International Space Station Program Mobile Servicing System (MSS) To

Total Page:16

File Type:pdf, Size:1020Kb

International Space Station Program Mobile Servicing System (MSS) To SSP 42004 Revision E Mobile Servicing System (MSS) to User (Generic) Interface Control Document Part I International Space Station Program Revision E, May 22, 1997 Type 1 Approved by NASA National Aeronautics and Space Administration International Space Station Program Johnson Space Center Houston, Texas Contract No. NAS15–10000 SSP 42004, Part 1, Revision E May 22, 1997 REVISION AND HISTORY PAGE REV. DESCRIPTION PUB. DATE C Totally revised Space Station Freedom Document into an International Space Station Alpha Document 03–14–94 D Revision D reference PIRNs 42004–CS–0004A, 42004–NA–0002, 42004–NA–0003, TBD 42004–NA–0004, 42004–NA–0007D, 42004–NA–0008A, 42004–NA–0009C, 42004–NA–0010B, 42004–NA–0013A SSP 42004, Part 1, Revision E May 22, 1997 INTERNATIONAL SPACE STATION PROGRAM MOBILE SERVICING SYSTEM TO USER (GENERIC) INTERFACE CONTROL DOCUMENT MAY 22, 1997 CONCURRENCE PREPARED BY: PRINT NAME ORGN SIGNATURE DATE CHECKED BY: PRINT NAME ORGN SIGNATURE DATE SUPERVISED BY (BOEING): PRINT NAME ORGN SIGNATURE DATE SUPERVISED BY (NASA): PRINT NAME ORGN SIGNATURE DATE DQA: PRINT NAME ORGN SIGNATURE DATE i SSP 42004, Part 1, Revision E May 22, 1997 NASA/CSA INTERNATIONAL SPACE STATION PROGRAM MOBILE SERVICING SYSTEM (MSS) TO USER INTERFACE CONTROL DOCUMENT MAY 22, 1997 Print Name For NASA DATE Print Name For CSA DATE ii SSP 42004, Part 1, Revision E May 22, 1997 PREFACE SSP 42004, Mobile Servicing System (MSS) to User Interface Control Document (ICD) Part I shall be implemented on all new Program contractual and internal activities and shall be included in any existing contracts through contract changes. This document is under the control of the Space Station Control Board (SSCB) with the concurrence of Canadian Space Agency (CSA), and any changes or revisions will be approved by the SSCB and CSA. Program Manager, Date International Space Station iii SSP 42004, Part 1, Revision E May 22, 1997 INTERNATIONAL SPACE STATION PROGRAM MOBILE SERVICING SYSTEM TO USER (GENERIC) INTERFACE CONTROL DOCUMENT PART 1 LIST OF CHANGES MAY 22, 1997 All changes to paragraphs, tables, and figures in this document are shown below: SSCBD ENTRY DATE CHANGE PARAGRAPH(S) TABLE(S) FIGURE(S) APPENDIX(ES) ADDENDA iv SSP 42004, Part 1, Revision E May 22, 1997 TABLE OF CONTENTS PARAGRAPH PAGE 1.0 INTRODUCTION. 1 – 1 1.1 PURPOSE AND SCOPE. 1 – 1 1.1.1 SECTION A PURPOSE AND SCOPE. 1 – 1 1.1.2 SECTION B PURPOSE AND SCOPE. 1 – 1 1.1.3 SECTION C PURPOSE AND SCOPE. 