World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document RP360 V5 World Bank Financed Sichuan Urban Development Project (SUDP) Mianyang Sub-project Remaining Loan Adjustment- Roads & Supporting Infrastructure Construction in the Cluster Zone of Public Disclosure Authorized Relocated Industries Through Post-disaster Reconstruction in Xinglong Area of Science & Education Pioneer Park of Mianyang Science and Technology City Public Disclosure Authorized Resettlement Action Plan Public Disclosure Authorized Mianyang Science and Technology City Development and Investment (Group) Co., Ltd. November 2009 Public Disclosure Authorized World Bank Financed SUDP Mianyang Sub-project Remaining Loan Adjustment-Roads & Supporting Infrastructure Construction in the Cluster Zone of Relocated Industries Through Post-disaster Reconstruction in Xinglong Area of Science & Education Pioneer Park of Mianyang Science and Technology City Compilation Description The Resettlement Action Plan (RAP) is of great importance to smooth implementation of Science & Education Pioneer Park Project in Mianyang, Sichuan, especially to those affected by land acquisition and house demolition within the scope of the Project. Local governments, Mianyang Science and Technology City Development Investment (Group) Co., Ltd. and Southwest Municipal Engineering Design & Research Institute of China, which is a design institute, attempt to minimize adverse impact of the Project on local residents through constantly repeated optimum designs. Mianyang Science & Technology City Development Investment (Group) Co., Ltd. has prepared the RAP with the assistance of resettlement specialists from Research Institute of Foreign Capital Introduction and Utilization, Southwest Jiaotong University. Mianyang Science and Technology City Development and Investment (Group) Co., Ltd. November 2009 Mianyang Science and Technology City Development and World Bank Financed Projects 2 Investment (Group) Co., Ltd. World Bank Financed SUDP Mianyang Sub-project Remaining Loan Adjustment-Roads & Supporting Infrastructure Construction in the Cluster Zone of Relocated Industries Through Post-disaster Reconstruction in Xinglong Area of Science & Education Pioneer Park of Mianyang Science and Technology City Contents Chapter 1 Overview ..............................................................................................................................7 1.1 Project description.............................................................................................................................7 1.2 Preparation of Resettlement Action Plan ........................................................................................10 1.3 Measures to reduce land acquisition and house demolition ............................................................10 1.3.1 Planning and design stage of the Project.....................................................................................10 1.3.2 Construction stage of the Project ................................................................................................11 1.3.3 Resettlement Action Plan for land acquisition and house demolition in the Project and implementation stage ..................................................................................................................11 Chapter 2 Socioeconomic Survey .......................................................................................................13 2.1 Socioeconomic overview of project-affected area ..........................................................................13 2.1.1 Socioeconomic conditions of Mianyang City.............................................................................13 2.1.2 Socioeconomic conditions of Science & Education Pioneer Park..............................................15 2.1.3 Socioeconomic conditions of affected communities...................................................................16 2.2 Socioeconomic survey by Southwest Jiaotong University..............................................................16 2.3 Socioeconomic characteristics of affected persons.........................................................................17 2.3.1 Overview.....................................................................................................................................17 2.3.2 Human resources.........................................................................................................................18 2.3.3 Natural resources ........................................................................................................................20 2.3.3.1 Land ownership ..................................................................................................................20 2.3.3.2 Cultivated land, orchards and economic forest...................................................................20 2.3.3.3 Water sources .....................................................................................................................20 2.3.4 Material resources.......................................................................................................................20 2.3.4.1 Houses and attachments......................................................................................................20 2.3.4.2 Productive assets.................................................................................................................21 2.3.4.3 Domestic durable goods .....................................................................................................21 2.3.5 Financial resources......................................................................................................................21 2.3.5.1 Income of households.........................................................................................................21 2.3.5.2 Income sources ...................................................................................................................22 2.3.5.3 Consumption pattern and deposits......................................................................................23 2.3.6 Vulnerable groups.......................................................................................................................23 Chapter 3 Project Impact.....................................................................................................................25 3.1 Scope of project impact...................................................................................................................25 