jW.ry.1ltr*!r;r,.;i*# "'&t?i' EIOAII,D :ffi POLLTITION CONTIIOL :4.,Piffi, BII{AR STATE -&W':W W Pariwestr Bhawan, Patliputra IndutriatArea, P'O'-Sadakat Asl.ram' --8OOO10 E PABX-O 6L2'2267,2sO I 226.226s, Fax-O6 1 2-22 6 1os; _ Ref. No. a, d ate d

From I Alok Kumar, Member SecretarY,

The Member SecretarY,. _ Central Pollution Control Board, Parivesh Bhawan, East Arjun Nagar, Delhi-110032. Sub:-Submission of monthly progress report for the month of June, 2O2O by State as per orders of the Hon'ble NGT dated- O6.L2.2O19 in O.A. No.673l2018. sir' Please find herewith the monthly progress report for the month of June, ZAZO in compliance with the order of the Hon'ble NGT dated- 06.12.2019 in O.A. Nci.OlZl2O18 for needful action.

You rs faithfu IIY, Encl : As above. I sd/- (Alok Kumar) Member SecretarY. Patnts, dated-&fu Memo N o,pr'-,'gg3\ b,2+ ry",\'1 copy Sri D.P. Mathuri a , Executive Director (Tech.), National Mission for Stadium/ Clea n MCG), Fi rst Flo or , Major DhYa n Cha d National Delhi- 110002 for information and necessa q-b g {" I 1?

ok Kumar) Mem ber Secreta rY. National Mission for Clean Ganga

Format for Submission of Monthly Progress Report by States/UTs

(Hon'ble NGT in the matter of OA No. 673/2018 dated 06.12.2019)

Sl. Activity to be Timeline Submission of Progress by State/UT- No. monitored Compliance Status 1. Ensure 100% 31.03.2020 In-situ treatment facilities (bio- treatment of sewage remediation) has been provided at at least in-situ Cant. Drain & Rajapur drain at Patna. remediation commencement of 31.03.2020 Presently, there is no sewerage network & setting up of STPs STP (except Patna) for sewage and connecting all the management along the Ganga River. Out of drains and other 34 projects on 23 Ganga front towns, 03 sources of generation relate with setting up of STP, 05 relate with of sewage to the STPs Sewerage Network alone, 07 relate with must be ensured Sewerage Network with STP and 19 relate with I&D and STP. The works related with setting up of STP of Karmalichak has been completed and STP of Beur is also almost completed (99%) whereas, other projects are to be completed by different dates. The total 34 projects on Ganga front towns include 17 ongoing projects, 09 under tendering process, 01 tender to be floated and 07 proposed projects. Out of the 06 polluted rivers stretches (Ganga, , Ramrekha, Harbaura, Parmar and Sirsiya), projects related with Ganga front towns including (Ganga & ) are under execution and DPR for remaining 04 proposed projects related with other polluted river stretches are under preparation by NEERI, Nagpur. Initiatives also have been taken for I&D and STP at 15 selected different towns on tributaries of the river Ganga. They are to be completed by June, 2021. Screening arrangements have been provided in a total no. of 125 drains along the Ganga front towns. UD&HD, GoB has invited tender for selection of agency for In-situ treatment through bio-remediation of drains joining

1

Ganga and other polluted rivers vide Notice Inviting Tender (NIT) dated-18.06.2020. 2. Timeline for 31.03.2021 Status of sewage management w.r.t. completing all steps setting up of STP, I&D and sewerage of action plans network is annexed as Annexure-3(a), including completion 3(b) & 3(c) of setting up STPs and their commissioning. 3. Chief Secretaries may 22.01.2020 Regular review meetings are conducted set up appropriate under the chairmanship of the Chief monitoring Secretary, to ensure the compliances mechanism at State of orders of the Hon'ble NGT on different level environmental issues including orders in Specifying O.A. No. 606/2018, 673/2018 etc. Last accountability of meeting was held on 18.06.2020. nodal authorities not below the Secretary level. Chief Secretaries may have an accountable person attached in their office for this purpose. Monitoring at State Fortnightly Being complied. level must take place Commencing 21.12.2019 4. Progress report may Monthly Being complied. be furnished by the (preferably States/UTs to before 20th of Secretary, Ministry every month) of Jal Shakti. Member Secretary, CPCB. 5. Progress Report may be comprised of details along with completion timelines on: (i) Identification Complied Details of polluting sources: of polluting a. Industrial pollution along polluted river sources stretches is annexed as Annexure-1.

2

including Complied b. Details of drains contributing river drains pollution is annexed as Annexure-2. contributing to river March, 2020 c. In-situ treatment facilities (bio- pollution and remediation) has been provided at action as per Danapur Cant. Drain & Rajapur drain at NGT order on Patna. in-situ d. UD&HD, GoB has invited tender for treatment selection of agency for In-situ treatment through bio-remediation of drains joining Ganga and other polluted rivers vide Notice Inviting Tender (NIT) dated- 18.06.2020. (ii) Status of Status of sewage management w.r.t. STPs, I&D setting up of STP, I&D and sewerage and sewerage network is annexed as Annexure-3(a), networks 3(b) & 3(c). Details of Existing Infrastructure, Gap Analysis, Proposed along with completion timeline (iii) Status of March, 2020 Ganga River: The State is contemplating CETPs to have CETPs for the industrial areas: Details of Fatuha (02 MLD) in Patna; Barari (01 MLD) Existing CETP in Bhagalpur; (06 MLD) in Vaishali and ETP and Bela (05 MLD) in Muzaffarpur). Infrastructure, Environmental Clearance (EC) has been Gap Analysis, accorded by SEIAA for aforesaid proposed Proposed CETPs in Bihar. Tenders have been invited along with many times but no responsive bids have completion been obtained. timeline, No. Harbaura (Sikrahna) River, Sirsiya of industries River, Parmar River, Ramrekha River and complying and Punpun River: There are no status Industrial Cluster/Area/Estate in the polluted river stretches other than that on , hence no requirement for setting up of CETP in the area. Individual industries located in the catchment areas have separate ETP.

3

(iv) Status of Solid  Status of Solid Waste Management & Waste Details of Processing Facilities is Management annexed as Annexure-4. & Details of Processing Facilities Details of Existing Infrastructure, Gap Analysis, Proposed along with completion timeline (v) Latest water  Latest water quality of polluted river quality of and its tributaries for the month April & polluted river, May 2020 is annexed as Annexure-5. its tributaries,  Drains with flow details are annexed as drains with Annexure-2. flow details  Ground water quality for the month of and ground June 2020 in the catchment of polluted water quality river is annexed as Annexure-6. in the catchment of polluted river; (vi) Preventing  ULBs have been directed to ensure the dumping of compliance of provisions of the Solid waste and Waste Management Rules, 2016 scientific including restriction on disposal of solid waste waste along water bodies. management  There are four Bio-Medical Waste including bio- treatment Facility and three captive medical treatment facility with a total capacity of wastes, plastic 33600 Kg/day under operation in the wastes and State. decentralizing  In addition to these two more common waste facilities are proposed to be established processing, at Bhojpur and Madhepura. including  Board is ensuring management of BMW waste in accordance with the provisions of the generated Bio-Medical Waste Management Rules, from hotels, 2016. ashrams, etc. (vii) Ground water has initiated drives for regulation recharging of ground water by providing

