Detailed 2Nd Quarter Progress Report DETAILED SECOND QUARTER 2017/18 PROGRESS REPORT No milestone for the quarter Over achieved Achieved Partially achieved Not achieved Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA Programe1: Administration Departmental Management 4.3.1 Percentage compliance with MPAT standards PMU No milestone for the quarter n/a No milestone for the quarter No milestone for the quarter No milestone for the quarter No milestone for the at the minimum targeted level 3 quarter IT n/a • • • • n/a Legal Services n/a • • • • n/a HRM n/a • • • • n/a Internal Audit n/a • • • • n/a Risk Management n/a • • • • n/a Financial Accounting n/a • • • • n/a SCM n/a • • • • n/a Corporate Services 4.3.4 Percentage vacancy rate for engineers and ≤10% ≤10% n/a 114% filled over stablishment. (675 filled out of 114% filled over stablishment. (675 filled out of Over by 24% • 114% filled over stablishment. (675 filled out of 592 The Department appoint candidate n/a Over achieved PoE accepted scientists 592 posts). 592 posts). posts). engineers and scientists additional to Formula: establishment as per OSD. Formula: Formula: Formula: 114% - 90%=24% 675/592*100=114% 675/592*100=114% 675/592*100=114% 4.3.5 Percentage of SMS employees attending 100% 30% n/a 108% ( 10 in Q1 +79 in Q2 = 89) attended training 108% ( 10 in Q1 +79 in Q2 = 89) attended training Over by 8% (7) (please • 108% ( 10 in Q1 +79 in Q2 = 89) attended training Instead of 2 groups spread in Q3 and Q4 n/a Over achieved PoE accepted for the Report of SMS interventions identified through the DPSA interventions identified through DPSA interventions identified through DPSA provide the formula for the interventions identified through DPSA attending Financial management, one member who attended training competency assessment Competency assessment Competency assessment calculation.) Competency assessment bigger group of 41 sms was conducted. during Q2 Other training took place as per Formula: Formula: Formula: schedule. 89/82*100= 108% 89/82*100= 108% 89/82*100= 108% Formula: Note: The 82 is the annual target set in the APP. Note: The 82 is the annual target set in the APP. 106% (89) – (82) 100% Note: The 82 is the annual target set in the APP. This target is accumulative. This target is accumulative. This target is accumulative. PMU 4.4.1 Percentage of the Water and Sanitation 100% of the Water and Sanitation Sector 50% n/a 27% of occupations registered 27% of occupations registered 23% 23% 27% of occupations registered DHET OFO Task Team Qquarterly The remaining occupations submissions Partially achieved Poe accepted Sector Occupations (skills) registered with Occupations (skills) registered with OFO meeting was moved to October for the financial year will be wholly OFO adjudicated in October 2017 Communications 5.2.1 Annual assessment of the benefits derived Annual assessment of benefits derived No milestone for the quarter n/a 3 Stakeholder consultations: 3 Stakeholder consultations: • • 3 Stakeholder consultations: • • Poe accepted from partnership agreement instruments from partnership agreement instruments July: July: July: No milestone for the Life4U Consultation on Partnership TOR Life4U Consultation on Partnership TOR Life4U Consultation on Partnership TOR quarter Assesment. Assesment. Assesment. August: August: • • August: • • Poe accepted Johnson and Johnson Consultaion on the Johnson and Johnson Consultaion on the Johnson and Johnson Consultaion on the Partnership TOR. Partnership TOR. Partnership TOR. September: September: September: Poe accepted GIZ Consultation on Partnership Assesment GIZ Consultation on Partnership Assesment GIZ Consultation on Partnership Assesment September 2017 September 2017 September 2017 n/a 1 1 • • 1 • • Poe accepted Partnership instruments finalised Partnership instruments finalised Partnership instruments finalised September: September: September: Poe accepted MOU GIZ MOU GIZ MOU GIZ August: