Phase 1 - COMING October 2017 Phase 2 - COMING APRIL 2018

Total Page:16

File Type:pdf, Size:1020Kb

Phase 1 - COMING October 2017 Phase 2 - COMING APRIL 2018 T h e UK’s bi gges t , new ret a i l and lei sure des t i n a t i on a t o ver EDGE LANE L 13 1EW 7 0 0,000 sqf t including mezzanines A development by phase 1 - COMING october 2017 phase 2 - COMING APRIL 2018 liverpoolshoppingPARK.co.uk LOCATION IN NUMBERS aintree shopping park 7 miles / 25 minutes drive 683,919 people living within 15 minutes drive time 1,799,137 people living within 30 minutes drive time stretching into Merseyside, Cheshire and Lancashire A5o68 queens drive 3,634,540 people living within 45 minutes drive time 5,795,546 people living within 60 minutes drive time EDGE LANE M62 Within minutes of the M62 serving Merseyside, LIVERPOOL CITY CENTRE Manchester and beyond A5o68 queens drive 65,000 vehicle daily traffic flow 1,500 car parking spaces new mersey retail park, speke 6 miles / 20 minutes drive Key area indicates highly populated residental area liverpoolshoppingPARK.co.uk OVERVIEW Liverpool Shopping Park (LSP) is the most strategic location in the Liverpool conurbation with excellent access to the 1.8 million people living within a 30 minute drive time. Edge Lane is the main route from the M62 into Liverpool’s City Centre providing huge traffic flows from residents, tourists and commuters from across the UK. Maximum connectivity is provided by the existing excellent communication links, both road and public transport; planning consent and budget are in place to further improve these to cater for the large customer volumes the scheme will generate. The new all movements junction on the city side of the scheme further improves access. Opportunities for retail and MARKETING P LAN leisure units with great flexibility ranging from 1,500 sqft to PHASE 1 OCTOBER 20 17 50,000 sqft, with 1500 free car PHASE 2 APRIL 20 18 parking spaces. liverpoolshoppingPARK.co.uk RETAIL AND LEISURE UNITS TO LET UNITS RANGING FROM 1,500 SQft to 50,000 SQft AGENTS Stephen McMullen 020 3058 0202 | [email protected] Lawrence Earnshaw 020 3058 0207 | [email protected] CHRIS PETCH 0161 956 8636 | [email protected] A DEVELOPMENT BY aewarchitects.com * Subject to fixed planning. Final Layout is not fixed.
Recommended publications
  • Liverpool Development Update
    LIVERPOOL DEVELOPMENT UPDATE November 2016 Welcome Welcome to the latest edition of Liverpool Development Update. When I became Mayor of the city in 2012, I said that Liverpool’s best days were ahead of it. If you consider the levels of investment being seen across the city today in 2016, my prediction is now ringing true. Since the start of 2012, we have seen over £3.8 billion worth of investment which has brought new businesses, new homes, new schools, and new and improved community and health facilities to Liverpool. We have seen the creation of nearly 15,000 job spaces, many of which will be filled with new jobs to the city. We have also created thousands more construction jobs. There is more good news. Several major new schemes are now in delivery mode. I am pleased to see rapid progress on Derwent’s Liverpool Shopping Park at Edge Lane, whilst Project Jennifer is now well underway with construction about to commence on its new Sainsburys and B&M stores. In addition, Neptune Developments have started work on the Lime Street Gateway project, and I can also report that work is underway on the first phase of the Welsh Streets scheme that will now see many of the traditional terraces converted to larger family homes. Meanwhile, some of the new schemes have started under the Strategic Housing Delivery Partnership which will build a further 1,500 new homes and refurbish another 1,000 existing ones. Plans for new schemes continue to be announced. The Knowledge Quarter is to be expanded with a new £1billion campus specialising in FRONT COVER: research establishments, whilst we are now also seeking to expand the Commercial Office District with new Grade A office space at Pall Mall which this city so vitally needs.