1 – 2 1.1.4 SECTION D PURPOSE AND SCOPE. 1 – 2 1.1.5 SECTION E PURPOSE AND SCOPE. 1 – 2 1.1.6 SECTION F PURPOSE AND SCOPE. 1 – 2 1.1.7 SECTION G PURPOSE AND SCOPE. 1 – 2 1.1.8 RESERVED. 1 – 2 1.1.9 SECTION I PURPOSE AND SCOPE. 1 – 2 1.2 PRECEDENCE. 1 – 2 1.3 CHANGE AUTHORITY. 1 – 3 1.4 COMMONALITY OF GRAPPLE FIXTURES AND END EFFECTORS (REFERENCE ONLY). 1 – 3 1.4.1 TYPES OF GRAPPLE FIXTURES. 1 – 3 1.4.1.1 SS GRAPPLE FIXTURES. 1 – 3 1.4.1.2 NSTS GRAPPLE FIXTURES. 1 – 3 1.5 DEFINITION OF THE TERM “USER”. 1 – 3 2.0 DOCUMENTS. 2 - 1 2.1 APPLICABLE DOCUMENTS. 2 - 1 3.0 GENERAL. 3 – 1 3.1 ENGINEERING UNITS AND TOLERANCES. 3 – 1 SECTION A3 PDGF TO USER INTERFACES. A3 – 1 A3.0 REQUIREMENTS. A3 – 1 A3.1 GENERAL. A3 – 1 A3.1.1 INTERFACE DESCRIPTION. A3 – 1 A3.1.2 COORDINATE SYSTEMS. A3 – 1 A3.1.3 PDGF INTERFACE FUNCTIONS. A3 – 1 A3.1.4 USER INTERFACE FUNCTIONS. A3 – 2 A3.1.5 INTERFACE RESPONSIBILITIES. A3 – 2 A3.2 INTERFACE REQUIREMENTS. A3 – 2 A3.2.1 PDGF INTERFACE REQUIREMENTS. A3 – 2 A3.2.1.1 PDGF ENVELOPES. A3 – 2 A3.2.1.2 PDGF MECHANICAL INTERFACE. A3 – 2 A3.2.1.3 PDGF STRUCTURAL INTERFACE. A3 – 2 A3.2.1.3.1 IMPACT LOADS. A3 – 3 A3.2.1.3.2 PDGF WEIGHT. A3 – 3 v SSP 42004, Part 1, Revision E May 22, 1997 A3.2.1.4 PDGF ELECTRICAL INTERFACE HARDWARE. A3 – 3 A3.2.1.4.1 ELECTRICAL CONNECTORS. A3 – 3 A3.2.1.5 PDGF POWER INTERFACE. A3 – 3 A3.2.1.5.1 POWER QUALITY. A3 – 3 A3.2.1.5.2 OVER CURRENT PROTECTION. A3 – 3 A3.2.1.5.3 ELECTRICAL BONDING INTERFACES. A3 – 3 A3.2.1.5.4 ELECTRICAL CONNECTOR DEADFACING. A3 – 3 A3.2.1.5.5 REDUNDANCY. A3 – 4 A3.2.1.6 C&DH INTERFACES. A3 – 4 A3.2.1.6.1 MIL–STD–1553 INTERFACES. A3 – 4 A3.2.1.6.1.1 PROVIDE OUTPUT AMPLITUDE. A3 – 4 A3.2.1.7 SYNC, CONTROL, AND VIDEO INTERFACES. A3 – 4 A3.2.1.7.1 VIDEO, SYNC, AND CONTROL TRANSMISSION AND SIGNAL CHARACTERISTICS. A3 – 4 A3.2.1.8 PASSIVE THERMAL CONTROL INTERFACE. A3 – 4 A3.2.1.8.1 PDGF TO USER THERMAL INTERFACE. A3 – 4 A3.2.1.8.2 PDGF THERMAL CONDUCTANCE. A3 – 4 A3.2.1.9 ENVIRONMENTS. A3 – 5 A3.2.1.9.1 ELECTROMAGNETIC EFFECTS. A3 – 5 A3.2.1.9.1.1 ELECTROMAGNETIC COMPATIBILITY. A3 – 5 A3.2.1.9.1.2 GROUNDING. A3 – 5 A3.2.1.9.1.3 BONDING. A3 – 5 A3.2.1.9.1.4 CABLE AND WIRE DESIGN. A3 – 5 A3.2.1.9.1.5 ELECTROSTATIC DISCHARGE. A3 – 5 A3.2.1.9.1.6 CORONA. A3 – 5 A3.2.2 USER INTERFACE REQUIREMENTS. A3 – 5 A3.2.2.1 USER ENVELOPES. A3 – 5 A3.2.2.1.1 PDGF’S LOCATION ON USER. A3 – 6 A3.2.2.2 USER MECHANICAL INTERFACE. A3 – 6 A3.2.2.3 USER STRUCTURAL INTERFACE. A3 – 6 A3.2.2.3.1 IMPACT LOADS. A3 – 6 A3.2.2.3.2 USER STIFFNESS REQUIREMENTS. A3 – 6 A3.2.2.4 USER ELECTRICAL INTERFACE HARDWARE. A3 – 6 A3.2.2.4.1 ELECTRICAL CONNECTORS. A3 – 6 A3.2.2.5 USER POWER INTERFACE. ..
