Energy from Waste

Total Page:16

File Type:pdf, Size:1020Kb

Energy from Waste Working Group on Thermal Treatment of Waste Energy from Waste State-of-the-Art-Report Statistics 5th Edition August 2006 Cover photo The photo on the front cover shows the SYSAV plant in Malmö, Sweden. For the time being the plant has three furnace lines and burns nearly 400,000 tonnes of waste pr. year. A 4th new line similar to line 3 with a capacity of 25 t/h is to go into operation by 2008. (Photo by Bo Strandh). The general manager of SYSAV, Mr. Hakon Rylander is chairman of ISWA’s Working Group on Thermal Treatment of Waste. The vice-chairman of the Working Group, Mr. Jørgen Haukohl of Rambøll Danmark A/S is the editor of this publication. Rambøll has been consultant for SYSAV on development of the Waste to Energy plant since 1998. Energy from Waste State-of-the-Art Report 5th Edition 2006 Austria • Belgium • Czech Republic • Denmark Finland • France • Germany Great Britain • Hungary • Italy • Netherlands • Norway Portugal • Spain • Sweden • Switzerland • USA Working Group on Thermal Treatment of Waste Impressum: Copyright: © by ISWA 2006 Edited by: Rambøll Danmark A/S Teknikerbyen 31 DK-2830 Virum Denmark Phone +45 4598 6000 Fax +45 4598 8520 Website: www.ramboll.dk Contact person: Jørgen haukohl E-mail: [email protected] Published by: ISWA Working Group on Thermal Treatment of Waste c/o ISWA General Secretariat Vesterbrogade 74, 3rd floor DK-1620 Copenhagen V Denmark Phone: +45 32 96 15 88 Fax: +45 32 96 15 84 E-mail: [email protected] Website: www.iswa.org Table of contents 1. Introduction 1 2. Waste to energy plants in Europe 3 2.1 Number of plants and capacity 3 2.2 Amounts of waste treated 6 2.3 Energy sold 9 2.4 Residues 11 National data 12 Abbreviations 12 Austria 13 Belgium 21 Czech Republic 31 Denmark 35 Finland 47 France 51 Germany 87 Great Britain 109 Hungary 119 Italy 123 Netherlands 141 Norway 149 Portugal 157 Spain 161 Sweden 169 Switzerland 181 USA 193 1. Introduction This is the 5th Edition of the State-of-the Art Report on waste to energy plants pre- pared by Rambøll on behalf of the ISWA Working Group on Thermal Treatment of Waste. This 5th Edition presents information on the plants in 16 European countries by year 2005 and includes operational data covering 2004. The countries included are Austria, Belgium, the Czech Republic, Denmark, Finland, France, Germany, Great Britain, Hungary, Italy, the Netherlands, Norway, Portugal, Spain, Sweden and Switzerland. To the best of the editors’ knowledge these 16 countries represent all European countries with waste to energy plants with the ex- ception of Luxembourg with only one plant incinerating 130.000 tonnes of waste per year. Data on the individual incineration plants are presented country by country in three tables in the report: 1. General Information (location, name, address etc.) 2. Technical Information (number of lines, capacity, furnace/boiler and flue gas treatment systems including their suppliers etc.) 3. Operational data (quantities incinerated, residues formed and energy produced and sold) The report covers MSW incineration plants with a capacity of more than 15 ton- nes/day or 10,000 tonnes/year, which means that special plants for hazardous waste, sludge, agricultural and hospital wastes are not included. The data has been collected through a questionnaire that was distributed to the waste to energy plants in the various countries in 2005. In general, the response rate on the questionnaire has been high in most countries, near to 100%, and it is believed that almost all the existing plants in the 16 countries are included. How- ever, for Austria, Belgium, France, Great Britain and Portugal technical information and operational data are not complete for all of the plants. In total the report brings information on 431 European waste to energy plants. This is an increase of 15% compared to the 375 plants listed in the 4th Edition embracing 14 countries. The increase is primarily due to a better response rate to the question- naires (Austria, Great Britain, Norway and Sweden). In most of the other countries the number of plants has remained constant or increased. However, as an exception to this trend, the number of plants in Italy has gone down from 62 to 51 due to clo- sure of old plants. Of the increase, the two additional countries, the Czech Republic and Finland, ac- counts for 4 plants. 