Pennsylvania's 2009 ARRA Planned Highway and Bridge

Total Page:16

File Type:pdf, Size:1020Kb

Pennsylvania's 2009 ARRA Planned Highway and Bridge Pennsylvania's 2009 ARRA Planned Highway and Bridge Projects for Letting [updated 3.24.09] $ Amount County SR Project Title Project Description/Location Type of Work (ARRA Funds) Concrete patching, joint repair and resurfacing on US Route 15 from State Route 94 York Springs exit to Adams 15 Blue-Gray Highway Resurfacing Resurfacing $6,785,000 State Route 234 Heidlersburg exit in Huntington, Tyrone and Latimore Townships Adams, Bridge Rehabilitation of 11 different bridges on various Cumberland, 22 Precast Bridge Parapet Repairs state routes in Adams, Cumberland, Lancaster, Safety $3,600,000 Franklin, Lancaster, Franklin, York Counties York Rehabilitation of the tunnel carrying State Route 3069 Liberty Tunnel Rehabilitation Phase Allegheny 3069 from the Liberty Bridge over the Monongahela River Tunnel Rehabilitation $12,500,000 2 to State Route 51 in the City of Pittsburgh Railroad Relocation, Bridge Retrofit and Building demolition of State Route 28 from Troy Hill to Milvale Allegheny 28 PA 28 Widening -Preparation Highway Reconstruction $45,956,000 in the City of Pittsburgh and Milvale Borough in advance of the widening project Reconstruction of the Interchange, installation of 2 Interchange Allegheny 60 US 22/30/60 Interchange new signals, signal work and signing in Robinson and $13,000,000 Improvements North Fayette Townships Bridge Restoration and approach work of Ft. Duquesne Allegheny 279 Ft. Duquesne Bridge Bridge Restoration $30,580,000 Bridge in City of Pittsburgh Rehabilitation of 2 bridges carrying US Route 422 Armstrong 422 US 422 Bridge Rehabilitation Eastbound and Westbound over State Route 28 ramps Bridge Rehabilitation $3,600,000 in East Franklin Township Preservation of State Route 3023 Iron Bridge over Armstrong 3023 Iron Bridge #1 Bridge Preservation $400,000 Buffalo Creek in South Buffalo Township Restoration of State Route 28 from State Route 3023 Armstrong 28 PA 28: SR 3023 to SR 128 to State Route 128 in South Buffalo and North Buffalo Highway Restoration $8,410,800 Townships Page 1 of 22 Pennsylvania's 2009 ARRA Planned Highway and Bridge Projects for Letting [updated 3.24.09] $ Amount County SR Project Title Project Description/Location Type of Work (ARRA Funds) Resurfacing US Route 422 from west of US Route 422/State Route 2009 Intersection to east of the US Route 422/State Route 1015 Intersection in Armstrong 422 County Line East Resurfacing Resurfacing $5,300,000 Worthington Borough and West Franklin Township, Armstrong County and Clearfield Township, Butler County Resurfacing, widening of approximately 1 mile portion of the existing Roaring Run Trail in the Village of Transportation Armstrong Roaring Run Trail Phase 5 $780,000 Edmon including construction of a rest room facility in Enhancement Kiskiminetas Township Rehabilitation of the Rochester Bridge over Beaver Beaver 51 Rochester Bridge Rehabilitation Bridge Rehabilitation $20,000,000 River in Rochester and Bridgewater Boroughs Bedford County Bridge Rehabilitation of 2 bridges on State Route 915 over Bedford 915 Bridge Rehabilitation $1,700,000 Rehabilitation Sandy Run in Broadtop Township Resurfacing of State Route 30 from Stony Lane (T-720) Bedford 30 Bedford Bypass Overlay to the Snake Spring Twp Line in Bedford Township and Resurfacing $7,700,000 Bedford Borough 1032, Bedford County Bridge Bridge deck replacements for various structures in Bedford Bridge Rehabilitation $600,000 2029 Rehabilitation Bedford County Bedford, Blair, Cambria, Fulton, Preservation of 20 bridges in Bedford, Blair, Cambria, Various Districtwide Bridge