August: • • August: • • Poe accepted GIZ MoU consultation GIZ MoU consultation GIZ MoU consultation July: July: July: Poe accepted consultation of GIZ MoU consultation of GIZ MoU consultation of GIZ MoU 1 5.2.1 Annual assessment of the benefits derived Annual assessment of benefits derived from partnership agreement instruments from partnership agreement instruments Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA n/a 6 6 Programe1: Administration• • 6 • • Poe accepted Partnership meetings Partnership meetings Partnership meetings September September September Progress report against Water Sector Partnership Progress report against Water Sector Partnership • • Progress report against Water Sector Partnership • • Poe accepted: action plans action plans action plans July (1) July (1) July (1) Poe accepted Teleconference between WWF-SA & DWS Teleconference between WWF-SA & DWS • • Teleconference between WWF-SA & DWS • • Poe accepted August (5) August (5) August (5) Poe accepted Collaboration meeting between DTI & BBBEE Collaboration meeting between DTI & BBBEE • • Collaboration meeting between DTI & BBBEE • • Poe accepted DWS & COBRA DWS & COBRA DWS & COBRA Poe accepted Collaboration meeting betweenDWS&DTI Collaboration meeting betweenDWS&DTI • • Collaboration meeting betweenDWS&DTI • • Poe accepted Collaboration meeting DWS women campaign Collaboration meeting DWS women campaign Collaboration meeting DWS women campaign Poe accepted Collaboration meeting with sunlight Collaboration meeting with sunlight • • Collaboration meeting with sunlight • • Poe accepted 5.2.2 Annual assessment on the implementation of Annual assessment on the implementation Quarterly report on the implementation n/a Quarterly report on the implementation Quarterly report on the implementation • • Quarterly report on the implementation • Achieved Poe accepted the Annual Communications Programme of the Annual Communications Programme of the Annual Communications of the Annual Communications of the Annual Communications of the Annual Communications programme programme programme programme 1 Quarterly marketing and media report 1 Quarterly marketing and media report • • 1 Quarterly marketing and media report • • Poe accepted 12 media briefings 12 media briefings • • 12 media briefings More media briefings were done due to • Poe accepted for 12 issues in the environment 378 media products 378 media products • • 378 media products More media products done due to issues • PoE accepted in the environment Opinion Pieces: 47 Opinion Pieces: 47 • • Opinion Pieces: 47 • • PoE accepted Sep:20 Sep:20 Sep:20 Aug: 14 Aug: 14 Aug: 14 July : 13 July : 13 July : 13 Statements:125 Statements:125 • • Statements:125 More statements done due to issues in • Poe accepted September:52 September:52 September:52 the environment August:33 August:33 August:33 July: 40 July: 40 July: 40 Internet articles Internet articles • • Internet articles • • PoE accepted September:24 September:24 September:24 August:17 August:17 August:17 July : 25 July : 25 July : 25 Media interviews Media interviews • • Media interviews • • PoE accepted September:21 September: 21 September: 21 August:32 August:32 August:32 July: 78 July: 78 July: 78 2 Key messages 2 Key messages • • 2 Key messages • • Poe accepted 1 marketing and advertising campaign 1 marketing and advertising campaign • • 1 marketing and advertising campaign • • Poe accepted 8 cabinet announcements 8 cabinet announcements 8 cabinet announcements • • Poe accepted 5 member statement 5 member statement • • 5 member statement More member statements were done to • Poe accepted keep members of Parliament informed of issues in the environment 2 DWS Corporate Publications produced 2 DWS Corporate Publications produced • • 2 DWS Corporate Publications produced • • Poe accepted 2 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA 5.2.3 Assessment of impact of Annual assessment of impact of mediated No milestone No milestone No milestone Programe1: Administration• • No milestone • • No milestone 1.1.8 mediated interactions that will interactions that will deliver meaningful n/a 8 community engagements / PPP 8 community engagements / PPP • • 8 community engagements / PPP • • Poe accepted deliver meaningful engagements with engagements with communities Sept: 3 Sept: 3 Sept: 3 communities August:2 August:2 August:2 July: 3 July: 3 July: 3 n/a 20 targeted stakeholder engagements 20 targeted