Recommended publications
  • A New Satellite, a New Vision
    A New Satellite, a New Vision For more on RADARSAT-2 Canadian Space Agency Government RADARSAT Data Services 6767 Route de l’Aéroport Saint-Hubert, Quebec J3Y 8Y9 Tel.: 450-926-6452 [email protected] www.asc-csa.gc.ca MDA Geospatial Services 13800 Commerce Parkway Richmond, British Columbia V6V 2J3 Tel.: 604-244-0400 Toll free: 1-888-780-6444 [email protected] www.radarsat2.info Catalogue number ST99-13/2007 ISBN 978-1-100-15640-8 © Her Majesty the Queen in right of Canada, 2010 TNA H E C A D I A N SPA C E A G E N C Y A N D E A R T H O B S E R VAT I O N For a better understanding of our ocean, atmosphere, and land environments and how they interact, we need high-quality data provided by Earth observation satellites. RADARSAT-2 offers commercial and government users one of the world’s most advanced sources of space-borne radar imagery. It is the first commercial radar satellite to offer polarimetry, a capability that aids in identifying a wide variety of surface features and targets. To expand Canada’s technology leadership in Earth observation, the Canadian Space Agency is working with national and international partners on shared objectives to enhance • northern and remote-area surveillance • marine operations and oil spill monitoring • environmental monitoring and natural resource management • security and the protection of sovereignty • emergency and disaster management RADARSAT-2 is the next Canadian Earth observation success story. It is the result of collaboration between the Canadian Space Agency and the company MDA.
    [Show full text]
  • Maxar Technologies with Respect to Future Events, Financial Performance and Operational Capabilities
    Leading Innovation in the New Space Economy Howard L. Lance President and Chief Executive Officer Forward-Looking Statement This presentation contains forward-looking statements and information, which reflect the current view of Maxar Technologies with respect to future events, financial performance and operational capabilities. The forward-looking statements in this presentation include statements as to managements’ expectations with respect to: the benefits of the transaction and strategic and integration opportunities; the company’s plans, objectives, expectations and intentions; expectations for sales growth, synergies, earnings and performance; shareholder value; and other statements that are not historical facts. Although management of the Company believes that the expectations and assumptions on which such forward-looking statements are based are reasonable, undue reliance should not be placed on the forward-looking statements because the Company can give no assurance that they will prove to be correct. Any such forward-looking statements are subject to various risks and uncertainties which could cause actual results and experience to differ materially from the anticipated results or expectations expressed in this presentation. Additional information concerning these risk factors can be found in the Company’s filings with Canadian securities regulatory authorities, which are available online under the Company’s profile at www.sedar.com, the Company’s filings with the United States Securities and Exchange Commission, or on the Company’s website at www.maxar.com, and in DigitalGlobe’s filings with the SEC, including Item 1A of DigitalGlobe’s Annual Report on Form 10-K for the year ended December 31, 2016. The forward-looking statements contained in this presentation are expressly qualified in their entirety by the foregoing cautionary statements and are based upon data available as of the date of this release and speak only as of such date.
    [Show full text]
  • Final Report of the International Space Station Independent Safety
    I Contents Executive Summary........................................................................................ 1 Principal Observations ..................................................................................... 3 Principal Recommendations ............................................................................. 3 1. Introduction..................................................................................................... 5 Charter/Scope ................................................................................................... 5 Approach........................................................................................................... 5 Report Organization ......................................................................................... 5 2. The International Space Station Program.................................................... 7 International Space Station Characteristics..................................................... 8 3. International Space Station Crosscutting Management Functions............ 12 Robust On-Orbit Systems.................................................................................. 12 The Design ........................................................................................................ 12 Verification Requirements ................................................................................ 12 Physical (Fit) Verification ................................................................................ 13 Multi-element Integrated Test..........................................................................
