- Naidu's 5 pc quota PNS n VIJAYAWADA ernment has decided to implement 10 percent reservation in educa- YSRCP MPs will have their hands tional institutions and govern- full when they enter Parliament for ment jobs for Economically was to placate Kapus the ensuing monsoon session that Weaker Sections among the castes is set to begin from Monday. in the ‘open category’. PNS n VIJAYAWADA form the government in the The ongoing dispute with The annual income limit for the state. Telangana over river Krishna eligibility to avail EWS quota has Months before the 2019 But after the government waters and implementation of also been enhanced to Rs 8 lakh. General Elections, the then N was formed, Naidu was silent promises made to the state under Orders in this regard were issued Chandrababu Naidu govern- for the good three years about the AP Reorganisation Act are late on Wednesday. ment had decided to split the the quota for Kapus and after some of the main issues that the The Jaganmohan Reddy govern- Centre’s sop of 10 percent they started protesting he YSRCP MPs will raise in the ses- ment has effectively reversed the N quota to open category castes started placating them. Later, sion. Chandrababu Naidu government’s among Kapus and other caste the TDP chief found an Though not publicly acknowl- and Chief Minister YS decision to split the Centre’s sop of groups. opportunity in Centre’s deci- edged, pressing for the disqualifi- Jaganmohan Reddy discussed the providing 10 percent reservation to The move was seen as an sion to give quota to castes in cation of rebel MP K Raghu Rama strategy to be adopted and issues the economically weak among the among Kapus and 5 percent to All the writ petitions and Public attempt to woo Kapus who the open category. Krishnam Raju is also high on the to be raised by the party MPs in open category castes between Ka- other castes for admissions into Interest Litigations (PILs) filed in were disgruntled in the state. Though the Naidu govern- priority list of the YSRCP MPs. Parliament. pus and other open category castes. educational institutions and initial this regard are still pending before Kapus, who are more in ment had sent the Kapu quota YSRCP senior leader V Vijaysai During the meeting held at the After enactment of The One appointments in the posts and courts and are yet to be disposed number after Backward Bill adopted by the state Reddy has already said they would camp office here on Thursday, the Hundred and Third Amendment services under the State govern- of. However, the state High Court Classes, are an important Assembly in the past to stage protests in Parliament if Chief Minister directed the MPs to of the Constitution of India, offi- ment. issued interim orders only in one vote bank for any political Centre, there was no Raju was not disqualified. raise Polavaram, privatisation of cially known as the Constitution Later, several writ petitions and of the writ petitions filed in pub- party to form the govern- response. The YSRCP will also reiterate the Visakhapatnam Steel Plant (One Hundred and Third PILs were filed against the Naidu lic interest and to ensure that the ment. In the 2014 elections, But in a surprise move, the the demand for grant of Special (VSP), Rayalaseema Lift Irrigation Amendment) Act, 2019, the then government’s decision challenging academic session and admission of with the help of actor-politi- Narendra Modi government Category Status to Andhra Pradesh Scheme (RLIS), Krishna River Naidu government had enacted the sub-categorisation of EWS students was not put to jeopardy in cian and Jana Sena chief had announced a 10 percent as per the promise made in Board Management (KRBM), two Acts bifurcating the 10 percent reservation into 5 percent for EWS the context of the litigation con- Pawan Kalyan and Naidu’s quota to EBC in open catego- Parliament. among other major issues pertain- EWS reservation providing 5 per- among Kapus and 5 percent for cerning the same. promise of giving quota to ry and Kapus in Andhra A meeting of the YSRC parlia- ing to the State in Parliament. cent reservation to the EWS among other open category them, Kapus had aligned with Pradesh also come under the mentary party was held on Economically Weaker Sections caste groups. 2 TDP which helped the party category. Thursday in which party supremo 2 Clear NREGS AP unveils policy to lift retail sector NGT sets up Committee to KRMB again directs TS GENCO pending dues by PNS n VIJAYAWADA examine Palamuru LI project to stop power generation Aug 1, HC tells The Andhra Pradesh government PNS n VIJAYAWADA PNS n VIJAYAWADA on Thursday came out with the AP government 'Retail Parks Policy 2016-2021' The National Green Tribunal (NGT) on Thursday Krishna River Management Board (KRMB) had with the objective of catalysing constituted a committee to examine the construction once again directed TS GENCO to stop using water PNS n VIJAYAWADA growth and providing thrust to of Palamuru Lift Irrigation Project undertaken by the from the projects on river Krishna common to two development of the retail sector in Telangana State government on the River Krishna and Telugu states to generate power. The AP High Court on the state. to furnish a report as to whether the ongoing con- "Telanagana State GENCO authorities are once Thursday set August 1 as the Through the new policy, the struction is compliant with the EIA notification and again requested to stop further release of water deadline for the State govern- State expects to attract new invest- other extant laws. immediately through Srisailam Left Power House, ment to clear pending MNRE- ments to the tune of Rs 5,000 crore On Thursday, an application was filed before the Nagarjuna Sagar Dam and Pulichinthala project as GA bills. in the retail sector by the year 2026.