    [Show full text]
  • At-Home COVID-19 Testing Kit (PCR)
    We are busy updating our site to make it an even better experience for you. Normal service will resume on Sunday evening. In the meantime if you wish to purchase an At-home COVID-19 testing kit, then follow the instructions detailed below. If you wish to purchase an At-home COVID-19 testing kit you will need to do so in store during the period above. Please see the list of stores that stock this test kit at the bottom of this document. MyHealthChecked At-home COVID-19 PCR test What is a MyHealthChecked At-Home COVID-19 PCR Swab Test? The MyHealthChecked At-home COVID-19 PCR test is an easy to use, nasal self-swab test to help identify if you have the COVID-19 (SARS-CoV-2) virus. This test can be used for both general testing and international travel, where a Fit to Fly certificate is required. You must check with your travel provider exactly what your requirements are before ordering, as requirements and timings can vary greatly from country to country. The test is also suitable for individuals prior to making decisions such as travel or meeting with friends or family, or someone who needs to prove a negative test result for group attendance. Who is this test suitable for? The MyHealthChecked At-home COVID-19 PCR test is suitable for all ages and can be used by both adults and children. Adults aged 18 and over: self-test (unless unable to do so). Children and teenagers aged 12 to 17: self-test with adult supervision.
    [Show full text]
  • Download (2MB)
    PATH DEPENDENT AND RISK AVERSE: IS RETAIL PLANNING INHIBITED BY A CULTURE OF FEAR? Thesis submitted in accordance with the requirements of the University of Liverpool for the degree of Doctor of Philosophy by: Mark Davies Department of Geography and Planning School of Environmental Sciences University of Liverpool October 2019 i Word Template by Friedman & Morgan 2014 Morgan & Friedman by Word Template ii Word Template by Friedman & Morgan 2014 Morgan & Friedman by Word Template DECLARATION This dissertation is the result of my own work and includes nothing that is the outcome of work done by, or in collaboration with others, except where specifically indicated in the text. It has not been previously submitted, in part or completely, to any university or institution for any degree, diploma, or other qualification. Signed: ______________________________________________________________ Date: _________________________________________________________________ iii Word Template by Friedman & Morgan 2014 Morgan & Friedman by Word Template iv Word Template by Friedman & Morgan 2014 Morgan & Friedman by Word Template ABSTRACT As new digital technology fundamentally changes the way people shop, retail firms are increasingly seeking to optimise their store portfolios so that they effectively support the provision of an omni-channel retail offer, which is leading to the decline of many traditional retail spaces. This thesis seeks to explore this issue, by considering why, in the face of such profound structural changes in retailing, the prevailing response of planners has been to reemphasise support for „town-centre-first‟, despite the fact that such an approach appears fundamentally misaligned with the issues that are driving decline today. Utilising a mixed methods approach, involving a detailed historical analysis of the evolution of retail planning in England and in-depth interviews with planners, this thesis seeks to understand why it is that town-centre-first continues to pervade as a strategic approach in retail planning.
    [Show full text]
  • Wavertree Boulevard South Wavertree Techpark
