Retail for Lease AVAILABLE up to SF 7,575

Total Page:16

File Type:pdf, Size:1020Kb

Retail for Lease AVAILABLE up to SF 7,575 Lake Shore Blvd. West Toronto, ON Retail For Lease AVAILABLE UP TO SF 7,575 ASKING NET RENT PSF $35.00 ADDITIONAL RENT $17.00 PSF (EST. 2019) OCCUPANCY DATE Q4 2019 (EST.) Elvie Antonacci* Associate Vice President I Retail Services ARTIST RENDERING 416 756 5419 [email protected] Andrew Kichler* Associate 416 756 5448 [email protected] Lake Shore Boulevard West Toronto, ON Median Age Avg. HH Income Avg. Size Household Secondary Education Employment Rate 41 $84,000 2.2 92% 65% Mostly non-family sized Diploma or degree WHAT IS THE OPPORTUNITY? WHEN WILL IT BE COMPLETE? Minto Long Branch is a new mixed use community Phase 2 occupancy for commercial tenant fixturing development consisting of 3 phases: is anticipated for October 2019. Townhomes in this phase are sold out and with occupancy expected for this fall. Completed in 2017 and is fully occupied PHASE 1 consisting of 333 townhomes and WHERE IS IT LOCATED? 12,500 SF of retail. The site is located at a signalized intersection at the south east corner of Long Branch Avenue and Lake Currently under construction and now Shore Boulevard West in the heart of Toronto West’s PHASE 2 being offered for lease. Long Branch community. • Up to 7,575 SF of ground floor commercial retail space plus • Up to 2,967 SF of basement space • Unit sizes start from 542 SF PHASE 2 BRINGS AN ADDITIONAL 130 TOWNHOMES Slated for a 2020 build start consisting PHASE 1 PHASE 3 PHASE 3 of an estimated 416 townhomes and 9,500 SF of retail. With an estimated 862 townhomes x 2.2 average household size that’s close to 1,900 PEOPLE AT YOUR DOORSTEP! PHASE 2 3590 LAKE SHORE BLVD WEST Lake Shore Boulevard West Toronto, ON WHY MINTO LONG BRANCH? This exciting retail opportunity provides flexible unit size options with excellent visibility fronting directly on Lake Shore Boulevard. The site is surrounded by immediate population density located on a key Toronto west corridor that is undergoing re-urbanization and rejuvenation. South Etobicoke was once Toronto’s best kept secrets and has experienced bustling growth. The Long Branch neighborhood is on the edge of this massive transformation and it’s strong appeal is no surprise. Its uniquely historic and vibrant with an eclectic mix of cafes, restaurants and amenities. It’s well within Toronto west city limits and remains one of the few walkable breathable communities in close proximity to Humber College’s Lakeshore Campus, the waterfront, streetcars, the Gardiner Expressway ramp, Long Branch GO Station, QEW, and Sherway Gardens. New development and re-urbanization makes Long Branch an attractive alternative to the downtown core. The estimated 1,900 population base in this growing community is in need of services, shops and amenities. The site falls within the Commercial Avenues Zone which permits a broad range of uses including medical, professional, banks, retail, and personal services to name a few. Restaurants and daycare uses are not being considered at this time. 3590 LAKE SHORE BLVD WEST Lake Shore Boulevard West Toronto, ON EVANS AVE 427 SHERWAY GARDENS GARDINER EXPRESSWAY KIPLING AVE QEW BROWNS LINE MINTO LONGBRANCH HUMBER COLLEGE LONG BRANCH GO STATION LAKE SHORE BLVD WEST Phase II Now Under Construction Up to 7,575 SF 3590 LAKE SHORE BLVD WEST Lake Shore Boulevard West Toronto, ON SITE PLAN PHASE 1 PHASE 3 PHASE 2 Now Under Construction Fully Leased Future Retail Up to 7,575 SF 3590 LAKE SHORE BLVD WEST Lake Shore Boulevard West Toronto, ON 1 1 1 1 1 1 1 1 1 1 1 1 11'-11 2" [3.64 M] 12'-4 