Recommended publications
  • Shemaroo Entertainment Limited
    DRAFT RED HERRING PROSPECTUS Dated September 19, 2011 Please read section 60B of the Companies Act, 1956 (This Draft Red Herring Prospectus will be updated upon filing with the RoC) 100% Book Building Issue SHEMAROO ENTERTAINMENT LIMITED Our Company was originally incorporated as a private limited company under the Companies Act, 1956 on December 23, 2005, with the name Shemaroo Holdings Private Limited. Subsequently, pursuant to a Scheme of Arrangement approved by the Hon’ble High Court of Bombay vide order dated March 7, 2008 and by the special resolution of our shareholders dated May 28, 2008, the name of our Company was changed to Shemaroo Entertainment Private Limited and a fresh certificate of incorporation was granted to our Company on June 3, 2008, by the RoC. Thereafter, pursuant to a special resolution of our shareholders dated March 26, 2011, our Company was converted to a public limited company and a fresh certificate of incorporation consequent to the change of status was granted on April 1, 2011, by the RoC. For further details in connection with changes in the name and registered office of our Company, please refer to the section titled “History and Certain Corporate Matters” on page 95 of this Draft Red Herring Prospectus. Registered and Corporate Office: Shemaroo House, Plot No.18, Marol Co-operative Industrial Estate, Off Andheri Kurla Road, Andheri East, Mumbai- 400059 Telephone: +91 22 4031 9911; Facsimile: +91 22 2851 9770 Contact Person and Compliance Officer: Mr. Ankit Singh, Company Secretary; Telephone: +91 22 4031 9911; Facsimile: +91 22 2851 9770 E-mail: [email protected]; Website: www.shemaroo.com PROMOTERS OF OUR COMPANY: MR.
    [Show full text]
  • Page 1 of 5 Review of Prioritized Projects Hon'ble CM Conducted
    Review of Prioritized Projects Hon’ble CM conducted Review for Prioritized Projects RECORD OF DISCUSSION Date Monday, 23rd July 2018 Time 4.30pm to 7.30pm Agenda Progress review on Prioritized projects by Hon’ble Chief Minister, A.P Venue Conference room, AP Secretariat, Velagapudi. Shri. D. Uma Maheswara Rao, Hon’ble Minister, WRD . Smt. Rekha Rani – Commissioner, R&R . Shri M. Venkateswara Rao, EnC, WRD . District collectors Attendees . Forest department . Ground water department, APSRAC and M/s Vassar Labs . Chief Engineers from Tirupathi, Ananthapuram, Kadapa, Ongole, Vijayawada & Visakhapatnam . Consultants to APWRD Page 1 of 5 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble CM and Minister of water resources reviewed status of prioritized projects. Overall status of 56 prioritized projects : For 1 Overall status - Projects inaugurated: 9 nos. information Projects ready for inauguration: 6 nos. Projects in progress: 41 nos. CE, Kurnool inquired about whether to take water inflow or wait till 25th August for Information on th intake of water. Hon’ble CM instructed to complete all the works by 25 August’18 For 2 inaugurated - and ensure water shall be taken from Owk to Gandikota. Information Projects Secretary, WRD informed that all CEs to note that water to be filled in all the tanks. Phase 1- 40% filling in all tanks & Phase 2- 30% and Phase 3-30%. Until Phase-1 For 3 Filling of tanks 40% is not filled in all tanks, phase 2 cannot be initiated. - Information Ensure to fill all the tanks by gravity, otherwise fill by minor lifts.
