DETAILED SECOND QUARTER 2017/18 PROGRESS REPORT No milestone for the quarter Over achieved Achieved Partially achieved Not achieved Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Programe1: Administration Departmental Management 4.3.1 Percentage compliance with MPAT standards PMU No milestone for the quarter n/a No milestone for the quarter No milestone for the quarter No milestone for the quarter No milestone for the at the minimum targeted level 3 quarter IT n/a • • • • n/a Legal Services n/a • • • • n/a HRM n/a • • • • n/a Internal Audit n/a • • • • n/a Risk Management n/a • • • • n/a Financial Accounting n/a • • • • n/a SCM n/a • • • • n/a Corporate Services 4.3.4 Percentage vacancy rate for engineers and ≤10% ≤10% n/a 114% filled over stablishment. (675 filled out of 114% filled over stablishment. (675 filled out of Over by 24% • 114% filled over stablishment. (675 filled out of 592 The Department appoint candidate n/a Over achieved PoE accepted scientists 592 posts). 592 posts). posts). engineers and scientists additional to Formula: establishment as per OSD. Formula: Formula: Formula: 114% - 90%=24% 675/592*100=114% 675/592*100=114% 675/592*100=114%
4.3.5 Percentage of SMS employees attending 100% 30% n/a 108% ( 10 in Q1 +79 in Q2 = 89) attended training 108% ( 10 in Q1 +79 in Q2 = 89) attended training Over by 8% (7) (please • 108% ( 10 in Q1 +79 in Q2 = 89) attended training Instead of 2 groups spread in Q3 and Q4 n/a Over achieved PoE accepted for the Report of SMS interventions identified through the DPSA interventions identified through DPSA interventions identified through DPSA provide the formula for the interventions identified through DPSA attending Financial management, one member who attended training competency assessment Competency assessment Competency assessment calculation.) Competency assessment bigger group of 41 sms was conducted. during Q2 Other training took place as per Formula: Formula: Formula: schedule.
89/82*100= 108% 89/82*100= 108% 89/82*100= 108% Formula:
Note: The 82 is the annual target set in the APP. Note: The 82 is the annual target set in the APP. 106% (89) – (82) 100% Note: The 82 is the annual target set in the APP. This target is accumulative. This target is accumulative. This target is accumulative.
PMU 4.4.1 Percentage of the Water and Sanitation 100% of the Water and Sanitation Sector 50% n/a 27% of occupations registered 27% of occupations registered 23% 23% 27% of occupations registered DHET OFO Task Team Qquarterly The remaining occupations submissions Partially achieved Poe accepted Sector Occupations (skills) registered with Occupations (skills) registered with OFO meeting was moved to October for the financial year will be wholly OFO adjudicated in October 2017
Communications 5.2.1 Annual assessment of the benefits derived Annual assessment of benefits derived No milestone for the quarter n/a 3 Stakeholder consultations: 3 Stakeholder consultations: • • 3 Stakeholder consultations: • • Poe accepted from partnership agreement instruments from partnership agreement instruments July: July: July: No milestone for the Life4U Consultation on Partnership TOR Life4U Consultation on Partnership TOR Life4U Consultation on Partnership TOR quarter Assesment. Assesment. Assesment. August: August: • • August: • • Poe accepted Johnson and Johnson Consultaion on the Johnson and Johnson Consultaion on the Johnson and Johnson Consultaion on the Partnership TOR. Partnership TOR. Partnership TOR. September: September: September: Poe accepted GIZ Consultation on Partnership Assesment GIZ Consultation on Partnership Assesment GIZ Consultation on Partnership Assesment September 2017 September 2017 September 2017
n/a 1 1 • • 1 • • Poe accepted Partnership instruments finalised Partnership instruments finalised Partnership instruments finalised September: September: September: Poe accepted MOU GIZ MOU GIZ MOU GIZ August: August: • • August: • • Poe accepted GIZ MoU consultation GIZ MoU consultation GIZ MoU consultation July: July: July: Poe accepted consultation of GIZ MoU consultation of GIZ MoU consultation of GIZ MoU
1 5.2.1 Annual assessment of the benefits derived Annual assessment of benefits derived from partnership agreement instruments from partnership agreement instruments
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
n/a 6 6 Programe1: Administration• • 6 • • Poe accepted Partnership meetings Partnership meetings Partnership meetings September September September Progress report against Water Sector Partnership Progress report against Water Sector Partnership • • Progress report against Water Sector Partnership • • Poe accepted: action plans action plans action plans July (1) July (1) July (1) Poe accepted Teleconference between WWF-SA & DWS Teleconference between WWF-SA & DWS • • Teleconference between WWF-SA & DWS • • Poe accepted
August (5) August (5) August (5) Poe accepted Collaboration meeting between DTI & BBBEE Collaboration meeting between DTI & BBBEE • • Collaboration meeting between DTI & BBBEE • • Poe accepted
DWS & COBRA DWS & COBRA DWS & COBRA Poe accepted Collaboration meeting betweenDWS&DTI Collaboration meeting betweenDWS&DTI • • Collaboration meeting betweenDWS&DTI • • Poe accepted
Collaboration meeting DWS women campaign Collaboration meeting DWS women campaign Collaboration meeting DWS women campaign Poe accepted
Collaboration meeting with sunlight Collaboration meeting with sunlight • • Collaboration meeting with sunlight • • Poe accepted 5.2.2 Annual assessment on the implementation of Annual assessment on the implementation Quarterly report on the implementation n/a Quarterly report on the implementation Quarterly report on the implementation • • Quarterly report on the implementation • Achieved Poe accepted the Annual Communications Programme of the Annual Communications Programme of the Annual Communications of the Annual Communications of the Annual Communications of the Annual Communications programme programme programme programme
1 Quarterly marketing and media report 1 Quarterly marketing and media report • • 1 Quarterly marketing and media report • • Poe accepted 12 media briefings 12 media briefings • • 12 media briefings More media briefings were done due to • Poe accepted for 12 issues in the environment
378 media products 378 media products • • 378 media products More media products done due to issues • PoE accepted in the environment
Opinion Pieces: 47 Opinion Pieces: 47 • • Opinion Pieces: 47 • • PoE accepted Sep:20 Sep:20 Sep:20 Aug: 14 Aug: 14 Aug: 14 July : 13 July : 13 July : 13
Statements:125 Statements:125 • • Statements:125 More statements done due to issues in • Poe accepted September:52 September:52 September:52 the environment August:33 August:33 August:33 July: 40 July: 40 July: 40 Internet articles Internet articles • • Internet articles • • PoE accepted September:24 September:24 September:24 August:17 August:17 August:17
July : 25 July : 25 July : 25 Media interviews Media interviews • • Media interviews • • PoE accepted September:21 September: 21 September: 21 August:32 August:32 August:32 July: 78 July: 78 July: 78 2 Key messages 2 Key messages • • 2 Key messages • • Poe accepted
1 marketing and advertising campaign 1 marketing and advertising campaign • • 1 marketing and advertising campaign • • Poe accepted 8 cabinet announcements 8 cabinet announcements 8 cabinet announcements • • Poe accepted
5 member statement 5 member statement • • 5 member statement More member statements were done to • Poe accepted keep members of Parliament informed of issues in the environment
2 DWS Corporate Publications produced 2 DWS Corporate Publications produced • • 2 DWS Corporate Publications produced • • Poe accepted
2 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
5.2.3 Assessment of impact of Annual assessment of impact of mediated No milestone No milestone No milestone Programe1: Administration• • No milestone • • No milestone 1.1.8 mediated interactions that will interactions that will deliver meaningful n/a 8 community engagements / PPP 8 community engagements / PPP • • 8 community engagements / PPP • • Poe accepted deliver meaningful engagements with engagements with communities Sept: 3 Sept: 3 Sept: 3 communities August:2 August:2 August:2
July: 3 July: 3 July: 3 n/a 20 targeted stakeholder engagements 20 targeted stakeholder engagements • • 20 targeted stakeholder engagements more meetings took place due to issues • Poe accepted in the environment Sept:8 Sept:8 Sept:8
August: 6 August: 6 August: 6
July: 6 July: 6 July: 6
n/a 3 special events 3 special events • • 3 special events • • Poe accepted Sept:1 Sept:1 Sept:1 August: 1 August: 1 August: 1 July: 1 July: 1 July: 1
n/a 19 project stakeholder engagement session 19 project stakeholder engagement session • • 18 project stakeholder engagement session • • Poe accepted Sept:9 Sept:9 Sept:8 August: 4 August: 4 August: 4 July: 6 July: 6 July: 6
n/a 10 Capacity building of forums 10 Capacity building of forums • • 10 Capacity building of forums Regions are reviewing and adding new • Poe accepted Sept :5 Sept :5 Sept :5 members which need to be capacitated August: 4 August: 4 August: 4 July: 1 July: 1 July: 1 n/a 40 issues management on water and 40 issues management on water and • • 15 issues management on water and sanitation Meetings are convened as an when there • Poe accepted sanitation forums and hotspots sanitation forums and hotspots forums and hotspots are issues to be addressed Sept: 16 Sept: 16 Sept: 6 Agust:12 Agust:12 Agust:5 July: 12 July: 12 July: 4
n/a 19 Forums involvement in DWS programmes 19 Forums involvement in DWS programmes • • 27 Forums involvement in DWS programmes in Forums have greater ability to participate • Poe accepted in all provinces in all provinces all provinces and organise activities after capacity Sept:3 Sept:3 Sept:4 building programmes August: 6 August: 6 August: 13 July : 10 July : 10 July : 10
Financial Management (Main Account)
3.3.1.1 Percentage of targeted procurement budget 15% 15% n/a 24.60% 24.60% Over by 9.60% Over by 9.60% 24.60% There are more QSE participating in the n/a Over achieved PoE accepted spent on qualifying small enterprises (QSE) procurement of the department
3.3.2.1 Percentage of targeted procurement budget 15% 15% n/a 40.06% 40.06% Over by 25.06% Over by 25.06% 40.06% There are more EME participating in the n/a Over achieved PoE accepted spent on exempted micro enterprises (EME) procurement of the department
4.3.2 Percentage expenditure on annual budget 100% 40% n/a 46% 46% Over by 6% Over by 6% 46% Unfiled funded vacant position and The department is currently filling critical Over achieved PoE accepted outstanding invoices across all vacant posts and the expenditure is programmes. expected to improve in the third quarter. All invoices related to goods and services to be processed as soon as they are received by the department.
Financial Management (Water Trading)
3.3.1.2 Percentage of targeted 15% 15% n/a 14% 14% Under by 1% Under by 1% 14% The implementation of the new PPR Targetted procurement of goods and Partially achieved PoE accepted procurement budget 2017 was still in progress during the services will be aligned with the new PPR spent on qualifying small month of May 2017 and the budget was 2017 which provides a platfom to target enterprises (QSE) resived which necessitate the review in the QSEs. the DMP for 2017/2018. 3.3.2.2 Percentage of targeted procurement budget 15% 15% n/a 48% 48% Over by 33% Over by 33% 48% The over achievement on EME target is • Over achieved PoE accepted spent on exempted micro enterprises (EME) as a result of the implementation of the Preferential Procurement Regulation 2017 where procurement of goods and services is through the quotations.
4.3.3 Number of debtor days 100 days 100 days n/a 98 days 98 days exceeded by 2 day 98 days The reason for over achievement of • Over achieved PoE accepted 2days can be attributed to the increase in revenue billed and amount impaired due to municipalities and Water Boards not servicing the accounts.
International Water Support 5.1.1 Number of analyses on progress against the 4 1 n/a 1 1 n/a n/a 1 • • Achieved PoE accepted approved annual International Relations Implementation Plan
3 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Programme 2: WaterPrograme1: Planning Administration and Information Management Integrated Planning 1.2.2 Integrated Water Quality Management Integrated Water Final Monitoring n/a Final Monitoring and Evaluation Final Monitoring and Evaluation • Final Monitoring and Evaluation n/a • Achieved Poe accepted for IWQM Strategy. Strategy Quality Management and Evaluation Framework Framework Framework implementation plan Framework developed
1.3.3 Number of hydroclimatic zones in 2 Concept notes and Vulnerability n/a Concept notes and Vulnerability Concept notes and Vulnerability • • Concept notes and Vulnerability n/a • Achieved Poe accepted which assessments for climate change • Zone 4, the Orange WMA Assessment methodology Assessment methodology Assessment methodology Assessment methodology vulnerability are completed • Zone 1 Northern Interior WMA developed for Zone 4 (Orange System) and developed for Zone 4 (Orange System) developed for Zone 4 (Orange System) developed for Zone 4 (Orange System) Zone 1 (Northern and Zone 1 (Northern Interior) and Zone 1 (Northern Interior) and Zone 1 (Northern Interior) Interior) 2.1.1 National Water and Sanitation master plan Draft National Water and Sanitation Master Discussion document for consultation in 5 n/a Discussion document for consultation in 9 water Discussion document for consultation in 9 water 4 Consultatons • Discussion document for consultation in 9 water Project shedule was reviewed due to the • Achieved Poe accepted (NWSMP) adopted (vi) Plan water management areas (i.e. Orange, management areas management areas management areas need to fast Breede-Gouritz, Berg-Olifants, Pongola-
2.2.1 Number of completed Record 3 No milestone No milestone • • No milestone • • No milestone of Implementation Decisions (RID) for bulk raw water planning projects Foxwood Dam Project No milestone No milestone No milestone • • No milestone • • Mokolo Crocodile (West) Comments and response report completed MOAs signed by DWS and negotiated with TCTA • • MOAs signed by DWS and negotiated with TCTA The report could not be finalised due to The MoAs have since been signed. Not achieved Poe accepted Water Augmentation for their agreement. for their agreement. delays in the signing of MoAs. Meeting was held with technical team to Project Phase 2A address technical issues of the projects and looking at possibilities to fastrack the project.
uMkhomazi Water Project No milestone No milestone • • No milestone • • No milestone Phase 1 Water Ecosystems 1.3.1 Number of river systems with 4 Not achieved Not achieved • • Not achieved Not achieved Not achieved water resources classes and determined resource quality objectives • Mvoti, Approval to gazette Water Resources Submission awaiting DG’s approval for the Submission on route for DG’s approval for the • • Submission on route for DG’s approval for the The knock-on effect of the delays on the The submission to gazette has been Not achieved Poe Accepted • Mzimkulu, Classes and RQOs. gazetting of the Water Resources Classes and gazette final legal notice . gazette final legal notice . translation to the local language has approved and the Water Resources RQOs. impacted on the planned gazetting Classes and RQOs will be gazetted. Draft legal notice gazetted for public milestone comments
• Crocodile (West)-Marico, Public comments addressed and Submission awaiting DG’s approval for the Submission on route for DG’s approval for the • • Submission on route for DG’s approval for the The addressing of comments (reported in Submission to request approval to revise Not achieved Poe Accepted • Mokolo & Matlabas comments register compiled. gazette final legal notice . gazette final legal notice . gazette final legal notice . Q1) on the draft RQOs took longer than the deliverables has been prepared for anticipated and this affected all planned Minister's approval deliverables after that.
Water Information Management 1.2.1 Adopted Water Monitoring Network Draft resourced Water Monitoring Network Stakeholder consultation in 5 Document on Stakeholder Consultations in 5 Document on Stakeholder Consultations in 5 • • Document on Stakeholder Consultations in 5 • • Achieved Poe Accepted Implementation plan implemented Implementation Plan WMAs WMAs WMAs WMAs
4 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Programe1:Water Information Administration Management (WTE) 1.3.2 Number of rivers in which the River Eco-status 71 63 Total =97 Total =97 Over by 34 Over by 53.96% Total =97 • • Over achieved Poe accepted for 97 River Monitoring Programme is implemented 65 APP& 32 ADD 65 APP& 32 ADD 65 APP& 32 ADD Monitored
Vaal (10) 10 Total: 14 Total: 14 • • Total: 14 • • 10 APP and 4 add 10 APP and 4 add 10 APP and 4 add Lower Vaal Lower Vaal Lower Vaal • • Lower Vaal • • Harts Harts Harts • • Harts • • Blesbokspruit Blesbokspruit Blesbokspruit • • Blesbokspruit • • Wilge Wilge Wilge • • Wilge • • Natalspruit Natalspruit Natalspruit • • Natalspruit • • Suikerbosrand Suikerbosrand Suikerbosrand • • Suikerbosrand • • Renoster Renoster Renoster • • Renoster • • Vals Vals Vals • • Vals • • Vet Vet Vet • • Vet • • Sand Sand Sand • • Sand • • • Klipriver Klipriver • • Klipriver • • Klipriver additional to the APP • Liebenbergvlei Liebenbergvlei • • Liebenbergvlei • • Liebenbergvlei additional to the APP • Taaibos Taaibos • • Taaibos • • Taaibos additional to the APP • Leeuspruit Leeuspruit • • Leeuspruit • • Leeuspruit additional to the APP Limpopo 7 Total: 9 Total: 9 • • Total: 9 • • North West (13) 7 APP and 2 add 7 APP and 2 add 7 APP and 2 add Nwanedi Nwanedi Nwanedi • • Nwanedi • • Nzhelele Nzhelele Nzhelele • • Nzhelele • • Lephalale Lephalale Lephalale • • Lephalale • • Crocodile Crocodile Crocodile • • Crocodile • • Groot Marico Groot Marico Groot Marico • • Groot Marico • • Molopo Molopo Molopo • • Molopo • • Magalies Magalies Magalies • • Magalies • • • Ngothwane Ngothwane • • Ngothwane • • Ngothwane additional to the APP • Elands Elands • • Elands • • Elands additional to the APP Orange (4) 4 4 4 • • 4 • • Caledon Caledon Caledon • • Caledon • • Modder Modder Modder • • Modder • • Riet Riet Riet • • Riet • • Orange Orange Orange • • Orange • • Mzimvubu-(25) 25 25 25 • • 25 • • Tsitsikamma Kowie Kowie Kowie • • Kowie • • Kromme Kromme Kromme • • Kromme • • Swartkops Swartkops Swartkops • • Swartkops • • Bloukrans Bloukrans Bloukrans • • Bloukrans • • Lottering Lottering Lottering • • Lottering • • Elands Elands Elands • • Elands • • Elandsbos Elandsbos Elandsbos • • Elandsbos • • Storms Storms Storms • • Storms • • Groot East Groot East Groot East • • Kouga/ • • Kouga/ Kouga/ Kouga/ • • Gamtoos • • Gamtoos Gamtoos Gamtoos • • • • Mthatha Mthatha Mthatha • • Mthatha • • Shixini Shixini Shixini • • Shixini • • Mngazi Mngazi Mngazi • • Mngazi • • Mngazana Mngazana Mngazana • • Mngazana • • Mnenu Mnenu Mnenu • • Mnenu • • Mzintlava Mzintlava Mzintlava • • Mzintlava • • Great kei Great kei Great kei • • Great kei • • Keiskamma Keiskamma Keiskamma • • Keiskamma • • Buffalo Buffalo Buffalo • • Buffalo • • Mbashe Mbashe Mbashe • • Mbashe • • Chalumna Chalumna Chalumna • • Chalumna • • Kwelera Kwelera Kwelera • • Kwelera • • Mzimvubu Mzimvubu Mzimvubu • • Mzimvubu • • Nahoon Nahoon Nahoon • • Nahoon • • Gonubie Gonubie Gonubie • • Gonubie • •
5 Number of rivers in which the River Eco-status Over achieved Monitoring Programme is implemented
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Berg- 2 Total: 12 Total: 12 Programe1: Administration• • Total: 12 • • Olifants (2) APP 2 and 10 additional APP 2 and 10 additional APP 2 and 10 additional Olifants-Doring Olifants-Doring Olifants-Doring • • Olifants-Doring • • Berg - Berg Berg • • Berg • • Letaba(10) Thabina Thabina • • Thabina • • Thabina additional to the APP Letsitele Letsitele • • Letsitele • • Letsitele additional to the APP Broederstroom Broederstroom • • Broederstroom • • Broederstroom additional to the APP Debegeni Debegeni • • Debegeni • • Debegeni additional to the APP Politsi Politsi • • Politsi • • Politsi additional to the APP Ga-Selati Ga-Selati • • Ga-Selati • • Ga-Selati additional to the APP Groot Letaba Groot Letaba • • Groot Letaba • • Groot Letaba additional to the APP Klein Letaba Klein Letaba • • Klein Letaba • • Klein Letaba additional to the APP Nsama Nsama • • Nsama • • Nsama additional to the APP Shingwedzi Shingwedzi • • Shingwedzi • • Shingwedzi additional to the APP Olifants Olifants (13 add) Elands-Olifants Elands-Olifants • • Elands-Olifants • • Elands-Olifants additional to the APP Klein Olifants Klein Olifants • • Klein Olifants • • Klein Olifants additional to the APP Bronkhorstpruit Bronkhorstpruit • • Bronkhorstpruit • • Bronkhorstpruit additional to the APP Wilge Wilge • • Wilge • • Wilge additional to the APP Steelpoort Steelpoort • • Steelpoort • • Steelpoort additional to the APP Kranspoort Kranspoort • • Kranspoort • • Kranspoort additional to the APP Waterval Waterval • • Waterval • • Waterval additional to the APP Olifants Olifants • • Olifants • • Olifants additional to the APP Mohlapitse Mohlapitse • • Mohlapitse • • Mohlapitse additional to the APP Blyde Blyde • • Blyde • • Blyde additional to the APP Sterkspruit Sterkspruit • • Sterkspruit • • Sterkspruit additional to the APP Spekboom Spekboom • • Spekboom • • Spekboom additional to the APP Selons Selons • • Selons • • Phongola- 16 Total: 30 Total: 30 • • Total: 30 • • Mzimkhulu (16) 16 (APP) & 14 ADD 16 (APP) & 14 ADD 16 (APP) & 14 ADD Mngeni Mngeni Mngeni • • Mngeni • • Mlazi Mlazi Mlazi • • Mlazi • • Matigulu Matigulu Matigulu • • Matigulu • • Mfolozi Mfolozi Mfolozi • • Mfolozi • • Mhlathuze Mhlathuze Mhlathuze • • Mhlathuze • • Thukela Thukela Thukela • • Thukela • • Mkhuze Mkhuze Mkhuze • • Mkhuze • • Mdloti Mdloti Mdloti • • Mdloti • • Mkhomazi Mkhomazi Mkhomazi • • Mkhomazi • • Mzimkhulu Mzimkhulu Mzimkhulu • • Mzimkhulu • • Phongola Phongola Phongola • • Phongola • • Hluhluwe Hluhluwe Hluhluwe • • Hluhluwe • • Mvoti Mvoti Mvoti • • Mvoti • • Thongathi Thongathi Thongathi • • Thongathi • • Lovu Lovu Lovu • • Lovu • • Mtamvuma Mtamvuma Mtamvuma • • Mtamvuma • • - Bivane Bivane • • Bivane • • Bivane is the additional to the APP - Black Mfolozi Black Mfolozi • • Black Mfolozi • • Black Mfolozi is the additional to the APP - White Mfolozi White Mfolozi • • White Mfolozi • • White Mfolozi is the additional to the APP - Slang Slang • • Slang • • Slang is the additional to the APP - Ncandu Ncandu • • Ncandu • • Ncandu is the additional to the APP - Sandspruit Sandspruit • • Sandspruit • • Sandspruit is the additional to the APP - Buffalo Buffalo • • Buffalo • • Buffalo is the additional to the APP - Bushmans Bushmans • • Bushmans • • Bushmans is the additional to the APP - Unspecified Mooi Unspecified Mooi • • Unspecified Mooi • • Unspecified Mooi is the additional to the APP - Mooi Mooi • • Mooi • • Mooi is the additional to the APP - Umsunduzi Umsunduzi • • Umsunduzi • • Umsunduzi is the additional to the APP - Nkhomazana Nkhomazana • • Nkhomazana • • Nkhomazana is the additional to the APP
6 Number of rivers in which the River Eco-status Over achieved Monitoring Programme is implemented
Phongola- Mzimkhulu (16)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
- Mkomzi MkomziPrograme1: Administration• • Mkomzi • • Mkomzi is the additional to the APP - Mafadobo Mafadobo • • Mafadobo • • Mafadobo is the additional to the APP Olifants (1) 1 Total: 3 Total: 3 • • Total: 3 • • (Gauteng-Mpumalanga) 1 APP & 2 ADD 1 APP & 2 ADD 1 APP & 2 ADD Olifants Olifants Olifants • • Olifants • • - Bronkhorstspruit Bronkhorstspruit • • Bronkhorstspruit • • Bronkhorstspruit is the additional to the APP - Elands Elands • • Elands • • Elands additional to the APP Water Services and Local Water Management 1.4.1 Number of large water supply systems 8 Water Balance Data n/a Water Balance Data Water Balance Data • • Water Balance Data - • Achieved Poe accepted assessed for water losses • Vaal River, and information and information and information and information • Umgeni River, collection within the collection within the collection within the collection within the • Crocodile West River, 8 large water supply 8 large water supply 8 large water supply 8 large water supply • Olifants River, systems systems systems systems • Algoa, • Amatole, • Bloemfontein and • Western Cape Supply Systems 2.1.2 Number of district municipalities (DMs) with 17 DMs Situational n/a Outstanding: Programme for the development of Not achieved Situational • Not achieved Outstanding: Programme for the The Branch will re-allocate budget for this not achieved Poe accepted completed 5 year water and sanitation assessments for 17 17 Reliability Implementation Master Plans could assessments for 17 development of 17 Reliability activity during the budget adjusment services master plans DMs developed not start due to funding shorfall. The DMs developed Implementation Master Plans could not establishment of five Working Stream Committees start due to funding shorfall. The in each DM could not start due to funding shortfall establishment of five Working Stream Committees in each DM could not start due to funding shortfall and National Treasury was approached for additional funding which was not approved.
Amajuba • • • • • • • • • uThungulu • • • • • • • • • uMgungundlovu • • • • • • • • • Joe Gqabi • • • • • • • • • Alfred Nzo • • • • • • • • • Ngaka Modiri Molema • • • • • • • • • Mopani • • • • • • • • • West Rand • • • • • • • • • iLembe • • • • • • • • • Ugu • • • • • • • • • uThukela • • • • • • • • • Zululand • • • • • • • • • Chris Hani • • • • • • • • • Capricorn • • • • • • • • • Waterberg • • • • • • • • • Dr Ruth Segomotsi Mompati • • • • • • • • •
Sisonke • • • • • • • • • 2.1.3 Number of Water 47 WSAs audited Situational n/a Not achieved Achieved • • Achieved • • Achieved PoE accepted Services Authorities assessment of macro (WSAs) audited on delivery performance Water and Sanitation confirmed delivery performance Mier LM • • • • • • • • • !Kai! Garib LM • • • • • • • • • //Khara Hais LM • • • • • • • • • !Kheis LM • • • • • • • • • Tsantsabane LM • • • • • • • • • Kgatelopele LM • • • • • • • • • Sol Plaatjie LM • • • • • • • • • Dikgatlong LM • • • • • • • • • Magareng LM • • • • • • • • • Phokwane LM • • • • • • • • • Matzikama LM • • • • • • • • • Cederberg LM • • • • • • • • • Lephalale LM • • • • • • • • • Mogalakwena LM • • • • • • • • • Thabazimbi LM • • • • • • • • • Modimolle LM • • • • • • • • • Bela-Bela LM • • • • • • • • • Ventersdorp LM • • • • • • • • • Potchefstroom LM • • • • • • • • • Matlosana LM • • • • • • • • • Maquassi Hills LM • • • • • • • • • Maquassi Hills LM • • • • • • • • • Richtersveld LM • • • • • • • • • Bergrivier LM • • • • • • • • • Mogale City LM • • • • • • • • • Rand West City • • • • • • • • • Merafong City LM • • • • • • • • • Nokeng tsa Taemane LM • • • • • • • • • Kungwini LM • • • • • • • • • Emfuleni LM • • • • • • • • • Midvaal LM • • • • • • • • • Lesedi LM • • • • • • • • • The Msunduzi LM • • • • • • • • • Newcastle LM • • • • • • • • • uMhlathuze LM • • • • • • • • • Camdeboo LM • • • • • • • • • Blue Crane Route LM • • • • • • • • • Ikwezi LM • • • • • • • • • Makana LM • • • • • • • • • Ndlambe LM • • • • • • • • • Sunday’s River Valley LM • • • • • • • • • Baviaans LM • • • • • • • • •
7 2.1.3 Number of Water Achieved Services Authorities (WSAs) audited on Water and Sanitation delivery performance
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Kouga LM • • • Programe1:• Administration• • • • • Kou-Kamma LM • • • • • • • • • Buffalo City LM • • • • • • • • • Mangaung LM • • • • • • • • • Mantsopa LM • • • • • • • • • • • • • • • • • • 2.2.2 Number of completed feasibility studies for 22 Process to initiate feasibility studies n/a Not achieved 3 • • 3 • • Achieved Poe accepted water and wastewater services projects finalized (i.e. provincial interaction Provincial interactions was achieved in Q1 and 1 Provincial interactions was achieved in Q1 and 1 (RBIG) sessions) carried over from previous FY and 2 planned carried over from previous FY and 2 planned Implementation studies have been completed Implementation studies have been completed
Mantsopa bulk sewer • • • • • • • • (Ladybrand) Spioenkop to Ladysmith BWS • • • • • • • • •
Greater Bulwer Donnybrook • • • • • • • • • Water Scheme Phase 2
Lephalale - Bulk Water • • • • • • • • • Augmentation Northern Nsikazi • • • Northern Nsikazi • • Northern Nsikazi • •
Kakamas Wastewater • • • • • • • • • treatment works Coffee Bay Water Treatment • • • • • • • • • Works Matjhabeng Bulk • • • • • • • • • sewer(Welkom) Masilonyana Bulk sewer • • • • • • • • • (Brandfort and Winburg) Ngagane Bulk Water Supply • • • • • • • • •
Provincial High Catalytic • • • • • • • • • Projects - Mutash Hub Msukaligwa regional water • • • • • • • • • supply scheme (Phase 3) Balfour WWTW • • • • • • • • •
Kinira Regional BWSS • • • • • • • • •
Belmont WWTW • • • • • • • • •
Ntabankulu Bulk Water Supply • • • • • • • • •
Mkemane Regional Bulk WSS • • • • • • • • •
Reitz Upgrading WWTP • • • • • • • • •
Mandlakazi BWS Phase 5 • • • • • • • • •
Cunningmore to Newington • • • Cunningmore to Newington • • Cunningmore to Newington • • BWS BWS BWS Britstown Oxidation Ponds • • • • • • • • •
Syferfontein • • • • • • • • •
Driefontein BWS Phase Driefontein BWS Phase 2 Carry over Driefontein BWS Phase 2 Carry over 2 Carry over from from previous FY from previous FY previous FY 2.2.3 Number of completed 25 Process to initiate implementation readiness n/a Not achieved Achieved: Provincial interactions was achieved in • • Achieved: Provincial interactions was achieved in • • Achieved Poe accepted implementation studies finalized (i.e. provincial interaction Q1 and 1 carried over and 5 planned Q1 and 1 carried over and 5 planned readiness studies for sessions) Implementation studies have been completed Implementation studies have been completed water and wastewater services projects Greater Mpofana Phase 1-3 • • • Greater Mpofana Phase 1-3 • • Greater Mpofana Phase 1-3 • • (RBIG) Spioenkop to Ladysmith BWS • • • Driefontein BWS Phase 2 • • Driefontein BWS Phase 2 • •
Empuluzi and Methula Bulk • • • Empuluzi and Methula Bulk • • Empuluzi and Methula Bulk • • water scheme water scheme water scheme Trompsburg bulk sewer • • • • • • • • • Mantsopa bulk sewer • • • • • • • • • (Ladybrand) Sedibeng Bulk Regional • • • • • • • • • Sewerage Scheme Nzhelele Valley Bulk Water • • • • • • • • • Supply Matoks Regional Water • • • • • • • • • Scheme Eerstehoek/Ekulindeni Bulk • • • • • • • • • Water Supply Northern Nsikazi • • • Northern Nsikazi • • Northern Nsikazi • • Greater Bulwer Donnybrook • • • • • • • • • Water Scheme Phase 2
Provincial High Catalytic • • • • • • • • • Projects - Mutash Hub Lephalale - Bulk Water • • • • • • • • • Augmentation Balfour WWTW • • • • • • • • • Kathu Bulk Water Supply • • • • • • • • • Kakamas Wastewater • • • • • • • • • treatment works
8 2.2.3 Number of completed Achieved implementation readiness studies for water and wastewater services projects (RBIG)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Kagisano Molopo Bulk Water • • • KagisanoPrograme1: Molopo Bulk Water Administration • • Kagisano Molopo Bulk Water • • Supply Supply Supply Chris Hani DM Cluster 7 • • • • • • • • • Cookhouse WWTW • • • • • • • • • Ngqamakhwe Bulk Water • • • • • • • • • Supply Syferfontein • • • • • • • • • Mandlakazi BWS Phase 5 • • • Mandlakazi BWS Phase 5 • • Mandlakazi BWS Phase 5 • • Ngagane Bulk Water Supply • • • • • • • • •
Britstown Oxidation Ponds • • • • • • • • •
Calitzdorp Waste Water • • • • • • • • • Treatment Works Sanitation Planning and Management 2.1.4 Number of WSAs 127 WSAs 39 WSAs assessed not achieved 32 under by 7 Under by 17.94% 32 Municipalities (i.e. City of Johannesburg To be fastracked Pattially achieved Poe submitted assessed for socioeconomic Metropolitan, City of Tshwane impact Metropolitan, Ekurhuleni Metropolitan, Emfuleni, Lesedi, Midvaal) delayed to confirm inception meetings
uThukela: The WSA cancelled the training July (13 WSAs) July (13 WSAs) • • • • • • • • Mopani • Mopani • • • Mopani • • • • Polokwane • Polokwane • • Polokwane • • • Polokwane • • Sekhukhune • Sekhukhune • • • • • • • Thabazimbi • Thabazimbi • • Thabazimbi • • • Thabazimbi • • Vhembe • Vhembe • • Vhembe • • • Vhembe • • City of Johannesburg • City of Johannesburg • • • • City of • • • • Metropolitan Metropolitan Johannesburg Metropolitan City of Tshwane Metropolitan • City of Tshwane Metropolitan • • • • City of Tshwane • • • • Metropolitan
Ekurhuleni Metropolitan • Ekurhuleni Metropolitan • • • • Ekurhuleni • • • • Metropolitan Emfuleni • Emfuleni • • • • Emfuleni • • • • • Lesedi • Lesedi • • • • Lesedi • • • • • Midvaal • Midvaal • • • • Midvaal • • • • • Alfred Nzo • Alfred Nzo • • • Alfred Nzo • • • Alfred Nzo • • • Amathole • Amathole • • • Amathole • • • Amathole • • August (13 WSAs) August (13 WSAs) • • • • • • • • • Blue Crane Route • Blue Crane Route • • • Blue Crane Route • • • Blue Crane Route • • • Buffalo City • Buffalo City • • • Buffalo City • • • Buffalo City • • Metropolitan Metropolitan • • Metropolitan • • Metropolitan • • • Camdeboo • Camdeboo • • • • Camdeboo • • • • • Chris Hani • Chris Hani • • • Chris Hani • • • Chris Hani • • • Joe Gqabi • Joe Gqabi • • • Joe Gqabi • • • Joe Gqabi • • • Kouga • Kouga • • • Kouga • • • Kouga • • • Kou-Kamma • Kou-Kamma • • • Kou-Kamma • • • Kou-Kamma • • • Makana • Makana • • • Makana • • • Makana • • • Ndlambe • Ndlambe • • • Ndlambe • • • Ndlambe • • • Nelson Mandela Bay • Nelson Mandela Bay • • • Nelson Mandela Bay • • • Nelson Mandela Bay • • Metropolitan Metropolitan • • Metropolitan • • Metropolitan • • • O.R. Tambo • O.R. Tambo • • • O.R. Tambo • • • O.R. Tambo • • • Sundays River Valley • Sundays River Valley • • • Sundays River Valley • • • Sundays River Valley • • • Amajuba • Amajuba • • • Amajuba • • • Amajuba • • September 13 WSAs September 13 WSAs • • • • • • • • • eThekwini Metropolitan • eThekwini Metropolitan • • • eThekwini Metropolitan • • • eThekwini Metropolitan • • • iLembe • iLembe • • • iLembe • • • iLembe • • • Newcastle • Newcastle • • • Newcastle • • • Newcastle • • • Harry Gwala (Sisonke) • Harry Gwala (Sisonke) • • • Harry Gwala (Sisonke) • • • Harry Gwala (Sisonke) • • • The Msunduzi • The Msunduzi • • • The Msunduzi • • • The Msunduzi • • • Ugu • Ugu • • • Ugu • • • Ugu • • • UMgungundlovu • UMgungundlovu • • • • UMgungundlovu • • • •
• uMhlathuze • uMhlathuze • • • uMhlathuze • • • uMhlathuze • • • Umkhanyakude • Umkhanyakude • • • Umkhanyakude • • • Umkhanyakude • • • Umzinyathi • Umzinyathi • • • Umzinyathi • • • Umzinyathi • • • Uthukela • Uthukela • • • Uthukela • • • • King Cetshwayo • King Cetshwayo • • • King Cetshwayo • • • King Cetshwayo • • (Uthungulu) (Uthungulu) • • (Uthungulu) • • (Uthungulu) • • • Zululand • Zululand • • • Zululand • • • Zululand Bela Bela Bela Bela Bela Bela Bela Bela carried over from QR1
Capricon Capricon Capricon Capricon Carried over from QR1
Dr Beyers Naude Dr Beyers Naude Dr Beyers Naude Dr Beyers Naude carried over from QR1 Lephalale Lephalale Lephalale • • Lephalale carried over from QR1
Policy and Strategy 4.1.1 Approved National Water and Sanitation Draft National Water Resources and Draft 1 NWSRSS-1 framework stakeholder • Draft Document produced; stakeholder Draft Document produced; stakeholder • • Draft Document produced; stakeholder • • Achieved PoE accepted Resources and Services Strategy (NWSRSS) Services Strategy Framework completed consultation consultation done consultation done consultation done and implementation plan 4.1.2 Revised water and sanitation norms and Approved norms and standards Public consultation finalised and comments • Consultations still continuing, comments still to be Consultations still continuing, comments still to be • • Consultations still continuing, comments still to be • • Achieved PoE accepted standards for all water and sanitation supply consolidated consolidated since extension has been requested consolidated since extension has been requested consolidated since extension has been requested and services
9 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Programme Programe1:3: Water Infrastructure Administration Devevelopment Strategic Infrastructure Development and Management 2.3.1 Number of bulk raw water projects ready for 5 implementation Tzaneen Tender for spillway raising advertised • Tender documents for spillway raising have been Tender documents for spillway raising have been • • Tender documents for spillway raising have been Tender cannot be advertised due to Fast track the submission requesting Not achieved PoE accepted finalised finalised finalised budget constraints. The approved 3 year approval to advertise all tenders and the MTEF budget issued for the project in award be subject to availability funds. 2017/18 was insufficient to go into Submission requesting the advertisement construction. The budget approved was of the tender was signed on 28 R40million and the project construction September 2017. cost is estimated at R322million over a A further submission requesting the period of 18 months. National Treasury advertisement of all tenders and Regulations now stipulates that no subsequent award being subject to tenders can be advertised without availability of funds was done and confirmation of budget for the entire awaiting approval in order to expedite the project. situation. Budget bid submitted to National Treasury for funding in 2018/19 MTEF.
Clanwilliam Tender awarded • Not achieved Not achieved • • Not achieved The approved 3 year MTEF budget Bid Evaluation Committee to convene in Not achieved PoE accepted issued for the project in 2017/18 was the third week of October 2017. Tender insufficient to go into construction. The validity extended to 31 December 2017. budget approved was R13million and the The tender validity was extended to 31 project construction cost is estimated at December 2017. It is anticipated that the R2.2billion over a period of 5 years. evaluation will commence and be finalised National Treasury Regulations now before this period. Appointment to be stipulates that no tenders can be made subject to the availability of funding advertised /awarded without confirmation on the project. Budget bid submitted to of budget for the entire project. National Treasury for funding in 2018/19 MTEF.
Nwamitwa Detailed dam engineering design • Detailed dam engineering design completed Detailed dam engineering design completed • • Detailed dam engineering design completed • • Achieved PoE accepted for Nwamitwa completed Progress Report and Nwamitwa Tender Design Report (Combined)
Mzimvubu No milestone • No milestone No milestone • • No milestone No milestone Detail design for Ntabelanga WTW • Detail design for Ntabelanga WTW is 90% Detail design for Ntabelanga WTW is 90% • • Detail design for Ntabelanga WTW is 90% The completion of the detailed design is Fast track the completion of the Not achieved PoE accepted for Mzimvubu completed complete complete complete pending the results of additional geotechnical investigations so that the Progress Report geotechnical investigations completion of the designs is achieved. A Variation Order has been approved via the existing Professional Service provider contract to facilitate the additional geotechnical investigations.
ORWRDP 2E, 2F Tender design continues • Review of designs by DWS: Engineering Services Review of designs by DWS: Engineering Services • • Review of designs by DWS: Engineering Services • • Achieved PoE accepted for ORWRDP 2DEF continues continues continues Monthly Progress Report
2.3.2 Number of bulk raw water projects under 4 construction Tzaneen Demolishing works on spill way • Demolition work on spillway is 50% complete Demolition work on spillway is 50% complete • • Demolition work on spillway is 50% complete Slow breakage rate due existing spillway Explosives demolition methods (blasting) Not achieved PoE accepted for Demolition completed concrete strength being higher than are being used to speed up the demolition Contract Progress Report expected work. The revised approved project completion date is 30 November 2017.
Clanwilliam No milestone • No milestone No milestone • • No milestone • • No milestone
Hazelmere PKW keys • The PKW outlet slabs and upstream walls are The PKW outlet slabs and upstream walls are • • The PKW outlet slabs and upstream walls are • • Achieved PoE accepted forHazelmere completed complete. complete. complete. Contractor Progress Report and Hazelmere PSP Progress Report
Operational anchors completed • Operational anchors Operational anchors • • Operational anchors completed • • PoE accepted forHazelmere completed completed Contractor Progress Report and Hazelmere PSP Progress Report
Grout curtain installation • Grout curtain installation completed Grout curtain installation completed • • Grout curtain installation completed • • PoE accepted forHazelmere completed Contractor Progress Report and Hazelmere PSP Progress Report
ORWRDP 2D Site establishment completed • Not achieved Not achieved • • Not achieved Site Establishment cannot commence Budget bid submitted to National Treasury Not achieved PoE accepted for ORWRDP 2DEF due to budget cuts. for funding in 2018/19 MTEF. Evaluation Monthly Progress Report and a is done and the tender was awarded submission subject to funds on the project being made available. Once funding is available on the project, construction will commence in line with the conditions of the appointment of contractor.
2.3.3 Number of bulk raw water projects completed 1 No milestone • No Milestone No Milestone • • No Milestone • • No milestone (Hazelmere)
10 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
3.4.1 Number of job opportunities created through 2800 600 • 157 157 Programe1: Administration• Under by 73.83% 157 Construction on ORWRDP 2D not None Not achieved PoE accepted for 137 jobs for implementing augmentation infrastructure commenced therefore there was no job (Target will not be met due to budgetary Hazelmere PoE accepted projects creation occurring on the project. constraints) for 20 jobs for Tzaneen However, 137 jobs created on Hazelmere Once funding is available on the Dam and 20 job created on Tzaneen ORWRDP 2D project, construction will Dam demolishing contract. commence which will result in an increase in job creation. However, it should be noted that the overall target will not be achieved as a result of the non- commencement and unavailability of funds to date on ORWRDP 2D.