2" [3.77 M] 12'-4 2" [3.77 M] 12'-4 2" [3.77 M] 12'-4 2" [3.77 M] 12'-4 2" [3.77 M] 12'-4 2" [3.77 M] 12'-4 2" [3.77 M] 12'-4 2" [3.77 M] 12'-4 2" [3.77 M] 12'-4 2" [3.77 M] Bulkhead 10'-7" [3.22 M] 11'-11 2" [3.65 M] Bulkhead Bulkhead Bulkhead Bulkhead Bulkhead Bulkhead 25'-4" [7.72 M] 25'-7" [7.80 M] 26'-10" [8.18 M] 26'-10" [8.18 M] 27'-10" [8.48 M] 29'-1" [8.86 M] 20'-4" [6.20 M] 21'-10" [6.65 M] 21'-10" [6.65 M] 22'-7" [6.88 M] 18'-9" [5.71 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 21'-8" [6.60 M] 16'-3" [4.95 M] GROUND FLOOR - UP TO 7,575 SF 27'-9" [8.46 M] " [6.87 M] 2 " [7.18 M] 1 2 1 21'-2" [6.45 M] 22'-6 23'-6 " [5.64 M] 4 1 " [3.65 M] 2 18'-6 15 1 11'-11 3 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 19'-2" [5.84 M] 21'-8" [6.60 M] 15'-8 4" [4.79 M] BASEMENT - UP TO 2,967 SF Elvie Antonacci* Andrew Kichler* Cushman & Wakefield ULC, Brokerage Associate Vice President I Retail Services Associate 3100 Steeles Avenue East, Suite 1100 416 756 5419 416 756 5448 Markham, ON L3R 8T3 | CANADA [email protected] [email protected] www.cushmanwakefield.com ©2019 Cushman & Wakefield ULC, Brokerage. All rights reserved. The information contained in this communication is strictly confidential. This information has been obtained from sources believed to be reliable but has not been verified. No warranty or representation, express or implied, is made as to the condi- tion of the property (or properties) referenced herein or as to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions imposed by the property owner(s). Any projections, opinions or estimates are subject to uncertainty and do not signify current or future property performance. *Sales Representative 3590 LAKE SHORE BLVD WEST.
Recommended publications
  • Entuitive Credentials
    CREDENTIALS SIMPLIFYING THE COMPLEX Entuitive | Credentials FIRM PROFILE TABLE OF CONTENTS Firm Profile i) The Practice 1 ii) Approach 3 iii) Better Design Through Technology 6 Services i) Structural Engineering 8 ii) Building Envelope 10 iii) Building Restoration 12 iv) Special Projects and Renovations 14 Sectors 16 i) Leadership Team 18 ii) Commercial 19 iii) Cultural 26 iv) Institutional 33 SERVICES v) Healthcare 40 vi) Residential 46 vii) Sports and Recreation 53 viii) Retail 59 ix) Hospitality 65 x) Mission Critical Facilities/Data Centres 70 xi) Transportation 76 SECTORS Image: The Bow*, Calgary, Canada FIRM PROFILE: THE PRACTICE ENTUITIVE IS A CONSULTING ENGINEERING PRACTICE WITH A VISION OF BRINGING TOGETHER ENGINEERING AND INTUITION TO ENHANCE BUILDING PERFORMANCE. We created Entuitive with an entrepreneurial spirit, a blank canvas and a new approach. Our mission was to build a consulting engineering firm that revolves around our clients’ needs. What do our clients need most? Innovative ideas. So we created a practice environment with a single overriding goal – realizing your vision through innovative performance solutions. 1 Firm Profile | Entuitive Image: Ripley’s Aquarium of Canada, Toronto, Canada BACKED BY DECADES OF EXPERIENCE AS CONSULTING ENGINEERS, WE’VE ACCOMPLISHED A GREAT DEAL TAKING DESIGN PERFORMANCE TO NEW HEIGHTS. FIRM PROFILE COMPANY FACTS The practice encompasses structural, building envelope, restoration, and special projects and renovations consulting, serving clients NUMBER OF YEARS IN BUSINESS throughout North America and internationally. 4 years. Backed by decades of experience as Consulting Engineers. We’re pushing the envelope on behalf of – and in collaboration with OFFICE LOCATIONS – our clients. They are architects, developers, building owners and CALGARY managers, and construction professionals.
