सतीश धवन अंतिरक्ष के द्र Satish Dhawan Space Centre शार SHAR ीहिरकोटा डा.घ.524124 आ.ं प्र

Total Page:16

File Type:pdf, Size:1020Kb

सतीश धवन अंतिरक्ष के �द्र Satish Dhawan Space Centre शार SHAR �ीहिरकोटा डा.घ.524124 आ.ं प्र भारत सरकार Government of India अतिरक्ष िवभाग Department of Space सतीश धवन अंतिरक्ष के द्र Satish Dhawan Space Centre शार SHAR ीहिरकोटा डा.घ.524124 आ.ं प्र. भारत SRIHARIKOTA P.O. 524124, AP, INDIA टेिलफोन:+91 8623 225023 Telephone: +91 8623 225023 Fax: +91 8623 225170 फे क्स: +91 8623 225170 GOVERNMENT OF INDIA :: DEPARTMENT OF SPACE SATISH DHAWAN SPACE CENTER SHAR :: SRIHARIKOTA – 524 124 SRI POTTI SREERAMULU.NELLORE DISTRICT (A.P) TENDER NOTICE NO. SDSC SHAR/Sr.HPS/PT/16/2018-19 On behalf of President of India, Sr. Head Purchase and Stores, SDSC SHAR, SRIHARIKOTA invites on line quotations for the following. Sl Ref. No. Description Qty. No SHAR SPP 2018 00 8662 e-procurement Design, Manufacture, Testing at Shop floor, Supply, Installation 01 [Two Part basis] at Site, Testing and Commissioning of High Energy X-Ray 1 SET Radioscopy system SHAR RO 2018 00 9324 e-procurement Software Development Services/manpower Hiring for 500 02 [Single part basis] Function points for the period of ONE year 1 Lot SHAR RO 2018 00 9326 e-procurement Work Contract for Software Development and Maintenance 03 [Two part basis] Contract for the Period of TWO years 1 Lot SHAR SPP 2018 00 9356 e-procurement Supply of Tri-chloro Ethylene 30000 04 [Single Part basis] kgs SHAR MSA 2018 00 9410 e- Supply of Data Entry Operators at various places of SDSC 05 procurement [Two part basis] SHAR, Sriharikota for the period of ONE year 1440 Units SHAR CMD 2018 00 9434 e- Construction supervision, Inspection and Certification services 06 procurement [Two Part basis] [Civil, electrical, Air-conditioning and allied works] for PSLV 1 Lot Integration Facilities project at SDSC SHAR 07 SHAR SN 2018 00 9447 e-procurement Software Drafting and Printing Service Contract at SCEND & 240 [Two Part basis] ASG, SDSC SHAR, Sriharikota Nos 08 SHAR SC 2018 00 9455 e-procurement Fabrication of Canteen Van Body on our TATA LPT 909/38 EX2 2 Nos. [Two Part basis] BS4 Cab Chassis. 09 SHAR MSA 2018 00 9502 e- Supply & Erection of Concertina Coil Fencing at SDSC SHAR, procurement [Two part basis] Sriharikota. 1 Lot Last Date for downloading of tender documents : 23.10.2018 at 16:00 hrs. Due Date for submission of bids online : 23.10.2018 at 16:00 hrs. Due Date for Bid Sealing on : 23.10.2018 at 16:01 hrs. to 23.10.2018 at 17.30 hrs. Due Date for Open Authorization : 23.10.2018 at 17.31 hrs. to 25.10.2018 at 17:00 hrs. Due Date for opening of tenders : 26.10.2018 at 14:30 hrs. Instructions to Tenderers: No tender fee shall be applicable for tenders submitted through EGPS 01. For full details/scope of work and terms and conditions etc., please see the enclosed annexures. 02. Interested tenderers can download the e-tender from ISRO e-procurement website https://eprocure.isro.gov.in and submit the offer on line in the e-procurement portal. Offers sent physically by post/courier/in person will not be considered. 03. Tender documents are also available on ISRO website www.isro.org; ISRO e-procurement website https://eprocure.isro.gov.in and SDSC SHAR, Sriharikota website www.shar.gov.in. The same can be down loaded and offer submitted on line in the e-procurement portal. 04. Quotations received after the due date/time will not be considered. 05. The tender documents are available for download upto 23.10.2018 at 1600 hrs. and last date for submission of tenders on line 23.10.2018 at 1600 hrs. and Tender Opening on 26.10.2018 at 14:30 hrs. 06. Sr. Head, Purchase and Stores, SDSC-SHAR, Sriharikota reserves the right to accept or reject any/or all the quotations. DT: 01.10.2018 Sr. HEAD, PURCHASE AND STORES 1 PSLV INTEGRATION FACILITIES (PIF) PROJECT REQUEST FOR PROPOSAL For CONSTRUCTION SUPERVISION, INSPECTION AND CERTIFICATION SERVICES for PSLV INTEGRATION FACILITIES (PIF) PROJECT AT SDSC SHAR (CIVIL, ELECTRICAL, AIRCONDITIONING AND ALLIED WORKS) Satish Dhawan Space Centre SHAR Indian Space Research Organization Sriharikota -524 124, A.P Contents S.No Description Page No PROPOSAL DOCUMENT, CLARIFICATION AND ADDENDUM……….. 