3.2 Material indices of project impact...................................................................................................25 3.2.1 Permanent land acquisition .........................................................................................................25 3.2.1.1 Amount of permanent land acquisition...............................................................................25 3.2.1.2 Analysis on impact of permanent land acquisition.............................................................25 3.3.2 Land for temporary use...............................................................................................................25 3.3.3 House demolition........................................................................................................................26 3.3.4 Project-affected commercial shops .............................................................................................26 3.3.5 Project-affected enterprises.........................................................................................................26 3.3.6 Project-affected population.........................................................................................................27 3.3.7 Scattered trees, tombs and other attachments..............................................................................27 3.3.8 Special facilities..........................................................................................................................27 Chapter 4 Legal Framework and Resettlement Policy........................................................................29 4.1 Policy basis .....................................................................................................................................29 Mianyang Science and Technology City Development and World Bank Financed Projects 3 Investment (Group) Co., Ltd. World Bank Financed SUDP Mianyang Sub-project Remaining Loan Adjustment-Roads & Supporting Infrastructure Construction in the Cluster Zone of Relocated Industries Through Post-disaster Reconstruction in Xinglong Area of Science & Education Pioneer Park of Mianyang Science and Technology City 4.2 Land acquisition, house demolition and resettlement policies........................................................29 4.2.1 General objectives and principles ...............................................................................................29 4.3 Laws and regulations concerned .....................................................................................................30 4.3.1 Regulations in Land Administration Law of the People’s Republic of China.............................30 4.3.1.1 Ownership and right of use of land.....................................................................................30 4.3.1.2. General plans for the utilization of land .............................................................................31 4.3.1.3 Protection of cultivated land...............................................................................................32
Recommended publications
  • World Bank Document
    CONFORMED COPY Public Disclosure Authorized LOAN NUMBER 7616-CN Loan Agreement Public Disclosure Authorized (Wenchuan Earthquake Recovery Project) between PEOPLE’S REPUBLIC OF CHINA Public Disclosure Authorized and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated March 20, 2009 Public Disclosure Authorized LOAN AGREEMENT AGREEMENT dated March 20, 2009, between PEOPLE’S REPUBLIC OF CHINA (“Borrower”) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (“Bank”). The Borrower and the Bank hereby agree as follows: ARTICLE I – GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to this Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in the Loan Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement. ARTICLE II – LOAN 2.01. The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in this Agreement, an amount equal to seven hundred ten million Dollars ($710,000,000), as such amount may be converted from time to time through a Currency Conversion in accordance with the provisions of Section 2.07 of this Agreement (“Loan”), to assist in financing the project described in Schedule 1 to this Agreement (“Project”). 2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section IV of Schedule 2 to this Agreement. 2.03. The Front-end Fee payable by the Borrower shall be equal to one quarter of one percent (0.25%) of the Loan amount. The Borrower shall pay the Front-end Fee not later than sixty (60) days after the Effective Date.
    [Show full text]
  • Sanctioned Entities Name of Firm & Address Date
    Sanctioned Entities Name of Firm & Address Date of Imposition of Sanction Sanction Imposed Grounds China Railway Construction Corporation Limited Procurement Guidelines, (中国铁建股份有限公司)*38 March 4, 2020 - March 3, 2022 Conditional Non-debarment 1.16(a)(ii) No. 40, Fuxing Road, Beijing 100855, China China Railway 23rd Bureau Group Co., Ltd. Procurement Guidelines, (中铁二十三局集团有限公司)*38 March 4, 2020 - March 3, 2022 Conditional Non-debarment 1.16(a)(ii) No. 40, Fuxing Road, Beijing 100855, China China Railway Construction Corporation (International) Limited Procurement Guidelines, March 4, 2020 - March 3, 2022 Conditional Non-debarment (中国铁建国际集团有限公司)*38 1.16(a)(ii) No. 40, Fuxing Road, Beijing 100855, China *38 This sanction is the result of a Settlement Agreement. China Railway Construction Corporation Ltd. (“CRCC”) and its wholly-owned subsidiaries, China Railway 23rd Bureau Group Co., Ltd. (“CR23”) and China Railway Construction Corporation (International) Limited (“CRCC International”), are debarred for 9 months, to be followed by a 24- month period of conditional non-debarment. This period of sanction extends to all affiliates that CRCC, CR23, and/or CRCC International directly or indirectly control, with the exception of China Railway 20th Bureau Group Co. and its controlled affiliates, which are exempted. If, at the end of the period of sanction, CRCC, CR23, CRCC International, and their affiliates have (a) met the corporate compliance conditions to the satisfaction of the Bank’s Integrity Compliance Officer (ICO); (b) fully cooperated with the Bank; and (c) otherwise complied fully with the terms and conditions of the Settlement Agreement, then they will be released from conditional non-debarment. If they do not meet these obligations by the end of the period of sanction, their conditional non-debarment will automatically convert to debarment with conditional release until the obligations are met.