Preservation Bridge Preservation $5,500,000 Huntingdon, Fulton, Huntingdon and Somerset Counties Somerset Replacement of Precast Bridge Parapets on Interstate Berks 78 I-78 Lenhartsville Parapets Safety $3,375,000 78 in Lenhartsville, Greenwich Township Install Median Barrier on State Route 100 in Berks 100 PA 100 Median Barrier Safety $420,000 Colebrookdale Township Page 2 of 22 Pennsylvania's 2009 ARRA Planned Highway and Bridge Projects for Letting [updated 3.24.09] $ Amount County SR Project Title Project Description/Location Type of Work (ARRA Funds) Installation of Cameras, Radios message signs on Interstate 78 (Eastbound and Westbound between Berks 78 I-78 ITS Implementation Lebanon County Line and State Route 61) and State ITS $2,420,000 Route 61 (Northbound and Southbound prior to Interstate 78)in Berks County Bridge Preservation in various locations in Berks Berks Various Berks County Bridge Preservation Bridge Preservation $6,000,000 County Surfacing and Safety Improvement on US Route 222 in Berks 222 US 222 Resurfacing and Safety Spring, Muhlenberg, Ontelaunee and Maiden Creek Resurfacing, Safety $10,034,000 Townships Resurfacing on State Route 2005 - 5th Street in the Berks 2005 5th Street Resurfacing Resurfacing $5,400,000 City of Reading Install median barrier on US Route 222 - Park Road in Berks 222 US 222 Park Road Median Barrier Safety $1,920,000 Spring, Bern, Muhlenberg and Ontelaunee Townships Installation of curb ramps in various locations in Berks Transportation Berks Various Berks County Curb Ramps $2,076,000 County Enhancement Pavement Restoration and Curb Ramps on Penn Street Blair 36 Penn Street Restoration (State Route 36) from Chimney Rocks Road to Pine Pavement Restoration $2,900,000 Street in Hollidaysburg Borough Bridge Preservation to various bridges in Snyder, Antis Blair Various Northern Blair Bridge Preservation Bridge Preservation $2,800,000 Townships and Tyrone Borough Resurfacing, Guiderail Upgrades and ADA curb ramps on State Route 1001 from Convention Center Blvd 1001, Pleasant Valley and Logan Boulevard Blair north to 3rd Street and on State Route 36 from Pine St Resurfacing $3,493,000 0036 Resurfacing (T-612) to Plank Rd (State Route 1001) in Allegheny, Townships and the City of Altoona. Rehabilitation of US Route 6 bridge over Sugar Creek Bradford 6 US 6 over Sugar Creek Bridge Rehabilitation $1,012,282 in Sylvania Borough Rehabilitation of State Route 187 over Bullard Creek in Bradford 187 PA 187 over Bullard Creek Bridge Rehabilitation $707,366 Rome Borough and Township Page 3 of 22 Pennsylvania's 2009 ARRA Planned Highway and Bridge Projects for Letting [updated 3.24.09] $ Amount County SR Project Title Project Description/Location Type of Work (ARRA Funds) Rehabilitation of State Route 1055 over Parks Creek in Bradford 1055 SR 1055 over Parks Creek Bridge Rehabilitation $613,267 Rome Township Rehabilitation of State Route 187 over the Bradford 187 Wysox River Bridge Bridge Rehabilitation $1,301,000 Susquehanna River in Asylum and Wysox Townships Preservation of 5 bridges on various routes in Monroe, Bradford, Sullivan, Sayre Boroughs, Monroe, Laporte, Wysox and 220 Districtwide Bridge Preservation Bridge Preservation $1,775,000 Tioga Farmington Townships in Bradford, Sullivan and Tioga Counties Intersection Improvements (4), Rehabilitation, Road Bucks Stoopville Road Improvements Surface, and Installation of Traffic Calming Devices to Safety $1,700,000 Stoopville Road in Newton Township Construction of ADA Curb Ramps in various locations Transportation Bucks Various Bucks County Curb Ramps $1,200,000 of Bucks County Enhancement Installation of ITS devices on Interstate 95 in various Bucks 95 I-95 ITS Extension