4

roof top rain water harvesting structures and construction of soak pits/recharge pits near public well, hand pump, tube well and other water bodies under Jal-Jeevan- Hariyali Abhiyan. Bihar Govt. has also notified The Bihar Ground Water (Regulation & Control of Development & Management) Act, 2006 for regulating and management of ground water. The authority may impose stipulated conditions for providing roof top rain water harvesting structures in the building plan in an area of the 1000 Sqm or more while according approval for construction. (viii) Adopting good In order to enhance water use efficiency in irrigation water intensive crop, assistance is given practices, for promotion of water saving tools/ technologies like sprinkler and drip irrigation, creation of farm ponds, efficient delivery and distribution system and adoption of agronomic practices like alternate row/ furrow irrigation, mulching, etc. Pradhan Mantri Krishi Sinchai Yojana also focuses on creating protective irrigation by harnessing rain water at micro level through 'Jal Sanchay' and 'Jal Sinchan' to insure 'Per Drop More Crop'. The state is implementing Pradhan Mantri Krishi Sinchai Yojana (Per Drop More Crop) for development of Micro Irrigation in Bihar during the year 2018- 19 with the cost of Rs 133.00 Crore by providing 90% subsidy to all categories of Farmers under Drip Irrigation and 75% Subsidy to all categories of farmers under Sprinkler Irrigation. State Govt. is also implementing community Tube well Scheme for benefit of small and marginal farmers with 100 % subsidy to provide water source for installation of Drip Irrigation System under the State Plan. As Horticultural and Commercial crops like Sugarcane require heavy water during summer season, Drip Irrigation is highly beneficial because about 60% of

5

conventional Irrigation water is saved under this system. The productivity of the crops under this system increases by about 25-30 % while cost of production decreases 30-35% in comparison to Conventional Irrigation System. (ix) Protection and Considering densely populated northern management plain terrain and mostly embanked river, of Flood Plain the issue of demarcation of flood plain Zones (FPZ), zone/buffer zone is not applicable in case of Bihar. State Govt. is contemplating to approach the Hon'ble NGT in this regard. (x) Rain water  To ensure initiatives of drives for harvesting, recharging of ground water by providing roof top rain water harvesting structures and construction of soak pits/recharge pits near public well, hand pump, tubewell and other water bodies under Jal-Jeevan-Hariyali Abhiyan.  Imposion of condition for providing roof top rain water harvesting structures in the building plan in an area of the 1000 Sqm or more while according approval for construction. (xi) Maintaining There is no control structure on Ganga and minimum other polluted river stretches and such environmental maintenance of e-flow is not applicable. flow of river (xii) Plantation on In view of the point no. 5(ix) above, State both sides of has certain limitation. However, a team of the river Department of Environment, Forest & (xiii) Setting up Climate Change, Govt. of Bihar official biodiversity visited Yamuna bio-diversity park in Delhi parks on flood and exploring its replication in the State. plains by removing encroachment

6

7

Annexure-1

Industrial Pollution along Polluted River Stretches:

1. Ganga River:

Bihar State Pollution Control Board has identified 57 Grossly Polluting Industries in the Ganga basin in Bihar. The major operational industries located on the banks of the River Ganga in Bihar stretch are M/s Super Thermal Power Station, NTPC, Barh, Dist.-Patna; M/s Kahalgaon Super Thermal Power Station (KhSTPS), NTPC, Kahalgaon, Dist.-Bhagalpur; M/s Barauni Oil Refinery, IOC Ltd. Barauni, Dist.-Begusarai; Barauni Thermal Power Station (BTPS), Begusarai; M/s Indian Tobacco Company Ltd., Dist.- Munger. There is no any discharge from aforesaid units into the Ganga river. ETPs have been installed in all operating industries.Online Continuous Effluent Monitoring System has been installed. Regular inspection is carried on to ensure the compliances ETPs have been installed in all operating industries.Online Continuous Effluent Monitoring System has been installed. Regular inspection is carried on to ensure the compliances.

2. Harbaura (Sikrahna) River:

Bihar State Pollution Control Board has identified 02 Grossly Polluting Industries in the Harbaura river in Bihar. The major operational industries located on the banks of the River Habaura in Bihar stretch are M/s New Swadeshi Sugar Mills & M/s New Swadeshi Sugar Mills, (Distillery Division), Narkatiaganj, Dist.-West Champaran. There is no any discharge from aforesaid units into the Harbaura River. ETPs have been installed in all operating industries. Online Continuous Effluent Monitoring System has also been installed. Regular inspection is being carried on to ensure the compliances. 3. Sirsiya River: There is no any water polluting or grossly polluting industry on the banks of Sirsiya River in Indian Territory. There is also no industrial cluster /area/estate in this polluted river stretch. 4. Parmar River: There is no any water polluting or grossly polluting industry on the banks of Parmar River in Indian Territory. There is also no industrial cluster /area/estate in this polluted river stretch. 5. Ramrekha River: Bihar State Pollution Control Board has identified 02 Grossly Polluting Industries in the Ramrekha river in Bihar. The major operational industries located on the banks of the River Ramrekha in Bihar stretch are M/s Harinagar Sugar Mills Ltd., Harinagar, Dist.- West Champaran & M/s

8

Harinagar Sugar Mills Ltd., (Distillery Division) Harinagar, Dist.-West Champaran. There is no discharge from aforesaid units into the Ramrekha river. ETPs have been installed in all operating industries. Online Continuous Effluent Monitoring System has also been installed. Regular inspection is being carried on to ensure the compliances. 6. Punpun River: Bihar State Pollution Control Board has identified 04 Grossly Polluting Industries in the Punpun basin in Bihar. The major operational industries located on the banks of the River Punpun in Bihar stretch are M/s Smirity Paper Mills Pvt. Ltd., Mahuli Road, Chitauna, Kothia, , Dist.- Patna, M/s Indira Paper Mill Pvt. Ltd., Mohuli Road, Mathpar, Begumpur, Didarganj, Patna, M/s Mateshwari Paper Mills Pvt. Ltd., Mahauli Road, Karmalichak, Didarganj, Patna and M/s Patna Paper Mill Pvt. Ltd ., Mahauli, Kothiya, Patna. ETPs have been installed in all operating industries.Online Continuous Effluent Monitoring System has been installed. Regular inspection is carried on to ensure the compliances. There is also no industrial cluster/area/estate in this polluted river stretch.

9

Annexure-2

Details of drains contributing river pollution:

1. Ganga River: A total number of 42 drains having flow > 01 MLD discharging into river Ganga with total discharge/flow of 778 MLD have been identified in Bihar stretch. The details of the drains with its flow, pollution load and quality are hereunder:- Details of drains having flow >01 MLD discharging into River Ganga SN Catchment Name of Standing Flow BOD Pollution Catchment Traceable Leanth of Area drain / (MLD) (mg Sources Area Length of Sampling

Flowing /l) (Domestic/ (Sq. Km) Drain in point from Industrial/ km confluence

Mixed) approx. point in KM Recipient approx. 1 ChhotiSaripu Flowing 5.87 26 Domestic Civil Lines, Syndicate 0.2 0.03 Ganga r Drain Colony, River MathiyaMohalla, Saripur

2 Buxar Hospital Flowing 3.82 36 Domestic Ward No. 22, 23, 24 0.15 0.03 Ganga Road Drain River

3 Buxar Sati Ghat Flowing 6.29 72 Domestic Ward No. 13, 24, 25, 0.25 0.05 Ganga Drain Tetari Bazar, River MunimChowk

4 Buxar Bangla Ghat Flowing 1.80 70 Domestic Ward No. 6 0.3 0.05 Ganga Drain River

5 Buxar Tadka Drain Flowing 8.23 74 Domestic Ward No. 13, 14, 24, 0.5 0.05 Ganga 25, 26, 28, 29, 32 River

6 Buxar Nath Baba Flowing 4.23 15 Domestic Ward No. 1, 2, 3 1.6 0.05 Ganga Mandir Drain River

7 Buxar Sohnipatti Flowing 1.31 15 Domestic Ward No. 20, 33 0.5 0.03 Ganga Drain River

8 Maner Maner Bazar Flowing 3.55 140 Domestic Ward No.- 1,4,5,6,7 5 4 Ganga Drain, River Infront of Machhli Market, Maner, Patna

9 Danapur, Danapur Flowing 8.16 24 Domestic Danapur, Sadar 4 0.117 Ganga Patna Cant. Drain Bazar, Bibiganj, River LalKothi, Ramnagar Colony, Sultanput, Yadav Colony, Cefence Colony, Mubarakpur,Kachra Colony, Judge Colony,

