G. Ratings of Project Performance in Isrs ...X

Total Page:16

File Type:pdf, Size:1020Kb

G. Ratings of Project Performance in Isrs ...X Document of The World Bank Report No: ICR00003783 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-76160) ON A LOAN IN THE AMOUNT OF US$710 MILLION Public Disclosure Authorized TO THE PEOPLE’S REPUBLIC OF CHINA FOR A WENCHUAN EARTHQUAKE RECOVERY PROJECT February 27, 2017 Public Disclosure Authorized Social, Urban, Rural and Resilience Global Practice East Asia and the Pacific Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective May 31, 2016) Currency Unit = Renminbi (RMB) RMB1.00 = US$ 0.15 US$1.00 = RMB6.57 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS AFD French Development Agency (Agence Française de Développement) AHH Affected Households CBD Central Business District CHIP Catastrophic Household Insurance Plan CPS Country Partnership Strategy CSI Core Sector Indicator EIA Environmental Impact Assessment EMP Environment Management Plan EPP Emergency Project Paper ESSAF Environmental and Social Screening Assessment Framework FA Force Account FM Financial Management FMM Financial Management Manual GCC Gansu Construction Commission GDP Gross Domestic Product GFDRR Global Facility for Disaster Reduction and Recovery GoC Government of China GPG Gansu Provincial Government IEG Independent Evaluations Group (of the Bank) IFI International Financing Institutions IOI Intermediate Outcome Indicators ISR Implementation Status and Results Report KPI Key Performance Indicator LA Loan Agreement LMG Longnan Municipal Government MDRC Municipal Development and Reform Commission M&E Monitoring and Evaluation MIS Management Information System MoF Ministry of Finance MTR Mid-Term Review Mu Chinese unit of land area measurement (1 ha=15mu) NCB National Competitive Bidding NDRC National Development and Reform Commission NMP National Masterplan for the Rehabilitation and Reconstruction of i Wenchuan Earthquake, State Council, August 2008 O&M Operations and Maintenance OM Operations Manual PAPs Project Affected People PDO Project Development Objectives PDRC Provincial Development and Reform Commission PFB Provincial Finance Bureau PIU Project Implementation Unit PLG Provincial Leading Group PMO Project Management Office POI Project Outcome Indicator QAE Quality at Entry QAG Quality Assessment Group (of the Bank) RAP Resettlement Action Plan RCC Roller Compacted Concrete RRC Rapid Response to Crises SA Social Assessment SPG Sichuan Provincial Government TA Technical Assistance TF Trust Fund WDS Western Development Strategy (of GoC) WTP Water Treatment Plant WWTP Wastewater Treatment Plant Regional Vice President: Victoria Kwakwa, EAPVP Country Director: Bert Hofman, EACCF Senior Global Practice Director: Ede Jorge Ijjasz-Vasquez, GSURR Sector Manager: Abhas K. Jha, GSURR Project Team Leader: Paul Procee, GSURR ICR Team Leader: Wanli Fang, GSURR ii PEOPLE’S REPUBLIC OF CHINA Wenchuan Earthquake Recovery Project TABLE OF CONTENTS Datasheet A. Basic Information ....................................................................................................... iv B. Key Dates ................................................................................................................... iv C. Ratings Summary ....................................................................................................... iv D. Sector and Theme Codes ............................................................................................. v E. Bank Staff .................................................................................................................... v F. Results Framework Analysis ...................................................................................... vi G. Ratings of Project Performance in ISRs ..................................................................... x H. Restructuring (if any) .................................................................................................. x 1. Project Context, Development Objectives and Design ................................................ 1 2. Key Factors Affecting Implementation and Outcomes ............................................... 6 3. Assessment of Outcomes ........................................................................................... 15 4. Assessment of Risk to Development Outcome .......................................................... 24 5. Assessment of Bank and Borrower Performance ...................................................... 25 6. Lessons Learned......................................................................................................... 29 Annex 1. Project Costs and Financing ........................................................................... 