    WAVERTREE TECHPARK LIVERPOOL WAVERTREE BOULEVARD SOUTH WAVERTREE TECHPARK HOME EMAIL SAVE PRINT CLOSE HOME EMAIL SAVE PRINT CLOSE HOME EMAIL SAVE PRINT CLOSE WAVERTREE MODERN OFFICE SPACE TO LET FROM 500 TO 3,500 SQ FT TECHPARK WAVERTREE TECHPARK HOME EMAIL SAVE PRINT CLOSE HOME EMAIL SAVE PRINT CLOSE HOME EMAIL SAVE PRINT CLOSE ALL UNITS HAVE WAVERTREE Self-contained P Ample parking available TECHPARK Offices are well provided with natural light via P Secure site via barrier system P extensive glazing Suitable for a number of uses subject to Flexible business units P planning P WAVERTREECURRENT AVAILABILITY WAVERTREE BOULEV TECHPARKUNIT SQ M SQ FT ARD 1F 40.7 438 P UNIT 1 2C 41.7 449 A F/G 2D/E 307 3,305 D H B C E F G 3B 152.9 1,646 A B 3C 153 1,649 WAVERTREE BOULEVARD SOUTH E AD C UNIT 2 3E 41.7 449 D/E 3F 89.2 961 D HOME EMAIL SAVE PRINT CLOSE RO DRYDEN 4E 181 1,950 A-C F 4F 181 1,950 UNIT 4 F E D C B A G UNIT 3 HOME EMAIL SAVE PRINT CLOSE NUE WAVERTREE AVE HOME EMAIL SAVE PRINT CLOSE WAVERTREE AY KINGSW TUNNEL TECHPARK BA A5049 TH ST TH T ROAD T LEEDS ST PRESCO ’S S CENTRAL D BUSINES AL DISTRICT ON GTON NEW ISLINGT KENSIN TO M62 MOTORWAY> ST CHU T STREET S RCHILL WA PRESCO ST OSW Y EDGE LANE H TITHEBARN LIVERPOOL WAVERTREE EDGE LANE LIVERPOOL SHOPPING PARK PEMBROKE PLACEUNIVERSITY HOSPITAL EDGE LANE LIVERPOOL MILL LA INNOVATION DALE ST PARK BINNS RD RIA ST LIME ST TECHPARK A5080 TO N LIME STREET EDGE LANE DRYDEN RD KNOWLEDGE QUARTER PIGHUE LANE E VIC QUEENS DRIV STATION LITTLEWOODS VD FILM STUDIOS NEWTON CT A5080 MANCHESTER> OW HILL
    [Show full text]
  • Liverpool Biennial 2018
    BIENNIAL PARTNER EXHIBITION EXHIBITIONS Liverpool 1 9 WORLDS WITHIN 21 Tate Liverpool LJMU’s Exhibition WORLDS John Moores Royal Albert Dock, Research Lab Painting Prize 2018 Liverpool Waterfront LJMU’s John Lennon Some of these sites Walker Art Gallery L3 4BB Art & Design Building are open at irregular William Brown Street Biennial Duckinfield Street times or for special L3 8EL 2 L3 5RD events only. Refer to Open Eye Gallery p.37 for details. 23 19 Mann Island, 10 Bloomberg New Liverpool Waterfront Blackburne House 7 Contemporaries 2018 2018 L3 1BP Blackburne Place St George’s Hall LJMU’s John Lennon L8 7PE St George’s Place Art & Design Building 3 L1 1JJ Duckinfield Street RIBA North – National 11 L3 5RD Architecture Centre The Oratory 8 21 Mann Island, St James Mt L1 7AZ Victoria Gallery 24 Liverpool Waterfront & Museum This is Shanghai L3 1BP 12 Ashton Street, Mann Island & Liverpool University of The Cunard Building 4 Metropolitan Liverpool L3 5RF Liverpool Waterfront Bluecoat Cathedral Plateau School Lane L1 3BX Mount Pleasant 17 L3 5TQ Chalybeate Spring EXISTING 5 St James’ Gardens COMMISSIONS FACT 13 L1 7A Z 88 Wood Street Resilience Garden L1 4DQ 75–77 Granby Street 18 25 L8 2TX Town Hall Mersey Ferries 6 (Open Saturdays only) High Street L2 3SW Terminal The Playhouse Pier Head, Georges Theatre 14 19 Parade L3 1DP Williamson Square Invisible Wind Central Library L1 1EL Factory William Brown Street 26 (until 7 October) 3 Regent Road L3 8EW George’s Dock L3 7DS Ventilation Tower 7 20 George’s Dock Way St George’s Hall 15 World
    [Show full text]
  • Digest of Merseyside Tourism Statistics, May 2008
    Digest of Tourism Statistics July 2009 Digest of Tourism Statistics, July 2009 Contents Page 1. Introduction 2 2. Core Tourism Statistics 3 2.1 Volume and Value of Tourism on Merseyside 3 2.2 Hotel Data 8 2.3 Conferences 12 2.4 Tourist Information Centres 12 2.5 Attractions 13 2.6 Events 15 2.7 Travel Data 16 2.8 ‟08 Summary 20 3. Recent TMP Surveys 22 3.1 Visitor Origin 22 3.2 Visitor Spend 24 3.3 Visitor Behaviour 25 4. Tourism Business Performance Survey 26 4.1 Introduction to Tourism Business Performance 26 4.2 Business Profile 26 4.3 Business Performance over the past two months 27 4.4 Forecasting 28 4.5 Steps taken to protect the business 29 4.6 Current trading difficulties 30 5. Information from VisitBritain 31 5.1 The “Credit Crunch” 31 6. Recent research articles 34 6.1 Creamfields 2008 34 6.2 2008 Liverpool Destination Benchmarking 37 Appendices Appendix I: Links to further information 42 Appendix II: Details of available publications 43 Appendix III: Crude guide to statistical confidence levels 44 Digest of Merseyside Tourism Statistics, July 2009 1 1. Introduction Welcome to the latest edition of the Digest of Tourism Statistics, and for those regular users of this publication, we start with an apology. Many of you will be aware that we have been a long time in awaiting the 2007 STEAM estimates for our region (see section 2.1); hence this edition has been delayed whilst these were produced. A further explanation is included within the relevant section.