10

Details of drains having flow >01 MLD discharging into River Ganga SN Catchment Name of Standing Flow BOD Pollution Catchment Traceable Leanth of Area drain / (MLD) (mg Sources Area Length of Sampling

Flowing /l) (Domestic/ (Sq. Km) Drain in point from Industrial/ km confluence

Mixed) approx. point in KM Recipient approx. Ramkrishnapuram, Bank Colony, Hathikhana, Lodipur, Sikandarpur, Urja Nagar, Tarachak,

10 Dighwara BeerpurBhua Flowing 1.15 80 Domestic Ward No.- 7,8,9 and 1.0 KM 0.08 KM Ganga l NH-19 10, Shankarpur, Main approx. approx. River Drain, market Dighwara

11 Patna DighaGhat Flowing 134.00 23 Domestic Digha, Ramjaipal 9.5 0.485 Ganga Drain (Canal) Nagar, Vastu Ganga River Colony, IAS Colony, Adampur, Jai Ram Bazar, Vrindavan Colony, Maulana Azad Nagar, Bochachak, Taj Nagar, Jalalpur, NavneetVihar, AdarshVihar Colony, Ved Nagar, MirdulaVihar, Rukanpura, BashantVihar, NTPC Phase- 2, Yadav Colony, SBI(old) Colony, MaaliTola, Railway Colony.

12 Patna Kurji Drain Flowing 65.00 34 Domestic Rajiv Nagar, 5.34 1.82 Ganga JaiprakashNigar, A.G. River Colony, CDA Colony, North Patel Nagar, Indrapuri, Patliputra Colony, PatnliputraInudstrial Area, Kurji, Shivaji Nagar, Balupur.

13 Patna RajapurPul Flowing 128.00 16 Domestic , 3.5 4.34 Ganga Drain Shastrinagar, River NandGaon, Rajbanshi Nagar, R. Block, Rajbhawan, Sanjay Gandhi JaivikUdyan, Board Colony, Professor's Colony, Adarsh Colony, Shivpuri, Mahesh Nagar, West Ananadpuri, LIC Colony, Basant Bihar Colony, Indra Nagar, RajapurMainpura, Dujra, Gandhi Nagar, GosaiTola, LIC Ghat, Anandpuri, Nehru Nagar, , S.K. Puri.

11

Details of drains having flow >01 MLD discharging into River Ganga SN Catchment Name of Standing Flow BOD Pollution Catchment Traceable Leanth of Area drain / (MLD) (mg Sources Area Length of Sampling

Flowing /l) (Domestic/ (Sq. Km) Drain in point from Industrial/ km confluence

Mixed) approx. point in KM Recipient approx. 14 Patna Mandiri Flowing 148.00 54 Domestic GPO, S.K. Nagar, East 2.44 3.12 Ganga (Bans Ghat) Budha Colony, River Drain Harding Park, , Rajapur, Lodipur, Area, Mohamadpur (Chainpura), Budhmard, Patna Jn., Harding Road, S.P. Verma Road.

15 Patna Anta Ghat Flowing 43 75 Domestic , 1.7 1.36 Ganga Drain Frazer Road, River Exhibition Road, LaljiTola, SalimpurAhra, Dujra, Bakarganj, Pirmohani, Daldali, Lohanipur, Lohanipur West, Sabjibagh, Civil Court, KadamKuhan, Antaghat.

16 Patna Krishna Ghat Flowing Pump 80 Domestic Not Same Ganga Drain House Area, SudhiTola, traceable location River Science College, NIT as it is a Patna, Thathari undergro Bazar, NayaTola, und drain. Bhikhnapahari, ChakMusallahpur, Musallahpur Hat, Sharif Colony, Ramna Road, LalBagh, Annie Besant Road, B.M. Das Road, MakhaniaKuhan, Mehandru.

17 Patna MittanGhat Flowing 48.00 90 Domestic Khatri Path, 0.547 Sampling Ganga Drain MittanGhat Path, and River Guzri Bazar, confluence Manas Path. point are same

18 Fatuha, Makshudpur Flowing 1.10 46 Domestic BindeshwariGhat 0.024 - Ganga Patna Drain (West River of Bindheshwar iGhat)

19 Fatuha, DevantiGhat Flowing 2.30 19 Domestic SonakothiMohallah 0.013 - Ganga Patna River

20 Fatuha, MastanaGha Flowing 1.14 42 Domestic - 0.014 - Ganga Patna t River

12

Details of drains having flow >01 MLD discharging into River Ganga SN Catchment Name of Standing Flow BOD Pollution Catchment Traceable Leanth of Area drain / (MLD) (mg Sources Area Length of Sampling

Flowing /l) (Domestic/ (Sq. Km) Drain in point from Industrial/ km confluence

Mixed) approx. point in KM Recipient approx. 21 Bakhtiyarp Raghopur- Flowing 4.30 36 Domestic Ganga ur, Patna Dagar Drain River

22 Barh, Patna Gauri Flowing 1.09 42 Domestic 13(P) & 14(P) - - Ganga Shankar River Ghat, Barh

23 Tapashwai Flowing 6.02 20 Domestic Ward No.-1 & 10 3.8 0.025 Ganga Ghat, River Mokama

24 Munger LalDrawaza Flowing 21.50 14 Domestic Munger Town 0.004 Sampling Ganga Drain and River confluence point are same.

25 Sultanganj Masjid ghat Flowing 1.70 14 Domestic Sultanganj Town 0.014 Sampling Ganga Drain and River confluence point are same.

26 Bhagalpur Adampur Flowing 18.91 15 Domestic Budhanath Park, 0.5 0.15 Ganga Drain Budhanath Baba River Madir, Adampur

27 Bhagalpur Hathiya Flowing 7.54 9 Domestic Mustafapur, 0.5 0.05 Ganga Drain near Hanuman Ghat, Sant River intake well Nagar, Mayaganj

28 Bhagalpur Surkhikal Flowing 13.10 32 Domestic BadiKhanjarpur, 0.5 0.1 Ganga Drain MaharajGhat, River Surkhikal, Tilakamanjhi

29 Bhagalpur SakhichandD Flowing 12.69 10 Domestic Makhajan, Tiger 0.4 0.1 Ganga rain Market, River BudhanathRoad

30 Bhagalpur BarariGhat Flowing 6.61 17 Domestic Railway Colony, 2 0.05 Ganga Drain, near Barari State Housing River Vikramshila Board Colony Bridge, Bhagalpur

31 Bhagalpur Neel Flowing 1.91 20 Domestic MadhukarChak, 0.7 0.05 Ganga KothiGhat Parmanandpur River Drain, Bhagalpur

32 Bhagalpur PipalliDham Flowing 1.49 10 Domestic Moorgi Pharm, 0.5 0.05 Ganga Drain-II, RoopVihar Colony River Bhagalpur

13

Details of drains having flow >01 MLD discharging into River Ganga SN Catchment Name of Standing Flow BOD Pollution Catchment Traceable Leanth of Area drain / (MLD) (mg Sources Area Length of Sampling

Flowing /l) (Domestic/ (Sq. Km) Drain in point from Industrial/ km confluence

Mixed) approx. point in KM Recipient approx. 33 Bhagalpur KuppaGhat Flowing 4.43 8 Domestic MaharshiMehi 0.6 0.05 Ganga Drain Ashram, Mustafapur, River Mayaganj

34 Bhagalpur KoylaGhat Flowing 7.63 125 Domestic ChhotiKhanjarpur, 0.5 0.1 Ganga KoylaGhat, River Kachahari, Faris Lane Road, Ward No. 22, 25

35 Bhagalpur HathiyaNala, Flowing 22.66 145 Domestic TilkaManjhi 1 0.3 Ganga Near University, River Tilkamnajhi MaharajGhat, Naya University Bazaar, ParbattiMohalla, Tatarpur, VikramshilaMohalla, Urdu Bazar, ChunihariTola

