Summary Report 2020-07-12 05:00

Total Page:16

File Type:pdf, Size:1020Kb

Summary Report 2020-07-12 05:00 SUMMARY REPORT 2020-07-12 05:00 Average Max Geofence Geofence Ignition Ignition Distance Spent Engine Start End Sr Device Name Speed Speed Start Address End Address In Out On Off (Kms) Fuel hours Time Time (Km/h) (Km/h) (times) (times) (times) (times) 2020- 2020- 1 vinit 0.00 0.3 13.0 0 0 h 0 m Darbhanga, Bihar, 846004, India Darbhanga, Bihar, 846004, India 07-11 07-11 0 0 0 0 05:01:39 12:54:15 Maunbehat Branch Post Office, Maunbehat Branch Post Office, Mamobihat, 2020- 2020- 2 rakesh kumar jha 0.00 0.0 0.0 0 0 h 0 m Mamobihat, Manigachhi Subdistrict, Manigachhi Subdistrict, Darbhanga District, 07-11 07-11 0 0 0 0 Darbhanga District, Bihar-847423 India Bihar-847423 India 00:01:24 23:14:56 Uttar Bihar Gramin Bank, Khairi Banka, 2020- 2020- 3 xylo 0.05 0.0 0.0 0 0 h 0 m Bisfi Subdistrict, Madhubani District, Bisfi, Madhubani, Bihar, India 07-11 07-11 0 0 0 0 Bihar-847121 India 00:01:03 23:26:53 2020- 2020- 4 BR-32PA-2510 21.56 4.7 38.0 0 2 h 1 m Madhubani, Bihar, 847200, India Madhubani, Bihar, 847200, India 07-11 07-11 0 0 29 29 00:02:03 23:25:55 2020- 2020- 2 h 52 5 Vijay Kumar 29.57 4.5 74.0 0 Darbhanga, Bihar, 846004, India Darbhanga, Bihar, 846004, India 07-11 07-11 0 0 16 16 m 00:01:40 23:59:13 2020- 2020- 23 h 56 6 Rupesh kumar 0.00 0.0 0.0 0 Ladania, Madhubani, Bihar, India Ladania, Madhubani, Bihar, India 07-11 07-11 0 0 0 0 m 00:01:33 23:59:03 2020- 2020- Devi Niwas,Gali Number 5 Laxmi Sagar, Devi Niwas,Gali Number 5 Laxmi Sagar, 7 Neeraj sagar 0.00 0.0 0.0 0 0 h 0 m 07-11 07-11 0 0 0 0 Darbhanga, Bihar-846009 India Darbhanga, Bihar-846009 India 13:55:49 15:41:24 Kotwali Chowk Bus Stop, Police Line, 2020- 2020- Kotwali Chowk Bus Stop, Police Line, Bhavara, 8 darmendra 0.00 0.0 0.0 0 0 h 6 m Bhavara, Madhubani, Bihar 847212, 07-11 07-11 0 0 6 6 Madhubani, Bihar 847212, India India 00:01:03 23:29:14 Upper Primary Middle School Dhaus Siswa, 2020- 2020- Pandaul, Madhubani, Bihar, 847234, 9 Kishor 0.01 0.0 0.0 0 0 h 0 m Andah Manoharpur, Pandaul Subdistrict, 07-11 07-11 0 0 0 0 India Madhubani District, Bihar-847234 India 12:15:49 22:45:20 Barhulia Post Office, Sabaul, Singhwara Barhulia Post Office, Sabaul, Singhwara 2020- 2020- 4 h 42 10 Nasir rahmani 116.34 13.1 71.0 0 Subdistrict, Darbhanga District, Bihar- Subdistrict, Darbhanga District, Bihar-847106 07-11 07-11 0 0 18 18 m 847106 India India 00:00:07 23:07:33 2020- 2020- Rajnagar, Madhubani, Bihar, 847235, 11 Kuldeep kumar 0.00 0.0 0.0 0 0 h 0 m Rajnagar, Madhubani, Bihar, 847235, India 07-11 07-11 0 0 0 0 India 00:05:10 20:34:46 2020- 2020- Bahadurpur, Darbhanga, Bihar, 847122, 12 Ajit Kumar jha 0.00 0.0 0.0 0 0 h 0 m Bahadurpur, Darbhanga, Bihar, 847122, India 07-11 07-11 0 0 0 0 India 01:15:36 20:23:16 Dargah E Huzur Data Kangali Shah, 2020- 2020- Bihari Urf Bhatgawan, Gaighat 13 Bittu singh 0.02 0.0 0.0 0 0 h 0 m Gaighat, Muzaffarpur, Bihar, 845435, India 07-11 