    [Show full text]
  • Creating an Impact: Liverpool's Experience As European Capital Of
    Impacts 08: The Liverpool Model www.impacts08.net European Capital of Culture Research Programme University of Liverpool Report by: Liverpool, L69 7ZA, UK Beatriz Garcia Email: [email protected] IMPACTS Ruth Melville European Capital of Culture Research Programme Tamsin Cox www.impacts08.net Creating an impact: Cover photography by Beatriz Garcia of The Liverpool Cityscape, 2008 ©Ben Johnson 2010. All Rights Reserved DACS. Liverpool’s experience as European Capital of Culture The Liverpool Cityscape will be on display in the Museum of Liverpool which opens in 2011. Impacts 08: The Liverpool Model www.impacts08.net European Capital of Culture Research Programme University of Liverpool Report by: Liverpool, L69 7ZA, UK Beatriz Garcia Email: [email protected] IMPACTS Ruth Melville European Capital of Culture Research Programme Tamsin Cox www.impacts08.net Creating an impact: Cover photography by Beatriz Garcia of The Liverpool Cityscape, 2008 ©Ben Johnson 2010. All Rights Reserved DACS. Liverpool’s experience as European Capital of Culture The Liverpool Cityscape will be on display in the Museum of Liverpool which opens in 2011. 41,000+ activities including: – 276 highlight events – 21,000 performance and exhibition days The Liverpool ECoC programme had a total – 20,000 workshops and training sessions – 7,000+ activities Resulting in: – An audience of 9.8 million income of £130 million over six years, the highest – A total audience of 18 million – 80%+ of audiences rated the – 1,000 volunteers giving 7,000 days events ‘good’
    [Show full text]
  • Liverpool Knowledge Quarter Urban Design Framework & Public Realm Implementation Plan
    Liverpool Knowledge Quarter Urban Design Framework & Public Realm Implementation Plan Liverpool Knowledge Quarter Liverpool Knowledge Quarter Liverpool Knowledge Quarter Anglican Cathedral Blackburne House Mount Vernon Contents Introduction 1 PART 1: The Area 4 PART 4: The Climax Plan 52 10 Little Lever Street 1:1 Historic Pattern 6 4:1 Vision 54 Manchester 1:2 Topography 12 4:2 Opportunities & Constraints 56 M1 1HR 1:3 Urban Form 14 4:3 Rebuilding Connections 60 1:4 Built Heritage 16 4:4 Knowledge Network 64 t. 0161 200 5500 1:5 Building and Townscape Quality 18 4:5 Climax Plan 66 f. 0161 237 3994 1:6 Building Heights 20 Civic Forum & LJMU City Campus 67 e. [email protected] 1:7 Townscape 22 Lime Street Station Approach 67 1:8 Character Areas 24 New Islington 68 1:9 The Regeneration Context 28 The Hospital 68 Liverpool University 69 PART 2: Activity 30 The Anglican Cathedral & Hope Street 70 2:1 Activity Generators 32 Falkner Square 71 2:2 Animation and Uses 34 2:3 Movement 36 PART 5: Implementation Plan 72 31 Blackfriars Road 2:4 Walking Routes 38 5:1 Taking forward the Climax Plan 74 Salford 2:5 Parking & Public Transport 40 5:2 Parking 76 Manchester 5:3 Starting with the Public Realm 78 M3 7AQ PART 3: Public Realm 42 5:4 Road Improvement Projects 82 3:1 Public Realm 44 5:5 Place Improvement Projects 84 5:6 Road Crossing Improvement Projects 86 with: Christopher Gibaud 3:2 Quality of the Public Realm 46 [email protected] 3:3 Open Spaces 48 3:4 Street Hierarchy 50 May 2008 Aerial photography: credit to Webb Aviation; all other photographs
    [Show full text]