1 The first section of the report contains a comparison of the 16 countries in terms of number of plants, amount of waste treated, energy sold and the residues generated. The second section presents the above national tables with general information, technical information and operational data for the waste to energy plants data in the 16 countries. Finally, the report contains information on the waste-to-energy plants in USA. Acknowledgements The editors express their gratitude for the kind and useful collaboration from the following contact persons in the various countries. Dr. Philipp Krobath, Fernvärme Wien, Austria Mrs. Katleen van den Eynden, Public Waste Agency of Flanders (OVAM), Belgium Mrs. Ella Stengler, CEWEP, Belgium Mrs. Jana Penickova, TERMIZO a.s, Czech Republic Mr. Esko Pohjanen, City of Turku, Finland Mr. Robert Morin, Veolia Proprete, France Mrs. Kyra Dreher,. ITAD e.V., Germany Mr. Tom Ellis,The Chartered Institute of Waste Management (CIWM), U.K Mr. János Bánhidy, FKF, Hungary Mrs. Valentina Cipriano, Federambiente and Mr. Antonio Bonomi, ASM Brescia, Italy Mr. Edward Pfeiffer, Kema, Netherlands Mr. Håkon Jentoft, Avfall Norge, Norway Mrs. Ana Loureiro, Valorsul, Portugal Mrs. Amalia Cerda, Tirme S.A., Spain Mr. Conrad Bader, Von Roll Inova, Switzerland Mr. Anders Hedenstedt, Svenska Renhållningsverksföreningen (RVF), Sweden Mr. Ted Michaels, Integrated Waste Services Association, USA Virum, August 2006 Rambøll Danmark A/S Error! Reference source not found.Error! Reference source not found. 2 2. Waste to energy plants in Europe This section presents a comparison of the waste to energy plants in Austria, Belgium, the Czech Republic, Denmark, Finland, Fr 2.1 Italy, the Netherlands, Norway, Portugal, Spain, Sweden and Switzerland in 2004/2005. Number of plants and capacity The total number of incineration plants in the 16 countries in 2005 was 431 as shown country by country in Figure 1: 140 120 100 ance, Germany, Great Britain, Hungary, 80 No. of60 plants 40 20 0 Austria Figure 1: Belgium Data on waste capacity are complete or almost complete for all the countries with the exception of Austria and Great Britain, where data are complete for respectively Number ofCzech Plants, Rep. 2005 50% and 70% of the plants. These two countries are marked with * in the section below. Denmark Finland It is worth noting that the Waste Incineration Directive (2000/76/EC) was to be fully implemented in the EU Member States by 28 December 2005.Franc Thise might have caused some plants to close during 2005. Consequently, the total number of plants and their capacities listed may be on the high side. Germany Great Britain The number of furnaces per plant3 varies from 1 to 8. The average size of the plants (tonnes/hour/plant) in 2005 is shown in Figure 2. Hungary Italy Netherlands Norway Portugal Spain Sweden Switzerland 80 70 60 50 40 30 Capacity20 (tonnes/hour/plant) 10 0 Austria* Figure 2: Belgium As can be seen, there are Czegreatch differences Rep. in the average size of the plants from one country to the other. Capacity per plant (averageDenma size),rk 2005 The data behind the graphs in Figure 1 and 2 areFinland shown in Table 1. The table con- tains information on the number of plants, their total capacity (nominal) in ton- nes/hour and the average capacity in tonnes/hour/plant forFra eachnce of the 16 countries. Germany In addition the table contains the total number of plants and capacity in the 16 coun- tries as well as the average plant size. Great Britain* Hungary Italy Netherlands Norway Portugal Spain Sweden 4 Switzerland Error! Reference source not found.Error! Reference source not found. Plants and capacities Total Capacity per Country No. of capacity plant plants tonnes/h tonnes/h/plant Austria* 9 91 10,1 Belgium 18 367 20,4 Czech Rep. 3 117 39,0 Denmark 34 577 17,0 Finland 1 8 8,0 France 127 1.909 15,0 Germany 68 2.445 36,0 Great Britain* 22 386 17,5 Hungary 1 60 60,0 Italy 51 690 13,5 Netherlands 11 670 60,9 Norway 13 78 6,0 Portugal 3 205 68,3 Spain 10 245 24,5 Sweden 30 513 17,1 Switzerland 30 464 15,5 Sum/average 431 8.825 20,5 * Data are incomplete for these countries, however the no. of plants should be correct. Table 1: Plants and capacities, 2005 5 2.2 Amounts of waste treated Operational data are complete or almost complete for all countries with the excep- tion of Portugal, where operational data are missing for 1 out of 3 plants, Austria, Belgium and France, where operational data are only 50-60% complete, and Great Britain, where operational data have only been obtained for 20% of the plants. These countries are marked with * in the following sections. The amounts of waste incinerated in the 16 countries in 2004 are shown in Figure 3. 