    [Show full text]
  • Of 4 Review of Prioritized Projects Hon'ble CM Conducted Review for Prioritized Projects RECORD of DISCUSSION Date
    Review of Prioritized Projects Hon’ble CM conducted Review for Prioritized Projects RECORD OF DISCUSSION Date Monday, 22nd October 2018 Time 03:45 PM to 04:45 PM Agenda Progress review on Prioritized projects by Hon’ble Chief Minister, A.P Venue Conference Hall, Polavaram Dam site . Shri. D. Uma Maheswara Rao, Hon’ble Minister, WRD . Shri. Shashi Bhushan Kumar, Secretary, WRD . Shri. KS Jawahar,MLA, Kovvur . Shri. Pithani Satyanarayana, Hon’ble Minister . Shri. M. Srinivas, MLA, Polavaram . Shri. Katamaneni Bhaskar, Collector, West Godavari Attendees . Smt. Rekha Rani, Commissioner R&R . Shri M. Venkateswara Rao, ENC, WRD . District collectors . Forest department . Ground water department, APSRAC and M/s Vassar Labs . Chief Engineers from Tirupathi, Ananthapuram, Kadapa, Ongole, Vijayawada & Visakhapatnam . Consultants to APWRD Page 1 of 4 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble CM and Minister of water resources reviewed status of prioritized projects. Overall status of 61 prioritized projects : Projects inaugurated: 15 nos. For 1 Overall status - Projects ready for inauguration: 7 nos. information Projects in progress: 39 nos. Hon’ble CM requested to provide timelines for all the prioritized projects. Secretary, WRD briefed the current situation of the state for the rainfall, ground water and water demand. Secretary, WRD Informed: — There is a need of urgency for efficient water management to protect state from the Drought and meet water supply demands. — All the Chief Engineers has the clear understanding of Water demand and water inflows of the projects in their region. Secretary, WRD instructed — All the Chief Engineers to conduct district level workshop to create awareness For 2 Water Management among the citizens about proper water management, water - information available/requirement and schedule for water release based on requirement.
    [Show full text]
  • Of 14 Borrower/Name & Address
    Stressed Assets Management Branch Flat No. 104, 1st floor H.No.6-3-639/640/642 Golden Edifice Complex Khairathabad Hyderabad – 500 004 –Tel:04023322157 E-mail: [email protected] E –Auction sale notice under SARFAESI Act 2002 * Sale of immovable/movable assets under the Securitization and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 (hereinafter referred to as the Act). Notice is hereby given to the public in general and to the Borrower/s and Guarantor/s in particular that the under mentioned property mortgaged to Syndicate Bank, the possession of which had been taken by the Authorised Officer of the Bank under Section 13(4) of the Act will be sold by E- Auction as mentioned below for recovery of under mentioned dues and applicable interest, charges and costs etc as detailed below. The property described below is being sold on “AS IS WHERE IS, WHATEVER THERE IS AND WITHOUT RECOURSE BASIS” under the rule no. 8 & 9 of the Security Interest (Enforcement) Rules (hereinafter referred to as the rules) for the recovery of the dues detailed as under: Borrower/Name & address. Guarantors: M/s Venkatadri Spinning Mills Pvt Ltd 01. Sri Mandapaka Srinivasa Rao, S/o Rep. by its M.D Mandapaka Srinivasa rao M Nageswara Rao, Tholeru Village, Registered Office at: Veeravasaram Mandal, West D No 7/248, Ammigunta Area Godavari Dist Chikkala Village, Chagallu Mandal 02. Sri Mandapaka Rambabu, S/o M West Godavari Dist, A.P. – 534342 Nageswara Rao, Tholeru Village, Veeravasaram Mandal, West Godavari Represented by its Dist 03.