  • Working Paper Manchester / Liverpool
    Shr ink ing Cit ies -------------------------------------------------------------------------------- MANCHESTER / LIVERPOOL II LIVERPOOL / MANCHESTER ARBEITSMATERIALIEN WORK ING PAPERS PABOCIE MATEPIALY ------------------------------------------------------------------------------------ MANCHESTER / LIVERPOOL MANCHESTER / LIVERPOOL II --------------------------------------------- March 2004 -------------------------------------------------------------------------------------------------------------- Shrinking Cities A project initiated by the Kulturstiftung des Bundes (Federal Cultural Foundation, Germany) in cooperation with the Gallery for Contemporary Art Leipzig, Bauhaus Foundation Dessau and the journal Archplus. Office Philipp Oswalt, Eisenacher Str. 74, D-10823 Berlin, P: +49 (0)30 81 82 19-11, F: +49 (0)30 81 82 19-12, II [email protected], www.shrinkingcities.com TABLE OF CONTENTS -------------------------------------------------------------------------------------------------------------- 3INTRODUCTION Philipp Misselwitz 5MAP OF THE M62 REGION 6STATISTICAL DATA: MANCHESTER / LIVERPOOL Ed Ferrari, Anke Hagemann, Peter Lee, Nora Müller and Jonathan Roberts M62 REGION 11 ABANDONMENT AS OPPORTUNITY Katherine Mumford and Anne Power 17 CHANGING HOUSING MARKETS AND URBAN REGENERATION: THE CASE OF THE M62 CORRIDOR Brendan Nevin, Peter Lee, Lisa Goodson, Alan Murie, Jenny Phillimore and Jonathan Roberts 22 CHANGING EMPLOYMENT GEOGRAPHY IN ENGLAND’S NORTH WEST Cecilia Wong, Mark Baker and Nick Gallent MANCHESTER 32 MANCHESTER CITY
    [Show full text]
  • Newton Court, Wavertree
    WAVERTREE TECHPARK LIVERPOOL NEWTON COURT WAVERTREE TECHPARK HOME EMAIL SAVE PRINT CLOSE HOME EMAIL SAVE PRINT CLOSE HOME EMAIL SAVE PRINT CLOSE WAVERTREE FLEXIBLE BUSINESS UNITS TO LET FROM 454 TO 1,989 SQ FT TECHPARK WAVERTREE TECHPARK HOME EMAIL SAVE PRINT CLOSE HOME EMAIL SAVE PRINT CLOSE HOME EMAIL SAVE PRINT CLOSE ALL UNITS HAVE WAVERTREE Self-contained P Ample parking available TECHPARK P Secure site via barrier system P Offices are well provided with natural light via extensive glazing Flexible business units Suitable for a number of uses subject to planning P PIGHUE LANE P WAVERTREECURRENT AVAILABILITY UNIT 3 UNIT 4 TECHPARKUNIT SQ M SQ FT UNIT 2 1E 121.6 1,309 DRYDEN ROAD P 4A 4A 1F 121.6 1,309 2G 3A 3B 4D 4B 4C 4E 4F 2ABC 175.4 1,888 2A 2D 2F 2E 2EFG 174.5 1,878 2B 2C NEWTON COURT 3A 179 1,928 3B 179.4 1,931 5C 5B 4A 84.7 912 HOME EMAIL SAVE 1FPRINT CLOSE 5E 4B 41 441 1D 1B 5F 5D 5A 1C 4C 43 463 5G 1E 1A 4D 189.6 2,041 UNIT 5 4E 48 516 UNIT 1 5A-G 534 5,751 HOME EMAIL SAVE PRINT CLOSE WAVERTREE ROAD RUTHERFORD CLOSE WAVERTREE BLVD HOME EMAIL SAVE PRINT CLOSE DRYDEN ROAD WAVERTREE AVENUE VENUE WAVERTREE A STEPHENSON WA Y WAVERTREE AY KINGSW TUNNEL TECHPARK BA A5049 TH ST TH T ROAD T LEEDS ST PRESCO ’S S CENTRAL D BUSINES AL DISTRICT ON GTON NEW ISLINGT KENSIN TO M62 MOTORWAY> ST CHU T STREET S RCHILL WA PRESCO ST OSW Y EDGE LANE H TITHEBARN LIVERPOOL WAVERTREE EDGE LANE LIVERPOOL SHOPPING PARK PEMBROKE PLACEUNIVERSITY HOSPITAL EDGE LANE LIVERPOOL MILL LA INNOVATION DALE ST PARK BINNS RD RIA ST LIME ST TECHPARK A5080 TO N LIME
    [Show full text]
  • Liverpool's Mayoral Development Zones