3 Section A Introduction ………………………………………………………………………... 10 Section B Scope of the Work………………………………………………………………… 15 Section C General Terms & Conditions …………………………………………………… 21 Section D Annexures………………………………………………………….…………………… 24 Annexure –A: Unpriced price bid format.…………………………….……. 25 Annexure –B : Service Provider evaluation format……………………… Annexure –C: Drawings …………………………………. …………………….. 26 PROPOSAL DOCUMENT, CLARIFICATION AND ADDENDUM Proposals are invited from the interested firms for the enclosed scope of work in two-part bid. Part- 1 Technical and Unpriced part of the work and Part - 2 Priced Commercial part. The RFP document is organized in four sections as follows. Section –A Introduction Section –B Scope of Work Section –C General Terms & Conditions Section –D Annexures Title of the Entity: PSLV integration Facilities [PIF] Project at SDSC SHAR Title of the proposal: CONSTRUCTION SUPERVISION, INSPECTION AND CERTIFICATION SERVICES of PSLV INTEGRATION FACILITIES (PIF) PROJECT AT SDSC SHAR (CIVIL, ELECTRICAL, AIRCONDITIONING AND ALLIED WORKS) Date of Public Notification issued: As per publication Last Date of purchase / downloading tender Document: As per publication Last date of submission of tender documents : As per publication Place of submission of tender documents : SDSC SHAR, Sriharikota 1. PROPOSAL DOCUMENT 1.1. One set of proposal document along with the drawings is issued. Service Provider shall sign and stamp each page of proposal as token of acceptance & submit along with the offer. 1.2. Transfer of Proposal document issued to another party shall not be permissible. 1.3. Proposal documents shall remain the property of Department and if obtained by one intending Service Provider shall not be utilized by another without the consent of the Department. 1.4. The proposal shall be completely filled in all respects and shall be submitted together with requisite information and Annexure. Any offer incomplete in any particulars is liable to be rejected. 1.5. The Proposal (Unpriced Techno-commercial bid) with a complete set of the required documents shall be up-loaded in ISRO e-procurement website. 1.6. The Proposals shall be submitted on-line in ISRO e-procurement portal before the time limit for bid submission specified in the Letter Inviting Bid. 1.7. The Proposal shall be opened on the date and at the time, specified in the Letter Inviting Bid or as soon thereafter as convenient. Proposal not received in time shall not be considered. 1.8. Service Provider shall set their quotations in firm figures and without qualifications or variations or additions in the terms of the Proposal documents. Proposal containing qualifying expressions such as "subject to minimum acceptance” or " subject to prior sale" or any other qualifying expressions or incorporating terms and conditions at variance with the terms and conditions incorporated in the Proposal documents are liable to be rejected. 1.9. ADDENDA /CORRIGENDA Addenda/corrigenda to the tender document may be issued by SDSC SHAR prior to the date of opening of the tenders, to clarify or reflect modifications in the contract terms and conditions. Such addendum/corrigenda will be distributed to each firm or person who had purchased the tender documents. 1.10. AMBIGUITY Should there be any ambiguity or doubt as to the meaning of any of the tender clause/condition or if any further information is required, the matter shall be immediately brought to the notice of Head, Purchase & Stores, SDSC SHAR in writing for necessary clarifications prior to the opening of the tenders. 