Safety $36,300,000 locations of Bucks and Philadelphia Counties Installation of ITS devices in various locations of Bucks, Philadelphia 95 Bucks County ITS Phase II Safety $20,000,000 Philadelphia and Bucks Counties Rehabilitataion of State Route 3027 bridge over Butler 3027 Harmony Junction Bridge Connoquenessing Creek and B & O Railroad in Jackson Bridge Replacement $8,500,000 Township Bridge Deck Replacement of State Route 4007 Bridge Butler 4007 West Park Road Bridge #5 Bridge Rehabilitation $1,800,000 over Interstate 79 in Worth Township Bridge Deck Replacement of State Route 4007 bridge Butler 4007 West Park Road Bridge #1 Bridge Rehabilitation $2,200,000 over Interstate 79 in Muddy Creek Township Preservation of State Route 3013 bridge over Butler 3013 Ribold Bridge Bridge Preservation $470,000 Connoquenessing Creek in Forward Township Preservation of State Route 2018 bridge over Little Butler 2018 SR 2018 Bridge Preservation Bridge Preservation $180,000 Buffalo Creek in Buffalo Township Page 4 of 22 Pennsylvania's 2009 ARRA Planned Highway and Bridge Projects for Letting [updated 3.24.09] $ Amount County SR Project Title Project Description/Location Type of Work (ARRA Funds) Bridge Preservation of State Route 3032 bridge over Butler 3032 Shannon Road Bridge Bridge Preservation $225,000 Connoquenessing Creek in Connoquenessing Township Preservation of State Route 2023 bridge over Little Butler 2023 Sandy Lick Bridge Bridge Preservation $250,000 Buffalo Creek in Buffalo Township Rehabilitation, Restoration and Resurfacing of US Route 422 from a point near Whipporwill Road to a Butler 422 Lyndora West Restoration Highway Restoration $2,163,200 point near the State Route 356 Exit in Franklin and Connoquenssing Townships Preservation of State Route 528 bridge over Butler 528 Wahlville Bridge #4 Bridge Preservation $465,000 Connoquenessing Creek in Forward Township Rehabilitation of 2 bridges on Manor Drive (State Route 1001) over R. J. Corman Railroad near the intersection of Munster Rd (State Route 1003) and Cambria 1001 Loretto Road Bridges Bridge Preservation $1,000,000 over R. J. Corman Railroad near the intersection of Winterset Road (State Route 1002) in Allegheny Township Bridge preservation of 3 bridges: on State Route 1021 over Wyerough Run near
Recommended publications
  • Muncy Creek Township
    Muncy Creek Planning Area Plan Adoptions 2016 COMPREHENSIVE PLAN REVIEW AND IMPLEMENTATION STRATEGY Plan Adoptions HUGHESVILLE BOROUGH COUNCIL – Adopted <MONTH DAY, YEAR> MUNCY BOROUGH COUNCIL – Adopted <MONTH DAY, YEAR> PICTURE ROCKS BOROUGH COUNCIL – Adopted <MONTH DAY, YEAR> MUNCY CREEK TOWNSHIP BOARD OF SUPERVISORS – Adopted <MONTH DAY, YEAR> SHREWSBURY TOWNSHIP BOARD OF SUPERVISORS – Adopted <MONTH DAY, YEAR> WOLF TOWNSHIP BOARD OF SUPERVISORS – Adopted <MONTH DAY, YEAR> Lycoming 2030: Plan the Possible 2 Muncy Creek Planning Area Acknowledgements 2016 COMPREHENSIVE PLAN REVIEW AND IMPLEMENTATION STRATEGY Acknowledgements Muncy Creek Planning Advisory Team (PAT) WALTER REED, REPRESENTATIVE OF HUGHESVILLE BOROUGH RICHARD SMITH, REPRESENTATIVE OF HUGHESVILLE BOROUGH STEVE JAQUITH, REPRESENTATIVE OF MUNCY BOROUGH (ALTERNATE) BILL RAMSEY, REPRESENTATIVE OF MUNCY BOROUGH LINDA STEIN, REPRESENTATIVE OF MUNCY BOROUGH STEVEN CULVER, REPRESENTATIVE OF MUNCY CREEK TOWNSHIP BILL POULTON, REPRESENTATIVE OF MUNCY CREEK TOWNSHIP ANGELA SNYDER, REPRESENTATIVE OF MUNCY CREEK TOWNSHIP BILL DORMAN, REPRESENTATIVE OF PICTURE ROCKS BOROUGH EUGENE OTTERBEIN, REPRESENTATIVE OF PICTURE ROCKS BOROUGH DEAN BARTO, REPRESENTATIVE OF WOLF TOWNSHIP MELANIE MCCOY, REPRESENTATIVE OF WOLF TOWNSHIP TERRY DINCHER, REPRESENTATIVE OF SHREWSBURY TOWNSHIP REBECCA FOUGHT, REPRESENTATIVE OF EAST LYCOMING RECREATION AUTHORITY DAVID MACIEJEWSKI, REPRESENTATIVE OF EAST LYCOMING SCHOOL DISTRICT MICHAEL PAWLIK, REPRESENTATIVE OF EAST LYCOMING SCHOOL DISTRICT GENE CAHN, REPRESENTATIVE