07-11 0 0 0 0 Subdistrict, Muzaffarpur District, Bihar- 00:01:30 23:58:38 843118 India 2020- 2020- Nenuttalah 23 h 57 Kusheshwar Asthan, Darbhanga, Bihar, Kusheshwar Asthan, Darbhanga, Bihar, 841418, 14 0.00 0.0 0.0 0 07-11 07-11 0 0 1 1 Rehmani m 841418, India India 00:00:09 23:59:02 Aurous Institute of Management,Old Route No NH 2020- 2020- Hari Narayan 12 h 41 NH227, Jaynagar, Jainagar, Madhubani, 28/NH 27 Mohammadpur Chauki, Nawabganj 15 1030.51 36.2 125.0 0 07-11 07-11 0 0 14 14 choudhary m Bihar, 847226, India Subdistrict, Bara Banki District, Uttar Pradesh- 01:19:45 23:51:44 225003 India 2020- 2020- 16 h 48 Ghanshyampur, Darbhanga, Bihar, 16 Ajay mishra 0.09 0.0 5.0 0 Ghanshyampur, Darbhanga, Bihar, 841423, India 07-11 07-11 0 0 55 55 m 841423, India 00:00:02 23:57:45 2020- 2020- 23 h 53 MDR, Biraul, Darbhanga, Bihar, 847103, 17 Sonu 0.04 0.0 5.0 0 MDR, Biraul, Darbhanga, Bihar, 847103, India 07-11 07-11 0 0 0 0 m India 00:01:12 23:58:27 2020- 2020- 23 h 53 18 Ashraf Ali 0.00 0.0 0.0 0 Alinagar, Darbhanga, Bihar, India Alinagar, Darbhanga, Bihar, India 07-11 07-11 0 0 1 1 m 00:00:36 23:58:35 Maa Vaishno Theater, Madhepur, Maa Vaishno Theater, Madhepur, Madhepur 2020- 2020- 19 Ajit 0.00 0.0 0.0 0 0 h 0 m Madhepur Subdistrict, Madhubani Subdistrict, Madhubani District, Bihar-847408 07-11 07-11 0 0 0 0 District, Bihar-847408 India India 00:01:47 23:58:09 2020- 2020- Akash Kumar Pandaul Block Office, Pandual, Bihar- 20 0.31 0.1 10.0 0 0 h 0 m Pandaul, Madhubani, Bihar, 847234, India 07-11 07-11 0 0 0 0 madhan 847234 India 00:01:30 23:58:38 Rahika Chowk,Old Route No NH 105/NH 2020- 2020- NH527B, Keotiranway, Madhubani, Bihar, 21 Sirajul Islam 0.17 0.0 0.0 0 0 h 0 m 527B Rahika, Madhubani Subdistrict, 07-11 07-11 0 0 0 0 847121, India Madhubani District, Bihar-847238 India 00:00:35 23:58:19 Middle School Phulparas,Old Route No Middle School Phulparas,Old Route No NH 2020- 2020- NH 104/NH 227 Phulparas, Phulparas 22 Virendra datta 0.00 0.0 0.0 0 0 h 0 m 104/NH 227 Phulparas, Phulparas Subdistrict, 07-11 07-11 0 0 0 0 Subdistrict, Madhubani District, Bihar- Madhubani District, Bihar-847409 India 00:04:20 23:55:59 847409 India St. Xaviers College Main Building, 2020- 2020- 0 h 27 Purluia Road, Chutia, Ranchi, Kanke, Ranchi, 23 Navin kumar 7.95 4.0 49.0 0 Purulia Rd, Pathalkudwa, Nayatoli, 07-11 07-11 0 0 3 3 m Jharkhand, 834001, India Ranchi, Jharkhand 834001, India 00:01:37 23:58:29 2020- 2020- 3 h 31 Indian Oil Petrol Pump/Elite Petro, Benta, Indian Oil Petrol Pump/Elite Petro, Benta, 24 Kiran kumar 12.69 3.4 58.0 0 07-11 07-11 0 0 17 17 m Darbhanga, Bihar-846003 India Darbhanga, Bihar-846003 India 00:02:04 23:59:23 2020- 2020- 23 h 49 Columbus Primary School,SH 56 Bhelu 25 Dr.H.S PARSAD 45.04 5.7 70.0 0 undefined 07-11 07-11 5 5 0 0 m Chak, Darbhanga, Bihar-846009 India 00:01:59 23:59:03 2020- 2020- 26 Dinanath kumar 0.00 0.0 0.0 0 0 h 0 m undefined undefined 07-11 07-11 0 0 0 0 00:00:47 23:55:38 2020- 2020- 27 Premchand prasad 