2. PREPARATION OF BIDS 2.1. SITE VISIT The SERVICE PROVIDER shall visit SDSC SHAR and acquaint himself fully with the requirements and no claims whatsoever will be entertained on the plea of ignorance of difficulties in the execution of the work. Before submitting the tender the Service Provider shall be deemed to have clearly understood and satisfied himself regarding the work and services, all conditions liable to be encountered during the execution thereof and that prices, and/or compensation quoted in the offer are adequate and all inclusive with respect to all factors, circumstances and conditions likely to be incidental, both direct and indirect, to the work and services. 2.2. VALIDITY OF OFFER Bid shall remain valid for acceptance for a period of 4 (Four) months from the due date of submission of the Bid. The Service Provider shall not be entitled during the said period to revoke or cancel his Bid or to vary the Bid except and to the extent required by Department and communicated in writing. Bid shall be revalidated for extended period as required by Department in writing. In such cases, unless otherwise specified, it is understood that validity is sought and provided without varying either the quoted price or any other terms and conditions of Bid finalized till that time. 2.3. COST OF BIDDING All direct and indirect costs associated with the preparation and submission of Bid (including clarification meetings and site visit, if any), shall be to Service Provider's account and the Department will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the Bid process. 2.4. APPLICABLE LANGUAGE/MEASUREMENTS The Bid and all correspondence incidentals to and concerning the Bid shall be in the English Language. For supporting document and printing literature submitted in any other language, an accurate English Translation shall also be submitted. Responsibility for correctness in translation shall lie with the Service Provider. All the measurements shall be given in metric system. 2.5. ARRANGEMENT OF BID The Bid shall be neatly presented on white paper with consecutively numbered pages.
Recommended publications
  • Tribal Medicinal Studies on Sriharikota Island, Andhra Pradesh
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by OpenSIUC Ethnobotanical Leaflets 14 : 95-107, 2010. Tribal Medicinal Studies on Sriharikota Island, Andhra Pradesh# R Bharath Kumar* and B. Surya Narayana** *Dept.Biotechnology, Vignan’s Engineering College, Vadlamudi, Guntur-522213 email: [email protected] **-307, Karnakamma Street, Venkatagiri Town –524132 email: [email protected] Issued January 01, 2010 Abstract Sriharikota Island in Andhra Pradesh is an elliptical land mass sandwiched between Bay of Bengal in the East and Pulicat Lake in the West. Sullurpet is the nearest railway station which is 18 km from Sriharikota Island and it is on Chennai-Kolkata trunk line and 90 Km away from North of Chennai. An aboriginal tribe called Yanadi dwells in Sriharikota. It is similar to Chenchu community elsewhere in Andhra Pradesh. Inspite of the community being drifted from their natural way of life due to agro-rural development activities, a few aged tribal men are still able to furnish traditional ethno-medicinal data. So far no ethno-botanical studies are conducted are in this area except for a list of 50 plants reported by the senior author and co-researchers (1989). Therefore a detailed study on tribal medicine in this area is undertaken. During this work 190 species are collected having a variety of ethno-pharmacological values. However this article deals with 23 species only, having remedial effect for arthritis and rheumatism. Out of them 10 species having anodyne properties from first hand ethnic information. Introduction An aboriginal tribe called Yanadi dwells in Sriharikota.