18 16 14 12 10 8 6 Waste treated (mill. tonnes/year) 4 2 0 Austria* Figure 3: Belgium* The average amounts of Czewastech treatedRep. per Figure 4 and 5. Amounts of waste treated, 2004 Denmark Finland France* Germany Great Britain* Hungary Italy 6 Netherlands plant and per capita in 2004 Nareorw shownay in Portugal* Spain Sweden Switzerland Error! Reference source not found.Error! Reference source not found.
Recommended publications
  • Waste Arisings and Waste Management Capacity Model
    Addendum to 2012 study: Waste Arisings and Waste Management Capacity Model Durham County Council June 2018 Addendum to 2012 study: Waste Arisings and Waste Management Capacity Model Disclaimer Anthesis Consulting Group PLC has prepared this report for the sole use of Durham County Council and for the intended purposes as stated in the agreement between Anthesis and Durham County Council under which this report was completed. Anthesis has exercised due and customary care in preparing this report but has not, save as specifically stated, independently verified information provided by others. No other warranty, express or implied, is made in relation to the contents of this report. The use of this report, or reliance on its content, by unauthorised third parties without written permission from Anthesis shall be at their own risk, and Anthesis accepts no duty of care to such third parties. Any recommendations, opinions or findings stated in this report are based on facts and circumstances as they existed at the time the report was prepared. Any changes in such facts and circumstances may adversely affect the recommendations, opinions or findings contained in this report. Anthesis Consulting Group, 2018 1 Addendum to 2012 study: Waste Arisings and Waste Management Capacity Model Addendum to 2012 study: Waste Arisings and Waste Management Capacity Model Durham County Council Prepared for: Prepared by: Spatial Policy Team Anthesis Consulting Group Regeneration & Local Services Development The Future Centre, Durham County Council 9 Newtec Place,
    [Show full text]
  • North East England Annual Aggregates Monitoring Report 2013
    North East England Annual Aggregates Monitoring Report 2013 Published December 2014 North East Aggregates Working Party County Durham │Northumberland │Tees Valley │Tyne and Wear North East Aggregates Working Party Annual Aggregates Monitoring Report 2013 Published December 2014 Published by Northumberland County Council on behalf of the North East Aggregates Working Party For further information on this document and the North East Aggregates Working Party, please contact: Kevin Tipple Secretary to the North East Aggregates Working Party Northumberland County Council Planning and Housing Services County Hall Morpeth Northumberland NE61 2EF Telephone: 01670 623631 Email: [email protected] Contents Executive Summary ..................................................................................................... ii Main report 1. Introduction ........................................................................................................... 1 2. Planning policy context .......................................................................................... 4 3. Production and reserves of primary aggregates: Crushed rock ............................ 6 4. Production and reserves of primary aggregates: land won sand and gravel ....... 14 5. Production of primary aggregates: Marine sand and gravel ................................ 21 6. Recycled and secondary aggregates .................................................................. 25 7. Development Plans ............................................................................................