36 Bhagalpur STP Drain, Flowing 1.77 130 Domestic SahebganjMohalla 0.8 0.4 Ganga Bhagalpur River

37 Bhagalpur SahebganjMi Flowing 4.51 32 Domestic Karngarh, Sahebganj 0.8 0.4 Ganga yabari Drain River

38 Bhagalpur ChampaNala Flowing 11.57 95 Domestic Champa Nagar, Nath 0.5 0.3 Ganga -1 Nagar River

39 Bhagalpur ChampaNala Flowing 8.38 42 Domestic Nath Nagar, Medini 0.8 0.1 Ganga -2 Nagar River

40 Kahalgaon Kagji Drain Flowing 2.23 38 Domestic Thana Road, Kulkulia 1.0 km - Ganga Road River

41 Kahalgaon AshmashanG Flowing 1.60 15 Domestic Kazipura, 1.0 km 0.08 KM Ganga hat Drain Paithanpura River

42 Kahalgaon Pampu Drain Flowing 1.40 24 Domestic Station Chawk, Basti 1.5 km 0.016 KM Ganga River

Total 777.99

2. Harbaura (Sikrahna) River: There are three (3) drains (near power grid of sugar mill, near Dhumnagar mandir and near Hardia) in Narkatiaganj town through which domestic waste water is discharge to Harbaura River. The total sewage/waste water discharges through aforesaid drains have been assessed to 14.59 MLD. The details of the drains are hereunder:-

14

Sl. Name of drain Average Recipient Sewage/waste flow water Quality No. (MLD)

1. Domestic Waste 6.736 Harbaura River pH: 6.59 Water/Sewage drain, passing near BOD: 22 mg/L power grid of Sugar COD: 80 mg/L Mill TSS: 53 mg/L

2. Dhum Nagar 4.215 Harbaura River pH: 6.59 Mandir drain BOD: 38 mg/L

COD: 148 mg/L

TSS: 78 mg/L

3. Nehar drain, Near 3.640 Low Lying Area and pH: 6.62 Hardiya Found Dry after 3.5 KM BOD: 24 mg/L COD: 84 mg/L

TSS: 26 mg/L

Total 14.591

3. Sirsiya River: There are three (3) drains (at Naga Road, at Chhatiaya Ghat and near Custom Check Post Bridge) in Raxaul town through which domestic waste water is discharge to Sirsiya River. The total sewage/waste water discharges through aforesaid drains have been assessed to 14.89 MLD. The details of the drains are hereunder:-

Sl. Name of drain Average Recipient Sewage/waste flow (MLD) water Quality No.

1. Drain at Naga Road, 6.03 Sirsiya River pH: 7.04 Shivpuri Mohalla, Raxaul BOD: 62 mg/L

COD:232 mg/L

TSS: 38 mg/L

2. Drain at Chhatiaya Ghat, 3.1 Sirsiya pH: 7.25 near Railway Bridge,

15

Raxaul River BOD: 9 mg/L

COD: 44 mg/L

TSS: 36 mg/L

3 Drain near Custom Check 5.76 Sirsiya pH: 7.31 Post Bridge, Raxaul River BOD: 16 mg/L

COD: 60 mg/L

TSS: 38 mg/L

Total 14.89

4. Parmar River:

There are four (4) drains namely Khajurbari Drain, Ward No.6, Haji Mohalla Drain, Idgah Chowk Drain, Isalmpur Drain, Ward No.-17.The aforesaid drains disperse in low lying area. The total sewage/waste water discharge through aforesaid drains has been assessed to 5.559 MLD. There is no sewerage network & STP for sewage management at Jogbani Nagar Panchayat area. The details of the drains are hereunder:- Sl. Name of drain Average Recipient Sewage/waste No. flow water Quality (MLD) 1. Khajurbari Drain, 2.96 Low lying area pH: 7.32 Ward No.6 BOD: 88 mg/L COD: 264 mg/L TSS: 118 mg/L 2. Haji Mohalla Drain 0.50 Low lying area pH: 7.20 BOD: 36 mg/L COD: 124 mg/L TSS: 82 mg/L 3. Idgah Chowk Drain 0.704 Low lying area pH: 7.42 BOD: 50 mg/L COD: 168 mg/L TSS: 74 mg/L 4 Isalmpur Drain, Ward 1.395 Low lying area pH: 7.28 No.-17 BOD: 70 mg/L COD: 212 mg/L TSS: 92 mg/L Total 5.559

5. Ramrekha River:

There are five (5) drains (atNagar Panchyat Road, near DhangalToli, at Kathawa Pull, at Railly Bazar and near Mill Quarter) in Ramnagarblock through which domestic waste water is discharge to Ramrekha River. The total 16 sewage/waste water discharges through aforesaid drains have been assessed to 27.88 MLD. The details of the drains are hereunder:-

Sl. Name of drain Average Recipient Sewage/waste water flow (MLD) Quality No.

1. Mukhya Bazar, Near Fish 10.743 Ramrekha pH: 6.08 Market, Nagar Panchyat Road, River BOD: 115 mg/L

COD: 372 mg/L

TSS: 54 mg/L

2. ChatiyaGhat Drain West, 11.721 Ramrekha pH: 6.34 DhangalToli, River BOD: 135 mg/L

COD: 520 mg/L

TSS: 60 mg/L

3. ChatiyaGhat Drain East, 1.065 Ramrekha pH: 6.69 Kathawa Pull, River BOD: 42 mg/L

COD: 160 mg/L

TSS: 116 mg/L

4. Railly Bazar Drain, 0.892 Ramrekha pH: 5.63 River BOD: 28 mg/L

COD: 108 mg/L

TSS: 22 mg/L

5. Mill Quarter Drain, Pachurkha 3.464 Ramrekha pH: 6.81 River BOD: 24 mg/L

COD: 108 mg/L

TSS: 46 mg/L

Total 27.885

17

6. Punpun River: There are two (2) drains Bakipur Gorakh Drainand Badshahi Drain (Badshahi Drain coming from Patna) in Fatuha town through which domestic waste water is discharge to Punpun River. The total sewage/waste water discharges through aforesaid drains have been assessed to64.95 MLD. The details of the drains are hereunder:-

Sl. Name of drain Average Recipient Sewage/waste flow (MLD) water Quality No.

1. BakipurGorakh Drain 2.95 Punpun pH: 6.41 River BOD: 85 mg/L

COD: 268 mg/L

TSS: 54 mg/L

2. Badshahi Drain 62 Punpun pH: 7.67 River BOD:38 mg/L

COD:124 mg/L

TSS:26 mg/L

Total 64.95

18

Annexure-3(a)

19

20

21

Annexure-3 (b)

Status of STPs and Its Timelines Amendment Project completion Total Cost S.No Action Point Terms Action Taken in timeline, date as per plan in Cr. If any 1. Patna: Target date As per agreement of (a) Pahari STP Physical Progress- 51.00% Ongoing date of completion 147.65 completion 9/11/2020 Dec, 2020 Target date Pahari Sewerage As per agreement of (b) Network Zone Physical Progress- 67.00% Ongoing date of completion 167.84 completion IV_A(S) 28/02/2021 Dec, 2020 Target date As per agreement Pahari Sewerage of (c) Physical Progress- 41.52% Ongoing date of completion 364.9 Network Zone V completion 25/04/2021 Dec, 2020 Proposal As per agreement for (d) Beur STP Physical Progress- 99.00% Ongoing date of completion 77.85 completion 5/10/2019 June, 2020 Target date As per agreement Beur Sewerage of (e) Physical Progress- 68.67% Ongoing date of completion 398.4 Network completion 5/4/2020 Dec, 2020 As per agreement (f) Karmalichak STP Physical Progress- 100% Completed date of completion - 73.61 5/10/2019 Karmalichak As per agreement Target date (g) Physical Progress- 54.00% Ongoing 253.98 Sewerage Network date of completion of