Recommended publications
  • (Special Trip) XXXX WER Yes AANDRUS, Bloemfontein 9300
    Place Name Code Hub Surch Regional A KRIEK (special trip) XXXX WER Yes AANDRUS, Bloemfontein 9300 BFN No AANHOU WEN, Stellenbosch 7600 SSS No ABBOTSDALE 7600 SSS No ABBOTSFORD, East London 5241 ELS No ABBOTSFORD, Johannesburg 2192 JNB No ABBOTSPOORT 0608 PTR Yes ABERDEEN (48 hrs) 6270 PLR Yes ABORETUM 3900 RCB Town Ships No ACACIA PARK 7405 CPT No ACACIAVILLE 3370 LDY Town Ships No ACKERVILLE, Witbank 1035 WIR Town Ships Yes ACORNHOEK 1 3 5 1360 NLR Town Ships Yes ACTIVIA PARK, Elandsfontein 1406 JNB No ACTONVILLE & Ext 2 - Benoni 1501 JNB No ADAMAYVIEW, Klerksdorp 2571 RAN No ADAMS MISSION 4100 DUR No ADCOCK VALE Ext/Uit, Port Elizabeth 6045 PLZ No ADCOCK VALE, Port Elizabeth 6001 PLZ No ADDINGTON, Durban 4001 DUR No ADDNEY 0712 PTR Yes ADDO 2 5 6105 PLR Yes ADELAIDE ( Daily 48 Hrs ) 5760 PLR Yes ADENDORP 6282 PLR Yes AERORAND, Middelburg (Tvl) 1050 WIR Yes AEROTON, Johannesburg 2013 JNB No AFGHANI 2 4 XXXX BTL Town Ships Yes AFGUNS ( Special Trip ) 0534 NYL Town Ships Yes AFRIKASKOP 3 9860 HAR Yes AGAVIA, Krugersdorp 1739 JNB No AGGENEYS (Special trip) 8893 UPI Town Ships Yes AGINCOURT, Nelspruit (Special Trip) 1368 NLR Yes AGISANANG 3 2760 VRR Town Ships Yes AGULHAS (2 4) 7287 OVB Town Ships Yes AHRENS 3507 DBR No AIRDLIN, Sunninghill 2157 JNB No AIRFIELD, Benoni 1501 JNB No AIRFORCE BASE MAKHADO (special trip) 0955 PTR Yes AIRLIE, Constantia Cape Town 7945 CPT No AIRPORT INDUSTRIA, Cape Town 7525 CPT No AKASIA, Potgietersrus 0600 PTR Yes AKASIA, Pretoria 0182 JNB No AKASIAPARK Boxes 7415 CPT No AKASIAPARK, Goodwood 7460 CPT No AKASIAPARKKAMP,
    [Show full text]
  • Goscor Cleaning Case Study - Medupi.Pdf 1 2017/02/24 2:48 PM
    Goscor Cleaning Case Study - Medupi.pdf 1 2017/02/24 2:48 PM CASE STUDY Industry: Industrial Facility Eskom’s Medupi Power Station Environmentally friendly vacuum truck cleans up at Medupi Power Station Customer Overview Medupi Power Station is a Greenfield coal-fired power plant project located west of Lephalale in Limpopo. It is regarded as the biggest dry-cooled power station in the world and the fourth largest coal plant in the Southern Hemisphere. Medupi has a planned operational life of 50 years and is the fourth dry-cooled, baseload station built in 20 years by Eskom after Kendal, Majuba and Matimba power stations. The boiler and turbine contracts for Medupi are the largest C that Eskom has signed in its 90-year history. M Y CM MY CY CMY “ K With the deployment of Challenges Medupi Power Station required specialised equipment to clean the HPVR-1000 vacuum and remove a diverse range of materials, such as ash, slurries, coal, and sludge’s at the power station during the final phase of truck, we have managed the restructuring. Environmentally conscious Medupi requires suppliers to comply with stringent standards. to quickly clear water from trenches, sumps and Solution Medupi Power Station selected Goscor Cleaning Equipment as a cavities. The truck also preferred supplier of specialised cleaning equipment. Goscor delivered the environmentally friendly high point HPVR -1000 makes clearing of coal Liquid ring vacuum truck to the power station and an additional vac truck was delivered to the Kendal Power Station. from coal mills and clear- This locally manufactured and specialised wet and dry vacuum truck was developed specifically to meet South African rugged ing of ash dust spillages conditions.
