Inner Mongolia Boosts Poverty Relief Efforts

Total Page:16

File Type:pdf, Size:1020Kb

Inner Mongolia Boosts Poverty Relief Efforts CHINA DAILY | HONG KONG EDITION Friday, November 29, 2019 | 19 BUSINESSFOCUS RIGHT TRACK Microlending offers lifeline to Sichuan’s agricultural enterprises By JIANG XUEQING erage a larger amount of funds in Guangyuan, Sichuan from the financial sector to sup- port the development of leading The family of Huang Mingzhi, a local enterprises and reduce pov- farmer in Wangcang county of erty in this way,” said Yang Ren- Guangyuan, Sichuan province, hai, an official of the Guangyuan was hard hit by poverty after his Bureau of Poverty Alleviation and eldest daughter was diagnosed Development. with leukemia. So far, 974 business entities in To improve his family’s finan- Guangyuan have obtained loans cial health, Huang transferred of this type totaling 589 million the management rights of 0.2 yuan, lifting 5,896 families out of hectare of farmland to Wang- poverty or creating jobs for them, cang-based Sichuan Mumen Tea Yang said. Co Ltd, a company specialized in Postal Savings Bank of China, a tea growing, production and large State-owned commercial sales, at a price of 3,000 yuan lender, offered a 1.5 million yuan ($427) per hectare a year and loan to Mumen Tea in 2017. received a payment of 80 to 100 Apart from building a 133-hec- yuan per day for fertilizing and tare tea plantation for high-end removing weeds from the compa- tea growing and demonstration ny’s tea plantation. purposes, the company also His annual household income signed contracts to purchase fresh has now increased to more than tea leaves grown on a total area of 30,000 yuan, compared with 1,333 hectares from local farmers 2,000 to 3,000 yuan a few years at a price of 800 yuan per kilo- ago. It includes revenue from tea gram, offered technical instruc- growing, pig farming, transfer of tions to the farmers, and paid farmland management rights, them 120 yuan for picking a kilo- working at the plantation, and gram of tea leaves, said Tan Bo, running a small business. general manager of the company. Mumen Tea has helped lift at Herdsmen feed mares at a husbandry cooperative in Ulaanqab, the Inner Mongolia autonomous region. JIANG XUEQING / CHINA DAILY least 78 farmers from 20 impover- ished families in Wangcang coun- ty of Guangyuan out of poverty by 5,896 By JIANG XUEQING At the end of the contract, the adopting a model that combines number of families that have been lifted out of poverty or in Ulaanqab, Inner Mongolia families own the mares and foals the resources and efforts of the offered jobs in Guangyuan, [email protected] born to the mares belong to the government, banks, agriculture Sichuan province, through a credit guarantee companies, agri- Inner Mongolia cooperative. new poverty relief model Huo Jinyuan, a 72-year-old farm- As the current demand for the cultural enterprises, and poverty- er in Ulaanqab in the Inner Mongo- serum of pregnant mares is only 300 stricken households. lia autonomous region, struggled to tons a year in China, the key to start- Starting as a pilot program in Currently, the company produ- make ends meet before an oats ing the business was finding a buyer. Guangyuan and Yibin in 2017, the ces 120 metric tons of tea a year. company joined hands with the boosts poverty PICC introduced the cooperative to model was later promoted across Its annual sales exceed 23 million local government and financial Ningbo Sansheng Pharmaceutical Sichuan province. It allows agri- yuan, of which offline sales institutions to help lift impoverish- Co Ltd, which agreed to buy the cultural enterprises and rural account for 80 percent. ed households in the region out of serum after it passed the drug man- entrepreneurial leaders that lack Similar to PSBC, Agricultural poverty. ufacturer’s inspection. sufficient collateral to obtain Bank of China Ltd also explored a The annual net income of his fam- relief efforts “Apart from lifting 300 rural bank loans ranging from 100,000 model of poverty alleviation in ily has now increased from between households out of poverty, we are yuan to 2 million yuan based on Wangcang county through the 3,000 yuan ($427) and 5,000 yuan to Firms in region join hands with local looking forward to those families their creditworthiness and the development of the agricultural 12,000 yuan as Yinshan Oats, a com- being able to buy more mares in level of assistance they provide for sector. pany specialized in oat breeding, government, financial institutions to three years’ time and joining our poor families. The bank offered three-year planting, deep processing and ware- support impoverished households cooperative as shareholders with For each poverty-stricken fami- loans ranging from 10,000 yuan house logistics in Qahar Right Wing their mares