Operations of Water Resources
2.4.1 Number of dam safety rehabilitation projects Roodekoppies 60% completion • 89% completion 89% completion Over by 29% Over by 29% 89% completion Insufficient budget delayed the Budget has been confirmed and the Over achieved PoE accepted for Roodekoppies for completed Dam procurement of crasher material Contractor will fast track the finalisation July 2017, August 2017 and for the procurement of material. September 2017 progress reports
2.4.2 Percentage of projects completed as per AMP 90% 25% • 18% (72/390)(inclusive of 45 for Q2) projects 18% (72/390)(inclusive of 45 for Q2) projects • • 18% (72/390)(inclusive of 45 for Q2) projects The budget was approved end of June Fast track Maintenance plan Partially achieved PoE accepted for AMP aligned maintenance Plan (Planned completed thus far: 1. Goudrtrouw completed thus far: 1. Goudrtrouw completed thus far: 1. Goudrtrouw 2017 due to negotiations with the implementation following late budget Maintainance Plans. Maintenance) Dam: Service Lift Monthly Dam: Service Lift Monthly 2. Pongola Dam: Service Lift Monthly 2. Pongola National Treasury as a result of the allocation to cover for lost time. 2. Pongola River(Lavumisa Pump Station): River(Lavumisa Pump Station): Transformer Oil River(Lavumisa Pump Station): Transformer Oil overdraft. Late allocation of budget, Increase resources through the extension Transformer Oil Samplings 3. Samplings 3. Hluhluwe Dam: Samplings 3. Hluhluwe Dam: meant that maintenance plan of the term contract in Central Operations. Hluhluwe Dam: Transformer Oil Samplings Transformer Oil Samplings 4. Klipfontein Dam: Transformer Oil Samplings 4. Klipfontein Dam: implementation was delayed by 3 4. Klipfontein Dam: Transformer Oil Samplings Transformer Oil Samplings Transformer Oil Samplings months. 5. Mhlathuze River GWS (Goedertrouw Dam): 5. Mhlathuze River GWS (Goedertrouw Dam): 5. Mhlathuze River GWS (Goedertrouw Dam): Transformer Oil Samplings Transformer Oil Samplings Transformer Oil Samplings 6. Midmar Dam: Water Supply to the newly 6. Midmar Dam: Water Supply to the newly 6. Midmar Dam: Water Supply to the newly constructed guard house/hut on the left bank constructed guard house/hut on the left bank 7. constructed guard house/hut on the left bank 7. 7. Bushmans GWS(Wagendrift Dam): Roof Bushmans GWS(Wagendrift Dam): Roof stripped Bushmans GWS(Wagendrift Dam): Roof stripped stripped and assesed, 8. and assesed, 8. and assesed, 8. agendrift Dam: House needed to be tiled with agendrift Dam: House needed to be tiled with agendrift Dam: House needed to be tiled with ceramic tiles in the kitchen, passage, bathroom ceramic tiles in the kitchen, passage, bathroom ceramic tiles in the kitchen, passage, bathroom and lounge and the bedroom needed carpet tiles and lounge and the bedroom needed carpet tiles and lounge and the bedroom needed carpet tiles to be installed 9. to be installed 9. to be installed 9. Wagendrift Dam: Houses 6, 7 &8 shower door Wagendrift Dam: Houses 6, 7 &8 shower door Wagendrift Dam: Houses 6, 7 &8 shower door and and toilet seats to be replaced, broken windows to and toilet seats to be replaced, broken windows to toilet seats to be replaced, broken windows to be be replaced, damaged floor tiles need to be be replaced, damaged floor tiles need to be replaced, damaged floor tiles need to be replaced. replaced. Two damaged garage doors to be replaced. Two damaged garage doors to be Two damaged garage doors to be replaced replaced 10. replaced 10. 10. Craigieburn Dam: Fencing of wo water Craigieburn Dam: Fencing of wo water reservoirs Craigieburn Dam: Fencing of wo water reservoirs reservoirs at Craigieburn Dam 11. at Craigieburn Dam 11. at Craigieburn Dam 11. Craigieburn Dam: Fencing of wo water reservoirs Craigieburn Dam: Fencing of wo water reservoirs Craigieburn Dam: Fencing of wo water reservoirs at Craigieburn Dam 12. Midmar at Craigieburn Dam 12. Midmar at Craigieburn Dam 12. Midmar Dam: Supply and delivery of water Dam: Supply and delivery of water Dam: Supply and delivery of water storage/conservancy tanks, tam to assist with storage/conservancy tanks, tam to assist with storage/conservancy tanks, tam to assist with excavation and location ot tank excavation and location ot tank excavation and location ot tank 13. ,Craigieburn Dam: Replace water pipe system 13. ,Craigieburn Dam: Replace water pipe system 13. ,Craigieburn Dam: Replace water pipe system Area A and Area B 14. Area A and Area B 14. Area A and Area B 14. Midmar Dam: Midmar Office - TSS building: Midmar Dam: Midmar Office - TSS building: Midmar Dam: Midmar Office - TSS building: Ceiling and other leaks. Install shelves and Ceiling and other leaks. Install shelves and Ceiling and other leaks. Install shelves and cupboards. Geyser to be installed. Toilet cupboards. Geyser to be installed. Toilet cupboards. Geyser to be installed. Toilet accessories to be installed. Carpots and access accessories to be installed. Carpots and access accessories to be installed. Carpots and access 15. Pongolapoort Dam: Additional Cost 15. Pongolapoort Dam: Additional Cost 15. Pongolapoort Dam: Additional Cost 16. ,Qamata/Lanti: Clearing of unwanted 16. ,Qamata/Lanti: Clearing of unwanted 16. ,Qamata/Lanti: Clearing of unwanted vegetation at Lay Dam B1 and C2 clearing of vegetation at Lay Dam B1 and C2 clearing of vegetation at Lay Dam B1 and C2 clearing of blocked mainholes at Lanti Weir blocked mainholes at Lanti Weir blocked mainholes at Lanti Weir 17. Glebrock Dam: Clearing of drainage system. 17. Glebrock Dam: Clearing of drainage system. 17. Glebrock Dam: Clearing of drainage system. Clearing of unwanted vegetation along th dam wall Clearing of unwanted vegetation along th dam wall Clearing of unwanted vegetation along th dam wall 18. Corona Dam: Clearing of furrow drains at 18. Corona Dam: Clearing of furrow drains at 18. Corona Dam: Clearing of furrow drains at dam wall. Killing of ants and termites activities dam wall. Killing of ants and termites activities dam wall. Killing of ants and termites activities along the dam wall area 19. along the dam wall area 19. along the dam wall area 19. Gcuwa Dam: herbicide spraying of unwanted Gcuwa Dam: herbicide spraying of unwanted Gcuwa Dam: herbicide spraying of unwanted vegetation along the dam wall 20. Fish vegetation along the dam wall 20. Fish vegetation along the dam wall 20. Fish Sundays( Teebus0: Grading of roads 2.4KM Sundays( Teebus0: Grading of roads 2.4KM Sundays( Teebus0: Grading of roads 2.4KM 21.Beervlei Dam: Clearing of vegetation at 21.Beervlei Dam: Clearing of vegetation at 21.Beervlei Dam: Clearing of vegetation at Beervlei Dam Beervlei Dam Beervlei Dam 22. Darlington Dam: Clearing of vegetation 22. Darlington Dam: Clearing of vegetation 22. Darlington Dam: Clearing of vegetation downstream toe area downstream toe area downstream toe area 23. Elandsdrift Dam: Clearing of vegetation on 23. Elandsdrift Dam: Clearing of vegetation on 23. Elandsdrift Dam: Clearing of vegetation on canal from Elandsdrift Dam to Tunnel canal from Elandsdrift Dam to Tunnel canal from Elandsdrift Dam to Tunnel 24. Uitkeer Sludge Ponds and WTW: Clearing of 24. Uitkeer Sludge Ponds and WTW: Clearing of 24. Uitkeer Sludge Ponds and WTW: Clearing of vegetation at Uitkeer sludge ponds and WTW 25. vegetation at Uitkeer sludge ponds and WTW 25. vegetation at Uitkeer sludge ponds and WTW 25. Brandvlei Main dam wall: Rebuil toe-drain Brandvlei Main dam wall: Rebuil toe-drain Brandvlei Main dam wall: Rebuil toe-drain measuring structure with outlet pipe measuring structure with outlet pipe measuring structure with outlet pipe 26.Miertjieskraal: Replace broken pipe section on 26.Miertjieskraal: Replace broken pipe section on 26.Miertjieskraal: Replace broken pipe section on right bank outlet 27. right bank outlet 27. right bank outlet 27. Albasini Dam: Replacement of Generator Albasini Dam: Replacement of Generator Albasini Dam: Replacement of Generator 28.Boschkop – Upgrading of the server at 28.Boschkop – Upgrading of the server at 28.Boschkop – Upgrading of the server at VRESAP VRESAP VRESAP 29. Boschkop - Replace gate motors at Boschkop 29. Boschkop - Replace gate motors at Boschkop 29. Boschkop - Replace gate motors at Boschkop pumpstation 30 pumpstation 30 pumpstation 30 Rietfontein - Replace gate motors at Rietfontein Rietfontein - Replace gate motors at Rietfontein Rietfontein - Replace gate motors at Rietfontein pumpstation 31. pumpstation 31. pumpstation 31. Grootdraai - Replace gate motors at Grootdraai Grootdraai - Replace gate motors at Grootdraai Grootdraai - Replace gate motors at Grootdraai pumpstation 32. pumpstation 32. pumpstation 32. Boschkop - Replace gate motors at Boschkop Boschkop - Replace gate motors at Boschkop Boschkop - Replace gate motors at Boschkop pumpstation 33. pumpstation 33. pumpstation 33. Zaaihoek - Replace gate motors at Zaaihoek Zaaihoek - Replace gate motors at Zaaihoek Zaaihoek - Replace gate motors at Zaaihoek pumpstation 34. pumpstation 34. pumpstation 34. Rietfontein / KWSAP - Repairs, replacement and Rietfontein / KWSAP - Repairs, replacement and Rietfontein / KWSAP - Repairs, replacement and supply of manhole de-watering pump supply of manhole de-watering pump supply of manhole de-watering pump 35.Grootdraai - Repairs, replacement and supply 35.Grootdraai - Repairs, replacement and supply 35.Grootdraai - Repairs, replacement and supply of manhole de-watering pump 36. of manhole de-watering pump 36. of manhole de-watering pump 36. Tutuka – Replacement of shaft and cabling for Tutuka – Replacement of shaft and cabling for Tutuka – Replacement of shaft and cabling for pump No.1 with similar equipment 37. pump No.1 with similar equipment 37. pump No.1 with similar equipment 37. Rietfontein - Refurbishment of Motor No 1 at RFT Rietfontein - Refurbishment of Motor No 1 at RFT Rietfontein - Refurbishment of Motor No 1 at RFT Pump Station 38. Pump Station 38. Pump Station 38. Geelhoutboom – Syphon project Geelhoutboom – Syphon project Geelhoutboom – Syphon project 11 39. Onverwacht pipe set (Usutu River) 39. Onverwacht pipe set (Usutu River) 39. Onverwacht pipe set (Usutu River) 40. Westoe – upgrading access road (Usutu River) 40. Westoe – upgrading access road (Usutu River) 40. Westoe – upgrading access road (Usutu River) 41. Boschkop – Upgrading of the server at 41. Boschkop – Upgrading of the server at 41. Boschkop – Upgrading of the server at VRESAP VRESAP VRESAP 42. Tutuka – Replacement of shaft and cabling for 42. Tutuka – Replacement of shaft and cabling for 42. Tutuka – Replacement of shaft and cabling for pump No.1 with similar equipment 43. pump No.1 with similar equipment 43. pump No.1 with similar equipment 43. Rietfontein – Supply, installation and Rietfontein – Supply, installation and Rietfontein – Supply, installation and commissioning VSD at KWSAP commissioning VSD at KWSAP commissioning VSD at KWSAP 44. Rietfontein – Refurbishment of 1x DN600 44. Rietfontein – Refurbishment of 1x DN600 44. Rietfontein – Refurbishment of 1x DN600 Control Valve 45. Control Valve 45. Control Valve 45. Grootdraai Pump Station-Commissioning of Grootdraai Pump Station-Commissioning of Grootdraai Pump Station-Commissioning of powerpack & setting of upper limits radial gate powerpack & setting of upper limits radial gate powerpack & setting of upper limits radial gate 90% 25% • 18% (72/390)(inclusive of 45 for Q2) projects 18% (72/390)(inclusive of 45 for Q2) projects • • 18% (72/390)(inclusive of 45 for Q2) projects The budget was approved end of June Fast track Maintenance plan Partially achieved PoE accepted for AMP completed thus far: 1. Goudrtrouw completed thus far: 1. Goudrtrouw completed thus far: 1. Goudrtrouw 2017 due to negotiations with the implementation following late budget Maintainance Plans. Dam: Service Lift Monthly Dam: Service Lift Monthly 2. Pongola Dam: Service Lift Monthly 2. Pongola National Treasury as a result of the allocation to cover for lost time. 2. Pongola River(Lavumisa Pump Station): River(Lavumisa Pump Station): Transformer Oil River(Lavumisa Pump Station): Transformer Oil overdraft. Late allocation of budget, Increase resources through the extension Transformer Oil Samplings 3. Samplings 3. Hluhluwe Dam: Samplings 3. Hluhluwe Dam: meant that maintenance plan of the term contract in Central Operations. Hluhluwe Dam: Transformer Oil Samplings Transformer Oil Samplings 4. Klipfontein Dam: Transformer Oil Samplings 4. Klipfontein Dam: implementation was delayed by 3 4. Klipfontein Dam: Transformer Oil Samplings Transformer Oil Samplings Transformer Oil Samplings months. 5. Mhlathuze River GWS (Goedertrouw Dam): 5. Mhlathuze River GWS (Goedertrouw Dam): 5. Mhlathuze River GWS (Goedertrouw Dam): Transformer Oil Samplings Transformer Oil Samplings Transformer Oil Samplings 6. Midmar Dam: Water Supply to the newly 6. Midmar Dam: Water Supply to the newly 6. Midmar Dam: Water Supply to the newly constructed guard house/hut on the left bank constructed guard house/hut on the left bank 7. constructed guard house/hut on the left bank 7. 7. Bushmans GWS(Wagendrift Dam): Roof Bushmans GWS(Wagendrift Dam): Roof stripped Bushmans GWS(Wagendrift Dam): Roof stripped stripped and assesed, 8. and assesed, 8. and assesed, 8. agendrift Dam: House needed to be tiled with agendrift Dam: House needed to be tiled with agendrift Dam: House needed to be tiled with ceramic tiles in the kitchen, passage, bathroom ceramic tiles in the kitchen, passage, bathroom ceramic tiles in the kitchen, passage, bathroom and lounge and the bedroom needed carpet tiles and lounge and the bedroom needed carpet tiles and lounge and the bedroom needed carpet tiles to be installed 9. to be installed 9. to be installed 9. Wagendrift Dam: Houses 6, 7 &8 shower door Wagendrift Dam: Houses 6, 7 &8 shower door Wagendrift Dam: Houses 6, 7 &8 shower door and and toilet seats to be replaced, broken windows to and toilet seats to be replaced, broken windows to toilet seats to be replaced, broken windows to be be replaced, damaged floor tiles need to be be replaced, damaged floor tiles need to be replaced, damaged floor tiles need to be replaced. replaced. Two damaged garage doors to be replaced. Two damaged garage doors to be Two damaged garage doors to be replaced replaced 10. replaced 10. 10. Craigieburn Dam: Fencing of wo water Craigieburn Dam: Fencing of wo water reservoirs Craigieburn Dam: Fencing of wo water reservoirs reservoirs at Craigieburn Dam 11. at Craigieburn Dam 11. at Craigieburn Dam 11. Craigieburn Dam: Fencing of wo water reservoirs Craigieburn Dam: Fencing of wo water reservoirs Craigieburn Dam: Fencing of wo water reservoirs at Craigieburn Dam 12. Midmar at Craigieburn Dam 12. Midmar at Craigieburn Dam 12. Midmar Dam: Supply and delivery of water Dam: Supply and delivery of water Dam: Supply and delivery of water storage/conservancy tanks, tam to assist with storage/conservancy tanks, tam to assist with storage/conservancy tanks, tam to assist with excavation and location ot tank excavation and location ot tank excavation and location ot tank 13. ,Craigieburn Dam: Replace water pipe system 13. ,Craigieburn Dam: Replace water pipe system 13. ,Craigieburn Dam: Replace water pipe system Area A and Area B 14. Area A and Area B 14. Area A and Area B 14. Midmar Dam: Midmar Office - TSS building: Midmar Dam: Midmar Office - TSS building: Midmar Dam: Midmar Office - TSS building: Ceiling and other leaks. Install shelves and Ceiling and other leaks. Install shelves and Ceiling and other leaks. Install shelves and cupboards. Geyser to be installed. Toilet cupboards. Geyser to be installed. Toilet cupboards. Geyser to be installed. Toilet accessories to be installed. Carpots and access accessories to be installed. Carpots and access accessories to be installed. Carpots and access 15. Pongolapoort Dam: Additional Cost 15. Pongolapoort Dam: Additional Cost 15. Pongolapoort Dam: Additional Cost 16. ,Qamata/Lanti: Clearing of unwanted Indicators and target as per 2017/18 Annual Performance Plan (APP) 16. ,Qamata/Lanti: Clearing of unwanted 16. ,Qamata/Lanti: Clearing of unwanted vegetation at Lay Dam B1 and C2 clearing of Analysis of perfomance Comments vegetation at Lay Dam B1 and C2 clearingQuarter of vegetation 2 at Lay Dam B1 and C2 clearing of blocked mainholes at Lanti Weir 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual blocked mainholes at Lanti Weir Progress blocked mainholes at Lanti Weir 17. GlebrockDescription Dam: ofClearing Actual of Achievement drainage system. Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets 17. GlebrockQuarter Dam: 2 outputClearing – ofpreliminary drainage system. 17. GlebrockQuarter Dam: 2 ActualClearing Achievement of drainage system. Deviation (Actual) Deviation (%) Clearing of unwanted vegetation along th dam wall per province / CMA Clearing of unwanted vegetation along th dam wall Clearing of unwanted vegetation along th dam wall 18. Corona Dam: Clearing of furrow drains at 18. Corona Dam: Clearing of furrow drains at 18. Corona Dam: Clearing of furrow drains at dam wall. Killing of ants and termites activities dam wall. Killing of ants and termites activities dam wall. Killing of ants and termites activities along the dam wall area 19. along the dam wall area 19. along the dam wallPrograme1: area 19.Administration Gcuwa Dam: herbicide spraying of unwanted Gcuwa Dam: herbicide spraying of unwanted Gcuwa Dam: herbicide spraying of unwanted vegetation along the dam wall 20. Fish vegetation along the dam wall 20. Fish vegetation along the dam wall 20. Fish Sundays( Teebus0: Grading of roads 2.4KM Sundays( Teebus0: Grading of roads 2.4KM Sundays( Teebus0: Grading of roads 2.4KM 21.Beervlei Dam: Clearing of vegetation at 21.Beervlei Dam: Clearing of vegetation at 21.Beervlei Dam: Clearing of vegetation at Beervlei Dam Beervlei Dam Beervlei Dam 22. Darlington Dam: Clearing of vegetation 22. Darlington Dam: Clearing of vegetation 22. Darlington Dam: Clearing of vegetation downstream toe area downstream toe area downstream toe area 23. Elandsdrift Dam: Clearing of vegetation on 23. Elandsdrift Dam: Clearing of vegetation on 23. Elandsdrift Dam: Clearing of vegetation on canal from Elandsdrift Dam to Tunnel canal from Elandsdrift Dam to Tunnel canal from Elandsdrift Dam to Tunnel 24. Uitkeer Sludge Ponds and WTW: Clearing of 24. Uitkeer Sludge Ponds and WTW: Clearing of 24. Uitkeer Sludge Ponds and WTW: Clearing of vegetation at Uitkeer sludge ponds and WTW 25. vegetation at Uitkeer sludge ponds and WTW 25. vegetation at Uitkeer sludge ponds and WTW 25. Brandvlei Main dam wall: Rebuil toe-drain Brandvlei Main dam wall: Rebuil toe-drain Brandvlei Main dam wall: Rebuil toe-drain measuring structure with outlet pipe measuring structure with outlet pipe measuring structure with outlet pipe 26.Miertjieskraal: Replace broken pipe section on 26.Miertjieskraal: Replace broken pipe section on 26.Miertjieskraal: Replace broken pipe section on right bank outlet 27. right bank outlet 27. right bank outlet 27. Albasini Dam: Replacement of Generator Albasini Dam: Replacement of Generator Albasini Dam: Replacement of Generator 28.Boschkop – Upgrading of the server at 28.Boschkop – Upgrading of the server at 28.Boschkop – Upgrading of the server at VRESAP VRESAP VRESAP 29. Boschkop - Replace gate motors at Boschkop 29. Boschkop - Replace gate motors at Boschkop 29. Boschkop - Replace gate motors at Boschkop pumpstation 30 pumpstation 30 pumpstation 30 Rietfontein - Replace gate motors at Rietfontein Rietfontein - Replace gate motors at Rietfontein Rietfontein - Replace gate motors at Rietfontein pumpstation 31. pumpstation 31. pumpstation 31. Grootdraai - Replace gate motors at Grootdraai Grootdraai - Replace gate motors at Grootdraai Grootdraai - Replace gate motors at Grootdraai pumpstation 32. pumpstation 32. pumpstation 32. Boschkop - Replace gate motors at Boschkop Boschkop - Replace gate motors at Boschkop Boschkop - Replace gate motors at Boschkop pumpstation 33. pumpstation 33. pumpstation 33. Zaaihoek - Replace gate motors at Zaaihoek Zaaihoek - Replace gate motors at Zaaihoek Zaaihoek - Replace gate motors at Zaaihoek pumpstation 34. pumpstation 34. pumpstation 34. Rietfontein / KWSAP - Repairs, replacement and Rietfontein / KWSAP - Repairs, replacement and Rietfontein / KWSAP - Repairs, replacement and supply of manhole de-watering pump supply of manhole de-watering pump supply of manhole de-watering pump 35.Grootdraai - Repairs, replacement and supply 35.Grootdraai - Repairs, replacement and supply 35.Grootdraai - Repairs, replacement and supply of manhole de-watering pump 36. of manhole de-watering pump 36. of manhole de-watering pump 36. Tutuka – Replacement of shaft and cabling for Tutuka – Replacement of shaft and cabling for Tutuka – Replacement of shaft and cabling for pump No.1 with similar equipment 37. pump No.1 with similar equipment 37. pump No.1 with similar equipment 37. Rietfontein - Refurbishment of Motor No 1 at RFT Rietfontein - Refurbishment of Motor No 1 at RFT Rietfontein - Refurbishment of Motor No 1 at RFT Pump Station 38. Pump Station 38. Pump Station 38. Geelhoutboom – Syphon project Geelhoutboom – Syphon project Geelhoutboom – Syphon project 39. Onverwacht pipe set (Usutu River) 39. Onverwacht pipe set (Usutu River) 39. Onverwacht pipe set (Usutu River) 40. Westoe – upgrading access road (Usutu River) 40. Westoe – upgrading access road (Usutu River) 40. Westoe – upgrading access road (Usutu River) 41. Boschkop – Upgrading of the server at 41. Boschkop – Upgrading of the server at 41. Boschkop – Upgrading of the server at VRESAP VRESAP VRESAP 42. Tutuka – Replacement of shaft and cabling for 42. Tutuka – Replacement of shaft and cabling for 42. Tutuka – Replacement of shaft and cabling for pump No.1 with similar equipment 43. pump No.1 with similar equipment 43. pump No.1 with similar equipment 43. Rietfontein – Supply, installation and Rietfontein – Supply, installation and Rietfontein – Supply, installation and commissioning VSD at KWSAP commissioning VSD at KWSAP commissioning VSD at KWSAP 44. Rietfontein – Refurbishment of 1x DN600 44. Rietfontein – Refurbishment of 1x DN600 44. Rietfontein – Refurbishment of 1x DN600 Control Valve 45. Control Valve 45. Control Valve 45. Grootdraai Pump Station-Commissioning of Grootdraai Pump Station-Commissioning of Grootdraai Pump Station-Commissioning of powerpack & setting of upper limits radial gate powerpack & setting of upper limits radial gate powerpack & setting of upper limits radial gate
12 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
2.4.3 Percentage unscheduled maintenance ≤10% ≤10% 0% Programe1:0% Administration0% • 0% n/a n/a Achieved projects completed as a proportion of planned maintenance projects
2.4.4 Number of kilometres of conveyance systems 15km 5km • 1.335km 1.335km • • 1.335km 1) Productivity levels on Nzhelele canal, 1) Reprioritised the budget according to Not achieved PoE accepted for Nzhelele and rehabilitated per annum Ncora Lei Dams, performing projects and those with high Boskop progress report Qamata Lei Dams and Boskop potential to achieve APP targets. canal were impacted by high 2) Projects that will be accelerated from production costs. the reprioritised funds include: 2) Some project on tender stage - Nzhelele canal additional budget require re-tendering SCM Preferential of R20million allocated to have a total of Procurement Regulations (PPR) of R40million to achieve 6km by 31 March 2017, these include Hoeklip Siphon 2018; and Ncora canal. - Lower Sunday Emergency Canal allocated R21million to achieve 5km; - Boskop Canal extra 10million for to achieve 4km - Qamata and Ncora Lei Damsat a total of R18million to give 6km .
3.4.1 Number of job opportunities created through 270 jobs 67 jobs opportunities • 69 jobs were created 69 jobs were created 69 jobs were created • 69 jobs were created • • Over achieved PoE accepted for 69 as four (4) ID's implementing operations of water resources opportunities were unclear as indicated on the infrastructure projects schedule.
Regional Bulk Infrastructure Grant 2.3.4 Number of mega regional 15 15 • 7 10 Under by 5 Under by 33.33% 10 Partially achieved bulk infrastructure project phases under construction EC 1 1 • 1 1 • • 1 n/a n/a OR Tambo King Sabata • OR Tambo King Sabata Dalindyebo • OR Tambo King Sabata Dalindyebo (KSD) Water OR Tambo King Sabata Dalindyebo (KSD) Water n/a n/a OR Tambo King Sabata Dalindyebo (KSD) Water n/a n/a PoE accepted. Dalindyebo (KSD) Water Supply (KSD) Water Supply Phase 2 of 2 Supply Phase 2 of 2 Supply Phase 2 of 2 Supply Phase 2 of 2 Phase 2 of 2 Please provide the Performance Evaluation Reports
GP 4 4 • 0 1 3 • 1 Sebokeng Wastewater Treatment • Sebokeng Wastewater Treatment • Not achieved • Sebokeng Wastewater Treatment Works n/a n/a • Sebokeng Wastewater Treatment Works n/a n/a PoE accepted Works (WWTW) Phase 1 of 2 Works (WWTW) Phase 1 of 2 (WWTW) Phase 1 of 2 (WWTW) Phase 1 of 2
• Sebokeng Wastewater Treatment • Sebokeng Wastewater Treatment • Not achieved Not achieved • Sebokeng • Not achieved The designs for module 7 had to be IA to finalise designsThe designs will be PoE accepted Works Phase 2 of 2 Works Phase 2 of 2 Wastewater Treatment reviewed due to time lapse of the initial finalised by December 2017 Works Phase 2 of 2 designs as a result of budget constraints and will be finalised by December 2017
Sedibeng Wastewater Treatment • Sedibeng Wastewater Treatment • Not achieved Not achieved • Sedibeng • Not achieved The project was stopped in favour of To finalise designs for the refurb of PoE accepted works – Rietspruit and Leeuwkuil works – Rietspruit and Leeuwkuil Wastewater Treatment refurb of Rietspruit and Leeuwkuil Rietspruit and Leeuwkuil WWTW as a WWTW WWTW works – Rietspruit and WWTW as a cheaper option cheaper option Leeuwkuil WWTW
Westonaria WWTW Phase 2 • Westonaria WWTW Phase 2 • Not achieved • Westonaria WWTW • Not achieved The projects (Zuurbekom and The project to be implemented subject to PoE accepted (Zuurbekom) (Zuurbekom) Phase 2 (Zuurbekom) Mohlakeng) were put on hold owing to budget availability and approval of uncertainties around funding and budget Bids by National Treasury . linkages to other projects (Syferfontein) in the immediate vicinity.
KZN 1 5 2 4 1 4 Jozini (Pongolapoort) BWS • Jozini (Pongolapoort) BWS • Jozini (Pongolapoort) BWS (pipeline) • Jozini (Pongolapoort) BWS (pipeline) n/a • Jozini (Pongolapoort) BWS (pipeline) n/a n/a PoE accepted. (pipeline) (pipeline)
- • Greater Mthonjaneni BWS • Greater Mthonjaneni BWS • Greater Mthonjaneni BWS n/a • Greater Mthonjaneni BWS n/a n/a PoE accepted.
- • Ngcebo BWS Not achieved • Ngcebo BWS n/a • Ngcebo BWS n/a n/a PoE accepted. - • Spienkop to Ladysmith BWS Not achieved • Spienkop to Not achieved Implementation protocol agreement not The implementation protocol will be PoE accepted Ladysmith BWS yet finalised. It will be finalised by end finalised by end November 2017 November
- • Umshwathi BWS Not achieved • Umshwathi BWS n/a • Umshwathi BWS n/a n/a PoE accepted LP 4 4 3 3 1 3 Mogalakwena BWS Phase 1 of 2 • Mogalakwena BWS Phase 1 of 2 • Mogalakwena BWS Phase 1 of 3 • Mogalakwena BWS Phase 1 of 3 n/a • Mogalakwena BWS Phase 1 of 3 n/a n/a PoE accepted.
- • Giyani Water Supply Phase 1 • Giyani Water Supply Phase 1 • Giyani Water Supply Phase 1 n/a • Giyani Water Supply Phase 1 n/a n/a PoE accepted. (Emergency) (Emergency) (Emergency) (Emergency)
- • Polokwane BWS Phase 1 • Polokwane BWS Phase 2 • Polokwane BWS Phase 2 n/a • Polokwane BWS Phase 2 n/a n/a PoE accepted.
13 2.3.4 Partially achieved
LP
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
- • Polokwane WWTW Phase 1 Not achieved Not achievedPrograme1: Administration• Polokwane WWTW Not achieved Construction has not commenced as the Fast Track the finalisation of the IRS PoE accepted Phase 1 implementation readiness study has not been completed.
14 2.3.4 Partially achieved
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
NC 1 1 1 Programe1:1 Administration 1 Vaal Gamagara BWS Phase 1 of 2 • Vaal Gamagara BWS Phase 1 of 2 • Vaal Gamagara BWS Phase 1 of 2 • Vaal Gamagara BWS Phase 1 of 2 n/a • Vaal Gamagara BWS Phase 1 of 2 n/a n/a PoE accepted.
2.3.5 Number of mega regional bulk infrastructure 3 No milestone No milestone No milestone No milestone No milestone n/a n/a No milestone No milestone for the quarter project phases completed
EC 1 OR Tambo KSD No milestone No milestone No milestone No milestone No milestone n/a n/a No milestone for the quarter BWS Phase 2 of 2 GP 1 Sebokeng No milestone No milestone No milestone No milestone No milestone n/a n/a No milestone for the quarter WWTW Phase 1 of 2 KZN 1 Jozini No milestone No milestone No milestone No milestone No milestone n/a n/a No milestone for the quarter (Pongolapoort) BWS 2.3.6 Number of large regional 53 53 43 46 Under by 7 Under by 13.20% 46 Partially Achieved bulk infrastructure project phases under construction EC 7 7 8 8 Over by 1 8 Ndlambe bulk water supply phase 1 • Ndlambe bulk water supply phase • Ndlambe bulk water supply phase 1 • Ndlambe bulk water supply phase 1 n/a • Ndlambe bulk water supply phase 1 n/a n/a PoE accepted. 1
• Cluster 4 Chris Hani DM phase 2 • Cluster 4 Chris Hani DM phase 2 • Cluster 4 Chris Hani DM phase 2 of 2 • Cluster 4 Chris Hani DM phase 2 of 2 n/a • Cluster 4 Chris Hani DM phase 2 of 2 n/a n/a PoE accepted. of 2 of 2
• Cluster 6 Chris Hani DM • Cluster 6 Chris Hani DM • Cluster 6 Chris Hani DM • Cluster 6 Chris Hani DM n/a • Cluster 6 Chris Hani DM n/a n/a PoE accepted.
• Cluster 9 Chris Hani DM • Cluster 9 Chris Hani DM • Cluster 9 Chris Hani DM • Cluster 9 Chris Hani DM n/a • Cluster 9 Chris Hani DM n/a n/a PoE accepted.
• Xonxa BWS • Xonxa BWS • Xonxa BWS • Xonxa BWS n/a • Xonxa BWS n/a n/a PoE accepted.
• Xhora BWS • Xhora BWS • Xhora BWS • Xhora BWS n/a • Xhora BWS n/a n/a PoE accepted.
• Refurbishment of 6 existing plants • Refurbishment of 6 existing plants • Refurbishment of 6 existing plants and • Refurbishment of 6 existing plants and n/a • Refurbishment of 6 existing plants and n/a n/a PoE accpepted and downstream infrastructure and downstream infrastructure downstream infrastructure (Binfield water downstream infrastructure (Binfield water downstream infrastructure (Binfield water (Binfield water (Binfield water treatment works (WTW), Masincedane treatment works (WTW), Masincedane treatment works (WTW), Masincedane treatment works (WTW), treatment works (WTW), WTW, Debe WTW,and Sandile WTW) WTW, Debe WTW,and Sandile WTW) WTW, Debe WTW,and Sandile WTW) Masincedane WTW, Debe Masincedane WTW, Debe WTW,and Sandile WTW) WTW,and Sandile WTW)
0 Nooitgedaght Nooitgedaght Nooitgedaght Nooitgedaght n/a n/a PoE accepted.This is not an APP target .
Please provide the Peformance Evaluation Reports FS 6 6 3 3 3 3 • Tokologo BWS Phase 2 of 2 • Tokologo BWS Phase 2 of 2 • Tokologo BWS Phase 2 of 2 • Tokologo BWS Phase 2 of 2 n/a • Tokologo BWS Phase 2 of 2 n/a n/a PoE accepted.
• Masilonyana BWS Phase 2 of 2 • Masilonyana BWS Phase 2 of 2 Not achieved Not achieved • Masilonyana BWS Not achieved Municipality is busy with the finalisation of Designs will be finalised in November PoE accepted Phase 2 of 2 designs, Delays were caused by change of the municipal administrator.
• Nketoana BWS Phase 1 of 2 • Nketoana BWS Phase 1 of 2 • Nketoana BWS Phase 1 of 2 • Nketoana BWS Phase 1 of 2 n/a • Nketoana BWS Phase 1 of 2 n/a n/a PoE accepted.
• Ngwathe Bulk Water Supply • Ngwathe Bulk Water Supply Not achieved Not achieved • Ngwathe Bulk Water Not achieved There is a budget shortfall, contractor will contractor will only be appointment in PoE accepted Phase 3 of 3 Phase 3 of 3 Supply Phase 3 of 3 only be appointment in quarter 4 of the quarter 4 of the municipal financial year municipal financial year
• Ngwathe Bulk Sewer Phase 2 of 2 • Ngwathe Bulk Sewer Phase 2 of 2 Not achieved Not achieved • Ngwathe Bulk Sewer Not achieved Finalisation of designs, Consultant has Consultant has been appointed PoE accepted (Parys) (Parys) Phase 2 of 2 (Parys) been appointed
• Welbedacht pipeline (Mangaung) • Welbedacht pipeline (Mangaung) • Welbedacht pipeline (Mangaung) • Welbedacht pipeline (Mangaung) n/a • Welbedacht pipeline (Mangaung) n/a n/a PoE accepted.
GP 1 1 1 1 1 • Meyerton wastewater treatment • Meyerton wastewater treatment • Meyerton wastewater treatment works • Meyerton wastewater treatment works n/a • Meyerton wastewater treatment works n/a n/a PoE accepted. works works
15 2.3.6 Partially Achieved
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
KZN 6 6 5 Programe1: Administration5 5 • Driefontein Indaka BWS • Driefontein Indaka BWS • Driefontein Indaka BWS • Driefontein Indaka BWS n/a • Driefontein Indaka BWS n/a n/a PoE accepted.
Please provide the Peformance Evaluation Reports
• Greytown BWS Phase 2 • Greytown BWS Phase 2 • Greytown BWS Phase 2 • Greytown BWS Phase 2 n/a • Greytown BWS Phase 2 n/a n/a PoE accepted.
Please provide the Peformance Evaluation Reports
• Nongoma BWS • Nongoma BWS • Nongoma BWS • Nongoma BWS n/a • Nongoma BWS n/a n/a PoE accepted.
Please provide the Peformance Evaluation Reports
• Middledrift BWS • Middledrift BWS • Middledrift BWS • Middledrift BWS n/a • Middledrift BWS n/a n/a PoE accepted.
Please provide the Peformance Evaluation Reports
• Mandlakazi BWS Phase 5 • Mandlakazi BWS Phase 5 • Mandlakazi BWS Phase 5 • Mandlakazi BWS Phase 5 n/a • Mandlakazi BWS Phase 5 n/a n/a PoE accepted.
Please provide the Peformance Evaluation Reports
• Maphumulo BWS Phase 3 • Maphumulo BWS Phase 3 Not achieved Not achieved • Maphumulo BWS Not achieved n/a n/a Phase 3 LP 15 15 15 14 1 14 • Sekhukhune BWS Phases 7 to 15 • Sekhukhune BWS Phases 7 to 15 • Sekhukhune BWS Phases 7 to 15 (i.e. 9 Phases) • Sekhukhune BWS Phases 7 to 15 (i.e. 9 Phases) n/a • Sekhukhune BWS Phases 7 to 15 (i.e. 9 Phases) n/a n/a PoE accepted. (i.e. 9 Phases) (i.e. 9 Phases)
• Moutse BWS Phase 1 and 5 (i.e. • Moutse BWS Phase 1 and 5 (i.e. 2 • Moutse BWS Phase 1 and 5 (i.e. 2 Phases) • Moutse BWS Phase 1 and 5 (i.e. 2 Phases) n/a • Moutse BWS Phase 1 and 5 (i.e. 2 Phases) n/a n/a PoE accepted. 2 Phases) Phases)
• Giyani BWS - Drought Relief • Giyani BWS - Drought Relief Not achieved Not achieved • Giyani BWS - Not achieved The Contractor suspended works on site Payment issues were resolved, the PoE accepted. Drought Relief due to late payments of invoice contractor is back on site
• Mametja Sekororo BWS Phase 1 • Mametja Sekororo BWS Phase 1 • Mametja Sekororo BWS Phase 1 of 2 • Mametja Sekororo BWS Phase 1 of 2 n/a • Mametja Sekororo BWS Phase 1 of 2 n/a n/a PoE accepted of 2 of 2 • Sinthumule Kutama BWS • Sinthumule Kutama BWS • Sinthumule Kutama BWS Augmentation Phase 3 • Sinthumule Kutama BWS Augmentation Phase 3 n/a • Sinthumule Kutama BWS Augmentation Phase 3 n/a n/a PoE accepted. Augmentation Phase 3 of 3 Augmentation Phase 3 of 3 of 3 of 3 of 3
• Nebo BWS • Nebo BWS • Nebo BWS n/a • Nebo BWS n/a n/a PoE accepted.
MP 4 4 2 2 2 • Northern Nsikazi BWS Phase 1 of • Northern Nsikazi BWS Phase 1 of 2 Northern Nsikazi BWS Phase 1 of 2 Northern Nsikazi BWS Phase 1 of 2 n/a Northern Nsikazi BWS Phase 1 of 2 n/a n/a PoE accepted. 2
• Emalahleni BWS Phase 3 of 4 • Emalahleni BWS Phase 3 of 4 Not achieved Not achieved • Emalahleni BWS Phase 3 of Not achieved Delays in finalisation of the feasibililty DWS planning to fast track feasibility PoE accepted 4 studies by IA studies.
• Musikaligwa / Driekoppies BWS • Musikaligwa / Driekoppies BWS Phase 1 Not achieved Not achieved • Musikaligwa / Driekoppies Not achieved Delays in the finalisation of the Tripatite SLA was finalised in October 2017. PoE accepted Phase 1 of 3 of 3 BWS Phase 1 of 3 Service Level Agreement for the implementation of the Driekopies project
• Balfour/ Siyathemba BWS Phase • Balfour/ Siyathemba BWS Phase 1 of 4 Balfour/ Siyathemba BWS Phase 1 of 4 Balfour/ Siyathemba BWS Phase 1 of 4 n/a Balfour/ Siyathemba BWS Phase 1 of 4 n/a n/a PoE accepted. 1 of 4 NC 1 1 1 1 1 • Namakwa BWS Phase 2 • Namakwa BWS Phase 2 • Namakwa BWS Phase 2 • Namakwa BWS Phase 2 n/a • Namakwa BWS Phase 2 n/a n/a PoE accepted.
NW 11 11 6 10 Undr by 1 Under by 9.09% 10 PoE accepted.
Madibeng BWS Phase 2 Madibeng BWS Phase 2 Madibeng BWS Phase 2 Madibeng BWS Phase 2 n/a Madibeng BWS Phase 2 n/a n/a PoE accepted.
• Pilanesberg BWS Phase 2 and • Pilanesberg BWS Phase 2 and Not achieved • Pilanesberg BWS Phase 2 Pilanesberg BWSPhase 3 • Pilanesberg BWS Phase 2 n/a n/a PoE accepted. Phase 3 (i.e. 2 phases) Phase 3 (i.e. 2 phases)
• Ratlou BWS Phase 1 (Setlagole) • Ratlou BWS Phase 1 (Setlagole) • Ratlou BWS Phase 1 (Setlagole) • Ratlou BWS Phase 1 (Setlagole) and n/a • Ratlou BWS Phase 1 (Setlagole) and n/a n/a PoE accepted. and Phase 2 (Madibogo) (i.e. 2 and Phase 2 (Madibogo) (i.e. 2 - Phase 2 (Madibogo) (i.e. 2 phases) - Phase 2 (Madibogo) (i.e. 2 phases) phases) phases)
• Mafikeng South BWS Phase 2 • Mafikeng South BWS Phase 2 • Mafikeng South BWS Phase 2 (upgrade WTW) • Mafikeng South BWS Phase 2 (upgrade WTW) n/a • Mafikeng South BWS Phase 2 (upgrade WTW) n/a n/a PoE accepted. (upgrade WTW) (upgrade WTW)
• Greater Mamusa BWS Phase 2 • Greater Mamusa BWS Phase 2 • Greater Mamusa BWS Phase 2 (Abstraction • Greater Mamusa BWS Phase 2 (Abstraction n/a • Greater Mamusa BWS Phase 2 (Abstraction n/a n/a PoE accepted. (Abstraction Bloemhof) and Phase (Abstraction Bloemhof) and Phase 3 Bloemhof) and Phase 3 (Upgrade of WTW) (i.e. 2 Bloemhof) and Phase 3 (Upgrade of WTW) (i.e. 2 Bloemhof) and Phase 3 (Upgrade of WTW) (i.e. 2 3 (Upgrade of WTW) (i.e. 2 phases) (Upgrade of WTW) (i.e. 2 phases) phases) phases) phases)
• Taung Naledi BWS Phase 2D • Taung Naledi BWS Phase 2D Not achieved • Taung Naledi BWS Phase 2D n/a • Taung Naledi BWS Phase 2D n/a n/a PoE accepted.
16 2.3.6 Partially Achieved
NW
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
• Moretele South BWS Phase 1 • Moretele South BWS Phase 1 • Moretele South BWS Phase 1 (Klipdrift) and • Moretele South BWSPrograme1: Phase 1 (Klipdrift) Administrationand n/a • Moretele South BWS Phase 1 (Klipdrift) and n/a n/a PoE accepted. (Klipdrift) and Phase 2 (Babelegi) (Klipdrift) and Phase 2 (Babelegi) Phase 2 (Babelegi) (i.e. 2 phases) Phase 2 (Babelegi) (i.e. 2 phases) Phase 2 (Babelegi) (i.e. 2 phases) (i.e. 2 phases) (i.e. 2 phases)
WC 2 2 2 2 0 2 • Stellenbosch WWTW Phase 2 of • Stellenbosch WWTW Phase 2 of 2 • Stellenbosch WWTW Phase 2 of 2 • Stellenbosch WWTW Phase 2 of 2 n/a • Stellenbosch WWTW Phase 2 of 2 n/a n/a PoE accepted. 2 • Paarl Bulk Sewer Phase 3 of 3 • Paarl Bulk Sewer Phase 3 of 3 • Paarl Bulk Sewer Phase 3 of 3 • Paarl Bulk Sewer Phase 3 of 3 n/a • Paarl Bulk Sewer Phase 3 of 3 n/a n/a PoE accepted.
2.3.7 Number of large regional bulk infrastructure 26 2 2 2 N/A n/a Achieved PoE accepted for Mooihoek BWS project phases completed and Moretele South BWS
5 N/A N/A N/A N/A N/A • Ndlambe BWS phase 1 N/A N/A N/A N/A N/A • Xhora BWS N/A N/A N/A N/A N/A • Xonxa BWS N/A N/A N/A N/A N/A • Cluster 6 Chis Hani DM N/A N/A N/A N/A N/A • Cluster 4 Chris Hani DM N/A N/A N/A N/A N/A 12 1 1 N/A N/A • Sekhukhune BWS Phases 7 to 15 N/A N/A N/A N/A N/A •(i.e. Moutse 9 phases) BWS Phases 1 and 5 (i.e. N/A N/A N/A N/A N/A Mooihoek2 phases) Mooihoek Mooihoek n/a Mooihoek Mooihoek BWS was not part of the Mooihoek was not APP target original plan however the project is funded in this financial year. No milestone • Mametja Sekororo BWS Phase 1 N/A N/A N/A N/A N/A of 2 4 0 0 0 0 • Northern Nsikazi BWS Phase 1 of N/A N/A N/A N/A N/A •2 Emalahleni BWS Phase 3 of 4 N/A N/A N/A N/A N/A • Musikaligwa / Driekoppies BWS N/A N/A N/A N/A N/A •Phase Balfour/ 1 of Siyathemba 3 BWS Phase N/A N/A N/A N/A N/A 1 of 4 4 1 1 1 • Ratlou BWS Phase 1 (Setlagole) • Greater Mamusa BWS Phase 2 •(Abstraction Mafikeng South Bloemhof) BWS Phase 2 •(upgrade Moretele WTW) South BWS Phase 1 • Moretele South BWS Phase 1 (Klipdrift) • Moretele South BWS Phase • Moretele South BWS Phase 1 (Klipdrift) N/A N/A Moretele South BWS was planned (Klipdrift) 1 (Klipdrift) to be completed Q4
1 0 0 0 0 0 • Paarl Bulk Sewer Phase 3 of 3 N/A N/A N/A N/A N/A
17 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
2.3.8 Number of small regional bulk infrastructure 41 41 19 Programe1:26 AdministrationUnder by 15 Under by 36.58% 26 Partially achieved project phases under construction
Schedule 6B (RBIG) 19 19 15 26 PoE accepted for 19 EC 8 8 4 5 4 5 Matatiele BWS • Matatiele BWS • Matatiele BWS • Matatiele BWS n/a • Matatiele BWS n/a n/a PoE accepted.
• Middleburg Ground Water Supply • Middleburg Ground Water Supply Not achieved Not achieved • Middleburg Ground Water Not achieved This project is delayed by procurement The tender response were higher than the PoE accepted. Supply processes of the Chris Hani District available budget. The tender will be re- Municipality. There is a possibility that the advertised after reviewing the cost project will be re advertised as the tender estimates. validity period expired
• Graaf Reinet GWS • Graaf Reinet GWS • Graaf Reinet GWS • Graaf Reinet GWS n/a • Graaf Reinet GWS n/a n/a PoE accepted.
• James Kleynhans BWS • James Kleynhans BWS • James Kleynhans BWS • James Kleynhans BWS n/a • James Kleynhans BWS n/a n/a PoE accepted.
• Sundays River BWS • Sundays River BWS (Patterson) Not achieved Not achieved • Sundays River Not achieved Insufficient funds to implement Phase 6 The tender response were higher than the PoE accepted. BWS(Patterson) available budget. The tender will be re- advertised after reviewing the cost estimates.
• Mount Ayliff Peri-urban water • Mount Ayliff Peri-urban water supply • Mount Ayliff Peri-urban water supply • Mount Ayliff Peri-urban water supply n/a • Mount Ayliff Peri-urban water supply n/a n/a PoE accepted. supply
• Makana Bulk Sewer • Makana Bulk Sewer Not achieved Not achieved • Makana Bulk Sewer Not achieved Awaiting appointment of contractor Fast track the appointment of the PoE accepted. contractor
• Mayfield WWTW • Mayfield WWTW Not achieved Not achieved • Mayfield WWTW Not achieved The application to source contractors Submission is underway for PoE accepted. from DWS Water Trading Entity has been readvertisement suspended
Hofmayer Ground Water Hofmayer Ground Water n/a Hofmayer Ground Water n/a n/a PoE accepted.