    [Show full text]
  • Robotic Arm.Indd
    Ages: 8-12 Topic: Engineering design and teamwork Standards: This activity is aligned to national standards in science, technology, health and mathematics. Mission X: Train Like an Astronaut Next Generation: 3-5-ETS1-2. Generate and compare multiple possible solutions to a problem based on how well each is likely A Robotic Arm to meet the criteria and constraints of the problem. 3-5-ETS1-3. Plan and carry out fair tests in which variables are controlled and failure points are considered to identify aspects of a model or prototype that can be EDUCATOR SECTION (PAGES 1-7) improved. STUDENT SECTION (PAGES 8-15) Background Why do we need robotic arms when working in space? As an example, try holding a book in your hands straight out in front of you and not moving them for one or two minutes. After a while, do your hands start to shake or move around? Imagine how hard it would be to hold your hands steady for many days in a row, or to lift something really heavy. Wouldn’t it be nice to have a really long arm that never gets tired? Well, to help out in space, scientists have designed and used robotic arms for years. On Earth, scientists have designed robotic arms for everything from moving heavy equipment to performing delicate surgery. Robotic arms are important machines that help people work on Earth as well as in space. Astronaut attached to a robotic arm on the ISS. Look at your arms once again. Your arms are covered in skin for protection.
    [Show full text]
  • NASA's Lunar Orbital Platform-Gatway
    The Space Congress® Proceedings 2018 (45th) The Next Great Steps Feb 28th, 9:00 AM NASA's Lunar Orbital Platform-Gatway Tracy Gill NASA/KSC Technology Strategy Manager Follow this and additional works at: https://commons.erau.edu/space-congress-proceedings Scholarly Commons Citation Gill, Tracy, "NASA's Lunar Orbital Platform-Gatway" (2018). The Space Congress® Proceedings. 17. https://commons.erau.edu/space-congress-proceedings/proceedings-2018-45th/presentations/17 This Event is brought to you for free and open access by the Conferences at Scholarly Commons. It has been accepted for inclusion in The Space Congress® Proceedings by an authorized administrator of Scholarly Commons. For more information, please contact [email protected]. National Aeronautics and Space Administration NASA’s Lunar Orbital Platform- Gateway Tracy Gill NASA/Kennedy Space Center Exploration Research & Technology Programs February 28, 2018 45th Space Congress Space Policy Directive-1 “Lead an innovative and sustainable program of exploration with commercial and international partners to enable human expansion across the solar system and to bring back to Earth new knowledge and opportunities. Beginning with missions beyond low-Earth orbit, the United States will lead the return of humans to the Moon for long-term exploration and utilization, followed by human missions to Mars and other destinations.” 2 LUNAR EXPLORATION CAMPAIGN 3 4 STRATEGIC PRINCIPLES FOR SUSTAINABLE EXPLORATION • FISCAL REALISM • ECONOMIC OPPORTUNITY Implementable in the near-term with the buying
    [Show full text]
  • Core 1..44 Committee (PRISM::Advent3b2 9.00)
    House of Commons CANADA Standing Committee on Industry, Science and Technology INDU Ï NUMBER 024 Ï 2nd SESSION Ï 39th PARLIAMENT EVIDENCE Wednesday, March 5, 2008 Chair Mr. James Rajotte Also available on the Parliament of Canada Web Site at the following address: http://www.parl.gc.ca 1 Standing Committee on Industry, Science and Technology Wednesday, March 5, 2008 Ï (1535) I've been tracking the development of RADARSAT-2 for a [English] number of years and was invited to appear before the House of Commons Standing Committee on Foreign Affairs and International The Chair (Mr. James Rajotte (Edmonton—Leduc, CPC)): Trade in 2005 to speak about the Remote Sensing Space Systems We'll call this meeting to order. This is the 24th meeting of the Act, which was at that time called Bill C-25. At that time I was Standing Committee on Industry, Science and Technology. representing my previous employer, the Polaris Institute, and we Members, we have 13 votes at 5:30, so we'll have to end this raised concerns about the potential defence applications of meeting at 5:15. RADARSAT-2 and the need for its sensitive technology to be firmly controlled by the Canadian government. I believe our last guest is here. We have with us today four guests. The orders of the day today are, pursuant to Standing Order 108 In recent years my work has become more involved in promoting (2), for the study of the proposed sale of part of MacDonald, Canadian leadership and ensuring that the benefits of space and its Dettwiler and Associates Ltd.