    [Show full text]
  • Utf8 Encode('Mahesh Is Handsome 360 Degrees' - Telugu Movie News)
    utf8_encode('Mahesh Is Handsome 360 Degrees' - Telugu Movie News) 'Mahesh Is Handsome 360 Degrees' - Telugu Movie News The movie has started setting the records ablaze right from the moment it was announced. For the best part of its production, it created the record for being the costliest film of Telugu industry. Then came the trade record when it was bought for a whopping sum of money by Eros for worldwide distribution, huge audio rights by Lahari music and offers for satellite telecast too. '1-Nenokakdine' marks the union of several big combinations for the first time. Mahesh - Sukumar, Mahesh - Devi Sri Prasad, Mahesh - Ratnavelu etc. Making their screen debuts are Gautham and the leading lady Kriti Sanon. While many a case the trade pundits are cautious about such first timers, in this case, they broke the shackles and bet their moneys big time on them. The audio was announced to be a first of its kind effort in which theaters across the state were connected LIVE too. And one fan each from Vizag Sangam Sarath theaters in Vizag, Asian theater from Warangal, Raj Theater in Kurnool, Annapurna theater in Vijayawada and Ashoka theater in Rajahmundry hosted the lunch of a song from the album on a LIVE feed from the theaters in a first of its kind effort. These are the fans that were selected by directors on ABN LIVE shows thru the past few days. Three fans from each of the venue were also given a chance to ask the hero Mahesh, Director Sukumar and the Music director Devi Sri Prasad a question and the fans across the state were treated with their answers which they themselves wanted to know from these guys.
    [Show full text]
  • Of 4 Review of Prioritized Projects Hon'ble CM Conducted Review For
    Review of Prioritized Projects Hon’ble CM conducted Review for Prioritized Projects RECORD OF DISCUSSION Date Monday, 08th October 2018 Time 04:00 PM to 05:30 PM Agenda Progress review on Prioritized projects by Hon’ble Chief Minister, A.P Venue Conference room, AP Secretariat, Velagapudi. Shri. D. Uma Maheswara Rao, Hon’ble Minister, WRD . Shri. Shashi Bhushan Kumar, Secretary, WRD . Smt. Rekha Rani – Commissioner, R&R . Shri M. Venkateswara Rao, EnC, WRD Attendees . District collectors . Forest department . Ground water department, APSRAC and M/s Vassar Labs . Chief Engineers from Tirupathi, Ananthapuram, Kadapa, Ongole, Vijayawada & Visakhapatnam . Consultants to APWRD Page 1 of 4 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble CM and Minister of water resources reviewed status of prioritized projects. Overall status of 57 prioritized projects : Projects inaugurated: 15 nos. For 1 Overall status - Projects ready for inauguration: 3 nos. information Projects in progress: 39 nos. Hon’ble CM requested to provide timelines for all the prioritized projects. Secretary, WRD briefed about 8 ongoing & 3 New projects under CE, Tirupathi. CE, TGP informed Adavipalli Lift (Peddamandyam Lift) works will finish by 21st Oct’18 and Kuppam Branch Canal works will finish by 16th Nov’18. Hon’ble CM raised concerned for delayed works in Nellore Barrage. Secretary, WRD and EnC, WRD visited the sites and instructed to entrust part of Projects under CE, works of Nellore Barrage to another agency to expedite works. For 2 - Tirupathi CE, TGP informed action has initiated to entrust the part of work to another information agency.