11 11 10 10 1 10 FS • Tswelopele BWS • Tswelopele BWS • Tswelopele BWS • Tswelopele BWS n/a • Tswelopele BWS n/a n/a PoE accepted • Mantsopa BWS Phase 1 of 2 • Mantsopa BWS Phase 1 of 2 • Mantsopa BWS Phase 1 of 3 • Mantsopa BWS Phase 1 of 3 n/a • Mantsopa BWS Phase 1 of 3 n/a n/a PoE accepted
• Phumelela BWS Phase 2 of 2 • Phumelela BWS Phase 2 of 2 • Phumelela BWS Phase 2 of 3 • Phumelela BWS Phase 2 of 3 n/a • Phumelela BWS Phase 2 of 3 n/a n/a PoE accepted
• Setsoto BWS Phase 2 of 4 • Setsoto BWS Phase 2 of 4 • Setsoto BWS Phase 2 of 5 • Setsoto BWS Phase 2 of 5 n/a • Setsoto BWS Phase 2 of 5 n/a n/a PoE accepted
• Rouxville/ Smithfield/ Zastron • Rouxville/ Smithfield/ Zastron BWS • Rouxville/ Smithfield/ Zastron BWS • Rouxville/ Smithfield/ Zastron BWS n/a • Rouxville/ Smithfield/ Zastron BWS (Mohokare n/a n/a PoE accepted BWS (Mohokare BWS) (Mohokare BWS) (Mohokare BWS) (Mohokare BWS) BWS)
• Maluti-a-Phofung BWS Phase 2 of • Maluti-a-Phofung BWS Phase 2 of • Maluti-a-Phofung BWS Phase 2 of 5 • Maluti-a-Phofung BWS Phase 2 of 5 n/a • Maluti-a-Phofung BWS Phase 2 of 5 n/a n/a PoE accepted 4 4 • Maluti-a-Phofung BWS Phase 3 of • Maluti-a-Phofung BWS Phase 3 of • Maluti-a-Phofung BWS Phase 3 of 5 • Maluti-a-Phofung BWS Phase 3 of 5 n/a • Maluti-a-Phofung BWS Phase 3 of 5 n/a n/a PoE accepted 4 4 • Metsimaholo Bulk Sewer • Metsimaholo Bulk Sewer • Metsimaholo Bulk Sewer • Metsimaholo Bulk Sewer n/a • Metsimaholo Bulk Sewer n/a n/a PoE accepted • Mafube Bulk Sewer Phase 1 of 2 • Mafube Bulk Sewer Phase 1 of 2 • Mafube Bulk Sewer Phase 1 of 2 • Mafube Bulk Sewer Phase 1 of 2 n/a • Mafube Bulk Sewer Phase 1 of 2 (Frankfort) n/a n/a PoE accepted (Frankfort) (Frankfort) (Frankfort) (Frankfort) • Mafube Bulk Sewer Phase 2 of 2 • Mafube Bulk Sewer Phase 2 of 2 Not achieved not achieved • Mafube Bulk Sewer Not achieved Budget not approved due to budget Project cannot commence due to budget PoE accepted (Frankfort) (Frankfort) Phase 2 of 2 constraints within the department constraints. Awaiting the approval of bids. (Frankfort)
• Moqhaka Bulk Water Supply • Moqhaka Bulk Water Supply • Moqhaka Bulk Water Supply (Steynrus) • Moqhaka Bulk Water Supply (Steynrus) n/a • Moqhaka Bulk Water Supply (Steynrus) Phase 1 n/a n/a PoE accepted (Steynrus) Phase 1 of 2 (Steynrus) Phase 1 of 2 Phase 1 of 2 Phase 1 of 2 of 2
7 7 3 3 3 3 MP • Hoxani WTW • Hoxani WTW • Completed in Q1 • Completed in Q1 • Completed in Q1 • Completed in Q1 n/a n/a PoE was accepted in Q1 therefore not counted again
• Sibange BWS Phase 1 of 2 • Sibange BWS Phase 1 of 2 Not achieved Not achieved • Sibange BWS Phase Not achieved Delays in the finalisation of the Tripatite SLA was finalised in October 2017 PoE accepted 1 of 2 Service Level Agreement for the implementation of the Driekopies project
• Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1 • Lushushwane BWS Phase 1 of 2 n/a n/a PoE accepted. of 2
• Upgrading of Balfour WWTW • Upgrading of Balfour WWTW Not achieved Not achieved • Upgrading of Balfour Not achieved Delays in finalisation of designs by Fastrack the finalisation of designs by PoE accepted phase 2 of 2 phase 2 of 2 WWTW phase 2 of 2 Implementing Agent end October.2017.
• Upgrading of Delmas WWTW • Upgrading of Delmas WWTW Not achieved Not achieved • Upgrading of Delmas Not achieved Delays in finalisation of Feasibility Facilitate a meeting between DWS PoE accepted Phase 2 of 2 Phase 2 of 2 WWTW Phase 2 of 2 Studies by Implementing Agent Planning & the IA to fastrack the finalisation of the Feasibility Studies
• Amsterdam WWTW Phase 1 of 2 • Amsterdam WWTW Phase 1 of 2 • Amsterdam WWTW Phase 1 of 2 • Amsterdam WWTW Phase 1 of 2 • Amsterdam WWTW Phase 1 • Amsterdam WWTW Phase 1 of 2 n/a n/a PoE accepted. of 2
• Bushbuckridge Water Services • Bushbuckridge Water Services • Bushbuckridge Water Services • Bushbuckridge Water Services • Bushbuckridge Water • Bushbuckridge Water Services (Cunningmore) n/a n/a PoE accepted. (Cunningmore) (Cunningmore) (Cunningmore) (Cunningmore) Services (Cunningmore)
18 2.3.8 Partially achieved
MP
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
11 11 1 Programe1:5 Administration6 1 NC • Loeriesfontein BWS Phase 1 • Loeriesfontein BWS Phase 1 Not achieved • Loeriesfontein BWS Phase 1 (pipeline) n/a • Loeriesfontein BWS Phase 1 (pipeline) n/a n/a PoE accepted (pipeline) and Phase 2 (reservoir) (pipeline) and Phase 2 (reservoir) -Phase 2 (reservoir) (i.e. 2 phases) and (i.e. 2 phases) (i.e. 2 phases) -Phase 2 (reservoir) (i.e. 2 phases)
• Van Wyksvlei Groundwater Phase • Van Wyksvlei Groundwater Phase Not achieved Not achieved • Van Wyksvlei Groundwater Not achieved Procurement delay for phase 1 & 2 The IA has advertised the tender PoE accepted 1 (pipeline upgrade) and Phase 2 1 (pipeline upgrade) and Phase 2 Phase 1 (pipeline upgrade) Contractors (boreholes) (i.e. 2 phases) (boreholes) (i.e. 2 phases) and - Phase 2 (boreholes) (i.e. 2 phases) • Windsorton to Holpan BWS • Windsorton to Holpan BWS Phase • Windsorton to Holpan BWS Phase 1 (pipeline) • Windsorton to Holpan BWS Phase 1 (pipeline) n/a • Windsorton to Holpan BWS Phase 1 (pipeline) n/a n/a PoE accepted. Phase 1 (pipeline) and Phase 2 1 (pipeline) and and Phase 2 (Water treatment Plant) and and (reservoir) (i.e.2 phases) -Phase 2 (reservoir) (i.e.2 phases) -Phase 2 (Water treatment Plant) - Phase 2 (Water treatment Plant)
• Rietchie Phase 1 (pipeline) and • Rietchie Phase 1 (pipeline) and Not achieved • Rietchie Phase 1 (pipeline) • Rietchie Phase 2 (reservoir) • Rietchie Phase 1 (pipeline) Rietchie phase 2 delayed the Rietchie upgrading of bulk water raising PoE accepted Phase 2 (reservoir) (i.e. 2 phases) Phase 2 (reservoir) (i.e. 2 phases) appoinment of contractor. main Phase 1 is complete, Phase 2 site handover meeting will be held in the first week of October 2017.
• Kameelmond/ Upington WWTW • Kameelmond/ Upington WWTW Not achieved Not achieved • Kameelmond/ Not achieved The Consultant has been appointed, Finalise appointmnet of contractor PoE accpeted Phase 1 (ponds) Phase 1 (ponds) Upington WWTW evaluation for contractors have been Phase 1 (ponds) done • Warrenton WTW Phase 1 (ponds) • Warrenton WTW Phase 1 (ponds) Not achieved Not achieved • Warrenton WTW Not achieved Delay with approval of IRS due not being Meeting on Co-Funding between DWS, PoE accepted. Phase 1 (ponds) able to secure Co-funding by Municipality, CoGHSTA and FBDM was Municipality held on the 21 September 2017.
• De Aar Boreholes Phase 1 • De Aar Boreholes Phase 1 Not achieved Not achieved • De Aar Boreholes Not achieved No Funds allocated for project in the Funding for the project will be sourced PoE accepted Phase 1 2017/18 FY from adjustments from other projects within the province
3 3 1 3 3 NW • Wolmaransstad WWTW • Wolmaransstad WWTW • Wolmaransstad WWTW • Wolmaransstad WWTW n/a • Wolmaransstad WWTW n/a n/a PoE accepted.
• Koster WWTW • Koster WWTW • Koster WWTW • Koster WWTW n/a • Koster WWTW n/a n/a PoE accepted • Tlokwe WTW Phase 1 •Tlokwe WTW Phase 1 •Tlokwe WTW Phase 1 (Potchefstroom) •Tlokwe WTW Phase 1 (Potchefstroom) n/a •Tlokwe WTW Phase 1 (Potchefstroom) n/a n/a PoE accepted (Potchefstroom) (Potchefstroom) 1 1 0 0 1 0 WC • Citrusdal WWTW Phase 2 of 2 • Citrusdal WWTW Phase 2 of 2 Not achieved Not achieved • Citrusdal WWTW Phase 2 of Not achieved Delays in Appointment of contractor Tender for appointment of contractor is PoE accepted 2 expected to be awarded in quarter 3
2.3.9 Number of small regional bulk infrastructure 20 2 0 1 0 1 Partially achieved PoE accepted project phases completed
Schedule 6B (RBIG) 0 0 0 EC 4 0 0 0 0 • Middleburg Ground Water Supply n/a n/a n/a n/a n/a n/a n/a
• Sundays River BWS n/a n/a n/a n/a n/a n/a n/a • Matatiele BWS n/a n/a n/a n/a n/a n/a n/a • James Kleynhans BWS n/a n/a n/a n/a n/a n/a n/a FS 5 0 0 0 0 • Mafube Bulk Sewer Phase 1 of 2 n/a n/a n/a n/a n/a n/a n/a
• Moqhaka Bulk Water Supply n/a n/a n/a n/a n/a n/a n/a (Steynrus) Phase 1 of 2
• Tswelopele BWS n/a n/a n/a n/a n/a n/a n/a • Rouxville/ Smithfield/ Zastron n/a n/a n/a n/a n/a n/a n/a BWS (Mohokare BWS)
• Maluti-a-Phofung BWS Phase 2 of n/a n/a n/a n/a n/a n/a n/a 4 MP 7 0 0 0 0 • Hoxani WTW • Hoxani WTW Completed in quarter 1 Completed in quarter 1 (Hoxani) Completed in quarter 1 Completed in quarter 1 n/a n/a Hoxani was completed Q1 • Sibange BWS Phase 1 of 2 N/A n/a n/a n/a n/a n/a • Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1 of 40 Not achieved Not achieved • Lushushwane BWS Phase 1 Not achieved The site was flooded and caused delays The project is currently at 70% PoE accepted of 40 on the construction construction and the completion date is November 2017
• Upgrading of Balfour WWTW n/a n/a n/a n/a n/a n/a n/a phase 2 of 2 • Upgrading of Delmas WWTW n/a n/a n/a n/a n/a n/a n/a Phase 2 of 2 • Amsterdam WWTW Phase 1 of 2 n/a n/a n/a n/a n/a n/a n/a
• Bushbuckridge Water Services n/a n/a n/a n/a n/a n/a n/a (Cunningmore) NW 3 0 0 n/a 0 0 • Wolmaransstad WWTW n/a n/a n/a n/a n/a n/a n/a • Koster WWTW n/a n/a n/a n/a n/a n/a n/a • Tlokwe WTW Phase 1 n/a n/a n/a n/a n/a n/a n/a (Potchefstroom) WC 1 0 0 n/a 0 0 0 0 • Citrusdal WWTW Phase 2 of 2 n/a n/a n/a n/a n/a n/a n/a
19 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Programe1:Water Services AdministrationInfrastructure Grant 2.5.1 Number of existing bucket sanitation backlog 25 382 7868 1137 Under by 6731 Under by 85.5% 1137 Slow progress on site due to limited The project to be implemented subject to Partially achiedved Poe accepted systems in formal settlements replaced with budget. budget availability and approval of adequate sanitation services per year budget Bids by National Treasury
EC 37 - - Makana - - NC 4 202 - 179 179 Griekwastad - 407 134 Maranteng - 134 - Rosedale - 801 45 Louisvale - 477 - Postdene - 149 - Victoria west - 524 - Campbell - 596 - Fraser Moleketi - 458 - Motswedimosa - 656 - Breipal - - - Paballelo - - - Dakotaweg - - - FS 21143 - 21143 944 944 Ficksburg - 218 - - Arlington - 1 192 - - Lindley - 820 - - Clocolan - 3379 - - Senekal - 2435 - - Petrus steyn - 960 - - Hertzogville - 1020 - - Reitz - 739 - - Dealesville - 1290 - - Rouxville - 50 49 49 Dewetsdorp - 191 - - Henneman - 1123 - - Virginia (Khothalong) - 1371 32 32 Theunissen - 62 159 159 Heibron - 1100 - - Vredefort - 698 - - Frankfort - - - Villiers - 1842 - - Ntswanatsatsi( Cornelia) - 338 82 82 Tweeling - 304 - - Memel - 568 29 29 Marquard - 583 81 81 Meloding(Mathjabeng) - 512 512 LP (LNW) - 14 14 Charlotte Maxeke - 14 14
20 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
2.5.2 Number of rural households served to 10032 No milestone No milestone Programe1: Administration No milestone No milestone Poe accepted eradicate sanitation backlogs as per norms and standards
EC 1921 1921
Mbhashe / Amathole
Mnquna /Amathole
Joe Gqabi
Alfred Nzo
O.R Tambo
Chris Hani
Bumbane
Celani
Fumbatha 9 9
Kobodi
KZN 742 742 Dejagersdrift 8 8 Eerstelingand Borelen 4 4 Ekuthuleni 7 7 Esixhobeni 25 25 Ethembeni 5 5 Ikhezi farm 7 7 Insuzeqcwensa 94 94 Masakhane 6 6 Mazakhele 4 4 Mdimane 10 10 Mpukane 16 16 Mthethofanayo 13 13 Ndwendwe 24 24 Ntibane 41 41 Ntokozweni 15 15 Siyaphumula 27 27 Sizanani 10 10 Tayside 12 12 Thuthukani 6 6 Umzimkhulu 114 114 Vumbuka 23 23 Wewe 30 30 Strijbank 241 241 Shayamoya LP 778 778 Ga- moretsele 53 53 Mavhunga 168 168 Sekgopokgopong Gedroogte 134 134 Makhushane 195 195 Machenga 182 182 Mashishimale 46 46 NW 70 70 Bona bona Madipaleseng Tlapeng 70 70 NC 322 322 Bankhara 322 322
21 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
2.3.12 Number of small WSIG projects under 182 86 Programe1:108 AdministrationUnder by 66 Under by 51.56% 108 Partially achieved construction Schedule 5B 174 174 86 104 EC 23 23 9 17 Under by 6 17 Alfred Nzo (4) Alfred Nzo (4) Alfred Nzo (3) Alfred Nzo (4) n/a Alfred Nzo (4) N/A n/a PoE accepted for 4,
Chris Hani (5) Chris Hani (5) Chris Hani (0) Chris Hani (7) n/a Chris Hani (7) N/A n/a PoE accepted for 7
Joe Gqabi (3) Joe Gqabi (3) Joe Gqabi (2) Joe Gqabi (2) Joe Gqabi (1) Joe Gqabi (2) Delays in procurement processes for the WSA to submit acceleration plans PoE accepted for 2, appointment of contractor
OR Tambo (6) OR Tambo (6) OR Tambo (0) Not achieved OR Tambo (6) OR Tambo (0) Delays in procurement processes for the WSA to submit acceleration plans PoE accepted appointment of contractor
Amathole (4) Amathole (4) Amathole (4) Amathole (4) n/a Amathole (4) N/A n/a PoE accepted for 4 Blue Crane (1) Blue Crane (1) Blue Crane (0) Not achieved Blue Crane (0) Blue Crane (0) Delays in procurement processes for WSA to submit acceleration plans PoE accepted appointment of contractor
FS 14 14 15 15 Over by 1 15 PoE accepted for 15 Letsemeng (1) Letsemeng (1) Letsemeng (2) Letsemeng (2) n/a Letsemeng (2) Oppermansgronde WTW and Petrusburg PoE accepted for 2 boreholes are a carry over that could not be completed due to litigation issues between contractors and the WSA
Mohokare (2) Mohokare (2) Mohokare (1) Mohokare (1) n/a Mohokare (1) The Consultant has been appointed, the PoE accepted Municipality is waiting for Eskom to committ on the upgrade of the electricity supply to commence with the appointment of the contractor
Kopanong (2) Kopanong (2) Kopanong (5) Kopanong (5) n/a Kopanong (5) n/a n/a PoE accepted for 5 Maluti (2) Maluti (2) Maluti (1) Maluti (1) n/a Maluti (1) The consultant has been appointed, the Finalise appointmnet of contractor PoE accepted for 1 tender for Contractor closed on the 29th September 2017.
Matjhabeng (1) Matjhabeng (1) Matjhabeng (0) Matjhabeng (0) Matjhabeng (1) Matjhabeng (0) The Municipality is busy with the tender Finalise appointmnet of consultant and PoE accepted evaluations to appoint the consultant contractor
Dihlabeng (1) Dihlabeng (1) Dihlabeng (4) Dihlabeng (4) Over by 3 Dihlabeng (4) PSP for the Upgrading of Betlehem WTW N/A PoE accepted for 4 and Fouriesburg WS Pumpstation was appointed by the WSA in 2014 hence implementation commenced earlier than anticipated
Phumelela (1) Phumelela (1) Phumelela (0) Phumelela (0) Phumelela (1) Phumelela (0) The consultant has been appointed, the Finalise appointmnet of contractor PoE for under achievement municipality is currently busy with the accepted tender evaluations to appoint the contractor
Setsoto (1) Setsoto (1) Setsoto (1) Setsoto (1) n/a Setsoto (1) The project is under construction the N/A PoE accepted for 1 progress is at 7%
Moqhaka (1) Moqhaka (1) Moqhaka (0) Moqhaka (0) Moqhaka (1) Moqhaka (0) The Municipality is busy with the tender Finalise appointmnet of contractor PoE for under achivement accepted evaluations to appoint the contractor
Ngwathe (1) Ngwathe (1) Ngwathe (0) Ngwathe (0) Ngwathe (1) Ngwathe (0) The consultant has been appointed, the Finalise appointmnet of contractor PoE accepted tender for contractor closed on the 04th October 2017
Metsimaholo (1) Metsimaholo (1) Metsimaholo (0) Metsimaholo (0) Metsimaholo (1) Metsimaholo (0) The Municipality is busy with the tender Finalise appointmnet of consultant and PoE for under achivement accepted evaluations to appoint the consultant contractor
GP 8 8 8 9 Over by 1 9 Emfuleni (2) Emfuleni (2) Emfuleni (3) Emfuleni (3) Over by 1 Emfuleni (3) n/a n/a PoE accepted for 3 Midvaal (1) Midvaal (1) Midvaal (0) Midvaal (1) n/a Midvaal (1) n/a n/a PoE accepted for 1 Lesedi (1) Lesedi (1) Lesedi (1) Lesedi (1) n/a Lesedi (1) n/a n/a PoE accepted for 1 Mogale City (2) Mogale City (2) Mogale City (0) Mogale City (2) n/a Mogale City (2) n/a n/a PoE accepted for 2 Merafong (1) Merafong (1) Merafong (0) Merafong (1) n/a Merafong (1) n/a n/a PoE accepted for 1 Rand West (1) Rand West (1) Rand West (1) Rand West (1) n/a Rand West (1) n/a n/a PoE accepted for 1 KZN 34 34 30 29 Under by 5 29 Amajuba (3) Amajuba (3) Amajuba (3) Amajuba (3) n/a Amajuba (3) n/a n/a PoE accepted for 3 Harry Gwala (4) Harry Gwala (4) Harry Gwala (3) Harry Gwala (3) Under by 1 Harry Gwala (3) Business Plan for the project was Regional P&I is expediting approval of PoE accepted for 3 submitted late, awaiting approval prior to the project BP commencement
iLembe (4) iLembe (4) iLembe (4) iLembe (4) n/a iLembe (4) n/a n/a PoE accepted for 4 King Cetshwayo (3) King Cetshwayo (3) King Cetshwayo (3) King Cetshwayo (3) n/a King Cetshwayo (3) n/a n/a PoE accepted for 3 uMsunduzi (2) uMsunduzi (2) uMsunduzi (2) uMsunduzi (2) n/a uMsunduzi (2) n/a n/a PoE accepted for 2 Newcastle (1) Newcastle (1) Newcastle (1) Newcastle (1) n/a Newcastle (1) n/a n/a PoE accepted for 1 Ugu (2) Ugu (2) Ugu (2) Ugu (2) n/a Ugu (2) n/a n/a PoE accepted for 1 uMgungundlovu (1) uMgungundlovu (1) uMgungundlovu (1) uMgungundlovu (1) n/a uMgungundlovu (1) n/a n/a PoE accepted for 1 uMhlathuze (2) uMhlathuze (2) uMhlathuze (2) uMhlathuze (2) n/a uMhlathuze (2) n/a n/a PoE accepted for 2 uMkhanyakude (4) uMkhanyakude (4) uMkhanyakude (2) uMkhanyakude (2) Under by 2 uMkhanyakude (2) Delays in advertisement of Tenders for The IA to ensure that the contractor put as PoE accepted for 2 Rudimentary Programme Phase 6 and much resources as possible in order to KwaZibi Water Supply Phase 1 shorten construction periods.
Mzinyathi (2) Mzinyathi (2) uMzinyathi (0) uMzinyathi (0) Under by 2 uMzinyathi (0) Delays in commencement with SCM Fast track SCM processess PoE accepted processes Uthukela (2) Uthukela (2) UThukela (2) UThukela (5) Over by 3 UThukela (5) N/A PoE accepted for 6 Zululand (4) Zululand (4) Zululand (2) Zululand (2) Under by 2 Zululand (2) Delays in procurement for Dindi and Fastrack tender adjudication processes PoE accepted for 2 Godlankomo Water Supply Projects for Dindi and Godlankomo projects
LP 32 32 4 5 Under by 27 4
22 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
LP Sekhukhune (5) Sekhukhune (5) Sekhukhune (0) SekhukhunePrograme1: (0) AdministrationUnder by 5 Sekhukhune (0) Projects planned for 2017-18 financial Projects planned for 2017-18 financial PoE accepted year are targeted for implementation in year are targeted for implementation in the 3rd quarter the 3rd quarter
Mopani DM (4) Mopani DM (4) Mopani DM (0) Mopani DM (0) Under by 4 Mopani DM (0) Projects planned for 2017-18 financial Projects planned for 2017-18 financial PoE accepted year are targeted for implementation in year are targeted for implementation in the 3rd quarter the 3rd quarter
Vhembe DM (3) Vhembe DM (3) Vhembe DM (0) Vhembe DM (0) Under by 3 Vhembe DM (0) Projects planned for 2017-18 financial Projects planned for 2017-18 financial PoE accepted year are targeted for implementation in year are targeted for implementation in the 3rd quarter the 3rd quarter
Capricorn DM (5) Capricorn DM (5) Capricorn DM (0) Capricorn DM (0) Under by 5 Capricorn DM (0) Projects planned for 2017-18 financial Projects planned for 2017-18 financial PoE accepted year are targeted for implementation in year are targeted for implementation in the 3rd quarter the 3rd quarter
Mogalakwena LM (5) Mogalakwena LM (5) Mogalakwena LM (1) Mogalakwena LM (3) Under by 2 Mogalakwena LM (3) Delays in appointmnet of contractors Mogalakwena Municipalty accelerated the PoE accepted appointment of contractors using the term contracts.
Lephalale LM (3) Lephalale LM (3) Lephalale LM (0) Lephalale LM (0) Under by 3 Lephalale LM (0) Projects planned for 2017-18 financial Projects planned for 2017-18 financial PoE accepted year are targeted for implementation in year are targeted for implementation in the 3rd quarter the 3rd quarter
Bela-Bela LM (2) Bela-Bela LM (2) Bela-Bela LM (3) Bela-Bela LM (2) n/a Bela-Bela LM (2) Bela bela municipality accelerated the PoE accepted procurement of contractors and construction commenced early
Lim368 (5) Lim368 (5) Lim368 (0) Lim368 (0) Under by 5 Lim368 (0) Projects planned for 2017-18 financial Projects planned for 2017-18 financial PoE accepted year are targeted for implementation in year are targeted for implementation in the 3rd quarter the 3rd quarter
23 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
MP 21 21 12 Programe1:9 AdministrationUnder by 12 9 Albert Luthuli (2) Albert Luthuli (2) Albert Luthuli (0) Albert Luthuli (0) Under by 2 Albert Luthuli (0) Funding could not be transferred in Fastrack tranfer of funds. PoE accepted quarter 1 and this delayed the appointment of contractors.
Mkhondo (2) Mkhondo (2) Mkhondo (0) Mkhondo (0) Under by 2 Mkhondo (0) Delays in finalisation of designs Tender for appointmnet of contractor has PoE accepted been advertised.
Lekwa (1) Lekwa (1) Lekwa (0) Lekwa (0) Under by 1 Lekwa (0) Funding could not be transferred in Fastrack tranfer of funds. PoE accepted quarter 1 and this delayed the appointment of contractors
Emakhazeni (2) Emakhazeni (2) Emakhazeni (2) Emakhazeni (2) n/a Emakhazeni (2) N/A PoE accepted Thembisile Hani (4) Thembisile Hani (4) Thembisile Hani (3) Thembisile Hani (3) Under by 1 Thembisile Hani (3) Delays in finalisation of designs Tender for appointmnet of contractor has PoE accepted been advertised.
Dr JS Moroka (1) Dr JS Moroka (1) Dr JS Moroka (0) Dr JS Moroka (0) Under by 1 Dr JS Moroka (0) The initial project was reprioritised and a Fastrack the Procurement of contractor. PoE accepted Business Plan for another project in a hotspot are had to be approved
Thaba Chweu (2) Thaba Chweu (2) Thaba Chweu (0) Thaba Chweu (0) Under by 2 Thaba Chweu (0) Funding could not be transferred in Fastrack tranfer of funds. PoE accepted quarter 1 and this delayed the appointment of contractors
Nkomazi (2) Nkomazi (2) Nkomazi (2) Nkomazi (2) n/a Nkomazi (2) n/a n/a PoE accepted for 2 Bushbuckridge (3) Bushbuckridge (3) Bushbuckridge (3) Bushbuckridge (0) Under by 3 Bushbuckridge (0) n/a n/a PoE accepted Mbombela (2) Mbombela (2) Mbombela (2) Mbombela (2) n/a Mbombela (2) n/a n/a PoE accepted for2 NC 25 25 6 8 Under by 17 8 Richtersveld (1) Richtersveld (1) Richtersveld (0) Richtersveld (0) Richtersveld (0) Consultant has been appointed, Tender Follow up with IA to ensure construction is PoE accepted has been advertised for contractors, achieved construction will commence in Quarter 3
Nama Khoi (1) Nama Khoi (1) Nama Khoi (0) Nama Khoi (0) Nama Khoi (0) Consultant has been appointed, Tender Follow up with IA to ensure construction is PoE accepted has been advertised for contractors, achieved construction will commence in Quarter 3
Kamiesberg (1) Kamiesberg (1) Kamiesberg (0) Kamiesberg (0) Kamiesberg (0) Consultant has been appointed, Tender Follow up with IA to ensure construction is PoE accepted has been advertised for contractors, achieved construction will commence in Quarter 3
Hantam (1) Hantam (1) Hantam (0) Hantam (0) Hantam (0) Consultant has been appointed, Tender Follow up with IA to ensure construction is PoE accepted has been advertised for contractors, achieved construction will commence in Quarter 3
Karoo Hoogland (1) Karoo Hoogland (1) Karoo Hoogland (0) Karoo Hoogland (0) Karoo Hoogland (0) Consultant has been appointed, Tender Follow up with IA to ensure construction is PoE accepted has been advertised for contractors, achieved construction will commence in Quarter 3
Khai-Ma (1) Khai-Ma (1) Khai-Ma (0) Khai-Ma (0) Khai-Ma (0) Consultant has been appointed, Tender Follow up with IA to ensure construction is PoE accepted has been advertised for contractors, achieved construction will commence in Quarter 3
Ubuntu (1) Ubuntu (1) Ubuntu (0) Ubuntu (0) Ubuntu (0) Consultant has been appointed, Tender Follow up with IA to ensure construction is PoE accepted has been advertised for contractors, achieved construction will commence in Quarter 3
Msobomvu (1) Msobomvu (1) Msobomvu (0) Msobomvu (0) Msobomvu (0) Contractors have been appointed, Follow up with IA to ensure construction is PoE accepted construction will commence in quarter 3 achieved
Emthanjeni (1) Emthanjeni (1) Emthanjeni (0) Emthanjeni (0) Emthanjeni (0) Tender advertisement has been finalised, Follow up with IA to ensure construction is PoE accepted awaiting final appointmnet of contractor achieved
Kareeberg (1) Kareeberg (1) Kareeberg (0) Kareeberg (0) Kareeberg (0) Tender advertisement has been finalised, Follow up with IA to ensure construction is PoE accepted awaiting final appointmnet of contractor achieved
Renosberg (1) Renosberg (1) Renosberg (1) Renosberg (0) Renosberg (0) PoE accepted Thembelihle (1) Thembelihle (1) Thembelihle (0) Thembelihle (0) Thembelihle (1) Thembelihle (0) Tender for appointmnet of contractor has Follow up with IA to ensure construction is PoE accepted been advertised, construction will achieved commence in quarter 3
Siyancuma (1) Siyancuma (1) Siyancuma (0) Siyancuma (0) Siyancuma (1) Siyancuma (0) Contractors have been appointed, Follow up with IA to ensure construction is PoE accepted construction will commence in quarter 3 achieved
Kai Garib (1) Kai Garib (1) Kai Garib (0) Kai Garib (0) Kai Garib (1) Kai Garib (0) Tender for appointmnet of contractor has Follow up with IA to ensure construction is PoE accepted been advertised, construction will achieved commence in quarter 3
Kheis (1) Kheis (1) Kheis (0) Kheis (0) Kheis (1) Kheis (0) Tender for appointmnet of contractor has Follow up with IA to ensure construction is PoE accepted been advertised, construction will achieved commence in quarter 3
Tsatsabane 1 Tsatsabane 1 Tsatsabane (0) Tsatsabane (0) Tsatsabane 1 Tsatsabane (0) Tender for appointmnet of contractor has Follow up with IA to ensure construction is PoE accepted been advertised, construction will achieved commence in quarter 3
Kgatelopele 1 Kgatelopele 1 Kgatelopele (0) Kgatelopele (0) Kgatelopele 1 Kgatelopele (0) Tender for appointmnet of contractor has Follow up with IA to ensure construction is PoE accepted been advertised, construction will achieved commence in quarter 3
24 NC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Khara Heist 1 Khara Heist 1 Khara Heist (0) Khara HeistPrograme1: (0) AdministrationKhara Heist 1 Khara Heist (0) Tender for appointmnet of contractor has Follow up with IA to ensure construction is PoE accepted been advertised, construction will achieved commence in quarter 3
Sol Plaatjie 1 Sol Plaatjie 1 Sol Plaatjie (0) Sol Plaatjie (0) Sol Plaatjie 1 Sol Plaatjie (0) Contractors have been appointed, Follow up with IA to ensure construction is PoE accepted construction will commence in quarter 3 achieved
Phokwane 1 Phokwane 1 Phokwane (0) Phokwane (0) Phokwane 1 Phokwane (0) Tender for appointmnet of contractor has Follow up with IA to ensure construction is PoE accepted been advertised, construction will achieved commence in quarter 3
Joe Morolong 2 Joe Morolong 2 Joe Morolong (2) Joe Morolong (4) Over by 2 Joe Morolong (4) PoE accepted Ga-Segonyana 2 Ga-Segonyana 2 Ga-Segonyana (2) Ga-Segonyana (3) n/a Ga-Segonyana (3) PoE accepted Gamagara 1 Gamagara 1 Gamagara (1) Gamagara (1) n/a Gamagara (1) PoE accepted NW 14 14 2 13 Under by 1 13 Moretele (3) Moretele (3) Moretele (0) Moretele (0) Under by 3 Moretele (0) Delays in submission of Business Plans Finalise approval of Business Plan PoE accepted by the WSA Rustenburg (3) Rustenburg (3) Rustenburg (0) Rustenburg (1) Under by 2 Rustenburg (1) Delays in submission of Business Plans Finalise approval of Business Plan PoE accepted by the WSA Kgetlengrivier (1) Kgetlengrivier (1) Kgetlengrivier (0) Kgetlengrivier (0) under by1 Kgetlengrivier (0) Delays in submission of Business Plans Finalise approval of Business Plan PoE accepted by the WSA Moses Kotane (2) Moses Kotane (2) Moses Kotane (0) Moses Kotane (1) Under by 1 Moses Kotane (1) Delays in submission of Business Plans Finalise approval of Business Plan PoE accepted by the WSA Dr Ruth Mompati (3) Dr Ruth Mompati (3) Dr Ruth Mompati (0) Dr Ruth Mompati (8) Over by 5 Dr Ruth Mompati (8) Delays in submission of Business Plans Finalise approval of Business Plan PoE accepted by the WSA Maquassi Hills (1) Maquassi Hills (1) Maquassi Hills (1) Maquassi Hills (1) n/a Maquassi Hills (1) PoE accepted Ventersdorp/ Tlokwe (1) Ventersdorp/ Tlokwe (1) Ventersdorp/ Tlokwe (1) Ventersdorp/ Tlokwe (2) Over by 1 Ventersdorp/ Tlokwe (2) PoE accepted WC 3 3 0 0 0 Matzikama (1) Matzikama (1) Matzikama (0) Matzikama (0) Under by 1 Matzikama (0) The consultant is appointed, however Tender readvertised with changed PoE accepted thre are challenges as the tender amount specification. is more than the allocated amount.
Cederberg (1) Cederberg (1) Cederberg (0) Cederberg (0) Under by 1 Cederberg (0) Consultant will be appointed by end Follow up with Municipality to ensure PoE accepted October. appointment of the contractor
Oudtshoorn (1) Oudtshoorn (1) Oudtshoorn (0) Oudtshoorn (0) Under by 1 Oudtshoorn (0) Consultant is appointed, construction will Follow up with IA to ensure construction is PoE accepted commence in November 2017. achieved
Schedule 6B 8 8 3 3 3 LP 3 3 0 0 Polokwane LM (2) Polokwane LM (2) Polokwane LM (0) Polokwane LM (0) Under by 2 Polokwane LM (0) Funds are available but not accessible as The planned projects will be Implemented PoE accepted they will be used to pay accruals. in the 2018/19 financial year
Thabazimbi LM (1) Thabazimbi LM (1) Thabazimbi LM (0) Thabazimbi LM (0) Under by 1 Thabazimbi LM (0) Funds are available but not accessible as The planned projects will be Implemented PoE accepted they will be used to pay accruals. in the 2018/19 financial year
NW 5 5 2 2 2 PoE accepted Madibeng (2) Madibeng (2) Madibeng (2) Madibeng (2) n/a Madibeng (2) n/a n/a PoE accepted Ngaka Modiri Molema (3) Ngaka Modiri Molema (3) Ngaka Modiri Molema (0) Ngaka Modiri Molema (0) Under by 3 Ngaka Modiri Molema (0) Funding was reprioritised to adress The planned projects will be Implemented PoE accepted hotspots in the 2018/19 financial year
1 1 1 1 PoE accepted KZN Nongoma LM (1)= Abaqulusi Nongoma LM (1)= Abaqulusi Nongoma LM (1)= Abaqulusi n/a Nongoma LM (1)= Abaqulusi PoE accepted
25 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
2.3.13 Number of small WSIG projects completed 5 0 0 Programe1:0 Administration 0 No milestone No milestone Schedule 5B 33 0 0 0 0 EC 9 No milestone No milestone No milestone No milestone Alfred Nzo (2) n/a n/a n/a n/a n/a Chris Hani (1) n/a n/a n/a n/a n/a Joe Gqabi (1) n/a n/a n/a n/a n/a OR Tambo (2) n/a n/a n/a n/a n/a Amathole (2) n/a n/a n/a n/a n/a Blue Crane (1) n/a n/a n/a n/a n/a FS 3 0 0 0 0 Kopanong (1) n/a n/a n/a n/a Dihlabeng (1) n/a n/a n/a n/a Metsimaholo (1) n/a n/a n/a n/a GP 1 n/a n/a n/a n/a Rand West (1) 0 0 0 0 KZN 5 n/a n/a n/a N/A Newcastle (1) n/a n/a n/a N/A Zululand (4) LP 2 n/a n/a n/a n/a Bela-Bela LM (2) 0 0 0 0 MP 2 0 1 0 0 0 0 Bushbuckridge (1) n/a n/a Albert Luthuli (2) n/a n/a n/a n/a NC 9 0 0 0 0 Hantam (1) n/a n/a n/a n/a Karoo Hoogland (1) n/a n/a n/a n/a Khai-Ma (1) n/a n/a n/a n/a Ubuntu (1) n/a n/a n/a n/a Emthanjeni (1) n/a n/a n/a n/a Kareeberg (1) n/a n/a n/a n/a Renosberg (1) n/a n/a n/a n/a Tsatsabane (1) n/a n/a n/a n/a Kgatelopele (1) n/a n/a n/a n/a NW 1 0 0 0 0 Moses Kotane (1) n/a N/A N/A N/A WC 1 0 0 0 0 Cederberg (1) n/a N/A N/A N/A Schedule 6B 8 0 1 0 0 KZN 0 0 1 0 0 Nongoma LM (1)= Abaqulusi n/a n/a 3 0 LP Polokwane LM (2) N/A n/a n/a N/A Thabazimbi LM (1) N/A n/a n/a N/A NW 5 0 Madibeng (2) N/A n/a n/a N/A Ngaka Modiri Molema (3) N/A n/a n/a N/A Accelerated Community Infrastructure 2.3.10 Number of small ACIP projects under 55 55 1 1 Under by 54 1 Not achieved construction Water Conservation and Demand 7 7 0 0 7 0 Management EC 3 3 0 0 3 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Sundays River WCDM Sundays River WCDM 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Makana WCDM Makana WCDM 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Ndlambe WCDM Ndlambe WCDM 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
FS 1 1 0 0 1 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Mafube WCDM Mafube WCDM 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
GP 2 2 0 0 2 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Lesedi WCDM Lesedi WCDM 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Merafong WCDM Merafong WCDM 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
NC 1 1 0 0 1 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Magareng WCDM Magareng WCDM 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
26 2.3.10 Not achieved
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
WATER SUPPLY 17 17 0 Programe1:0 Administration17 0 EC 3 3 0 0 3 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Waterford Community Water Waterford Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A Supply for the bucket eradication programme.
Blue Crane Route Community Blue Crane Route Community Water 0 0 0 0 The budget has been reprioritised to pay N/A Water Supply Supply for the bucket eradication programme.
Blue Crane Route Community Blue Crane Route Community Water 0 0 0 0 The budget has been reprioritised to pay N/A Water Supply Supply for the bucket eradication programme.
FS 5 5 0 0 5 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Letsemeng Community Water Letsemeng Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A Supply for the bucket eradication programme.
Letsemeng Community Water Letsemeng Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A Supply for the bucket eradication programme.
Mafube Community Water Supply Mafube Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Phumelela Community Water Phumelela Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A Supply for the bucket eradication programme.
Mafube Community Water Supply Mafube Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
MP 1 1 0 0 1 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Delmas Water supply and Water Delmas Water supply and Water 0 0 0 0 The budget has been reprioritised to pay N/A conservation demand and demand conservation demand and demand for the bucket eradication programme. management management
NC 2 2 0 0 2 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Emthanjeni Community Water Emthanjeni Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A Supply for the bucket eradication programme.
Siyathemba Community Water Siyathemba Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A Supply for the bucket eradication programme.
LP 1 1 0 0 1 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Tshilidzini Community Water Tshilidzini Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A Supply for the bucket eradication programme.
NW 1 1 0 0 1 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Ventersdorp Water Community Ventersdorp Water Community 0 0 0 0 The budget has been reprioritised to pay N/A Supply Supply for the bucket eradication programme.
WC 4 4 0 0 4 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
George Community Water Supply George Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Laingsburg Laingsburg 0 0 0 0 The budget has been reprioritised to pay N/A Community Water Supply Community Water Supply for the bucket eradication programme.
Kannaland Community Water Kannaland Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A Supply for the bucket eradication programme.
Mossel Bay Community Water Mossel Bay Community Water Supply 0 0 0 0 The budget has been reprioritised to pay N/A Supply for the bucket eradication programme.
27 2.3.10 Not achieved
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
WASTE WATER TREATMENT WORKS 31 31 0 Programe1:0 Administration30 0 EC 5 5 0 0 5 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Ndlambe WWTW Ndlambe WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Nkonkobela WWTW Nkonkobela WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Kouga WWTW Kouga WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Dr Beyer Naude WWTW Dr Beyer Naude WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Koukamma WWTW Koukamma WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
FS 6 6 0 0 6 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Kopanong WWTW Kopanong WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Moqhaka WWTW Moqhaka WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Mantsopa WWTW Mantsopa WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Masilonyana WWTW Masilonyana WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Phumelela WWTW Phumelela WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Mohokare WWTW Mohokare WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
GP 2 2 0 0 2 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Randfontein WWTW Randfontein WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Emfuleni WWTW Emfuleni WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
KZN 3 3 1 1 2 1 Ingwavuma WWTW Ingwavuma WWTW Ingwavuma WWTW Ingwavuma WWTW Ingwavuma WWTW n/a n/a PoE accepted Manguzi WWTW Manguzi WWTW 0 0 0 0 The IA delayed appointment of WSA to fast track appointmnet of contractors contractors Hluhluwe WWTW Hluhluwe WWTW 0 0 0 0 The IA delayed appointment of WSA to fast track appointmnet of contractors contractors MP 3 3 0 0 3 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Mkhondo WWTW Mkhondo WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Dr Pixley Ka Sema WWTW Dr Pixley Ka Sema WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme. Dr Pixley Ka Sema WWTW Dr Pixley Ka Sema WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
LP 4 4 0 0 4 -4 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Tzaneen WWTW Tzaneen WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Mutale WWTW Mutale WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
28 2.3.10 Not achieved
LP
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Capricorn WWTW Capricorn WWTW 0 Programe1:0 Administration0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Lephalale WWTW Lephalale WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
NC 2 2 0 0 2 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Khai Ma WWTW Khai Ma WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Sol Plaatjie WWTW Sol Plaatjie WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
NW 3 3 0 0 3 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
City of Matlosana WWTW City of Matlosana WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Ventersdorp WWTW Ventersdorp WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
City of Matlosana WWTW City of Matlosana WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
WC 3 3 0 0 3 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Kannaland WWTW Kannaland WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Cederberg WWTW Cederberg WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
Kannaland WWTW Kannaland WWTW 0 0 0 0 The budget has been reprioritised to pay N/A for the bucket eradication programme.
2.3.11 Number of small ACIP projects under 55 No milestone No milestone No milestone No milestone n/a n/a No milestone completed
Water Conservation and Demand 7 No milestone No milestone No milestone No milestone No milestone n/a n/a Management EC 3 n/a n/a Sundays River WCDM n/a n/a Makana WCDM n/a n/a Ndlambe WCDM n/a n/a FS 1 n/a n/a Mafube WCDM n/a n/a GP 2 n/a n/a Lesedi WCDM n/a n/a Merafong WCDM n/a n/a NC 1 n/a n/a Magareng WCDM n/a n/a WATER SUPPLY 17 n/a n/a EC 3 n/a n/a Waterford Community Water n/a n/a Supply Blue Crane Route Community n/a n/a Water Supply Blue Crane Route Community n/a n/a Water Supply
29 2.3.11 No milestone
No milestone No milestone No milestone No milestone No milestone
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
FS 5 Programe1: Administration n/a n/a Letsemeng Community Water n/a n/a Supply Letsemeng Community Water n/a n/a Supply Mafube Community Water Supply n/a n/a
Phumelela Community Water n/a n/a Supply Mafube Community Water Supply n/a n/a
MP 1 n/a n/a Delmas Water supply and Water n/a n/a conservation demand and demand management
NC 2 n/a n/a Emthanjeni Community Water n/a n/a Supply Siyathemba Community Water n/a n/a Supply LP 1 n/a n/a Tshilidzini Community Water n/a n/a Supply NW 1 n/a n/a Ventersdorp Water Community n/a n/a Supply
WC 4 n/a n/a George Community Water Supply n/a n/a
Laingsburg n/a n/a Community Water Supply Kannaland Community Water n/a n/a Supply Mossel Bay Community Water n/a n/a Supply WASTE WATER TREATMENT WORKS 31 n/a n/a
EC 5 n/a n/a Ndlambe WWTW n/a n/a Nkonkobela WWTW n/a n/a Kouga WWTW n/a n/a Dr Beyer Naude WWTW n/a n/a Koukamma WWTW n/a n/a FS 6 n/a n/a Kopanong WWTW n/a n/a Moqhaka WWTW n/a n/a Mantsopa WWTW n/a n/a Masilonyana WWTW n/a n/a Phumelela WWTW n/a n/a Mohokare WWTW n/a n/a GP 2 n/a n/a Randfontein WWTW n/a n/a Emfuleni WWTW n/a n/a KZN 3 n/a n/a Ingwavuma WWTW n/a n/a Manguzi WWTW n/a n/a Hluhluwe WWTW n/a n/a MP 3 n/a n/a Mkhondo WWTW n/a n/a Dr Pixley Ka Sema WWTW n/a n/a Dr Pixley Ka Sema WWTW n/a n/a
30 2.3.11 No milestone
No milestone No milestone No milestone No milestone No milestone
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
LP 4 Programe1: Administration n/a n/a Tzaneen WWTW n/a n/a Mutale WWTW n/a n/a Capricorn WWTW n/a n/a Lephalale WWTW n/a n/a NC 2 n/a n/a Khai Ma WWTW n/a n/a Sol Plaatjie WWTW n/a n/a NW 3 n/a n/a City of Matlosana WWTW n/a n/a Ventersdorp WWTW n/a n/a City of Matlosana WWTW n/a n/a WC 3 n/a n/a Kannaland WWTW n/a n/a Cederberg WWTW n/a n/a Kannaland WWTW n/a n/a 3.4.1 Number of job opportunities created through 166 241 241 Over achieved PoE accepted for 241 water services infrastructure programmes.
EC 104 76 76 n/a n/a FS 32 0 0 n/a n/a GP 0 0 0 KZN 21 0 0 n/a n/a MP 0 0 0 LP 0 117 117 NC 9 0 0 n/a n/a NW 0 48 48 WC 0 0 0 3.2.1 Number of Resource Poor Farmers financially 706 357 103 Under by 254 Under by 71.14% 103 Not achieved supported to enhance access to water
EC 268 0 0 The Q 2 target was achieved in Q1.