    [Show full text]
  • For Immediate Release
    NEWS RELEASE FOR IMMEDIATE RELEASE October 17, 2018 MDA leaders outline opportunities, challenges for Canada in space Speech to the Greater Saskatoon Chamber of Commerce highlights innovation and economic upsides for Canada, if government acts to secure our place in space Saskatoon, SK – MDA, a Maxar Technologies company (formerly MacDonald, Dettwiler and Associates Ltd.) (NYSE: MAXR) (TSX: MAXR), today outlined that Canada’s role and potential involvement in the growing new space economy requires a full commitment from the Government of Canada for a new space strategy that would secure Canada’s place as a leader in space, Mike Greenley, the Group President of MDA, said in a speech to the Greater Saskatoon Chamber of Commerce. “We need a long-term, fully funded space plan for Canada that establishes the requisite funding to maintain and enhance our existing world-leading capabilities in AI-based space robotics, satellite communications, Earth observation and space science, while cultivating new areas of leadership. And we need it now, because there are pressing decisions that need to be made,” Greenley said. Greenley and Holly Johnson, the president’s business manager at MDA, made their presentation today in Saskatchewan to highlight the impact space has in the region, from Canadian Light Source Inc. to Calian SED Systems, a partner with MDA in the Don’t Let Go Canada campaign currently underway. Greenley and Johnson took advantage of their time in Saskatchewan to discuss MDA Launchpad, the company’s initiative to bring more Canadians companies on board the space industry. MDA has tasked senior leaders to deal with small- to medium-sized enterprises looking to collaborate with MDA.
    [Show full text]
  • Maxar 2020 Annual Report
    A message from Maxar CEO, Dan Jablonsky I would like to take this opportunity to provide a recap of last year’s performance, remind stockholders of our commitment to innovation and the path ahead, and end with a reminder of our commitment to value creation and our broader purpose. Despite the numerous challenges of the global COVID-19 pandemic, the year proved to be another important and successful year in our company’s journey. Maxar is a world leading space technology and intelligence company. We unlock the promise of space to help customers solve problems on Earth and beyond. In 2020, Maxar continued to lead the throughout the year, and we look forward industry in Earth Intelligence by providing to serving and growing with them in the critical data and insights that government years to come. Our team members are and commercial customers need to make passionate about the work we do and informed decisions in an increasingly believe strongly our Earth Intelligence and complex world. In Space Infrastructure, Space Infrastructure capabilities have the we continued to provide innovative ways power to change how we navigate and for our customers to support understand our changing world and explore communications and exploration across what’s beyond it. our planet and beyond, including the power needed to return to the moon and Mars. Our commitment to customers and their critical missions remained unwavering 1 annual shareholder letter 2020 PERFORMANCE AND KEY HIGHLIGHTS Managed well during the COVID-19 pandemic: One of the largest stories of the year was the global pandemic, and we remained steadfast in our efforts to protect our workforce while producing the products and solutions our partners need to complete their critical missions.
    [Show full text]
  • In-Space Assembly of Large Telescopes for Exoplanet
    In-space Assembly of Large Telescopes for Exoplanet Direct Imaging Nick Siegler, Chief Technologist, NASA Exoplanet Exploration Program (JPL/Caltech) Rudranarayan Mukherjee, Robotics Technologist (JPL/Caltech) The decision to implement a Starshade mission will not be finalized until NASA’s completion of the National Environmental Policy Act (NEPA) process. This document is being made available for information purposes only. © 2017 California Institute of Technology. Government sponsorship acknowledged. Aperture size limited by launch vehicle Future science needs will require increasingly large telescopes In-Space Large Aperture Telescope Assembly Evolvable Space Telescope (NGAS) 5 6 4 1 3 2 3 4 m 1 2 Polidan et al. 2016 3 In-Space Large Aperture Telescope Assembly Using the Deep Space Gateway (cis-Lunar orbit) to assemble NASA GSFC 4 In-Space Large Aperture Telescope Upgrade Telescope returns from ESL2 for servicing at EML1 Courtesy: Future In-Space Operations (FISO) working group (2007) 5 In-Space Large Aperture Telescope Assembly Free-fliers (e.g. Orion) and assembly module docked to spacecraft bus NASA GSFC 6 DARPA Orbital Express (2007) • Multiple OEDMS autonomous berthing and docking maneuvers In-space firsts: • Transfer of fuel • Transfer of a battery through the use of 3-m long Astro robotic arm NEXTSat DARPA/Boeing/MDA/Ball Aerospace jpl.nasa.gov 7 Robotic Servicing Missions DARPA Robotic Servicing of Geosynchronous Satellites (RSGS) (SSL) DARPAjpl.nasa.gov Robotic Servicing Missions Restore-L (NASA GSFC) • Refueling an existing