as assets,” said Zhang ly that receives a job offer or is lift- to 50,000 yuan to poverty-strick- Middle Banner of Ulaanqab, offered Jinzhu, legal representative of the ed out of poverty according to the en families, using a specially him free oat seeds and bought the cooperative. current poverty alleviation stan- designed credit rating system. oats he planted for 3 yuan per kilo- Its production capacity is expect- dards, the agricultural enterprise Borrowers could apply for this gram, 30 percent higher than the ed to reach 15 tons in 2020. Consid- that offers help is eligible for a kind of small loan without collat- market price. ering that the income from 100,000 yuan loan. eral or credit guarantee, and the The production capacity of his pregnant mare serum may vary “Our clients obtained subsi- government provided funds to farmland also increased from from 180,000 to 260,000 yuan per dized loans as the government cover the full amount of interest around 750 kg per hectare to about ton, it is estimated that the coopera- implemented an interest-deduct- paid. 3,000 kg thanks to the high-quality tive will make a profit of 700,000 to ed policy for this type of loan and “We formed a risk control team seeds and training on oat planting 800,000 yuan a year, he said. offered subsidies to cover guaran- at the village level that includes provided by the company. “To reduce poverty through finan- tee fees. In the end, the interest leading village officials and virtu- A total of 1,087 poverty-stricken cial support, we must raise our polit- rate they paid was no more than ous and respectable villagers. families enjoyed the same benefits ical awareness and adhere to 1.3 percent,” said Liu Deqiang, They rated impoverished families amid a nationwide poverty-relief commercially sustainable lending. vice-president of the Postal Sav- on a 10-point scale according to battle in China. Financial institutions should pro- ings Bank of China’s Wangcang their creditworthiness, labor President Xi Jinping called for mote intellectual development of county subbranch. skills, production willingness and perseverance in the fight against impoverished families and invigo- The government also injected household income. Our bank poverty as time is limited for the rate them to make money, thus pre- money into agriculture credit made decisions on whether or not country to meet its goal of eradicat- venting them from relying heavily guarantee companies to establish to issue a loan to a family and how ing extreme poverty by 2020. He on government assistance,” said guarantee funds and a risk shar- much to offer based on the rat- made the remarks when deliberat- Zhang Chunlin, president of the ing mechanism. When a default ings,” said Cai Dong, general man- ing with deputies from Gansu prov- Agricultural Bank of China Inner occurs, the government will ager of the department of agro- ince at the second session of the 13th Mongolia Branch. assume 40 percent of the loan related business at Agricultural National People’s Congress, China’s With the help of financial institu- loss, and the relevant bank and Bank of China Guangyuan national legislature, on March 7. tions and the China Banking and agriculture credit guarantee com- Branch. During an inspection tour in Insurance Regulatory Commission, pany will be responsible for 30 A mechanism of coordination Chongqing in April, Xi said: “The 192 impoverished families and the percent each. among the township government, battle against poverty has entered a rural collective economic organiza- “This credit guarantee mecha- the village-level risk control team decisive and critical stage. We must tion in Tumuertai town in Qahar nism was built for the long run. It and the bank was established for press ahead with our full strength Right Wing Rear Banner purchased has a significant effect on poverty post-lending management. This and strongest resolve and never a total of 292 Angus cattle for 4.69 alleviation, so local governments model of poverty reduction stop until a complete victory is million yuan, of which the regulator in Sichuan have continuously through microlending proved secured.” contributed 2.6 million yuan and injected funds into agriculture effective in Wangcang and was Gao Sen, head of the government Zheshang Jinhui Trust Co Ltd con- credit guarantee companies promoted nationwide, he said. of Qahar Right Wing Middle Ban- tributed 500,000 yuan. Ping An since 2017. These companies The bank offered loans totaling ner, said civil servants in the banner Insurance (Group) Co of China Ltd charged borrowers guarantee 1.32 million yuan to 30 poor fami- strictly implemented President Xi’s also donated 148,400 yuan to pur- fees at a rate as low as 0.5 to 1 per- lies in Xiuhai village, Wangcang instructions on poverty alleviation chase insurance for the cattle.