FS 15 7 7 Not applicable GP 14 0 0 None Not applicable KZN 80 4 4 KZN was delayed due to delays in the KZN transfer agreements have since Please provide PoE for the transfer approval of transfer agreements. been approved and thus implementation agreements will commence in Q3.
LP 41 0 0 LP: implementation was delayed due to LP to utilize DWS construction to Please provide PoE to substantiate the procurement processes. implement the projects. the reason for variance
MP 102 0 0 Delay to appoint contractors to MP Provincial Office to fast track the Please provide PoE to substantiate commenced with the implementation of appointment of Contractors the reason for variance RPF projects.
NC 40 0 0 None Not applicable NW 22 21 21 One beneneficiary will no longer be Please provide PoE to substantiate supported as there is no additional water the reason for variance to be allocated in his area.
WC 124 71 71 None Not applicable PoE accepeted for 71,
Please note that 53 IDs were not counted as they were not included in the schedule provided.
31 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
3.2.2 Number of tanks installed to harvest water for 1500 425 42 Programe1: AdministrationUnder by 383 Under by 90.11% 42 Not achieved food production and other household productive use
EC 180 0 0 FS 100 0 0 GP 100 0 0 KZN 220 0 0 LP 240 0 0 MP 140 0 0 NC 120 0 0 NW 220 42 42 WC 180 0 0 3.2.3 Number of job opportunities created through 247 84 0 Under by 84 Under by 100% 0 Please provide reasons for variance Please provide recovery plan Not achieved the ResourcePoor Farmer and Water Harvesting programmes Programme 4 : Water Sector Regulation
Economic and Social Regulation sub-programme 1.5.1 Number of WMAs assessed for Acid Mine 1 WMA 100% platinum mines assessed in 100% platinum mines assessed in Crocodile 100% platinum mines assessed in Crocodile n/a n/a Achieved PoE accepted for Platinum mines Drainage (AMD) (Crocodile (West), Limpopo) Crocodile (West), Limpopo (West), Limpopo (West), Limpopo assessed in Crocodile Limpopo 1 and 2 1.5.2 Number of WMAs in which mitigation 1 Draft 2 strategy for 100% Draft 2 strategy for Inkomati-Usutu 100% Draft 2 strategy for Inkomati-Usutu n/a n/a Achieved PoE accepted for Inkomati Usutu strategies for potential AMD are developed Inkomati-Usutu WMA Inkomati-Usutu mitigation strategy
1.5.3 Completion of the Witwatersrand AMD long EIA completed EIA public Target not achieved. However, EIA Practitioner Target not achieved. However, EIA Practitioner Single source procurement of an EIA On critical path. Limited opportunity for Not achieved PoE accepted for EIA appointment. term project participation appointed and EIA Inception Report produced appointed and EIA Inception Report produced Practitioner was not approved by the recovery due to timeframes prescribed in National Treasury SCM Instruction concluded National Treasury. Single source EIA regulations. However, DWS and DEA Note 3 OF 2016-2017 and procurement was motivated to expedite will make every attempt to expedite DIGBY WELLS the EIA process processes as is legally permissible
1.5.4 Mine water management technologies Assessment of 5 AMD treatment Site establishment MoA returned to TCTA for finalisation MoA returned to TCTA for finalisation Delays in incoperating all comments from The process will be expedited once MoA Not achieved PoEaccepted for Signed ToR, TDP assessed technologies finalised all the relavant parties involved is signed. meeting 04 Aug 2017 minutes, TDP meeting 04 Aug 2017 attendance register
4.2.5 Water economic regulator established Approved business case for the Consultations on the Not achieved Not achieved External consultation could not take Follow up on the Ministerial approval and Not achieved PoE accepted for PPI 4 2 5 1 establishment of the independent draft business case place, the business case was presented deferred the external consultation to Business Case POE for Aug 2017, economic regulator for the independent to Top Management on the 14 August October PPI 4.2.5.1 Business Case, August economic regulator and recommended for Ministeial approval PPI 4.2.7.2 RWPS, August PPI 4.2.7.1 N&S, 4.2.5.1, 4.2.5.2
4.2.6 Water tariffs in the value chain approved 2018/19 Raw water charges and bulk tariffs Raw water charges Achieved Achieved n/a n/a n/a n/a Achieved PoE accepted Raw Water POE for approved for 2018/19 August 2017, PPI 4. 2 .6. 2 Bulk approved Water POE for Aug 2017, August PPI 4.2.6.2 Bulk Water, August PPI 4.2.6.1 Raw Water and POE 4.2.6.2 folder
4.2.7 Water pricing regulations implemented Pricing Strategy & Norms and Implementation of Achieved Achieved n/a n/a n/a n/a Achieved PoE accepted for PPI 4.2.7. 1 NS Standards monitored the revised pricing POE for Aug 2017, PPI 4. 2.7. 2 strategy monitored RWPS POE for AUG 2017,4.2.7.1 during the 2018/19 and 4.2.7.2 raw water charge determination Water Use Authorisation and Administration sub-programme 3.1.1 Percentage of applications for water use 80% 80% 63% (85/136) 63% (85/136) Under by 17% Recruitment and capacity building of Finalise the recruitment of Specialist and Partially achieved PoE accepted for 85 applications. authorisation finalised within 300 days additional officials to provide specialist also building capacity Please sign the schedule and also inputs is currently underway provide a schedule that reflects the outstanding 51 that was not processed.
Water Supply Services and Sanitation Regulation 1.1.1 Number of wastewater systems assessed for 963 No milestone No milestone No milestone n/a n/a n/a n/a No milestone for the n/a compliance with the Green Drop Regulatory quarter standards Kruger National Park Sasol Synfuels WSA
Sasol Synfuels WSA
Sun City Resort WSA
Nedbank WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
32 1.1.1 No milestone for the quarter
Kruger National Park
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Kruger National Park WSA Programe1: Administration Kruger National Park WSA
Kruger National Park WSA
Eskom Eskom Power Station WSA Camden Power Station WWTW Eskom Power Station WSA Matla Power Station WWTW Department of Public Works Department of Public Works Cofimvaba CS Eastern Cape Mthatha
Department of Public Works Elliotdale CS Eastern Cape Mthatha
Department of Public Works Elliotdale SAPS Eastern Cape Mthatha
Department of Public Works Engcobo CS Eastern Cape Mthatha
Department of Public Works Eastern Cape Mthatha Flagstaff CS Department of Public Works Libode CS Eastern Cape Mthatha
Department of Public Works Eastern Cape Mthatha Lusikisiki CS Department of Public Works Eastern Cape Mthatha Maluti SAPS (Military base) Department of Public Works Eastern Cape Mthatha Mthatha ACCU SAPS Department of Public Works Eastern Cape Mthatha Mthatha CS Department of Public Works Mthatha 14SAI Eastern Cape Mthatha
Department of Public Works Mount Fletcher CS Eastern Cape Mthatha
Department of Public Works Mqanduli CS Eastern Cape Mthatha
Department of Public Works Mzamba SAPS Eastern Cape Mthatha
Department of Public Works Ngqamakhwe DCS Eastern Cape Mthatha
Department of Public Works Qunu Museum Eastern Cape Mthatha
Department of Public Works Ntabankulu CS Eastern Cape Mthatha
Department of Public Works Willowvale CS Eastern Cape Mthatha
Department of Public Works Middeldrift Prison Eastern Cape Port Elizabeth
Department of Public Works Heald Town Police Station Eastern Cape Port Elizabeth
Department of Public Works Debe Nek Police Station Eastern Cape Port Elizabeth
Department of Public Works Die Blaar Housing Complex Eastern Cape Port Elizabeth
Department of Public Works Storms River Police Station Eastern Cape Port Elizabeth
Department of Public Works Kwaaibrandt Housing Complex Eastern Cape Port Elizabeth
Department of Public Works Patensie Prison Eastern Cape Port Elizabeth
Department of Public Works Kirkwood Prison Eastern Cape Port Elizabeth
Department of Public Works Middleburg/ GrootfonteinAgric College Eastern Cape Port Elizabeth
Department of Public Works Albany Prison Eastern Cape Port Elizabeth
Department of Public Works Bulembu SAPS Airport Eastern Cape Port Elizabeth
Department of Public Works Free Bloemspruit State Department of Public Works Free Caledonspoort State Department of Public Works Free Goedemoed State
33 1.1.1 No milestone for the quarter
Department of Public Works
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Department of Public Works Free Groenpunt Programe1: Administration State Department of Public Works Free Grootvlei State Department of Public Works Free Maseru Bridge State Department of Public Works Free 22 Field Unit State Department of Public Works Free Debrig/ DOD Mob Center State Department of Public Works Zonderwater CS Gauteng Pretoria Department of Public Works Boekenhoutkloof Military Base Gauteng Pretoria Department of Public Works CAT Military Base Gauteng Pretoria Department of Public Works Ditholo Military Base Gauteng Pretoria Department of Public Works Roodeplaat Dog School (SAPS) Gauteng Pretoria Department of Public Works Thabatshwane Military Base Gauteng Pretoria Department of Public Works Toitskraal Gauteng Pretoria Department of Public Works Wallmansthal Military Base Gauteng Pretoria Department of Public Works Gauteng JHB Devon Department of Public Works Acornhoek SAPS Limpopo Department of Public Works Beit Bridge Border Post Limpopo Department of Public Works Hoedspruit Military Base-Main Works Limpopo Department of Public Works Hoedspruit Boston Military Base Limpopo Department of Public Works Hoedspruit Military Base-BVVA Limpopo Department of Public Works Hoedspruit Military Base - HQ Limpopo Department of Public Works Hoedspruit Military Base - 8SQ Limpopo Department of Public Works Hoedspruit Military Base - 19SQ Limpopo Department of Public Works Hoedspruit Military Base - 85SQ Limpopo Department of Public Works Hoedspruit Military Base - 400SQ Limpopo Department of Public Works Hoedspruit Military Base - 514SQ Limpopo Department of Public Works Leboeng SAPS Limpopo Department of Public Works Makhado Military Base Limpopo Department of Public Works Matatshe CS Limpopo Department of Public Works Naboomspruit Military Base Limpopo Department of Public Works Soekmekaar Magistrate Court Limpopo Department of Public Works Vuwane Military Base Limpopo Department of Public Works Barberton CS Mpumalanga Department of Public Works Camden Military Base Mpumalanga Department of Public Works Daggakraal SAPS Mpumalanga Department of Public Works Geluk CS Mpumalanga Department of Public Works Lebombo Port of Entry Mpumalanga Department of Public Works Mahamba Port of Entry Mpumalanga Department of Public Works Oshoek Port of Entry Mpumalanga Department of Public Works Sand River Military Base Mpumalanga Department of Public Works Witbank CS Mpumalanga Department of Public Works Zonestraal Military Base Mpumalanga Department of Public Works Acornhoek Mpumalanga Department of Public Works Barberton CS Mpumalanga Department of Public Works North Bray SAPS West Department of Public Works North Boshoek SAPS West Department of Public Works North Klipdrift MB West Department of Public Works North Losperfontein CS West
34 1.1.1 No milestone for the quarter
Department of Public Works
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Department of Public Works North Molopo MB Programe1: Administration West Department of Public Works North Ramatlabama BC West Department of Public Works North Rooigrond CS West Department of Public Works North Skilpad BC West Department of Public Works North Swartkopfontein BC West Department of Public Works North Welgegend West Department of Public Works Brandvlei Prison Western Cape Department of Public Works Buffeljagsrivier Prison Western Cape Department of Public Works Drakenstein Prison Western Cape Department of Public Works Dwarsrivier Prison Western Cape Department of Public Works Helderstroom Prison Western Cape Department of Public Works Langebaan Road Central Flight School Western Cape Department of Public Works Paardeberg Prison Western Cape Department of Public Works Riebeek West Prison Western Cape Department of Public Works Robben Island Western Cape Department of Public Works Saldanha Naval Base Western Cape Department of Public Works Test Flight & Development Centre Western Cape Department of Public Works Voorberg Prison Western Cape Department of Public Works Lohatlha Military Base Northern Cape Department of Public Works Louisvale Military Base Northern Cape Department of Public Works Middelputs Border Post Northern Cape Department of Public Works Nakop Northern Cape Department of Public Works Olifantshoek Radio Station Northern Cape Department of Public Works Vioolsdrift Port of Entry Northern Cape Department of Public Works Onverwacht Border Post Eastern Cape Department of Public Works Mtubatuba SANDF Eastern Cape Department of Public Works Esibayeni SAPS Eastern Cape Department of Public Works Ubombo SAPS Eastern Cape Department of Public Works Golela Border Post Eastern Cape Department of Public Works Ingwavuma SAPS Eastern Cape Department of Public Works Ndumo SANDF Eastern Cape Department of Public Works Emanguzi SAPS Eastern Cape Department of Public Works Glencoe Prison Eastern Cape Department of Public Works Hlobane SAPS Eastern Cape Department of Public Works Ncome Prison Eastern Cape Department of Public Works Waterval Prison Eastern Cape Department of Public Works Ekuseni Youth Centre Eastern Cape Department of Public Works Sevontein Prison Eastern Cape Department of Public Works Wartburg SAPS Eastern Cape Department of Public Works Nkandla Prestige Project Eastern Cape Department of Public Works New Hanover Prison Eastern Cape Department of Public Works Kranskop Prison Eastern Cape Department of Public Works Eastern Cape Mthunzini Prison Eastern Cape Alfred Nzo Local Municipality Cedarville
Alfred Nzo Local Municipality Matatiele
Alfred Nzo Local Municipality Mount Ayliff
Alfred Nzo Local Municipality Mount Frere
Alfred Nzo Local Municipality Bizana
Alfred Nzo Local Municipality Ntabankulu
35 1.1.1 No milestone for the quarter
Eastern Cape
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Amathole District Municipality Adelaide Programe1: Administration Amathole District Municipality Alice-Fort Hare
Amathole District Municipality Amabele
Amathole District Municipality Bedford
Amathole District Municipality Butterworth
Amathole District Municipality Cathcart Amathole District Municipality Cinsta East
Amathole District Municipality Fort Beaufort
Amathole District Municipality Idutywa
Amathole District Municipality Kei Mouth
Amathole District Municipality Keiskammahoek
Amathole District Municipality Komga
Amathole District Municipality Middledrift
Amathole District Municipality Peddie
Amathole District Municipality Seymour
Amathole District Municipality Stutterheim
Baviaans Local Municipality Steytlerville WWTW Baviaans Local Municipality Willowmore WWTW
Baviaans Local Municipality Rietbron WWTW
Blue Crane Route Local Cookhouse Municipality Blue Crane Route Local Pearston Municipality Blue Crane Route Local Somerset East Municipality Buffalo City Local Municipality Amalinda Central
Buffalo City Local Municipality Berlin
Buffalo City Local Municipality Breidbach
Buffalo City Local Municipality Bisho
Buffalo City Local Municipality Dimbaza
Buffalo City Local Municipality East Bank
Buffalo City Local Municipality Gonubie
Buffalo City Local Municipality Keyser’s Beach
Buffalo City Local Municipality Kidd’s Beach
Buffalo City Local Municipality Mdantsane East
Buffalo City Local Municipality Postdam
Buffalo City Local Municipality Reeston
Buffalo City Local Municipality Schornville KWT
Buffalo City Local Municipality West Bank
Buffalo City Local Municipality Zwelitcha
Camdeboo Local Municipality Aberdeen
Camdeboo Local Municipality Graff Reniet
Camdeboo Local Municipality NieuBethseda
Chris Hani District Municipality Cala
Chris Hani District Municipality Cofimvaba
Chris Hani District Municipality Cradock
Chris Hani District Municipality Dordrecht Chris Hani District Municipality Elliot
Chris Hani District Municipality Engcobo
Chris Hani District Municipality Hofmeyr
Chris Hani District Municipality Indwe
Chris Hani District Municipality Lady Frere
Chris Hani District Municipality Molteno
36 1.1.1 No milestone for the quarter
Eastern Cape
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Chris Hani District Municipality Middleburg Programe1: Administration Chris Hani District Municipality Queenstown
Chris Hani District Municipality Sada
Chris Hani District Municipality Sterkstroom
Chris Hani District Municipality Tarkastad
Chris Hani District Municipality Tsomo
Ikwezi Local Municipality Kliplaats
Ikwezi Local Municipality Jansenville
Joe Gqabi District Municipality Aliwal North
Joe Gqabi District Municipality Barkley East (Old Plant)
Joe Gqabi District Municipality Barkley East (New Plant)
Joe Gqabi District Municipality Burgersdorp
Joe Gqabi District Municipality Nerchle
Joe Gqabi District Municipality Jamestown
Joe Gqabi District Municipality Lady Grey
Joe Gqabi District Municipality Maclear (AS)
Joe Gqabi District Municipality Maclear (OP)
Joe Gqabi District Municipality Mount Fletcher
Joe Gqabi District Municipality Oviston
Joe Gqabi District Municipality Prenjiesberg
Joe Gqabi District Municipality Sterkspruit
Joe Gqabi District Municipality Steynsburg
Joe Gqabi District Municipality Ugie
Joe Gqabi District Municipality Venterstad
Kouga Local Municipality Hankey
Kouga Local Municipality Humansdorp
Kouga Local Municipality Jeffreys Bay
Kouga Local Municipality Kruisfontein
Kouga Local Municipality Loerie
Kouga Local Municipality St Francis
Kouga Local Municipality Thornhill
Koukamma Local Municipality Blikkiesdorp
Koukamma Local Municipality Clarkson
Koukamma Local Municipality Coldstream 1
Koukamma Local Municipality Coldstream 2 / Laaurel Ridge
Koukamma Local Municipality Joubertina / Ravinia
Koukamma Local Municipality Kareedouw
Koukamma Local Municipality Krakeel River
Koukamma Local Municipality Louter Water
Koukamma Local Municipality Misgund
Koukamma Local Municipality Nompumelelo / Sandrift Mandelapark
Koukamma Local Municipality Stormsriver
Koukamma Local Municipality Woodlands
Makana Local Municipality Alicedale
Makana Local Municipality Belmont Valley
Makana Local Municipality Mayfield
Ndlambe Local Municipality Alexandria / Kwanonkqubela Ndlambe Local Municipality Bathurst / Molukhanyo
Ndlambe Local Municipality Boesman river Mouth / Marselle Ndlambe Local Municipality Kenton on Sea / Ekuphumleni Ndlambe Local Municipality Port Alfred
Nelson Mandela Metropolitan Cape Receife Municipality
37 1.1.1 No milestone for the quarter
Eastern Cape
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Nelson Mandela Metropolitan Despatch Programe1: Administration Municipality Nelson Mandela Metropolitan Driftsands Municipality Nelson Mandela Metropolitan Fishwater Flats-Domestic Municipality Nelson Mandela Metropolitan Fishwater Flats Industrial Municipality Nelson Mandela Metropolitan Kelvin Jones Municipality Nelson Mandela Metropolitan KwaNobuhle Municipality Nelson Mandela Metropolitan Rocklands Municipality OR Tambo District Municipality Bizana
OR Tambo District Municipality Flagstaff
OR Tambo District Municipality Lusikisiki
OR Tambo District Municipality Mqanduli
OR Tambo District Municipality Mthatha
OR Tambo District Municipality Ngqeleni
OR Tambo District Municipality Ntabankulu
OR Tambo District Municipality Port St Johns
OR Tambo District Municipality Qumbu
OR Tambo District Municipality Tsolo
Sundays River Valley Local Enon/ Bersheba Municipality Sundays River Valley Local Greater Kirkwood Municipality Sundays River Valley Local Peterson Municipality Free State Dihlabeng Local Municipality Bethlehem
Dihlabeng Local Municipality Clarens/ Kgubetswana
Dihlabeng Local Municipality Fouriesburg/ Mashaeng
Dihlabeng Local Municipality Paul Roux
Dihlabeng Local Municipality Rosendal/ Mautse
Kopanong Local Municipality Bethulie
Kopanong Local Municipality Edenburg
Kopanong Local Municipality Fauresmith
Kopanong Local Municipality Gariep Dam
Kopanong Local Municipality Jagersfontein
Kopanong Local Municipality Philipolis
Kopanong Local Municipality Reddersburg
Kopanong Local Municipality Springfontein
Kopanong Local Municipality Trompsburg
Letsemeng Local Municipality Jacobsdal
Letsemeng Local Municipality Luckhoff
Letsemeng Local Municipality Koffiefontein
Letsemeng Local Municipality Oppermansgronde
Letsemeng Local Municipality Petrusburg
Mafube Local Municipality Cornelia
Mafube Local Municipality Frankfort
Mafube Local Municipality Tweeling
Mafube Local Municipality Namahadi
Mafube Local Municipality Villiers/QalaMoedingbotjha Maluti Elandsriver
Maluti Kestell
Maluti Makwane/Matsegeng
Maluti Moeding
Maluti Phuthaditjaba
Maluti Tshiame
Maluti Wilge/Harrismith
Mangaung Metropolitan Bainsvlei Municipality Mangaung Metropolitan Bloemindustria Municipality Mangaung Metropolitan Blowmspruit Municipality
38 1.1.1 No milestone for the quarter
Free State
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Mangaung Metropolitan Bothsabelo Programe1: Administration Municipality Mangaung Metropolitan Northern Works Municipality Mangaung Metropolitan Sterkwater Municipality Mangaung Metropolitan Thaba Nchu Municipality Mangaung Metropolitan Welvaart Municipality Mantsopa Local Municipality Excelsior
Mantsopa Local Municipality Hobhouse
Mantsopa Local Municipality Lady Brand
Mantsopa Local Municipality Thaba Patdisa
Mantsopa Local Municipality Tweespruit
Masilonyana Local Municipality Brandfort
Masilonyana Local Municipality Soutpan
Masilonyana Local Municipality Theunissen
Masilonyana Local Municipality Verkeerdevlei
Masilonyana Local Municipality Winburg
Matjhabeng Local Municipality Allanridge
Matjhabeng Local Municipality Henneman
Matjhabeng Local Municipality Kutlwanong
Matjhabeng Local Municipality Mmamahabane-Mbabane
Matjhabeng Local Municipality Odendaalsrust
Matjhabeng Local Municipality Phomolong
Matjhabeng Local Municipality Thabong
Matjhabeng Local Municipality Theronia
Matjhabeng Local Municipality Ventersburg
Matjhabeng Local Municipality Virginia
Matjhabeng Local Municipality Witpan
Metsimaholo Local Municipality Deneysville
Metsimaholo Local Municipality Sasolburg
Metsimaholo Local Municipality Oranjeville
Metsimaholo Local Municipality Rouxville
Mohokare Local Municipality Smithfield
Mohokare Local Municipality Zastron
Mohokare Local Municipality Kroonstad
Moqhaka Local Municipality Steynsrus Moqhaka Local Municipality Viljoenskroon Nala Local Municipality Bothaville Nala Local Municipality Wesselsbron
Naledi Local Municipality Dewetsdorp
Naledi Local Municipality Van Stadensrus
Naledi Local Municipality Wepener
Ngwathe Local Municipality Edenville
Ngwathe Local Municipality Heibron
Ngwathe Local Municipality Koppies
Ngwathe Local Municipality Parys
Ngwathe Local Municipality Vredefort
Nketoana Local Municipality Arlington
Nketoana Local Municipality Lindley/Ntha
Nketoana Local Municipality Petrus Stern
Nketoana Local Municipality Reitz
Phumelela Local Municipality Memel
Phumelela Local Municipality Vrede
Phumelela Local Municipality Warden
Setsoto Local Municipality Clocolan Setsoto Local Municipality Ficksburg
39 1.1.1 No milestone for the quarter
Free State
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Setsoto Local Municipality Marquard Programe1: Administration Setsoto Local Municipality Senekal
Tokologo Local Municipality Boshoff
Tokologo Local Municipality Dealesville
Tokologo Local Municipality Hertzogville
Tswelopele Local Municipality Bultfontein
Tswelopele Local Municipality Hoopstad
Gauteng City of Johannesburg Driefontein
City of Johannesburg Ennerdale
City of Johannesburg Goukoppies
City of Johannesburg Bushkoppies
City of Johannesburg Northern Works
City of Johannesburg Olifantvlei City of Tshwane Babelegi
City of Tshwane Baviaanspoort
City of Tshwane Daspoort
City of Tshwane Ekangala Oxidation Ponds
City of Tshwane Godrich
City of Tshwane Klipgat
City of Tshwane Rayton
City of Tshwane Refilwe
City of Tshwane Rethabiseng
City of Tshwane Rietgat
City of Tshwane Rooiwal East
City of Tshwane Rooiwal North
City of Tshwane Sandspruit City of Tshwane Summersplace
City of Tshwane Sunderland Ridge
City of Tshwane Temba
City of Tshwane Zeekoegat
Ekurhuleni Anchor
Ekurhuleni Benoni
Ekurhuleni Carl Grunding
Ekurhuleni Dekema
Ekurhuleni Daveyton
Ekurhuleni Esther Park
Ekurhuleni Hartebeesfontein
Ekurhuleni Herbert Bickley
Ekurhuleni Jan Smuts
Ekurhuleni JP Marais
Ekurhuleni Olifantsfontein
Ekurhuleni Rondebult
Ekurhuleni Rynfield
Ekurhuleni Tsakane
Ekurhuleni Vlakplaats
Ekurhuleni Waterval
Ekurhuleni Welgedacht
Emfuleni Leeukuil
Emfuleni Rietspruit
Emfuleni Sebokeng
Lesedi Hiedelburg
Lesedi Ratanda
Merafong LM Khutsong
Merafong LM Kokosi-Fochville
Merafong LM Oberholzer
Merafong LM Welverdiend
Merafong LM Wedela
Midvaal Meyerton
40 1.1.1 No milestone for the quarter
Gauteng
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Midvaal OheniMuri Programe1: Administration Midvaal Vaal Marina
Mogale City Flip Human
Mogale City Magaliesburg
Mogale City Percy Stewart
Randfontein Hannes Van Niekerk
KwaZulu-Natal Amajuba Local Municipality Utrecht
Amajuba Local Municipality Tweediedale
Amajuba Local Municipality Welgedacht
Amajuba Local Municipality Durnacol
eThekwini Metropolitan Municipality Amanzimtoti
eThekwini Metropolitan Municipality Cato Ridge
eThekwini Metropolitan Municipality Central
eThekwini Metropolitan Municipality Craigieburn
eThekwini Metropolitan Municipality Dassenhoek
eThekwini Metropolitan Municipality Fredville eThekwini Metropolitan Municipality Genazzano
eThekwini Metropolitan Municipality Glenwood Road
eThekwini Metropolitan Municipality Hammarsdale
eThekwini Metropolitan Municipality Hillcrest
eThekwini Metropolitan Municipality Isipingo
eThekwini Metropolitan Municipality Kingsburgh
eThekwini Metropolitan Municipality KwaMashu
eThekwini Metropolitan Municipality KwaNdengezi
eThekwini Metropolitan Municipality Magabeni
eThekwini Metropolitan Municipality Mpumalanga
eThekwini Metropolitan Municipality New Germany
eThekwini Metropolitan Municipality Northern Works
eThekwini Metropolitan Municipality Phoenix
eThekwini Metropolitan Municipality Southern
eThekwini Metropolitan Municipality Tongaat Central
eThekwini Metropolitan Municipality Umbilo
eThekwini Metropolitan Municipality Umdloti
eThekwini Metropolitan Municipality Umhlanga
eThekwini Metropolitan Municipality Umhlatuzana
eThekwini Metropolitan Municipality Umkomaas
eThekwini Metropolitan Municipality Verulam
ILembe District Municipality Vukile
ILembe District Municipality Darnall
ILembe District Municipality Frasers
ILembe District Municipality Gledhow
ILembe District Municipality Mandeni
ILembe District Municipality Maphumulo Hospital
ILembe District Municipality Montebello Hospital
ILembe District Municipality Ntumjambili Hospital
ILembe District Municipality Shakaskraal
ILembe District Municipality Stanger-Kwadukuza
ILembe District Municipality Sundumbili
ILembe District Municipality Tugela
ILembe District Municipality Vukile
41 1.1.1 No milestone for the quarter
KwaZulu-Natal
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Newcastle Local Municipality Charlestown Ponds Programe1: Administration Newcastle Local Municipality Kilbarchin-Ngagane
Newcastle Local Municipality Madadeni
Newcastle Local Municipality Newcastle
Newcastle Local Municipality Osizweni
Sisonke District Municipality Bulwer
Sisonke District Municipality Franklin
Sisonke District Municipality Ixopo
Sisonke District Municipality Kokstad
Sisonke District Municipality Polela
Sisonke District Municipality Riverside Ponds
Sisonke District Municipality St Appollonaris
Sisonke District Municipality uMzimkhulu
Sisonke District Municipality Underberg
Ugu District Municipality Eden Wilds
Ugu District Municipality Gamalakhe
Ugu District Municipality Harding
Ugu District Municipality KwaMbonwa
Ugu District Municipality Malangeni
Ugu District Municipality Margate
Ugu District Municipality Umbango
Ugu District Municipality Melville
Ugu District Municipality Munster
Ugu District Municipality Ramsgate
Ugu District Municipality Red Dessert
Ugu District Municipality Scottburgh
Ugu District Municipality Shelley Beach
Ugu District Municipality Skogheim-Bhobhoyi
Ugu District Municipality Southbroom
Ugu District Municipality Umzinto
Ugu District Municipality Uvongo
uMgungundlovu District Applebosch Hospital Municipality uMgungundlovu District Camperdown Municipality uMgungundlovu District Coolair Municipality uMgungundlovu District Howick Municipality uMgungundlovu District Mooi River Municipality uMgungundlovu District Richmond Municipality uMhlathuze Local Municipality Empangeni
uMhlathuze Local Municipality Esikhawini
uMhlathuze Local Municipality Ngwelezana
uMhlathuze Local Municipality Nseleni
uMhlathuze Local Municipality Vulindlela
uMkhanyakude District Municipality Bethesda Hospital-Ubombo
uMkhanyakude District Municipality Hlabisa Hospital
uMkhanyakude District Municipality Hluhluwe
uMkhanyakude District Municipality Ingwavuma-Mosvold Hospital
uMkhanyakude District Municipality Jozini
uMkhanyakude District Municipality KwaMsane
uMkhanyakude District Municipality Manguzi Hospital
uMkhanyakude District Municipality Mtubatuba
uMkhanyakude District Municipality Mkhuze
uMkhanyakude District Municipality St Lucia Ponds
uMsunduzi Local Municipality Darvill
42 1.1.1 No milestone for the quarter
KwaZulu-Natal
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
uMsunduzi Local Municipality Lynnfield Park Programe1: Administration uMzinyathi District Municipality Dundee-Glencoe
uMzinyathi District Municipalit Greytown
uMzinyathi District Municipalit Nqutu New
uMzinyathi District Municipalit Pomeroy Ponds
uMzinyathi District Municipalit Tugela Ferry
uThukela District Municipality Ladysmith
uThukela District Municipality Estcourt
uThukela District Municipality Colenso
uThukela District Municipality Bergville
uThukela District Municipality Winterton
uThukela District Municipality Ekuvukeni
uThukela District Municipality Ezakheni
uThukela District Municipality Weenen
uThukela District Municipality Wembezi
uThungulu District Municipality Catherine Booth Hospital
uThungulu District Municipality Ekhombe Hospital
uThungulu District Municipality Ekuphumuleni Hospital
uThungulu District Municipality Gingindlovu Ponds
uThungulu District Municipality King Dinizulu
uThungulu District Municipality KwaBadala
uThungulu District Municipality Mbongolwane Hospital
uThungulu District Municipality Melmoth Ponds
uThungulu District Municipality MpushiniPonds
uThungulu District Municipality Mtunzini
uThungulu District Municipality Nkandla
uThungulu District Municipality Oceanview
Zululand District Municipality Owen Sithole Agriculture College
Zululand District Municipality Ceza Hospital
Zululand District Municipality Coronation
Zululand District Municipality eDumbe-Paul Pietersburg
Zululand District Municipality eMondlo
Zululand District Municipality Hlobane
Zululand District Municipality Itselejuba Hospital
Zululand District Municipality Ulundi
Zululand District Municipality Nkonjeni Hospital Ponds
Zululand District Municipality Nongoma
Zululand District Municipality Pongola
Limpopo BelaBela Local Municipality Pienaarsrivier
BelaBela Local Municipality Radium
Capricorn Local Municipality Warmbath
Capricorn Local Municipality Alldays
Capricorn Local Municipality Lebowakgomo AS Plant
Capricorn Local Municipality Mogwadi
Capricorn Local Municipality Lebowakgamo Ponds
Greater Sekhukhune District Senwabarwana Municipality Greater Sekhukhune District Burgersfort Municipality Greater Sekhukhune District Dennilton Municipality
43 1.1.1 No milestone for the quarter
Limpopo
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Greater Sekhukhune District Elandskraal Programe1: Administration Municipality Greater Sekhukhune District Groblersdal Municipality Greater Sekhukhune District Jane Furse Ponds Municipality Greater Sekhukhune District LeeuwfonteinMokganyaka Municipality Greater Sekhukhune District Mapokile ponds Municipality Greater Sekhukhune District Marle Hall Municipality Greater Sekhukhune District MecklebergMoreke ponds Municipality Greater Sekhukhune District Monsterslus-Hlogotlou Municipality Greater Sekhukhune District Motetema Municipality Greater Sekhukhune District Nebo ponds Municipality Greater Sekhukhune District Penge Municipality Greater Sekhukhune District Phokwane ponds Municipality Greater Sekhukhune District Roosenenkal Municipality Greater Sekhukhune District Steelpoort Municipality Lephalale Local Municipality Tubatse ponds
Lephalale Local Municipality Paarl
Lephalale Local Municipality Witpoort
Modimolle Local Municipality Zongesien
Modimolle Local Municipality Modimolle
Mogalakwena Local Municipality Vaalwater
Mogalakwena Local Municipality Mokopane old & New
Mookgophong Local Municipality Rebone
Mookgophong Local Municipality Naboomspruit
Mopani District Municipality Thusanag Ponds (Roedtan) Mopani District Municipality Lulekani
Mopani District Municipality Namakgale
Mopani District Municipality Phalaborwa
Mopani District Municipality Ga-Kgapane
Mopani District Municipality Giyani
Mopani District Municipality Lenyenye
Mopani District Municipality Modjadjiskoolf-Duiwelskloof Mopani District Municipality Nkowankowa
Mopani District Municipality Senwamokgope
Mopani District Municipality Tzaneen
Mopani District Municipality Phafhudi hospital
Polokwane Local Municipality Shilubane hospital
Polokwane Local Municipality Mankweng
Polokwane Local Municipality Polokwane Pasveer
ThabazimbiLocal Municipality Seshego
Thabazimbi Local Municipality Northam
Thabazimbi Local Municipality Rooiberg
Vhembe District Municipality Thabazimbi
Vhembe District Municipality Louis Trichardt Makhado
Vhembe District Municipality Makhado Dzanani
Vhembe District Municipality Malamulele
Vhembe District Municipality Mhinga
Vhembe District Municipality Musina
Vhembe District Municipality Mutale ponds
Vhembe District Municipality Nancefield
Vhembe District Municipality Thohoyandou
Vhembe District Municipality Tshifulanani ponds
Vhembe District Municipality Vleifontein ponds
Vhembe District Municipality Vuwani ponds
Vhembe District Municipality Waterval Makhado
44 1.1.1 No milestone for the quarter
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Mpumalanga Albert Luthuli Local Municipality Carolina Programe1: Administration Albert Luthuli Local Municipality Ekulendeni-Kromdraai
Albert Luthuli Local Municipality Elukwatini-Eerstehoek
Albert Luthuli Local Municipality Mpuluzi-Mayflower
Bushbuckridge Local Municipality Badplaas
Bushbuckridge Local Municipality Dwarsloop
Bushbuckridge Local Municipality Mkhuhlu
Bushbuckridge Local Municipality Thulamahashe
Bushbuckridge Local Municipality Hoxane
Bushbuckridge Local Municipality Maviljan
Bushbuckridge Local Municipality Tintswalo
Bushbuckridge Local Municipality Acornhoek
Dipaleseng Local Municipality Manghwazi
Dipaleseng Local Municipality Balfour
Dipaleseng Local Municipality Groutvlei Eskom
Dipaleseng Local Municipality Grootvlei Mine
Dr JS Moroka Local Municipality Greylingstad
Dr JS Moroka Local Municipality Siyabuswa
Dr JS Moroka Local Municipality Vaalbank/Libangeni
Emakhazeni Local Municipality Toitskraal
Emakhazeni Local Municipality Machadodorp
Emakhazeni Local Municipality Belfast
Emakhazeni Local Municipality Dullstroom
Emakhazeni Local Municipality Emthonjeni
Emalahleni Local Municipality WatervalBoven-Mgwenwa
Emalahleni Local Municipality Riverviw
Emalahleni Local Municipality Ferrobank
Emalahleni Local Municipality Klipspruit
Emalahleni Local Municipality Naauwpoort
Emalahleni Local Municipality Kriel-Ganala
Emalahleni Local Municipality Phola-Ogies
Govan Mbeki Local Municipality Rietspruit
Govan Mbeki Local Municipality Embalenhle
Govan Mbeki Local Municipality Kinross
Govan Mbeki Local Municipality Leandra-Leslie
Govan Mbeki Local Municipality Bthal
Govan Mbeki Local Municipality Evander
Lekwa Local Municipality Trichardt
Lekwa Local Municipality Standerton
Mbombela Local Municipality Morgenzon
Mbombela Local Municipality Kabokweni
Mbombela Local Municipality Kingstonvale
Mbombela Local Municipality White river
Mbombela Local Municipality Kanyamanzane
Mbombela Local Municipality Hazyview
Mbombela Local Municipality Matsulu
Mbombela Local Municipality Rockys Drift
Mbombela Local Municipality Davel
Mbombela Local Municipality Lothair
45 1.1.1 No milestone for the quarter
Mpumalanga
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Mbombela Local Municipality Hectorspruit Programe1: Administration PixleykaSeme Local Municipality Malelane
PixleykaSeme Local Municipality Volksrust
PixleykaSeme Local Municipality Vukuzakhe
PixleykaSeme Local Municipality Wakkerstroom
PixleykaSeme Local Municipality Amersfoort
Steve Tshwete Local Municipality Perdekop
Steve Tshwete Local Municipality Boskrans-Mlhuzi-Middelburg
Steve Tshwete Local Municipality KwaZamokuhle-hendrina
Steve Tshwete Local Municipality Komati
Thaba Cheuw Local Municipality BlinkTweefonteinpan-Mine Village
Thaba Cheuw Local Municipality Lydenburg
Thaba Cheuw Local Municipality Sabie
Thembisile Local Municipality Graskop
Thembisile Local Municipality KwaMhlanga Ponds East
Umjindi Local Municipality KwaMhlanga West
Victor Khanye Local Municipality Barberton
Victor Khanye Local Municipality Botleng
Victor Khanye Local Municipality Delmas
North West Dr Ruth S Mompati Local Bloemhof Municipality Dr Ruth S Mompati Local Scweizer-Reinecker Municipality Dr Ruth S Mompati Local Vryburg Municipality Kgetleng river Local Municipality Christiana
Kgetleng river Local Municipality Koster
Madibeng Local Municipality Swartruggens
Madibeng Local Municipality Brits
Madibeng Local Municipality Letlhabile
Madibeng Local Municipality Haartbeespoort
Maquassi hills Local Municipality Mothotlung
Maquassi hills Local Municipality Leeudoringstad
Matlosana Local Municipality Wolmaranstad
Matlosana Local Municipality Klerksdorp
Matlosana Local Municipality Orkney
Matlosana Local Municipality Stilfontein
Moretele Local Municipality Haartbeesfontein
Moses Kotane Local Municipality Ga MotlaSwartdam
Moses Kotane Local Municipality Madikwe
Ngaka Modiri Molema Local Mogwase Municipality Ngaka Modiri Molema Local Mmabatho Municipality Ngaka Modiri Molema Local Lichtenburg Municipality Ngaka Modiri Molema Local Daleryville Municipality Ngaka Modiri Molema Local Lehurutshe-Welbedacht Municipality Ngaka Modiri Molema Local Ottosdal Municipality Ngaka Modiri Molema Local Sannieshof Municipality Ngaka Modiri Molema Local Zeerust Municipality Ngaka Modiri Molema Local Itsoseng Municipality Ngaka Modiri Molema Local Mafikeng Municipality Ngaka Modiri Molema Local Atamelang Municipality Rustenburg Local Municipality Coligny
46 1.1.1 No milestone for the quarter
North West
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Rustenburg Local Municipality Boitekong Programe1: Administration Rustenburg Local Municipality Rustenburg
Rustenburg Local Municipality Lethabong
Tlokwe Local Municipality Monakato
Ventersdorp Local Municipality Potchefstroom-Tlokwe
Ventersdorp Local Municipality Ventersdorp
Northern Cape Kai Garib Local Municipality Kakamas
Kai Garib Local Municipality Keimoes
iKheis Local Municipality Kenhardt
iKheis Local Municipality Groblershoop
iKheis Local Municipality Brandboom
iKheis Local Municipality Wegdraai
iKheis Local Municipality Topline
Dikgatlong Local Municipality Grootdrink
Dikgatlong Local Municipality Barkly West
Dikgatlong Local Municipality Delpoortshoop
Emthanjeni Local Municipality Windsorton
Emthanjeni Local Municipality De Aar