    [Show full text]
  • Water for Food and Ecosystems in the Baviaanskloof Mega Reserve Land and Water Resources Assessment in the Baviaanskloof, Easter
    Water for Food and Ecosystems in the Baviaanskloof Mega Reserve Land and water resources assessment in the Baviaanskloof, Eastern Cape Province, South Africa H.C. Jansen Alterra-report 1812 Alterra, Wageningen, 2008 ABSTRACT Jansen, H.C., 2008. Walerfor bood and hicosystems in the baviaanskloofMega Reserve. IMnd and water resources assessment in the Baviaanskloof,Hastern Cape Province, South Africa. Wageningen, Alterra, Alterra-report 1812. 80 pages; 21 figs.; 6 tables.; 18 refs. This report describes the results of the land and water assessment for the project 'Water for Food and Ecosystems in the Baviaanskloof Mega Reserve'. Aim of the project is to conserve the biodiversity in a more sustainable way, by optimizing water for ecosystems, agricultural and domestic use, in a sense that its also improving rural livelihoods in the Baviaanskloof. In this report an assessment of the land and water system is presented, which forms a basis for the development and implementation of land and water policies and measures. Keywords: competing claims, IWRM, land management, nature conservation, policy support, water management, water retention ISSN 1566-7197 The pdf file is tree of charge and can he downloaded vi«i the website www.ahctra.wur.nl (go lo Alterra reports). Alterra docs not deliver printed versions ol the Altena reports. Punted versions can be ordered via the external distributor. I-or oidcrmg have a look at www.li tx> ni l) ljtl.nl/mppcirtc ilser vice . © 2008 Alterra P.O. Box 47; 6700 AA Wageningen; The Netherlands Phone: + 31 317 484700; fax: +31 317 419000; e-mail: info.alterra@,wur.nl No part of this publication may be reproduced or published in any form or by any means, or stored in a database or retrieval system without the written permission of Alterra.
    [Show full text]
  • II-Databasis Van Gemeenskapsvoeding- En
    DATABASE OF COMMUNITY NUTRITION AND DEVELOPMENT CENTRES IN PROVINCES Household Food and Nutrition Security Programme (HF&NSP) The addresses where the Implementing Agents for the Household Food and Nutrition Security Programme (HF&NSP) are as listed below: Province Town Implementing Agent Community Physical Address Contact Number Nutrition and Development Centre’s (CNDCs) funded/ province 7 Northern Cape Hartswater Thabang 22 950 Bonita park, Ms Liza Lingerman Hartswater 073 0208398 10 National DSD Pretoria Food & Nutrition 235 134 HSRC Building Mr. Mondli Mbhele Security Coordination PRETORIA 082 3022275 ANNEXURE A: LIST OF NPO’S OPERATING COMMUNITY NUTRITION AND DEVELOPMENT CENTRE’S (CNDCS) NO Province District Local Municipality Town Name of Organisation Physical address Municipality 195 Northern John Taolo Joe Moro long Local Perth Perth DIC Perth Village Cape Gaetsewe District Municipality 196 Northern Frances Baard Sol Plaatje L ocal Kimberley Readira Soup Kitchen 1544 Jeremiah SebeStr, Cape District Municipality Redirile, Kimberley, 8345 197 Northern Frances Baard Dikgatlong Lo cal Barkley West Thabiso DIC 2708 Morape Street, Cape District Municipality Mataleng, Barkley West 198 Northern Frances Baard Phokwane Lo cal Pampierstad MogomotsiDIC 977a Mosegedi Street, Cape District Municipality Pampierstad, 8566 199 Northern John Taolo Ga -Segonyana Lo cal Bankhara BankharaBodulong DIC Dipico Street Bankhara Cape Gaetsewe District Municipality 200 Northern John Taolo Joe Morolong Local Tshwaragano Soup Kitchen Stand 799, Diben Cape Gaetsewe
    [Show full text]
  • Olyvenhoutsdrif Settlement
    OLYVENHOUTSDRIF SETTLEMENT APPLICATION FOR REZONING AND SUBDIVISION IN TERMS OF THE SPATIAL PLANNING AND LAND USE MANAGEMENT ACT (ACT 16 OF 2013) OF PLOT 755, OLYVENHOUTSDRIF SETTLEMENT, KENHARDT RD, DAWID KRUIPER LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE NOVEMBER 2016 SUBMITTED AND COMPILED BY: Macroplan Town and Regional Planners P.O. Box 987 Upington 8800 Tel: 054 332 3642 /Fax: 054 332 4283 E-mail: [email protected] OLYVENHOUTSDRIF SETTLEMENT APPLICATION FOR REZONING AND SUBDIVISION IN TERMS OF THE SPATIAL PLANNING AND LAND USE MANAGEMENT ACT (ACT 16 OF 2013) OF PLOT 755, OLYVENHOUTSDRIF SETTLEMENT, KENHARDT RD, DAWID KRUIPER LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE NOVEMBER 2016 SUBMITTED AND COMPILED BY: Macroplan Town and Regional Planners P.O. Box 987 Upington 8800 Tel: 054 332 3642 /Fax: 054 332 4283 E-mail: [email protected] INDEX APPLICATION FOR LAND USE CHANGE Page Section A: APPLICATION FORM 1 Section B: MOTIVATIONAL REPORT 8 1 Introduction 8 1.1 Background 8 1.2Current Reality 12 1.3Assignment 12 1.4Objective 12 1.5Jurisdiction 12 1.6Compliance with Principles 13 2 Planning Considerations 20 2.1Location of area 20 2.2Physiography 21 2.3Integrated Planning 21 2.4Character of the Area 23 2.5Infrastructure 23 2.6Size, zonings, and regulations 24 2.7Summary 24 3 Proposed land use change 25 3.1Planning Approach 25 3.2Public Participation 25 3.3Proposed land uses 26 4 Recommendation 26 4.1Approval of application 26 List of figures Figure 1: Location plan: Regional 10 Figure 2: Location plan: Local 11 Figure 3: Zoning plan: Excerpt 15 Figure 4: General land uses 16 Figure 5: Proposed land use change 27 Figure 6: Proposed Detail Site Layout 28 List of Photos and Images Photos 1-2: Study area 17 Photos 3-4: Study area 18 Photos 5-6: Study area 19 Image 1: Upington Renewable Energy Development Zone.
    [Show full text]
  • Small Hydropower in Southern Africa – an Overview of Five Countries in the Region
    Small hydropower in Southern Africa – an overview of five countries in the region Wim Jonker Klunne Council for Scientific & Industrial Research, Pretoria, South Africa Abstract Background This paper looks at the status of small hydropower While approximately 10% of the global hydropow- in Lesotho, Mozambique, South Africa, Swaziland er potential is located on the African continent (the and Zimbabwe. For each country, an overview will majority in Sub-Saharan Africa), only 4 – 7% of this be given of the electricity sector and the role of huge resource has been developed (ESHA & IT hydropower, the potential for small hydropower Power, 2006; Min Conf Water for Agriculture and and the expected future of this technology. Small Energy in Africa, 2008). hydropower has played an important role in the his- Figures stating the potential of hydropower usu- tory of providing electricity in the region. After a ally refer to large-scale hydropower only. No prop- period with limited interest in applications of small er statistics on the potential for small- and micro- hydropower, in all five countries, a range of stake- scale hydropower are available for the African con- holders from policy makers to developers are show- tinent. Their rates of development are commonly ing a renewed interest in small hydropower. understood to be even lower than for large-scale Although different models were followed, all five hydropower. Gaul, et al. (2010) compared the 45 countries covered in the paper do currently see 000 plants below 10 MW in China with a total of a activities around grid connected small scale few hundred developed sites in the whole of Africa hydropower.
    [Show full text]
  • Environmental Impact Assessment Environmental Impact and Waste
    Revised DEIR: Comments and Responses Report (Version 4) i 12670 Environmental Impact Assessment Environmental Impact and Waste Management License Application for the proposed Extension of the Ash Disposal Facility and Associated Infrastructure at Camden Power Station (DEA Ref No 12/12/20/2300 and NEAS Ref No: DEA/EIA/0000399/2011) Comments and Responses Report Version 4 This report (Version 4) captures the issues raised by stakeholders during the Environmental Impact Assessment (EIA) process and Waste Management License Application for the proposed extension of ash disposal facilities and associated infrastructure at Camden Power Station. As part of the announcement, a Background Information Document (BID), with a comment and registration sheet was posted and distributed by hand during May 2011. Letters of notification were also sent out by registered mail in May 2011 to all landowners within a 10 km radius of the Camden Power Station. An advertisement was placed in various newspapers and site notices were also put up in the area of the proposed development during May 2011. An open house and public meeting to discuss the Draft Scoping Report was held at the Indawo Game Lodge, Ermelo on 27 July 2011. This event was announced by advertisements in various newspapers and letters of invitation were also sent out to stakeholders. Issues and comments raised at this meeting as well as comments received during the public review period from 18 July to 22 August 2011 were added as Version 2 of this report to the Final Scoping Report before it was submitted to the Department of Environmental Affairs (DEA).
