NORTHWEST CORRIDOR EXPRESS LANES / MARIETTA, GEORGIA Profile BRIDGE DESIGN ENGINEER: Parsons, Peachtree Corners, Ga
Total Page:16
File Type:pdf, Size:1020Kb
PROJECT Aerial view of a mainline Northwest bridge. Bridge 25 parallels existing Interstate 75 southbound lanes and is over 1 mile long. Photo: Corridor Aerial Innovations of Express Lanes Georgia Inc. by Alan Kite, Parsons Corporation The Interstate 75/Interstate 575 parallel to I-75 to Hickory Grove Road (I-75/I-575) corridor northwest of (approximately 17 miles) and from the the Atlanta Beltway, or Interstate I-75/I-575 interchange parallel to I-575 285 (I-285), runs through a densely to Sixes Road (approximately 12 miles). Project location and vicinity map. Photo: populated and rapidly growing section The project scope included 39 bridges, Parsons. in the Atlanta, Ga., metropolitan area. two major interchanges, roadway, This corridor currently accommodates signing, tolling facilities, intelligent 297,000 vehicles per day, which transportation systems, and all ancillary almost meets the traffic projection of structures for the project. Flyover ramps 310,000 vehicles per day by 2035 per within the I-75/I-285 interchange are the project’s environmental assessment. up to 2827 ft long with span lengths Several planning studies over the past up to 175 ft and pier heights up to 90 15 years have looked for economical ft to cross numerous roadways, existing alternatives to alleviate daily traffic flyover ramps, and irregular terrain. congestion, increase traffic capacity, and provide a construction scheme Prestressed concrete girders were used with minimal impact on existing traffic. on several of the interchange bridges In the fall of 2013, a public-private to construct cost-effective and low- partnership, design-build-finance maintenance structures. North of the contract was executed to construct I-75/I-575 interchange, mainline viaduct reversible managed toll lanes that superstructures are 39.25 ft wide with will allow drivers to choose to pay a four prestressed concrete bulb-tee dynamically priced toll to bypass beams, 72 to 74 in. deep, supported congestion. on single-column hammerhead piers. Bridge lengths range from 1298 to The project extended from the I-285 5981 ft to span over existing local Project location and vicinity map. (Atlanta Beltway)/I-75 interchange roads, railroads, streams, wetlands, and All Figures: Parsons. NORTHWEST CORRIDOR EXPRESS LANES / MARIETTA, GEORGIA profile BRIDGE DESIGN ENGINEER: Parsons, Peachtree Corners, Ga. OTHER BRIDGE CONSULTANT: Heath & Lineback Engineers, Marietta, Ga. PRIME CONTRACTOR: Northwest Express Roadbuilders, a joint venture of Archer Western and Hubbard Construction Company, Marietta, Ga. PRECASTER: Standard Concrete Products, Atlanta, Ga.—a PCI-certified producer POST-TENSIONING CONTRACTOR: Freyssinet Inc., Sterling, Va. OTHER MATERIAL SUPPLIERS: Mechanically stabilized earth wall panel fabricator: Reinforced Earth Company, Atlanta, Ga.; noise barrier panel fabricator: Oldcastle Precast Inc., Newnan, Ga.—a PCI-certified producer 16 | ASPIRE Spring 2019 on/off ramps to I-75. Throughout the with all offices were held to discuss project corridor, smaller bridges were design issues, the use of similar details, used to span over local roads and and adherence to the design schedules. streams. Precast Concrete Pier Caps The $654 million design-build-finance Numerous project challenges related project required a fast-paced design to site conditions and economical schedule, with all bridge and structure construction methods had to be design to be completed in 15 months. resolved at various locations along the To meet this schedule, design teams alignment. At one project location, a were established in six Parsons offices proposed 3500-ft-long bridge would (Atlanta, Ga.; Baltimore, Md.; Boston, be adjacent to the existing I-75 Mass.; Chicago, Ill.; Orlando, Fla.; and roadway. A mechanically stabilized Washington, D.C.) and the local office earth (MSE) wall supported the existing of Heath & Lineback Engineers to fill, with a stream and environmentally create the design and generate contract sensitive wetlands located at the documents. Each office was assigned bottom of the wall and running parallel bridges with similar superstructure to the interstate. Eighteen single- Cross section of a 3300-ft-long bridge and substructure types and similar column piers along the proposed adjacent and parallel to southbound span arrangements to provide design bridge were to be constructed in the Interstate 75, the existing retaining wall, consistency and an efficient design narrow wetlands area between the and wetlands. Figure: Parsons. that met the design schedule. Another stream and the wall. advantage of using multiple offices pressure behind the existing MSE wall. was that it allowed independent design During