AMENDMENT in the ENVIRONMENTAL CLEARANCE for the PROPOSED CONSTRUCTION of RESIDENTIAL COMPLEX FORM I a 2019 FORMI I. BASIC INFOR
Total Page:16
File Type:pdf, Size:1020Kb
AMENDMENT IN THE ENVIRONMENTAL CLEARANCE FOR THE PROPOSED CONSTRUCTION OF RESIDENTIAL COMPLEX FORM I FORMI I. BASIC INFORMATION S. No Item Details 1. Name of the project/s Amendment in the Environmental Clearance for the proposed construction of Residential development at Adayalambattu Villlage, Ambattur Taluk, Thiruvallur District. 2. S.No. in the schedule The project is categorized under Schedule 8 (b) “Township & Area Development projects” of EIA Notification 2006 and its subsequent amendment 3. Proposed capacity / EC obtained Built-up area is 1,61964.85 area/length/tonnage to be Sq.m. handled/command area/lease Built up area for EC Amendment area/number of wells to be drilled requested is 1,60,922 sq.m 4. New/Expansion/Modernization New (Amendment in EC) 5. Existing Capacity/ Area etc. Existing Built up area is 1,61964.85 Sq.m. 6. Category of Project i.e. ‘A’ or ‘B’ Category B1 7. Dose it attract the general No condition? If yes, please specify. 8. Dose it attract the specific condition? Not Applicable If yes, please specify. 9. Location Plot/Survey/ Khasra. No 4, 5, 6, 7, 13, 14, 15, 73/1B and 73/1C Village Adayalambattu Taluk Maduravoyal District Thiruvallur State Tamil Nadu 10. Nearest railway station/airport along Railway Station with distance in Km. Koyambedu Metro Station–3.74 km(E) Airport Chennai International Airport –9.25 km (S) 11. Nearest town, city, district Maduravoyal– 1.12 km (SE) headquarters along with distance in Km. 12. Village Panchayats, Zillaparished, Corporation of Chennai municipal corporation, local Address: 1131, EVR Periyar Salai, Park body(complete postal address with Town, Ripon Building, Chennai - 600 003 telephone nos. to be given) Telephone No: 044 25619555 13. Name of the applicant M/s.KG Foundation Private Limited 14. Registered address Marble Arch, Ground Floor, No.5, Bishop Wallers Avenue (East), Mylapore,Chennai- 600 004 a 2019 AMENDMENT IN THE ENVIRONMENTAL CLEARANCE FOR THE PROPOSED CONSTRUCTION OF RESIDENTIAL COMPLEX FORM I 15. Address for correspondence Name Mr. Haresh Kishor Designation (Owner/Partner/CEO) Director Address Marble Arch,Ground Floor, No.5, Bishop Wallers Avenue (East), Mylapore, Chennai- Pin Code 600 004 E-Mail [email protected] Telephone/ Mobile No 91 44 2499 9999 Fax No 91 44 2499 7577 16. Details of Alternative Sites No alternative sites examined Examined, if any, location of these sites should be shown on a topo sheet. 17. Interlinked Projects Not Applicable 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves Not Applicable approval / Clearance under the following acts: if yes, details of the same and their status to be given. (a)The Forest (Conservation) Act, 1980? (b)The Wildlife (Protection) Act, 1972? (c)The C.R.Z Notification, 1991? 22. Whether there is any government No order/ Police relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending No against the land/ or land in which the Project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Order/ directions of the Court, if any And its relevance with the proposed Project (I) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, and the like) b 2019 AMENDMENT IN THE ENVIRONMENTAL CLEARANCE FOR THE PROPOSED CONSTRUCTION OF RESIDENTIAL COMPLEX FORM I Details thereof (with Information/Checklist approximate quantities /rates, S.No. Yes/No confirmation wherever possible) with source of information data 1.1 Permanent or temporary No There will not be any change in the change in land use, land cover land use, land cover or topography or topography including as the site is categorized as Primary increase intensity of land use Residential use by Chennai (with respect to local land use Metropolitan Development Authority plan) (CMDA). 1.2 Clearance of existing land, No Not required vegetation and Buildings? 1.3 Creation of new land uses? No Not required 1.4 Pre-construction investigations Yes Geo technical investigation has been e.g. Bore Houses, Soil testing? done to find the suitability of soil for providing of adequate foundations for the proposed structure. The geotechnical investigation report is enclosed as Annexure X. 1.5 Construction works? Yes Construction of various buildings will be done systematically, with economy of materials and with due care on environmental protection. 1.6 Demolition works? No No demolition works will be carried out as the land is vacant. 1.7 Temporary sites used for Yes Inside the proposed site, a small construction works or housing area will be utilized temporarily for of construction workers? construction of sheds for the workers and materials. Water supply and sanitation facilities will be provided for them. Mostly workers will be deployed from local area only. 1.8 Above ground buildings, Yes Excavation works will be carried out structures or earthworks for foundation of the structures. including linear structures, cut Later on, the cut and fill process will and fill or excavations be required to the minimum extent for leveling. 