    [Show full text]
  • Rn~ ~ Atafu:R ~ ~, L!Fl~F{Aj,2.1 , ~ Fcmn1f (Or.Fct.), ~ Ffl ~ ~<Rt ~ ~ ~~Cm- S1rlf
    'ft.!No.~./A.14011 /2/2012-1 ~ ~/Government of India 3Rlft~ R'BDT/Department of Space *** 3Rlft~ ~/Antariksh Bhavan ~ ~J.T!JL "&/New BEL Road, ~/Bangalore-560 094 . .!.f_Rl d~ </September, 2019 cfil4f~4 ~/ OFFICE MEMORANDUM ~/Subject: rn~ ~ atafu:r ~ ~, l!fl~f{aj,2.1 , ~ fcMn1f (or.fct.), ~ ffl ~ ~<Rt ~ ~ 14 cro ~-~.arr.) afR ~- 10,000/- ~ ~ ffl ~ ~ ~- 37,400-67,000/- ~ m ~(~~-~-arr.)~ f..14=;,cfi ~~cm- S1Rlf..l~Rti ~ amm ~ m ~ ~ ~/ Filling up the post of Controller in Satish Dhawan Space Centre, SHAR, (SDSC SHAR), Sriharikota, Department of Space (DOS) in the Level 14 of Pay Matrix (7th CPC) and in the Pay Band of Rs.37,400- 67,000/- plus Grade Pay Rs.10,000/- (6th CPC) on deputation basis• regarding. *** ~ fct'BDT ;fi" "f@l!(T ™ ~ ~ !(ITT, ~ ~Ri.fi1 zt, 3Rlft~ fct'BDT (3i°. -Fct.) it m ~ ~i:ffi ;fi" ~ 14 (Tc1t ;fi".~.3IT.) afR 'fi. 10,0001- ;fi" ffi m ~ 'fi. 37,400-61,0001- ;fi" m ~ <~ ;fi".~.3IT.) (~ ~ ;fi" ~) it f.-14 31 cfi ;fi" "CR c!?r' Sl fa f.-l 1Rfi ;fi" 3ITUR ~ ffl cfiT ~ ~I ~ f.:t<:n:n' ;fi" ~ . 'CfP-fdT ~ +i I '1 <is ~-I it ~ ~ ~I '•P-l f.-1 d 3ITTTcfilfr cfiT ffi "cl'm a:r,=,:r itcfT !(ra m• m ~ ~m 'ft~iTfu'a- if.arr.fr.it. ;fi" R'1Tcfi 17 '5ff 2010 ;fi" cfi'T.fil.'ff. 6/8/2009-~m. {ffi 11) ;fi" ~ fclf.-1,i~a ~I It is proposed to fill up one post of Controller in Satish Dhawan Space Centre, SHAR, (SDSC SHAR), Sriharikota, of this Department in the Level 14 of Pay Matrix (?1h CPC) and 1 Pay Band of Rs.37,400-67,000/- plus Grade Pay Rs.10,000/- (6 h CPC) (Joint Secretary level) on deputation basis.
    [Show full text]
  • Space India Jan-June 2016.Pdf
    The Indian Space Programme Space activities in the country were initiated with the setting up of Indian National Committee for Space Research (INCOSPAR) in 1962. In the same year, work on Thumba Equatorial Rocket Launching Station (TERLS), near Thiruvananthapuram, was also started. The Indian space programme was institutionalised in November 1969 with the formation of Indian Space Research Organisation (ISRO). Government of India constituted the Space Commission and established the Department of Space (DOS) in June 1972 and brought ISRO under DOS in September 1972. Department of Space has the primary responsibility of promoting development of space science, technology and applications towards achieving self reliance and assisting in all round development of the nation. Towards IPRC this, DOS has evolved the following programmes: PRL: Physical Research Laboratory NARL: National Atmospheric Research Laboratory NE-SAC: North Eastern Space Applications Centre SCL: Semi- • Indian National Satellite (INSAT) programme for Conductor Laboratory IIST: Indian Institute of Space Science and Te chnology ISRO: Indian Space Research Organisation Antrix: Antrix Corporation Limited telecommunications, TV broadcasting, meteorology, VSSC: Vikram Sarabhai Space Centre LPSC: Liquid Propulsion Systems Centre IPRC: ISRO Propulsion Complex SDSC: Satish Dhawan Space Centre developmental education, etc. ISAC: ISRO Satellite Centre NRSC: National Remote Sensing Centre SAC: Space Applications Centre IISU: ISRO Inertial Systems Unit DECU: Development and • Remote
    [Show full text]
  • Final Eia Sullurpeta