Recommended publications
  • World Bank Document
    CONFORMED COPY Public Disclosure Authorized LOAN NUMBER 7616-CN Loan Agreement Public Disclosure Authorized (Wenchuan Earthquake Recovery Project) between PEOPLE’S REPUBLIC OF CHINA Public Disclosure Authorized and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated March 20, 2009 Public Disclosure Authorized LOAN AGREEMENT AGREEMENT dated March 20, 2009, between PEOPLE’S REPUBLIC OF CHINA (“Borrower”) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (“Bank”). The Borrower and the Bank hereby agree as follows: ARTICLE I – GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to this Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in the Loan Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement. ARTICLE II – LOAN 2.01. The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in this Agreement, an amount equal to seven hundred ten million Dollars ($710,000,000), as such amount may be converted from time to time through a Currency Conversion in accordance with the provisions of Section 2.07 of this Agreement (“Loan”), to assist in financing the project described in Schedule 1 to this Agreement (“Project”). 2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section IV of Schedule 2 to this Agreement. 2.03. The Front-end Fee payable by the Borrower shall be equal to one quarter of one percent (0.25%) of the Loan amount. The Borrower shall pay the Front-end Fee not later than sixty (60) days after the Effective Date.
    [Show full text]
  • Lithofacies Palaeogeography of the Late Permian Wujiaping Age in the Middle and Upper Yangtze Region, China
    Journal of Palaeogeography 2014, 3(4): 384-409 DOI: 10.3724/SP.J.1261.2014.00063 Lithofacies palaeogeography and sedimentology Lithofacies palaeogeography of the Late Permian Wujiaping Age in the Middle and Upper Yangtze Region, China Jin-Xiong Luo*, You-Bin He, Rui Wang School of Geosciences, Yangtze University, Wuhan 430100, China Abstract The lithofacies palaeogeography of the Late Permian Wujiaping Age in Middle and Upper Yangtze Region was studied based on petrography and the “single factor analysis and multifactor comprehensive mapping” method. The Upper Permian Wujiaping Stage in the Middle and Upper Yangtze Region is mainly composed of carbonate rocks and clastic rocks, with lesser amounts of siliceous rocks, pyroclastic rocks, volcanic rocks and coal. The rocks can be divided into three types, including clastic rock, clastic rock-limestone and lime- stone-siliceous rock, and four fundamental ecological types and four fossil assemblages are recognized in the Wujiaping Stage. Based on a petrological and palaeoecological study, six single factors were selected, namely, thickness (m), content (%) of marine rocks, content (%) of shallow water carbonate rocks, content (%) of biograins with limemud, content (%) of thin- bedded siliceous rocks and content (%) of deep water sedimentary rocks. Six single factors maps of the Wujiaping Stage and one lithofacies palaeogeography map of the Wujiaping Age were composed. Palaeogeographic units from west to east include an eroded area, an alluvial plain, a clastic rock platform, a carbonate rock platform where biocrowds developed, a slope and a basin. In addition, a clastic rock platform exists in the southeast of the study area. Hydro- carbon source rock and reservoir conditions were preliminarily analyzed based on lithofacies palaeogeography.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Annex 1 Hong Kong Special Administrative Region Government
    Annex 1 Hong Kong Special Administrative Region Government Pre-selected Post-Sichuan Earthquake Restoration and Reconstruction Projects (First Batch) Duration Estimated Item Location Project Title Project Cost (month) (RMB 100m) Infrastructure Sub-total = 7.6560 A section of 303 Provincial Wenchuan County, 1 Road from Yingxiu to 24 7.6560 Aba Prefecture Wolong Education facilities Sub-total = 4.0981 Wenchuan County, Shuimo Secondary School 2 24 0.5570 Aba Prefecture in Wenchuan Cangxi County, Sichuan Cangxi Secondary 3 24 0.6523 Guangyuan School Santai County, Number 1 Secondary 4 24 0.7737 Mianyang School in Santai Jingyang District, Number 1 Primary School 5 24 0.1481 Deyang in Deyang Jingyang District, Huashan Road Primary 6 24 0.1604 Deyang School in Deyang Number 5 Secondary Jingyang District, 7 School Senior Secondary 24 1.8066 Deyang Section in Deyang Integrated social welfare facilities Sub-total = 1.3826 Chaotian District, Integrated social welfare 8 24 0.3384 Guangyuan services centre in Chaotian Yuanba District, Integrated social welfare 9 24 0.3168 Guangyuan services centre in Yuanba Youxian District, Integrated social welfare 10 24 0.2554 Mianyang services centre in Youxian Jingyang District, Integrated social welfare 11 24 0.4720 Deyang services centre in Deyang Duration Estimated Item Location Project Title Project Cost (month) (RMB 100m) Integrated social welfare facilities (cont.) Sub-total = 1.0269 Integrated social welfare Wangcang County, 12 services centre in 24 0.3744 Guangyuan Wangcang Cangxi County, Integrated
    [Show full text]
  • Bojun Education Company Limited 博駿教育有限公司 (Incorporated in the Cayman Islands with Limited Liability) (Stock Code: 1758)