    [Show full text]
  • Not Applicable for IOC/HPC
    APPOINTMENT OF RETAIL OUTLET DEALERSHIPS IN AP BY IOC Location Sl. Name Of Location Revenue District Type of RO Estimated Category Type of Site Minimum Minimum Minimum Estimated Estimated Mode of Fixed Fee / Security No. (Not (Regular/Rur monthly (CC/DC/CFS) Frontage of Depth of Site Area of site working fund selection Min bid Deposit ( Rs applicable al) Sales Site (in M) (in M) (in Sq. M.). capital required for (Draw of amount ( Rs in Lakhs) for IOC/HPC) Potential requirement developmen Lots/Bidding in Lakhs) (MS+HSD) in for t of ) Kls operation of infrastructur RO (Rs in e at RO (Rs Lakhs) in Lakhs ) DRAW OF 1 BUKKAPATNAM VILLAGE & MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 2 GOTLUR VILLAGE, DHARMAVARAM MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 3 VAYALPADU (NOT ON NH - SH), VAYALAPADU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS THONDAVADA VILLAGE (NOT ON NH/SH), CHANDRAGIRI DRAW OF 4 CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 5 DODDIPALLE (NOT ON NH/SH), PILERU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS NARAYANA NELLORE VILLAGE (NOT ON SH/NH) NANDALUR DRAW OF 6 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 7 ARAKATAVEMULA NOT ON SH/NH , RAJUPALEM MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 8 GUTTURU VILLAGE, PENUKONDA MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 9 MADDALACHERUVU VILLAGE, KANAGANAPALLE MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 10 KALICHERLA (NOT ON NH/SH), PEDDAMANDYAM MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS CHINNACHEPALLE, NOT ON SH/ NH, KAMALAPURAM DRAW OF 11 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 12 GUDIPADU NOT ON SH/NH, DUVVUR MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS BUGGANIPALLE VILLAGE NOT ON NH/SH, BETHAMCHERLA DRAW OF 13 KURNOOL Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 14 GOVINDPALLE VILLAGE NOT ON NH/SH, SIRVEL MANDAL KURNOOL Rural 48 ST CFS 20 20 400 0 0 0 2 LOTS DRAW OF 15 POLAKAL VILLAGE NOT ON NH/SH, C .
    [Show full text]
  • 6. Water Quality ------61 6.1 Surface Water Quality Observations ------61 6.2 Ground Water Quality Observations ------62 7
    Version 2.0 Krishna Basin Preface Optimal management of water resources is the necessity of time in the wake of development and growing need of population of India. The National Water Policy of India (2002) recognizes that development and management of water resources need to be governed by national perspectives in order to develop and conserve the scarce water resources in an integrated and environmentally sound basis. The policy emphasizes the need for effective management of water resources by intensifying research efforts in use of remote sensing technology and developing an information system. In this reference a Memorandum of Understanding (MoU) was signed on December 3, 2008 between the Central Water Commission (CWC) and National Remote Sensing Centre (NRSC), Indian Space Research Organisation (ISRO) to execute the project “Generation of Database and Implementation of Web enabled Water resources Information System in the Country” short named as India-WRIS WebGIS. India-WRIS WebGIS has been developed and is in public domain since December 2010 (www.india- wris.nrsc.gov.in). It provides a ‘Single Window solution’ for all water resources data and information in a standardized national GIS framework and allow users to search, access, visualize, understand and analyze comprehensive and contextual water resources data and information for planning, development and Integrated Water Resources Management (IWRM). Basin is recognized as the ideal and practical unit of water resources management because it allows the holistic understanding of upstream-downstream hydrological interactions and solutions for management for all competing sectors of water demand. The practice of basin planning has developed due to the changing demands on river systems and the changing conditions of rivers by human interventions.