    [Show full text]
  • Mississauga's Premier Office, Commercial & Industrial Condominium Address
    755 QUEENSWAY EAST IDENTITY PANTONE 447 PANTONE 199 PRIMARY SECONDARY Mississauga’s Premier Office, Commercial & Industrial Condominium Address 755 QUEENSWAY EAST IDENTITY WING 4 Own Your WING 3 WING 2 755 QUEENSWAY Success OFFICES Why Rent When PANTONE 447 PANTONE 199 50c/30m/40y/90k 0C/100M/72Y/0K Introducing Mississauga’s Premier You Can Own! WING 1 New Condominium Business Address At The Gateway Position your business ahead of the curve by owning your commercial premises at Cawthra Rd. and Queensway East – in south Mississauga’s sought-after business corridor. This newly renovated To South Mississauga’s commercial condominium complex offers both prime Class A office, commercial and industrial space, strategically located just moments Business Corridor from QEW, Hwy 427, multiple transit options, Downtown Toronto CAWTHRA RD. and Toronto Pearson International Airport. QUEENSWAY EAST Your Next Smart FLEXIBILITY TO EXPAND CAPITAL INVESTMENT Business Move Anticipating expansion in the near future? Consider purchasing a larger Custom design your premises to fit your company’s needs exactly. unit and subletting the excess space to generate additional revenue Capital investments in your unit increases the value whereas How Do I Benefit From Office, Commercial stream until you’re ready to use it. improvements made to leased units only benefit the landlord. or Industrial Condominium Ownership? DUAL ASSET-BUILDING: YOUR BUSINESS & YOUR REAL ESTATE LOCKED IN OCCUPANCY COSTS While you’re expanding the value of your business, ownership of the Stable long-term mortgage rates reduce cost and financial real estate you occupy can create its own separate asset value. In the uncertainty, whereas leased space means unexpected rent BUILDING EQUITY event that you sell your business, the real estate will have its own value, increases and market uncertainty.
    [Show full text]
  • (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
    Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion.
    [Show full text]
  • Miway Service Changes Effective March 24, 2014: Date Posted: March 7, 2014. Route 1/1C – Dundas Monday to Sunday: the Route 1C
    MiWay Service Changes Effective March 24, 2014: Date Posted: March 7, 2014. Route 1/1C – Dundas Monday to Sunday: The Route 1C – Dundas will provide two-way service along The Collegeway. Please visit miway.ca/routemaps for revised routing. Schedules have been revised. Please visit miway.ca/schedules for new departure times. Route 4 – Sherway Gardens Weekday The 9:30 pm westbound trip from Sherway Gardens (STOP #9 0 5 8) will now depart at 9:35 pm to improve passenger connections. Route 5/5B – Dixie Weekday The Route 5B - Dixie will be cancelled and replaced with the new Route 55 – Meyerside Loop. Service frequency will be improved on Route 5 – Dixie during rush hours. Route 7 – Airport Saturday A new northbound trip will depart from the City Centre Transit Terminal (STOP #0 7 6 6) at 5:01 am. A new southbound trip will depart from Westwood Mall (STOP #2 8 5 3) at 6:00 am. Route 12 – Rexdale Weekday Schedules have been revised during the afternoon rush hour to allow more transfer time to Malton GO trains. Please visit miway.ca/schedules for new departure times. Route 20 – Rathburn Weekday Five additional westbound trips will depart from Islington Subway Station (STOP #1 6 3 2) at 9:09 am, 4:52 pm, 6:38 pm, 7:09 pm, and 7:26 pm. Schedules have been revised. Please visit miway.ca/schedules for new departure times. Route 23 – Lakeshore Weekday The 4:52 am westbound trip from Long Branch GO Station (STOP #0 4 4 6) will now depart at 4:56 am to connect with Route 5 - Dixie at Lakeshore Road and Ogden Avenue.