    Environmental Impact Consultancy Services for AP Urban Water Supply & Assessment& Environmental Sullurupeta Septage Management Improvement Project (APUWS& Management Plan ULB SMIP) 0 of 125 Environmental Impact Consultancy Services for AP Urban Water Supply & Assessment& Environmental Sullurpeta Septage Management Improvement Project (APUWS& Management Plan ULB SMIP) TABLE OF CONTENT CHAPTER S. NO. PARTICULAR PAGE NO LIST OF TABLES 2 LIST OF FIGURES 3 LIST OF ANNEXURES 4 ACRONYMS 5 EXECUTIVE SUMMARY 8 CHAPTERS 1 INTRODUCTION 1.0 Introduction 10 1.1 Introduction to the overall state-wide project 10 1.2 Sub-project justification 11 1.3 Requirement for an Environmental Impact Assessment 11 1.4 Objectives of the Project’s Environmental and Social 13 Management Planning Framework (ESMPF) 1.5 Scope of Work for this report 14 1.6 Other Legislative and Regulatory Considerations 15 2 PROJECT LOCATION AND BASELINE DATA 2.0 Project Location 23 2.1 Baseline Data 23 2.1.1 Geographical & Demographic characteristics 24 2.1.2 Meteorology of Sullurpeta 26 2.1.3 Air Quality 29 2.1.4 Noise Pollution 31 2.1.5 Water Quality 32 2.1.6 Source Sustainability 33 2.1.7 Surface Water Quality 34 2.1.8 Ground Water Quality 39 2.2 Soils 45 2.3 Flora & Fauna 47 2.3.1 Flora 47 2.3.2 Fauna 53 3 PROJECT DESCRIPTION AND ANALYSIS OF ALTERNATIVES 3.1 Existing and Proposed Water Supply System in Project Area 57 3.2 Potential Impacts and Risks form the Proposed Water Supply 58 Components 3.3 Proposed Water Supply System in Sullurpeta 62 3.4 Description of the Sub-Project Components 65 3.5 Analysis of Alternatives 71 4 KEY ENVIRONMENTAL IMPACTS 4.1 Identification of Impacts 73 4.2 Potential Environmental Impacts and Rises during Construction 74 1 of 125 Environmental Impact Consultancy Services for AP Urban Water Supply & Assessment& Environmental Sullurpeta Septage Management Improvement Project (APUWS& Management Plan ULB SMIP) CHAPTER S.
    [Show full text]
  • Sns College of Technology
    SNS COLLEGE OF TECHNOLOGY (An Autonomous Institution) DEPARTMENT OF AERONAUTICAL ENGINEERING Subject Code & Name: 16AE409 ROCKETS AND MISSILES Date:09.07.19 DAY: 06 UNIT: 1: BASICS OF LAUNCH VEHICLES AND MISSILES TOPIC: 6: various Indian space launch vehicles : LVL3,PSLV,GSLV,ULV& HLV HISTORIC 1. SLV: Satellite Launch Vehicle Satellite Launch Vehicle-3 (SLV-3) was India's first experimental satellite launch vehicle, which was an all solid, four stage vehicle weighing 17 tonnes with a height of 22m and capable of placing 40 kg class payloads in Low Earth Orbit (LEO). SLV-3 was successfully launched on July 18, 1980 from Sriharikota Range (SHAR), when Rohini satellite, RS-1, was placed in orbit, thereby making India the sixth member of an exclusive club of space-faring nations. SLV-3 employed an open loop guidance (with stored pitch programme) to steer the vehicle in flight along a pre-determined trajectory. The first experimental flight of SLV-3, in August 1979, was only partially successful. Apart from the July 1980 launch, there were two more launches held in May 1981 and April 1983, orbiting Rohini satellites carrying remote sensing sensors. The successful culmination of the SLV-3 project showed the way to advanced launch vehicle projects such as the Augmented Satellite Launch Vehicle (ASLV), Polar Satellite Launch Vehicle (PSLV) and the Geosynchronous satellite Launch Vehicle (GSLV). 2. ASLV: Augmented Satellite Launch Vehicle With a lift off weight of 40 tonnes, the 24 m tall ASLV was configured as a five stage, all-solid propellant vehicle, with a mission of orbiting 150 kg class satellites into 400 km circular orbits.