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. Bojun Education Company Limited 博駿教育有限公司 (Incorporated in the Cayman Islands with limited liability) (Stock Code: 1758) Annual Results Announcement For The Year Ended 31 August 2020 HIGHLIGHTS For the year ended 31 August 2020 2019 Change Change RMB’000 RMB’000 RMB’000 Percentage Revenue 375,740 338,019 +37,721 +11.2% Gross profit 104,411 89,755 +14,656 +16.3% Profit for the year 15,242 28,941 –13,699 –47.3% Adjusted net profit* 15,760 28,998 –13,238 –45.7% * The adjusted net profit is presented because our management believes such information will be helpful for investors in assessing the level of net profit of the Company by eliminating the effects of certain one-off or non-recurring items. For the details of reconciliation to the most directly comparable financial measure calculated and presented in accordance with Hong Kong Financial Reporting Standards (“HKFRSs”), which is profit for the year. Please refer to the section headed “Financial review – Adjusted net profit” in this announcement. As at the beginning of the school year Change 2019/2020 2018/2019 Change Percentage Total students enrolment 12,082 10,173 +1,909 +18.8% As at 31 August 2020 2019 Change Change RMB’000 RMB’000 RMB’000 Percentage Contract liabilities 369,348 350,837 +18,511 +5.3% – 1 – ANNUAL RESULTS FOR THE YEAR ENDED 31 AUGUST 2020 The board (the “Board”) of directors (the “Director(s)”) of Bojun Education Company Limited (the “Company”, together with its subsidiaries and consolidated affiliated entities (the “Consolidated Affiliated Entities”), the “Group”) is pleased to announce the consolidated annual results of the Group for the year ended 31 August 2020.
    [Show full text]
  • The Overall Planning for Post Wenchuan Earthquake
    Supplementary Appendix A 1 The Overall Planning for Post-Wenchuan Earthquake Restoration and Reconstruction Compilation Basis: Law of the People’s Republic of China on Protecting against and Mitigating Earthquake Disasters Regulations on Post-Wenchuan Earthquake Restoration and Reconstruction (the State Council No. 526) Guiding Opinions of the State Council on Post-Wenchuan Earthquake Restoration and Reconstruction (NDRC [2008] No.22) Compiling Units: Planning Group of Post-Wenchuan Earthquake Restoration and Reconstruction of the Earthquake Relief Headquarters under the Sate Council Group Leader: National Development and Reform Committee (NDRC) Co-leader: The People’s Government of Sichuan Province, Ministry of Housing and Urban-Rural Development (MOHURD) Group Members: The People’s Government of Shaanxi Province, People’s Government of Gansu Province, Ministry of Education, Ministry of Science and Technology, Ministry of Industry and Information Technology, State Ethnic Affairs Commission, Ministry of Public Security, Ministry of Civil Affairs, Ministry of Finance, Ministry of Human Resources and Social Security, Ministry of Land and Resources, Ministry of Environmental Protection, Ministry of Transport, Ministry of Railways, Ministry of Water Resources, Ministry of Agriculture, Ministry of Commerce, Ministry of Culture, Ministry of Health, National Population and Family Planning Commission, People’s Bank of China, State-owned Assets Supervision and Administration Commission, State Administration of Taxation, State Administration of
    [Show full text]
  • Interim Report 2021 CORPORATE INFORMATION
    CONTENTS 2 Company Profile 3 Corporate Information 5 Operating and Financial Highlights 7 Management Discussion and Analysis 36 Other Information 47 Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income 48 Condensed Consolidated Statement of Financial Position 50 Condensed Consolidated Statement of Changes in Equity 51 Condensed Consolidated Statement of Cash Flows 52 Notes to the Condensed Consolidated Financial Statements 67 Definitions COMPANY PROFILE We are one of the leading private education service groups in Chengdu, Sichuan Province, the PRC with a track record of more than 20 years in the provision of private education services. Through our schools, we provide education services to students of different age groups from kindergarten to high school. As at 28 February 2021, we operated 13 schools in Sichuan Province, including six kindergartens, one primary and middle school, two middle schools and one middle and high school in Chengdu, as well as one primary and middle school in each of Bazhong City ( 巴中市 ) and Guangyuan City ( 廣元市 ) respectively, and a primary, middle and high school in Ziyang City ( 資 陽市 ). As of 28 February 2021, we had an enrolment of 12,279 students supported by 1,711 employees, including 996 teachers. Since 2001, we have built the foundation of school level. In September 2019, we our business upon private preschool launched a school in Ziyang City, Sichuan education and expanded our footprints to Province to provide education from primary the private primary school, middle and high to high school levels. school education industry. In June 2001, we established Chengdu Youshi Experimental We aim to provide quality education services Kindergarten, our first kindergarten formed in with a strong emphasis on the all-round joint venture with Chengdu Preschool Normal development of students.