    [Show full text]
  • 2016 Annual Report.PDF
    HAITONG SECURITIES CO., LTD. 海通證券股份有限公司 Annual Report 2016 2016 Annual Report 年度報告 CONTENTS Section I Definition and Important Risk Warnings 3 Section II Company Profile and Key Financial Indicators 7 Section III Summary of the Company’s Business 23 Section IV Report of the Board of Directors 28 Section V Significant Events 62 Section VI Changes in Ordinary Share and Particulars about Shareholders 91 Section VII Preferred Shares 100 Section VIII Particulars about Directors, Supervisors, Senior Management and Employees 101 Section IX Corporate Governance 149 Section X Corporate Bonds 184 Section XI Financial Report 193 Section XII Documents Available for Inspection 194 Section XIII Information Disclosure of Securities Company 195 IMPORTANT NOTICE The Board, the Supervisory Committee, Directors, Supervisors and senior management of the Company represent and warrant that this annual report (this “Report”) is true, accurate and complete and does not contain any false records, misleading statements or material omission and jointly and severally take full legal responsibility as to the contents herein. This Report was reviewed and passed at the twenty-third meeting of the sixth session of the Board. The number of Directors to attend the Board meeting should be 13 and the number of Directors having actually attended the Board meeting was 11. Director Li Guangrong, was unable to attend the Board meeting in person due to business travel, and had appointed Director Zhang Ming to vote on his behalf. Director Feng Lun was unable to attend the Board meeting in person due to business travel and had appointed Director Xiao Suining to vote on his behalf.
    [Show full text]
  • Post-Wenchuan Earthquake Rural Reconstruction and Recovery in Sichuan China
    POST-WENCHUAN EARTHQUAKE RURAL RECONSTRUCTION AND RECOVERY IN SICHUAN CHINA: MEMORY, CIVIC PARTICIPATION AND GOVERNMENT INTERVENTION by Haorui Wu B.Eng., Sichuan University, 2006 M.Eng., Sichuan University, 2009 A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY in THE FACULTY OF GRADUATE AND POSTDOCTORAL STUDIES (Interdisciplinary Studies) THE UNIVERSITY OF BRITISH COLUMBIA (Vancouver) September 2014 ©Haorui Wu, 2014 Abstract On May 12, 2008, an earthquake of a magnitude of 7.9 struck Wenchuan County, Sichuan Province, China, which affected 45.5 million people, causing over 15 million people to be evacuated from their homes and leaving more than five million homeless. From an interdisciplinary lens, interrogating the many interrelated elements of recovery, this dissertation examines the post-Wenchuan earthquake reconstruction and recovery. It explores questions about sense of home, civic participation and reconstruction primarily based on the phenomenon of the survivors of the Wenchuan Earthquake losing their sense of home after their post-disaster relocation and reconstruction. The following three aspects of the reconstruction are examined: 1) the influence of local residents’ previous memories of their original hometown on their relocation and the reconstruction of their social worlds and lives, 2) the civic participation that took place throughout the post-disaster reconstruction, 3) the government interventions overseeing and facilitating the entire post-disaster reconstruction. Based on fieldwork, archival and document research, memory workshops and walk-along interviews, a qualitative study was conducted with the aim of examining the earthquake survivors’ general memories of daily life and specific memories of utilizing space in their original hometown.