    [Show full text]
  • Waterfront Transit Network Vision – Phase 1
    ACTION REQUIRED ____________________________________________________________________________ Date: July 11, 2016 Subject: Waterfront Transit Network Vision – Phase 1 Attached for the consideration of the TTC Board is Executive Committee Item 16.17 “Waterfront Transit Network Vision – Phase 1” which was adopted by the Executive Committee at its meeting on June 28, 2016. Original signed by Vincent Rodo Chief Financial & Administration Officer Attachment Waterfront Transit Network Vision – Phase 1 http://www.toronto.ca/legdocs/mmis/2016/ex/bgrd/backgroundfile-94287.pdf Appendix 1 – Planning History for Waterfront Transit http://www.toronto.ca/legdocs/mmis/2016/ex/bgrd/backgroundfile-94534.pdf Appendix 2 – Waterfront Transit Feeling congested? Evaluation Framework http://www.toronto.ca/legdocs/mmis/2016/ex/bgrd/backgroundfile-94535.pdf EX16.17 STAFF REPORT ACTION REQUIRED Waterfront Transit Network Vision – Phase 1 Date: June 20, 2016 To: Executive Committee Deputy City Manager, Cluster B From: Chief Planner & Executive Director, City Planning Division Wards: 5, 6, 13, 14, 19, 20, 28, 30 and 32 Reference P:\2016\ClusterB\PLN\EX16002 Number: SUMMARY At its meeting of November 3 and 4, 2015, City Council directed staff to work with the TTC and Waterfront Toronto on a comprehensive review of waterfront transit initiatives and options (Item EX 9.9). An external consultant, Steer Davies Gleave, was retained to assist staff with the review. The study area is from Long Branch in the west to Woodbine Avenue in the east, and south of the Queensway/Queen Street. The Waterfront Transit "Reset" was divided into two phases. Council approved funding for Phase 1 of the "reset" for the following work program items: review all relevant background material; create an overall study vision with related objectives; develop a preliminary list of improvement concepts; consult with the public and stakeholders; identify preferred concepts for further study; and develop a scope of work for Phase 2.
    [Show full text]
  • Your Guide to Getting to Fennell Campus
    YOUR GUIDE TO GETTING TO FENNELL CAMPUS Know Your Commuting Options! ORIGIN: South Toronto DESTINATION: Mohawk College Fennell Campus ESTIMATED COST OF DRIVING ALONE1: • Etobicoke City Centre: $460/month • Downtown: $535/month • Davisville: $610/month OPTION 1: CARPOOL Estimated cost savings with 1 passenger: • Etobicoke City Centre: $230/month • Downtown: $265/month • Davisville: $305/month Try sharing a ride to campus using Smart Commute’s Carpool Zone, the free on-line ride-connection program that matches you with other Mohawk employees and students. Carpooling To Fennell Campus Comes With Perks! Carpoolers can purchase a carpool permit and receive preferred parking in the Carpool Zone lot; Carpool permits include 4 emergency day passes per semester (one per month) in case carpool partner is unavailable; Take advantage of the QEW HOV lanes! Learn more about Mohawk’s preferred carpool parking zone! To try it for free, visit the Mohawk Carpool Zone group. Complete your profile and start searching for a carpool buddy. Save time, money AND get a better parking spot. OPTION 2: TRANSIT (GO Transit & HSR) Estimated Savings: $225-267/month Note: Transit cost is based on using a PRESTO Card on GO Transit at ‘student rates’ and Mohawk Student HSR bus pass. Qualified students can receive a GO Transit student ID card from The Square at Fennell Campus. Estimated trip time: 1 hour, 15 minutes from Union Station Bus Terminal 1 hour, 40 minutes from Long Branch GO Station Want more detailed directions? Google Transit has several tools to make your transit trip as easy and convenient as possible. Find transit stops in your area and station information and schedules by visiting www.google.ca/transit! 1 Estimated using CAA’s 2012 Drive Cost report of 16.68 cents/ km for fuel and maintenance, and the monthly cost of a two- semester Mohawk College parking pass.