1.9 Underground works mining or No No underground works will be tunneling? required as the proposed project is the construction of Residential buildings including commercial activities. 1.10 Reclamation works? No Only levelling of ground if required. 1.11 Dredging? No No need for dredging 1.12 Off shore structures? No Not required 1.13 Production and manufacturing No It’s a construction project. Hence processes? not applicable c 2019 AMENDMENT IN THE ENVIRONMENTAL CLEARANCE FOR THE PROPOSED CONSTRUCTION OF RESIDENTIAL COMPLEX FORM I 1.14 Facilities for storage of goods No Temporary sheds will be or materials? constructed for the storage of cement, sand and other materials during construction phase. 1.15 Facilities for treatment or Yes Sewage generated shall be treated disposal of solid waste or liquid through STP of capacity 980 KLD effluents? and the treated sewage can be utilized for flushing and greenbelt development and excess will be disposed through Nesapakkam STP. Biodegradable waste will be treated through Organic Waste Converter (OWC).Non-Biodegradable and inert waste will be collected and handed over to Authorized Recyclers. 1.16 Facilities for long term housing No There is no residential facility for of operational workers? operational workers as they will be deployed from local area. 1.17 New road, rail or sea traffic No The existing transportation during Construction or infrastructure will be made use operation? during construction and operational phase. 1.18 New road, rail, air, waterborne No The existing infrastructure would be or other transport adequate. infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No As construction works will be within transport routes or a specified area, there is no need infrastructure leading to for closure or diversion of existing changes in Traffic movements? transport routes. The existing transport infrastructure will be made use of. 1.20 New or diverted transmission No Not envisaged lines or pipelines? 1.21 Impoundment, damming, No Not envisaged culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No Stream crossings 1.23 Abstraction or transfers of No No Ground water shall be water form ground or surface abstracted. waters? 1.24 Changes in water bodies or No Rain water from within the proposed land surface affecting drainage development shall be properly or runoff? collected and routed to the rain water harvesting trenches along the boundary and the overflow will be d 2019 AMENDMENT IN THE ENVIRONMENTAL CLEARANCE FOR THE PROPOSED CONSTRUCTION OF RESIDENTIAL COMPLEX FORM I collected in the exclusive sumps to be provided for collection of rain water. Excess water will be discharged accordingly. 1.25 Transport of personnel or Yes Transport of personnel or materials for construction, construction materials during operation or decommissioning? construction phase will be through existing roads. 1.26 Long-term dismantling or No No long term works involved in the decommissioning or restoration proposed activity works? 1.27 Ongoing activity during No Only temporary thatched sheds will decommissioning which could be built for storing cement and have an impact on the other materials. So there will be no environment? decommissioning works. 1.28 Influx of people to an area Yes During construction period workers either temporarily or will be deployed locally permanently? 1.29 Introduction of alien species? No No such alien species are envisaged 1.30 Loss of native species or No No loss of native species will occur genetic diversity? as the site is plain 1.31 Any other actions? No Only eco-friendly activities like tree plantation will be undertaken 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply) Details thereof (with S. Information/Checklist approximate quantities /rates, Yes/No No. confirmation wherever possible) with source of information data 2.1 Land especially undeveloped or No There is no agricultural land. agricultural land (ha) 2.2 Water (expected source & Yes Total water Requirement 1020 KLD competing users) unit: KLD of which recycled water for flushing (345 KLD) and Green belt development (28 KLD) Excess Treated Sewage 497 KLD will be disposed to Nesapakkam STP. Fresh water requirement of 674 KLD shall be met through tanker lorries. 2.3 Minerals (MT) No Since the proposed project is the construction of Residential buildings there will be no usage of minerals 2.4 Construction material - stone, Yes Cement - 9,000bags aggregates, sand/soil Steel - 120 MT Sand - 7,000 cum e 2019 AMENDMENT IN THE ENVIRONMENTAL CLEARANCE FOR THE PROPOSED CONSTRUCTION OF RESIDENTIAL COMPLEX FORM I (expected source - MT) Brick - 1,00,000 Nos.