    [Show full text]
  • Government of Andhra Pradesh Socio
    GOVERNMENT OF ANDHRA PRADESH PLANNING DEPARTMENT SOCIO ECONOMIC SURVEY 2018-19 Srikakulam Vizianagaram Visakhapatnam East Godavari West Godavari Guntur Krishna Kurnool Prakasam Anantapuramu Nellore Cuddapah Chittoor PLANNING DEPARTMENT SOCIO ECONOMIC SURVEY 2018-19 GOVERNMENT OF ANDHRA PRADESH Title_Kala.indd 1 09-07-2019 11.57.49 PM SOCIO ECONOMIC SURVEY 2018-19 i ii SOCIO ECONOMIC SURVEY 2018-19 SOCIO ECONOMIC SURVEY 2018-19 iii PREFACE At the national level, the Ministry of Finance, Government of India presents the Economic Survey in both houses of the Parliament every year, just before the Union Budget. It is the ministry’s view on the annual economic development of the country. Annual document of the Ministry of Finance, Government of India, Economic Survey, reviews the developments in the Indian economy over the previous 12 months, summarizes the performance on major development programs and highlights the policy initiatives of the government and the prospects of the economy in the short to medium term. It contains certain prescriptions that may find a place in the Union Budget which is presented a day or two later. The Government of Andhra Pradesh publishes ‘Socio- Economic Survey’ report every year and places it in both Houses of the State Legislature along with the budget documents. The report is a unique volume that captures the socio-economic changes took place in the state since the beginning of the financial year. The report essentially attempts to present the growth performance of the state economy by capturing the progress under key macro- economic aggregates and physical outcomes because of implementation of various programmes / schemes during the year 2018-19.
    [Show full text]
  • Prof. U.R. Rao Chairman, PRL Council (Former Chairman, ISRO & Secretary, DOS) Department of Space, Antariksh Bhavan New BEL Road, Bangalore – 560 094
    INDIA’S SPACE PROGRAM (AN OVERVIEW) (Lecture–1) Prof. U.R. Rao Chairman, PRL Council (Former Chairman, ISRO & Secretary, DOS) Department of Space, Antariksh Bhavan New BEL Road, Bangalore – 560 094 (2006) Slide -1 INDIA DECIDES TO GO INTO SPACE • Background – Ground / Balloon Based Studies, Atmospheric Sciences, Cosmic Rays, Astrophysics • Thumba Equatorial Rocket Launching Station (TERLS) in 1962 Cooperation with NASA, USSR, CNES AND UK Rocket Experiments to Study Equatorial Aeronomy Meteorology and Astrophysics • Population (1.06 Billion), Per capita GDP (550$), Illiteracy (39%), Population Below PL (30%) India with 16% Population, 2% Land, 1.5% Forest, Consumes 2% Energy, has 1.5% Global GDP. India Opts Space Technology for Rapid Socio-Economic Development Slide - 2 INDIAN SPACE ENDEAVOUR There are some who question the relevance of space activities in a developing nation. To us, there is no ambiguity of purpose. We do not have the fantasy of competing with the economically advanced nations in the exploration of the Moon or the planets or manned space-flight. But we are convinced that if we are to play a meaningful role nationally, and in the comity of nations, we must be second to none in the applications of advanced technologies to the real problems of man and society IRS BUDGET Rs 3148 Cr/ annum LAUNCHER APPLICATIONS HUMAN RESOURCES LEADERSHIP EXPERTISE 16500 strong LARGE USER BASE INSAT INTERNATIONAL COOPERATION INDUSTRY VIKRAM A. SARABHAI SPACE ASSETS Remote sensing & SPACE COMMERCE Telecom satellite Constellations INFRASTRUCTURE End-to-end capability STATE OF THE ART TECHNOLOGY Slide - 3 HUMBLE BEGINNING • Establishment of Space Science Tech Center, Thumba-1965 Rocket Technology Development – Centaur – Rohini • Earth Station at Ahmedabad – 1968 / Space Applications Center 1972 Landsat Earth Station – Hyderabad – 1978 • Krishi Darshan (80 Village near Delhi) – Remote Sensing Aerial Expts.