    [Show full text]
  • Developing Toronto's Transit Network Plan: Phase 1
    EX13.3 STAFF REPORT ACTION REQUIRED Developing Toronto's Transit Network Plan: Phase 1 Date: March 3, 2016 To: Executive Committee City Manager, Deputy City Manager, Cluster B and Chief Planner & From: Executive Director, City Planning Division Wards: All Reference Number: SUMMARY Significant investment has been made by all three orders of government to expand the transit network and address years of underinvestment in a critical infrastructure system for Toronto. The Toronto York-Spadina Subway Extension (TYSSE), Eglinton LRT (Mount Dennis to Kennedy) and Finch West LRT will be in service by 2021. In order to sustain recent progress, planning for new transit expansion projects must keep pace given the lead times to plan, design and build complex infrastructure. The purpose of this report is to recommend advancing planning and technical analysis on SmartTrack, Scarborough Subway Extension, Relief Line and Waterfront Transit, in order to set the stage for upcoming discussions on funding and financing new transit. In particular, this report recommends: • Finalizing the SmartTrack concept by narrowing the planning analysis to focus on key elements: an optimized Eglinton West LRT extension to Pearson Airport; and two SmartTrack/GO RER integration options that propose an urban service frequency at 11 existing GO RER stations with 4 to 8 new stations on the Kitchener GO and Stouffville/Lakeshore East GO Corridors; • Approving Pape to Downtown via Queen/Richmond as the preferred corridor for the Relief Line, and proceed to determine the preferred alignment and stations; • Completing the review of corridor options and related work for the Scarborough Subway Extension, and develop recommendations to integrate the proposed, optimized Eglinton East LRT into the University of Toronto Scarborough Campus secondary plan; and identify areas in need of an Avenue Study to facilitate intensification along the proposed LRT corridor.
    [Show full text]
  • 23 Bus Time Schedule & Line Route
    23 bus time schedule & line map 23 Eastbound View In Website Mode The 23 bus line (Eastbound) has 2 routes. For regular weekdays, their operation hours are: (1) Eastbound: 12:15 AM - 11:45 PM (2) Westbound: 12:15 AM - 11:45 PM Use the Moovit App to ƒnd the closest 23 bus station near you and ƒnd out when is the next 23 bus arriving. Direction: Eastbound 23 bus Time Schedule 48 stops Eastbound Route Timetable: VIEW LINE SCHEDULE Sunday 12:17 AM - 10:29 PM Monday 4:20 AM - 11:45 PM Clarkson Go Station Platform 7 1110 Southdown Road, Peel Tuesday 12:15 AM - 11:45 PM Lakeshore Rd W at Inverhouse Dr Wednesday 12:15 AM - 11:45 PM 966 Inverhouse Drive, Peel Thursday 12:15 AM - 11:45 PM Lakeshore Rd W West Of Clarkson Rd Friday 12:15 AM - 11:45 PM 1834 Lakeshore Road West, Peel Saturday 12:15 AM - 11:53 PM Lakeshore Rd W at Clarkson Rd Lakeshore Road West, Peel Lakeshore Rd W at Meadow Wood Rd 1672 Lakeshore Road West, Peel 23 bus Info Direction: Eastbound Lakeshore Rd at Johnsons Lane Stops: 48 1654 Lakeshore Road West, Peel Trip Duration: 31 min Line Summary: Clarkson Go Station Platform 7, Lakeshore Rd W at Silver Birch Trail Lakeshore Rd W at Inverhouse Dr, Lakeshore Rd W 1510 Lakeshore Road West, Peel West Of Clarkson Rd, Lakeshore Rd W at Clarkson Rd, Lakeshore Rd W at Meadow Wood Rd, Lakeshore Lakeshore Rd W at Bexhill Rd Rd at Johnsons Lane, Lakeshore Rd W at Silver Birch 1376 Lakeshore Road West, Mississauga Trail, Lakeshore Rd W at Bexhill Rd, Lakeshore Rd W at Festavon Crt, Lakeshore Rd at Owenwood Dr, Lakeshore Rd W at Festavon Crt