32 Annex 2. Outputs by Component................................................................................... 33 Annex 3. Economic and Financial Analysis .................................................................. 52 Annex 4. Bank Lending and Implementation Support/Supervision Processes .............. 62 Annex 5. Summary of Borrower's ICR and/or Comments on Draft ICR ...................... 65 Annex 6. Land Acquisition and Resettlement Experiences ........................................... 67 Annex 7. List of Supporting Documents ....................................................................... 71 Annex 8. Photos before and after the WERP project..................................................... 72 iii CHINA: Wenchuan Earthquake Recovery Project DATASHEET A. Basic Information Country: China Project Name: Wenchuan Earthquake Recovery Project ID: P114107 L/C/TF Number(s): IBRD-76160 ICR Date: 02/21/2017 ICR Type: Core ICR Lending Instrument: ERL Borrower: People's Republic of China Original Total USD 710.00M Disbursed Amount: USD 695.80M Commitment: Revised Amount: USD 710.00M Environmental Category: A Implementing Agencies: Longnan Municipal Government, Gansu Provincial Government Sichuan Provincial Construction Commission, Sichuan Provincial Health Bureau Co-financiers and Other External Partners: French Development Agency B. Key Dates Revised / Actual Process Date Process Original Date Date(s) Concept Review: 10/31/2008 Effectiveness: 06/17/2009 06/17/2009 11/19/2012 Appraisal: 11/13/2008 Restructuring(s): 06/16/2014 01/23/2015 Approval: 02/12/2009 Mid-term Review: 05/14/2012 05/28/2012 Closing: 06/30/2014 05/31/2016 C. Ratings Summary C.1 Performance Rating by ICR Outcomes: Satisfactory Risk to Development Outcome: Substantial Bank Performance: Satisfactory Borrower Performance: Satisfactory C.2 Detailed Ratings of Bank and Borrower Performance (by ICR) Bank Ratings Borrower Ratings Quality at Entry: Satisfactory Government: Satisfactory Implementing Quality of Supervision: Satisfactory Moderately Satisfactory Agency/Agencies: iv Overall Bank Overall Borrower Satisfactory Satisfactory Performance: Performance: C.3 Quality at Entry and Implementation Performance Indicators Implementation Performance Indicators QAG Assessments (if any) Rating Potential Problem Project at any Yes Quality at Entry (QEA): None time (Yes/No): Problem Project at any time Yes Quality of Supervision (QSA): None (Yes/No): DO rating before Closing/Inactive Moderately status: Satisfactory D. Sector and Theme Codes Original Actual Sector Code (as % of total Bank financing) Energy efficiency in Heat and Power 2 2 General education sector 5 5 General transportation sector 25 25 General water, sanitation and flood protection sector 55 55 Health 13 13 Theme Code (as % of total Bank financing) Municipal governance and institution building 3 3 Natural disaster management 97 97 E. Bank Staff Positions At ICR At Approval Vice President: Victoria Kwakwa James W. Adams Country Director: Bert Hofman David R. Dollar Practice Manager: Abhas K. Jha Ede Jorge Ijjasz-Vasquez & Keshav Varma Project Team Leader: Paul Procee Mara Warwick ICR Team Leader: Wanli Fang & Paul Procee ICR Primary Author: Geoffrey Spencer v F. Results Framework Analysis Project Development Objectives (from Project Appraisal Document) To restore essential infrastructure, health, and education services to at least levels existing prior to the Wenchuan Earthquake, and where appropriate, to provide for expansion of services, while reducing the vulnerability to seismic and flood hazards and building capacity of local governments to manage the recovery program. Revised Project Development Objectives (as approved by original approving authority) Not revised. (a) PDO Indicator(s) Original Target Values Actual Value Achieved at Baseline Formally Revised Indicator (from approval Completion or Target Value Target Values documents) Years Indicator 1*: Sichuan - Roads rehabilitated, Non-rural (Kilometers, Core) Value Km 0 0 200 218 Date achieved 05/12/2008 06/30/2014 05/31/2016 05/31/2016 Comments (incl. % 109% achievement. All roads designed and built to new seismic codes. One minor achievement) section of Lingjiang West road (1.86km), delayed because of difficulty in getting National Railway Authority approval, is now under construction and will be completed by March 31, 2017. Indicator 2: Sichuan - Percentage of project roads with traffic restored to pre-earthquake levels (Percentage, Custom) Value % 0 100 100 100 Date achieved 05/12/2008 06/30/2014 05/31/2016 05/31/2016 Comments (incl. % 100% achievement. All road subproject design and specifications
Recommended publications
  • Spatiotemporal Changes and the Driving Forces of Sloping Farmland Areas in the Sichuan Region