    [Show full text]
  • __History of Kew Depot and It's Routes
    HISTORY OF KEW DEPOT AND ITS ROUTES Page 1 HISTORY of KEW DEPOT and the ROUTES OPERATED by KEW Compiled and written by Hugh Waldron MCILT CA 1500 The word tram and tramway are derived from Scottish words indicating the type of truck and the tracks used in coal mines. 1807 The first Horse tram service in the world commences operation between Swansea and Mumbles in Wales. 12th September 1854 At 12.20 pm first train departs Flinders Street Station for Sandridge (Port Melbourne) First Steam operated railway line in Australia. The line is eventually converted to tram operation during December 1987 between the current Southbank Depot and Port Melbourne. The first rail lines in Australia operated in Newcastle Collieries operated by horses in 1829. Then a five-mile line on the Tasman Peninsula opened in 1836 and powered by convicts pushing the rail vehicle. The next line to open was on 18/5/1854 in South Australia (Goolwa) and operated by horses. 1864 Leonard John Flannagan was born in Richmond. After graduating he became an Architect and was responsible for being the Architect building Malvern Depot 1910, Kew Depot 1915 and Hawthorn Depot 1916. He died 2nd November 1945. September 1873 First cable tramway in the world opens in Clay Street, San Francisco, USA. 1877 Steam tramways commence. Victoria only had two steam tramways both opened 1890 between Sorrento Pier to Sorrento Back Beach closed on 20th March 1921 (This line also operated horse trams when passenger demand was not high.) and Bendigo to Eaglehawk converted to electric trams in 1903.
    [Show full text]
  • For the Record SOUTHERN STATES COOP
    The following is a list of MDE’s JOHNFor W. RITTER TRUCKING, the INC. - 8271 DAYSRecord COVE RUBBLE LANDFILL - DAVID YINGLING PROPERTY - 2300 Brock Bridge Road, Laurel, MD 20724. (98- HORIZONTAL EXPANSION - 6425 Days Hughes Shop, Westminster, MD 21158. permiting activity from OPT-6467) Oil operations permit for above Cove Road, White Marsh, MD 21162. Sewage sludge application on agricultural land February 15 - March 15, 1998 ground storage tank and transportation (98DP3261) Surface industrial discharge permit KENNETH FORD - 2867 Bird View Road, MARYLAND CITY WATER GAMSE LITHOGRAPHING COMPANY, INC. Westminster, MD 21157. Sewage sludge For more information RECLAMATION FACILITY - 462 Brock - 7413 Pulaski Highway, Baltimore, MD application on agricultural land on any of these permits, Bridge Road, Laurel, MD 20724. Sewage sludge 21237-2529. (TR 4626) Received an air LOIS G. PAULSON - 322 Klee Mill Road, application on agricultural land permit to construct for two printing presses Sykesville, MD 21784. Sewage sludge please call our PASADENA YACHT CLUB - 8631 Fort MARYLAND TRANSPORTATION AU- application on agricultural land Environmental Permits Smallwood Road, Pasadena, MD 21122. (TR THORITY - Reservoir Road and Peninsula MELVIN BLIZZARD - 1246 Deer Park Road, 4639) Received an air permit to construct for Expressway, Baltimore, MD 21219. (TR 4640) Westminster, MD 21157. Sewage sludge Service Center at one 4,000 gallon underground storage tank Received an air permit to construct for one application on agricultural land (410) 631-3772. PATUXENT WATER RECLAMATION groundwater remediation PRESTON GREEN, CA-17 - 3300 Sams Creek FACILITY - Cronson Boulevard, Crofton, MD MARYLAND STATE DEPARTMENT OF Road, New Windsor, MD 21776. Sewage sludge 21114. Sewage sludge application on agricul- GENERAL SERVICES - 3O1 W.