    [Show full text]
  • Loral Space & Communications Inc
    Table of Contents UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 10-K ☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 FOR THE FISCAL YEAR ENDED DECEMBER 31, 2020 OR ☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 Commission file number 1-14180 LORAL SPACE & COMMUNICATIONS INC. (Exact name of registrant specified in its charter) Jurisdiction of incorporation: Delaware IRS identification number: 87-0748324 600 Fifth Avenue New York, New York 10020 Telephone: (212) 697-1105 Securities registered pursuant to Section 12(b) of the Act: Title of each class Trading Symbol Name of each exchange on which registered Common stock, $.01 par value LORL Nasdaq Global Select Market Preferred Stock Purchase Rights Nasdaq Global Select Market Securities registered pursuant to Section 12(g) of the Act: None Indicate by check mark if the registrant is well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ◻ No ☒ Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes ◻ No ☒ Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ◻ Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
    [Show full text]
  • The RADARSAT-Constellation Mission (RCM)
    The RADARSAT-Constellation Mission (RCM) Dr. Heather McNairn Science and Technology Branch, ORDC [email protected] Daniel De Lisle RADARSAT Constellation Mission Manager Canadian Space Agency [email protected] Why Synthetic Aperture Radar (SAR)? The Physics: • At microwave frequencies, energy causes alignment of dipoles (sensitive to number of water molecules in target) • Characteristics of structure in target impacts how microwaves scatter (sensitive to roughness and canopy structure) The Operations: • At wavelengths of centimetres to metres in length, microwaves are unaffected by cloud cover and haze • As active sensors, SARs generate their own source of energy; can operate day or night and under low illumination conditions The Reality for Agriculture: • The backscatter intensity and scattering characteristics can be used to estimate amount of water in soils and crops, and tell us something about the type and condition of crops • The near-assurance of data collection is critical for time sensitive applications, in times of emergency (i.e. flooding), risk (i.e. disease), and for consistent measures over the entire growing season (i.e. monitoring crop condition) Why a RADARSAT Constellation? • The use of C-Band SAR has increased significantly since the launch of RADARSAT-1 • Many Government of Canada users have developed operational applications that deliver information and products to Canadians and the international community, based on RADARSAT • This constellation ensures C-Band continuity with improved system reliability, primarily to support current and future operational users • RCM is a government-owned mission, tailored to respond to Canadian Government needs for maritime surveillance, disaster management and ecosystem monitoring Improved stream flow forecasts1 Estimates of crop biomass2 AAFC’s annual crop inventory Produced by ACGEO Contact: [email protected] 1Bhuiyan, H.A.K.M, McNairn, H., Powers, J., and Merzouki, A.
    [Show full text]
  • Downloaded for Infrastructure GIS Data
    NATIONAL TECHNICAL DOCUMENT FOR ESTABLISHING CARTOGRAPHIC BASE IN INDIA Generation of Large Scale (1:10,000; 1:2,000 & Lesser) Maps for Disaster Management and Planning March 2016 National Disaster Management Authority Government of India CONTENTS Table of Contents Foreword i Preface ii Acknowledgement iii Table of Contents iv-vii List of Figures and Tables viii-ix Abbreviations x-xii Glossary of Terms xiii-xv Generation of National Topographic Database (NTDB) For 1:10,000; 1:2,000 & 1 1 Lesser Scale 1.1 Mapping at 1:10,000; 1:2,000 & Lesser Scale 2 1.2 NTDB on 1:10,000; 1:2,000 & Lesser Scale- A National Need 2 2 Geographical Information System for Disaster Management 3 2.1 GIS in Different Phases of Disaster Management 3-6 2.2 GIS database for Disaster Management 7-8 2.3 Scope for developing a GIS database for Disaster Management 8 2.4 Projection System 8 2.5 Positional Accuracy 8 2.6 Technology 8 2.7 Functional Requirements for Database Management 8-9 3 Critical Facilities Mapping (CFM) 10 3.1 Defining Critical Facilities for Mapping 10-11 4 Geo-referencing of Satellite Imagery 12-13 Technology for 1:10,000 Scale Mapping 14 5 Various Methodologies Available for Preparing Maps of Scale1:10,000 from 15 Images 5.1 Satellite Imaging 15 5.2 Aerial Photography 15 5.3 Comparison Between Satellite Imaging and Aerial Mapping 16 5.3.1 General Differences 16 5.3.2 Comparison of Accuracy of Imaging 17-18 5.4 Comparison of Ground Sampling Distance (GSD) for Satellite Imaging and 18-19 Aerial Photogrammetry 5.5 Aerial Mapping 20 5.5.1 Map Checking
    [Show full text]