Emthanjeni Local Municipality Britstown
Gamagara Local Municipality Hanover
Gamagara Local Municipality Olifantshoek
Gamagara Local Municipality Dibeng
Gamagara Local Municipality Dingleton
Ga-Segonyana Local Municipality Kathu
Ga-Segonyana Local Municipality Kuruman
Hantam Local Municipality Mothibistad
Hantam Local Municipality Brandvlei
Hantam Local Municipality Calvinia
Hantam Local Municipality Loeriesfontein
Hantam Local Municipality Nieuwoudtville
Joe Morolong Local Municipality Middelpos
Joe Morolong Local Municipality Hotazel
Kamiesberg Local Municipality Van Zylsrus
Kamiesberg Local Municipality Garies
Kareeberg Local Municipality Kamieskroon
Kareeberg Local Municipality Carnarvon
Kareeberg Local Municipality Vanwyksvlei
Karoo Hoogland Local Municipality Vosburg
Karoo Hoogland Local Municipality Williston
Karoo Hoogland Local Municipality Fraserburg
Kgatelopele Local Municipality Sutherland
Khai Ma Local Municipality Danielskuil
KharaHais Local Municipality Pofadder
KharaHais Local Municipality Kameelmond
Magareng Local Municipality Louisvaleweg
Mier Local Municipality Warrenton
Mier Local Municipality Rietfontein
Mier Local Municipality Askham
NamaKhoi Local Municipality Loubos
NamaKhoi Local Municipality Bergsig
NamaKhoi Local Municipality Carolusberg
47 1.1.1 No milestone for the quarter
Northern Cape
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
NamaKhoi Local Municipality Concordia Programe1: Administration NamaKhoi Local Municipality Komaggas
NamaKhoi Local Municipality Nababeep
NamaKhoi Local Municipality Okiep
NamaKhoi Local Municipality Springbok
Phokwane Local Municipality Steinkopf
Phokwane Local Municipality Pampierstad
Phokwane Local Municipality Jan Kempdorp
Renosterberg Local Municipality Hartswater
Renosterberg Local Municipality Vanderkloof
Renosterberg Local Municipality Petrusville
Richtersveld Local Municipality Philipstown
Siyancuma Local Municipality Port Nolloth
Siyancuma Local Municipality Douglas
Siyancuma Local Municipality Griekwastad
Siyathemba Local Municipality Schmidtsdrift
Siyathemba Local Municipality Prieska
Siyathemba Local Municipality Marydale
Sol Plaatjie Local Municipality Niekerkshoop
Sol Plaatjie Local Municipality Beaconsfield
Sol Plaatjie Local Municipality Homevale
Thembelihle Local Municipality Ritchie
Thembelihle Local Municipality Hopetown (Old)
Thembelihle Local Municipality Hopetown (New)
Thembelihle Local Municipality Strydenburg (Old)
Tsantsabane Local Municipality Strydenburg (New)
Tsantsabane Local Municipality Postmasburg
Ubuntu Local Municipality Jenn-Haven
Ubuntu Local Municipality Loxton
Ubuntu Local Municipality Richmond
Umsobomvu Local Municipality Victoria West
Umsobomvu Local Municipality Colesberg
Umsobomvu Local Municipality Norvalspont
Umsobomvu Local Municipality Noupoort
Western Cape Witzenberg Local Municipality Ceres
Witzenberg Local Municipality Tulbagh
Witzenberg Local Municipality Wolseley
Theewaterskloof Local Municipality Op-de-Berg
Theewaterskloof Local Municipality Botrivier
Theewaterskloof Local Municipality Caledon
Theewaterskloof Local Municipality Grabouw
Theewaterskloof Local Municipality Riviersonderend
Theewaterskloof Local Municipality Genadendal
Theewaterskloof Local Municipality Villiersdorp
Swellendam Local Municipality Greyton
Swellendam Local Municipality Klipperivier
Swellendam Local Municipality Koornlands
Swellendam Local Municipality Buffeljags
Swellendam Local Municipality Suurbraak
Swartland Local Municipality Barrydale
48 1.1.1 No milestone for the quarter
Western Cape
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Swartland Local Municipality Malmesbury Programe1: Administration Swartland Local Municipality Darling
Swartland Local Municipality Chatsworth
Swartland Local Municipality Kalbaskraal
Swartland Local Municipality RiebeeckKasteel
Swartland Local Municipality Riebeeck Wes
Swartland Local Municipality Moorreesburg
Swartland Local Municipality Koringberg
Stellenbosch Local Municipality Ongegund (PPC)
Stellenbosch Local Municipality Stellenbosch
Stellenbosch Local Municipality Raithby
Stellenbosch Local Municipality Pniel
Stellenbosch Local Municipality Wemmershoek
Stellenbosch Local Municipality Franschhoek
Saldanha Bay Local Municipality Klapmus
Saldanha Bay Local Municipality Hopefield
Saldanha Bay Local Municipality Langville
Saldanha Bay Local Municipality Langebaan
Saldanha Bay Local Municipality Paternoster
Saldanha Bay Local Municipality Saldanha
Saldanha Bay Local Municipality Sandy Point
Prince Albert Local Municipality Vredanburg
Prince Albert Local Municipality Prince Albert
Prince Albert Local Municipality Leeeugamka
Overstrand Local Municipality Klaarstroom
Overstrand Local Municipality Gansbaai
Overstrand Local Municipality Hauston
Overstrand Local Municipality Hermanus
Overstrand Local Municipality Kleinmond
Oudtshoorn Local Municipality Stranford
Oudtshoorn Local Municipality De Rust
Oudtshoorn Local Municipality Oudtshoorn
Mossel Bay Local Municipality Dysseldorp
Mossel Bay Local Municipality Mossel Bay
Mossel Bay Local Municipality Friermersheim B
Mossel Bay Local Municipality Grootbrak
Mossel Bay Local Municipality Herbertsdale
Mossel Bay Local Municipality Pinnacle point
Mossel Bay Local Municipality Ruiterbos
Matzikama Local Municipality Brandwag
Matzikama Local Municipality Doringbaai
Matzikama Local Municipality Bitterfontein
Matzikama Local Municipality Ebannarser
Matzikama Local Municipality Klawre
Matzikama Local Municipality Koekenaap
Matzikama Local Municipality Lutzville
Matzikama Local Municipality Lutzvillewes
Matzikama Local Municipality Nuwerus
Matzikama Local Municipality Strandfontein
Matzikama Local Municipality Van Rhynsdorp
49 1.1.1 No milestone for the quarter
Western Cape
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Matzikama Local Municipality Vredendal North Programe1: Administration Matzikama Local Municipality Vredendal South
Matzikama Local Municipality Ashton
Langeberg Local Municipality Bonnievale
Langeberg Local Municipality McGregor
Langeberg Local Municipality Montague
Langeberg Local Municipality Robertson
Laingsburg Local Municipality Laingsburg
Knysna Local Municipality Belvedere
Knysna Local Municipality Brenton on sea
Knysna Local Municipality Karatara
Knysna Local Municipality Knysna ASP
Knysna Local Municipality Knysna SBR
Knysna Local Municipality Rheenendal
Knysna Local Municipality Sedgefield
Kannaland Local Municipality Ladismith
Kannaland Local Municipality Calitzdorp
Kannaland Local Municipality Zoar
Hessequa Local Municipality Albertina
Hessequa Local Municipality Garcia
Hessequa Local Municipality Gouritzmand
Hessequa Local Municipality Heidelberg
Hessequa Local Municipality Jongensfontein
Hessequa Local Municipality Melkhoutfontein
Hessequa Local Municipality Riversdale
Hessequa Local Municipality Slanghuis
Hessequa Local Municipality Stilbaai
Hessequa Local Municipality Witsand
George Local Municipality Gwaing
George Local Municipality Haarlem
George Local Municipality Harold’s Bay
George Local Municipality Outeniqua
George Local Municipality Uniondale
George Local Municipality Kleinkranz
Drakenstein Local Municipality Gouda
Drakenstein Local Municipality Hermon
Drakenstein Local Municipality Kliprug
Drakenstein Local Municipality Paarl
Drakenstein Local Municipality Saron
Drakenstein Local Municipality wellington
City of Cape town Athlone
City of Cape town Bellville
City of Cape town Greenpoint
City of Cape town Camp,s Bay
City of Cape town Cape Flats
City of Cape town Gordon’s Bay
City of Cape town Borcherd’sQuarrry
City of Cape town Groot Springfontein
City of Cape town Hout Bay
City of Cape town Klipheuwel
City of Cape town Kraaifontein
City of Cape town Llandudno
City of Cape town Macassar
50 1.1.1 No milestone for the quarter
Western Cape
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
City of Cape town Melbosstrand Programe1: Administration City of Cape town Milller’s point
City of Cape town Mitcheels plain
City of Cape town Oudekraal
City of Cape town Potsdam
City of Cape town Scottdene
City of Cape town Simon’s town
City of Cape town Wesfleur Atlantis
City of Cape town WesfleurIndustria
City of Cape town Wildevoelvlei
City of Cape town Zandvliet
City of Cape town philadephia
City of Cape town Parow
Cederberg Local Municipality Citusdal
Cederberg Local Municipality Clanwilliam
Cederberg Local Municipality Eland’s Bay
Cederberg Local Municipality Graaafwater
Cederberg Local Municipality Lambert;s Bay
Cederberg Local Municipality Wupperthal
Cederberg Local Municipality Algeria
Cape Agulhas Local municipality Bradasdorp
Cape Agulhas Local municipality Waenhuiskruins
Cape Agulhas Local municipality Napier
Cape Agulhas Local municipality Struisbaai
Breede Valley local Municipality De Doorns
Breede Valley local Municipality Worcester
Breede Valley local Municipality Rawsonville
Breede Valley local Municipality Touwrivier
Bitou Local Municipality Kurland
Bitou Local Municipality Pletternberg Bay
Berg River Local Municipality Velddrift
Berg River Local Municipality Porterville
Berg River Local Municipality Pikertberg
Berg River Local Municipality Eeendekuil
Berg River Local Municipality Dwarskersbos
Beaufort West Local Municipality Murraysburg
Beaufort West Local Municipality Beaufort West
Beaufort West Local Municipality Nelspoort
Beaufort West Local Municipality Merweville
1.1.2 Number of non-compliant wastewater systems 260 100 182 182 Over by 82 Over by 82% Over achieved PoE accepted for 182 monitored against the Green Drop Regulatory 28 28 tool
FS Harrismith Ngwathe WWTW Nala LM Bothaville WWTW Bothaville WWTW Bothaville WWTW Moqhaka LM Reitz WWTW Viljoenskroon WWTW Viljoenskroon WWTW Nketoana Local Municipality Reitz WWTW Arlington Phumelela Local Municipality Vrede WWTW Dihlabeng LM Bethlehem Setsoto LM Senekal Matjhabeng Local Municipality Theronia Henneman WWTW Henneman WWTW Kutlwanong WWTW Kutlwanong WWTW Thabong WWTW Thabong WWTW Phomolong WWTW Phomolong WWTW Witpan Witpan WWTW Witpan WWTW Sol Plaatje Municipality Homevalle WWTW Dipaleseng Local Municipality Balfour WWTW Balfour WWTW Balfour WWTW Naledi Wepener Nala LM Bothaville Mafube LM Namahadi Frankfort WWTW Frankfort WWTW Villiers WWTW Villiers WWTW Letsemeng LM Jacobsdal Petrusburg WWTW Petrusburg WWTW Letsemeng LM Koffiefontein Mohokare Local Municipality Zastron
51 1.1.2
FS
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Kopanong Local Municipality Reddersburg Reddersburg Reddersburg Programe1: Administration Kopanong Local Municipality Springfontein Kopanong Local Municipality Trompsburg Nketoana LM Lindley-Ntha Lindley WWTW Lindley WWTW Rosendal Rosendal Nketoana LM Petrus Steyn Nketoana LM Reitz Tswelopele LM Hoopstad Setsoto Local Municipality Clocolan Ngwathe Local Municipality Heilbron Moqhaka Local Municipality Steynsrus MasilonyanaLocal Municipality Brandfort MasilonyanaLocal Municipality Masilo Dihlabeng LM Mautse Rosendal Matjhabeng Local Municipality Theronia Allanridge Odendaalsrus Mangaung Metro Sterkwater Sterkwater Sterkwater Bainsvlei Dewetsdorp WWTW Dewetsdorp WWTW Botshabelo Seloshela WWTW Seloshela WWTW Northern Works Wepener WWTW Wepener WWTW Van Stadensrus WWTW Van Stadensrus WWTW Naledi Dewtsdorp, Nala LM Wesselsbron Wesselsbron Wesselsbron Mafube Local Municipalit Tweeling, Mafube Local Municipalit Cornelia Letsemeng Local Municipality Luckhoff, Mohokare LM Rouxville Mohokare LM Smithfield Kopanong Local Municipality Edenberg Edenberg Edenberg Kopanong Local Municipality Fauresmith Fauresmith Fauresmith Setsoto Local Municipality Marquard Setsoto Local Municipality Senekal Ngwathe Local Municipality Koppies Ngwathe Local Municipality Parys MasilonyanaLocal Municipality Theunissen MasilonyanaLocal Municipality Soutpan Verkeerdevlei Naledi Van Stadensrus, Letsemeng Local Municipality Oppermans, Letsemeng Local Municipality Petrusburg Setsoto Local Municipality Ficksburg Ficksburg Ficksburg Kopanong LM Gariep Dam Gariep WWTW Gariep WWTW Kopanong LM Jagersfontein, Kopanong LM Philippolis Masilonyana LM Winburg Ngwathe Local Municipality Vredefort Phumelela Local Municipality Tokologo LM Boshof Hertzogville WWTW Hertzogville WWTW Dealesville Paul Roux WWTW Paul Roux WWTW Maluti a Phofung LM Wilge Tshiame Dithlabeng LM Clarens Paul Roux Fezile Dabi DM Koppies WWTW Koppies WWTW Heilbron WWTW Heilbron WWTW
52 1.1.2
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
MP 37 Programe1:35 Administration Lekwa Local Municipality Standerton WWTW Standerton WWTW Standerton WWTW Govan Mbeki eMbalenhle WWTW(Secunda) Msukaligwa Ermelo WWTW Ermelo WWTW Ermelo WWTW Govan Mbeki Kinross WWTW Lekwa Local Municipality Morgenzon Morgenzon WWTW Morgenzon WWTW Dipaleseng LM Greylingstad Greylingstad WWTW Greylingstad WWTW Pixley ka Seme LM Volksrust Volksrust WWTW Volksrust WWTW Pixley ka Seme LM Vukuzakhe Vukuzakhe WWTW Vukuzakhe WWTW Msukaligwa LM Breyten Ponds Emalahleni Ferrobank Ferrobank WWTW Ferrobank WWTW Emalahleni Phola-Ogies Emalahleni Kriel-Ganala Kriel-Ganala WWTW Kriel-Ganala WWTW Mkhondo Amsterdam Amsterdam WWTW Amsterdam WWTW Mkhondo Piet Retief Piet Retief WWTW Piet Retief WWTW Govam Mbeki Trichardt Thembisile KwaMhlanga Ponds East KwaMhlanga Ponds East KwaMhlanga Ponds East KwaMhlanga Ponds West KwaMhlanga Ponds West Twefontein k WWTW Twefontein k WWTW Albert Luthuli Ekulendeni-Kromdraai Carolina WWTW Carolina WWTW Elukwatini WWTW Elukwatini WWTW Empuluzi WWTW Empuluzi WWTW Badplaas WWTW Badplaas WWTW Dr JS Moroka Vaalbank Vaalbank WWTW Vaalbank WWTW Bushbuckridge Dwarsloop Mbombela Kabokweni Pixley ka Seme LM Amersfoort, Amersfoort WWTW Amersfoort WWTW Msukaligwa LM Breyten AS, Breyten WWTW Breyten WWTW Chrissesmeer Chrissesmeer Chrissesmeer Emalahleni Klipspruit, Klipspruit, Klipspruit, Govan Mbeki LM Evander Leandra-Leslie Balfour WWTW Balfour WWTW Albert Luthuli Local Municipality Mpuluzi-Mayflower Dipaleseng Grootvlei Mine Grootvlei Mine WWTW Grootvlei Mine WWTW Dipaleseng Grootvlei Eskom Grootvlei Eskom WWTW Grootvlei Eskom WWTW Pixley ka Seme Perdekop, Perdekop, Perdekop, Pixley ka Seme Wakkerstroom Wakkerstroom Wakkerstroom Msukaligwa Davel, Davel WWTW Davel WWTW Msukaligwa Lothair Lothair WWTW Lothair WWTW Emalahleni Rietspruit, Rietspruit WWTW Rietspruit WWTW Riverview, Riverview WWTW Riverview WWTW Naauwpoort WWTW Naauwpoort WWTW Emakhazeni Emthonjeni-Machadorp Bushbuckridge Thulamahshe, Bushbuckridge Mangwaza, Manghwazi Bushbuckridge Tintiswalo Hospital Mbombela LM Hazyview Thaba Chweu Lydenburg Lydenburg Lydenburg Delmas WWTW Delmas WWTW Botleng WWTW Botleng WWTW GP 4 4 Midvaal Vaal Marina WWTW Meyrton Emfuleni Leeukuil WWTW City of Johannesburg Bushkoppies WWTW Bushkoppies WWTW Bushkoppies WWTW City of Johannesburg Ennedale WWTW City of Johannesburg Goudkoppies WWTW City of Tshwane Rooivaal WWTW City of Tshwane Baviaanspoort Baviaanspoort WWTW Baviaanspoort WWTW City of Tshwane Sunderland Ridge Mogale City Flip Human Flip Human WWTW Flip Human WWTW Emfuleni Sebokeng Lesedi Heidelberg Midvaal Oheni Muri Ekurhuleni Metro Tsakane Ekurhuleni Welgedacht Rynfield WWTW Rynfield WWTW Dekema Ancor Rondebult Herbert Bickley JP Marais City of Tshwane Ekangala City of Tshwane Rethabiseng
NC 24 24 Gamagara Local Municipality Kathu Waste Water Treatment Works Debeng WWTW Gammagara Local Municipality Olifantshoek WWTW Siyancuma Douglas WWTW Douglas WWTW Douglas WWTW Magareng Warrenton WWTW Gammagara Dingleton WWTW Phokwane Local Municipality Jan Kemp Dorp WWTW Dikgatlong Local Municipality Delport hoop WWTW Renosterberg Vanderkloof Renosterberg Petrusville Petrusville Petrusville Renosterberg Phillipstown Richtersveld Port Nolloth Thembelihle Hopetown Old Hopetown Old Hopetown Old Ga-Segonyana Kuruman Mier Askham Mier Loubos Umsombomvu Noupoort Noupoort Noupoort Norvalspoort Norvalspoort Ubuntu Richmond Richmond Richmond Thembelihle Hopetown New, Kai Garib Local Municipality Kenhardt Karoo Hoogland Local Municipality Williston Kareeberg Carnavon Vosburg Van Wykvlei Emthanjeni De Aar De Aar De Aar Hanover Hanover Briststown Briststown Siyathemba Prieska Prieska Prieska Marydale Marydale Niekershoop Niekershoop
53 1.1.2
NC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Nama Khoi Bergsig Bergsig Bergsig Programe1: Administration Okiep Okiep Steikopf Steikopf Concordia Concordia Nababeep Nababeep Carolusberg Carolusberg Springbok Springbok Komaggas Komaggas !Kheis Groblershoop Brandboom Brandboom Grootdrink Grootdrink Topline Topline Wegraai Wegraai David Kruiper LM Rietfontein EC 16 16 Kouga Weston Hankey Joe Gqabi DM Barkely WWTW Barkely East Pond 1 Barkely East Pond 1 PoE not provided Barkely East Pond 2 Barkely East Pond 2 PoE not provided Ndlambe LM Alexandria-KwaNonkqubela Ndlambe LM Bushmans River Mouth, O.R Tambo DM Nqgeleni, Nqgeleni, Nqgeleni, PoE accepted O.R.Tambo District Municipality Port St John, Port St John, Port St John, PoE accepted O.R.Tambo District Municipality Qumbu, Qumbu, Qumbu, PoE accepted O.R.Tambo District Municipality Tsolo Tsolo Tsolo PoE accepted O.R.Tambo District Municipality Lusikisiki, O.R.Tambo District Municipality Mqanduli Chris Hani DM Molteno, Lukhanji Local Municipality Queenstown, Chris Hani DM Sada, Chris Hani DM Sterkstroom, Chris Hani DM Tsomo Chris Hani DM Engcobo Koukamma LM Kareedouw Koukamma LM Krakeel River Ndlambe Bathurst-Nolukhanyo, Ndlambe Marselle O.R Tambo DM Flagstaff O.R Tambo DM Mthatha, Chris Hani District Municipality Cala, Chris Hani District Municipality Cofimvaba, Molteno Molteno PoE not provided Chris Hani District Municipality Cradock, Chris Hani District Municipality Elliot Koukamma Local Municipality Clarkson Koukamma Local Municipality Louterwater Louterwater Louterwater PoE accepted Ndlambe Kenton on Sea - Ekuphunleni, Ndlambe Port Alfred Kou-Kamma Sanddrift PoE accepted Kou-Kamma Stormsriver Stormsriver Stormsriver Baviaans Rietbron Alfred Nzo Bizana Bizana Bizana PoE accepted Alfred Nzo Cedarville, Alfred Nzo Ntanbankulu Blue Crane Route Cookhouse, Cookhouse, Cookhouse, PoE accepted Blue Crane Route Pearston Pearston Pearston PoE not provided Blue Crane Route Somerset East Somerset East Somerset East PoE accepted Chris Hani Hofmeyr Hofmeyr Hofmeyr PoE not provided Chris Hani Middelburg Middelburg Middelburg PoE not provided Chris Hani Tarkastad Tarkastad Tarkastad PoE not provided Kouga LM Camdeboo LM
NW 11 11 PoE accepted for 11 Matlosana Local Municipality Oarkney WWTW Oarkney WWTW Oarkney WWTW PoE accepted Klerksdorp Klerksdorp PoE accepted Dr Ruth S Mompati Local Bloemhof WWTW Dr Ruth S Mompati Local Christiana WWTW Rulaganyang Rulaganyang Rulaganyang PoE accepted Moretele Swartdam Ngaka Modiri Sannieshof, Sannieshof Sannieshof PoE accepted Ngaka Modiri Mafikeng Ngaka Modiri Delareyville, Delareyville Delareyville PoE accepted Ngaka Modiri Lehurutshe-Welbedacht Lehurutshe-Welbedacht Lehurutshe-Welbedacht PoE accepted but not on schedule Ngaka Modiri Atamelang Ventersdorp Ventersdorp Ngaka Modiri Zeerust City of Matlosana Hartebeesfontein Hartebeesfontein Hartebeesfontein PoE accepted Dr Ruth Mompati Bloemhof Dr Ruth Mompati Schweizer-Reinecke Dr Ruth Mompati Vryburg Ketlengrivier Koster Swartruggens Moses Kotane Mogwase NgakaModiriMolema Local Lichetenburg Ngaka Modiri Molema Local Coligny, Ngaka Modiri Molema Local Ottosdal Ottosdal Ottosdal PoE accepted Ngaka Modiri Molema Local Itsoseng, Matlosana Local Municipality Stilfontein, Stilfontein, Stilfontein, PoE accepted Maquassi Hills Wolmaranstad Makwasi Makwasi PoE accepted Maquassi Hills Leeudoringstad Leeudoringstad Leeudoringstad PoE accepted Rustenburg LM Boitekong Rustenburg Monakato Lethabong Madibeng LM Mothutlung KZN 4 4 Harry Gwala DM Franklin WWTW Franklin WWTW PoE accepted Uthukela District Municipality Weenen Weenen WWTW Weenen WWTW PoE accepted uThungulu District Municipality Mbongolwane Ulundi Thulasizwe Sisonke DM Franklin Uthukela DM Ladysmith uThukela District Municipality Wembezi Wembezi WWTW Wembezi WWTW PoE accepted uThukela District Municipality Estcourt Estcourt WWTW Estcourt WWTW PoE accepted uThungulu District Municipality Nkandla, uThungulu District Municipality Oceanview Ugu District Municipality Mbango, Ugu District Municipality Margate uThungulu DM Owen Sithole Agric College uMzinyathi District Municipality Tugela Ferry
54 1.1.2
KZN
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
ILembe District Municipality Vukile, Programe1: Administration
55 1.1.2
KZN
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
ILembe District Municipality Montebello Hospital Programe1: Administration Umkhanyakude St Lucia LP 8 8 Greater Sekhukhune Nebo Greater Sekhukhune District Phokwane Greater Sekhukhune District Tubatse Tubatse WWTW Tubatse WWTW PoE not provided Greater Sekhukhune District Monsterlus (Hlogotlou) Greater Sekhukhune District Motetema Motetema WWTW Motetema WWTW PoE accepted Greater Sekhukhune District Rebone Lephalale Local Municipality Zongesien Zongesien WWTW Zongesien WWTW PoE accepted Mookgophong Thusang (Roedtan) Thabazimbi Local Municipality Thabazimbi Mopani District Municipality Modjadji (Duiwelskloof) Vhembe District Municipality Mutale Vhembe District Municipality Mhinga BelaBela Local Municipality Radium Greater Sekhukhune District Leeuwfontein (Mokganyaka), Greater Sekhukhune District Meckleberg (Moroke), Meckleberg (Moroke) WWTW Meckleberg (Moroke) WWTW PoE accepted Mopani District Municipality Senwamokgope, Senwamokgope WWTW Senwamokgope WWTW PoE accepted Vhembe District Municipality Musina, Musina Nancefield WWTW Musina Nancefield WWTW PoE accepted Greater Sekhukhune DM Burgersfort, Greater Sekhukhune DM Elandskraal, Elandskraal WWTW Elandskraal WWTW PoE accepted Greater Sekhukhune DM Groblersdal Groblersdal WWTW Groblersdal WWTW PoE accepted Greater Sekhukhune DM Jane Furse Jane Furse WWTW Jane Furse WWTW PoE accepted Greater Sekhukhune DM Denilton Greater Sekhukhune DM Marble Hall Greater Sekhukhune DM Roosenekaal Roosenekaal WWTW Roosenekaal WWTW PoE not provided Vhembe District Municipality Thohoyandou Thohoyandou WWTW Thohoyandou WWTW PoE not provided Vhembe District Municipality Dzanani Vhembe District Municipality Siloam Ponds Mopani District Municipality Namakgale Vhembe District Municipality Nancefiled, Vhembe Tshifulanani
56 1.1.2
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
WC 57 Programe1:57 Administration Kannaland Local Municipality Zoar Matzikama Nuwerus Cederberg Algeria, Cederberg Local Municipality Wupperthal Bergrivier LM Dwarskerboss Dwarskerboss PoE accepted Bergrivier LM Eendekuil Eendekuil PoE accepted Bergrivier LM Piketburg Piketburg PoE accepted Bergrivier LM Porteville Porteville PoE accepted Bergrivier LM Veldrift Veldrift PoE accepted Cape Agulhas LM Bredasdorp Bredasdorp PoE accepted Cape Agulhas LM Napier Napier PoE accepted Cape Agulhas LM Struisbaai Struisbaai PoE accepted Cape Agulhas LM Armiston Armiston PoE accepted Bitou LM Breede Valley LM Breede Valley LM Breede Valley LM Breede Valley LM Breede Valley LM Worcester WWTW Worcester WWTW PoE accepted Drakenstein LM De Doorns WWTW De Doorns WWTW PoE accepted Drakenstein LM Towsrivier WWTW Towsrivier WWTW PoE accepted Drakenstein LM Drakenstein LM Drakenstein LM Gouda WWTW Gouda WWTW PoE accepted Drakenstein LM Hermon WWTW Hermon WWTW PoE accepted George LM Paarl WWTW Paarl WWTW PoE accepted George LM Pearl Valley WWTW Pearl Valley WWTW PoE accepted George LM Saron WWTW Saron WWTW PoE accepted George LM Wellington WWTW Wellington WWTW PoE accepted George LM Haarlem WWTW Haarlem WWTW PoE accepted George LM Kleinkrantz WWTW Kleinkrantz WWTW PoE accepted Hessequa LM Gwaing WWTW Gwaing WWTW PoE accepted Hessequa LM Heroldsbay WWTW Heroldsbay WWTW PoE accepted Hessequa LM Outeniqua WWTW Outeniqua WWTW PoE accepted Hessequa LM Unio-dale WWTW Unio-dale WWTW PoE accepted Hessequa LM Albetina WWTW Albetina WWTW PoE accepted Hessequa LM Garcia WWTW Garcia WWTW PoE accepted Hessequa LM Gouritzmond WWTW Gouritzmond WWTW PoE accepted Hessequa LM Heidelberg WWTW Heidelberg WWTW PoE accepted Hessequa LM Jongensfontein WWTW Jongensfontein WWTW PoE accepted Hessequa LM Melkhoutfontein WWTW Melkhoutfontein WWTW PoE accepted Knysna LM Riversdale WWTW Riversdale WWTW PoE accepted Knysna LM Slangrivier WWTW Slangrivier WWTW PoE accepted Knysna LM Stillbay WWTW Stillbay WWTW PoE accepted Knysna LM Witsand WWTW Witsand WWTW PoE accepted Knysna LM Belvidere WWTW Belvidere WWTW PoE accepted Knysna LM Brenton WWTW Brenton WWTW PoE accepted Laingsburg LM Karatakon WWTW Karatakon WWTW PoE accepted Laingsburg LM Knysna WWTW Knysna WWTW PoE accepted Langeberg LM Rheenendal WWTW Rheenendal WWTW PoE accepted Langeberg LM Sedge Field WWTW Sedge Field WWTW PoE accepted Langeberg LM Laingsburg Laingsburg PoE accepted Langeberg LM Matjiesfontein Matjiesfontein PoE accepted Langeberg LM Robertson WWTW Robertson WWTW Langeberg LM Bonnievale WWTW Bonnievale WWTW Matzikama LM McGregor WWTW McGregor WWTW Matzikama LM Montagu WWTW Montagu WWTW Matzikama LM Ashton WWTW Ashton WWTW Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Mosselbay LM Mosselbay LM Mosselbay LM Mosselbay LM Mosselbay LM Friemersheim WWTW Friemersheim WWTW PoE accepted Mosselbay LM Brandwatch WWTW Brandwatch WWTW PoE accepted Mosselbay LM Grootbrak WWTW Grootbrak WWTW PoE accepted Beaufort West LM Hartenbos WWTW Hartenbos WWTW PoE accepted Beaufort West LM Harbertsdale WWTW Harbertsdale WWTW PoE accepted Beaufort West LM Pinnacle Point WWTW Pinnacle Point WWTW PoE accepted Beaufort West LM Ruiterbos WWTW Ruiterbos WWTW PoE accepted Beaufort West LM City of Cape Town City of Cape Town City of Cape Town Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Stellenbosch LM Stellenbosch LM Stellenbosch LM Stellenbosch LM Stellenbosch LM Stellenbosch WWTW Stellenbosch WWTW PoE accepted Theewaterkloof LM Klapmuts WWTW Klapmuts WWTW Theewaterkloof LM Raithby WWTW Raithby WWTW Theewaterkloof LM Priel WWTW Priel WWTW Theewaterkloof LM Theewaterkloof LM Villiesdorp WWTW Villiesdorp WWTW Theewaterkloof LM Grabouw WWTW Grabouw WWTW Theewaterkloof LM Caledon WWTW Caledon WWTW Theewaterkloof LM Botrivier WWTW Botrivier WWTW Theewaterkloof LM Greyton WWTW Greyton WWTW Witzenburg LM Riviersonderend WWTW Riviersonderend WWTW Witzenburg LM Genadendal WWTW Genadendal WWTW Witzenburg LM
57 1.1.2
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Witzenburg LM Programe1: Administration Witzenburg LM Ceres WWTW Ceres WWTW PoE accepted Witzenburg LM Op Die berg WWTW Op Die berg WWTW PoE accepted Witzenburg LM Tulbagh WWTW Tulbagh WWTW PoE accepted Witzenburg LM Wolseleg WWTW Wolseleg WWTW PoE accepted Oudtshoorn LM De rust WWTW De rust WWTW PoE accepted Oudtshoorn LM Dysselsdorp WWTW Dysselsdorp WWTW PoE accepted Oudtshoorn LM Oudtshoorn WWTW Oudtshoorn WWTW PoE accepted 1.1.3 Number of warer supply systems assessed for 1036 No milestone No milestone No milestone No milestone n/a n/a n/a n/a No milestone for the compliance with Blue Drop regulatory quarter standards EC Alfred Nzo DM Matatiele LM - Belfort Tw Alfred Nzo DM Matatiele LM - Matatiele Tw Alfred Nzo DM Mbizana LM - Borehole Systems (Rural) Alfred Nzo DM Mbizana LM - Mbizana Tw System Alfred Nzo DM Mbizana LM - Nomlacu Tw System Alfred Nzo DM Ntabankulu LM - Borehole Systems (Rural) Alfred Nzo DM Ntabankulu LM - Ntabankulu Tw Alfred Nzo DM Umzimvubu LM - Kwabhaca Tw Alfred Nzo DM Umzimvubu LM - Mount Ayliff Tw Amatole Dm Amahlahti LM - Kei Road Amatole DM Amahlathi LM - Cathcart Amatole DM Amahlathi LM - Stutterheim Amatole DM Binfield Network Supply Amatole DM Debe Nek Network Supply Amatole DM Glenmore Network Supply Amatole DM Great Kei LM - Kei Bridge Wtw Amatole DM Great Kei LM - Cinsta East Amatole DM Great Kei LM - Haga- Haga Amatole DM Great Kei LM - Kei Mouth Amatole DM Great Kei LM - Morgans Bay Amatole DM Masincedane Network Supply Amatole DM Mbashe LM - Cwebe Amatole DM Mbashe LM - Dutywa Amatole DM Mbashe LM - Dwesa Amatole DM Mbashe LM - Elliotdale Amatole DM Mbashe LM - Mendu Amatole DM Mbashe LM - Willowvale Amatole DM Mbhashe LM - Qwaninga Wtw Amatole DM Mbhashe LM - Mbhashe North Wtw Amatole DM Mbhashe LM - Nqadu Wtw Amatole DM Mbhashe-Mncwasa Wtw Stellenbosch WWTW Stellenbosch WWTW Amatole DM Mnquma LM - Nqamakwe Wtw Klapmuts WWTW Klapmuts WWTW Amatole DM Mnquma LM - Kotana/Ehlobo Raithby WWTW Raithby WWTW Amatole DM Mnquma LM - Qolorha Priel WWTW Priel WWTW Amatole DM Mnquma LM - Tholeni Amatole DM Mnquma LM -Butterworth Wtw Villiesdorp WWTW Villiesdorp WWTW Amatole DM Ngqanda Borehole Water Supply Grabouw WWTW Grabouw WWTW Amatole DM Nkonkobe LM - Alice Wtw Caledon WWTW Caledon WWTW Amatole DM Nkonkobe LM - Fort Beaufort Wtw Botrivier WWTW Botrivier WWTW Amatole DM Nkonkobe LM - Hogsback Greyton WWTW Greyton WWTW Amatole DM Nkonkobe LM - Seymor Riviersonderend WWTW Riviersonderend WWTW Amatole DM Nxuba LM - Adelaide Genadendal WWTW Genadendal WWTW Amatole DM Nxuba LM - Bedford Amatole DM Peddie Network Supply Amatole DM Sandile Network Supply Ceres WWTW Ceres WWTW Amatole DM Upper Mnyameni Network Supply Op Die berg WWTW Op Die berg WWTW Baviaans LM Miller Tulbagh WWTW Tulbagh WWTW Baviaans LM Rietbron Wolseleg WWTW Wolseleg WWTW Baviaans LM Sewefontein De rust WWTW De rust WWTW Baviaans LM Steytleville Dysselsdorp WWTW Dysselsdorp WWTW Baviaans LM Vondeling Oudtshoorn WWTW Oudtshoorn WWTW Baviaans LM Willowmore Baviaans LM Zaaimanshoek Blue Crane Route LM Cookhouse Blue Crane Route LM Pearston Blue Crane Route LM Sommerset East Buffalo City LM Hanover Buffalo City LM Kei Road System Buffalo City LM Kidds Beach (Borehole) Scheme Buffalo City LM King Williams Town ( Kwt Water Treatment Buffalo City LM Laing Network Supply Buffalo City LM Majali (Borehole) System Buffalo City LM Mdantsane Supply Scheme (Umz, Nahoon, Buffalo City LM Peddie Supply Scheme Buffalo City LM Sandile Network Supply Buffalo City LM Umzonyana Wtw (East London) Camdeboo LM Aberdeen Camdeboo LM Graaf-Reinet Camdeboo LM Nieu-Bethesda Chris Hani DM Emalahleni - Indwe Supply System Chris Hani DM Emalahleni - Machubeni Supply System Chris Hani DM Emalahleni (Rural & Farms - Untreated) Chris Hani DM Emalahleni- Dordrecht Supply System Chris Hani DM Engcobo - Engcobo Town Supply System Chris Hani DM Engcobo - Gqaga Supply System Chris Hani DM Engcobo (Rural Treated Boreholes) Chris Hani DM Engcobo-Nkobongo Supply System Chris Hani DM Inkwanca - Molteno Supply System Chris Hani DM Inkwanca - Sterkstroom Supply System Chris Hani DM Intsika Yethu - Tsojana Supply System Chris Hani DM Intsika Yethu (Untreated) Chris Hani DM Intsika Yethu -Tsomo Service System Chris Hani DM Inxuba Yethemba - Cradock Supply System Chris Hani DM Inxuba Yethemba - Middelburg Supply Chris Hani DM Lukhanji - Queenstown Supply System Chris Hani DM Lukhanji - Whittlesea Supply System Chris Hani DM Lukhanji (Rural & Farms - Untreated) Chris Hani DM Sakhisizwe - Cala Supply System Chris Hani DM Sakhisizwe - (Farms & Rural - Treated) Chris Hani DM Sakhisizwe - Elliot Supply Sytem Chris Hani DM Sakhisizwe- Xhalanga Supply System Chris Hani DM Sakhisizwe-Cala Package System Chris Hani DM Tsolwana: Hofmeyer Supply System Chris Hani DM Tsolwana: Ntabathemba Supply System Chris Hani DM Tsolwana: Tarkastad Supply System Ikwezi LM Jansenville
58 1.1.3 No milestone for the quarter
EC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Ikwezi LM Klipplaat Programe1: Administration Ikwezi LM Waterford Ikwezi LM Wolwefontein Joe Gqabi DM Elundini LM - Maclear (Aucamp Wtp) And Joe Gqabi DM Elundini LM - Maclear Rural (Boreholes & Joe Gqabi DM Elundini LM - Ugie (Ugie Wtp) Joe Gqabi DM Elundini LM - Ugie Rural (Boreholes & Joe Gqabi DM Elundini LM -Mount Fletcher Rural Joe Gqabi DM Elundini LM -Mt Fletcher (Mount Fletcher Joe Gqabi DM Gariep LM - Burgersdorp (Burgersdorp Wtp) Joe Gqabi DM Gariep LM - Oviston (Oviston Wtp) Joe Gqabi DM Gariep LM - Steynsburg (Steynsburg Wtw) Joe Gqabi DM Maletswai LM - Aliwal North (Aliwal North Joe Gqabi DM Maletswai LM - Jamestown (Jamestown Joe Gqabi DM Senqu LM - Barkly East (Barkly East Wtp) Joe Gqabi DM Senqu LM - Lady Grey (Lady Grey Wtw) Joe Gqabi DM Senqu LM - Rhodes (Rhodes Wtp) Joe Gqabi DM Senqu LM - Sterkspruit Rural (Boreholes & Joe Gqabi DM Senqu LM -Rossouw (Boreholes) Joe Gqabi DM Senqu LM -Sterkspruit (Sterkspruit Wtp) Kouga LM Hankey Kouga LM Humansdorp Kouga LM Jeffreys Bay Kouga LM Loerie Kouga LM Oyster Bay Kouga LM Patensie Kouga LM St. Francis Bay Kouga LM Thornhill Kou-Kamma LM Bilikiesdorp Kou-Kamma LM Clarkson Kou-Kamma LM Coldstream Kou-Kamma LM Joubetina Kou-Kamma LM Kareedouw Kou-Kamma LM Krakeel Kou-Kamma LM Louterwater Kou-Kamma LM Misgund Kou-Kamma LM Sanddrif Kou-Kamma LM Storms River Kou-Kamma LM Woodlands Makana LM Alicedale Makana LM Grahamstown Makana LM Riebeeck East Ndlambe LM Albany Coast Network Ndlambe LM Alexandria Wtw Ndlambe LM Bathurst Wtw Ndlambe LM Cannon Rock Wtw Ndlambe LM Port Alfred Ndlambe LM Seafield / Kleinemonde Nelson Mandela MM Churchill Nelson Mandela MM Elandsjagt Nelson Mandela MM Groendal Nelson Mandela MM Linton Nelson Mandela MM Loerie Nelson Mandela MM Nelson Mandela Metropolitan Municipality Nelson Mandela MM Nooitgedacht Nelson Mandela MM Rocklands Nelson Mandela MM Springs OR Tambo DM Coffee Bay Wtw OR Tambo DM Corana Wtw OR Tambo DM Flagstaff Wtw OR Tambo DM Ingquza Hill Lm - Bh OR Tambo DM Mhlahlane Wtw OR Tambo DM Mhlanga Wtw OR Tambo DM Mhlontlo Lm-Bh OR Tambo DM Mqanduli Wtw OR Tambo DM Mvumelwano Wtw OR Tambo DM Ngqeleni Wtw OR Tambo DM Nyandeni Lm -Bh OR Tambo DM Port St Johns Wtw OR Tambo DM Psj Lm-Bh OR Tambo DM Sidwadweni Wtw OR Tambo DM Thornhill Wtw OR Tambo DM Tsolo Wtw OR Tambo DM Umzimvubu Wtw OR Tambo DM Upper Chulunca Wtw Sunday's River Valley LM Addo Wtw Sunday's River Valley LM Enon / Bersheba Wtw Sunday's River Valley LM Glenconnor Borehole Sunday's River Valley LM Kirkwood Wtw Sunday's River Valley LM Kleinpoort Borehole Sunday's River Valley LM Paterson Boreholes FS Dihlabeng LM Bethlehem Water Supply System Dihlabeng LM Clarens Water Supply System Dihlabeng LM Fouriesburg Water Supply System Dihlabeng LM Rosendal Water Supply System Kopanong LM Bethulie Supply System (supplied by Bloem Kopanong LM Edenburg Supply System (supplied by Kopanong LM Fauresmith Supply System (supplied by Kopanong LM Gariep Water Supply System (supplied by Kopanong LM Jagersfontein Supply System (supplied by Kopanong LM Philippolis Supply System (supplied by Kopanong LM Reddersburg Supply System (supplied by Kopanong LM Springfontein Supply System (supplied by Kopanong LM Trompsburg Supply System (supplied by Letsemeng LM Jacobsdal WTW Letsemeng LM Koffiefontein Letsemeng LM Luckhoff Letsemeng LM Oppermangronde Letsemeng LM Petrusburg Mafube LM Frankfort Mafube LM Tweeling Mafube LM Villiers Maluti a Phofung LM Qwaqwa (Makwane WTW) Maluti a Phofung LM Harrismith (Wilge WTW) Maluti a Phofung LM QWAQWA (Fika - Patso WTW) Mangaung LM Bloemfontein Mangaung LM BOTSHABELO Mangaung LM Thaba Nchu
59 1.1.3 No milestone for the quarter
FS
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Mantsopa LM Excelsior Water Supply System Programe1: Administration Mantsopa LM Hobhouse Water supply system Mantsopa LM Ladybrand Water Supply System Mantsopa LM Thaba Phatchoa Water Supply System Mantsopa LM Tweespruit Water Supply System Masilonyana LM Brandfort Supply System Masilonyana LM Soutpan Supply System Masilonyana LM The Greater Masilonyana Local Municipality Masilonyana LM Theunissen Supply System Masilonyana LM Verkeerdevlei Supply System Masilonyana LM Winburg Supply System Matjhabeng LM Allanridge Water supply System Matjhabeng LM Hennenman Water Supply System Matjhabeng LM Odendaalsrus Water Supply System Matjhabeng LM Ventersburg Water Supply System Matjhabeng LM Virginia Water Supply System Matjhabeng LM Welkom Water Supply System Metsimaholo LM Deneysville Metsimaholo LM Oranjeville Metsimaholo LM Sasolburg Mohokare LM Rouxville Conventional Water Treatment Mohokare LM Smithfield Conventional Water Treatment Mohokare LM Zastron Conventional Water Treatment Moqhaka LM Kroonstad Moqhaka LM Steynsrus Moqhaka LM Viljoenskroon Nala LM Balkfontein (Sedibeng Water) Naledi LM Dewetsdorp Supply System (Bloem Water) Naledi LM Vanstadensrus WTW Naledi LM Wepener Supply System (Bloem Water) Ngwathe LM Heilbron (WSA) Ngwathe LM Koppies (WSA) Ngwathe LM Parys (WSA) Ngwathe LM Vredefort (WSA) Nketoana LM Arlington Nketoana LM Lindley Nketoana LM Petrus Steyn Nketoana LM Reitz Phumelela LM Memel Supply system Phumelela LM Vrede Supply system Phumelela LM Warden Setsoto LM Clocolan (Clocolan TW) Setsoto LM Ficksburg (Ficksburg TW) Setsoto LM Marquard (Marquard TW) Setsoto LM Senekal (Cyferfontein and De Put TW) Tokologo LM Boshof Water Supply System Tokologo LM Dealesville Water Supply System Tokologo LM Hertzogville Water Supply System Tswelopele LM Bultfontein Supply Zone Tswelopele LM Hoopstad Supply Zone KZN Amajuba DM Dannhauser LM - Buffalo Flats - (Ngagane Amajuba DM Dannhauser LM - Dannhauser Amajuba DM Dannhauser LM - Durnacol (Durnacol TW) - Amajuba DM Dannhauser LM - Rudimentary Boreholes - Amajuba DM Utrecht LM - Waterval Prison (Ngagane Amajuba DM Utrecht LM- Utrecht (Utrecht TW) - uTW Amajuba DM Utrecht LM-Rudimentary Boreholes -uTW eThekwini MM eThekwini Main (Umgeni,Kloof TW,Mdhloti eThekwini MM Ogunjini (Ogunjini TW) eThekwini MM Rural Boreholes eThekwini MM Tongaat iLembe DM Amatigulu iLembe DM Blythedale Water supply iLembe DM Darnall Water Supply Scheme iLembe DM Dedankivane iLembe DM Driefontein iLembe DM Esidumbini supply system iLembe DM Ethembeni iLembe DM Glendale iLembe DM Gogovuma WTW iLembe DM Groutville Water Supply iLembe DM Hlanganani iLembe DM Hlimbithwa Water Scheme iLembe DM Ifalethu iLembe DM Isiminya iLembe DM Isithundu WTW iLembe DM KwaSathane iLembe DM Lambothi iLembe DM Madundube Water Treatment Works iLembe DM Makwanini iLembe DM Mandeni WTW iLembe DM Maqumbi Borehole iLembe DM Masibambisane WW iLembe DM Mayelisweni water supply iLembe DM Mazitapele iLembe DM Mbitane WTW iLembe DM Montebello hospital supply iLembe DM Mphumulo iLembe DM Mushane WTW iLembe DM Ndulinde water scheme iLembe DM Ndwedwe iLembe DM Ngcebo iLembe DM Ntabaskop water supply iLembe DM Ntunjambili iLembe DM Ohwebede iLembe DM Phambela iLembe DM San souci iLembe DM Sundumbili iLembe DM Sundumbili Reticulation iLembe DM Umvoti/kwaDukuza iLembe DM Uthukela Mouth BH iLembe DM Uthukela WTW iLembe DM Vukile High School WTW iLembe DM Waterfall iLembe DM Wosiyane Water Supply iLembe DM Zinkwazi water supply Newcastle LM Charlestown Water System (Pixle ka Sema Harry Gwala DM Bulwer
60 1.1.3 No milestone for the quarter
KZN