    [Show full text]
  • Dixie Road Lane Reconfiguration
    Design Study Report Dixie Road Lane Reconfiguration With Bicycle Lanes from Rometown to Lakeshore Prepared for Region of Peel by IBI Group September 2, 2016 IBI GROUP DESIGN STUDY REPORT DIXIE ROAD LANE RECONFIGURATION Prepared for Region of Peel Document Control Page CLIENT: Region of Peel PROJECT NAME: Dixie Road Lane Reconfiguration Preliminary and Detail Design REPORT TITLE: Dixie Road Lane Reconfiguration IBI REFERENCE: 38948 VERSION: 4 DIGITAL MASTER: Hamilton J:\38948_DixieRd\10.0 Reports ORIGINATOR: Norma Moores REVIEWER: AUTHORIZATION: CIRCULATION LIST: Project Team Table of Contents submitted January 28, 2015 Draft Version 2 submitted April 15, 2016 HISTORY: Final Draft Version 3 submitted June 14, 2016 Final Version 4 submitted September 2, 2016 September 2, 2016 IBI GROUP DESIGN STUDY REPORT DIXIE ROAD LANE RECONFIGURATION Prepared for Region of Peel Table of Contents Executive Summary .................................................................................................................. E.1 Background ....................................................................................................................... E.1 Project Description ............................................................................................................ E.2 Consultation ...................................................................................................................... E.4 Next Steps .......................................................................................................................
    [Show full text]
  • 5 Bus Time Schedule & Line Route
    5 bus time schedule & line map 5 Northbound View In Website Mode The 5 bus line (Northbound) has 2 routes. For regular weekdays, their operation hours are: (1) Northbound: 12:12 AM - 11:42 PM (2) Southbound: 12:15 AM - 11:46 PM Use the Moovit App to ƒnd the closest 5 bus station near you and ƒnd out when is the next 5 bus arriving. Direction: Northbound 5 bus Time Schedule 55 stops Northbound Route Timetable: VIEW LINE SCHEDULE Sunday 12:14 AM - 8:29 PM Monday 4:17 AM - 11:42 PM Long Branch Go Station Platform A Long Branch, Toronto Tuesday 12:12 AM - 11:42 PM Lakeshore Rd at Forty-Third St Wednesday 12:12 AM - 11:42 PM 3857 Lake Shore Boulevard West, Toronto Thursday 12:12 AM - 11:42 PM Lakeshore Rd West Of Forty-Third St Friday 12:12 AM - 11:42 PM 1533 Lakeshore Road East, Mississauga Saturday 12:12 AM - 11:41 PM Lakeshore Rd E at Deta Rd 1437 Lakeshore Rd E, Mississauga Lakeshore Rd E at Dixie Rd 1381 Lakeshore Road East, Mississauga 5 bus Info Direction: Northbound Lakeshore Rd E West Of Fergus Ave Stops: 55 1239 Lakeshore Rd E, Mississauga Trip Duration: 47 min Line Summary: Long Branch Go Station Platform A, Lakeshore Rd E at Haig Blvd Lakeshore Rd at Forty-Third St, Lakeshore Rd West 1165 Lakeshore Road East, Mississauga Of Forty-Third St, Lakeshore Rd E at Deta Rd, Lakeshore Rd E at Dixie Rd, Lakeshore Rd E West Of Lakeshore Rd E at Hydro Rd Fergus Ave, Lakeshore Rd E at Haig Blvd, Lakeshore 1115 Lakeshore Rd E, Mississauga Rd E at Hydro Rd, Lakeshore Rd E at Ogden Ave, Ogden Ave at Gardner Ave, Ogden Ave at Pelham Lakeshore Rd
    [Show full text]
  • Shantz Aaron.Pdf (7.260Mb)