    [Show full text]
  • Challenges & Modern Techniques in Realising Complex Infrastructure
    National Workshop on Challenges & Modern Techniques in Realising Complex Infrastructure at Satish Dhawan Space Centre SHAR ISRO, Sriharikota on 5th March 2018 Organised Jointly by ISSE Sriharikota - Chennai Chapter & SDSC SHAR, ISRO, Sriharikota Indian Society of Systems for Satish Dhawan Space Centre SHAR Science and Engineering (ISSE) Sriharikota Indian Society of Systems for Science and Satish Dhawan Space Centre SHAR is the Engineering (ISSE) is a professional body spaceport of India. SDSC has state-of-the- for inter-disciplinary collabration of systems art facilities for producing heavier class solid in Science and Engineering. ISSE is unique propellant rocket boosters and facilities for among the systems oriented institutions having testing their flightworthiness. There are two the objective of bringing together scholars and operational Launch Pads, viz., the First Launch practitioners from Academic, Business and Pad (FLP) and the Second Launch Pad (SLP), R&D Organisations for promoting the system equipped with integration, liquid storage and concepts. The Society was started in 2010 at servicing facilities. Mission Control Centre Vikram Sarabhai Space Centre (VSSC), with & Launch Control Centre are equipped with its Headquarters at Thiruvananthapuram. sophisticated instrumentation, tracking and ISSE, Sriharikota-Chennai Chapter was real time display facilities. All the Launch inaugurated on 29th December 2015 by Vehicles of ISRO are being launched from Shri A.S. Kiran Kumar, then Chairman, ISRO. Sriharikota. Challenges & Modern Techniques in Invited Talks by Eminent Speakers Realising Complex Infrastructure for Nation Building This workshop aims to bring eminent engineers and technologists under one Technology has enabled man made structures roof and disseminate their rich expertise, to with stand against natural calamities which experience, knowledge to the delegates.
    [Show full text]
  • Annual Report 2016-17
    Report of Activities of ISSE for the period from st th 1 November 2016 till 30 September, 2017 Dear Members, The Executive committee takes pleasure in presenting the annual report of the functioning of the society from 1st November 2016 till 30th September, 2017. The working of our society is guided by our objectives of promoting systems science and engineering, disseminating knowledge pertaining to systems theory and applications, encouraging meritorious work in systems domain, reporting results of original research and providing a platform for scholars and practitioners to come together to share ideas and experiences. The major activities conducted and important achievements of ISSE during the period are presented in the Annual Report 2016-17. The society had yet another eventful year during this period. ISSE has 10 chapters across the country which are located at Thiruvananthapuram, Kochi, Bangalore, Manipal, Hyderabad, Amaravati, Sriharikota-Chennai, Trichy, Coimbatore and Chandigarh. Trichy, Coimbatore and Chandigarh chapters were inaugurated during the reporting period. The society is strengthening its activities through its chapters by organising a variety of events in system engineering domain towards the society objective of promoting the systems concept. The National Conference of ISSE, iNaC-03 with the theme ‘Complex Engineering Systems of National Importance’, is being orgnaised during October 12-13, 2017 at Indian School of Business, Chandigarh under the auspices of SCL, Chandigarh. Annual General Body Meeting 2016 The Annual General Body Meeting 2016 was held on December 16, 2016, 5.00 pm at National Remote Sensing Centre, Hyderabad along with a Half day Technical Session organized by ISSE Hyderabad Chapter.
    [Show full text]
  • GSLV MK-III Rocket. 2. Chandrayaan-2 Was Launched to Space by ISRO from Satish Dhawan Space Centre, Sriharikota in Andhra Pradesh
    1. Chandrayaan-2 Indian 2nd Lunar Odessy was launched by – GSLV MK-III rocket. 2. Chandrayaan-2 was launched to space by ISRO from Satish Dhawan Space Centre, Sriharikota in Andhra Pradesh. 3. Chandrayaan-2 will be unique because-it will explore the south pole region of Lunar terrain which remain unexplored till today. 4. The weight of Chandrayaan-2 is 3850kg. 5. Time to be taken by the spacecraft to reach the Moon - 48 days. 6. Indian rank in the world for launching such a mission - 4th. 7. Chairman of ISRO - K. Sivan 8. Project Director of Chandrayaan-2 Mission – Ms. Muthya Vanitha 9. Mission Director of Chandrayaan-2 Mission – Ms. Ritu Kharidhal 10. Chandrayaan-2 mission duration - 1year 11. Chandrayaan-1 was launched by ISRO on 2008. 12. Chandrayaan-2 include ORBITER, LANDER & ROVER. Name of the Lander - Vikram (1471kg weight) Name of the Rover - Pragyan (27kg weight). 13. First in Chandrayaan-2 i. 1st space mission to conduct soft landing on South Pole of Moon. ii. 1st Indian expedition with home-grown technology. iii. 1st Indian mission to explore the Lunar terrain with home grown technology. 14. ISRO plan for the Solar mission called Aditya in-2020. 15. There is renewed global interest in the Moon because of reserve of Helium-3 and Water. 16. Details about GSLV-MK-III Rocket 43.43m height 640 tonns weight 3 stage motor capable to launch 4 tonnes satellite to the Geosynchronous Orbit. 17. Scientific Objectives of Chandrayaan-2 i. To get information on solar environment. ii. Extensive mapping to know Moon’s origin & evolution.