    sustainability Article Spatiotemporal Changes and the Driving Forces of Sloping Farmland Areas in the Sichuan Region Meijia Xiao 1 , Qingwen Zhang 1,*, Liqin Qu 2, Hafiz Athar Hussain 1 , Yuequn Dong 1 and Li Zheng 1 1 Agricultural Clean Watershed Research Group, Institute of Environment and Sustainable Development in Agriculture, Chinese Academy of Agricultural Sciences/Key Laboratory of Agro-Environment, Ministry of Agriculture, Beijing 100081, China; [email protected] (M.X.); [email protected] (H.A.H.); [email protected] (Y.D.); [email protected] (L.Z.) 2 State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100048, China; [email protected] * Correspondence: [email protected]; Tel.: +86-10-82106031 Received: 12 December 2018; Accepted: 31 January 2019; Published: 11 February 2019 Abstract: Sloping farmland is an essential type of the farmland resource in China. In the Sichuan province, livelihood security and social development are particularly sensitive to changes in the sloping farmland, due to the region’s large portion of hilly territory and its over-dense population. In this study, we focused on spatiotemporal change of the sloping farmland and its driving forces in the Sichuan province. Sloping farmland areas were extracted from geographic data from digital elevation model (DEM) and land use maps, and the driving forces of the spatiotemporal change were analyzed using a principal component analysis (PCA). The results indicated that, from 2000 to 2015, sloping farmland decreased by 3263 km2 in the Sichuan province. The area of gently sloping farmland (<10◦) decreased dramatically by 1467 km2, especially in the capital city, Chengdu, and its surrounding areas.
    [Show full text]
  • The Utilization of Aerosol Therapy in Mechanical Ventilation Patients: a Prospective Multicenter Observational Cohort Study and a Review of the Current Evidence
    1071 Original Article Page 1 of 11 The utilization of aerosol therapy in mechanical ventilation patients: a prospective multicenter observational cohort study and a review of the current evidence Shan Lyu1#, Jie Li2#, Limin Yang3, Xiaoliang Du4, Xiaoyi Liu5, Libo Chuan6, Guoqiang Jing7, Zhenyan Wang8, Weiwei Shu9, Chunjuan Ye10, Qionglan Dong11, Jun Duan12, James B. Fink2,13, Zhancheng Gao14, Zongan Liang15; on behalf of Respiratory Care Committee in Chinese Thoracic Society 1Department of Critical Care Medicine, Peking University People’s Hospital, Beijing, China; 2Department of Cardiopulmonary Sciences, Division of Respiratory Care, Rush University Medical Center, Chicago, IL, USA; 3Department of Respiratory Care, Zhejiang University School of Medical Sir Run Run Shaw Hospital, Hangzhou, China; 4Department of Neurosurgical, Tongji Medical College of Huazhong University of Science and Technology Tongji Hospital, Wuhan, China; 5Department of Critical Care Medicine, Dazhou Central Hospital, Dazhou, China; 6Intensive Care Unit, the First People’s Hospital of Yunnan Province, Kunming, China; 7Department of Respiratory and Critical Care Medicine, Binzhou Medical University Hospital, Binzhou, China; 8Department of Critical Care Medicine, Peking University International Hospital, Beijing, China; 9Department of Critical Care Medicine, Yongchuan Hospital of Chongqing Medical University, Chongqing, China; 10Department of Surgical Intensive Care Unit, the First Affiliated Hospital of Xi’an Jiaotong University, Xi’an, China; 11Department of Critical
    [Show full text]
  • World Bank Document
    CONFORMED COPY Public Disclosure Authorized LOAN NUMBER 7616-CN Loan Agreement Public Disclosure Authorized (Wenchuan Earthquake Recovery Project) between PEOPLE’S REPUBLIC OF CHINA Public Disclosure Authorized and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated March 20, 2009 Public Disclosure Authorized LOAN AGREEMENT AGREEMENT dated March 20, 2009, between PEOPLE’S REPUBLIC OF CHINA (“Borrower”) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (“Bank”). The Borrower and the Bank hereby agree as follows: ARTICLE I – GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to this Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in the Loan Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement. ARTICLE II – LOAN 2.01. The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in this Agreement, an amount equal to seven hundred ten million Dollars ($710,000,000), as such amount may be converted from time to time through a Currency Conversion in accordance with the provisions of Section 2.07 of this Agreement (“Loan”), to assist in financing the project described in Schedule 1 to this Agreement (“Project”). 2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section IV of Schedule 2 to this Agreement. 2.03. The Front-end Fee payable by the Borrower shall be equal to one quarter of one percent (0.25%) of the Loan amount. The Borrower shall pay the Front-end Fee not later than sixty (60) days after the Effective Date.