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Harry Gwala DM Creighton Programe1: Administration Harry Gwala DM Donnybrook Borehole Schemes Harry Gwala DM Esiqandulweni Harry Gwala DM Franklin Harry Gwala DM Highflats/Spornet Harry Gwala DM Hlanganani/Polela Harry Gwala DM Ibisi Harry Gwala DM Ixopo Harry Gwala DM Jolivet/Ugu Harry Gwala DM Kokstad Harry Gwala DM Nokweja Harry Gwala DM Riverside Harry Gwala DM St Apollinaris Harry Gwala DM Umzimkhulu Harry Gwala DM Underberg Harry Gwala DM Washbank/Highlands Msunduzi LM Umsunduzi Ugu DM Assissi Ugu DM Bhobhoyi Ugu DM Boreholes Ugu DM Harding Ugu DM Hlokozi Ugu DM KwaFodo Ugu DM KwaHlongwa Ugu DM KwaLembe Ugu DM KwaMbotho Ugu DM KwaNdelu Ugu DM KwaNyuswa 1 Ugu DM KwaNyuswa 2 Ugu DM Phungashe Ugu DM Umtamvuna Ugu DM Umtwalume Ugu DM Umzinto Ugu DM Vulamehlo Ugu DM Weza Umgungundlovu DM Appelsbosch Umgungundlovu DM Boreholes (Untreated) Umgungundlovu DM Embuthweni Umgungundlovu DM Gomane Boreholes Umgungundlovu DM Impendle Spring Umgungundlovu DM Lidgetton West Umgungundlovu DM Makeni Umgungundlovu DM Mpofana Umgungundlovu DM Mtulwa Umgungundlovu DM Ntanzi Umgungundlovu DM Nzinga Umgungundlovu DM Richmond Umgungundlovu DM Rosetta Umgungundlovu DM Umgeni Bulk Supply uMhlathuze LM Esikhaleni WTW uMhlathuze LM Mzingazi WTW uMhlathuze LM Ngwelezane WTW uMhlathuze LM Nsezi WTW Umkhanyakude DM Block 6 Umkhanyakude DM Borehole Clusters Umkhanyakude DM Enkanyezini Umkhanyakude DM Hlabisa Umkhanyakude DM Hluhluwe Phase1 Umkhanyakude DM Hluhluwe Phase2 Umkhanyakude DM Ingwavuma Umkhanyakude DM Jozini (New) Umkhanyakude DM Jozini (Old) Makhonyeni Makhonyeni Umkhanyakude DM Malobeni Umkhanyakude DM Manguzi Umkhanyakude DM Manguzi Airfield Umkhanyakude DM Mbazwana Umkhanyakude DM Mjindi Central Umkhanyakude DM Mkuze Umkhanyakude DM Mpembeni Umkhanyakude DM Mseleni Umkhanyakude DM Mshudu Umkhanyakude DM Mtubatuba Umkhanyakude DM Nkolokotho Umkhanyakude DM Nondubuya Umkhanyakude DM Othobothini Umkhanyakude DM Shemula Umkhanyakude DM Thengane Umzinyathi DM Msinga LM - Fabeni WTW Umzinyathi DM Msinga LM - Keat`s Drift (Ethembeni ) WTW Umzinyathi DM Msinga LM - Pomeroy WTW Umzinyathi DM Msinga LM - Sampofu WTW Umzinyathi DM Nqutu LM - Isandlwana WTW Umzinyathi DM Nqutu LM - Nondweni WTP Nqutu LM - Nqutu (Vant`s Drift) Nqutu LM - Nqutu (Vant`s Drift) WTW Nqutu LM - Qudeni WTW Nqutu LM - Qudeni WTW Umvoti LM - Amakhabaleni WTW Umvoti LM - Amakhabaleni WTW Umvoti LM - Greytown WTW Umvoti LM - Greytown WTW Umvoti LM - Muden WTW Umvoti LM - Muden WTW UMVOTI LM Kranskop WTW UMVOTI LM Kranskop WTW Uthukela DM Emnambithi /Ladysmith - Colenso Town Uthukela DM Emnambithi /Ladysmith - Ezakheni Uthukela DM Emnambithi /Ladysmith - Ladysmith Town Uthukela DM Imbabazane - Loskop Uthukela DM Imbabazane - Loskop (rural scheme) Uthukela DM Indaka - Ekuvukeni Township and Uthukela DM Indaka - Tugela Estates Uthukela DM Okhahlamba - Bergville Town and Uthukela DM Okhahlamba - Langkloof Uthukela DM Okhahlamba -Moyeni/ Zwelisha Uthukela DM Okhahlamba - Winterton Town, Khethani Uthukela DM Umtshezi - Archie Rodel Uthukela DM Umtshezi - George Cross Uthukela DM Umtshezi - Weenen Town Uthungulu DM Eshowe Uthungulu DM Gingindlovu (Gingindlove WTW) Uthungulu DM Greater Mthonjaneni Uthungulu DM Mbonambi Bulk supply ( Nsezi plant WTW-
61 1.1.3 No milestone for the quarter
KZN
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Uthungulu DM Melmoth ( Melmoth WTW) Programe1: Administration Uthungulu DM Middledrift Uthungulu DM Mtunzini( City of uMhlathuze) Uthungulu DM Nkandla ( Package plants) Uthungulu DM Nkandla (Nkandla WTW) Uthungulu DM Nkandla Rudementary (Boreholes) Uthungulu DM Ntambanana(Package plants) Uthungulu DM Rudimentary Schemes- Mthonjaneni Uthungulu DM Rudimentary Schemes- Ntambanana Uthungulu DM Rudimentry Schemes- Umlalazi(boreholes) Uthungulu DM Umlalazi ( Package plants) Zululand DM Babanango Zululand DM Belgrade Zululand DM Belgrade New Zululand DM Ceza Water Supply Zululand DM Coronation Zululand DM eDumbe Zululand DM eMakhosini Zululand DM eMondlo Town Zululand DM Enyathi Town Zululand DM Enyokeni Palace Zululand DM Frischgewaagd Bilanyoni Zululand DM Gumbi Rural Supply Scheme Zululand DM Hlobane Zululand DM Itshelejuba hospital Zululand DM Khambi Zululand DM Khangela Palace Zululand DM Khiphunyawo Zululand DM Kombuzi Zululand DM Louwsberg Zululand DM Mandlakazi Zululand DM Masokaneni Zululand DM Mountain View Zululand DM Mpungamhlope Zululand DM Msibi Zululand DM Mvuzini Zululand DM Nkonjeni Hospital Zululand DM Nkosentsha Zululand DM Nongoma Zululand DM Ophuzane Zululand DM Osingisingini Zululand DM Pongola Zululand DM Purim Rural Water Supply Zululand DM Sidinsi Zululand DM Spekboom Zululand DM Tholakele Zululand DM Thulasizwe hospital Zululand DM Ulundi Nkonjeni Zululand DM Usuthu Zululand DM Vryheid MP Albert Luthuli LM Badplaas Albert Luthuli LM Bettysgoed Albert Luthuli LM Carolina Albert Luthuli LM Ekulindeni Albert Luthuli LM Elukwatini Albert Luthuli LM Empuluzi/Mayflower Albert Luthuli LM Fernie Albert Luthuli LM Rudimentary Boreholes Bushbuckridge LM Bushbuckridge- Cork Bushbuckridge LM Bushbuckridge- Dingleydale Bushbuckridge LM Bushbuckridge Marite Bushbuckridge LM Bushbuckridge- Sigagule Bushbuckridge LM Bushbuckridge- Thorndale Bushbuckridge LM Bushbuckridge- Zoeknog Bushbuckridge LM BWB Edinburg B Bushbuckridge LM Rand Water Mpumalanga Bushbuckridge - Bushbuckridge LM Rand Water Mpumalanga Bushbuckridge - Bushbuckridge LM Rand Water Mpumalanga Bushbuckridge - Dipaleseng LM The Greater Dipaleseng Local Municipality Dr JS Moroka LM Weltervreden Emakhazeni LM Belfast (Belfast Water Treatment Plant) Emakhazeni LM Dullstroom (Dullstroom Water Treatment Emakhazeni LM Emgwenya (Waterval Boven Water Emakhazeni LM Entokozweni (Machadodorp Water Emalahleni LM Kendal Emalahleni LM Kriel/Ganala Emalahleni LM Rietspruit Emalahleni LM Witbank Govan Mbeki LM The Greater Govan Mbeki Local Lekwa LM Morgenzon WTW Lekwa LM Standerton WTW Mbombela LM Elandshoek (Elandshoek Package Plant) Mbombela LM Hazyview (Hazyview TW) Mbombela LM Karino (TW Sembcorp Silulumanzi) Mbombela LM Matsulu (Matsulu TW - Sembcorp Mbombela LM Nelspruit (Nelspruit Old & New TW - Mbombela LM Rand Water Mpumalaga Mbombela - Mbombela LM Rand Water Mpumalanga Mbombela - Mbombela LM Rand Water Mpumalanga Mbombela - Mbombela LM Rand Water Mpumalanga Mbombela- Mbombela LM Rand Water Mpumalanga Mbombela - Mbombela LM Rand Water Mpumalanga Mbombela- Mbombela LM Rand Water Mpumulanga Mbombela - Mbombela LM Tekwane ( Primkop TW - Sembcorp Mbombela LM White River (White River TW) Mbombela LM White River Country Estates (White River Mkhondo M Amsterdam Water Supply System Mkhondo M Mkhondo Water Supply System Mkhondo M Rural Water Supply System Mkhondo M Saul Mkhize Water Supply System Mkhondo M The Greater Mkhondo Local Municipality Msukaligwa LM Breyten water treatment works Msukaligwa LM Davel water teatment works Msukaligwa LM Douglas dam water works Msukaligwa LM Eskom Camden Msukaligwa LM Lothair water treatment works Msukaligwa LM South works (noitgedacht farm) Nkomazi LM Driekoppies/ Shoemansdal/ Buffelspruit/
62 1.1.3 No milestone for the quarter
MP
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Nkomazi LM Fig Tree/ Masibekele WSS Programe1: Administration Nkomazi LM Hectorspruit WSS Nkomazi LM Malalane WSS Nkomazi LM Marloth Park WSS Nkomazi LM Mbuzini WSS Nkomazi LM Naas/Block C WSS Nkomazi LM Nkomazi Rudimentary Boreholes Nkomazi LM Ntunda WSS Nkomazi LM Nyathi WSS Nkomazi LM Sibange WSS Nkomazi LM Tonga WSS Pixley K Seme LM Amesfoort Pixley K Seme LM Volkrust WTW Pixley K Seme LM Vukuzakhe Pixley K Seme LM Wakkerstroom Steve Tshwete LM Borehole: Doornkop #1 CPA WSS Steve Tshwete LM Borehole: Mafube/ Sikhululiwe WSS Steve Tshwete LM ESKOM:Komati/ Blinkpan WSS Steve Tshwete LM Middelburg/ Mhluzi WSS Steve Tshwete LM Presidentsrus WSS Steve Tshwete LM Steve Tshwete/ Hendrina WSS-optimum Thaba Chweu LM Coromandel Water Treatment Plant Thaba Chweu LM Graskop Water Supply System Thaba Chweu LM Lydenburg Water Treatment Plant Thaba Chweu LM Rural Water Supply System Thaba Chweu LM Sabie Water Supply System Thembisile LM Machipe (Goederede) Thembisile LM Engwenyameni (Klipfontein) Thembisile LM Kwaggafontein System Thembisile LM Kwamhlanga Thembisile LM Langkloof Thembisile LM Moloto Thembisile LM Thembalethu Umjindi LM Emjindini Trust water supply scheme Umjindi LM Rimer`s water treatment works / Barberton Umjindi LM Sheba water supply scheme Victor Khanye LM 1. Victor Khanye Water Victor Khanye LM Delmas Rand Water NC Kai Garib LM Alheit Kai Garib LM Aughrabies Kai Garib LM Bloemsmond Kai Garib LM Cillie Kai Garib LM Currieskamp Kai Garib LM Kakamas Bulk Water Kai Garib LM Keimoes Bulk Water Kai Garib LM Lennertsville Kai Garib LM Lutzburg Kai Garib LM Marchand Kai Garib LM Riemvasmaak - Sending Kai Garib LM Riemvasmaak - Vredesvallei Kai Garib LM Soverby Kheis LM Brandboom/Boegoeberg Kheis LM Gariep Kheis LM Groblershoop Kheis LM Grootdrink Kheis LM Topline Kheis LM Wegdraai Khara Hais LM AH September (Upington) Khara Hais LM Karos Supply System Khara Hais LM Lambrechtsdrift Khara Hais LM Leerkrans Khara Hais LM Leseding Khara Hais LM Louisvale Khara Hais LM Ntsikelelo Khara Hais LM Raaswater Dikgatlong LM Barkley West Dikgatlong LM Blikfontein (Borehole) Dikgatlong LM Boetsap SAP (Borehole) Dikgatlong LM Dan Carl (Borehole) Dikgatlong LM Delportshoop and Longlands (Sedibeng Dikgatlong LM District Management Area - Other Dikgatlong LM Eierfontein (Borehole) Dikgatlong LM Gong-Gong (Borehole) Dikgatlong LM Holpan (Borehole) Dikgatlong LM Kalkfontein (Borehole) Dikgatlong LM Koopmansfontein Dikgatlong LM Longlands (Sedibeng Water) Dikgatlong LM Longlands Clinic (Borehole) Dikgatlong LM Olierivier Dikgatlong LM Pniel (Borehole) Dikgatlong LM Pniel Estate (Borehole) Dikgatlong LM Spitskop (Borehole) Dikgatlong LM Stillwater Dikgatlong LM Ulco (Mine) Dikgatlong LM Windsorton Emthanjeni LM Britstown Borehole Scheme Emthanjeni LM De Aar Borehole Scheme Emthanjeni LM Hanover Borehole Scheme Gamagara LM Dibeng(boreholes) Gamagara LM Dingleton (Vaalgamagara bulk supply Gamagara LM Kathu (kathu WTW, Boreholes, Gamagara LM Olifantshoek (Vaal gamagara Bulk Supply Ga-Segonyana LM Bankhara-Bodulong (Managed by Ga- Ga-Segonyana LM Lokaleng (GLM Boreholes_Sedibeng Ga-Segonyana LM Magobe/Magojaneng (GLM Ga-Segonyana LM Sedibeng (GLM Boreholes_Sedibeng Ga-Segonyana LM Seven miles (GLM Boreholes_Sedibeng Ga-Segonyana LM Slouya (GLM Boreholes_Sedibeng Water) Ga-Segonyana LM Thamoyanche (GLM Boreholes_Sedibeng Ga-Segonyana LM Vergenoeg (GLM Boreholes_Sedibeng Hantam LM Brandvlei Hantam LM Calvinia Hantam LM Loerisfontein Hantam LM Middelpos Hantam LM Nieuwoudtville Hantam LM Swartkop Joe Morolong LM Black Rock Joe Morolong LM Hotazel
63 1.1.3
NC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Joe Morolong LM Kikahela Groundwater Management Area: Programe1: Administration Joe Morolong LM Laxey Groundwater Management Area Joe Morolong LM Maipeng Groundwater Management Area Joe Morolong LM Mamatwan/Hotazel Ground water Joe Morolong LM Manyeding A Groundwater Management Joe Morolong LM Manyeding Lower Groundwater Joe Morolong LM Mc Carthy`s Rus (Boreholes) Joe Morolong LM Metsetswaneng Groundwater Management Joe Morolong LM Middelputz (Boreholes) Joe Morolong LM Severn SAPS (Borehole) Joe Morolong LM Severn School (Borehole) Joe Morolong LM Tsineng Groundwater Management Area: Joe Morolong LM Van Zylsrus (Boreholes) Joe Morolong LM Ward 1 Heuningvlei Area Kamiesberg LM Garies Kamiesberg LM Hondeklipbaai Kamiesberg LM Kamassies Kamiesberg LM Kamieskroon Kamiesberg LM Kharkams Kamiesberg LM Kheis Kamiesberg LM Klipfontein Kamiesberg LM Koiingnaas Kamiesberg LM Leliefontein Kamiesberg LM Lepelfontein Kamiesberg LM Nourivier Kamiesberg LM Paulshoek Kamiesberg LM Rooifontein Kamiesberg LM Soebatsfontein Kamiesberg LM Spoegrivier Kamiesberg LM Tweerivier Kareeberg LM Carnarvon Kareeberg LM Vanwyksvlei Kareeberg LM Vosburg Karoo Hoogland LM Fraserburg Karoo Hoogland LM Sutherland Karoo Hoogland LM Williston Kgatelopele LM Danielskuil (Boreholes) Kgatelopele LM Idwala (Boreholes) Kgatelopele LM Lime Acres De Beers (Sedibeng) Kgatelopele LM Owendale (Boreholes) Khai-Ma LM Onseepkans (Melkbosrand TW) Khai-Ma LM Onseepkans (RK) Khai-Ma LM Pofadder / Aggeneys (Pelladrift) Khai-Ma LM Witbank Magareng LM Warrenton Mier LM Andriesvale Mier LM Askham Mier LM Loubos Mier LM Mier (Boorgate) Mier LM Noenieput (Boorgat) Mier LM Philandersbron Mier LM Rietfontein Mier LM Swartkopdam Mier LM Welkom Nama kHoi LM Bergsig Nama kHoi LM Buffelsrivier Nama kHoi LM Bulletrap Nama kHoi LM Matjieskloof Nama kHoi LM Nababeep Nama kHoi LM Okiep System Nama kHoi LM Rooiwal Nama kHoi LM Springbok Nama kHoi LM Steinkopf Nama kHoi LM Vioolsdrift Phokwane LM Hartswater Phokwane LM Jan Kempdorp Phokwane LM Pampierstad (Managed by Sedibeng Water) Renosterberg LM Petrusville (from Vanderkloof) Renosterberg LM Phillipstown Boreholes Renosterberg LM Vanderkloof Richtersveld LM Eksteenfontein Richtersveld LM Kuboes Richtersveld LM Lekkersing Richtersveld LM Port Nolloth / Alexander Baai (Alexcor & 8 Richtersveld LM Sanddrift Siyancuma LM Campbell Supply System Siyancuma LM Douglas Siyancuma LM Griekwastad Supply System Siyancuma LM Schmidtsdrift Supply System Siyathemba LM Marydale Borehole system Siyathemba LM Niekerkshoop Borehole System Siyathemba LM Prieska Orange River Sol Plaatjie LM Kby Zone 16 : Riverton Sol Plaatjie LM Kby Zone A-E : Ritchie Thembelihle LM Hopetown (Orange River) Thembelihle LM Strydenburg (Boreholes) Tsantsabane LM Groen Water Supply System Tsantsabane LM Jenn Heaven Supply System Tsantsabane LM Postdene Supply System Tsantsabane LM Postmasburg Tsantsabane LM Skeyfontein Supply System Tsantsabane LM Tsantsabane Local Municipality Tsantsabane LM Vaal Gamagara Ubuntu LM Hutchinson Ubuntu LM Loxton Ubuntu LM merriman Ubuntu LM Richmond Ubuntu LM Victoria West Umsobomvu LM Colesberg (TW &boreholes) Umsobomvu LM NORVALSPONT (TW) Umsobomvu LM Noupoort (boreholes) WC Beaufort West LM Beaufort West Beaufort West LM Merweville Beaufort West LM Murraysburg BWM Beaufort West LM Nelspoort Bergrivier LM Aurora Bergrivier LM Eendekuil Bergrivier LM Piketberg
64 1.1.3
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments WC Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Bergrivier LM Poterville Programe1: Administration Bergrivier LM Redeling-huys Bergrivier LM Velddrif Bitou LM Kurland Bitou LM Nature`s Valley Bitou LM Plettenberg Bay Breede Valley LM Bokrivier (Touwsrivier) Breede Valley LM De Doorns
65 1.1.3
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Breede Valley LM De Koppen (Fairyglen) Programe1: Administration Breede Valley LM Rawsonville Breede Valley LM Worcester Cape Agulhas LM Aniston/Waenhuskrans Cape Agulhas LM Bredasdorp Cape Agulhas LM Elim Fountain Water Cape Agulhas LM Klipdale Cape Agulhas LM L` Agulhas Cape Agulhas LM Napier Cape Agulhas LM Protem Cape Agulhas LM spanjaardskloof Cape Agulhas LM Struisbaai Cape Agulhas LM Suiderstrand Cederberg LM Algeria Cederberg LM Citrusdal Cederberg LM Clanwilliam Cederberg LM Elands Bay Cederberg LM Graafwater Cederberg LM Lambert`s Bay Cederberg LM Leipoldtville Cederberg LM Paleisheuwel City of Cape Town M Cape Town Drakenstein LM Bainskloof (Bainskloof TW) Drakenstein LM Drakenstein (Paarl Mountain TW & Cape Drakenstein LM Gouda (West Coast DM) Drakenstein LM Hermon Drakenstein LM Saron (Saron TW) George LM George Water Works George LM Haarlem Water Works George LM Uniondale Water Treatment Works George LM Wilderness Water Works Hessequa LM Albertinia Hessequa LM Garcia Hessequa LM Gouritsmond Hessequa LM Heidelberg Hessequa LM Vermaaklikheid Hessequa LM Witsand Kannaland LM Calitzdorp Kannaland LM Ladismith Kannaland LM Van Wyksdorp WTW Kannaland LM Zoar Town Knysna LM Belvidere Knysna LM Brenton -On-Sea Knysna LM Brenton-On-Lake Knysna LM Buffalo Bay Knysna LM Karatara Knysna LM Knysna WTW and Desal Plant Knysna LM Rheenendal Knysna LM Sedgefield WTW, Desal Plant, Emergency Laingsburg LM Laingsburg Laingsburg LM Matjiesfontein Langeberg LM Ashton Langeberg LM Bonnievale Langeberg LM McGregor Langeberg LM Montagu Langeberg LM Robertson Matzikama LM Bitterfontein DMA Matzikama LM Ebenhaezer Matzikama LM Klawer Matzikama LM Kliprand Matzikama LM Koekenaap Matzikama LM Lutziville Matzikama LM Lutziville West Matzikama LM Vredendal Mossel Bay LM Friemersheim WSS Mossel Bay LM Hebertsdale WSS Mossel Bay LM Lodewykstenk WSS Mossel Bay LM Mosselbaai/ Grootbrak/ Kleinbrak WSS Mossel Bay LM Ruiterbos WSS Oudtshoorn LM De Rust Oudtshoorn LM Klein Karoo Water Supply Scheme Oudtshoorn LM Oudtshoorn Overstrand LM Baardskeerdersbos Supply System Overstrand LM Buffeljags Bay Supply System Overstrand LM Buffelsrivier Supply System Overstrand LM Greater Gansbaai Supply System Overstrand LM Greater Hermanus Supply System Overstrand LM Kleinmond Supply System Overstrand LM Pearly Beach Supply System Overstrand LM Stanford Supply System Prince Albert LM Klaarstroom Prince Albert LM Leeugamka Prince Albert LM Prince Albert Saldanha Bay LM Saldanda Bay Supply Systems Stellenbosch LM Blackheath (City Of Cape Town) Stellenbosch LM Faure System (City of Cape Town) Stellenbosch LM Franschhoek Stellenbosch LM Stellenbosch Stellenbosch LM Wemmershoek (City of Cape Town) Swartland LM Malmesbury Supply System Swartland LM Moorreesburg Supply System Swellendam LM Barrydale Swellendam LM Buffelsjagrivier Swellendam LM Suurbraak Swellendam LM Swellendam Theewaterskloof LM Bereaville Theewaterskloof LM Botrivier Theewaterskloof LM Caledon Theewaterskloof LM Genadendal-WTW Theewaterskloof LM Grabouw WTW Theewaterskloof LM Greyton Theewaterskloof LM Riviersonderend WTW Theewaterskloof LM Tesselaarsdal WTW Theewaterskloof LM Villiersdorp WTW Theewaterskloof LM Voorstekraal Witzenberg LM Ceres Water Care Works Witzenberg LM Op die Berg Water Care works Witzenberg LM Prince Alfred Hamlet Water Care Works
66 1.1.3
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Witzenberg LM Tulbagh Water Treatment Works Programe1: Administration
67 1.1.3
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Witzenberg LM Wolseley Water Care Works Programe1: Administration WC Beaufort West LM Beaufort West Beaufort West LM Merweville Beaufort West LM Murraysburg BWM Beaufort West LM Nelspoort Bergrivier LM Aurora Bergrivier LM Eendekuil Bergrivier LM Piketberg Bergrivier LM Poterville Bergrivier LM Redeling-huys Bergrivier LM Velddrif Bitou LM Kurland Bitou LM Nature`s Valley Bitou LM Plettenberg Bay Breede Valley LM Bokrivier (Touwsrivier) Breede Valley LM De Doorns Breede Valley LM De Koppen (Fairyglen) Breede Valley LM Rawsonville Breede Valley LM Worcester Cape Agulhas LM Aniston/Waenhuskrans Cape Agulhas LM Bredasdorp Cape Agulhas LM Elim Fountain Water Cape Agulhas LM Klipdale Cape Agulhas LM L` Agulhas Cape Agulhas LM Napier Cape Agulhas LM Protem Cape Agulhas LM spanjaardskloof Cape Agulhas LM Struisbaai Cape Agulhas LM Suiderstrand Cederberg LM Algeria Cederberg LM Citrusdal Cederberg LM Clanwilliam Cederberg LM Elands Bay Cederberg LM Graafwater Cederberg LM Lambert`s Bay Cederberg LM Leipoldtville Cederberg LM Paleisheuwel City of Cape Town M Cape Town Drakenstein LM Bainskloof (Bainskloof TW) Drakenstein LM Drakenstein (Paarl Mountain TW & Cape Drakenstein LM Gouda (West Coast DM) Drakenstein LM Hermon Drakenstein LM Saron (Saron TW) George LM George Water Works George LM Haarlem Water Works George LM Uniondale Water Treatment Works George LM Wilderness Water Works Hessequa LM Albertinia Hessequa LM Garcia Hessequa LM Gouritsmond Hessequa LM Heidelberg Hessequa LM Vermaaklikheid Hessequa LM Witsand Kannaland LM Calitzdorp Kannaland LM Ladismith Kannaland LM Van Wyksdorp WTW Kannaland LM Zoar Town Knysna LM Belvidere Knysna LM Brenton -On-Sea Knysna LM Brenton-On-Lake Knysna LM Buffalo Bay Knysna LM Karatara Knysna LM Knysna WTW and Desal Plant Knysna LM Rheenendal Knysna LM Sedgefield WTW, Desal Plant, Emergency Laingsburg LM Laingsburg Laingsburg LM Matjiesfontein Langeberg LM Ashton Langeberg LM Bonnievale Langeberg LM McGregor Langeberg LM Montagu Langeberg LM Robertson Matzikama LM Bitterfontein DMA Matzikama LM Ebenhaezer Matzikama LM Klawer Matzikama LM Kliprand Matzikama LM Koekenaap Matzikama LM Lutziville Matzikama LM Lutziville West Matzikama LM Vredendal Mossel Bay LM Friemersheim WSS Mossel Bay LM Hebertsdale WSS Mossel Bay LM Lodewykstenk WSS Mossel Bay LM Mosselbaai/ Grootbrak/ Kleinbrak WSS Mossel Bay LM Ruiterbos WSS Oudtshoorn LM De Rust Oudtshoorn LM Klein Karoo Water Supply Scheme Oudtshoorn LM Oudtshoorn Overstrand LM Baardskeerdersbos Supply System Overstrand LM Buffeljags Bay Supply System Overstrand LM Buffelsrivier Supply System Overstrand LM Greater Gansbaai Supply System Overstrand LM Greater Hermanus Supply System Overstrand LM Kleinmond Supply System Overstrand LM Pearly Beach Supply System Overstrand LM Stanford Supply System Prince Albert LM Klaarstroom Prince Albert LM Leeugamka Prince Albert LM Prince Albert Saldanha Bay LM Saldanda Bay Supply Systems Stellenbosch LM Blackheath (City Of Cape Town) Stellenbosch LM Faure System (City of Cape Town) Stellenbosch LM Franschhoek Stellenbosch LM Stellenbosch Stellenbosch LM Wemmershoek (City of Cape Town) Swartland LM Malmesbury Supply System Swartland LM Moorreesburg Supply System Swellendam LM Barrydale
68 1.1.3
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Swellendam LM Buffelsjagrivier Programe1: Administration Swellendam LM Suurbraak Swellendam LM Swellendam Theewaterskloof LM Bereaville Theewaterskloof LM Botrivier Theewaterskloof LM Caledon Theewaterskloof LM Genadendal-WTW Theewaterskloof LM Grabouw WTW Theewaterskloof LM Greyton Theewaterskloof LM Riviersonderend WTW Theewaterskloof LM Tesselaarsdal WTW Theewaterskloof LM Villiersdorp WTW Theewaterskloof LM Voorstekraal Witzenberg LM Ceres Water Care Works Witzenberg LM Op die Berg Water Care works Witzenberg LM Prince Alfred Hamlet Water Care Works Witzenberg LM Tulbagh Water Treatment Works Witzenberg LM Wolseley Water Care Works LP Bela Bela Local Municipality Bela Bela/magalies water supply system Bela Bela Local Municipality Radium borehole water system Bela Bela Local Municipality Rapotokwane borehole water system Capricorn District Municipality Alldays Water Supply system Capricorn District Municipality Botlokwa Regional Water Supply System Capricorn District Municipality Lebowakgomo Water Supply System Capricorn District Municipality Mashashane Water Supply System Capricorn District Municipality Mogwadi Water Supply System Capricorn District Municipality Olifantspoort Water Supply System Capricorn District Municipality Senwabarwana Water Supply Systems Capricorn District Municipality Zebidiela Water Supply System Greater Sekhukhune District Burgersfort Water Supply System Greater Sekhukhune District Fetakgomo Supply System Greater Sekhukhune District Flag Boshielo Water Supply System Greater Sekhukhune District Moroke Borehole Greater Sekhukhune District Moutse Water Supply System Greater Sekhukhune District Ngwaabe Supply System Greater Sekhukhune District Nkosini Water Supply System Greater Sekhukhune District Roosenekal Water Supply System Greater Sekhukhune District Penge Water Supply System Greater Sekhukhune District Tubatse Greater Sekhukhune District Vergelegen Water Supply System Lephalale Local Municipality Lephalale LM/ Matimba WTP - Reticulation Lephalale Local Municipality Lephalale LM/ Zeeland WTP - Reticulation Lephalale Local Municipality Mokuruanyane Regional Water Supply Lephalale Local Municipality Seleka Water Supply Scheme Lephalale Local Municipality Shongoane Water Supply Scheme Lephalale Local Municipality Witpoort Regional Water Supply Scheme Modimolle Local Municipality Mabaleng Res(Borehole MM 006/2010) Modimolle Local Municipality Mabatlane Res (Borehole MM 007/2010) Modimolle Local Municipality Modimolle/Magalies Water System Mokgalakwena Local Municipality Mokopane Mahwelerng Mopani District Municipality Drakensig Mopani District Municipality Ebenezer Mopani District Municipality Finale Mopani District Municipality Giyani Water supply area Mopani District Municipality Greater Tzaneen Municipality Mopani District Municipality Letaba Politsi and Modjadji Mopani District Municipality Letsitele Mopani District Municipality Mapuve Mopani District Municipality Middle Letaba Mopani District Municipality Muyexe Reverse Osmosis Mopani District Municipality Nkambako Mopani District Municipality Nkowankowa Mopani District Municipality Nondweni Mopani District Municipality Phalaborwa, Lulekani and Namakgale Mopani District Municipality Sekororo Mopani District Municipality Semarela Mopani District Municipality Thabina Mopani District Municipality Thapane Mopani District Municipality The Oaks Mopani District Municipality Tours Water Supply System Mopani District Municipality Zava Package Plant Polokwane Local Municipality Chuenemaja Polokwane Local Municipality City Polokwane Polokwane Local Municipality Mankweng Area Polokwane Local Municipality Molepo Polokwane Local Municipality Moletjie Area Polokwane Local Municipality Seshego Thabazimbi Local Municipality Leeupoort Water Scheme Thabazimbi Local Municipality Northam Water Supply Thabazimbi Local Municipality Rooiberg Water Scheme Thabazimbi Local Municipality Schilpadnest Water Scheme Thabazimbi Local Municipality The Greater Thabazimbi Magalies Vhembe District Municipality Elim Water System Vhembe District Municipality Kutama Sinthumule Water System Vhembe District Municipality Makhado (Louis Trichardt) Water System Vhembe District Municipality Musekwa Water System Vhembe District Municipality Musina Water System Vhembe District Municipality Mutale water system Vhembe District Municipality Mutshedzi Water System Vhembe District Municipality Nzhelele Water System Vhembe District Municipality Thohoyandou Water System Vhembe District Municipality Tshedza water supply system Vhembe District Municipality Tshifhire Murunwa Water System NW Dr Ruth Segomotsi District Bogosing (Greater Taung LM - Managed by Dr Ruth Segomotsi District Buxton (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Dikhuting (Greater Taung LM Dr Ruth Segomotsi District Diretsaneng (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Draaihoek (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Leshobo (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Lokgabeng (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Longaneng (Greater Taung LM Dr Ruth Segomotsi District Loselong (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Lothwanyeng (Greater Taung LM Dr Ruth Segomotsi District Lotlhapong (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Madipelesa (Greater Taung LM Boreholes_ Dr Ruth Segomotsi District Mokasa 1 (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Mokasa 2 (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Mokgareng (Greater Taung LM Borehole_
69 1.1.3
NW
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Dr Ruth Segomotsi District Molelema (Greater Taung LM Programe1: Administration Dr Ruth Segomotsi District Morokweng (Greater Taung LM Dr Ruth Segomotsi District Tamasikwa (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Tlapeng 1&2 (Greater Taung LM Dr Ruth Segomotsi District Vaaltuin (Greater Taung LM Boreholes_ Kgetleng River Local Municipality Derby B/H Madibeng Local Municipality Koster Madibeng Local Municipality Swartruggens Madibeng Local Municipality Brits Madibeng Local Municipality Hartbeespoort Madibeng Local Municipality Rand Water Maquassi Hills Local Municipaity Leeudoringstad-Witpoort System Maquassi Hills Local Municipaity Tswellelang-Lebaleng System Maquassi Hills Local Municipaity Wolwaransstad Bore hole System Matlosana Local Municipality City of Matlosana.. Moretele Local Municipality Temba Treatment plant Moses Kotana Local Municipality Madikwe water treament plant Moses Kotana Local Municipality Molatedi water treatment plant Moses Kotana Local Municipality Pella water treatment works Moses Kotana Local Municipality Vaalkop water treatment plant Ngaka Modiri Molema District Ditsobotla:Itsoseng B/H / Lichtenburg Ngaka Modiri Molema District Mafikeng B/H + WTW: Combine in the Ngaka Modiri Molema District Ramotshere Moiloa: Dinokana + Ngaka Modiri Molema District Ramotshere Moiloa: Motswedi + Gopane Ngaka Modiri Molema District Ramotshere-Moiloa Great Marico Package Rustenburg Local Muncipality Marikana System Rustenburg Local Muncipality Rustenburg Boreholes System Rustenburg Local Muncipality Rustenburg Town System Rustenburg Local Muncipality Vaalkop System Tlokwe Local Municipality Potchefstroom (Tlokwe WTW) Ventersdorp Local Municipality Boikhutso Village (Bore Hole Supply Ventersdorp Local Municipality Boikhutsong village (Bore Hole Supply Ventersdorp Local Municipality Gamogopa village (Bore Hole Supply Ventersdorp Local Municipality Goedgevonden Village (Bore Hole Supply Ventersdorp Local Municipality Tsetse village (Bore Hole Supply System) Ventersdorp Local Municipality Ventersdorp (Water Treatment Works Ventersdorp Local Municipality Welgevonden village (Bore Hole Supply 1.1.4 Number of non-compliant water supply 250 144 144 Over by 44 Over by 44% Over achieved The reported total achievement per systems monitored against the Blue Drop region needs to be broken down as Regulatory tool per the list given in column D, and Additional achievement to the APP list not included in the list needs to be reported as additionals.
WC 40 40 PoE accepted for 10 Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Hessequa Local Municipality Albertinia (Q2)
Hessequa Local Municipality Garcia (Q2)
Hessequa Local Municipality Gouritsmond (Q2)
Hessequa Local Municipality Heidelberg (Q2)
Hessequa Local Municipality Jongensfontein (Q2)
Hessequa Local Municipality Melkhoutfontein (Q2)
Hessequa Local Municipality Vermaaklikheid (Q2)
Hessequa Local Municipality Witsand (Q2)
Hessequa Local Municipality Matjiesfontein (Q2)
Hessequa Local Municipality no milestone for the quarter
Hessequa Local Municipality no milestone for the quarter
Laingsburg Local Municipality no milestone for the quarter
Swellendam Local Municipality no milestone for the quarter
Swellendam Local Municipality no milestone for the quarter
Swellendam Local Municipality no milestone for the quarter
Swellendam Local Municipality no milestone for the quarter
Matzikama Local Municipality no milestone for the quarter
Matzikama Local Municipality no milestone for the quarter
Oudtshoorn Local Municipality no milestone for the quarter
Oudtshoorn Local Municipality no milestone for the quarter
Oudtshoorn Local Municipality no milestone for the quarter
70 1.1.4
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Prince Albert Local Municipality no milestone for the quarter Programe1: Administration Stellenbosch Local Municipality no milestone for the quarter
Matzikama Local Municipality no milestone for the quarter
Bergrivier LM Aurora Aurora PoE accepted Bergrivier LM Eendekuil Eendekuil PoE accepted Bergrivier LM Piketberg Piketberg PoE accepted Bergrivier LM Porterville Porterville PoE accepted Bergrivier LM Redelinghuis Redelinghuis PoE accepted Breede Valley LM De Doorns De Doorns PoE accepted Breede Valley LM Touwsrivier Touwsrivier PoE accepted Breede Valley LM Worcester (De Koppen) Worcester (De Koppen) PoE accepted Breede Valley LM Worcester (Stettnyskloof) Worcester (Stettnyskloof) PoE accepted Drakenstein LM Paarl Paarl PoE accepted Drakenstein LM Saron Saron PoE accepted George LM George George PoE accepted George LM Haarlem Haarlem PoE accepted George LM Uniondale Uniondale PoE accepted George LM Wilderness Wilderness PoE accepted Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Knysna LM Buffalo Bay Buffalo Bay PoE accepted
Knysna LM Katarata Katarata PoE accepted
Knysna LM Knysna Knysna PoE accepted
Knysna LM Rheenendal Rheenendal PoE accepted
Knysna LM Sedgefield Sedgefield PoE accepted
Laingsburg Local Municipality Laingsburg Laingsburg PoE accepted
Laingsburg Local Municipality Matjiesfontein Reservoir Matjiesfontein Reservoir PoE accepted
Langeberg LM Ashton Ashton PoE accepted Langeberg LM Bonnievale Bonnievale PoE accepted Langeberg LM McGregor McGregor PoE accepted Langeberg LM Montagu Montagu PoE accepted Langeberg LM Non compliance letter Non compliance letter PoE accepted Langeberg LM Robertson Robertson PoE accepted Matzikama Local Municipality Action Plan feedback letter Action Plan feedback letter PoE accepted
Mosselbay Friemersheim Friemersheim PoE accepted Mosselbay Herbertsdale Herbertsdale PoE accepted Mosselbay Lodewykstenk Lodewykstenk PoE accepted Mosselbay Ruiterbos Ruiterbos PoE accepted Mosselbay Grootbak Grootbak PoE accepted Mosselbay Kleinbrak Kleinbrak PoE accepted Mosselbay Sandhoogte Sandhoogte PoE accepted Hessequa Local Municipality
Hessequa Local Municipality
Laingsburg Local Municipality
Swellendam Local Municipality
Swellendam Local Municipality
Swellendam Local Municipality
Swellendam Local Municipality
Matzikama Local Municipality
Matzikama Local Municipality
71 1.1.4
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Oudtshoorn Local Municipality Programe1: Administration Oudtshoorn Local Municipality
Oudtshoorn Local Municipality
Prince Albert Local Municipality
Stellenbosch Local Municipality Paradyskloof Paradyskloof PoE accepted
Stellenbosch Local Municipality Franshoek Franshoek PoE accepted
Stellenbosch Local Municipality Stellenbosch (Idas Valley) Stellenbosch (Idas Valley) PoE accepted
TWK NCL TWK NCL ALL WTWs TWK NCL ALL WTWs EC 20 20 Amatole District municipality Ngqanda Borehole Water Supply (Q1)
Amatole District municipality Nkonkobe LM - Fort Beaufort WTW (Q1)
Amatole District municipality Peddie Network Supply (Q1)
Amatole District municipality Upper Mnyameni Network Supply (Q1)
Alfred Nzo Baviaans Local Municipality Miller (Q1)
Baviaans Local Municipality Vondeling (Q1) Buffalo City Local Municipality Peddie Supply Scheme (Q2) Peddie Peddie PoE accepted
Chris Hani District municipality Intsika Yethu (untreated) (Q2)
Chris Hani District municipality Tsolwana: Ntabathemba supply system Ntabethemba Ntabethemba PoE accepted (Q2) Nkobongo Nkobongo Camdeboo LM Jansenville (Q2) PoE accepted
Ikwezi Local Municipality Klipplaat (Q2) Elundini LM - Ugie Rural (Boreholes & Springs) (Q2) Wolwefontein (Q2)
Joe Gqabi District municipality Elundini LM -Mount Fletcher Rural (Boreholes & Springs) (Q2) Joe Gqabi District municipality Gariep LM - Oviston (Oviston WTP) (Q3)
Joe Gqabi District municipality Senqu LM -Rossouw (Boreholes)(Q3)
Ugie Ugie PoE accepted Kouga Local Municipality Oyster Bay(Q3) Oyster Bay Oyster Bay PoE accepted Humansdorp Humansdorp PoE accepted Hankey Hankey PoE accepted Kou-Kamma Local Municipality Bilikiesdorp (Q3) Blikiesdorp Blikiesdorp PoE accepted Kou-Kamma Local Municipality Clarkson (Q3) Clarkson Clarkson PoE accepted
Kou-Kamma Local Municipality Coldstream (Q3) Coldstream Coldstream PoE accepted
Kou-Kamma Local Municipality Krakeel (Q3) Krakeel Krakeel PoE accepted
Kareedouw Kareedouw PoE accepted Joubertina Joubertina PoE accepted Sandrift Sandrift PoE accepted Stormsrivier Stormsrivier PoE accepted Woodlands Woodlands PoE accepted Sunday`s River Valley Local Louterwater (Q4) Louterwater Louterwater PoE accepted Municipality OR Tambo District Municipality Coffee Bay Coffee Bay PoE accepted Mqanduli Mqanduli PoE accepted Thornhill Thornhill PoE accepted NC 18 18 PoE accepted for 18 !Kai! Garib Local Municipality Alheit (Q1)
!Kai! Garib Local Municipality Aughrabies (Q1) !Kai! Garib Local Municipality Cillie (Q1)
!Kai! Garib Local Municipality Currieskamp (Q1)
!Kai! Garib Local Municipality Kakamas Bulk Water (Q1)
!Kai! Garib Local Municipality Keimoes Bulk Water (Q1)
!Kai! Garib Local Municipality Lennertsville (Q1)
!Kai! Garib Local Municipality Lutzburg (Q1)
!Kai! Garib Local Municipality Marchand (Q1)
!Kai! Garib Local Municipality Riemvasmaak - Sending (Q1)
Dihlabeng Local Municipality Clarens Water Supply System (Q1)
!Kai! Garib Local Municipality Riemvasmaak - Vredesvallei (Q2)
!Kai! Garib Local Municipality Soverby (Q2)
72 1.1.4
NC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Dikgatlong Local Municipality Barkley West (Q2) Barkley West Barkley West Programe1: Administration PoE accepted Dikgatlong Local Municipality Blikfontein (Borehole) (Q2) Blikfontein Blikfontein PoE accepted
Dikgatlong Local Municipality Boetsap SAP (Borehole) (Q2) Boetsap Boetsap PoE accepted
Dikgatlong Local Municipality Delportshoop and Longlands (Sedibeng Delportshoop Delportshoop PoE accepted Water) (Q2) Dikgatlong Local Municipality Eierfontein (Borehole) (Q2)
Dikgatlong Local Municipality Gong-Gong (Borehole) (Q2) Gong-Gong Gong-Gong PoE accepted
Dikgatlong Local Municipality Holpan (Borehole) (Q2) Holpan Holpan PoE accepted
Dikgatlong Local Municipality Kalkfontein (Borehole) (Q2)
Dikgatlong Local Municipality Koopmansfontein (Q2) Koopmansfontein Koopmansfontein PoE accepted
Longlands Longlands PoE accepted Dikgatlong Local Municipality Longlands Clinic (Borehole) (Q2) Longlands Clinic Longlands Clinic PoE accepted Longlands Sedibeng Longlands Sedibeng PoE accepted Dikgatlong Local Municipality Pniel (Borehole) (Q2) Pniel Pniel PoE accepted
Dikgatlong Local Municipality Pniel Estate (Borehole) (Q2) Pniel Estate Pniel Estate PoE accepted
Dikgatlong Local Municipality Spitskop (Borehole) (Q2) Spitskop Spitskop PoE accepted
Dikgatlong Local Municipality Stillwater (Q2) Stilwater Stilwater PoE accepted Dikgatlong Local Municipality Ulco (Mine) (Q3)
Dikgatlong Local Municipality Windsorton (Q3) Novalpont Novalpont PoE accepted
Vaal Gamagara Vaal Gamagara PoE accepted Gamagara Local Municipality Dibeng (boreholes )(Q3) Noupoort Noupoort PoE accepted
Gamagara Local Municipality Dingleton (Vaal Gamagara bulk supply pipeline & Dingleton WTW) (Q3)
Gamagara Local Municipality Kathu (kathu WTW, Boreholes, Vaalgamagara Bulk Supply) (Q3) Gamagara Local Municipality Olifantshoek (Vaal gamagara Bulk Supply Pipeline) (Q3) Ga-Segonyana Local Municipality Bankhara-Bodulong (Managed by Ga- Segonyana LM) (Q3) Ga-Segonyana Local Municipality Kuruman-Wrenchville (Managed by Ga- Segonyana LM) (Q3) Ga-Segonyana Local Municipality Lokaleng (GLM Boreholes_Sedibeng Water) (Q3)
Joe Morolong Local Municipality Bothetheletsa Groundwater Management Area: D41L-M2 (Q3)
Joe Morolong Local Municipality Bothithong Groundwater Management Area D41G-04 (Q3) Joe Morolong Local Municipality Churchill Groundwater Management Area: D41L-M10 (Q3)
Joe Morolong Local Municipality Laxey Groundwater Management Area D41G-05 (Q3) Joe Morolong Local Municipality Maipeng Groundwater Management Area D41L-K9 (Q3) Joe Morolong Local Municipality Manyeding A Groundwater Management Area: D41L-M5 (Q3)
Joe Morolong Local Municipality Misgund (Q4)
Joe Morolong Local Municipality Sanddrif (Q4)
Joe Morolong Local Municipality Addo Supply (Q4)
Kamiesberg Local Municipality Enon Supply (Q4)
Kareeberg Local Municipality Glenconnor (Q4)
Kareeberg Local Municipality Kirkwood (Q4)
Kareeberg Local Municipality Paterson (Q4)
Kgatelopele Local Municipality Tsineng Groundwater Management Area: D41L-M11 (Q4)
Magareng Local Municipality Van Zylsrus (Boreholes) (Q4)
Magareng Local Municipality Ward 1 Heuningvlei Area (Q4)
Magareng Local Municipality Garies (Q4)
Magareng Local Municipality Carnarvon (Q4)
Nama Khoi Local Municipality Vanwyksvlei (Q4)
Richtersveld Local Municipality Vosburg (Q4)
Richtersveld Local Municipality Idwala (Boreholes) (Q4)
Richtersveld Local Municipality Majeng Water Tank (Private) (Q4)
73 1.1.4
NC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Richtersveld Local Municipality Malekos Farm (Private) (Q4) Programe1: Administration Umsobomvu Local Municipality Nazareth House (Private) (Q4)
Umsobomvu Local Municipality Warrenton (Q4)
Umsobomvu Local Municipality Buffelsrivier (Q4)
Umsobomvu Local Municipality Eksteenfontein (Q4)
Umsobomvu Local Municipality Lekkersing (Q4)
Umsobomvu Local Municipality Port Nolloth / Alexander Baai (Alexcor & 8 Myl)(Q4)
Umsobomvu Local Municipality Sanddrift (Q4)
Umsobomvu Local Municipality Norvalspont (TW)(Q4)
Umsobomvu Local Municipality Noupoort (boreholes)(Q4)
Namakhoi Buffelsrivier Buffelsrivier PoE accepted FS 22 22 Dihlabeng Local Municipality Rosendal Water Supply System (Q1)
Kopanong LM
Letsemeng Local Municipality Jacobsdal WTW (Q1)
Letsemeng Local Municipality Koffiefontein (Q1)
Letsemeng Local Municipality Luckhoff (Q1)
Letsemeng Local Municipality Oppermangronde (Q2) Oppermangronde Oppermangronde PoE accepted
Letsemeng Local Municipality Petrusburg (Q2) Petrusburg Petrusburg PoE accepted