    [Show full text]
  • Organisation, Functions and Duties A
    ORGANISATION, FUNCTIONS AND DUTIES A. Organisation With the setting up of Indian National Committee for Space Research (INCOSPAR) in 1962, the space activities in the country were initiated. In the same year, the work on Thumba Equatorial Rocket Launching Station (TERLS) near Thiruvananthapuram was also started. Indian Space Research Organisation (ISRO) was established in August 1969. The Government of India constituted the Space Commission and established the Department of Space (DOS) in June 1972 and brought ISRO under DOS in September 1972. The Space Commission formulates the policies and oversees the implementation of the Indian space programme to promote the development and application of space science and technology for the socio-economic benefit of the country. DOS implements these programmes through, mainly, Indian Space Research Organisation (ISRO) and the Grant- in-Aid institutions viz. Physical Research Laboratory (PRL), National Atmospheric Research Laboratory (NARL), North Eastern-Space Applications Centre (NE-SAC), Semi- Conductor Laboratory (SCL) and Indian Institute of Space Science and Technology (IIST). The Antrix Corporation, established in 1992 as a government owned company, markets the space products and services. The establishment of space systems and their applications are coordinated by the national level committees, namely, INSAT Coordination Committee (ICC), Planning Committee on National Natural Resources Management System (PC-NNRMS) and Advisory Committee of on Space Sciences (ADCOS). The Secretariat of DOS and ISRO Headquarters are located at Antariksh Bhavan in Bangalore. Programme offices at ISRO Headquarters coordinate the programmes like satellite communication, earth observation, launch vehicle, space science, disaster management support, sponsored research scheme, contracts management, international cooperation, safety, reliability, publications and public relations, budget & economic analysis, civil engineering and human resources development.
    [Show full text]
  • Unit 25. India's Reusable Launch Vehicle (RLV)
    GAUTAM SINGH UPSC STUDY MATERIAL – Science & Technology 0 7830294949 Unit 25. India’s Reusable Launch Vehicle (RLV)- Everything you need to know India successfully tested the launched of indigenously made Reusable Launch Vehicle (RLV), capable of launching satellites into orbit around earth and then re- enter the atmosphere, from Sriharikota in Andhra Pradesh. RLV is dubbed as India’s own space shuttle. (The ‘Space Shuttle’ was a partially reusable low Earth orbital spacecraft system operated by the U.S. National Aeronautics and Space Administration (NASA), as part of the Space Shuttle program.) What’s the significance of Reusable Launch Vehicle (RLV)? THANKS FOR READING – VISIT OUR WEBSITE www.educatererindia.com GAUTAM SINGH UPSC STUDY MATERIAL – Science & Technology 0 7830294949 RLV is the unanimous solution to achieve low cost, reliable and on—demand space access. The making of the Indian space shuttle or RLV-TD has taken five years and the government has invested Rs. 95 crore in the project. This flight will test the capability of the vehicle to survive a re-entry at speeds higher than that of sound. The solution to reducing cost of launching satellites into orbit is to recycle the rocket or make it reusable. Scientists at ISRO believe that they could reduce the cost by as much as 10 times if reusable technology succeeds, bringing it down to $2,000 per kg from the present $20,000 per kg. What about NASA’s space shuttle programme? Nasa grounded its space shuttle programme in 2011 after using its reusable vehicles like Discovery, Endeavor, Columbia and Challenger for over three decades to launch various missions, including the International Space Station (ISS) and the Hubble telescope.
    [Show full text]