    [Show full text]
  • TAU Industries' Prospecting Applications
    MCFMagaliesburg Community Forum TAU INDUSTRIES’ PROSPECTING Applications: 1. Koesterfontein - DMR GP10498PR 2. Kaalfontein - DMR GP10505PR 3. Zuickerbosch - DMR GP10504PR MAIN MCF COMMENTRARY DOCUMENT 06 Nov 2018 REV C001 Magaliesburg Community Forum [email protected] Draft EIA/EMP Complaints and Comments // Magaliesburg Community Forum Use of this Document This document has been prepared by the MCF for the exclusive information sharing between the DMR and other state organs and decision makers to voice the concerns of the MCF’s members who form part of the Interested and Affected Parties of the three Tau Industries prospecting applications in the Magaliesburg region, which forms part of the Mogale City Local Municipality (MCLM). If there is a need to present any of this information to any other public or third party person (including the general public), a written response and approval must be obtained from the MCF prior to publication of this information, content and data, either in whole or in part. The MCF reserves the right to amend, add additional comments, and raise additional concerns or provide updates where needed and / or not captured due to the time allowed to review all of the DRAFT EIA and EAP information. These documents should not be seen as complete and as either standalone comments or concerns of the MCF, their members and all the I&AP. TAU Industries’ Prospecting Applications - via Joan Projects 0 MCF Ref: C001 TAU Industries – Draft EAP and EMP reports Magaliesburg Community Forum TABLE OF CONTENTS 1 Executive Summary .......................................................................................................... 3 2 Background on Gold Mining Impacts ............................................................................. 4 3 Who is MCF .....................................................................................................................
    [Show full text]
  • Sponsored by the Department of Science and Technology Volume
    Volume 26 Number 3 • August 2015 Sponsored by the Department of Science and Technology Volume 26 Number 3 • August 2015 CONTENTS 2 Reliability benefit of smart grid technologies: A case for South Africa Angela Masembe 10 Low-income resident’s preferences for the location of wind turbine farms in the Eastern Cape Province, South Africa Jessica Hosking, Mario du Preez and Gary Sharp 19 Identification and characterisation of performance limiting defects and cell mismatch in photovoltaic modules Jacqui L Crozier, Ernest E van Dyk and Frederick J Vorster 27 A perspective on South African coal fired power station emissions Ilze Pretorius, Stuart Piketh, Roelof Burger and Hein Neomagus 41 Modelling energy supply options for electricity generations in Tanzania Baraka Kichonge, Geoffrey R John and Iddi S N Mkilaha 58 Options for the supply of electricity to rural homes in South Africa Noor Jamal 66 Determinants of energy poverty in South Africa Zaakirah Ismail and Patrick Khembo 79 An overview of refrigeration and its impact on the development in the Democratic Republic of Congo Jean Fulbert Ituna-Yudonago, J M Belman-Flores and V Pérez-García 90 Comparative bioelectricity generation from waste citrus fruit using a galvanic cell, fuel cell and microbial fuel cell Abdul Majeed Khan and Muhammad Obaid 100 The effect of an angle on the impact and flow quantity on output power of an impulse water wheel model Ram K Tyagi CONFERENCE PAPERS 105 Harnessing Nigeria’s abundant solar energy potential using the DESERTEC model Udochukwu B Akuru, Ogbonnaya
    [Show full text]
  • REIPPP Projects
    REIPPP Projects Window 1 Projects Net capacity Technology Project Location Technology Developer Contractor Status MW supplier Klipheuwel – Dassiefontein Group 5, Dassiesklip Wind Energy Facility Caledon, WC Wind 26,2 Sinovel Operational Wind Energy fFcility Iberdrola MetroWind Van Stadens Wind Port Elizabeth, EC Wind 26,2 MetroWind Sinovel Basil Read Operational Farm Hopefield Wind Farm Hopefield, WC Wind 65,4 Umoya Energy Vestas Vestas Operational Noblesfontein Noblesfontein, NC Wind 72,8 Coria (PKF) Investments 28 Vestas Vestas Operational Red Cap Kouga Wind Farm – Port Elizabeth, EC Wind 77,6 Red Cap Kouga Wind Farm Nordex Nordex Operational Oyster Bay Dorper Wind Farm Stormberg, EC Wind 97,0 Dorper Wind Farm Nordex Nordex Operational South Africa Mainstream Jeffreys Bay Jeffereys Bay, EC Wind 133,9 Siemens