    [Show full text]
  • Middlesbrough Council Local Plan
    MIDDLESBROUGH COUNCIL LOCAL PLAN - HOUSING INFRASTRUCTURE DELIVERY PLAN MARCH 2014 Contents 1. Introduction 3 2. The Local Plan - Housing 4 3. Infrastructure planning - legislative, policy and wider context 5 4. Methodology 8 5. Scoping 9 6. Baseline infrastructure assessments 12 7. Infrastructure delivery schedule 45 Appendix A Housing allocations 59 Appendix B Mobile telecommunications sites in Middlesbrough 61 2 1. Introduction 1.1 Produced in line with national planning policy (see paragraphs 3.2 - 3.4 for more details), this Infrastructure Delivery Plan (IDP) provides details of infrastructure needed to support future growth as a result of the Local Plan - Housing, including the type, timing and potential costs of infrastructure. 1.2 The IDP is intended to be a 'living' document, with its content monitored on a regular basis (in all likelihood alongside the Local Plan Annual Monitoring Report [AMR]) and updated as appropriate, in order to reflect changing circumstances, including when any new Local Development Documents (LDDs) are produced as part of the overarching Local Plan. To remain up-to-date, a flow of information from (internal [i.e. Council) and external) service providers to the Planning Policy team will be required on a regular basis. 1.3 The IDP does not include every infrastructure project planned in Middlesbrough or provide a list of planning obligations; it only includes those that will help to deliver the development (i.e. housing) proposed by the Local Plan - Housing or contribute towards the creation of sustainable communities. It does, however, identify areas where gaps in provision exist or are likely to exist over the plan period.
    [Show full text]
  • UK Construction Forecast SAMPLE
    UK Construction Forecast SAMPLE UK Construction Forecast Summer 2018 Volume 24: Issue 3 A report by the Forecasting Committee for the Construction Industries This report has been prepared for publication by the Construction Futures team, which is part of Experian’s Economics Unit, with guidance from its Forecasting Committee for the Construction Industries. The members of the committee serve in a personal not a representative capacity. The contribution of the members, and that of the Forecasting Groups (listed in Appendix D), is gratefully acknowledged. Whilst every endeavour has been made to obtain the best available data from appropriate sources, Experian’s Market Insight Division can give no guarantee of accuracy, nor for the applicability of the forecasts for particular decisions. No responsibility is taken for any consequential loss or other effects from these data. Copyright © Experian 2018 ISSN 0308-079X Apart from fair dealing for the purposes of research or private study, or criticism or review, and only as permitted under the Copyright Designs and Patents Act 1998, this publication may only be reproduced, stored or transmitted, in any form or by any means, with the prior permission in writing of the Publishers or in the case of reprographic reproduction in accordance with the terms of the licences issued by the Copyright Licensing Agency in the UK. US copyright law is applicable in the US. Printed by PAPCOM © Experian UK Construction Forecast Summer 2018 Volume 24: Issue 3 CONTENTS Page Executive Summary 1 1. Macroeconomic outlook 9 2. Housing 16 3. Housing repair, maintenance and improvement 23 4. New infrastructure 28 5.
    [Show full text]
  • (Public Pack)Agenda Document for Cabinet, 15/11/2017 10:00
    Cabinet Date Wednesday 15 November 2017 Time 10.00 am Venue Committee Room 2, County Hall, Durham Business Part A Items during which the press and public are welcome to attend - members of the public can ask questions with the Chairman's agreement 1. Public Questions 2. Minutes of the meeting held on 18 October 2017 (Pages 3 - 6) 3. Declarations of interest Key Decisions: 4. Council Tax Base 2018/19 and Forecast Surplus on the Council Tax Collection Fund as 31 March 2018 - Report of Corporate Director of Resources [Key Decision: CORP/R/17/03] (Pages 7 - 24) 5. Review of School Provision in County Durham: Ensuring Financial Sustainability of Schools - Joint Report of Corporate Director of Children and Young People's Services and Corporate Director of Resources [Key Decision: CORP/R/17/01] (Pages 25 - 56) 6. County Durham Plan Progress Report and the Council's Response to the Planning for the Right Homes in the Right Places Consultation - Report of Corporate Director of Regeneration and Local Services [Key Decision: REAL/03/17] (Pages 57 - 214) Ordinary Decisions: 7. Forecast of Revenue and Capital Outturn 2017/18 - Period to 30 September 2017 - Report of Corporate Director of Resources (Pages 215 - 238) 8. Mid-Year Review Report on Treasury Management for the period to 30 September 2017 - Report of Corporate Director of Resources (Pages 239 - 248) 9. Review of humanitarian support in County Durham - Joint Report of Director of Transformation and Partnerships and Corporate Director of Children and Young People's Services (Pages 249 - 296) 10. Such other business as, in the opinion of the Chairman of the meeting, is of sufficient urgency to warrant consideration.