58.56 15.6 86.0 0 2 h 5 m undefined undefined 07-11 07-11 0 0 6 6 00:01:02 23:57:51 2020- 2020- 4 h 19 28 Kaushal Kumar 58.45 9.6 60.0 0 undefined SH56, Benipur, Darbhanga, Bihar, 847103, India 07-11 07-11 0 0 17 17 m 00:05:24 23:59:08 2020- 2020- Abhay Bhawan, New Balbhadrapur, Abhay Bhawan, New Balbhadrapur, Darbhanga, 29 Lalit mishara 0.00 0.0 0.0 0 0 h 0 m 07-11 07-11 0 0 0 0 Darbhanga, Bihar-846001 India Bihar-846001 India 04:25:18 04:35:50 2020- 2020- 6 h 29 SH75, Bahadurpur, Darbhanga, Bihar, 846005, 30 0718 173.03 20.9 78.0 0 Gaighat, Muzaffarpur, Bihar, India 07-11 07-11 0 0 10 10 m India 00:01:42 23:58:11 2020- 2020- Benipatti, Madhubani, Bihar, 847223, 31 Sonphee kumar 0.07 0.0 0.0 0 0 h 0 m Benipatti, Madhubani, Bihar, 847223, India 07-11 07-11 0 0 0 0 India 00:01:12 23:57:19 2020- 2020- 32 Raman jee 0.00 0.0 0.0 0 0 h 0 m Lakhnaur, Madhubani, Bihar, India Lakhnaur, Madhubani, Bihar, India 07-11 07-11 0 0 0 0 00:03:52 23:56:10 2020- 2020- 33 Ram julum yadav 0.00 0.0 0.0 0 0 h 0 m Ghoghardiha, Madhubani, Bihar, India Ghoghardiha, Madhubani, Bihar, India 07-11 07-11 0 0 0 0 00:03:26 23:55:46 Lulhaul Post Office, Lulhaul, Singhia 2020- 2020- 2 h 12 Lulhaul Post Office, Lulhaul, Singhia Subdistrict, 34 Ram nivash 62.64 15.9 85.0 0 Subdistrict, Samastipur District, Bihar- 07-11 07-11 0 0 10 10 m Samastipur District, Bihar-848209 India 848209 India 00:00:50 23:59:12 2020- 2020- NH19, Gobindpur, Dhanbad, Jharkhand, NH19, Gobindpur, Dhanbad, Jharkhand, 828205, 35 Khushilal.yadav 0.00 0.0 0.0 0 0 h 0 m 07-11 07-11 0 0 0 0 828205, India India 01:31:14 22:56:00 Jama Masjid, Ganeshpur, Madhubani 2020- 2020- 5 h 21 Golu Tea Stall,Station Road Lakshmi Nagar 36 Raj kumar jha 421.41 15.2 70.0 0 Subdistrict, Madhubani District, Bihar- 07-11 07-11 0 0 23 23 m Colony, Madhubani, Bihar-847211 India 847212 India 00:01:48 23:58:40 Prathmik Vidyalaya Madna, Madna, Prathmik Vidyalaya Madna, Madna, Khajauli 2020- 2020- 1 h 13 37 Manoj kumar 14.38 6.8 56.0 0 Khajauli Subdistrict, Madhubani District, Subdistrict, Madhubani District, Bihar-847228 07-11 07-11 0 0 4 4 m Bihar-847228 India India 00:04:49 20:15:11 2020- 2020- 38 Prashant 0.00 0.0 0.0 0 0 h 0 m Darbhanga, Bihar, 846004, India Darbhanga, Bihar, 846004, India 07-11 07-11 0 0 0 0 00:01:33 23:58:03 Punjab National Bank ATM,VIP Road 2020- 2020- 6 h 15 Durga Mandir, Kangni, Jale Subdistrict, 39 Navin kumar 200.42 19.4 95.0 0 Rajkumar Ganj, Darbhanga, Bihar- 07-11 07-11 0 0 14 15 m Darbhanga District, Bihar-847304 India 846004 India 00:00:15 23:59:05 2020- 2020- 0 h 14 40 Rajeshwar shah 1.62 0.5 34.0 0 Darbhanga, Bihar, 846004, India Darbhanga, Bihar, 846004, India 07-11 07-11 0 0 5 5 m 00:00:41 23:58:04 Sub Health Centre, Dih Lahi, Dilahi Branch Post Office, Dih Lahi, 2020- 2020- 3 h 10 41 Raghunath 66.27 14.1 89.0 0 Hanumannagar Subdistrict, Darbhanga Hanumannagar Subdistrict, Darbhanga District, 07-11 07-11 0 0 27 27 m District, Bihar-846003 India Bihar-846003 India 00:04:28 23:57:48 