22

20/05/2021 completion Dec, 2020 Target date As per agreement Saidpur STP & of (h) Physical Progress- 92.00% Ongoing date of completion 188.18 Adjoining Network completion 5/4/2020 June, 2020 Target date As per agreement Saidpur Sewerage of (i) Physical Progress- 47.80% Ongoing date of completion 431.21 Network completion 29/01/2021 Dec, 2020 Agreement Executed Survey work is completed for on 30.12.2019, Digha STP and sewerage network, design under Ongoing Target date of - Sewerage Scheme progress. completion Dec, (j) 2022 1187.86 Agreement Executed STP on 30.12.2019, Designsubmitted by contractor and Sewerage Ongoing Target date of - and vetting under progress Scheme completion Dec, (k) 2022 Target date of Phulwarishariff Financial evaluation done. Bid 46.25 Tendered completion Dec, - I&D and STP document pending from BUIDCo. (Sanctioned) (l) 2021 As per agreement Proposal for Sultanganj I&D and 2 Physical Progress- 26.00% Ongoing date of completion completion 63.51 STP Dec, 2019 Dec, 2020 As per agreement Proposal for 3. Barh I&D and STP Physical Progress- 37.00% Ongoing date of completion completion 53.9 January, 2020 Dec, 2020 As per agreement Proposal for Naugachhia I&D 4. Physical Progress- 15.00% Ongoing date of completion completion 61.89 and STP January, 2020 Dec, 2020

23

Survey&Design work completed. STP land handed over on As per agreement Proposal for Mokama I&D and 5. 27.12.2019. Site development and Ongoing date of completion completion 59.17 STP Boundary wall work & SBR raft June, 2020 Dec, 2020 work in progress.

Site survey work and boundary As per agreement Proposal for Sonepur I&D and wall work is completed. 6 Ongoing date of completion completion 29.35 STP Execution work started for Feb, 2020 Dec, 2020 Building construction.

As per agreement Proposal for Maner I&D and Agreement executed with 7. Ongoing date of completion completion 40.83 STP successful bidder. Dec, 2020 June, 2021 As per agreement Proposal for Bakhtiyarpur I&D Agreement executed with 8 Ongoing date of completion completion 36.04 and STP successful bidder. Dec, 2020 June, 2021 Tendered, Two bids received. Financial evaluation submitted to Target date of Bhagalpur I&D and NMCG on 30.09.2019. Some 254.13 9. Tendered completion June, - STP observation has been received on (Sanctioned) 2022 11.09.19 and there compliances has been sent to NMCG. Two Bid received. Techncial Target date of Hajipur STP and Tendered, Two bid received on 305.19 10. evaluation completed and completion Dec, - Sewer Network 25.10.2019 (Sanctioned) financial bid is under process. 2022 Agreement executed on Target date of Chhapra I&D and 236.15 11. 04.02.2020, survey work Ongoing completion Dec, STP (Sanctioned) completed. 2021

24

Revised AA&ES amounting Rs. Target date of Buxar STP and Revised AA&ES issued by 164.23 12. 128.14 Cr obtained from completion Dec, - Sewer Network NMCG on 31.12.2019 (Sanctioned) NMCG. Tender to be floated. 2022 Target date of Begusarai STP and Survey work is completed, 230.06 13. Ongoing completion June. Sewer Network Physical Progress- 5.00%. (Sanctioned) 2022 Target date Target date of Danapur I&D and Financial evaluation done. Bid of 103.27 14. Tendered completion Dec, STP document pending from BUIDCo. completion (Sanctioned) 2021 Dec, 2021 Target date Target date of Khagaria I&D and of 21.00 15. Retender publish on 27.05.2020. Tendered completion Dec, STP completion (Sanctioned) 2021 Dec, 2021 Target date of Munger STP and 4 Bids received on 07.01.2020. Tendered, 4 Bids received on 294.02 16. completion Dec, - Sewer Network Bid evaluation is under progress. 07.01.2020. (Sanctioned) 2022 Target date of Barahiya I&D and 27.00 17. Retender publish on 27.05.2020 AA&ES recevied on 31.12.2019 completion June, - STP (Sanctioned) 2022 Target date of Kahalgaon I&D 25.77 18. Retender publish on 27.05.2020. AA&ES recevied on 30.12.2019 completion June, - and STP (Sanctioned) 2022 Compliance report sent to Target date of Dighwara I&D and Proposed project, Revised DPR 19. NMCG for DPR approval on completion Dec, - - STP sent to NMCG for approval. 24.08.2018 2021 Compliance report sent to Target date of Teghra I&D and Proposed project, Revised DPR 20. NMCG for DPR approval on completion Dec, - - STP sent to NMCG for approval. 17.12.2018 2021 Target date of Manihari I&D and DPR sent to NMCG for 21. Proposed project, DPR prepared. completion Dec, - - STP approval on 06.08.2018 2021

25

Target date of Jamalpur I&D and Proposed project, DPR sent to 22. Compliance of TPA awaited. completion Dec, - - STP NMCG for approval. 2021 Target date of I&D and 23. Proposed project DPR is under preparation completion Dec, - - STP 2021 3. Status of STPs in state of Bihar under NamamiGangeProgramme in 5 River Stretches 2 Punpun River Financial evaluation done. Target date of Fatuha I&D and 1 BUIDCo Board approval to be Tendered completion Dec, - - STP obtained. 2021 3 Ramrekha River Harinagar Target date of DPR is under preparation by 1. (Ramnagar) I&D Proposed project completion Dec, - - NEERI and STP 2021 4 Sikrahna River Target date of Narkatiaganj I&D DPR is under preparation by 1 Proposed project completion Dec, - - and STP NEERI 2021 5 Parmar River Target date of Jogbani I&D and DPR is under preparation by 1 Proposed project completion Dec, - - STP NEERI 2021 6 Sirsia River Target date of Raxual I&D and DPR is under preparation by 1 Proposed project completion Dec, - - STP NEERI 2021 2. Status of STPs in Bihar State of other 7 Tributaries of River Ganga I Sone River DPR is prepared by PBS and Target date of 1 I&D and STP Proposed project send to NMCG for approval completion Dec,

26

2021

DPR is prepared by Aarveer Target date of Arwal I&D and 2 Proposed project Associates and send to NMCG completion Dec, STP for approval 2021 Target date of Daudnagar I&D and DPR is under preparation by 3 Proposed project completion Dec, STP NEERI 2021 II BurhiGandak River DPR is prepared by Target date of Muzaffarpur I&D DARASHAW and send to 1 Proposed project completion Dec, and STP NMCG for approval and TPA 2021 compliance in progress Target date of Samastipur I&D DPR is under preparation by 2 Proposed project completion Dec, and STP REPL 2021 Target date of Motihari I&D and DPR is under preparation by 3 Proposed project completion Dec, STP NEERI 2021 III Target date of Supaul I&D and DPR is prepared by NEERI and 1 Proposed project completion Dec, STP send to NMCG for approval 2021 Target date of Saharsa I&D and DPR is under preparation by 2 Proposed project completion Dec, STP NEERI 2021 Target date of Madhepur I&D and DPR is under preparation by 3 Proposed project completion Dec, STP NEERI 2021 IV Baghmati River

27

Target date of Darbhanga I&D and DPR is under preparation by 1 Proposed project completion Dec, STP NEERI 2021 V Gandak River Target date of Gopalganj I&D and DPR is prepared by SECON and 1 Proposed project completion Dec, STP send to NMCG for approval 2021 Target date of Bagha I&D and DPR is under preparation by 2 Proposed project completion Dec, STP DARASHAW 2021 VI Target date of Kishanganj I&D DPR is under preparation by 1 Proposed project completion Dec, and STP NEERI 2021 VII Target date of Lakhisarai I&D and DPR is under preparation by 1 Proposed project completion Dec, STP NEERI 2021 Target date of DPR is under preparation by 2 I&D and STP Proposed project completion Dec, NEERI 2021

28

Annexure-3(c)