    [Show full text]
  • Bojun Education Company Limited 博駿教育有限公司
    The Stock Exchange of Hong Kong Limited and the Securities and Futures Commission take no responsibility for the contents of this Post Hearing Information Pack, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this Post Hearing Information Pack. Post Hearing Information Pack of Bojun Education Company Limited 博駿教育有限公司 (the “Company”) (Incorporated in the Cayman Islands with limited liability) WARNING The publication of this Post Hearing Information Pack is required by The Stock Exchange of Hong Kong Limited (the “Stock Exchange”) and the Securities and Futures Commission (the “SFC”) solely for the purpose of providing information to the public in Hong Kong. This Post Hearing Information Pack is in draft form. The information contained in it is incomplete and is subject to change which can be material. By viewing this document, you acknowledge, accept and agree with the Company, its sponsors, advisers or members of the underwriting syndicate that: (a) this document is only for the purpose of providing information about the Company to the public in Hong Kong and not for any other purposes. No investment decision should be based on the information contained in this document; (b) the publication of this document or supplemental, revised or replacement pages on the Stock Exchange’s website does not give rise to any obligation of the Company, its sponsors, advisers or members of the underwriting syndicate to proceed with an offering in Hong Kong or any other jurisdiction.
    [Show full text]
  • World Bank Document
    50678 Project Name: Wenchuan Earthquake Resconstruction Project (Sichuan Component) 6.800 Component: Health Component TTL: Mara. K. Wrick Subject: Tentative Procurement Plan for Good, Works and Consultancy Services Date: 30-Jun-09 12356 7 8 9 10 12 13 14 15 16 Prior / District / Batch Building Reforcing Pre.Design Bidding Const. Start Const. End Ref. No. Municipal Con. No. Contract Description Estimated Cost Proc. Method Post Remark Public Disclosure Authorized Public Disclosure Authorized County Number Complete Complete Date Date Area Area Review Sqm (RMB million) (US$ million) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) A) Construction of Works for Hospital, MCH Center and THC 326.40 48.00 1 CD DY One DY-C1 Dayi No.2 People's Hospital Buidling 2500.00 0.00 8.98 1.32 NCB/Works Prior 2009/04/01 2009/09/09 2009/09/29 2010/02/08 2 MY FC One FC-C1 Fucheng MCH Center and Fenggu THC 2800 6276 14.04 2.06 NCB/Works Prior 2009/03/20 2009/09/09 2009/09/29 2010/01/08 3 MY YX One YX-C1 Youxian MCH Center and Youxian THC 4800 2409 12.46 1.83 NCB/Works Prior 2009/03/21 2009/08/20 2009/09/09 2010/01/08 4 MY ST One ST-C1 Santai County People's Hospital 12974 0 36.12 5.31 NCB/Works Prior 2009/04/05 2009/08/20 2009/09/09 2010/02/07 5 MY ZT One ZT-C1 Wenchang THC 2430 1026 4.30 0.63 NCB/Works Prior 2009/03/28 2009/08/20 2009/09/09 2010/01/08 6 MY YT One YT-C1 Yanting County MCH Center 3500 0 10.88 1.60 NCB/Works Prior 2009/03/26 2009/08/20 2009/09/09 2010/01/08 7 NC LZ One LZ-C1 Lanzhong City People's Hospital, and four THCs 5072 3732 15.34 2.26 NCB/Works
    [Show full text]
  • UNDP in China
    FOREWORD This report presents the findings and recommendations from policy studies on the challenges and responses to poverty reduction in China at this important juncture of the country’s development. This joint research was undertaken over the course of the past year and a half, by the United Nations Development Programme (UNDP) and the International Poverty Reduction Centre in China (IPRCC), to inform China’s poverty reduction efforts for the next ten years. This year marks the beginning of China’s new ten-year poverty reduction strategy and represents the last decade for achieving an all-round Xiaokang society by 2020. The year 2011 also marks the commencement of the 12th Five-Year Plan. And this year also constitutes the beginning of the last 5 years of the Millennium Development Goals. This is clearly a significant juncture for human development, both for China and for the whole world. Over the past thirty years, UNDP has witnessed China’s outstanding performance in poverty alleviation, achievements which have exceeded even the greatest expectations of China’s many observers. However, as China has developed, her challenges have become more complex, and further poverty reduction will undoubtedly prove more difficult to tackle than in previous years. One reason for this is that reducing the absolute number of poor people often masks increases in relative poverty. As a result, poverty reduction efforts will need to be redirected towards the substantial number of people that have been left behind. This includes the elderly, children, ethnic minorities, migrant workers, people living in remote areas, etc. Contemporary poverty in China has also shown signs of some typical “transitional poverty” characteristics, either toward or away from residual poverty largely determined by the suitability of macro-economic frameworks and the quality of institutional governance.