2020- 2020- 3 h 57 SH55, Khudabandpur, Samastipur, SH55, Khudabandpur, Samastipur, Bihar, 42 Pujan 149.42 24.8 111.0 0 07-11 07-11 0 0 15 15 m Bihar, 848210, India 848210, India 00:03:40 23:58:51 2020- 2020- Singla, Singhia, Samastipur, Bihar, 43 Rahul kumar 0.00 0.0 0.0 0 0 h 0 m Singla, Singhia, Samastipur, Bihar, 848209, India 07-11 07-11 0 0 1 1 848209, India 00:00:29 23:58:59 2020- 2020- MDR, Lakhnaur, Madhubani, Bihar, 44 Sushil kumar 0.00 0.0 0.0 0 0 h 0 m MDR, Lakhnaur, Madhubani, Bihar, 841414, India 07-11 07-11 0 0 1 1 841414, India 00:04:59 23:55:21 2020- 2020- 0 h 42 45 Roushan kumar 6.36 2.2 46.0 0 Laukahi, Madhubani, Bihar, India Laukahi, Madhubani, Bihar, India 07-11 07-11 0 0 7 7 m 00:01:55 23:57:18 2020- 2020- Panchobh, Hanumannagar,
Recommended publications
  • Ground Water Year Book, Bihar (2015 - 2016)
    का셍ााल셍 उप셍ोग हेतू For Official Use GOVT. OF INDIA जल ल MINISTRY OF WATER RESOURCES CENTRAL GROUND WATER BOARD जल ,, (2015-2016) GROUND WATER YEAR BOOK, BIHAR (2015 - 2016) म鵍य पूर्वी क्षेत्र, पटना सितंबर 2016 MID-EASTERN REGION, PATNA September 2016 ` GOVT. OF INDIA जल ल MINISTRY OF WATER RESOURCES जल CENTRAL GROUND WATER BOARD ,, (2015-2016) GROUND WATER YEAR BOOK, BIHAR (2015 - 2016) म鵍य पर्वू ी क्षेत्र, पटना MID-EASTERN REGION, PATNA सितंबर 2016 September 2016 GROUND WATER YEAR BOOK, BIHAR (2015 - 2016) CONTENTS CONTENTS Page No. List of Tables i List of Figures ii List of Annexures ii List of Contributors iii Abstract iv 1. INTRODUCTION.............................................................................................................1 2. HYDROGEOLOGY..........................................................................................................1 3. GROUND WATER SCENARIO......................................................................................4 3.1 DEPTH TO WATER LEVEL........................................................................................8 3.1.1 MAY 2015.....................................................................................................................8 3.1.2 AUGUST 2015..............................................................................................................10 3.1.3 NOVEMBER 2015........................................................................................................12 3.1.4 JANUARY 2016...........................................................................................................14
    [Show full text]
  • District Plan 2011 - 12
    I DISTRICT PLAN 2011 - 12 SUPAUL - i I Submitted by : District Planning Committee, Supaul Submitted to: Department of Planning & Development, Government of Bihar DISTRICT PLAN 2011 - 12 SUPAUL ¥ V *k g f II A © H f: © f&T SJkH*»»* Submitted by : District Planning Committee, Supaul Submitted to: Department of Planning & Development, Government of Bihar ACKNOWLEDGEMENTS For sustainable and planned economic development it is essential to formulate the Annual District