    [Show full text]
  • Sri Vasavi Engineering College
    SRI VASAVI ENGINEERING COLLEGE (Sponsored by Sri Vasavi Educational Society, Tadepalligudem) (Approved by AICTE, New Delhi & Accredited by NAAC with ‘A’ Grade) (Permanently affiliated to JNTUK & Recognized by UGC under section 2(f) & 12(B) Pedatadepalli, TADEPALLIGUDEM – 534 101. W.G.Dist. (A.P.) LIST OF CANDIDATES APPLIED FOR ADMISSION INTO UG PROGRAMMES (B.TECH. COURSES) UNDER CATEGORY ‘B’ (MANAGEMENT QUOTA) SEATS FOR THE ACADEMIC YEAR 2017-18 AS ON DATE 15-07-2017 S.No. Name of the Candidate Rank Details % of Marks in Branch Application Remarks and Address In JEE-Mains/ Qualifying Opted for Registration APEAMCET Examination Admn. In Date KOPPINEEDI NAVYA SATYA SRI NQ 91.2 1 D/o K.Venkata Rama Rao CSE 11-07-2017 Nil Attili Mandal & Post West Godavari Dist. MULLAPUDI POOJA D/o Mullapudi Bhima Raju 2 Lakkavaram Post 104212 86.6 CSE 11-07-2017 Nil Jangareddy Gudem Mandal West Godavari Dist. YADALAPALLI D P RAGHAVA S/o Yadlapalli Dharma Rao 3 82008 87.8 CSE 11-07-2017 Nil Ganapavaram Post & Mandal West Godavari Dist. YADAVALLI PURNA SAI S/o Yadavalli Rambabu 4 Pedavellamilli Post 86500 91.0 CSE 11-07-2017 Nil Ungutur Mandal West Godavari Dist. TALLAPRAGADA RAJA RAVI TEJA S/o T D N S S 5 SARVESWARARAO 64509 90.1 ECE 11-07-2017 Nil K N Road, TADEPALLIGUDEM – 534 101. West Godavari Dist. RAJAMAHENDRAVARAPU DANESWARA RAO S/o R.Srinivas 6 NQ 91.1 ECE 11-07-2017 Nil Chivatam Post Undrajavaram Mandal West Godavari Dist. BOYAPATI MURALI CHOUDARI 7 S/o Boyapati Venkateswara Rao 50437 96.2 ECE 11-07-2017 Nil Chintalapudi Mandal & Post West Godavari Dist.
    [Show full text]
  • Page 1 of 6 Review of Prioritized Projects Hon'ble CM Conducted
    Review of Prioritized Projects Hon’ble CM conducted Review for Prioritized Projects RECORD OF DISCUSSION Date Monday, 12th November 2018 Time 08:20 PM to 09:00 PM Agenda Progress review on Prioritized projects by Hon’ble Chief Minister, A.P Venue Conference room, AP Secretariat, Velagapudi. Shri. D. Uma Maheswara Rao, Hon’ble Minister, WRD . Smt. Rekha Rani, Commissioner R&R . District collectors Attendees . Forest department . Ground water department . Chief Engineers from Tirupathi, Anantapuram, Kadapa, Ongole, Vijayawada & Visakhapatnam . Consultants to APWRD Page 1 of 6 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble CM reviewed status of prioritized projects. Overall status of 62 prioritized projects : Projects inaugurated: 16 nos. For 1 Overall status - Projects ready for inauguration: 6 nos. information Projects in progress: 40 nos. Hon’ble CM requested to provide timelines for all the prioritized projects. Hon’ble CM and Hon’ble Minister reviewed the water flow/release of HNSS. CE, Anantapuram informed the water shall reach as per the below plan: th — Lepakshi – 20 Nov’18 For 2 Release of Water - — Madaksira – 15th Nov’18 information — Cherlopally – 15th Nov’18 — Water will reach Chittor border via PBR by 20th Dec’18. Hon’ble CM instructed to ensure that water reaches Kuppam region by 15th Jan’19. Hon’ble CM reviewed the status of following projects (Detailed progress of projects attached in annexure): — Adavipalli Reservoir – CE, TGP informed reservoir works are completed and requested for extension of time for Peddamandyam lift till 20th Feb’18 — Kuppam Branch Canal (HNSS Phase II) – CE, TGP informed only 100m of LA is pending and expediting the works.