    [Show full text]
  • East Anglia Region Commentary 04
    Timetable Planning Rules London North Eastern 2019 TIMETABLE Version 4.1 Issued by Amy Forte Timetable Production Manager The Quadrant MK Elder Gate Milton Keynes MK9 1EN Tel: 07801 334042 Final Principal and Final Subsidiary Change Timetable 2019 26 October 2018 NETWORK RAIL Timetable Planning Rules 2019 Version: 4.1 London North Eastern Final Principal and Final Subsidiary Change Date: 26 October 2018 Timetable 2019 Page: 2 of 320 Contents Section Page no. Section Page no. 5.1 Sectional Running Times .........................................74 1 Introduction and General Notes .................... 3 5.1.1 Source of Current SRTs ...................................74 1.1 Index of Routes ............................................................. 4 5.1.2 Method of Calculation .......................................74 1.2 Sectional Appendices and Rule Book .................. 7 5.1.3 New and Revised Sectional Running Times75 1.2.1 Sectional Appendix .............................................. 7 5.1.4 Timing of Trains Consisting of Passenger 1.2.2 Rule Book ................................................................ 7 Vehicles on Goods Lines ............................................75 1.3 Definitions ....................................................................... 9 5.2 Headways ......................................................................75 1.3.1 Train Classification .............................................. 9 5.2.1 Headway Values .................................................75 1.3.2 Days of Operation
    [Show full text]
  • Chemicals &Process
    CHEMICALS &PROCESS CHEMICALS & PROCESS TEES VALLEY INDUSTRY OPPORTUNITIES The UK chemicals sector is increasing at a rate of 3.6% per year, and accounted for Located on the North East coast, Tees Valley is a high-growth, corridors connecting manufacturing sites, bulk industrial gas high-value area and a global leader for the chemical and and effluent treatment plants. Tees Valley is also home to the £12.1billion of the UK’s GVA in 2016. Since 1990, output has grown by 27%, making it process industry. With one of the most significant integrated world-renowned Wilton International, the largest private- one of the UK’s fastest growing sectors. industrial economies in the world, the region produces wire electricity network in the UK. around 30% of the UK’s chemical output and is home to The Chemistry Growth Partnership, an initiative run by The Northern Powerhouse contributes 48% of the UK’s some of the world’s biggest chemical manufacturers. Tees Valley is home to one of the biggest gas crackers in the government and industry, has the responsibility of chemical production and is by far the largest region in terms Europe, owned by SABIC. The firm is currently undertaking determining the future roadmap of the sector, with other of output for the sector. This is based upon three strong Tees Valley’s chemical industry is concentrated across a the region’s largest process sector investment in a Governmental bodies and Local Authorities also offering clusters interlinked by strong East-West supply chains and relatively small area with a well-developed infrastructure.