Mafube LM Maluti a Phofung Local Municipality Qwaqwa (Makwane WTW) (Q2) Makwane Makwane PoE accepted
Maluti a Phofung Local Municipality Harrismith (Wilge WTW) (Q2) Wilge Wilge PoE accepted
Maluti a Phofung Local Municipality Qwaqwa (Fika - Patso WTW) (Q2) Fika Patso Fika Patso PoE accepted
Mangaung Local Municipality Thaba Nchu (Q3) Rustfontein Rustfontein PoE accepted Van Stadensrus Van Stadensrus PoE accepted Mantsopa Local Municipality Excelsior Water Supply System (Q3)
Thaba Phatchoa Water Supply System (Q3)
Tweespruit Water Supply System (Q3)
Masilonyana LM Brandfort Brandfort PoE accepted Verkeerdevlei Verkeerdevlei PoE accepted PoE accepted Matjhabeng LM Balkfontein (Sedibeng Water) Balkfontein (Sedibeng Water) PoE accepted Virginia (Sedibeng Water) Virginia (Sedibeng Water) PoE accepted Moqhaka LM Nketoana LM Metsimaholo Local Municipality Deneysville Deneysville PoE accepted
Moqhaka LM Kroonstad Kroonstad PoE accepted Viljoenskroon Viljoenskroon PoE accepted Ngwathe LM Parys Parys PoE accepted Nketoana LM Lindley Lindley PoE accepted Reitz Reitz PoE accepted Phumelela LM Parys Parys PoE accepted Setsoto LM Warden Warden PoE accepted Tokolokgo LM Hertzogville Hertzogville PoE accepted Nala Local Municipality Balkfontein (Sedibeng Water) (Q3)
Naledi Local Municipality Dewetsdorp Supply System (Bloem Water) (Q3) Ngwathe LM Phumelela LM
Setsoto LM Tswelopele Local Municipality Bultfontein Supply Zone (Q3)
Tswelopele Local Municipality Hoopstad Supply Zone (Q3)
Tokolokgo LM Kopanong LM Bethulie Bethulie Gariep Gariep KZN 13 13 Amajuba District municipality Dannhauser LM - Dannhauser Dannhauser Dannhauser (Dannhauser TW) - uTW (WSP) (Q1)
Amajuba District municipality Dannhauser LM - Durnacol (Durnacol TW) - Durnacol Durnacol uTW (WSP)(Q1) Amajuba District municipality Utrecht LM - Waterval Prison (Ngagane TW) - uTW (WSP) (Q1) Amajuba District municipality Utrecht LM- Utrecht (Utrecht TW) - uTW Utrecht Utrecht (WSP) (Q1) iLembe District municipality Hlanganani (Q1)
74 1.1.4
KZN
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
iLembe District municipality Hlimbithwa Water Scheme (Q2) Programe1: Administration iLembe District municipality Ifalethu (Q2)
iLembe District municipality Makwanini (Q2)
iLembe District municipality Mushane WTW (Q2)
iLembe District municipality Ohwebede (Q2) Newcastle Local Municipality Charlestown Water System (Pixle ka Sema TW) (Q2) Sisonke District municipality Bulwer (Q2)
Sisonke District municipality Esiqandulweni (Q2)
Sisonke District municipality Nokweja (Q2)
Ugu District municipality Boreholes (Q2) UMgungundlovu District Appelsbosch (Q2) municipality UMgungundlovu District Boreholes (Untreated) (Q2) municipality UMgungundlovu District Embuthweni (Q2) municipality UMgungundlovu District Gomane Boreholes(Q2) municipality UMgungundlovu District Impendle Spring (Q2) municipality UMgungundlovu District Lidgetton West (Q2) municipality UMgungundlovu District Makeni (Q2) municipality UMgungundlovu District Mpofana (Q2) municipality UMgungundlovu District Mtulwa (Q2) municipality UMgungundlovu District Ntanzi (Q2) municipality UMgungundlovu District Nzinga (Q2) municipality UMgungundlovu District Richmond (Q2) municipality UMgungundlovu District Rosetta (Q2) municipality UMgungundlovu District Springs (Untreated) (Q2) municipality UMgungundlovu District Umgeni Bulk Supply (Q2) municipality Umkhanyakude District municipality Borehole Clusters (Q3)
Umkhanyakude District municipality Hluhluwe Phase2 (Q3)
Umkhanyakude District municipality Ingwavuma (Q3)
Umkhanyakude District municipality Malobeni (Q3)
Umkhanyakude District municipality Manguzi (Q3)
Umkhanyakude District municipality Mkuze (Q3)
Umkhanyakude District municipality Mpembeni (Q3)
Umkhanyakude District municipality Mseleni (Q3)
Umzinyathi District municipality Isandlwana Isandlwana
Nqutu LM - Qudeni WTW (Q3) Qhudeni Qhudeni Uthukela District municipality Imbabazane - Loskop (rural scheme) (Q3)
Uthukela District municipality Indaka - Ekuvukeni Township and surrounding Rural areas (Q3) Uthukela District municipality Indaka - Tugela Estates (Q3)
Uthukela District municipality Okhahlamba - Langkloof (Q4)
Moyeni Zwelisha Zululand District municipality Coronation (Q4) Coronation Coronation
Zululand District municipality Hlobane (Q4) Hlobane Hlobane
Zululand District municipality Louwsberg (Q4) Louwsberg Louwsberg
Zululand District municipality Masokaneni (Q4)
Zululand District municipality Mpungamhlope (Q4) Osingisingini Osingisingini
Zululand District municipality Sidinsi (Q4) Sidinsi Sidinsi
Zululand District municipality Tholakele (Q4) Ceza Ceza Pongola Pongola Usuthu Usuthu NW 7 7 Dr. Ruth S Mompati District Draaihoek (Greater Taung LM Borehole_ Draaihoek (Greater Taung LM Borehole_ Municipality Sedibeng Water) Q1) Sedibeng Water) Q1) Dr. Ruth S Mompati District Kagisano-Molopo LM, Kagisano (Boreholes Municipality - Botshelo Water) (Q1)
75 1.1.4
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments NW 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Dr. Ruth S Mompati District Kagisano-Molopo LM, Molopo (Boreholes - Programe1: Administration Municipality Botshelo Water) (Q1)
Dr. Ruth S Mompati District Lekwa Teemane LM- Christiana (Lekwa Municipality Teemane LM) (Q1) Dr. Ruth S Mompati District Lekwa-Teemane LM - Bloemhof (Q1) Municipality Greater Taung LM Granspan Granspan PoE accepted Khudutlou Khudutlou PoE accepted Leshobo Leshobo PoE accepted Lokgabeng Lokgabeng PoE accepted Buxton Buxton PoE accepted Dikhuting Dikhuting PoE accepted Dr. Ruth S Mompati District Mamusa LM (Boreholes, Reseivoirs - Municipality Mamusa lm) Dr. Ruth S Mompati District Naledi LM (Boreholes/ Reservoirs - Naledi Municipality LM) (Q2) Dr. Ruth S Mompati District Ntshwanahatshe (Greater Taung LM Municipality Boreholes_ Sedibeng Water) (Q2)
Dr. Ruth S Mompati District Takapori (Greater Taung LM Borehole_ Municipality Sedibeng Water) (Q2) Moses Kotane Local Municipality Madikwe water treament plant (Q2)
Moses Kotane Local Municipality Vaalkop water treatment plant (Q2)
Rustenburg Local Municipality Rustenburg Boreholes System (Q2)
Ventersdorp Local Municipality Boikhutso Village (Bore Hole Supply System) (Q2) Moses Kotane Local Municipality Molatedi water treatment plant (Q3)
Moses Kotane Local Municipality Pella water treatment works (Q3)
Ventersdorp Local Municipality Boikhutsong village (Bore Hole Supply System) (Q4) Ventersdorp Local Municipality Gamogopa village (Bore Hole Supply System) (Q4) Ventersdorp Local Municipality Goedgevonden Village (Bore Hole Supply System) (Q4) Ventersdorp Local Municipality Tsetse village (Bore Hole Supply System) (Q4) Ventersdorp Local Municipality Ventersdorp (Water Treatment Works Supply System) (Q4) Ventersdorp Local Municipality Welgevonden village (Bore Hole Supply System) (Q4) Ventersdorp Local Municipality Tonga WSS (Q4)
Ventersdorp Local Municipality Machipe (Goederede) (Q4)
Rustenburg LM
Madibeng LM
Ngaka Modiri Molema DM MP 24 24
Chief Albert Luthuli Badplaas Badplaas Bettygood Bettygood Carolina Carolina Ekulindeni Ekulindeni Elukwatini Elukwatini Empuluzi Empuluzi Ferni Ferni Mooiplaas Mooiplaas Dipaleseng Local Municipality Balfour Balfour
Dr Pixley ka Semme Local Amersfoort Amersfoort Municipality Volkrust Volkrust Vukuzakhe Vukuzakhe Wakkerstroom Wakkerstroom Lekwa Local Municipality Morgenzon Morgenzon Standerton Standerton Mkhondo Local Municipality Amsterdam Water Supply System (Q1) Amsterdam Amsterdam
Driefontein Water Supply System (Q1) Driefontein Driefontein
Piet Retief Water Supply System (Q1) Piet Retief Piet Retief
Piet Retief (New) Piet Retief (New) Rural Water Supply System (Q1) The Greater Mkhondo Local Municipality (Q2) Msukaligwa Local Municipality Breyten Breyten Davel Davel Ermelo Northern Ermelo Northern Ermelo Southern Ermelo Southern Lothair Lothair Dipaleseng Local Municipality The Greater Dipaleseng Local Municipality (Q1) Mkhondo Local Municipality Amsterdam Water Supply System (Q1)
Mkhondo Local Municipality Driefontein Water Supply System (Q1)
Mkhondo Local Municipality Piet Retief Water Supply System (Q1)
Mkhondo Local Municipality Rural Water Supply System (Q1)
76 1.1.4
MP
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Mkhondo Local Municipality The Greater Mkhondo Local Municipality Programe1: Administration (Q2) Nkomazi Local Municipality Driekoppies/ Shoemansdal/ Buffelspruit/ Shongwe WSS (Q2)
Nkomazi Local Municipality Fig Tree/ Masibekele WSS (Q2) Nkomazi Local Municipality Hectorspruit WSS (Q2) Nkomazi Local Municipality Komatipoort WSS(Q2) Nkomazi Local Municipality Langeloop WSS(Q2) Nkomazi Local Municipality Low Creek WSS(Q2) Nkomazi Local Municipality Madadeni WSS(Q2) Umjindi Local Municipality Engwenyameni (Klipfontein)(Q2) Umjindi Local Municipality Kwaggafontein System(Q2) Umjindi Local Municipality Kwamhlanga(Q2) Umjindi Local Municipality Langkloof(Q2) Umjindi Local Municipality Moloto (Q2) Umjindi Local Municipality Thembalethu(Q2) Umjindi Local Municipality Emjindini Trust water supply scheme (Boreholes)(Q2) Umjindi Local Municipality Rimer`s water treatment works / Barberton water scheme (Q2) Nkomazi Local Municipality Magudu WSS (Q2) Nkomazi Local Municipality Malalane WSS (Q2) Nkomazi Local Municipality Marloth Park WSS (Q2) Nkomazi Local Municipality Mbuzini WSS (Q2) Nkomazi Local Municipality Naas/Block C WSS (Q2) Nkomazi Local Municipality Nkomazi Rudimentary Boreholes (Q2)
Nkomazi Local Municipality Ntunda WSS (Q2) Nkomazi Local Municipality Nyathi WSS (Q2) Nkomazi Local Municipality Sibange WSS (Q2)
Thaba Chweu Bushbuck ridge
LP Greater Sekhukhune District Mapodile p. Station (Q1) Municipality Greater Sekhukhune District Marishane Water Supply System (Q1) Municipality Greater Sekhukhune District Moroke Borehole (Q1) Municipality Greater Sekhukhune District Moutse Water Supply System (Q1) Municipality Greater Sekhukhune District Ngwaabe Supply System (Q1) Municipality Greater Sekhukhune District Vergelegen Water Supply System (Q3) Municipality Lephalale Local Municipality Mokuruanyane Regional Water Supply Scheme (Q3)
Mopani District municipality Semarele (Q3) Mopani District municipality The Greater Mopani District municipality (Q3) Vhembe District municipality Elim Water System (Q4)
Vhembe District municipality Kutama Sinthumule Water System (Q4)
GP Emfuleni DM
77 Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Compliance MonitoringPrograme1: and Enforcement Administration 1.1.5 Number of dams evaluated for compliance 160 36 Grand total: 65 A total of 65 were monitored of which: Over by 29 45% A total of 65 were monitored of which: The actual number will fluctuate Did submission to DG to request to Over achieved with dam safety regulations by Approved 27 (APP) depending on workload of Approved amend the target description (Waiting for Professional Persons (APPs) 38 (Additional) 27 are in the APP & 27 are in the APP & Professional Persons who do the work. approval). 38 are additional 38 are additional
LP 0 0 0 0 0 A211/52 Klipfontein No1 Reservoir A211/54 Centurion Silt Dam A211/57 Eskom Convention Centre Dam GP 4 4 4 4 A212/41 Emmarentia Dam A212/46 Westdene Dam A212/61 Leeukop-Korf Dam A212/62 Leeukop-Skilpad Dam A213/52 Hippo Dam A230/08 Bon Accord Dam A231/34 Primula Flood Structure
A231/35 Premier Mine No.7 Slimes Dam A231/47 General Louis Botha Drive Flood Attenuation Structure A231/48 Bronberge Reservoir A231/50 Devillebois Vloed Struktuur C110/13 Bethal Dam C110/16 Willem Brummer Dam C111/58 Goedehoop Dam C112/56 Rooijan Dam C114/02 Grootdraai Dam C114/49 Kromdraai Dam Kromdraai Dam Kromdraai Dam Kromdraai Dam C120/01 Vaal Dam C122/37 Rusticana Dam C122/39 Rusticana Dam 2 C123/42 Grootvlei 453 Dam C132/13 Kleinfontein 357 Dam C133/12 Vrede/Thembalihle Dam
C211/27 Rietspruit Dam 1 C211/28 Rietspruit Dam 2 C212/21 Rietfontein Westelike Vloedvertragings Dam
C212/22 Rietfontein Oostelike Vloedvertragings Dam
C212/57 North Ridge Reservoir C212/60 Brakpan No3 Reservoir C212/64 Holfontein Cell 7 C221/51 Germiston Reservoir C221/52 Klipriviersberg No 1 Reservoir C221/53 Klipriviersberg No 2 Reservoir C221/55 Forest Hill No 2 Reservoir C222/36 Doornpoort Return Water Doornpoort Return Water Doornpoort Return Water Doornpoort Return Water C223/43 Sasolburg Reservoir C230/04 Boskop Dam C231/42 Donaldson Dam C231/77 Libanon No 3 Reservoir C231/80 Adma Dam Adma Dam Adma Dam Adma Dam C232/51 Deelkraal Dam C232/53 Leeudoorn Return Water Dam C801/10 Sterkfontein C804/38 Emden Dam C804/46 Morgenzon Dam C805/44 Middelpunt Dam C805/61 Miemiesrust Dam C805/62 Boston A Dam C121/75 Lang Dam Lang Dam Lang Dam Lang Dam Lang Dam is not in the APP
NW 1 1 1 A215/47 Middelkraal Dam A216/46 Crocodile River Mine Return Water Dam
A220/02 Olifantsnek Dam A220/09 Swartruggens Dam A223/51 Prison Dam A224/28 Lengua Dam (Previously Bakubung Dam)
A224/30 Sun City Dam A230/06 Bischoffs Dam A232/35 Hartebeesthoek Reservoir A233/31 Bospoort Dam A233/34 Buffelspruit Dam A234/28 Nooitgedacht Dam A245/01 Amandelbult Tailings Return Water Dam
A300/03 Klein Maricopoort Dam A301/18 Rietvallei Dam A302/17 Roodesloot Dam A304/22 Bloemfontein Dam (Was A303/17)
C301/23 Taung Dam C301/31 Holfontein Dam D410/02 Disaneng Dam Dam D411/26 Lotlamoreng Dam A233/24 Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam is not in the APP LP 3 3 3 A401/07 Motlobo Dam A402/42 Rietpoort Dam A402/50 Inelkander Dam A601/22 Suid-Holland Dam A602/54 Rietfontein Dam 7
78 1.1.5
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 LP PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
A703/30 Waterpoort Dam Programe1: Administration A901/42 Damani Dam A901/56 Moddervlei N02 Dam (Bush) A901/58 Moddervlei Nr3 Dam(Mac) A901/59 Moddervlei No1 Dam(Salani) A901/65 Vis Dam No 2 B800/17 Dap Naude Dam No report received No report will report in Q3 Will report in Q3 No report - will report in Q3 B800/19 Duivelskloof Dam B801/74 Fish Eagle Dam B801/82 Thabina Dam B801/AH Malole Dam B801/AP Bo Cramer Dam B801/AQ Tubb'shill-Bottom Dam B801/DY Tubb's Hill Top Dam B802/45 Leeudraai Dam B901/03 Silwervis Dam B901/06 Shingwidzi Dam B902/09 Makuleke Dam B800/15 Altenzur Dam Altenzur Dam Altenzur Dam Altenzur Dam Altenzur Dam is not in the APP
B801/BJ Leonora (Tsjokwane) Dam Leonora (Tsjokwane) Dam Leonora (Tsjokwane) Dam Leonora (Tsjokwane) Dam Leonora (Tsjokwane) Dam is not in the APP B800/21 Hans Merensky Dam Hans Merensky Dam Hans Merensky Dam Hans Merensky Dam Hans Merensky Dam is not in the APP MP 4 4 4 B101/84 Isibonela Attenuation B102/58 Dam N0.5 B103/29 Kromdraai Dam B103/33 Hendrina Powerstation Raw Water Terminal Reservoirsno.1&2
B103/36 Hendrina-Dorps Dam B103/68 Coastal Coal B201/38 Goedgedacht Dam B202/33 Kusile P.S. Raw Water Reservoir B320/03 Roodepoort Dam B321/43 S-Dam B321/44 Winkel Dam B323/16 Funda-Mlimi Middle Dam (Gemsbokfontein No.1) B400/26 De Hoop Dam B401/44 Belfast Dam B402/39 Tweefontein Mine Return Water Dam
B402/45 Helena Return Water Dam A B403/39 Bendu Dam B501/11 Flag Boshielo - Was Arabie Dam X103/67 Dawn View Dam X200/64 My Own X201/89 River Dam X202/84 Somerset Dam X205/73 Maroela Dam X205/92 Lochmseleni Dam Lochmseleni Dam Lochmseleni Dam Lochmseleni Dam X205/AA Newu Dam X205/AM Exotica X301/96 Lake Panic 2 Dam X301/AO Bongani Dam X302/32 Acornhoek B100/04 Witbank Dam Witbank Dam Witbank Dam Witbank Dam Witbank Dam is not in the APP
B501/14 Mahlangu Dam Mahlangu Dam Mahlangu Dam Mahlangu Dam Mahlangu Dam is not in the APP
B101/36 Rietspruit Dam Rietspruit Dam Rietspruit Dam Rietspruit Dam Rietspruit Dam is not in the APP
FS 1 1 1 C241/17 Buffelsfontein Evaporation Dam C241/37 (Chemwes) Kareerand Tailings Dam
C242/48 West Complex Storm Water Dam
C242/52 Ratzegaai Dam C400/08 Mushroom Valley Dam C401/34 Barolong Dam C401/36 Eden Dam C402/37 Wolwas Dam Nr. 1 C402/43 Wolwas Nr.2 C402/44 Sparta Dam C402/48 Dresden Dam C403/35 De Put Grond Dam C403/36 De Put Keerwal C403/45 Petra Dam C404/80 Freegold New Return Water Dam C404/AV Riebeeckstad Reservoir 1 C404/AW Riebeeckstad Reservoir 2 C404/BC Eendoorn Dam C405/36 Cronjespruit Dam 1 C405/37 Abrahams Hof Dam C405/38 Palmietfontein Dam C510/09 Fouriespruit Dam C514/36 Hk Balancing Dam C520/02 Krugersdrift C520/08 Mazelspoort C521/37 Goedgenoeg Dam C522/31 Quin-Se-Dam C600/06 Strydom Dam C600/15 Serfontein Dam C601/01 Bloemhoek Dam C601/29 Taaibosdal Dam C602/22 Rietfontein C700/06 Uniefees (Langdam)
79 1.1.5
FS
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
C702/18 Vliegenkraal Dam Programe1: Administration D132/13 Holspruit Dam D132/29 Oorlogspoort Dam (Same As D132/11 Amersham Dam) D140/04 Molteno Dam D142/21 Harmsfontein Dam D142/23 Klipfontein D142/25 Oudeklip-Modderfontein Dam D142/26 Krompoort Dam D142/28 Plat Dam D142/44 Kraaifontein Dam D200/10 Tweespruit Dam D201/44 Verdun Dam D201/51 Meulspruit D202/54 Moperi Dam D204/48 Donkerpoort Scheme Dam D204/62 Sterkwater Sterkwater Sterkwater Sterkwater D310/02 Hartebeestfontein Dam D310/12 Knapsak Dam D330/27 Petrusville Dam D342/12 Rietfontein Dam D350/21 Viljoens Dam D350/32 Eselzhoek Dam NC 3 3 3 C900/07 Bloemhof Dam D540/09 Masolkakop Dam Masolkakop Dam Masolkakop Dam Masolkakop Dam D540/10 Jaskloof-Sedam D550/03 Loxton Dam D551/13 Helpmekaar Dam D600/02 Aspeling Dam D603/15 Wortelfontein Dam D801/18 Lake Grappa Dam Lake Grappa Dam Lake Grappa Dam Lake Grappa Dam Lake Grappa Dam is not in the APP
D730/37 Neusberg Weir Neusberg Weir Neusberg Weir Neusberg Weir Neusberg Weir is not in the APP
WC 42 42 42 E100/26 Trap Se Dam E100/72 Driefontein Dam E100/AA Olyvenboschkraal Dam E100/AR Middeltuin Dam E100/BA Bokant Huis Dam E100/BD Vaalwater Dam E200/12 Zeekoegat-Nuwe Dam E201/38 Brakfontein Weir (Elandsvlei Dam)
E201/83 Uitkyk-Groot Dam Uitkyk-Groot Dam Uitkyk-Groot Dam Uitkyk-Groot Dam E201/87 Weltevrede-Groot No.1-Dam E201/88 Weltevrede-Groot No.3-Dam E201/89 Weltevrede-Groot No9-Dam E201/90 Weltevrede-Boonste Dam E201/91 Weltevrede-Perdekloof Dam E201/92 Weltevrede-Sekretaris Dam E201/99 Morester-Heiveld Dam E201/AC Disakloof (Formerly Wydekloofkaffersdaldam) E201/AI Sandfontein No.1-Dam E201/AK Lang No.2-Dam E201/AN Die Kloof Nuwe No.1 Dam Die Kloof Nuwe No.1 Dam Die Kloof Nuwe No.1 Dam Die Kloof Nuwe No.1 Dam E201/CO Swart Dam E201/DB Diep Dam E201/DI Jakkalsfontein Dam E201/DV Middel Dam E304/12 Melkboom Dam G100/27 Mountain Dam Mountain Dam Mountain Dam Mountain Dam G100/29 Hermitage Dam(Previously Moutons Valley Hermitage Dam(Previously Moutons Valley Dam) Hermitage Dam(Previously Moutons Valley Dam) Hermitage Dam(Previously Moutons Valley Dam) Dam) G101/97 Nieuwedorp Dam G101/AD Dundarach Main Dam G101/AG La Valle Dam G101/AN Calais Dam G101/AS Rachelsfontein Big Dam G101/AZ Beaucoup-L'eau Dam G101/BI Allendale Plaas Dam G101/BL Hoenderhok Dam G101/BR Simonsberg Dam H G101/BT Stellengift Dam C G101/BV Salomonsvlei G101/BW Dal Weiding Stormwater Control Dam Dal Weiding Stormwater Control Dam Dal Weiding Stormwater Control Dam Dal Weiding Stormwater Control Dam
G101/CH Maritz Dam G101/DE Donkerhoek Dam G101/DG Roelanda Dam G101/DL Top Dam (Was Backsberg Nr5 Dam)
G101/DY Smit Groot Dam G101/EA Adrem Dam G101/EB St Loucia Dam G101/ED Rooiheuwel Dam G101/EQ Bottom G101/ES Middle G101/EY Klein Normandie Dam G101/EZ Vergesicht Dam G101/FA De Hoop Dam G102/87 Roodezands Dam G102/89 Grootskuur Dam G102/91 Blou Am G102/95 Vlei Dam G102/AD Modderasvlei-Huis Dam G102/AE Diepkloof Dam G102/AU Allesverloren-Boonste Dam
80 1.1.5
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
G102/AV Allesverloren Groot Dam Programe1: Administration G102/BB Steinthal Klipfontein Dam G102/BC De Hof Dam De Hof Dam De Hof Dam De Hof Dam G102/BX Rijk's Dam No 3 G102/BY Rijk's Dam No 4 G103/06 Januarieskraal Dam Januarieskraal Dam Januarieskraal Dam Januarieskraal Dam G104/93 Langberg Main Dam G104/94 Moutons Valley Upper Mountain Dam
G104/97 Diepkloof Rooiklip G104/98 Achtervlei-Sement Dam G104/AB Tierkloofno.2-Dam G104/AE Voorstevlei-Groot No.3-Dam G104/AF Vark Dam G104/AI Voorberg-Bronberg Dam G104/AK Voorberg-Wjm Dam G104/AP Boplaas Dam G104/AZ Sig Dam G104/BG Perskeboord Dam G104/BT Platkloof Dam G104/BX Dasboschkloof Dam Dasboschkloof Dam Dasboschkloof Dam Out of scope Dasboschkloof Dam Out of scope Report not signed G104/BY Platkloof Dam G104/CD Groot Groot Groot Groot G202/66 Goedgedacht No.1-Dam G202/73 Weltevreden-Groot Dam G202/84 Bordeaux Dam G202/87 Kromrivier Dam G202/89 Mollenbergkloof Dam G202/93 Moreson Dam G202/94 Weltevreden Dam G202/AA Jenifer Dam G202/AB Wynkeldershoek Nr2 Dam G202/AE Marchese Dam G202/AW Bergsig Dam (Previously Joostenbergvlakte) G202/AX Rooidraai G203/73 Erf 20635 Belville Ds Dam (Same As G203/77?) G204/70 Simonsig Big Dam G204/74 Helderberg-Kloof Dam G204/89 Weltevrede Dam G204/90 Nooitgedacht-Grootvlei Dam G204/AC Neethlingshof Dam G204/AX Zevenfontein Groot Dam G204/BA Dennebos Dam G204/BC Wemmershoek Dam G204/BO Langverwacht Bottom Dam G204/BT Thelema Dam G204/BV Welgevallen Dam G204/BZ Die Kom Dam G204/CD Quoin Rock Dam A G205/67 Knorhoek Dam G301/13 Wagenboomsrivier-Onder Dam G301/36 Kromantonie Nr2 Dam G400/19 Saddle Dam G400/31 Twaalffontein Dam Twaalffontein Dam Twaalffontein Dam Twaalffontein Dam G400/36 Skaapkraal Dam G401/61 Helderfontein Small Dam G401/76 Kromriverdam G401/81 Applethwaite Lake G401/83 Pickstone Dam Pickstone Dam Pickstone Dam Pickstone Dam G401/89 Beukesdal Dam G401/95 Groenrug Dam Groenrug Dam Groenrug Dam Groenrug Dam G401/AE Jakkalsrivier Dam G401/AI Grand Canyon Dam G401/AN Olifantsvlei Dam Olifantsvlei Dam Olifantsvlei Dam Olifantsvlei Dam G402/52 Eerstehoop-Wit Dam G402/54 Waboomskloof Dam G402/62 Klei Dam G402/70 Twaalffontein Top Dam Twaalffontein Top Dam Twaalffontein Top Dam Twaalffontein Top Dam G402/74 Maremmana Dam Previously Botrivier Dam
G402/77 Highlands/Iona Dam G404/62 New Dam (Was Waboomsrivier Top Dam)
G501/15 Klein-Sanddrif Klein-Sanddrif Klein-Sanddrif Klein-Sanddrif G501/26 Uintjieskuil Dam Uintjieskuil Dam Uintjieskuil Dam Uintjieskuil Dam H100/19 Paardekloof-Wit Dam H101/64 Bos Dam H101/70 Rooikloof Dam H101/74 De Liefde Dam H101/77 Rooiwal Dam H101/87 Buchuland Upper Dam H101/88 Buchuland Middle Dam H101/91 Bordeaux Dam H101/93 Hartebeestvalley Dubbel Dam H101/95 Hartebeestvalley Fish Dam H101/96 Wakkerstroom-Geel Dam H101/97 Witsand Dam (Same As Groot Dam H101/Cp) H101/AD Waaihoek Dam H101/AE Loxtonia Bo-Dam H101/AT Meul Dam H101/BD Romans River Dam H101/BS Vadersgawe Dam H101/BT Romansrivier Dam H101/CS Kliprivier Dam H101/CU Normandie 2 H200/47 Waltham Dam H200/49 De Vlakte No.2-Dam
81 1.1.5
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
H300/21 Uitkykdam Programe1: Administration H300/22 Bergplaas Big Dam H300/24 Valletjies Dam Valletjies Dam Valletjies Dam Valletjies Dam H300/26 Riethoek-Groot Dam H300/42 Goedemoed No.2-Dam H400/02 Keerom Dam H401/60 Memel-Huis Dam H401/61 Wilgerboom Dam H401/64 Voorregsvlei Dam H401/68 Kalkbank Dam H401/71 Moordkuilsdrif H402/45 Dasbos Dam H402/46 Zevenberg Dam H402/62 Eureka H402/63 Eureka No .2 Dam H402/66 Mcgregor-Nuwe Dam No.1
H402/79 Brandvlei-Wit Dam H402/99 Klipdrift (Modderriver) Dam H402/AG Boskloof Dam H402/AL Gat H402/AQ Gannakloof Dam H402/AT Bo-Dam H500/09 Waterval-Groot Dam Waterval-Groot Dam Waterval-Groot Dam Waterval-Groot Dam H500/12 Goudmyn Zuidr-Groot H600/53 Meerlustkloof Dam H600/63 Helderstroom-Donkerhoek Dam H600/65 Waterkloof No.2 Dam H600/79 Longdown Dam H700/89 Sika Hoof Dam H800/03 Duivenhoks Dam J112/10 Damfontein Dam J112/18 Dam-Met-Eiland No.1 J121/14 Karrona-Boonste Dam J121/21 Aartappel Dam J210/02 Stolsrivier Dam J230/01 Oukloof Dam J232/08 Angeliersbosch Dam J240/03 Rietkloof Dam J251/66 Rooi Dam J251/68 Boonste Dam J252/11 Rooikloof Dam J331/41 Hooggenoeg-Ou Dam J331/42 Standbeeld-Se-Dam J332/11 Klaarstroom Dam J332/13 Begrafplaas Dam J333/18 Voelgesang-Bo Dam Voelgesang-Bo Dam Voelgesang-Bo Dam Voelgesang-Bo Dam J333/19 Voelgesang-Kloof-Onder Dam Voelgesang-Kloof-Onder Dam Voelgesang-Kloof-Onder Dam Voelgesang-Kloof-Onder Dam J333/22 Vergelegen Dam Still Dam (Originally Called De Rust Still Dam (Originally Called De Rust Dam) Dam) Breevlei No.1-Dam Breevlei No.1-Dam Lentelus No.3-Dam Lentelus No.3-Dam K300/33 Lakeview Dam Lakeview Dam Lakeview Dam Lakeview Dam Hentie Henning Hentie Henning Patrick Rawlings Dam Patrick Rawlings Dam Buffelsrivier Dam 1 Buffelsrivier Dam 1 Buffelsrivier Dam Buffelsrivier Dam K700/04 Buffelsrivier Dam 3 G400/06 Huisrivier Dam (Formerly Arieskraal Dam1) Huisrivier Dam (Formerly Arieskraal Dam1) Huisrivier Dam (Formerly Arieskraal Dam1) Huisrivier Dam (Formerly Arieskraal Dam1) Huisrivier Dam (Formerly Arieskraal Dam1) not in the APP
H600/66 Panorama Dam, Panorama Dam Panorama Dam Panorama Dam Panorama Dam not in the APP
H500/08 Joubertsdal-Vaalkops Dam Joubertsdal-Vaalkops Dam Joubertsdal-Vaalkops Dam Joubertsdal-Vaalkops Dam Joubertsdal-Vaalkops Dam not in the APP G204/AQ Chardonnay Dam Chardonnay Dam Chardonnay Dam Chardonnay Dam Chardonnay Dam not in the APP
G203/75 Doordekraal Dam Doordekraal Dam Doordekraal Dam Doordekraal Dam Doordekraal Dam not in the APP
H100/18 Stettynskloof Dam Stettynskloof Dam Stettynskloof Dam Stettynskloof Dam Stettynskloof Dam not in the APP
H200/25 Fairy Glen Fairy Glen Fairy Glen Fairy Glen Fairy Glen not in the APP G101/87 Victoria Dam Victoria Dam Victoria Dam Victoria Dam Victoria Dam not in the APP
G401/90 Saal Dam Saal Dam Saal Dam Saal Dam Saal Dam not in the APP G200/18 Idasvalley No2 Dam Idasvalley No2 Dam Idasvalley No2 Dam Idasvalley No2 Dam Idasvalley No2 Dam not in the APP
H401/73 Conradie Servituut Dam Conradie Servituut Dam Conradie Servituut Dam Conradie Servituut Dam Conradie Servituut Dam not in the APP J350/22 South Cape Produce Dam 1 (Previouly South Cape Produce Dam 1 (Previouly South South Cape Produce Dam 1 (Previouly South South Cape Produce Dam 1 (Previouly South South Cape Produce Dam 1 South Hops Dam no3) Hops Dam no3) Hops Dam no3) Hops Dam no3) (Previouly South Hops Dam no3) not in the APP G400/09 Boomerang Dam Boomerang Dam Boomerang Dam Boomerang Dam Boomerang Dam not in the APP
H101/64 Bos Dam Bos Dam Bos Dam Bos Dam Bos Dam not in the APP H900/27 Melkhoutfontein Dam (Olive Grove Dam) Melkhoutfontein Dam (Olive Grove Dam) Melkhoutfontein Dam (Olive Grove Dam) Melkhoutfontein Dam (Olive Grove Dam) Melkhoutfontein Dam (Olive Grove Dam) not in the APP
G100/25 Bethel Dam Bethel Dam Bethel Dam Bethel Dam Bethel Dam not in the APP G100/30 Nantes Dam Nantes Dam Nantes Dam Nantes Dam Nantes Dam not in the APP
G205/74 Boskloof Dam Boskloof Dam Boskloof Dam Boskloof Dam Boskloof Dam not in the APP
H101/AU Kanet-Vlei Dam Kanet-Vlei Dam Kanet-Vlei Dam Kanet-Vlei Dam Kanet-Vlei Dam not in the APP
H402/BE Noreen Dam1 Noreen Dam1 Noreen Dam1 Noreen Dam1 Noreen Dam1 not in the APP
82 1.1.5
WC
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
H402/BF Noreen Dam2 Noreen Dam2 Noreen Dam2 Programe1: Administration Noreen Dam2 Noreen Dam2 not in the APP G204/CF Shemara Dam Shemara Dam Shemara Dam Shemara Dam Shemara Dam not in the APP
EC K800/01 Landman Dam 4 4 4 K800/13 Dennegeur Dam (Also Fingo Ground Dam See K800/09) K800/19 Lieu Amor Dam K800/59 Fingo Dam No.4 (Previously Nuwevlei Dam K800/40) K800/60 Fingo Dam No.6 (Previously Ben Dam K800/38) K800/69 Kromhout Dam K800/81 Langfontein Dam 2 K901/78 Holding Reservoir L112/03 The Vale Dam L221/02 Kruidfontein No.3 Dam L600/01 Klipfontein Dam L700/41 Wolwefontein Dam L820/01 Kouga Dam (Paul Sauer Dam) L820/54 Jaydee Dam L820/98 Black Ginger Dam M100/07 Rietfontein Dam (Previously:Wally Holmes)
M100/11 Steyn's Dam N110/01 Bloemhof N140/18 De Hoop P102/14 Table Hill Big Dam P300/14 Le Grange Dam P400/04 Rosslyn Dam P400/05 Kenkele Dam P400/06 Pinedale Dam P400/24 Golden Ridge Dam P400/25 Belmont Dam 1 (Was Fairyvale P400-02)
Q130/01 Grassridge Dam Q921/12 Drieshof Dam R102/02 Dimbaza Dam - Ciskei R201/25 Rooikrans Dam-Ciskei R202/18 Mdantsane Wwtw Effluent Dam 3 R302/22 Tanga Dam S300/06 Waterdown Dam S302/33 Glenbrock Dam S302/49 Pensula Farm Dam S600/05 Wriggleswade Dam S702/08 Gcuwa Dam T300/04 Mountain Dam T301/24 Ugie Dam T302/59 Cengane Dam T304/26 Welbedacht Dam T304/70 Mountain Lake Dam T305/30 Roodeberg Dam T305/36 Stryd-Kop Dam T902/23 Nqadu Dam (Willowvale) R402/12 Tomatoe Dam Tomatoe Dam Tomatoe Dam Tomatoe Dam Tomatoe Dam is not in the APP
W930/46 Sinqumeni Dam Sinqumeni Dam Sinqumeni Dam Sinqumeni Dam Sinqumeni Dam is not in the APP
R101/04 Pleasantview Dam Pleasantview Dam Pleasantview Dam Pleasantview Dam Pleasantview Dam is not in the APP
T201/06 Mabeleni Dam Mabeleni Dam Mabeleni Dam Mabeleni Dam Mabeleni Dam is not in the APP
KZN 3 3 3 T402/09 Brairglendam T402/10 Roselandsdam T501/24 Goxhill Dam T501/37 Dartford Dam T501/44 Castleburn Dam T501/53 Scottston Dam T501/73 Goxhill Dam 2 T502/21 Traveller's Rest Dam T502/23 Amanzimnyama Dam U100/14 Max Lake U100/67 Donegal Dam U100/71 Springbrook Dam U201/45 Brookdales Dam U201/86 Elderslie Dam No 14886 U201/91 Chiltern Dam U201/BB Syndicate Dam U203/56 Tedder No2 Dam U302/15 Claremont Farm Dam U401/34 Erica Dam U402/10 Plaas Dam U402/13 Hartebeesfontein Dam U403/12 Essery U500/01 Newsondela Dam (Nonoti) V101/61 Kopanong Dam V103/07 Qedusizi Dam V105/35 Drakensberg Sun Dam Drakensberg Sun Dam Drakensberg Sun Dam Drakensberg Sun Dam V201/36 Castle Howard Dam 1 V201/55 Springvale Bottom Dam V201/58 Littlefalls Dam V201/AD Berning Dam V201/AO Spring Grove V301/30 Mahawane Dam V301/33 Torrington 7386 Dam No.1 (Same As B193/2/V301/52?) V301/34 Van Der Westhuizen Dam V301/94 White House Dam
83 1.1.5
KZN
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
V301/AA Mrs Sampson Dam Programe1: Administration V302/43 Ellies Glen Dam V302/56 Mrs Theron Dam V303/36 Grootspruit Dam Owned By Pr Steenkamp
V701/20 Lake Murray W110/21 Ashill W121/44 Melmoth Off-Channel Storage W121/45 Bedhlane W121/47 Wallenton W122/07 Lake Mzingazi W122/16 Lake Nhlabane W221/11 Sankunzi Dam W300/05 Vaalbank Dam W301/21 Boulder Dam (Coronation) W301/31 Uitschot Dam 6 W303/20 Mzinene Dam W410/07 Mooihoek Dam W421/08 'E Dumbe Dam W430/01 Nduma Dam W440/01 Pongolapoort Dam W440/41 Koedoesberg No2 Dam Koedoesberg No2 Dam Koedoesberg No2 Dam Koedoesberg No2 Dam Koedoesberg No2 Dam is not in the APP W440/06 Koedoesberg Besproeings Koedoesberg Besproeings Koedoesberg Besproeings Koedoesberg Besproeings Koedoesberg Besproeings is not in the APP 1.1.6 Number of water users monitored for 384 99 Grand total: 103 APP A grand total 213 water users were monitored of Over by 4 on the APP A grand total 213 water users were monitored of Over achieved due to recovery reports Over achieved Submission will be done to Act DG compliance 103 (APP) which which from Q1 and amendments on APP for amendment of quarters and 110 (Additional) (Submission will be done to Act DG for requests from Provinces to replace 103 are in the APP & 103 are in the APP & amendment of quarters and requests users 110 are additoinal 110 are additoinal from Provinces to replace users)
Forestry 20 6 6 6 6 Slabbert MJ KZN Bracken Forestry: Ptn2, Maresdale Bracken Forestry: Ptn2, Maresdale Bracken Forestry: Ptn2, Maresdale Bracken Forestry: Ptn2, Maresdale
KZN Bracken Forestry: Ptn3, Maresdale Bracken Forestry: Ptn3, Maresdale Bracken Forestry: Ptn3, Maresdale Bracken Forestry: Ptn3, Maresdale
KZN Bracken Forestry: Remainer, Maresdale Bracken Forestry: Remainer, Maresdale Bracken Forestry: Remainer, Maresdale Bracken Forestry: Remainer, Maresdale
KZN Bracken Forestry: Ptn0, Geluk Bracken Forestry: Ptn0, Geluk Bracken Forestry: Ptn0, Geluk Bracken Forestry: Ptn0, Geluk KZN Sappi Saiccor Sappi Saiccor Sappi Saiccor Sappi Saiccor Mthethwa-Mhlana tribal Authority
Tongatt Hullets Goeie Hoop Farming Pty Ltd: Weatherstone farm Goeie Hoop Farming Pty Ltd: Balmoral farm
Goeie Hoop Farming Pty Ltd: Vidy farm
Goeie Hoop Farming Pty Ltd: Langwies farm Nyeswa Forest Project Likhetlane Community Qhobosheaneng Community Muofhe T.S LP Khakhu SA Khakhu SA Khakhu SA Khakhu SA Masikhwa N.M Thagwana R.S Mpact Piet Retief
Agriculture 104 30 49 49 49 Amendment to APP users and quarters - Amendment to APP users and in process to draft submission to act DG quarters - in process to draft to amend submission to act DG to amend
(Irrigation) 65 [Irrigation] 17 [Irrigation] 34 34 34 FS Mr Jan Augustinus vd Merwe Will be replaced with Mr Gert van Zyl Business Trust - will include in submission to act DG
FS Pierre Ferreira Trust Will be replaced with Mrs SJ Spies - will include in submission to act DG FS Mrs SJ Spies Mrs SJ Spies Mrs SJ Spies Mrs SJ Spies FS Osborne Boerdery (Pty) Ltd Will be replaced with JGL Wilken - will include in submission to act DG FS Danrika Boerdery (Pty) Ltd Not done to be replaced by FS - will include in submission to act DG Connie Cloetzee Familie NC Burger Du Plessis Family Trust Burger Du Plessis Family Trust Burger Du Plessis Family Trust Burger Du Plessis Family Trust On APP in Q3 - Province done in Q2 On APP in Q3 - Province done in Q2
Mrs DJE Burger NC WEJ Boerdery cc WEJ Boerdery cc WEJ Boerdery cc WEJ Boerdery cc On APP in Q3 - Province done in Q2 On APP in Q3 - Province done in Q2 Eldoreen Plase Truse 2.5.1 Ms M du Preez CF Louw Nuwejaarskraal Testamentee Trust FS Tshepiso Farms (Pty) Ltd Move to Q3 Property falls under FS and not NC as Property falls under FS and not NC per APP. License is not captured as per APP. License is not captured correctly on WARMS. Inspection will be correctly on WARMS. Inspection will conducted in Q3 (Will include in be conducted in Q3 (Will include in submission to act DG) submission to act DG)
Imonetix Acorn Creek Development
84 1.1.6 Over achieved
(Irrigation)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
FS Frank 1474/0 Frank 1474/0 Frank 1474/0 Programe1: Administration Frank 1474/0 Frank 1474/0 is not on APP FS Rietvlei 112/2 Rietvlei 112/2 Rietvlei 112/2 Rietvlei 112/2 Rietvlei 112/2 is not on APP
FS Theronshoop 411/0 Theronshoop 411/0 Theronshoop 411/0 Theronshoop 411/0 Theronshoop 411/0 is not on APP
FS Generous Trust: Besemko 1808/0 Generous Trust: Besemko 1808/0 Generous Trust: Besemko 1808/0 Generous Trust: Besemko 1808/0 Generous Trust: Besemko 1808/0 is not on APP WC Little River Trading Little River Trading Little River Trading Little River Trading Spier Home farm Leef op Hoop farm EC Hillview Farm Control Hillview Farm Control Hillview Farm Control Hillview Farm Control This falls under EC and will be amended This falls under EC and will be in submission to act DG amended in submission to act DG
WC Stillbaai Golf Course Stillbaai Golf Course Stillbaai Golf Course Stillbaai Golf Course Stillbaai Golf Course is not on APP WC Mr Thiart Mr Thiart Mr Thiart Mr Thiart Mr Thiart is not on APP WC Altus Baard Family Trust Altus Baard Family Trust Altus Baard Family Trust Altus Baard Family Trust Altus Baard Family Trust is not on APP WC AJ van Zyl Family Trust AJ van Zyl Family Trust AJ van Zyl Family Trust AJ van Zyl Family Trust AJ van Zyl Family Trust is not on APP WC Oubaai Golf Course Oubaai Golf Course Oubaai Golf Course Oubaai Golf Course Oubaai Golf Course is not on APP
AM van Schoor Trust Valley Trust Frans Meg Gerber Family Trust EC Pienaar Familie Trust Pienaar Familie Trust Pienaar Familie Trust Pienaar Familie Trust EC SM Fegen SM Fegen SM Fegen SM Fegen Clisa 83 (Pty) Ltd EC DL Collett DL Collett DL Collett DL Collett DL Collett is not on APP EC JP Smith JP Smith JP Smith JP Smith JP Smith is not on APP EC Joubertina Dam Normal Flow Joubertina Dam Normal Flow Joubertina Dam Normal Flow Joubertina Dam Normal Flow Joubertina Dam Normal Flow is not on APP NC VNB Boerdery (Pty) Ltd Move to Q3 Move to Q3 - will include in submission to Move to Q3 - will include in act DG submission to act DG GM van Heerden Grootbosvoerkrale (Pty) Ltd NC Loomar Boerdery (Pty) Ltd Move to Q3 Move to Q3 - will include in submission to Move to Q3 - will include in act DG submission to act DG Mrs C Kondos JP Van den Berg Zelpy 2102 (Pty) Ltd Vlakpan Trust GP Black Mongrove Trading Black Mongrove Trading Black Mongrove Trading Black Mongrove Trading Letter received - This will be revised as Letter received - This will be revised more information received. Also when as more information received. Also checking with Revenue collection they when checking with Revenue are faltering on the water levies payment. collection they are faltering on the No inspection report - move inspection to water levies payment. No inspection Q3 report - move inspection to Q3
GP Fortress Bonsmaras Ptn2 Farm Hague Fortress Bonsmaras Ptn2 Farm Hague Fortress Bonsmaras Ptn2 Farm Hague Fortress Bonsmaras Ptn2 Farm Hague Fortress Bonsmaras Ptn2 Farm Hague is not on APP Wilgepoort Boerdery Trust
MP Fetakgomo Farming co operation Fetakgomo Farming co operation Fetakgomo Farming co operation Fetakgomo Farming co operation
MP Gerrit Trust Gerrit Trust Gerrit Trust Gerrit Trust Moletele Communal property Association
Moletele Communal property Association
MP Kabakwe Estate 2 cc This falls under GP - will be done in Q3 as per This falls under GP - will be done in Q3 This falls under GP - will be done in their BP and replaced with Four Rivers Trading - as per their BP and replaced with Four Q3 as per their BP and replaced with will include in submission to actDG Rivers Trading - will include in Four Rivers Trading - will include in submission to actDG submission to actDG
MP MBB Family Trust This falls under NW - will be done in Q3 and This falls under NW - will be done in Q3 This falls under NW - will be done in replaced with NN Ligege (MP) as a follow-up - will and replaced with NN Ligege (MP) as a Q3 and replaced with NN Ligege include in submission to actDG follow-up - will include in submission to (MP) as a follow-up - will include in actDG submission to actDG
Ouniek Trust Ilangabi Investments 12 (Pty) Ltd – Brinkor Ltd Obekilifa Farming sand and training projects
Mr RI Hulley KZN Bondesio Brand Kraal Bondesio Brand Kraal Bondesio Brand Kraal Bondesio Brand Kraal NP Blaker Bret Latimar Family Trust Indlovu Family cc KZN Mr Lunga Mlungisi Ndwandwe Mr Lunga Mlungisi Ndwandwe Mr Lunga Mlungisi Ndwandwe Mr Lunga Mlungisi Ndwandwe Mjindi Farming ZZ2 Esmefour ZZ2 Esmefour LP Morane farms cc Morane farms cc Morane farms cc Morane farms cc Recovery: Done and signed in Q1 but Recovery: Done and signed in Q1 reported in Q2 but reported in Q2
Tshikonela small farmer project LP Maswiri Boerdery (Various Properties) Maswiri Boerdery (Various Properties) Maswiri Boerdery (Various Properties) Maswiri Boerdery (Various Properties)
LP Ba-Lephondo Agricultural Primary Co- Ba-Lephondo Agricultural Primary Co-operative Ba-Lephondo Agricultural Primary Co-operative Ba-Lephondo Agricultural Primary Co-operative operative Ltd Ltd Ltd Ltd LP Stilhoek Boerdery Stilhoek Boerdery Stilhoek Boerdery Stilhoek Boerdery LP Mr PH Storm Mr PH Storm Mr PH Storm Mr PH Storm Versamel Boerdery Mr Nengovhela Thomani Simon
85 1.1.6 Over achieved
(Irrigation)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Chatleka Communal Property Association Programe1: Administration Maasstroom Eiendomme cc Golden Creek Investment NW Imberbe (Pty) Ltd Move to Q3 - will include in submission to act DG Move to Q3 - will include in submission to Move to Q3 - will include in act DG submission to act DG Rindveldt Eiendomme Aalwynhoek Trust NW Wymer Investment (Erfdeel 41 KP Ptn0) Wymer Investment (Erfdeel 41 KP Ptn0) Wymer Investment (Erfdeel 41 KP Ptn0) Wymer Investment (Erfdeel 41 KP Ptn0) Wymer Investment (Erfdeel 41 KP Ptn0) is not on APP NW Krokodilnest 21 Trust Pnt1 Krokodilnest 21 Trust Pnt1 Krokodilnest 21 Trust Pnt1 Krokodilnest 21 Trust Pnt1 Krokodilnest 21 Trust Pnt1 is not on APP NW Krokodilnest 21 Trust: Schwenin 15 Ptn3) Krokodilnest 21 Trust: Schwenin 15 Ptn3) Krokodilnest 21 Trust: Schwenin 15 Ptn3) Krokodilnest 21 Trust: Schwenin 15 Ptn3) Krokodilnest 21 Trust: Schwenin 15 Ptn3) is not on APP