    [Show full text]
  • Draft 2021 LRTP
    DRAFT SEDA‐COG Metropolitan Planning Organization (MPO) LONG RANGE TRANSPORTATION PLAN The Draft Long Range Transportation Plan includes regional overview information and the MPO region’s long range vision for prioritizing transportation investments. This copy of the draft plan is available as part of a 30‐day comment period beginning on May 24, 2021, and ending on June 22, 2021. The public comment period provides the public an opportunity to provide feedback on all facets of the Long Range Transportation Plan before its adoption. The plan can be reviewed online at: http://www.seda‐cog.org/departments/transportation/long‐range‐plan. Written and electronic comments may be submitted via email, SEDA‐COG web portal, fax, or Postal Service by 4:00 p.m. on Tuesday, June 22, 2021. Email comments may be submitted to lrtp@seda‐cog.org or through the web portal at http://www.seda‐cog.org/departments/transportation/transportation‐comments Comments may be faxed to 570‐524‐9190 Please address all written comments to: Mr. Don Kiel SEDA‐COG MPO 201 Furnace Road Lewisburg, PA 17837 If you would like to provide comments or discuss the draft plan in person, a Virtual Public Meeting will be held during the public comment period as follows: Date: June 3, 2021 Time: 7:00 p.m. to 8:00 p.m. Location: The content of this Notice is available in alternative formats and other languages upon request by contacting the SEDA‐COG MPO at 570‐524‐4491, or by written correspondence directed to the MPO at 201 Furnace Road, Lewisburg, PA 17837, or by email at jsaylor@seda‐cog.org.
    [Show full text]
  • 2010 Annual Report.Pdf
    U.S. Department of Energy Office of Environmental Management Transportation Emergency Preparedness Program 2010 Annual Report 2010 Annual Report Department of Energy Transportation Emergency Preparedness Program Executive Summary The mission for the Transportation Emergency Preparedness Program (TEPP) is to ensure federal, state, tribal, and local responders have access to the plans, training, and technical assistance necessary to safely, efficiently, and effectively respond to radiological transportation accidents. To support this mission TEPP has formed strong partnerships over the last 15 years with state, tribal and local response organizations, Federal agencies and other national programs integrating TEPP planning tools and training into a variety of hazardous materials preparedness programs. These partnerships have resulted in states and tribes either using all or portions of the TEPP resources in their programs. Many have adopted the TEPP training program, Modular Emergency Response Radiological Transportation Training (MERRTT), into their hazardous material training curriculums to assist them in preparing their fire departments, law enforcement organizations, hazardous materials response teams, emergency management officials, public information officers and emergency medical technicians to respond to a radiological transportation accidents. This Fiscal Year (FY) 2010 DOE TEPP Annual Report highlights events, outreach, partnerships and training where TEPP has proven to be integral in building radiological response capabilities of states and tribes that may need to respond to radiological incidents. To help build those capacities, TEPP promotes state and tribal implementation by providing responders who successfully complete a MERRTT Train-the-Trainer (T3) course with the tools and knowledge to integrate MERRTT into their state, tribal, or local training programs. TEPP has proven to be an effective and growing preparedness resource across the nation.
    [Show full text]
  • I-180/I-80 Interchange Signing Project
    NEBRASKA DEPARTMENT OF TRANSPORTATION NOTICE OF HIGHWAY IMPROVEMENT PROJECT I-180/I-80 Interchange Signing HSIP-180-9(4); C.N. 13349 Identified as I-180/I-80 Interchange Signing, Construction is tentatively scheduled to begin the proposed project would install new spring of 2018 with completion within three overhead guide signs and two new overhead working days. sign structures at the Interstate 80 (I-80) and The proposed project would require short Interstate 180 (I-180) interchange located within duration detours during the removal and the city limits of Lincoln in Lancaster County. installation of the overhead signs and structures. The proposed project would begin on I-80 at mile The detours would be required for the on/off- marker (MM) 401.00 and end at MM 401.25 and ramps from westbound I-80 to northbound and begin on I-180 at MM 0.00 and end at MM 1.15. southbound I-180 and from northbound I-180 to westbound I-80. All detours would utilize I-80 The purpose of this project is to preserve the Exit 399 and Cornhusker Highway. I-180 and I-80 transportation asset, improve the reliability of the transportation system, and NDOT has worked to develop this project to perpetuate the mobility of the traveling public. minimize inconvenience and hardships. We are The need for this proposed project is based dedicated to improving Nebraska’s Highway on the condition of the overhead signs and system and with your help we can achieve this structures. goal. Proposed construction would consist of removing the existing overhead guide signs and Any questions or comments regarding this project should sign structures and installing new overhead guide be submitted to: Sarah Soula, Public Involvement Manager, Nebraska Department of Transportation, P.O.