    [Show full text]
  • Probabilistic Predictions for Hydrology Applications
    Probabilistic Predictions for Hydrology Applications S. C. Kar NCMRWF, Noida (Email: [email protected]) International Conference on Ensemble Methods in Modelling and Data Assimilation (EMMDA) 24-26 February 2020 Motivation TIGGE Datasets ANA and FCST for Nov 30 2017 TIGGE Datasets ANA and FCST for Dec 01 2017 Analysis and Forecasts of Winds at 925hPa MSLP Forecast and Analysis (Ensemble members) Uncertainties in Seasonal Simulations (CFS and GFS) Daily Variation of Ensemble Spread Surface hydrology exhibit significant interannual variability River Basins in India over this region due to interannual variations in the summer monsoon precipitation. The western and central Himalayas including the Hindukush mountain region receive large amount of snow during winter seasons during the passage of western disturbances. Snowmelt Modeling: GLDAS models Variation in Snowmelt among Hydrology Models is quite large Evaporation from GLDAS Models For proper estimation Evaporation, consistent forcing to hydrology model (especially precipitation, Soil moisture etc) and proper modeling approach is required. Extended-Range Probabilistic Predictions of Drought Occurrence 5-day accumulated rainfall forecasts (up to 20 days) have been considered. Ensemble spread (uncertainties in forecast) examined for each model IITM ERPS at 1degree 11 members T382GFS 11 members T382 CFS 11 members T126 GFS 11 members T126 CFS Probabilistic extended range forecasts were prepared considering all 44 members Probability that rainfall amount in next 5-days will be within 0-25mm
    [Show full text]
  • Nagarjuna Sagar Dam 1 Nagarjuna Sagar Dam
    Nagarjuna Sagar Dam 1 Nagarjuna Sagar Dam Nagarjuna Sagar Dam Nagarjuna Sagar Dam నాగార్జునసాగర్ ఆనకట్ట Location of Nagarjuna Sagar Dam Official name నాగార్జునసాగర్ ఆనకట్ట Nagarjuna Sagar Dam Location Guntur District, Nalgonda district, Andhra Pradesh, India Coordinates 16°34′32″N 79°18′42″E Construction began 10 December 1955 Opening date 1960 Construction cost 1300 crore rupees Dam and spillways Height 124 metres (407 ft) from river level Length 1,450 metres (4,757 ft) Impounds Krishna River Reservoir Creates Nagarjuna Sagar Reservoir Capacity 11,560,000,000 m3 (9,371,845 acre·ft) [1] Active capacity 5,440,000,000 m3 (4,410,280 acre·ft) Catchment area 215000 km² (83012 sq mi) Nagarjuna Sagar Dam 2 Surface area 285 km2 (110 sq mi) Power station Commission date 1978-1985 Turbines 1 x 110 MW Francis turbines, 7 x 100.8 MW reversible Francis turbines Installed capacity 816 MW Nagarjuna Sagar Dam (Telugu: నాగార్జునసాగర్ ఆనకట్ట) is the world's largest masonry dam at the time of its construction, which is built across Krishna River at Nagarjuna Sagar in Guntur district & Nalgonda district of Andhra Pradesh, India. The construction duration of the dam was between the years of 1955 and 1967. The dam created a water reservoir whose capacity is 11,472 million cubic metres. The dam is 490 ft (150 m). tall and 1.6 km long with 26 gates which are 42 ft (13 m). wide and 45 ft (14 m). tall.[2] Nagarjuna Sagar was the earliest in the series of large infrastructure projects initiated for the Green Revolution in India; it also is one of the earliest multi-purpose irrigation and hydro-electric projects in India.
    [Show full text]