    LIVERPOOL’S MAYORAL DEVELOPMENT ZONES: Review of achievements 2012-2017 (February 2018 revised edition) Liverpool’s Mayoral Development Zones - R e v i e w | 1 2012-2016 Foreword On becoming Mayor of Liverpool in April 2012, I made a series of commitments which included creating 20,000 new jobs in the city. Making such a commitment at that time, whilst the country was in the middle of a crippling recession, coupled with a series of unprecedented government cuts being imposed on Liverpool, was always going to be a tall order. But Liverpool is a city that I passionately believe in. I have often said that the city’s best years are to come, and I truly believe that over the last four years we have proven what is possible to achieve against all the odds. Key to the success of this important commitment is how this City Council can work with other agencies and partners, pulling together the resources needed so that we create the opportunities to work with new and existing businesses, in turn helping them to grow and create those new jobs. To do this, over the last five years, the city has focussed its attention on five key Mayoral Development Zones and two Enterprise Zones, each chosen as areas with the most potential for generating employment, particularly for local people in adjacent residential areas where jobs are vitally needed. We have used our land resources, connections and partnerships to provide the sites, support and opportunities to attract businesses to invest in these zones. Since early 2012, over £2.45 billion worth of development within them has seen existing jobs safeguarded in new and refurbished offices, warehouses, industries, health facilities, schools and colleges.
    [Show full text]
  • Equity Costa Store List 2019 Live from 2Nd March 2019 Version 3.Xlsx
    Store Name Address Blackheath 41 Tranquil Vale London SE3 0BU Hempstead Valley Shopping Centre 2 Unit F11a, Hempstead Valley Shopping Centre Kent ME7 3PD Aberdeen - Academy Unit 15, The Academy Aberdeen AB10 1LB Aberdeen - Bon Accord Centre Bon Accord Shopping Centre Aberdeen AB25 1HZ Aberdeen - Union Square Mall Café Aberdeen AB11 5PS Aberdeen - Cults 2-3 The Courtyard Aberdeen AB15 9SD Aberdeen - Tesco, Rousay Drive Rousay Drive Aberdeen AB15 6XS Aberdeen, Westhill SC, 27 Unit 27, Westhill Shopping Centre Aberdeen AB32 6RL Debenhams Aberdeen Debenhams, Unit 7 Aberdeen AB11 6BE Aberdeen, Next, Berryden Rd, 4 NEXT, Unit 4, Berryden Road Aberdeen AB25 3SG Aberdeen, Abbotswell Rd, DT Drive Thru Aberdeen AB12 3AD Aberdeen Bridge of Don DT Drive Thru, Bridge of Don Retail Park Aberdeen AB23 8JW Aberdeen, Marischal Sq Unit 1a, Marischal Square Aberdeen AB10 1BL Abergavenny, Head of the Valleys DT Westgate Abergavenny NP7 9LL Abergavenny 11 High Street Abergavenny NP7 5RY Aberystwth 5 Great Darkgate Street Aberystwth SY23 1DE Aberystwyth Parc Y Llyn RP, Next Costa Coffee, NEXT, Parc Y Llyn Retail Park Aberystwyth SY23 3TL Milton, Milton Gate 2, DT Drive Thru, 2 Milton Gate Abingdon OX14 4TX Accrington Unit 6 Broadway Accrington BB5 1EY Alderley Edge 24 London Road Alderley Edge SK9 7DZ Aldershot 49-51 Union Street Aldershot GU11 1EP Alnwick 69-71 Bondgate Within Alnwick NE66 1HZ Altrincham - George Street Unit SU207 Altrincham WA14 1RJ Timperley Paul House Altrincham WA15 7UG Hale Barns Unit 5, The Square Altrincham WA15 8ST Amersham 35-37 Sycamore
    [Show full text]