TOWNWISE INFORMATION ON SEWAGE MANAGEMENT IN DIFFERENT STATES

Discharge D), (based (based D),

Use of of treated

treated effluent Present Operat

Sl. Utilization ent State City/ Town effluent to natural monitoring ional No. capacity Census) Efflu Influent in MLD, water system status parameter parameter

constructed

nology adopted h nology if any bodies/ installed in MLD) Design parameter Design Tec

land (MLD) Sludge Management Implementing agency Implementing Year of Commissioning Population (based on 2011 2011 on (based Population STP Installed capacity (to be Status of STP proposed to be to proposed STP of Status Scheme under STP Scheme under which was constructed/ Underconstruction constructed/ on 2011 population Census data) Census population 2011 on Sewage Generation (ML Generation Sewage

Not Not Not Not Not applica

applicable applicabl applicable applicable As per ble as as STP is As per e as STP as STP is as STP is Under Patna, Nov- Namami MoEF &CC STP is 60 SBR not CPHEEO is not not not constr Pahari STP 20 Gange notification not BUIDCo commissio Manual commissi commissio commissio uction for 15for yrs commis ned till Oct,2017 oned till ned till ned till sioned date date date date till date constructionUnder

1 Bihar 1,684,222 181.9 Not Not Not Not Not applica

applicable applicabl applicable applicable ble as as STP is As per Asper old e as STP as STP is as STP is Under Patna, Mar- Namami STP is 43 SBR not CPHEEO MoEF &CC is not not not constr Beur STP 20 Gange not

BUIDCo commissio Manual guideline commissi commissio commissio uction for 15for yrs commis ned till oned till ned till ned till sioned date date date date till date constructionUnder

29

Not Not Not Not Not

applica

applicable applicabl applicable applicable ble as as STP is As per Asper old e as STP as STP is as STP is Patna,Karm Comp Namami STP is Compl 37 SBR not CPHEEO MoEF &CC is not not not alichak STP leted Gange not eted

BUIDCo commissio Manual guideline commissi commissio commissio for 15for yrs commis ned till oned till ned till ned till Completed sioned date date date date till date

Not Not Not Not Not applica

applicable applicabl applicable applicable ble as as STP is As per Asper old e as STP as STP is as STP is Under Patna,Said Apr- Namami STP is 60 SBR not CPHEEO MoEF &CC is not not not constr pur STP 20 Gange not BUIDCo commissio Manual guideline commissi commissio commissio uction for 15for yrs commis ned till oned till ned till ned till sioned date date date date till date constructionUnder

Not Not Not Not Not applica Agree

applicable applicabl applicable applicable Asper ble as ment as STP is As per e as STP as STP is as STP is Patna.Digh Dec- Namami MoEF &CC STP is done 100 ASP not CPHEEO is not not not a STP 22 Gange notification not on BUIDCo commissio Manual commissi commissio commissio for 15for yrs Oct,2017 commis 30/12/ ned till oned till ned till ned till 30/12/2019 sioned 2019 date date date date till date Agreement on done

Not Not Not Not Not applica Agree

applicable applicabl applicable applicable Asper ble as ment as STP is As per e as STP as STP is as STP is Patna,Kank Dec- Namami MoEF &CC STP is done 50 ASP not CPHEEO is not not not arbagh STP 22 Gange notification not on

BUIDCo commissio Manual commissi commissio commissio for 15for yrs Oct,2017 commis 30/12/ ned till oned till ned till ned till 30/12/2019 sioned 2019 date date date date

till date Agreement on done

30

Not

Not Not Not Not applica

applicable applicabl applicable applicable Not ble as as STP is As per As per NGT e as STP as STP is as STP is Jun- Namami yet STP is Under 25 not CPHEEO order is not not not 182,241 19.7 21 Gange finaliz not tender

BUIDCo commissio Manual April2019 commissi commissio commissio for 15for yrs ed commis

ned till oned till ned till ned till tenderUnder sioned date date date date till date 2 Danapur

Not Not Not Not Not applica

applicable applicabl applicable applicable Asper ble as as STP is As per e as STP as STP is as STP is Under Sep- Namami MoEF &CC STP is 3 6.5 SBR not CPHEEO is not not not constr 40,068 4.3 21 Gange notification not BUIDCo commissio Manual commissi commissio commissio uction for 15for yrs commis ned till Oct,2017 oned till ned till ned till sioned date date date date till date constructionUnder Maner

Not

Not Not Not Not applica

applicable applicabl applicable applicable Not ble as as STP is As per As per NGT e as STP as STP is as STP is Jun- Namami yet STP is Under 7 not CPHEEO order is not not not 50,961 5.5 21 Gange finaliz not tender BUIDCo commissio Manual April2019 commissi commissio commissio for 15for yrs ed commis

ned till oned till ned till ned till tenderUnder sioned date date date date till date 4 Fatuha

Not Not Not Not Not applica

applicable applicabl applicable applicable Asper ble as as STP is As per e as STP as STP is as STP is Under Dec- Namami MoEF &CC STP is 5 11 SBR not CPHEEO is not not not constr 61,470 6.6 22 Gange notification not

BUIDCo commissio Manual commissi commissio commissio uction for 15for yrs commis ned till Oct,2017 oned till ned till ned till sioned date date date date till date constructionUnder Barh

31

Not Not Not Not Not applica

applicable applicabl applicable applicable Asper ble as as STP is As per e as STP as STP is as STP is Under Sep- Namami MoEF &CC STP is 6 10 SBR not CPHEEO is not not not constr 47,897 5.2 21 Gange notification not

BUIDCo commissio Manual commissi commissio commissio uction for 15for yrs commis ned till Oct,2017 oned till ned till ned till sioned date date date date till date constructionUnder Bakhtiyarpu r

Not

Not Not Not Not applica

applicable applicabl applicable applicable Not ble as as STP is As per As per NGT e as STP as STP is as STP is Jun- Namami yet STP is Under 13 not CPHEEO order is not not not 81,740 8.8 21 Gange finaliz not tender BUIDCo commissio Manual April2019 commissi commissio commissio for 15for yrs ed commis

ned till oned till ned till ned till tenderUnder sioned date date date date till date Phulwarish 7 ariff

Not Not Not Not Not applica

applicable applicabl applicable applicable Asper ble as o as STP is As per e as STP as STP is as STP is Under Jun- Namami MoEF &CC STP is 8 8 SBR not CPHEEO is not not not constr 60,678 6.6 21 Gange notification not BUIDC commissio Manual commissi commissio commissio uction for 15for yrs commis ned till Oct,2017 oned till ned till ned till sioned date date date date till date constructionUnder Mokama

Not

Not Not Not Not applica

applicable applicabl applicable applicable Not ble as as STP is As per As per NGT e as STP as STP is as STP is Jun- Namami yet STP is Under 22 not CPHEEO order is not not not 147,688 16.0 22 Gange finaliz not tender

BUIDCo commissio Manual April2019 commissi commissio commissio for 15for yrs ed commis

ned till oned till ned till ned till tenderUnder sioned date date date date till date 9 Hajipur

32

Not Not Not Not Not

applica

applicable applicabl applicable applicable Asper ble as as STP is As per e as STP as STP is as STP is Sep- Namami MoEF &CC STP is LoA 10 32 SBR not CPHEEO is not not not 202,352 21.9 21 Gange notification not issued

BUIDCo commissio Manual commissi commissio commissio for 15for yrs Oct,2017 commis ned till oned till ned till ned till LoA issued sioned date date date date till date Chhapra

Not Not Not Not Not applica

applicable applicabl applicable applicable Asper ble as as STP is As per e as STP as STP is as STP is Under Feb- Namami MoEF &CC STP is 3.5 SBR not CPHEEO is not not not constr 37,776 4.1 21 Gange notification not BUIDCo commissio Manual commissi commissio commissio uction for 15for yrs commis ned till Oct,2017 oned till ned till ned till sioned date date date date till date constructionUnder 11 Sonepur

