Intelligent Transport Systems in Malta Progress Report August 2014 In
Total Page:16
File Type:pdf, Size:1020Kb
Intelligent Transport Systems in Malta Progress Report August 2014 In Accordance with Article 17(3) of Directive 2010/40/EU MEMBER STATE Malta NAME OF ORGANISATION Transport Malta National Transport Authority and National TYPE OF ORGANISATION Transport Regulator Mr. Peter Paul Barbara National Coordinator CONTACT PERSON Malta National Electromobility Platform and Intelligent Transport Systems MNEP - TM Email: [email protected] Tel: +356 2560 8208 ii Contents Executive Summary ............................................................................................................................ 1 1.0 Introduction and Background ............................................................................................. 5 1.1. Transport in Malta.................................................................................................................... 5 1.1.1 Traffic Growth .............................................................................................. 5 1.1.2 Road Safety.................................................................................................... 7 1.1.3 Public Passenger Transport......................................................................... 8 1.1.4 National Policy on Safe and Sustainable mobility ................................... 10 1.2. Transport Malta ...................................................................................................................... 11 1.3. The ITS Action Plan .............................................................................................................. 12 2.0 Current Status of ITS in Malta .......................................................................................... 14 2.1. Controlled Vehicular Access (CVA) .................................................................................... 15 2.1.1 ITS Deployment and the CVA .................................................................... 15 3.0 Public Transport .................................................................................................................. 16 3.1. ITS Deployment in Public Transport .................................................................................... 16 3.2. Battery Electric Vehicles (BEVs)- Setting up the pace ....................................................... 17 3.2.1. ITS Deployment in the PORT-PVE and Demo-EV Projects .................... 18 3.3. ITS Enabled Public Taxi and Monitoring System (PTM) ................................................... 19 3.3.1. ITS Deployment in the PTM System .......................................................... 19 3.4. Speed Camera Network ......................................................................................................... 20 3.4.1 ITS Deployment - A Speed Camera network ............................................. 20 4.0 Legal and Technical Framework ....................................................................................... 20 4.1. Legal ITS Framework ............................................................................................................ 20 4.2. Technical Framework ............................................................................................................ 21 5.0 Funding .................................................................................................................................. 22 5.1. Action Area 1: Optimal use of road, traffic and travel data ................................................ 23 5.2. Action Area 2: Continuity of Traffic and Freight Management ITS Services on European Transport Corridors and in Conurbations ......................................................................... 29 5.3. Action Area 3: Road Safety and Security............................................................................. 33 5.4. Action Area 4: Integration of the vehicle into the transport infrastructure ........................ 36 5.5. Action Area 5: Data security and protection, and liability issues ....................................... 38 5.6. Action Area 6: European ITS cooperation and coordination .............................................. 39 6.0 Current Status of ITS Deployment ................................................................................... 40 6.1. MODUS – Encouraging Modal Shift in Land Transportation ............................................ 41 7.0 Future Implementation extension and expansion of the UTMC ......................................... 44 8.0 Additional Developments From 2013 - 2015 .................................................................... 45 8.1. Vehicle Activated Signs – Deployment of VASs Nationwide............................................ 45 8.2. Procurement of the First Phase ............................................................................................. 47 8.3. Geographic Information System (GIS) ................................................................................. 50 9.0 Updated Information on National ITS Actions 2014 ..................................................... 54 iii 10.0 UPDATES ON THE Priority Areas For Action And Related Measures .................... 63 Action Area 1: Optimal use of road, traffic and travel data .............................................................. 63 Action Area 2: Continuity of Traffic and Freight Management ITS Services on European Transport Corridors and in Conurbations .......................................................................................... 64 Action Area 3: Road safety and security............................................................................................ 66 Action Area 4: Integration of the vehicle into the transport infrastructure ...................................... 67 Action Area 5: Data security and protection, and liability issues .................................................... 68 Action Area 6: European ITS cooperation and coordination............................................................ 69 11.0 Annexes .................................................................................................................................. 70 iv Table of Figures Figure 1: Share of Car as % age of all trips ......................................................................................... 6 Figure 2: Motorisation (cars/1000 persons) ......................................................................................... 6 Figure 3: Map of Malta - Trans European Network at 2011 .............................................................. 7 Figure 4: Total Road Fatalities that took place between 2000 and 2014 ........................................... 8 Figure 5: Malta Bus Patronage 1990 - 2014 ........................................................................................ 9 Figure 6: Modal Split for Trips ending in Valletta in 1998 and 2010 .............................................. 11 Figure 7: Committed Expenditure 2013 - 2018 ................................................................................. 23 Figure 8: Planned ITS Information Services ..................................................................................... 27 Figure 9: ITS Components for Incident Measures ............................................................................ 32 Figure 10: Traffic Control Centre and Sub-Systems ......................................................................... 41 Figure 11: Estimated ITS Capital Investment 2016 - 2018 .............................................................. 45 v BLANK PAGE vi EXECUTIVE SUMMARY This report is submitted by Transport Malta in accordance with Paragraph 3 of Article 17 of Directive 2010/40/EU which requires Member States to submit to the European Commission by 27th August 2014, following the Initial Report, the five year for ITS Deployment in the form of a National Action Plan and a report every three years on the progress made in the deployment of the respective actions referred to in Article 17(1). This report is therefore based on the deployment of Intelligent Transport System (ITS) as indicated in the National ITS Action Plan for Malta. The information in this report is to be considered as guidance and is provided by Transport Malta on an ‘as is’ basis and commitment for such deployment depends on the availability of funds to the Transport Authority in Malta. The respective National Action and this updated report is a synthesis of how Transport Malta intends to roll out Malta’s first major ITS deployment over the coming years which is split in two phases and spanning over an eight year time frame. The first phase was initiated in 2013 and is set to be completed by 2017 while the second phase will be carried out in the following three years, from 2018 to 2020. This document is an updated version of the ITS Action Plan first submitted in 2012 for reporting purpose n line with the ITS Framework Directive, 2010/40/EU. It is to be noted however that since the submission of the First Action Plan, few developments has been recorded as far as ITS deployment is concerned. This report includes updated data and revised timeframes as far as implementation of the ITS Action Plan for Malta is concerned. In the meantime it is to be noted that this Action Plan is being continuously updated to reflect any changes in the plan including any additional ITS deployment. The implementation of this action plan is being carried out at a time when the focus of national transport policy