    [Show full text]
  • Sanctioned Entities Name of Firm & Address Date
    Sanctioned Entities Name of Firm & Address Date of Imposition of Sanction Sanction Imposed Grounds China Railway Construction Corporation Limited Procurement Guidelines, (中国铁建股份有限公司)*38 March 4, 2020 - March 3, 2022 Conditional Non-debarment 1.16(a)(ii) No. 40, Fuxing Road, Beijing 100855, China China Railway 23rd Bureau Group Co., Ltd. Procurement Guidelines, (中铁二十三局集团有限公司)*38 March 4, 2020 - March 3, 2022 Conditional Non-debarment 1.16(a)(ii) No. 40, Fuxing Road, Beijing 100855, China China Railway Construction Corporation (International) Limited Procurement Guidelines, March 4, 2020 - March 3, 2022 Conditional Non-debarment (中国铁建国际集团有限公司)*38 1.16(a)(ii) No. 40, Fuxing Road, Beijing 100855, China *38 This sanction is the result of a Settlement Agreement. China Railway Construction Corporation Ltd. (“CRCC”) and its wholly-owned subsidiaries, China Railway 23rd Bureau Group Co., Ltd. (“CR23”) and China Railway Construction Corporation (International) Limited (“CRCC International”), are debarred for 9 months, to be followed by a 24- month period of conditional non-debarment. This period of sanction extends to all affiliates that CRCC, CR23, and/or CRCC International directly or indirectly control, with the exception of China Railway 20th Bureau Group Co. and its controlled affiliates, which are exempted. If, at the end of the period of sanction, CRCC, CR23, CRCC International, and their affiliates have (a) met the corporate compliance conditions to the satisfaction of the Bank’s Integrity Compliance Officer (ICO); (b) fully cooperated with the Bank; and (c) otherwise complied fully with the terms and conditions of the Settlement Agreement, then they will be released from conditional non-debarment. If they do not meet these obligations by the end of the period of sanction, their conditional non-debarment will automatically convert to debarment with conditional release until the obligations are met.