Not Not Not Not Not

applica

applicable applicabl applicable applicable Asper ble as as STP is As per e as STP as STP is as STP is Dec- Namami MoEF &CC STP is LoA 12 17 SBR not CPHEEO is not not not 252,008 27.2 21 Gange notification not issued BUIDCo commissio Manual commissi commissio commissio for 15for yrs Oct,2017 commis ned till oned till ned till ned till LoA issued sioned date date date date till date Begusarai

Not Not Not Not Not applica

applicable applicabl applicable applicable Not ble as Tender as STP is As per As per NGT e as STP as STP is as STP is Sep- Namami yet STP is to be 13 16 not CPHEEO order is not not not 102,861 11.1 22 Gange finaliz not publish

BUIDCo commissio Manual April2019 commissi commissio commissio for 15for yrs ed commis ned till oned till ned till ned till ed sioned date date date date till date Tender to be published be Tender to Buxar

33

Not Not Not Not Not applica

applicable applicabl applicable applicable Bid

ble as as STP is As per As per NGT e as STP as STP is as STP is evaluat Sep- Namami STP is underion 30 SBR not CPHEEO order is not not not ion 213,303 23.0 22 Gange not process BUIDCo commissio Manual April2019 commissi commissio commissio under for 15for yrs commis ned till oned till ned till ned till sioned process date date date date till date Bid evaluat 14 Munger

Not Not Not Not Not applica

applicable applicabl applicable applicable Asper ble as as STP is As per e as STP as STP is as STP is Under Dec- Namami MoEF &CC STP is 15 10 MBR not CPHEEO is not not not constr 52,892 5.7 20 Gange notification not BUIDCo commissio Manual commissi commissio commissio uction for 15for yrs commis ned till Oct,2017 oned till ned till ned till sioned date date date date till date constructionUnder Sultanganj

Not

Not Not Not Not applica

applicable applicabl applicable applicable Not Asper ble as as STP is As per e as STP as STP is as STP is Dec- Namami yet MoEF &CC STP is Under 45 not CPHEEO is not not not 400,146 43.2 21 Gange finaliz notification not tender BUIDCo commissio Manual commissi commissio commissio for 15for yrs ed Oct,2017 commis

ned till oned till ned till ned till tenderUnder sioned date date date date till date 16 Bhagalpur

Not Not Not Not Not applica

applicable applicabl applicable applicable Asper ble as as STP is As per e as STP as STP is as STP is Under

Dec- Namami 5 yrs MoEF &CC STP is 17 9 SBR not CPHEEO is not not not constr 49,069 5.3 20 Gange notification not

BUIDCo commissio Manual commissi commissio commissio uction for 1 for commis ned till Oct,2017 oned till ned till ned till sioned date date date date till date constructionUnder Naugachia

34

Not

Not Not Not Not applica

applicable applicabl applicable applicable Wetla Asper ble as as STP is As per e as STP as STP is as STP is Jun- Namami nd MoEF &CC STP is Under 18 4.5 not CPHEEO is not not not 49,406 5.3 21 Gange techn notification not tender

BUIDCo commissio Manual commissi commissio commissio for 15for yrs ology Oct,2017 commis

ned till oned till ned till ned till tenderUnder sioned date date date date till date Khagaria

Not

Not Not Not Not applica

applicable applicabl applicable applicable Not ble as as STP is As per As per NGT e as STP as STP is as STP is Dec- Namami yet STP is Under 6 not CPHEEO order is not not not 43,032 4.6 21 Gange finaliz not tender BUIDCo commissio Manual April2019 commissi commissio commissio for 15for yrs ed commis

ned till oned till ned till ned till tenderUnder sioned date date date date till date 19 Barahiya

Not

Not Not Not Not applica

applicable applicabl applicable applicable Not ble as as STP is As per As per NGT e as STP as STP is as STP is Dec- Namami yet STP is Under 20 6 not CPHEEO order is not not not 33,700 3.6 21 Gange finaliz not tender BUIDCo commissio Manual April2019 commissi commissio commissio for 15for yrs ed commis

ned till oned till ned till ned till tenderUnder sioned date date date date till date Kahalgaon

Not Not yet yet sanctio 96,811 10.5 sancti ned yet Not

oned sanctioned

21 Didhwara

Not yet Under 22 56,234 6.1 sancti DPR oned Under DPRUnder

Teghra

35

Not yet Under

191,407 20.7 sancti DPR oned Under DPRUnder

23 Manihari

Not yet Under 24 105,434 11.4 sancti DPR oned Under DPRUnder

Jamalpur

Not yet Under 25 44,364 4.8 sancti DPR oned Under DPRUnder

Khagual

Not yet Under

48,411 5.2 sancti DPR Harinagar/R oned Under DPRUnder

26 amnagar

Not yet Under 27 49,507 5.3 sancti DPR Narkatiagan oned Under DPRUnder

j

Not yet Under

39,281 4.2 sancti DPR oned Under DPRUnder

28 Jogbani

Not yet Under 29 55,536 6.0 sancti DPR oned Under DPRUnder

Raxual

Not yet Under 30 137,231 14.8 sancti DPR oned Under DPRUnder

Dehri

36

Not yet Under

51,849 5.6 sancti DPR oned Under DPRUnder

31 Arwal

Not yet Under 32 52,364 5.7 sancti DPR oned Under DPRUnder

Daudnagar

Not yet Under

354,462 38.3 sancti DPR oned Under DPRUnder

33 Muzafarpur

Not yet Under 34 67,925 7.3 sancti DPR oned Under DPRUnder

Samastipur

Not yet Under

126,158 13.6 sancti DPR oned Under DPRUnder

35 Motihari

Not yet Under 36 65,437 7.1 sancti DPR oned Under DPRUnder

Supaul

Not yet Under 37 156,540 16.9 sancti DPR oned Under DPRUnder

Saharsa

Not yet Under

54,472 5.9 sancti DPR oned Under DPRUnder

38 Madepura

37

Not yet Under 39 296,039 32.0 sancti DPR oned Under DPRUnder

Darbhanga

Not R yet Under

67,339 7.3 sancti DPR oned Under DP Under

40 Gopalganj

Not yet Under 41 112,634 12.2 sancti DPR oned Under DPRUnder

Bagha

Not yet Under 42 105,782 11.4 sancti DPR oned Under DPRUnder

Kisanganj

Not yet Under

99,979 10.8 sancti DPR oned Under DPRUnder

43 Lakhisarai

Not yet Under 44 87,357 9.4 sancti DPR oned Under DPRUnder

Jamui

38

Annexure - 4 Urban Development and Housing Department, Govt. of Bihar Solid Waste Management Report STATE OF BIHAR

(1) Solid Waste Management including Legacy Waste Status of Solid Waste Management in Bihar

Total No. of ULBs : 142

MSW MSW MSW Gap (TPD) Timeline

Generated Processed Landfill

(TPD) (TPD) (TPD)

2272 1226 (54%) 112 (4.9 %) 934(41.1%) Environment Clearance (EC) from SEIAA needed.

December 2022

Assessment of SWM Facilities (Capacity Wise)

Required Existing Gap (TPD) Observations

Capacity Capacity

(TPD) (TPD)

Waste 954 (TPD) 515(54 %) 439 (46%) Non-biodegradable waste Presently Segregation DRY WASTE being Processed Facility (MRF) through Self-Help Groups (SHGs), informal waste picker, Local waste recycler and rag picker in all ULBs.

39

Waste Processing

Biodegradable 1068 (TPD) 576.8 (54%) 491 (46%) Work underway through126 composting Waste (Bio- WET WASTE units at 79 ULBs of Bihar. methanation and Composting

Non 260 (TPD) 5 (TPD) 255 (TPD) Considering population Biodegradable more than 10,0000 Cites

(Recycling: required 26 units of RDF, WTE Co- Recycling Plant (5TPD)and processing) 26 units RDF plant (5TPD) respectively.

01 Recycling plantof capacity 05 TPD at Patna Municipal corporation Started.

Waste 250 (TPD) 112 (TPD) 138 (TPD) Inert waste @ 11% yet to Disposal be planned and work will Inert Waste (Landfill) be done as per assumption.