    [Show full text]
  • Options and Opportunities for Waste to Energy Technologies
    NNFCC Options and opportunities for waste to energy technologies Dr Geraint Evans Head of Biofuels and Bioenergy NNFCC NNFCC Today’s presentation – UK W2E Scene • Waste available • Policy – focus on MSW/C&I • Waste to energy – Mass burn incineration – Advanced thermal processes – gasification • Power • Heat • Fuels – Biochemical processes NNFCC UK waste arisings, million tonnes/year (2008) Northern England Wales Scotland Total Ireland MSW 28.5 1.8 3 1.1 34.4 C&I waste 67.9 5.3 7.8 1.6 82.6 C&D waste 89.6 12.2 11.8 5 118.6 Total 186 19.3 22.6 7.7 235.6 • About half goes to landfill • Landfilling will decline over next decade but will still be in use NNFCC As electrical power equivalent in GWe, assuming 25% conversion efficiency Northern England Wales Scotland Total Ireland MSW 2.1 0.1 0.2 0.1 2.6 C&I waste 5.0 0.4 0.6 0.1 6.1 C&D 2.3 0.3 0.3 0.1 3.0 waste Total 9.4 0.8 1.1 0.3 11.7 • Compare against: – Drax – 4 GWe; 7% of UK power supply – Air Products IGCC – 50 MWe – Typical mass burn incineration plant – 25 MWe NNFCC Bioenergy Strategy - April 2012 • Sets out the Governments approach to ensuring that the benefits from bioenergy are secured. • Four principles ensure: – Looking out to 2050, genuine carbon reductions are achieved – Bioenergy is cost effective – Regular assessment of potential unintended consequences • Uncertainty is not sufficient to justify inaction. Lower risk pathways have been identified: – Use of wastes – Heat (direct biomass and biomethane) – Transport, in particular advanced biofuels – Electricity, primarily coal conversion but also CHP – longer term, CCS becomes important.
    [Show full text]
  • Waste to Energy: State of the Art Report, 6Th Edition
    REPORT Waste-to-Energy State-of-the-Art-Report Statistics 6th Edition August, 2012 ISWA – the International Solid Waste Association is a global, independent and non-profit making association, working in the public interest to promote and develop sustainable and professional waste management worldwide Waste-to-Energy State-of-the-Art-Report 6th Edition August, 2012 AUSTRIA • BELGIUM • CZECH REPUBLIC • DENMARK • FINLAND • FRANCE GERMANY • HUNGARY • IRELAND • ITALY • NETHERLANDS • NORWAY • PORTUGAL SLOVAKIA • SPAIN • SWEDEN • SWITZERLAND • UNITED KINGDOM • USA Data 2012 Prepared for ISWA by the Working Group on Energy Recovery Edited by RAMBØLL Danmark A/S Hannemanns Allé 53 DK-2300 Copenhagen S Denmark Phone +45 5161 1000 Fax +45 5161 1001 Contact person: Jørgen Haukohl E-mail: [email protected] Website: www.ramboll.com Cover photo The photo on the front cover shows the SYSAV plant in Malmö, Sweden. The plant has four furnace lines and burns nearly 550,000 tonnes of waste pr. year. (Photo by Bo Strandh). The chairman of ISWA’s Working Group on Energy Recovery is Mrs. Bettina Kamuk from Rambøll Denmark A/S. Rambøll has been consultant for SYSAV on development of the Waste to Energy plant since 1998. The vice-chairman of the Working Group, Mr. Jørgen Haukohl from Rambøll Danmark A/S is the editor of this publication. Copyright © ISWA 2012, all rights reserved ISWA – the International Solid Waste Association is a global, independent and non-profit making association, working in the public interest to promote and develop sustainable and professional waste management worldwide Table of Content 1. Introduction 1 2. Statistics 3 3.