    [Show full text]
  • Construction Suspended Where Possible for July 4
    State of Illinois JB Pritzker, Governor Illinois Department of Transportation Omer Osman, Acting Secretary FOR IMMEDIATE RELEASE: CONTACT: July 1, 2020 Paul Wappel 217.685.0082 Maria Castaneda 312.447.1919 Construction suspended where possible for July 4 Non-emergency closures called off, but motorists should still expect work zones SPRINGFIELD – The Illinois Department of Transportation announced today that lanes that have been closed for construction will reopen, where possible, for the Fourth of July holiday to minimize travel disruption. Non-emergency closures will be suspended from 3 p.m. July 2 to 11:59 p.m. July 5. The following lane closures will remain in place during the holiday weekend. Work zone speed limits will remain in effect where posted. Please buckle up, put your phone down and drive sober. District 1 City of Chicago: • The following ramps in the Jane Byrne Interchange work zone will remain closed: • o Inbound Kennedy (Interstate 90/94) Expressway exit to inbound Ida B. Wells Drive. o Outbound Dan Ryan Expressway exit to Taylor Street and Roosevelt Road. o Outbound Ida B. Wells Drive entrance from Canal Street. o Outbound Ida B. Wells Drive exit to outbound Dan Ryan. o Outbound Ida B. Wells Drive exit to outbound Kennedy. o Inbound Eisenhower Expressway (Interstate -290) to outbound Kennedy; detour with U-turn posted. o Inbound Eisenhower; lane reductions continue. o Inbound Ida B. Wells Drive; lane reductions continue. • Outbound Kennedy exit at Canfield Road; closed. • Westbound Bryn Mawr Avenue between Harlem and Oriole avenues; lane reductions continue. • Westbound Higgins Avenue between Oriole and Canfield avenues; lane reductions continue.
    [Show full text]
  • Chapter Four
    CHAPTER FOUR EXISTING TRANSPORTATION SYSTEM INVENTORY WITH NEEDS ASSESSMENT ANALYSIS This Chapter of the WATS Long Range Transportation Plan provides a description of the existing multi-modal transportation system in Lycoming County encompassing highways and bridges, public transportation, airports, railroads and bike / pedestrian facilities. There are no waterway or inland ports located in the County. An inventory of current transportation assets by transportation mode will be provided, including a current physical condition and operational performance needs assessment. This data driven inventory and assessment is important to properly address transportation asset management needs and to improve operational performance of the overall system in terms of public safety, security, efficiency and cost effective movement of people and goods. HIGHWAY SYSTEM Highway Designations / Classification System According to the PennDOT Bureau of Planning and Research, there are 1,995.18 linear miles of publicly owned roadways throughout Lycoming County. PennDOT owns 716.59 linear miles, (35%) of public roadways in Lycoming County. In addition, there are 1,258.86 miles, (63%) of locally-owned roadways owned by 52 different local municipalities included on the PennDOT Liquid Fuels System. Other agencies own the remainder of roads in the County. Lycoming County government only owns two roads which are County Farm Road at the Lysock View county complex housing the Department of Public Safety (911 center), Pre- Release and county farm and an entrance road to the White Deer Recreation Complex. There are federal designations and classifications established for highway systems in the nation as noted in the following sections. Road Functional Classification System The Federal Highway Administration, PennDOT and Metropolitan & Rural Planning Organizations cooperatively establish and update maps that delineate various road classifications which group roadways into a hierarchy based on the type of highway service provided.
    [Show full text]
  • Changes to Transit Service in the MBTA District 1964-Present
    Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.