the early stages of the project, This system minimized the impact on the checks on major bridge elements to be it was evident that access to the site, environmentally sensitive wetlands area, performed by engineers not directly traffic maintenance, and minimizing remained within the required vertical and involved in the initial design. impact on the wetlands would be a lateral structural loading capacities, and major challenge. Two alternatives were limited traffic interruptions. Prior to the start of design, a project- evaluated: building a conventional specific design criterion was written temporary work bridge, and using Precast concrete caps were cast by that included contract-specific accelerated bridge construction methods the contractor at a yard located requirements, Georgia Department of with precast concrete pier elements. approximately 5 miles from the pier Transportation (GDOT) bridge standards, Ultimately, it was decided to perform all construction site. The precast concrete and contractor-preferred materials (for major construction activities from the units were transported individually example, concrete strengths), where existing southbound interstate shoulder using a single specialized-permit vehicle. applicable. with limited nighttime lane closures. A rapid setup/takedown type of crane was used to erect the precast concrete Precast concrete girders were selected The piers are founded on 78-in.-diameter caps onto a temporary support bracket because rapid construction was critical drilled monoshafts. Excavated spoil was attached to the top of the column. The to meeting the schedule, and because contained with permanent casings that temporary shoring bracket included of their additional benefits of high were installed with drilling equipment screw jacks mounted on top of the pier durability, low maintenance, excellent staged on the southbound I-75 shoulder. column to support and provide geometry quality, and low cost relative to other The maximum offset from the existing control to the precast concrete cap construction materials. In addition, I-75 southbound curb to the centerline before the connection was cast. standard details were established and of the pier shaft was limited to 7.5 ft. provided to each bridge design team to This distance was dictated by the A cast-in-place concrete bedding ensure project-wide design and detailing practical reach of the drilling rig as well layer between the top of column and consistencies. Weekly conference calls as the maximum allowable surcharge bottom of cap was used to provide GEORGIA DEPARTMENT OF TRANSPORTATION, OWNER BRIDGE DESCRIPTION: The project included 39 bridges; mainline bridges were between 807 and 5981 ft long and 29 ft 3 in. to 39 ft 3 in. wide. Mainline bridge superstructures have a 7½ in. thick cast-in-place concrete deck and prestressed concrete girders. STRUCTURAL COMPONENTS: Mainline bridges used BT72 and BT74 prestressed concrete bulb-tee girders supported on single-column hammerhead piers and drilled shafts or piles; precast concrete pier caps; and precast concrete post-tensioned straddle-beam piers BRIDGE CONSTRUCTION COST: $131 million AWARDS: 2018 Roads & Bridges #1 Road; Georgia Engineering Excellence Award Winner in Transportation; Georgia Partnership for Transportation Quality Preconstruction Design Award Grand Prize Winner; Precast Concrete Institute 2019 Design Award Main Span More than 150 Feet ASPIRE Spring 2019 | 17 Erection of a precast concrete pier cap Lifting the post-tensioned precast concrete portion of a straddle bent cap from the fill from the adjacent Interstate 75 shoulder. embankment. The top of the embankment was constructed at the same slope as the Photo: Northwest Express Roadbuilders. final cap geometry to control the geometry of the formwork and post-tensioning ducts. The bottom segment of the cap was cast on the ground and lifted into place after post- tensioning. The top portion of the cap was then cast in place. Photo: Northwest Express Roadbuilders. construction tolerance and to position the bridge, three types of intermediate design strength) before tensioning. the precast concrete cap. The cap- piers were used: conventional The “U” shape also minimized the column connection was established hammerhead on a single column, lifting weight (210 kip) and provided using a filleted rectangular blockout inverted-tee hammerhead on a single part of the formwork for the cast- (with 7.375 in. chamfers at each column, and inverted-tee straddle in-place concrete after the precast corner) in the precast concrete cap. bent on two columns. The inverted- concrete member was erected on the Headed dowels, confined by heavy tee hammerhead pier caps were used columns. The prestressed beam seats transverse reinforcement, reinforced the in two of the intermediate bents to were constructed as part of the