    [Show full text]
  • The Causes and Effects of the Development of Semi-Competitive
    Central European University The Causes and Effects of the Development of Semi-Competitive Elections at the Township Level in China since the 1990s By Hairong Lai Thesis submitted in fulfillment for the degree of PhD, Department of Political Science, Central European University, Budapest, January 2008 Supervisor Zsolt Enyedi (Central European University) External Supervisor Maria Csanadi (Hungarian Academy of Sciences) CEU eTD Collection PhD Committee Tamas Meszerics (Central European University) Yongnian Zheng (Nottingham University) 1 Contents Summary..........................................................................................................................................4 Acknowledgements..........................................................................................................................6 Statements........................................................................................................................................7 Chapter 1: Introduction .................................................................................................................8 1.1 The literature on elections in China ....................................................................................8 1.2 Theories on democratization .............................................................................................15 1.3 Problems in the existing literature on semi-competitive elections in China .....................21 1.4 Agenda of the current research..........................................................................................26
    [Show full text]
  • M6.9 Southern Qinghai, China Earthquake of 13 April 2010 Network
    U.S. DEPARTMENT OF THE INTERIOR EARTHQUAKE SUMMARY MAP XXX U.S. GEOLOGICAL SURVEY Prepared in cooperation with the Global Seismographic M6.9 Southern Qinghai, China Earthquake of 13 April 2010 Network Epicentral Region L. B Tectonic Setting alka 90° 92° 94° 96° 98° 100° 102° 104° 106° 70° sh 80° 90° 100° 110° 120° M O N G O L I A GOLMUD Shymkent Changchun Jilin Xinjiang Minhe Dzhambul Almaty 36° QABQA 2001 Urumqi LANZHOU Tashkent Bishkek 36° NamanganK ATE Fushun Y R T i a PL Gulistan G Y n S h a n MUR Kanggye Southern Qinghai Ningxia Z S T A 40° Andizhan A N Shenyang Osh Hamhung K U N L U N Fergana 40° F A U L T Anshan Sinuiju 13 April 2010 23:49:37 UTC Pingliang T Linxia A J Kashi T H Jingning I K I Huhot P'yongyang O R ZIKETAN Neiguanying S T N E A A N Baotou Beijing O R Dalian K 1937 Lintao 33.271° N., 96.629° E. Kulob Tangshan Maying Lung- EUR Kaesong Kagang Depth 10 km AS EXPLANATION shan- IA P H LA l t Tianjin U T Mw = 6.9 (USGS) TE a u Inch`on S O A chen h F R E Ta g Shijiazhuang K O Longxi y n Yinchuan Taiyuan Mag ≥ 7.0 Hezuo K A l t E Felt across the mountaiQnionuasn area in western China, over 400 u AT e PL killed, tens of thousands displaced. n H SIA Gangu RA j Eg U W 0 - 69 km u s n O i n a L TIANSHUI n t a Xining u L H u n Y E Gansu Rawalpindi M o K u n H A l u n F S E 70 - 299 Min Xian Tianshui Islamabad a u l t Lanzhou DAWU I Luoyang Zhengzhou 34° Li Xian M Xi'an 300 - 600 Qinghai Amritsar A C H I N A Tewo 34° Faisalabad TIBETAN PLATEAU Nanjing Volcanoes Lahore g Shanghai Hui-Xian Simla L Hefei in 30° Chandigarh a J A g
    [Show full text]
  • Lithofacies Palaeogeography of the Late Permian Wujiaping Age in the Middle and Upper Yangtze Region, China
    Journal of Palaeogeography 2014, 3(4): 384-409 DOI: 10.3724/SP.J.1261.2014.00063 Lithofacies palaeogeography and sedimentology Lithofacies palaeogeography of the Late Permian Wujiaping Age in the Middle and Upper Yangtze Region, China Jin-Xiong Luo*, You-Bin He, Rui Wang School of Geosciences, Yangtze University, Wuhan 430100, China Abstract The lithofacies palaeogeography of the Late Permian Wujiaping Age in Middle and Upper Yangtze Region was studied based on petrography and the “single factor analysis and multifactor comprehensive mapping” method. The Upper Permian Wujiaping Stage in the Middle and Upper Yangtze Region is mainly composed of carbonate rocks and clastic rocks, with lesser amounts of siliceous rocks, pyroclastic rocks, volcanic rocks and coal. The rocks can be divided into three types, including clastic rock, clastic rock-limestone and lime- stone-siliceous rock, and four fundamental ecological types and four fossil assemblages are recognized in the Wujiaping Stage. Based on a petrological and palaeoecological study, six single factors were selected, namely, thickness (m), content (%) of marine rocks, content (%) of shallow water carbonate rocks, content (%) of biograins with limemud, content (%) of thin- bedded siliceous rocks and content (%) of deep water sedimentary rocks. Six single factors maps of the Wujiaping Stage and one lithofacies palaeogeography map of the Wujiaping Age were composed. Palaeogeographic units from west to east include an eroded area, an alluvial plain, a clastic rock platform, a carbonate rock platform where biocrowds developed, a slope and a basin. In addition, a clastic rock platform exists in the southeast of the study area. Hydro- carbon source rock and reservoir conditions were preliminarily analyzed based on lithofacies palaeogeography.