    [Show full text]
  • North & South Tees Industrial Development Framework
    TEES VALLEY JOINT STRATEGY UNIT NORTH & SOUTH TEES INDUSTRIAL DEVELOPMENT FRAMEWORK November 2009 FSE97402A.2170 Prepared by Prepared for Parsons Brinckerhoff Ltd & Genecon Tees Valley Joint Strategy Unit Manchester Technology Centre Melrose House, Melrose Street, Oxford Road Middlesbrough Manchester TS1 2XF M1 7ED Report Title : North & South Tees Industrial Development Framework Report Status : Version 2 Job No : FSE97402A Date : November 2009 Prepared by : Daniel Dufton, Mark Reynolds, Ben Pretty .. Checked by : Sarah Claxton .................................................. Approved by : Paul Noble ........................................................ CONTENTS Page EXECUTIVE SUMMARY PROJECT BRIEFING SECTION 1 1 INTRODUCTION 1 1.1 Purpose of the Report 1 1.2 Context 1 1.3 Report Structure 2 SECTION 2 3 RATIONALE FOR INTERVENTION 3 2.1 Introduction 4 2.2 The Importance of Manufacturing Industry in North South Tees 4 2.3 Economic Development Policy Rationale 6 2.4 Equity and Competitiveness Rationale 11 2.5 Current Challenges and Constraints 12 2.6 Summary 21 SECTION 3 22 STRATEGIC SECTOR OPPORTUNITIES 22 3.1 Introduction 23 3.2 Offshore Wind 23 3.3 Decommissioning / Fabrication Activities in Marine and Oil / Gas Sectors 24 3.4 Port Related Opportunities 24 3.5 Carbon Capture and Storage 25 3.6 Power Generation and Export 25 3.7 Bulk Chemicals 26 3.8 Biotechnology 28 3.9 Biofuels 28 3.10 Waste / Resource Recovery 29 3.11 Steel 29 3.12 Industrial Symbiosis 30 3.13 Summary 32 SECTION 4 33 STRATEGIC ANALYSIS 33 4.1 Constraints Assessment
    [Show full text]
  • UK Energy from Waste Statistics – 2019
    UK Energy from Waste Statistics – 2019 May 2020 UK Energy from Waste Statistics - 2019 INTRODUCTION Tolvik’s sixth annual report on the UK Energy from Waste (“EfW”) sector brings together data from a range of sources into a single document. Thanks to excellent co-operation between the Environment Agency, Environmental Services Association and individual EfW operators, there has been significant progress in the standardisation of reporting via the Annual Performance Reports (“APR”) prepared by operators which has greatly facilitated the preparation of this report. As we develop the report each year, so the range of subjects covered is expanded. For the first time, and in line with increased stakeholder interest, this year we have undertaken a preliminary assessment of the carbon intensity of EfWs per tonne of waste processed. Such analysis is, given the lack of an agreed methodology, subjective and we would particularly welcome any feedback on our calculations. Meanwhile the sections on operations, consumable usage and emissions to air have been developed as more data becomes available. For consistency with previous years, the focus of this report continues to remain upon conventional moving grate EfWs and Advanced Conversion Technology (“ACT”) facilities in the UK generating energy from the combustion of Residual Waste. Residual Waste is defined as non-hazardous, solid, combustible mixed waste which remains after recycling activities. This definition is a little broader than that for Municipal Waste but primarily includes wastes falling within European Waste Catalogue (“EWC”) 19 12 10, 19 12 12 and 20 03 01. The report continues to exclude EfW facilities in Jersey and the Isle of Man and facilities solely processing Waste Wood or other biomass wastes.
    [Show full text]
  • Tees Valley Growth Point Programme of Development
    Tees Valley Growth Point Programme of Development Why Tees Valley, Why Now? Our action plan to deliver accelerated, Infinity Bridge at Stockton (Erected September 2008) additional economic and housing growth. Tees Valley Growth Point Programme of Development Executive Summary Vision: By 2016 we will have implemented a Growth and Renewal development programme to respond to the needs of our changing and growing local economy Tees Valley PoD Objectives Our Compelling Case for Growth Overall Programme and Priority Growth • To take an integrated approach to the regeneration, planning, Sites employment, transport and housing agendas; • Our economic assets include a world class petrochemical industry, • To redevelop Brownfield sites and reclaim former industrial our port (the second largest in the UK), our low carbon economy sites to create new, environmentally sensitive, urban places; • The overall programme delivers 17, 076 units to 2016/17 and 27, 756 and research capability and our advanced engineering and • To provide long term and sustainable benefits which extend units to 2020/21. digital/multi-media cluster: sectors more resilient to short term beyond housing growth; • We have identified sites for accelerated development to 2011. These market fluctuations; • To Increase urban competitiveness; are: • Track record of delivering gross housing development of over 3,300 • To extend the socio-economic benefits of growth to all; Central Park East Central Area units per annum; • To develop housing which compliments future economic growth Former
    [Show full text]