    [Show full text]
  • State of Illinois
    State of Illinois Illinois Department of Transportation District 1 – Urban Interstate Resurfacing Milling and resurfacing on Interstate 290 from Sacramento Boulevard to Interstate 90/94 in Chicago. District 2 – Rural 4 Lane Bridge Rehabilitation Miscellaneous repairs on the structure carrying Interstate 80 over the Mississippi River. District 6 – Rural 2 Lane Concrete pavement on County Highway 10 east of Elkhart. District 6 – Urban Streetscape Streetscape reconstruction that includes new concrete pavers, sidewalks, lighting, planting beds and traffic signals on Capitol Avenue between 5th Street and 7th Street in Springfield. District 8 – Urban Pedestrian Bridge Construction Construction of a 3-span pedestrian bridge, sidewalk, lighting, landscaping, sewer and retaining walls for the city of Alton over US 67 at Riverfront Park. Printed by authority of the State of Illinois, 0445-11, 01/11, 500 FY 2012-2017 Proposed Highway Improvement Program Spring 2011 Published by the Illinois Department of Transportation Springfield, Illinois 62764 Printed by authority of State of Illinois, April 2011, 275 copies. This document is printed on recycled paper. This document is available on-line at www.dot.il.gov/opp/publications.html. CONTENTS Page Program Development Process ................................... 1 Seeking Public Involvement – Outreach Meetings ....... 3 Executive Summary ..................................................... 5 Department of Transportation District Map ................. 21 Public Review and Comment Form ...........................
    [Show full text]
  • Operations and Financial Analysis
    OPERATIONS AND FINANCIAL ANALYSIS APRIL 22, 2015 PREPARED BY: LOUIS BERGER WATER SERVICES TABLE OF CONTENTS A) EXECUTIVE SUMMARY B) OPERATIONS ANALYSIS C) FINANCIAL ANALYSIS D) APPENDICES EXECUTIVE SUMMARY Introduction Louis Berger was tasked by the Baltimore City Department of Transportation (BCDOT) to evaluate the Charm City Circulator (CCC) bus operation and analyze financial performance, and develop route operations alternatives that maximize ridership while minimizing costs. Objective The objective is to develop and evaluate alternatives to eliminate the annual deficits while providing maximum service to riders within existing financial resources. Description of Current System Existing Condition The CCC consists of four routes, Purple, Orange, Green and Banner providing “Fast. Friendly. Free.” service throughout downtown Baltimore 362 days per year, with hours of service varying by day type and by season. Key characteristics of each route: Purple Route- runs north - south from Federal Hill to Historic Mount Vernon. Ten (10) minute headways require six (6) buses to operate. Heaviest ridership of all the routes. Orange Route- runs east – west from Historic Fell’s Point and Harbor Point in the east beyond University of Maryland, Baltimore in the west. Ten (10) minute headways require five (5) buses to operate. Ridership is second best in the system. Green Route- roughly U shaped route serves Johns Hopkins University Hospital East Baltimore Campus (JHUH) connecting south to Harbor Point and Harbor East, then northwest to park and ride lots, looping down near City Center then back around. Ten (10) minute headways require six (6) buses. Longest route, least productive in terms of riders. Banner Route- angles southeast of the city past Federal Hill to Fort McHenry.
    [Show full text]
  • 2018 Susquehanna Brochure
    2 0 1 8 E M E RGE NCY P R E PARE DNES S GUIDE IMPORTANT EMERGENCY PREPAREDNESS INFORMATION INSIDE EMERGENCY Emergency Information 1 3 Any emergency at the Susquehanna plant would fall into one of the following 2 4 our categories, established by the U.S. Nuclear Regulatory Commission. CLASSIFICATIONS Noti�ication of Unusual Event General Emergency Events are in process or have occurred which Events are in process or have occurred that involve indicate a potential degradation of the level of actual or imminent substantial core degradation or safety of the plant or indicate a security threat to melting with potential for loss of containment facility protection has been initiated. No releases of integrity or hostile action that results in an actual radioactive material requiring offsite response or loss of physical control of the facility. Radioactive monitoring are expected unless further releases can be reasonably expected to exceed degradation of safety systems occurs. EPA Protective Action Guideline exposure levels offsite for more than the immediate site area. Alert Events are in process or have occurred that involve an actual or potential substantial degradation Siren Maintenance of the level of safety of the plant or a security event that involves probable life-threatening risk To maintain a high level of siren to site personnel or damage to site equipment because of hostile action. Any releases are system performance, periodic expected to be limited to small fractions of the maintenace and testing may U.S. Environmental Protection Agency Protective Action Guideline exposure levels. occur. Testing may result in a growl or short 10-second sound Site Area Emergency of the siren.
    [Show full text]