    [Show full text]
  • World Bank Document
    INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3902 Public Disclosure Authorized Date ISDS Prepared/Updated: 10/30/2008 I. BASIC INFORMATION A. Basic Project Data Country: China Project ID: P114107 Project Name: Wenchuan Earthquake Recovery Task Team Leader: Mara K. Warwick Estimated Appraisal Date: November 13, Estimated Board Date: December 16, 2008 2008 Managing Unit: EASCS Lending Instrument: Emergency Recovery Public Disclosure Authorized Loan Sector: General water, sanitation and flood protection sector (44%);Roads and highways (39%);Health (13%);General education sector (4%) Theme: Natural disaster management (P);Pollution management and environmental health (S);Access to urban services and housing (S) IBRD Amount (US$m.): 710.00 IDA Amount (US$m.): 0.00 GEF Amount (US$m.): 0.00 PCF Amount (US$m.): 0.00 Other financing amounts by source: Borrower 30.00 30.00 Public Disclosure Authorized B. Project Objectives [from section 2 of PCN] To restore essential infrastructure, health, and education services to at least pre-earthquake levels and reduce vulnerability to seismic and flood hazards in project areas. C. Project Description [from section 3 of PCN] The proposed emergency recovery loan (ERL) will span Sichuan and Gansu provinces and will be processed using a programmatic approach, which will include the following key areas: (a) identification, selection, and appraisal of individual investment projects, including technical standards; (b) safeguards; (c) procurement; (d) financial management; and (e) monitoring and evaluation. During preparation, frameworks will be developed to guide the selection, appraisal and implementation of the individual investments during project implementation. Public Disclosure Authorized The components of the ERL cover three main sectors: infrastructure, health and education.
    [Show full text]
  • Analysis of Accumulation Models of Middle Permian in Northwest Sichuan Basin
    EARTH SCIENCES RESEARCH JOURNAL GEOLOGY Earth Sci. Res. J. Vol. 24, No. 4 (December, 2020): 419-428 Analysis of accumulation models of middle Permian in Northwest Sichuan Basin Bin Li1,2,*, Qiqi Li3, Wenhua Mei2, Qingong Zhuo4, Xuesong Lu4 1State Key Laboratory of Shale Oil and Gas Enrichment Mechanisms and Effective Development, Wuxi, 214126 2School of Geoscience and Technology, Southwest Petroleum University, Chengdu, 610500 3School of Earth Resources, China University of Geosciences, Wuhan, 430074; 4PetroChina Research Institute of Petroleum Exploration and Development, Beijing 100083, China *Corresponding author: [email protected] ABSTRACT Keywords: Northwest of Sichuan Basin; Great progress has been made in middle Permian exploration in Northwest Sichuan in recent years, but there are still Structure Evolution of Foreland Basin; Middle many questions in understanding the hydrocarbon accumulation conditions. Due to the abundance of source rocks and Permian; Paleozoic; Accumulation conditions; the multi-term tectonic movements in this area, the hydrocarbon accumulation model is relatively complex, which has Accumulation Model. become the main problem to be solved urgently in oil and gas exploration. Based on the different tectonic backgrounds of the middle Permian in northwest Sichuan Basin, the thrust nappe belt, the hidden front belt, and the depression belt are taken as the research units to comb and compare the geologic conditions of the middle Permian reservoir. The evaluation of source rocks and the comparison of hydrocarbon sources suggest that the middle Permian hydrocarbon mainly comes from the bottom of the lower Cambrian and middle Permian, and the foreland orogeny promoted the thermal evolution of Paleozoic source rocks in northwest Sichuan to high maturity and over maturity stage.