LP Koufontein Farm Ptn2 (JP Bronkhorst) Koufontein Farm Ptn2 (JP Bronkhorst) Koufontein Farm Ptn2 (JP Bronkhorst) Koufontein Farm Ptn2 (JP Bronkhorst) Koufontein Farm Ptn2 (JP Bronkhorst) is not on APP (Agro-processing) 39 [Agro Processing] 13 AgroProcessing] 15 15 15 J Mcfarlane EC JGL Boerdery cc JGL Boerdery cc JGL Boerdery cc JGL Boerdery cc EC Amagasela Pork Producer Amagasela Pork Producer Amagasela Pork Producer Amagasela Pork Producer Amagasela Pork Producer is not on APP Groot Patrysvlei Boerdery Eikenhof Poultry Farm MP Silver Charm nvestments 14 (PTY) Ltd Silver Charm nvestments 14 (PTY) Ltd Silver Charm nvestments 14 (PTY) Ltd Silver Charm nvestments 14 (PTY) Ltd
Finbond (PTY) Ltd LP Vusithemba Piggery Vusithemba Piggery Vusithemba Piggery Vusithemba Piggery LP Ibis piggery Ibis piggery Ibis piggery Ibis piggery Cavan Ranching Limpopo CC Maremani nature Reserve PS Le Roux TJ Munyai Autumn Star Trading 629 (PTY) Ltd
Buffshelf 15 Trust NC Trans hex mynbou Replaced with Oange River Wine Cellars - will Replaced with Oange River Wine Cellars - Replaced with Oange River Wine include in submission to act DG will include in submission to act DG Cellars - will include in submission to act DG NC Orange River Wine Cellars Orange River Wine Cellars Orange River Wine Cellars Orange River Wine Cellars NC Mr JM Fourie Mr JM Fourie Mr JM Fourie Mr JM Fourie NC Die Nel Trust Die Nel Trust Die Nel Trust Die Nel Trust NC AJJ Van Zyl AJJ Van Zyl AJJ Van Zyl AJJ Van Zyl Sparta Baby Beef FS Burger Geldenhuys Trust NW Cronje Broers Boer Trust Cronje Broers Boer Trust Cronje Broers Boer Trust Cronje Broers Boer Trust NW PH Theron PH Theron PH Theron PH Theron Saldolite (Pty) Ltd Porteville Olives Ceres Fruit Zandberg Chalala Farms WC Saamstaan Beleggings Trust Saamstaan Beleggings Trust Saamstaan Beleggings Trust WC Graaf Fruit Move to Q4 - will include in submission to act DG Move to Q4 - will include in submission to Move to Q4 - will include in act DG submission to act DG WC Aqua Empower Aqua Empower Aqua Empower Aqua Empower WC Noordhoek Noordhoek Noordhoek Noordhoek Reported under WC WC Piketberg Sunrise farm Piketberg Sunrise farm Piketberg Sunrise farm Piketberg Sunrise farm Piketberg Sunrise farm is not on APP Amelia farms Atlantis Foundaries Bosman Adama Sparrenberg CACE farming Bokkeveld Kwekery Eikenhof Poultry farm Industry 30 9 13 13 13 Amendment to APP users and quarters - Amendment to APP users and in process to draft submission to act DG quarters - in process to draft to amend submission to act DG to amend
MP Hendrina Power Station Hendrina Power Station Hendrina Power Station Hendrina Power Station MP Arnot power station Arnot power station Arnot power station Arnot power station Kusile Power Station MP Tubatse Chrome Tubatse Chrome Tubatse Chrome Tubatse Chrome Tubatse Chrome is not on APP
Tutuka power Matla Power Station Duvha Power Station Komati Power Station PoE outstanding Kendal Power Station Columbus Stainless(Pty)Ltd Glencore Merafe Venture Operations – PoE outstanding Lydenburg Smelter GP Samancor Samancor Samancor Samancor Scaw Metals ZINCOR: Exxaro Base Metal (Pty)Ltd
Tobivox (Pty) Ltd (Tom Burke Solar Park)
LP Matimba power station Matimba power station Matimba power station Matimba power station
Medupi power station Polokwane Meturllical Complex AEIC NW Mine Omnia Fertilizer Mine Omnia Fertilizer Mine Omnia Fertilizer Mine Omnia Fertilizer Dafne Energy Spitskop solar KZN Eskom-Ingula Pump Storage Scheme Eskom-Ingula Pump Storage Scheme Eskom-Ingula Pump Storage Scheme Eskom-Ingula Pump Storage Scheme
86 1.1.6 Over achieved
Industry
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Mission Kwasizabantu: hrdroponic system Programe1: Administration Ekhamanzi Springs: Aquelle Bottling Plant
EC Da Gama Textiles Da Gama Textiles Da Gama Textiles Da Gama Textiles EC Border Combing Company t/a Samil Natural Border Combing Company t/a Samil Natural Border Combing Company t/a Samil Natural Border Combing Company t/a Samil Natural Fibres Border Combing Company t/a Samil Fibres Fibres Fibres Natural Fibres is not on APP
Bellatrix Solar NC Garob Wind Farm (Pty) Ltd Garob Wind Farm (Pty) Ltd Garob Wind Farm (Pty) Ltd Garob Wind Farm (Pty) Ltd
NC DSP79 Solar Energy DSP79 Solar Energy DSP79 Solar Energy DSP79 Solar Energy Kathu Solar Park Pty (Ltd): Kalahari Solar Power Phase 1 ACWA Power SolarReserve Redstone Solar Termal Power Firefly Investments 230 (Pty) Ltd WC Apollo Brick Clay Mine and brick Apollo Brick Clay Mine and brick manufacturers: Apollo Brick Clay Mine and brick manufacturers: Apollo Brick Clay Mine and brick manufacturers: Apollo Brick Clay Mine and brick manufacturers: Brakkefontein Clay Products Brakkefontein Clay Products Brakkefontein Clay Products Brakkefontein Clay Products manufacturers: Brakkefontein Clay Products is not on APP
WC Distell Distell Distell Distell Distell is not on APP Mining 96 26 41 41 41 Amendment to APP users and quarters - Amendment to APP users and in process to draft submission to act DG quarters - in process to draft to amend submission to act DG to amend
Lafarge – Peak Quarry WC Lafarge – Tygerberg Quarry Move to Q3 - unavailability of SHEQ Manager for Move to Q3 - unavailability of SHEQ Move to Q3 - unavailability of SHEQ the mine - will include in submission to act DG Manager for the mine - will include in Manager for the mine - will include in submission to act DG submission to act DG
PPC – De Hoek Cape Lime WC PPC- Rhiebeck West Move to Q3 - will include in submission to act DG Move to Q3 - will include in submission to Move to Q3 - will include in act DG submission to act DG WC Tormin Mine Tormin Mine Tormin Mine Tormin Mine Tormin Mine is not on APP
WC Elandsfontein Exploration Mine Elandsfontein Exploration Mine Elandsfontein Exploration Mine Elandsfontein Exploration Mine Elandsfontein Exploration Mine is not on APP Afrisam South Africa (Pty) Ltd: Peninsula Quarry
LP Boikarabelo Coal Mine (Ledjadja Coal Boikarabelo Coal Mine (Ledjadja Coal Mine) Boikarabelo Coal Mine (Ledjadja Coal Mine) Boikarabelo Coal Mine (Ledjadja Coal Mine) Mine) LP Exxaro: Grootegeluk Coal Mine Exxaro: Grootegeluk Coal Mine (Additional) Exxaro: Grootegeluk Coal Mine (Additional) Exxaro: Grootegeluk Coal Mine (Additional) Additional - inspection done and reported Additional - inspection done and in Q1 reported in Q1
LP Tshikondeni Coal Mine Tshikondeni Coal Mine Tshikondeni Coal Mine Tshikondeni Coal Mine Additional - inspection done and reported Additional - inspection done and in Q1 reported in Q1 LP Vele Mine Vele Mine Vele Mine Vele Mine Additional - inspection done and reported Additional - inspection done and in Q1 reported in Q1 LP De Beer Venetia Mine De Beer Venetia Mine De Beer Venetia Mine De Beer Venetia Mine Additional - inspection done and reported Additional - inspection done and in Q1 reported in Q1 LP Mogalakwena Mogalakwena Mogalakwena Mogalakwena Additional - inspection done and reported Additional - inspection done and in Q1 reported in Q1 LP DMI Minerals SA (Pty) Ltd- Krone Endora DMI Minerals SA (Pty) Ltd- Krone Endora Dimond DMI Minerals SA (Pty) Ltd- Krone Endora Dimond DMI Minerals SA (Pty) Ltd- Krone Endora Dimond Additional - inspection done and reported Additional - inspection done and Dimond Mining Project Mining Project Mining Project Mining Project in Q1 reported in Q1
Thaba Chueu Mining (Pty) Ltd Exxaro Coal (Pty) Ltd: Thabametsi Coal mine LP TivanI Mine (Pty) Ltd TivanI Mine (Pty) Ltd TivanI Mine (Pty) Ltd TivanI Mine (Pty) Ltd Royal Bafokeng Resources (Pty) Ltd: Bafokeng Rasimone Platinum Mine
NW Thaba Chronimet Chrome Mine Open Cast Thaba Chronimet Chrome Mine Open Cast Thaba Chronimet Chrome Mine Open Cast Thaba Chronimet Chrome Mine Open Cast
NW Thaba Chronimet Chrome Mine PoE outstanding Underground section
Samancor Chrome Limited: Western Chrome Mines: Millsell and Waterkloof Sections Henric Ferrochrome (Pty) Ltd: Maroelabult Sectio Rustenburg Platinum Mines Limited- Amandelbult Section Rustenburg Platinum Mines Union Section
Phoenix Platinum Mining (Pty) Ltd
Eastern Chrome Mines Lannex Section
Modikwa Platinum Mine Rhino Minerals(Pty)Ltd: Havercoft Andalusite Mine MP Glencore Xstrata Helena Section Glencore Xstrata Helena Section Glencore Xstrata Helena Section Glencore Xstrata Helena Section MP Glencore Xstrata Thorncliffe Section Glencore Xstrata Thorncliffe Section Glencore Xstrata Thorncliffe Section Glencore Xstrata Thorncliffe Section
MP Glencore Xstrata Magareng Section Glencore Xstrata Magareng Section Glencore Xstrata Magareng Section Glencore Xstrata Magareng Section
Anglo Coal Greenside Colliery MP Samancor Eastern Chrome Samancor Eastern Chrome Samancor Eastern Chrome Samancor Eastern Chrome Mines(Steelpoort/Doornbosch Section) Mines(Steelpoort/Doornbosch Section) Mines(Steelpoort/Doornbosch Section) Mines(Steelpoort/Doornbosch Section)
Muhanga Mines(Pty)Ltd:Goedehoop Mine
Optimum Coal: Woestalleen Colliery
87 1.1.6 Over achieved
Mining
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Glencore Operations SA (Pty) Ltd: Oogies Programe1: Administration fontein Colliery MP Linarox (Pty) Ltd: Welstand Colliery Linarox (Pty) Ltd: Welstand Colliery Linarox (Pty) Ltd: Welstand Colliery Linarox (Pty) Ltd: Welstand Colliery
MP Exxaro coal mpumalanga (pty) Ltd: North Exxaro coal mpumalanga (pty) Ltd: North Block Exxaro coal mpumalanga (pty) Ltd: North Block Exxaro coal mpumalanga (pty) Ltd: North Block Block complex-Glisa coal complex-Glisa coal complex-Glisa coal complex-Glisa coal
MP Namane Anker Coal: Elandsfontein Colliery Namane Anker Coal: Elandsfontein Colliery Namane Anker Coal: Elandsfontein Colliery Namane Anker Coal: Elandsfontein Colliery
Anglo American Thermal Coal: Goedehoop Colliery (South) Analisa Mining and Industrial Services (Pty) Ltd: Lefa Coal Mine
Bokoni Platinum Mine Eyethu coal (pty) Ltd:Leewuwpoort colliery- T&DB SECTION
Assmang Chrome Dwarsrivier Mine
Stuart Coal: East Block MP Northam Platinum Ltd – Booysendal Mining Northam Platinum Ltd – Booysendal Mining Northam Platinum Ltd – Booysendal Mining Northam Platinum Ltd – Booysendal Mining
Anglo Coal Inyosi: Kriel Colliery HCI Khusela: Palesa BECSA: Khutala Colliery MP Palabora Copper Mine (Pty) Ltd Palabora Copper Mine (Pty) Ltd Palabora Copper Mine (Pty) Ltd Palabora Copper Mine (Pty) Ltd Nungu Trading 341 (Pty) Ltd; Elandspruit Colliery Idwala Crypts (Pty) Ltd: Vierfontein Colliery
Chromex Mining (Pty) Ltd: Mecklenburg Chrome Mine MP Anglo American Platinum: Rustenburg Anglo American Platinum: Rustenburg Platinum Anglo American Platinum: Rustenburg Platinum Anglo American Platinum: Rustenburg Platinum Platinum Mines Limited: Mototolo Joint Mines Limited: Mototolo Joint Venture Mines Limited: Mototolo Joint Venture Mines Limited: Mototolo Joint Venture Venture
HCI Coal (Pty) Ltd: Nokuhle Colliery
Vaalbult Mining Company (Pty) Ltd: Vaalbult Colliery BECSA: MMS Klipfontein Section
MP Just Coal: Bankfontein Colliery Just Coal: Bankfontein Colliery Just Coal: Bankfontein Colliery Just Coal: Bankfontein Colliery BHP Billiton: Klipspruit Colliery Delmas Coal: Kuyasa Coal African Exploration: Vlakfontein Colliery
Phokathaba platinum mine MP Kendal Colliery Kendal Colliery Kendal Colliery Kendal Colliery MP Anglo Operations Elders Colliery Anglo Operations Elders Colliery Anglo Operations Elders Colliery Anglo Operations Elders Colliery Anglo Operations Elders Colliery is not on APP MP Londani Coal: Nndanganeni Colliery Londani Coal: Nndanganeni Colliery Londani Coal: Nndanganeni Colliery Londani Coal: Nndanganeni Colliery Londani Coal: Nndanganeni Colliery is not on APP
MP Two Rivers Platinum Mine Two Rivers Platinum Mine Two Rivers Platinum Mine Two Rivers Platinum Mine Two Rivers Platinum Mine is not on APP MP Wescoal Intbane Colliery Wescoal Intbane Colliery Wescoal Intbane Colliery Wescoal Intbane Colliery Wescoal Intbane Colliery is not on APP Hlagisa Mining : Wildfontein Colliery
Anglo American: Twickenham Platinum Mine Tendele Coal Mining (Pty) Ltd: Somkele Anthracite Min Treonox sands (Pty) Ltd; Fairbreeze Mine
Richards Bay Minerals: Zulti North, Tisand and Smelter Site Richards Bay Minerals: Zulti Services corridor project NC De Beers Consolidated Mines LTD:Finsch De Beers Consolidated Mines LTD:Finsch Mine De Beers Consolidated Mines LTD:Finsch Mine De Beers Consolidated Mines LTD:Finsch Mine Recovery done and signed in Q1 but Mine reported in Q2
NC Sishen Mine Audit was done and reported in Q4 (16/17) after Audit was done and reported in Q4 Audit was done and reported in Q4 complaints no audit was done for Q1 or Q2 but (16/17) after complaints no audit was (16/17) after complaints no audit administrative compliance actions are currently in done for Q1 or Q2 but administrative was done for Q1 or Q2 but process compliance actions are currently in administrative compliance actions process are currently in process
NC Black Mountain Mine Black Mountain Mine Black Mountain Mine Black Mountain Mine NC Harmony Gold : Mareetsane Moved to Q3 - will include in submission to act DG Moved to Q3 - will include in submission Moved to Q3 - will include in to act DG submission to act DG Black Mountain Mine: Gamsberg Zinc Mine
Transhex De Beers Consolidated Mines Ltd: Namaqualand Mine New Park Properties NC Kgalogano Mining Exploration Kgalogano Mining Exploration Kgalogano Mining Exploration Kgalogano Mining Exploration Recovery done in Q1 but signed and reported in Q2 NC Wide Investment 100 Mashwening Wide Investment 100 Mashwening Wide Investment 100 Mashwening Wide Investment 100 Mashwening Recovery done and signed in Q1 but reported in Q2 NC Theta Mining Droogeveldt Theta Mining Droogeveldt Theta Mining Droogeveldt Theta Mining Droogeveldt Recovery done and signed in Q1 but reported in Q2 Shiva Uranium
88 1.1.6 Over achieved
Mining
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Anglo Gold Ashanti Vaal River operations Programe1: Administration Chemwes FS Koffiefontein Mine Joint Venture- Koffiefontein Mine Joint Venture- Koffiefontein Koffiefontein Mine Joint Venture- Koffiefontein Koffiefontein Mine Joint Venture- Koffiefontein Koffiefontein Mine Mine Mine Mine GP Xstrata Coal South Africa(Pty)Ltd (Spitzkop) Xstrata Coal South Africa(Pty)Ltd (Spitzkop) Xstrata Coal South Africa(Pty)Ltd (Spitzkop) Xstrata Coal South Africa(Pty)Ltd (Spitzkop) On APP in Q3 but done in Q2 due to high possible care and maintenance during the 3rd quarter hence it was expedited for inspection in the 2nd quarter such that a holistic view and information can be sampled during the operational status
Sasol Mining (Pty) Ltd, Sigma Collieries, Mooikraal Mine GP Harmony Gold (Pty)Ltd: Evander Gold Harmony Gold (Pty)Ltd: Evander Gold Mined Harmony Gold (Pty)Ltd: Evander Gold Mined Harmony Gold (Pty)Ltd: Evander Gold Mined Mined Coal Of Africa (Pty) Ltd, Mooiplaats Colliery (Langcarel) Crown Gold Recoveries (Pty) Ltd: Knights Operations Sibanye Gold Limited: Cooke Operations Siding Gold Fields - South Deep Mine Vunene: Usutu West Colliery GP GFI Mining SA(Pty) Ltd: Driefontein Gold GFI Mining SA(Pty) Ltd: Driefontein Gold Mine GFI Mining SA(Pty) Ltd: Driefontein Gold Mine GFI Mining SA(Pty) Ltd: Driefontein Gold Mine Mine GP Anglo Gold Ashanti (West Wits Operations) Anglo Gold Ashanti (West Wits Operations) Anglo Gold Ashanti (West Wits Operations) Anglo Gold Ashanti (West Wits Operations)
GP Ergo Mining(Properiety)Limited Ergo Mining(Properiety)Limited Ergo Mining(Properiety)Limited Ergo Mining(Properiety)Limited Recovery: Done in Q1 but reported in Q2 per APP GP New Kleinfontein Gold Mine New Kleinfontein Gold Mine New Kleinfontein Gold Mine New Kleinfontein Gold Mine New Kleinfontein Gold Mine is not on APP Grootvlei Proprietery Mines Silver Lake Training 447 (Pty) Ltd – Silver Lake Colliery Lelliefontein Operation
KZN RBM Zulti South RBM Zulti South RBM Zulti South RBM Zulti South RBM Zulti South is not on APP
KZN RBM Zulti North RBM Zulti North RBM Zulti North RBM Zulti North RBM Zulti North is not on APP
Muncipal 79 22 90 (21 APP and 69 Additional) 90 (21 APP and 69 Additional) 90 (21 APP and 69 Additional) Amendment to APP users and quarters - Amendment to APP users and in process to draft submission to act DG quarters - in process to draft to amend submission to act DG to amend
WWTW 45 12 73 (13 APP & 60 Additional) 73 (13 APP & 60 Additional) 73 (13 APP & 60 Additional) Greater-Tubatse-Penge MP Greater-Tubatse-Lebowakgomo Greater-Tubatse-Lebowakgomo Greater-Tubatse-Lebowakgomo Greater-Tubatse-Lebowakgomo MP Burgersfort WWTW Burgersfort WWTW Burgersfort WWTW Burgersfort WWTW Burgersfort WWTW not on APP
MP Trichardt WWTW & pump station Trichardt WWTW & pump station Trichardt WWTW & pump station Trichardt WWTW & pump station Trichardt WWTW & pump station not on APP MP Kwazamokuhle WWTW and pump station Kwazamokuhle WWTW and pump station Kwazamokuhle WWTW and pump station Kwazamokuhle WWTW and pump station Kwazamokuhle WWTW and pump station not on APP Delareyville Schweizer Reineke NC Bestwood Estate Bestwood Estate Bestwood Estate Bestwood Estate Bloemhof Carnavon Nketoana Local Municipality: Reitz Wastewater Treatment Works
GP Merafong Local Municipality - Oberholzer Merafong Local Municipality - Oberholzer Merafong Local Municipality - Oberholzer Merafong Local Municipality - Oberholzer
Merafong Local Municipality – Kokosi
GP Midvaal Local Municipality – Vaal Marina Midvaal Local Municipality – Vaal Marina Midvaal Local Municipality – Vaal Marina Midvaal Local Municipality – Vaal Marina
ERWAT: (Herbet Bickly Waste Water Treatment Works Delareyville Schweizer Reineke GP Johannesburg Water (SOC) Ltd: Johannesburg Water (SOC) Ltd: Bushkoppies Johannesburg Water (SOC) Ltd: Bushkoppies Johannesburg Water (SOC) Ltd: Bushkoppies Bushkoppies WWTW WWTW WWTW WWTW GP Johannesburg Water (Pty) Ltd (Ennerdale Johannesburg Water (Pty) Ltd (Ennerdale Johannesburg Water (Pty) Ltd (Ennerdale Johannesburg Water (Pty) Ltd (Ennerdale Recovery: Done and signed in Q1 but Recovery: Done and signed in Q1 WWTWs) WWTWs) WWTWs) WWTWs) reported in Q2 but reported in Q2
GP East Rand Water Care Company: East Rand Water Care Company: Rondebult East Rand Water Care Company: Rondebult East Rand Water Care Company: Rondebult Rondebult WWTW WWTW WWTW WWTW ERWAT: (Dekema Waste Water Treatment) Works Ekurhuleni Local Municipality (Klipportjie and Sunward Pump stations upgrade)
GP East Rand Water Care Company (Ancor East Rand Water Care Company (Ancor WWTWs) East Rand Water Care Company (Ancor WWTWs) East Rand Water Care Company (Ancor WWTWs) WWTWs) GP Kokosi WWTW Kokosi WWTW Kokosi WWTW Kokosi WWTW Kokosi WWTW not on APP
LP Musina Local Municipality (Musina WWTW) Musina Local Municipality (Musina WWTW) Musina Local Municipality (Musina WWTW) Musina Local Municipality (Musina WWTW)
LP Musina Local Municipality (Beitbridge Musina Local Municipality (Beitbridge WWTW) Musina Local Municipality (Beitbridge WWTW) Musina Local Municipality (Beitbridge WWTW) WWTW) Lephalale Local Municipality (Zongezien WWTW) Thohoyandou WWTW
89 1.1.6 Over achieved
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Modimolle Local Municipality (Modimolle Programe1: Administration WWTW) Mookgophong Local Municipality (Mookgophong WWTW)
Musina Local Municipality (Nancefield Ponds) Rustenburg LM: Rustenburg WWTW
Rustenburg LM: Monakato WWTW
Rustenburg LM: Lethabong WWTW
Rustenburg LM: Boitekong WWTW
Randfontein LM: Badirile WWTW City of Joburg: Driefonteing WWTW
City of Tshwane Sunderland Ridge WWTW
NW Madibeng Local Municipality Brits Madibeng Local Municipality Brits Madibeng Local Municipality Brits Madibeng Local Municipality Brits
City of Tshwane Baviaanspoort WWTW and Daspoort WWTW City of Tshwane: Daspoort WWTS
WC Cederberg LM: Citrusdal Replaced with Outentique WWTW No audit as this plant will only be No audit as this plant will only be completed with construction by completed with construction by September 2017 (Will include in September 2017 (Will include in submission to act DG to amend) submission to act DG to amend)
WC Outentiqua WWTW Outentiqua WWTW Outentiqua WWTW Outentiqua WWTW Replaced Cederberg; LM Citrusdal
WC Loeriesfontein WWTW Loeriesfontein WWTW Loeriesfontein WWTW Loeriesfontein WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Calvinia WWTW Calvinia WWTW Calvinia WWTW Calvinia WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Nieuwoudtville WWTW Nieuwoudtville WWTW Nieuwoudtville WWTW Nieuwoudtville WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Harkeville WWTW Harkeville WWTW Harkeville WWTW Harkeville WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Beervlei WWTW Beervlei WWTW Beervlei WWTW Beervlei WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Rooikraal WWTW Rooikraal WWTW Rooikraal WWTW Rooikraal WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Diepwalle WWTW Diepwalle WWTW Diepwalle WWTW Diepwalle WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Struisbaai WWTW Struisbaai WWTW Struisbaai WWTW Struisbaai WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Napier WWTW Napier WWTW Napier WWTW Napier WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Vaenhuiskrans/ Arniton WWTW Vaenhuiskrans/ Arniton WWTW Vaenhuiskrans/ Arniton WWTW Vaenhuiskrans/ Arniton WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Bredarsdorp WWTW Bredarsdorp WWTW Bredarsdorp WWTW Bredarsdorp WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Hartenbosch WWTW Hartenbosch WWTW Hartenbosch WWTW Hartenbosch WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Herbertsdale WWTW Herbertsdale WWTW Herbertsdale WWTW Herbertsdale WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Ruitersbos WWTW Ruitersbos WWTW Ruitersbos WWTW Ruitersbos WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Groot Brak WWTW Groot Brak WWTW Groot Brak WWTW Groot Brak WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Brandwatch WWTW Brandwatch WWTW Brandwatch WWTW Brandwatch WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Pinnicle Point WWTW Pinnicle Point WWTW Pinnicle Point WWTW Pinnicle Point WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Stillbaai WWTW Stillbaai WWTW Stillbaai WWTW Stillbaai WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Gouritsmond WWTW Gouritsmond WWTW Gouritsmond WWTW Gouritsmond WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Albertina WWTW Albertina WWTW Albertina WWTW Albertina WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Melkhotfontein WWTW Melkhotfontein WWTW Melkhotfontein WWTW Melkhotfontein WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
90 1.1.6 Over achieved
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
WC Heidelberg WWTW Heidelberg WWTW Heidelberg WWTWPrograme1: Administration Heidelberg WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Witsand WWTW Witsand WWTW Witsand WWTW Witsand WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Slangrivier WWTW Slangrivier WWTW Slangrivier WWTW Slangrivier WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Riversdale WWTW Riversdale WWTW Riversdale WWTW Riversdale WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Gracia WWTW Gracia WWTW Gracia WWTW Gracia WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Jongensfontein WWTW Jongensfontein WWTW Jongensfontein WWTW Jongensfontein WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Dysselsdorp WWTW Dysselsdorp WWTW Dysselsdorp WWTW Dysselsdorp WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Oudtshoorn WWTW Oudtshoorn WWTW Oudtshoorn WWTW Oudtshoorn WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Beldvidere WWTW Beldvidere WWTW Beldvidere WWTW Beldvidere WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Brenton-on-Sea WWTW Brenton-on-Sea WWTW Brenton-on-Sea WWTW Brenton-on-Sea WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Karatara WWTW Karatara WWTW Karatara WWTW Karatara WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Knysna WWTW Knysna WWTW Knysna WWTW Knysna WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Rheenendal WWTW Rheenendal WWTW Rheenendal WWTW Rheenendal WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Sedgefield WWTW Sedgefield WWTW Sedgefield WWTW Sedgefield WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Gwaing WWTW Gwaing WWTW Gwaing WWTW Gwaing WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Uniondale WWTW Uniondale WWTW Uniondale WWTW Uniondale WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Haarlem WWTW Haarlem WWTW Haarlem WWTW Haarlem WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Kleinkrantz WWTW Kleinkrantz WWTW Kleinkrantz WWTW Kleinkrantz WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Harold's Bay WWTW Harold's Bay WWTW Harold's Bay WWTW Harold's Bay WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Oubaai WWTW Oubaai WWTW Oubaai WWTW Oubaai WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
WC Pine Lake Marine WWTW Pine Lake Marine WWTW Pine Lake Marine WWTW Pine Lake Marine WWTW This will reflect on individuals PA and This will reflect on individuals PA additional to Province BP and additional to Province BP
EC Middledrift Correctional Services WWTW Middledrift Correctional Services WWTW Middledrift Correctional Services WWTW Middledrift Correctional Services WWTW Middledrift Correctional Services WWTW not on APP
EC Dimbaza WWTW Dimbaza WWTW Dimbaza WWTW Dimbaza WWTW Dimbaza WWTW not on APP
EC Aberdeen WWTW Aberdeen WWTW Aberdeen WWTW Aberdeen WWTW Aberdeen WWTW not on APP
EC Somerset East WWTW Somerset East WWTW Somerset East WWTW Somerset East WWTW One report for Nompumelelo/ Coldstream/ Storms River - not on APP
EC Nompumelelo WWTW Nompumelelo WWTW Nompumelelo WWTW Nompumelelo WWTW Nompumelelo WWTW not on APP
EC Coldstream WWTW Coldstream WWTW Coldstream WWTW Coldstream WWTW Coldstream WWTW not on APP
EC Storms River WWTW Storms River WWTW Storms River WWTW Storms River WWTW Storms River WWTW not on APP
EC Kelvin Jones (WGIV) Kelvin Jones (WGIV) Kelvin Jones (WGIV) Kelvin Jones (WGIV) Kelvin Jones (WGIV) not on APP
EC Engcobo Prison WWTW Engcobo Prison WWTW Engcobo Prison WWTW Engcobo Prison WWTW Engcobo Prison WWTW not on APP
EC Mthatha Prison WWTW Mthatha Prison WWTW Mthatha Prison WWTW Mthatha Prison WWTW Mthatha Prison WWTW not on APP
EC Kirkwood Department of Correctional Kirkwood Department of Correctional Service Kirkwood Department of Correctional Service Kirkwood Department of Correctional Service Kirkwood Department of Service WWTW WWTW WWTW WWTW Correctional Service WWTW not on APP EC Adelaide WWTW Adelaide WWTW Adelaide WWTW Adelaide WWTW Adelaide WWTW not on APP
EC Kei Mouth WWTW Kei Mouth WWTW Kei Mouth WWTW Kei Mouth WWTW Kei Mouth WWTW not on APP
KZN St Lucia Ponds (WGIV) St Lucia Ponds (WGIV) St Lucia Ponds (WGIV) St Lucia Ponds (WGIV) St Lucia Ponds (WGIV) not on APP
Ethekwini: Phoenix Ethekwini: Verulum Emalahleni LM: Phola Emalahleni LM: Klipspruit
91 1.1.6 Over achieved
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Goven Mbeki LM: Bethal Programe1: Administration Steve Tshwete LM: Kwazamokuhle
Emakhazeni LM: Belfast NW Sun International: Sun City family resort Sun International: Sun City family resort Sun International: Sun City family resort
NW Madibeng Waste/Landfill 34 10 17 (8 APP & 9 Additional) 17 (8 APP & 9 Additional) 17 (8 APP & 9 Additional) Senqu LM Senqu LM Senqu LM Holfontein FS Ventersdorp LM Ventersdorp LM Ventersdorp LM Ventersdorp LM Kwadukuza Nelspruit Karwydeskraal Marble hall Thabazimbi Phalaborwa EC Port Elizabeth Will be replaced by King Williams Town Landfill The region suggested that since there The region suggested that since site have been inspections conducted on this there have been inspections site in previous financial year, it will be conducted on this site in previous better to give attention to other sites that financial year, it will be better to give have not been inspected before attention to other sites that have not been inspected before
EC King Williams Town King Williams Town King Williams Town King Williams Town EC Koedoeskloof Will be replaced by Stutterheim Landfill site The region suggested that since there The region suggested that since have been inspections conducted on this there have been inspections site in previous financial year, it will be conducted on this site in previous better to give attention to other sites that financial year, it will be better to give have not been inspected before attention to other sites that have not been inspected before
EC Stutterheim WDS Stutterheim WDS Stutterheim WDS Stutterheim WDS LP Medupi-Eskom Move to Q4 - will include in submission to act DG There has been a strategic inspection There has been a strategic conducted with DEA at Medupi on 7-9 inspection conducted with DEA at Feb 2017 and the report was not yet Medupi on 7-9 Feb 2017 and the finalised - cannot conduct another report was not yet finalised - cannot inspection while DEA is still finalising the conduct another inspection while report. DEA is still finalising the report.
LP Eskom Matimba Power Station Eskom Matimba Power Station Eskom Matimba Power Station Eskom Matimba Power Station Eskom Matimba Power Station not on APP KZN Bulbuldrive Bulbuldrive Bulbuldrive Bulbuldrive KZN Arcelor Mittal Newcastle Construction Arcelor Mittal Newcastle Construction completion Arcelor Mittal Newcastle Construction completion Arcelor Mittal Newcastle Construction completion Arcelor Mittal Newcastle completion Construction completion not on APP
KZN Lanxes Cisa Construction completion Lanxes Cisa Construction completion Lanxes Cisa Construction completion Lanxes Cisa Construction completion Lanxes Cisa Construction completion not on APP KZN Humberdale WDS Humberdale WDS Humberdale WDS Humberdale WDS Humberdale WDS not on APP
GP Mooiplaats Move to Q3 - Monitoring Committee Meeting was Move to Q3 - Monitoring Committee Move to Q3 - Monitoring Committee postponed - Joint with DEA. Will include in Meeting was postponed - Joint with DEA. Meeting was postponed - Joint with submission to act DG Will include in submission to act DG DEA. Will include in submission to act DG
EC Jeffreys Bay Jeffreys Bay Jeffreys Bay Jeffreys Bay EC Jansenville Solid WDS Jansenville Solid WDS Jansenville Solid WDS Jansenville Solid WDS Jansenville Solid WDS not on APP
EC Aberdeen Solid WDS Aberdeen Solid WDS Aberdeen Solid WDS Aberdeen Solid WDS Aberdeen Solid WDS not on APP
EC Pearston Solid WDS Pearston Solid WDS Pearston Solid WDS Pearston Solid WDS Pearston Solid WDS not on APP
EC Somerset East Solid WDS Somerset East Solid WDS Somerset East Solid WDS Somerset East Solid WDS Somerset East Solid WDS not on APP GP Betlhemem Betlhemem Betlhemem Betlhemem GP and not FS as per APP - will include in submission to act DG
Klerksdorp Ermelo Shongweni Assmang Cato Ridge Nylstroom Vrede Sappi Ngodwana Glencore Compass Medical W Sun city Witbank Bethal Kleinzee NC Kgalagadi Kgalagadi Kgalagadi Kgalagadi (Three inspections under Kgalagadi)
Prieska Kuruman Rietfontein - Ekurhuleni Metro Municipality
GP Holfontein Holfontein Holfontein Holfontein Reported in Q1 (Additional) Holfontein additional to APP (reported in Q1) GP Sasol Secunda Medium Term Vanadium Sasol Secunda Medium Term Vanadium Facility Sasol Secunda Medium Term Vanadium Facility Sasol Secunda Medium Term Vanadium Facility Sasol Secunda Medium Term Facility Cell Cell Cell Cell Vanadium Facility Cell is additional to APP Gauteng Department of Housing
92 1.1.6 Over achieved
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Public Institutions 9 3 5 (3 APP and 2 Additional) 5 (3 APP and 2 Additional)Programe1: Administration 5 (3 APP and 2 Additional) Amendment to APP users and quarters - Amendment to APP users and in process to draft submission to act DG quarters - in process to draft to amend submission to act DG to amend
KZN Uthukela Water: Muden Waterworks Uthukela Water: Muden Waterworks Uthukela Water: Muden Waterworks Uthukela Water: Muden Waterworks
NC Transnet Transnet Transnet Transnet Transnet NW JHB Road Agency JHB Road Agency JHB Road Agency JHB Road Agency WC Dept of Transport and Public Works Dept of Transport and Public Works Dept of Transport and Public Works Dept of Transport and Public Works Dept of Transport and Public Works not on APP MP Drive by: Eskom Pylon Towers removed in Drive by: Eskom Pylon Towers removed in Drive by: Eskom Pylon Towers removed in Drive by: Eskom Pylon Towers removed in wetland Drive by: Eskom Pylon Towers wetland at Kusile wetland at Kusile wetland at Kusile at Kusile removed in wetland at Kusile not on APP Sanral upgrade of R37 Sanral Rehabilitation of N11 Rand Water Dam Safety 46 10 9 (APP) 9 (APP) 9 (APP) Amendment to APP users and quarters - Amendment to APP users and in process to draft submission to act DG quarters - in process to draft to amend submission to act DG to amend
WC Sonstraal Dam Sonstraal Dam Sonstraal Dam Sonstraal Dam WC Doordekraal Dam Doordekraal Dam Doordekraal Dam Doordekraal Dam Nantes Dam Bethel Dam Idasvalley No 2 Dam WC Scottsdene Maturation Ponds Scottsdene Maturation Ponds Scottsdene Maturation Ponds Scottsdene Maturation Ponds Porterville Lei Dam Dal Weiding Stormwater Control Dam
Amandel Dam Vygeboom Dam Golfdam Victoria Dam Prison Dam LP Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam Lejwe La Metsi (Thabamanzi) Dam
Bospoort Dam Bon Accord Dam LP Rietspruit Dam (Failed In 2014) Rietspruit Dam (Failed In 2014) Rietspruit Dam (Failed In 2014) Rietspruit Dam (Failed In 2014) Rietfontein N0.1(Lower) Dam Kwaggasbult Dam Bethel Dam Nantes Dam Dal Weiding Stormwater Control Dam
Gert Combrink Dam Rietfontein No.2(Upper) Dam LP Rietfontein Dam 7 Rietfontein Dam 7 Rietfontein Dam 7 Rietfontein Dam 7 Parma 40 Ms Dam Lake Mzingazi KZN Mahawane Dam Mahawane Dam Mahawane Dam Mahawane Dam KZN Martins Dam Martins Dam Martins Dam Martins Dam 'E Dumbe Dam Amanzimnyama Dam Eshlazi Dam Nuwe Dam Kenhardtdam Bon Accord Dam Masolkakop Dam Glen Una Eenzaamheid Dam Amalinda Dam Churchill Dam Van Stadens Gorge Dam First Falls Dam Crystal Springs Dam Sarel Hayward Dam Bulkriver Dam Bakers Dam Umzoniana Dam Joubertina Dam EC Upper Van Stadens Dam Upper Van Stadens Dam Upper Van Stadens Dam Upper Van Stadens Dam Sandriver Dam 1.1.7 Number of water management institutions 31 9 9 (7 APP and 2 Additional) 9 (7 APP and 2 Additional) 9 (7 APP and 2 Additional) Amendment to APP users and quarters - Amendment to APP users and monitored for compliance with own water use in process to draft submission to act DG quarters - in process to draft entitlements and effective monitoring of to amend submission to act DG to amend affiliated water users
EC Lower Sundays River Water User Lower Sundays River Water User Association (Q1) Lower Sundays River Water User Association (Q1) Lower Sundays River Water User Association (Q1) Recovery: No PoE received in Q1 but Recovery: No PoE received in Q1 Association (Q1) reported in Q2 but reported in Q2
EC Gamtoos River Irrigation Board (Q1) Gamtoos River Irrigation Board (Q1) Gamtoos River Irrigation Board (Q1) Gamtoos River Irrigation Board (Q1) Recovery: Done in Q1 but reported in Q2 Recovery: Done in Q1 but reported in Q2 EC Klipplaat Klipplaat Klipplaat Klipplaat Klipplaat not on APP FS Orange-Riet Water User Association (Q1) Orange-Riet Water User Association (Q1) Orange-Riet Water User Association (Q1) Orange-Riet Water User Association (Q1) Recovery: Done in Q1 but reported in Q2 Recovery: Done in Q1 but reported in Q2 FS Kalkfontein Water User Association (Q1) Kalkfontein Water User Association (Q1) Kalkfontein Water User Association (Q1) Kalkfontein Water User Association (Q1) Recovery: Done in Q1 but reported in Q2 Recovery: Done in Q1 but reported in Q2 Kakamas Water User Association (Q4)
Broadwater Farms (Orange - Vaal) (Q4)
Boegoeberg Water User Association (Q4)
Riemvasmaak Gemeenskapsontwikkelings (Q4)
93 Over achieved
1.1.7 Number of water management institutions monitored for compliance with own water use entitlements and effective monitoring of affiliated water users
Indicators and target as per 2017/18 Annual Performance Plan (APP) Analysis of perfomance Comments Quarter 2 09/November /2017 PPI No Performance Indicators Target for 2017/18 as per Annual Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis Performance Plan (APP) Quarter 2 Target as per APP Disaggregated targets Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%) per province / CMA
Vaalharts Water User Association (Q1) Programe1: Administration NC Kalahari East Water Board (Q2) Move to Q3 - will include in submission to act DG Move to Q3 - will include in submission to Move to Q3 - will include in act DG submission to act DG Vyfhoek Suid Nedersettingsraad (Q4)
Clisa 83 (Q4) Guilford (Q4) Crocodile River Major Irrigation Board (Q4)
Letaba Water User Association (Q4)
Komati River Irrigation Board (Q2)
Lomati River Irrigation Board (Q3)
Suidkaap River Irrigation Board (Q4)
IUCMA (Q4) Loskop Irrigation Board (Q1) Lower Blyde River Water User Association (Q3) Letsitelerivier Irrigation Board - Damararivier (Q4) Mokolo Water User Association (Q4)
Department Of Agriculture, Forestry And Fisheries (Q4) Hartbeespoort Irrigation Board (Q4)
NW Crocodile River W-Tvl Irrigation Board (Q4) Crocodile River W-Tvl Irrigation Board (Q4) Crocodile River W-Tvl Irrigation Board (Q4) Crocodile River W-Tvl Irrigation Board (Q4) Under NW but on APP this falls under LP Under NW but on APP this falls - Done in Q2 but in APP in Q4 - will under LP - Done in Q2 but in APP in include in submission to act DG Q4 - will include in submission to act DG
Bon Accord Irrigation Board (Q4)
WC Rondebosch WUA (Q1) Rondebosch WUA (Q1) Rondebosch WUA (Q1) Rondebosch WUA (Q1) Recover: Reported in Q2 by WC province WC Vyeboom WUA Vyeboom WUA Vyeboom WUA Vyeboom WUA WC Northern Sandveld WUA (Q2) Will be replace and moved to Q3 - WUA not Will be replace and moved to Q3 - WUA Will be replace and moved to Q3 - functional - will include in submission to act DG not functional - will include in submission WUA not functional - will include in to act DG submission to act DG
Koo IB (Q3) WC Citrusdal WUA (Q3) Will be replaced by Vyeboom WUA and reported Will be replaced by Vyeboom WUA and Will be replaced by Vyeboom WUA in Q2 - will include in submission to act DG reported in Q2 - will include in submission and reported in Q2 - will include in to act DG submission to act DG
BGCMA (Q4) NC Friersdale IB Friersdale IB Friersdale IB Friersdale IB Friersdale IB not on APP 1.1.8 Percentage of reported non-compliant cases 80% 80% 81% (136/167) 81% (136/167) Over by 1% Over by 1% 81% (136/167) Over achieved Poe accepted investigated EC 7 7 7
NC 24 24 24
GP 21 21 21 NW 13 13 13
FS 1 1 1 KZN 34 34 34
WC 1 1 1
MP 14 14 14
LP 21 21 21
Institutional Oversight 4.2.1 Number of public entities annually assessed 13 9 water boards Business plans (BPs) Business plans (BPs) and Shareholder Compacts Business plans (BPs) and Business plans (BPs) and Shareholder Compacts Achieved PoE accepted and Shareholder (SHC) analysed Shareholder Compacts (SHC) (SHC) analysed Compacts (SHC) analysed analysed 2 CMAs Annual Reports (ARs) Annual Reports analysed and submitted for Annual Reports analysed and Annual Reports analysed and submitted for PoE accepted analysed and tabled approval for tabling submitted for approval for approval for tabling in Parliament tabling
94