    Understanding Factors Associated With Commuter Rail Ridership A Demand Elasticity Study of the GO Transit Rail Network by Aaron Shantz A thesis presented to the University of Waterloo in fulfillment of the thesis requirement for the degree of Master of Environmental Studies in Planning Waterloo, Ontario, Canada, 2021 © Aaron Shantz 2021 Author’s Declaration I hereby declare that I am the sole author of this thesis. This is a true copy of the thesis, including any required final revisions, as accepted by my examiners. I understand that this thesis may be made electronically available to the public. ii Abstract Mode share in major North American cities is currently dominated by private automobile use. Planners have theorized that transitioning commuter rail systems to regional rail networks is a viable method to increase ridership and stabilize mode share. This process is currently underway in Ontario, Canada, as the amount and frequency of service is being increased throughout the GO Transit rail network via the GO Expansion Program. However, previous studies have shown that transit demand does not solely respond to service quantity expansions. Variables related to the built environment, regional economy, network characteristics, and socioeconomic status of the customer base can influence transit demand to varying degrees. Further, the literature states that the travel behavior of commuter rail users is unique, as access mode, distance, socioeconomic status, and the utility derived from varying trip types can differ compared to local transit users. These findings suggest that supplementary policies might be needed to reduce automobile reliance and stimulate demand for regional transit. Many transit researchers have conducted demand elasticity studies to identify what factors are significantly associated with transit ridership.
    [Show full text]
  • Mike Hillcoat P.Eng., CCCA SENIOR ASSOCIATE
    Entuitive | Calgary + Lethbridge + Toronto Mike Hillcoat P.Eng., CCCA SENIOR ASSOCIATE Passionate about improving public infrastructure, and engaging on projects that make positive contributions to renewing and rehabilitating our cities, Mike acts as project manager for Entuitive’s transportation sector and building restoration service in Toronto. He draws upon considerable expertise in transportation, managing design and construction supervision teams, and managing high-profile projects involving transportation structures and facilities including rail stations, rail overbuild projects, and transit maintenance facilities. Mike has worked closely with rail and transit authorities in Canada and abroad, and understands the importance of developing designs that can be constructed with minimum impact on existing operations. Mike has extensive experience in the rehabilitation of existing structures, Education Bachelor of Engineering Science, and leads Entuitive’s Building Restoration group in Toronto. This University of Western Ontario experience includes the renovation and restoration of major transit facilities including GO Transit’s Union Station, TTC’s Bloor-Yonge station, Memberships and various parking and underground concrete structures. Professional Engineers Ontario (PEO) Construction Specifications Canada Mike also brings over 15 years of experience in construction contract administration and has acted as resident engineer on a number of American Institute of Steel Construction projects in Canada and the US. He is a Certified Construction Contract Awards Administrator and has a true appreciation of the needs of all parties ACEC Engineering Excellence: involved in the design and construction process. Diamond Award for Structural Systems Manhattan West Platform, 2015 Before his current focuses on transportation and restoration, Mike’s Award of Excellence, Canadian worked on a broad range of projects in the commercial, retail, Architect, Union Station - GO Roof, 2012 hospitality, cultural, healthcare, sports and education sectors.
    [Show full text]