    [Show full text]
  • Field Investigation on Industrial Buildings in Mianyang District and Some
    th The 14 World Conference on Earthquake Engineering October 12-17, 2008, Beijing, China Field Investigation on Industrial Buildings in Mianyang District and Some Advices on Post-earthquake Rehabilitation and Seismic Design 1 2 HU Kongguo and WANG Yanke 1 Senior Engineer, Structure Evaluation &Strengthening Div.,China Electronics Engineering Design Institute, Beijing, China 2 Engineer, Structure Evaluation &Strengthening Div., China Electronics Engineering Design Institute, Beijing ,China Email:[email protected],[email protected] ABSTRACT : The 5.12 Wenchuan Earthquake has caused a huge loss to the lives of Sichuan people and their properties. Immediately after the earthquake, the Ministry of Industry and Information Technology of the People’s Republic of China sent an earthquake loss investigation team to arrive at the five regions heavily hit by the earthquake, namely Chengdu, Deyang, Mianyang, Guangyuan and Yaan, etc., to investigate the damages to industrial buildings and equipment as well as the loss of human lives. This paper only deals with the damages to the industrial buildings caused by this earthquake, which also includes the post-quake reinforcement and retrofitting proposals as well as advices on the seismic design of industrial buildings to be built in this region in the future. KEYWORDS: Field Damage Investigation; Industrial Buildings; Post-earthquake Rehabilitation 1. OVERVIEW OF DAMAGE TO INDUSTRIAL BUILDINGS IN MIANYANG CITY CAUSED BY THE EARTHQUKE With a jurisdiction over two districts, one city and six counties and a total area of 20,000km2 and a population of 5.29 million, Mianyang City features six major industrial sectors such as electronics and information, metallurgy, automobile and auto part, building material, bio-pharmacy and foodstuff as well as textile, etc.
    [Show full text]
  • Research on the Renewal and Reconstruction of Pingwu Old County Seat
    Open Access Library Journal 2021, Volume 8, e7776 ISSN Online: 2333-9721 ISSN Print: 2333-9705 Research on the Renewal and Reconstruction of Pingwu Old County Seat Fang Xu School of Architecture, Southwest Minzu University, Chengdu, China How to cite this paper: Xu, F. (2021) Abstract Research on the Renewal and Reconstruction of Pingwu Old County Seat. Open Access China’s urban planning has the characteristics of multi-field and multi-level, and Library Journal, 8: e7776. the corresponding planning theories are also diversified, which can be applied to https://doi.org/10.4236/oalib.1107776 different situations. However, with the rapid development of China’s economy, society and culture, the continuous increase of population and the high-speed Received: July 20, 2021 Accepted: August 6, 2021 urban construction, the problem of unbalanced urbanization process has Published: August 9, 2021 emerged. Therefore, the renewal and reconstruction of the old city has be- come the general trend of the current urban construction and development. It Copyright © 2021 by author(s) and Open is the key to urban construction and an unavoidable problem in the process Access Library Inc. of urbanization. It is related to the comprehensive development process of This work is licensed under the Creative Commons Attribution International economy, culture and society of a city. How to carry out the renewal and re- License (CC BY 4.0). construction of the old city scientifically and rationally has brought great http://creativecommons.org/licenses/by/4.0/ challenges to the city planners and builders. This paper takes the renovation Open Access of Pingwu old county seat as an example, and analyzes the location, historical evolution, important history, cultural relics, buildings and facilities of Pingwu old county seat according to existing data and field research, and based on the status quo of Pingwu and old city renovation, upgrading strategy is put for- ward, in order to contribute to Pingwu and city construction and development.