Plan on the basis of available resources. As per the direction of the Department of Planning and Development, Government of Bihar, with an objective to prepare the effective Plan, we have collected relevant information and data ensuring the assimilation of district level important components from various departments as well as the priority sectors like Health, Education, Livelihood and Infrastructure etc. Keeping in view the past experience of formulation and implementation of various sectoral Action Annual Plans and recent directions of the department the Annual District Plan 2011 -12 for Rs. 103142.3 89 lakh has been prepared for the maximum utilization of available resources, so that the socio-economic development of the district can be further accelerated. I would like to thank Mr. Kunwar Jung Bahadur, Deputy Development Commissioner, Mr. D.N. Mishra, Regional Planning officer, Kosi Division, Mr. Prakash Yadav, District Planning Officer, Mr. Vivek Sharan (Ex. District Facihtator) and Mr. D P Karn, District Facihtator, GoI-UN Joint Convergence Program for their important contribution in formulation of Annual District Plan 2011 -12 for the district of Supaul. Mr. Brajesh Kumar Vikal, DPRO also deserves special thanks for his support in the Plan formulation.
    [Show full text]
  • Situation Report - Bihar Floods
    SITUATION REPORT - BIHAR FLOODS NAME OF THE DISASTER: FLOODS DATE: 15.07.04 at 7:30 PM Rain in the upper catchment areas of Nepal has resulted in the rise of the water levels of all the major rivers of Bihar and so far 16 districts (out of a total of 38 districts) have been affected by the flood waters. 11.128 million people are affected by the unprecedented floods in Darbhanga, Madhubhani, Sitamarhi, Sheohar and East Champaran Districts. Situation is grim with continuous rains over the northern portion of the state and is likely to get critical with rain/thundershowers forecasted over Bihar by the Indian Meteorological department. As per the Central Water Commission report, river Kamala Balan, Budhi Gandak, Bagmati, Kosi, Mahananda and Adhwara group of rivers are flowing above the danger level. The districts so far affected are Supaul, Darbhanga, Bhagalpur, W.Champaran, Muzaffarpur, Sitamarhi, Khagaria , Sheohar, Madhubani, Araria, Saharsa , E. Champaran, Katihar, Kishanganj & Samastipur. The worst affected districts are Darbhanga, Sheohar, Madhubani and Sitamarhi. Sitamarhi, Darbhanga & Sheoher districts are cut off from the state head quarter.In many districts Rail & Road communications are also cut off. DAMAGES DETAILS: No. of District Affected 16 No. of Block Affected 127 No. of Panchayat affected 1529 No. of Villages affected 4889 Flood Affected Area 4.3253 million Hect. Population affected 11.128 million No of Human lives lost 41 No. of Cattle lives lost 557 No of house damages 283225 Estimated value of damage to houses 24.056 million Rs. Estimated value of damage of public properties 43.63 million Rs.