Siemens Operational Renewable Power Jeffreys Bay African Clean Energy Cookhouse Wind Farm Cookhouse, EC Wind 135,0 Suzlon Suzlon Operational Developments Khi Solar One Upington, NC Solar CSP 50,0 Khi Dolar One Consortium Abengoa Abengoa Construction KaXu Solar One Pofadder, NC Solar CSP 100,0 KaXu Solar One Consortium Abengoa Abengoa Operational SlimSun Swartland Solar Park Swartland, WC Solar PV 5,0 SlimSun BYD Solar Juwi, Hatch Operational RustMo1 Solar Farm Rustenburg, NWP Solar PV 6,8 RustMo1 Solar Farm BYD Solar Juwi Operational Mulilo Renewable Energy Solar De Aar, NC Solar PV 9,7 Gestamp Mulilo Consortium Trina Solar Gestamp, ABB Operational PV De Aar Konkoonsies Solar Pofadder, NC Solar PV 9,7 Limarco 77 BYD Solar Juwi Operational
    [Show full text]
  • Annual Performance Plan 2021-2022 to 2023-24
    ANNUAL PERFORMANCE PLAN (VOTE 41) FOR THE FISCAL YEARS 2021/22 TO 2023/24 Published by the Department of Water and Sanitation Private Bag X313 Pretoria 0001 South Africa Tel: +2712 336 7500 Fax: +2712 336 8664 This annual performance plan can be obtained from www.dws.gov.za 4 5 ANNUAL PERFORMANCE Plan (VOTE 41) FOR THE FISCAL YEARS 2021/22 TO 2023/24 Foreword by the Minister ...........................................................................................................................................................................i Message from the Deputy Minister .......................................................................................................................................................iii Overview of the Accounting Officer .......................................................................................................................................................v Official sign ...............................................................................................................................................................................................off vi List of abbreviations and acronyms ......................................................................................................................................................vii Strategic overview .................................................................................................................................................. 1 Strategy map of the DWS ...........................................................................................................................................................................1
    [Show full text]
  • Spatial Transformation: Are Intermediate Cities Different? South African Cities Network: Johannesburg
    CENTRE FOR DEVELOPMENT SUPPORT SENTRUM VIR ONTWIKKELINGSTEUN ACKNOWLEDGEMENTS Lead authors: Lochner Marais (University of the Free State) Danie Du Plessis (Stellenbosch University) Case study authors: Drakenstein: Ronnie Donaldson (Stellenbosch University) King Sabata Dalindyebo: Esethu Ndzamela (Nelson Mandela University) and Anton De Wit (Nelson Mandela University Lephalale: Kgosi Mocwagae (University of the Free State) Matjhabeng: Stuart Denoon-Stevens (University of the Free State) Mahikeng: Verna Nel (University of the Free State) and James Drummond (North West University) Mbombela: Maléne Campbell (University of the Free State) Msunduzi: Thuli Mphambukeli (University of the Free State) Polokwane: Gemey Abrahams (independent consultant) Rustenburg: John Ntema (University of South Africa) Sol Plaatje: Thomas Stewart (University of the Free State) Stellenbosch: Danie Du Plessis (Stellenbosch University) Manager: Geci Karuri-Sebina Editing by Write to the Point Design by Ink Design Photo Credits: Page 2: JDA/SACN Page 16: Edna Peres/SACN Pages 18, 45, 47, 57, 58: Steve Karallis/JDA/SACN Page 44: JDA/SACN Page 48: Tanya Zack/SACN Page 64: JDA/SACN Suggested citation: SACN. 2017. Spatial Transformation: Are Intermediate Cities Different? South African Cities Network: Johannesburg. Available online at www.sacities.net ISBN: 978-0-6399131-0-0 © 2017 by South African Cities Network. Spatial Transformation: Are Intermediate Cities Different? is made available under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by-nc-sa/4.0/. 2 SPATIAL TRANSFORMATION: ARE INTERMEDIATE CITIES DIFFERENT? Foreword As a network whose primary stakeholders are the largest cities, the South African Cities Network (SACN) typically focuses its activities on the “big” end of the urban spectrum (essentially, mainly the metropolitan municipalities).