    [Show full text]
  • Online Appendix (474.67
    How do Tax Incentives Aect Investment and Productivity? Firm-Level Evidence from China ONLINE APPENDIX Yongzheng Liu School of Finance Renmin University of China E-mail: [email protected] Jie Mao School of International Trade and Economics University of International Business and Economics E-mail: [email protected] 1 Appendix A: Supplementary Figures and Tables Figure A1: The Distribution of Estimates for the False VAT Reform Variable Panel A. ln(Investment) Panel B. ln(TFP, OP method) 15 50 40 10 30 20 5 Probabilitydensity Probability density 10 0 0 -0.10 0.00 0.10 0.384 -0.02 0.00 0.02 0.089 The simulated VAT reform estimate The simulated VAT reform estimate reference normal, mean .0016 sd .03144 reference normal, mean .00021 sd .00833 Notes: The gure plots the density of the estimated coecients of the false VAT reform variable from the 500 simulation tests using the specication in Column (3) of Table 2. The vertical red lines present the treatment eect estimates reported in Column (3) of Table 2. Source: Authors' calculations. 2 Table A1: Evolution of the VAT Reform in China Stage of the Reform Industries Covered (Industry Classication Regions Covered (Starting Codes) Time) Machine and equipment manufacturing (35, 36, 39, 40, 41, 42); Petroleum, chemical, and pharmaceutical manufacturing (25, 26, 27, 28, 29, 30); Ferrous and non-ferrous metallurgy (32, 33); The three North-eastern provinces: Liaoning (including 1 (July 2004) Agricultural product processing (13, 14, 15, 17, 18, 19, 20, 21, Dalian city), Jilin and Heilongjiang. 22); Shipbuilding (375); Automobile manufacturing (371, 372, 376, 379); Selected military and hi-tech products (a list of 249 rms, 62 of which are in our sample).
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Annual Report 2019
    HAITONG SECURITIES CO., LTD. 海通證券股份有限公司 Annual Report 2019 2019 年度報告 2019 年度報告 Annual Report CONTENTS Section I DEFINITIONS AND MATERIAL RISK WARNINGS 4 Section II COMPANY PROFILE AND KEY FINANCIAL INDICATORS 8 Section III SUMMARY OF THE COMPANY’S BUSINESS 25 Section IV REPORT OF THE BOARD OF DIRECTORS 33 Section V SIGNIFICANT EVENTS 85 Section VI CHANGES IN ORDINARY SHARES AND PARTICULARS ABOUT SHAREHOLDERS 123 Section VII PREFERENCE SHARES 134 Section VIII DIRECTORS, SUPERVISORS, SENIOR MANAGEMENT AND EMPLOYEES 135 Section IX CORPORATE GOVERNANCE 191 Section X CORPORATE BONDS 233 Section XI FINANCIAL REPORT 242 Section XII DOCUMENTS AVAILABLE FOR INSPECTION 243 Section XIII INFORMATION DISCLOSURES OF SECURITIES COMPANY 244 IMPORTANT NOTICE The Board, the Supervisory Committee, Directors, Supervisors and senior management of the Company warrant the truthfulness, accuracy and completeness of contents of this annual report (the “Report”) and that there is no false representation, misleading statement contained herein or material omission from this Report, for which they will assume joint and several liabilities. This Report was considered and approved at the seventh meeting of the seventh session of the Board. All the Directors of the Company attended the Board meeting. None of the Directors or Supervisors has made any objection to this Report. Deloitte Touche Tohmatsu (Deloitte Touche Tohmatsu and Deloitte Touche Tohmatsu Certified Public Accountants LLP (Special General Partnership)) have audited the annual financial reports of the Company prepared in accordance with PRC GAAP and IFRS respectively, and issued a standard and unqualified audit report of the Company. All financial data in this Report are denominated in RMB unless otherwise indicated.
    [Show full text]
  • A New Method for Time-Of-Day Breakpoints Determination Based on Clustering and Image Processing
    Canadian Journal of Civil Engineering A new method for time-of-day breakpoints determination based on clustering and image processing Journal: Canadian Journal of Civil Engineering Manuscript ID cjce-2019-0153.R2 Manuscript Type: Article Date Submitted by the 28-Sep-2019 Author: Complete List of Authors: Shen, Hui; Southwest University of Science and Technology; Mianyang Polytechnic Yan, Jing; Southwest University of Science and Technology Liu, Daoguang; Southwest University of Science and Technology Liu, Zhigui;Draft Southwest University of Science and Technology; Southwest University of Science and Technology, School of computer science and technology Keyword: signal control, clustering, image segment, TOD breakpoints Is the invited manuscript for consideration in a Special Not applicable (regular submission) Issue? : https://mc06.manuscriptcentral.com/cjce-pubs Page 1 of 33 Canadian Journal of Civil Engineering A new method for time-of-day breakpoints determination based on clustering and image segmentation Hui Shen1,3, Jing Yan2, Daoguang Liu2, Zhigui Liu*1,2 1. School of Information Engineering, Southwest University of Science and Technology, 59, Qinglong Road, Fucheng District, Mianyang, 621000, China. 2. School of Computer Science and Technology, Southwest University of Science and Technology, 59, Qinglong Road, Fucheng District, Mianyang, 621000, China. 3. Corresponding author. Mianyang Polytechnic, 1, Xianren Road, Youxian District, Mianyang, 621000, China. Draft Abstract: Signal control is an important part of the transportation system and it plays an important role in improving the capacity of intersections. This paper proposes a new traffic time division method for multi-period fixed-time control strategy. Firstly, we put forward a new concept-transportation overlap rate, in order to complete the clustering of daily traffic flow patterns.