    [Show full text]
  • 2016 Annual Report.PDF
    HAITONG SECURITIES CO., LTD. 海通證券股份有限公司 Annual Report 2016 2016 Annual Report 年度報告 CONTENTS Section I Definition and Important Risk Warnings 3 Section II Company Profile and Key Financial Indicators 7 Section III Summary of the Company’s Business 23 Section IV Report of the Board of Directors 28 Section V Significant Events 62 Section VI Changes in Ordinary Share and Particulars about Shareholders 91 Section VII Preferred Shares 100 Section VIII Particulars about Directors, Supervisors, Senior Management and Employees 101 Section IX Corporate Governance 149 Section X Corporate Bonds 184 Section XI Financial Report 193 Section XII Documents Available for Inspection 194 Section XIII Information Disclosure of Securities Company 195 IMPORTANT NOTICE The Board, the Supervisory Committee, Directors, Supervisors and senior management of the Company represent and warrant that this annual report (this “Report”) is true, accurate and complete and does not contain any false records, misleading statements or material omission and jointly and severally take full legal responsibility as to the contents herein. This Report was reviewed and passed at the twenty-third meeting of the sixth session of the Board. The number of Directors to attend the Board meeting should be 13 and the number of Directors having actually attended the Board meeting was 11. Director Li Guangrong, was unable to attend the Board meeting in person due to business travel, and had appointed Director Zhang Ming to vote on his behalf. Director Feng Lun was unable to attend the Board meeting in person due to business travel and had appointed Director Xiao Suining to vote on his behalf.
    [Show full text]
  • Challenges and Countermeasures of Tourism
    International Conference on Social Science and Technology Education (ICSSTE 2015) Challenges and Countermeasures of Regional Tourism Cooperation Development Strategy of Sichuan-Shanxi-Gansu Golden Triangle Area,Western China Qin Jianxiong1 Zhang Minmin1 1 College of tourism and historic culture, Southwest University For Natianalities, Chengdu, 610041 Abstract visitors can explore in this line up and down five SSGGTA triangle of three provinces , dependent thousand years of culture, enjoy the mystery of Qinba [1] landscape, folk customs are similar, for the first time landscape . These tourism resources in Chongqing, since the 2002 held in Bazhong of SSGGTA triangle area Chengdu, Xi'an, Lanzhou, Wuhan five source among SSGGTA triangle tourism cooperation zone is composed tourism cooperation will be signed in SSGGTA triangle of Sichuan Bazhong, Guangyuan, Dazhou and Shanxi tourism, build "Golden Triangle" cooperation agreement, Hanzhoung, Ankang three provinces and five to 2005 has successively held 3 annual meeting. The goal municipalities, carry out cooperation in the past 3 years, of cooperation is through the sincere cooperation of the three provinces and five municipalities in the propaganda, three provinces, the formation of regional tourism build mutual interaction, line group, strategic planning collaboration regular contact system, the characteristics of consensus interaction and so on has made significant tourism products, the formation of regional joint progress, regional cooperation has been fully affirmed the promotion,a barrier free Tourism Zone, to realize the two provincial government and support. Sichuan North Sichuan area has been the focus of tourism development sustainable development of Shanxi tourism in Golden in the province, tourism development, Shanxi will also Triangle.
    [Show full text]
  • Since the Reform and Opening Up1 1
    Int. Statistical Inst.: Proc. 58th World Statistical Congress, 2011, Dublin (Session CPS020) p.6378 Research of Acceleration Urbanization Impacts on Resources and Environment in Sichuan Province Caimo,Teng National Bureau of Statistics of China, Survey Organizations of Sichuan No.31, the East Route, Qingjiang Road Chengdu, China, 610072 E-mail: [email protected] Since the reform and opening up, the rapid development of economic society and the rise ceaselessly of urbanization in Sichuan play an important role for material civilization and spiritual civilization, but also bring influence for resources and environment, this paper give an in-depth analysis about this. Ⅰ. The Main Characteristics of the Urbanization Development in Sichuan The reflection of urbanization in essence is from the industry cluster to population cluster., we tend to divided the process of urbanization into four stages, 1949-1978 is the first stage, 1978 – 1990 is the second stage, 1990 -2000 is the third stage, After the year of 2000 is the fourth stage. In view the particularities of the first phase, this paper researches mainly after three stages. 1. The level of the urbanization enhances unceasingly. With the reform and opening-up and the rapid development of social economy, the urbanization in Sichuan has significant achievements. The average annual growth of the level of urbanization is 0.8 percent in the twelve years of the second stage. The average annual growth in the third stage and the four stages is individually 0.5 and 1.3 percentage. The average annual growth of urbanization in the fourth stage is faster respectively 0.5 and 0.8 percent than the previous two stages which reflects obviously the rapid rise of the urbanization after the fourth stage in Sichuan.
    [Show full text]