    [Show full text]
  • G. Ratings of Project Performance in Isrs ...X
    Document of The World Bank Report No: ICR00003783 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-76160) ON A LOAN IN THE AMOUNT OF US$710 MILLION Public Disclosure Authorized TO THE PEOPLE’S REPUBLIC OF CHINA FOR A WENCHUAN EARTHQUAKE RECOVERY PROJECT February 27, 2017 Public Disclosure Authorized Social, Urban, Rural and Resilience Global Practice East Asia and the Pacific Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective May 31, 2016) Currency Unit = Renminbi (RMB) RMB1.00 = US$ 0.15 US$1.00 = RMB6.57 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS AFD French Development Agency (Agence Française de Développement) AHH Affected Households CBD Central Business District CHIP Catastrophic Household Insurance Plan CPS Country Partnership Strategy CSI Core Sector Indicator EIA Environmental Impact Assessment EMP Environment Management Plan EPP Emergency Project Paper ESSAF Environmental and Social Screening Assessment Framework FA Force Account FM Financial Management FMM Financial Management Manual GCC Gansu Construction Commission GDP Gross Domestic Product GFDRR Global Facility for Disaster Reduction and Recovery GoC Government of China GPG Gansu Provincial Government IEG Independent Evaluations Group (of the Bank) IFI International Financing Institutions IOI
    [Show full text]
  • Letter of Intent on Hong Kong Special Administrative Region's Second
    Letter of Intent on Hong Kong Special Administrative Region’s Second Stage Work in Support of Restoration and Reconstruction in the Sichuan Earthquake Stricken Areas Between the Hong Kong Special Administrative Region Government and the Sichuan Provincial People’s Government (Translation) 1. Preamble 1.1. To take forward the Hong Kong Special Administrative Region (HKSAR)’s work in support of restoration and reconstruction in the Sichuan Earthquake, the HKSAR Government (the Hong Kong side) and Sichuan Provincial People’s Government (the Sichuan side), after deliberations, reached consensus on the basic principles, the list of 20 first stage reconstruction support projects, project management and funding arrangements, as well as communication and coordination mechanism, and signed the “Cooperation Arrangement on HKSAR’s Support for Restoration and Reconstruction in the Sichuan Earthquake Stricken Areas between the HKSAR Government and Sichuan Provincial People’s Government (the Cooperation Arrangement). 1.2. Since the signing of the Cooperation Arrangement, the Hong Kong and Sichuan sides have maintained close contact and communication to take forward the 20 confirmed first stage reconstruction support projects, and conducted a series of studies, site visits and discussions for the second stage reconstruction support projects. After deliberations, both sides agreed on 103 projects selected from Sichuan side’s recommended list for implementation at the second stage. To take forward the initiative, on the basis of the Cooperation Arrangement, both sides agreed to sign this “Letter of Intent on HKSAR’s Second Stage Work in Support of Restoration and Reconstruction in the Sichuan Earthquake Stricken Areas Between the HKSAR Government and the Sichuan Provincial People’s Government” (the Letter of Intent), which sets out both sides’ initial agreement and the Hong Kong side’s intent on the second stage reconstruction support work.
    [Show full text]