    [Show full text]
  • Based on Binary Logit Model Analysis on Characteristics of Sharing Bicycle Travel Taking Fucheng District of Mianyang City As an Example
    Open Journal of Social Sciences, 2020, 8, 260-273 https://www.scirp.org/journal/jss ISSN Online: 2327-5960 ISSN Print: 2327-5952 Based on Binary Logit Model Analysis on Characteristics of Sharing Bicycle Travel Taking Fucheng District of Mianyang City as an Example Tingting An, Langong Hou* School of Civil Engineering and Architecture, Southwest University of Science and Technology, Mianyang, China How to cite this paper: An, T. T., & Hou, Abstract L. G. (2020). Based on Binary Logit Model Analysis on Characteristics of Sharing The study of urban shared bike travel characteristics is the premise of sus- Bicycle Travel Taking Fucheng District of tainable development of shared bike. In this paper, using the form of a ques- Mianyang City as an Example. Open Jour- tionnaire, the citizens of Fucheng District of Mianyang City were investigated nal of Social Sciences, 8, 260-273. https://doi.org/10.4236/jss.2020.84019 and obtained 98 Valid data. Analysis of travel characteristics is based on sur- vey data, and studies the factors affecting the use of shared bicycles, combined Received: December 18, 2019 with the establishment of travel behavior theory Logit model, with the aid of Accepted: April 17, 2020 Published: April 20, 2020 SPSS Calculate with software. The results showed that women were more likely to choose shared bike trips than men; those who chose shared bikes Copyright © 2020 by author(s) and tended to be younger; those who shared bikes were more favored by students Scientific Research Publishing Inc. and office workers; those with higher education levels were more likely to This work is licensed under the Creative Commons Attribution International choose shared bike trips; and those with higher education levels were the most License (CC BY 4.0).
    [Show full text]
  • Wa Shan – Emei Shan, a Further Comparison
    photograph © Zhang Lin A rare view of Wa Shan almost minus its shroud of mist, viewed from the Abies fabri forested slopes of Emei Shan. At its far left the mist-filled Dadu River gorge drops to 500-600m. To its right the 3048m high peak of Mao Kou Shan climbed by Ernest Wilson on 3 July 1903. “As seen from the top of Mount Omei, it resembles a huge Noah’s Ark, broadside on, perched high up amongst the clouds” (Wilson 1913, describing Wa Shan floating in the proverbial ‘sea of clouds’). Wa Shan – Emei Shan, a further comparison CHRIS CALLAGHAN of the Australian Bicentennial Arboretum 72 updates his woody plants comparison of Wa Shan and its sister mountain, World Heritage-listed Emei Shan, finding Wa Shan to be deserving of recognition as one of the planet’s top hotspots for biological diversity. The founding fathers of modern day botany in China all trained at western institutions in Europe and America during the early decades of last century. In particular, a number of these eminent Chinese botanists, Qian Songshu (Prof. S. S. Chien), Hu Xiansu (Dr H. H. Hu of Metasequoia fame), Chen Huanyong (Prof. W. Y. Chun, lead author of Cathaya argyrophylla), Zhong Xinxuan (Prof. H. H. Chung) and Prof. Yung Chen, undertook their training at various institutions at Harvard University between 1916 and 1926 before returning home to estab- lish the initial Chinese botanical research institutions, initiate botanical exploration and create the earliest botanical gardens of China (Li 1944). It is not too much to expect that at least some of them would have had personal encounters with Ernest ‘Chinese’ Wilson who was stationed at the Arnold Arboretum of Harvard between 1910 and 1930 for the final 20 years of his life.
    [Show full text]