Out of 142 ULBs, 103 have their own sanitary landfill sites, while 39 ULBs have been tagged to the nearby location.

Assessment of SWM Facilities (ULB wise)

Required Existing Gap Time Observations frame

40

Waste 223 no. 67 no 156 no December Suitable Land for Material Recovery Segregation 2022 Facility (MRF)Center Development Facility (MRF) has identified in all 142 ULBs.

Work started at 67 sites in 50 ULB.

Waste Processing

Bio- 268site 126 142 site December State has gone for decentralized Degradable site 2020 composting out of 142 ULBs.142 waste (Bio- ULBs have identified land for waste methanation to compost plant for <05 TPD. and

Composting Work started to processing the wet waste at 126 sites in 79 ULBs.

142 sites under construction in left ULBs.

Non 52 no 01 no 51 no December Biodegradable 2022 All 26 cities having population more (Recycling than one lakh Land available for RDF, co- Recycling and RDF Plant. processing)

Waste 142 103 38 December Out of 142 ULBs land has already Disposal (Inert (tagged) 2022 been identified in 103 ULBs for ULBs Landfill) setting up sanitary Landfills facility. 39 ULBs tagged for sanitary Landfill facility nearer locations.

Legacy Waste

1 Number of Dumpsites 04 sites

41

(Where dumping of waste is closed and treated as Legacy Waste. Patna, Muzaffarpur, Gaya and Darbhanga Municipal corporation )

2 Quantity of Waste dumped at Dumpsites 3288 MT

3 Number of dumpsites cleared 00

(Patna and Muzafarpur municipal corporation has started the legacy waste remediation)

4 Number of dumpsites in which bio-mining Patna and Muzaffarpur Municipal has commenced corporation has stated bio mining work and completed by March 2022

5 Time frame for clearing all dumpsites March 2022

42

Annexure - 5

Water Quality Status of River Ganga during the Year (2020-2021)

Sl. Sampling Point pH D.O. B.O.D. T.C. F.C. Designated No. best use mg/L mg/L MPN/100ml MPN/100ml 1 Ganga at Chausa karmnasa D/S April 8.15 9.7 1.4 3900 2200 Class-D Confluence , Buxar May 8.50 10.6 1.9 17000 2700

3 Ganga at Ramrekha ghat, Buxar. April 8.38 9.5 1.9 14000 2600 Class-D Dist.- Buxar May 8.47 9.5 1.3 22000 11000

3 Ganga River at Jail Ghat, Buxar April 8.19 9.4 1.6 4000 3300 Class-D May 8.33 9.8 1.4 17000 4000 4 Ganga at D/S Buxar near Road April 8.48 8.9 2.0 35000 14000 Class-D Bridge. Dist. - Buxar May 8.47 9.5 1.3 22000 11000

5 Ganga at Danapur near Pipapul. April 8.17 8.7 1.3 983 377 Class-D Dist. - Patna May 8.49 9.0 1.1 1700 930

6 Ganga at U/S Patna, Kurji.Dist. - April 8.22 8.5 1.6 3267 1667 Class-D Patna May 8.44 8.7 1.3 3900 2200

7 Ganga at D/S Patna, Gaighat April 8.23 8.6 1.5 11300 4767 Class-D Dist. Patna. May 8.43 9.4 1.3 4000 3300

8 Ganga at Malsalami, Patna City April 8.24 8.6 1.5 3300 1933 Class-D Dist. - Patna May 8.42 8.8 1.1 4600 1700

9 Ganga Before Confluence of April 8.39 8.7 1.8 3300 1850 Class-D Punpun River at Triveni Ghat May 8.30 8.2 1.4 3300 1400 Fatuha, Patna Dist. - Patna.

10 Ganga at Kewala ghat, Fatuha April 8.36 8.7 1.7 9850 2500 Class-D Dist.- Patna May 7.80 6.3 2.4 28000 3300

11 Ganga at Kachchi Dargah- April 8.32 8.8 1.5 4000 1100 Class-D Bidupur Road Bridge, Dist-Patna May 8.43 9.4 1.2 4900 1300

12 Ganga at Bakhtiyarpur-Tajpur April 8.36 8.7 1.5 2600 1400 Class-D Road Bridge near Athamalgola, May 8.28 7.8 1.8 3900 1700 Dist-Patna

13 Ganga at U/S Mokama, April 8.43 8.8 1.5 2700 1100 Class-D Mahadeo Asthan Dist.- Patna May 8.45 7.6 1.9 3200 2600

14 Ganga at D/S Mokama near April 8.45 9.0 1.4 1400 930 Class-D Rajendra Bridge, Simaria Ghat May 8.16 8.5 1.6 22000 4900

43

Patna

15 Ganga at Barh Dist.- Patna April 8.37 8.6 1.8 17000 3300 Class-D May 8.32 7.7 2.0 13000 1300 16 Ganga U/S of NTPC Water April 8.38 8.6 1.9 2000 930 Class-D intake Point, Barh Dist.- Patna May 8.34 7.5 2.1 2400 1400

17 Ganga D/S of NTPC Water April 8.38 8.5 1.9 11000 2200 Class-D intake Point, Barh Dist.- Patna May 8.48 8.4 2.2 7000 1700

18 Ganga at U/S Munger near April - - - - - Class-D Kasth haranighat. Dist.- Munger May 8.18 8.4 2.0 3950 2800

19 Ganga at D/S Munger near April - - - - - Class-D Crematorium Ghat Dist. - May 8.36 8.3 2.2 6800 2150 Munger

20 Ganga at U/S Sultanganj, Ajgaibi April - - - - - Class-D Nath Dist.- Bhagalpur May 8.37 9.0 1.4 3900 2000

21 Ganga at D/S Sultanganj at April - - - - - Class-D Cremation ghat Dist.- Bhagalpur May 8.31 9.1 1.4 14000 2600

22 Ganga at D/S Bhagalpur near April - - - - - Class-D Bararighat. Dist.- Bhagalpur May 8.45 9.4 1.8 3300 1700

23 U/S Ganga at Bhagalpur kuppa April - - - - - Class-D ghat Dist.- Bhagalpur May 8.38 8.1 1.4 3200 1100 May

24 Ganga at Kahalgaon near April - - - - - Class-D Jahajghat. Dist.- Bhagalpur May 8.33 9.5 1.3 3200 1400

44

Water Quality Status of River Sirsiya Location: Raxaul at Entry point in Indian Territory (Near Custom Office) during Year (2020-21) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 7.37 2.7 3.2 54000 54000

Location: Koriya Tola at Raxaul during during Year (2020-21) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 7.39 1.7 4.4 54000 54000

Water Quality Status of River Harbaura U/S Harbaura River, Narkatiaganj during Year (2020-21) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 7.94 8.0 1.1 54000 54000

D/S Harbaura River, Narkatiaganj during Year (2020-21) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 7.49 3.5 3.2 160000 160000

Water Quality Status of River Parmar Location: Jogbani at Entry point in Indian Territory during Year (2020-21) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 7.85 8.6 1.6 7000 1700

45

Water Quality Status of River Ramrekha U/S Ramrekha River Hari Nagar during Year (2020-21) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 7.10 3.5 3.2 160000 160000

D/S Ramrekha River Hari Nagar during Year (2020-21) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 6.94 3.2 4.0 160000 160000

Water Quality Status of River Punpun U/S Punpun River at Kinzar, Jehanabad during Year (2020-21) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 8.15 7.9 1.8 2100 1200

U/S Punpun River at Punpun during Year (2020-21) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 8.37 7.6 2.8 35000 3900

D/S Punpun River at Fatuha during Year (2019-20) Month pH D.O B.O.D T.C F.C mg/L mg/L MPN/ 100 ml MPN/100 ml May 7.75 8.0 4.8 35000 28000

46

Annexure - 6

47

48

49

50

51

52

53

54

55