    [Show full text]
  • Madhubani District, Bihar State
    भूजल सूचना पुस्तिका मधुबनी स्जला, बबहार Ground Water Information Booklet Madhubani District, Bihar State ADMINISTRATIVE MAP BIHAR STATE N MADHUBANI DISTRICT, BIHAR W E Ganga R. Harlakhi S Ladania Madhwapur Jaynagar Basopatti Laukaha Khajauli Laukahi Babubarhi Benipatti Rajnagar Andhratharhi Phulparas MADHUBANI Bisfi Ghoghordiha Jhanjharpur Pandaul LEGEND District Boundary Lakhnaur Block Boundary Madhepur River Road Km.8 0 8 16 Km. Railway District HQ. SCALE Block HQ. के न्द्रीय भमू मजल बो셍 ड Central Ground water Board Ministry of Water Resources जल संसाधन मंत्रालय (Govt. of India) (भारि सरकार) Mid-Eastern Region मध्य-पर्वू ी क्षेत्र Patna पटना मसिंबर 2013 September 2013 PREPARED BY - Shri S. Sahu Sc. B UNDER SUPERVISION OF - Shri A.K.Agrawal, Sc-’D’ CARTOGRAPHY - Shri Lokendra Kumar, Draughtsman UPDATED BY - ShriCONTENTS S.N. Dwivedi, Sc- C & Dr.Fakhre Alam, STA(Hg) 2 DISTRICT AT A GLANCE 5 - 6 1.0 INTRODUCTION 7 - 9 1.1.1 Location, Area and Population 1.2 Basin/Sub-Basin and Drainage 1.4 Landuse Pattern, Agriculture and Irrigation Practices 1.5 Activities Carried out by CGWB 2.0 CLIMATE AND RAINFALL 9-10 3.0 GEOMORPHOLOGY AND SOIL TYPES 10 4.0 GROUND WATER SCENARIO 11 - 16 4.1 Hydrogeology 4.2 Depth to Water Level 4.2 Ground water Resources 4.3 Status of Ground Water development 4.4 Ground Water Quality 5.0 GROUND WATER MANAGEMENT STRATEGY 16 - 18 5.1 Ground Water development 5.2 Design of Tube Wells 5.2.1 Sallow Tube Wells 5.2.2 Deep Tube Wells 5.3 Water Conservation and Artificial Recharge: 6.0 GROUND WATER RELATED ISSUES AND PROBLEMS: 18 7.0 MASS AWARENESS AND TRAINING PROGRAMME: 18 8.0 AREA NOTIFIED BY CENTRAL GROUND WATER AUTHORITY/ STATE GROUND WATER AUTHORITY 19 9.0 RECOMMENDATION 19 3 LIST OF TABLES Table 1 Principal Rivers and their Tributaries in Madhubani District Table 2 Rainfall Pattern in the Madhubani district during 1997-98 Table 3 Replenishable ground water resource in the district as on 31st March- 2009.
    [Show full text]
  • Situation: Bihar Flood Page 1 of 8 Approximately 16 Million People Have Been Displaced by Flood in Bihar, Where 351 People Have
    Situation: Bihar Flood SITREP 26/08/2002 NATURE OF THE DISASTER: FLOOD Approximately 16 million people have been displaced by flood in Bihar, where 351 people have died so far and about 338,000 houses have collapsed. The worst affected districts are Sitamarhi, Darbhanga, Khagaria, Madhubani, Gopalganj The map below shows the partial and fully flooded districts of Bihar as of date. AREA AFFECTED: • Number of District: 24 (Sitamarhi, Nalanda, Muzaffarpur, Darbhanga, Patna, Katihar, E.Champaran, W. Champaran, Sheohar, Gopalganj, Smastipur, Madhubani, Saharsa Supaul, Shekhpura, Siwan, Araria, Kishanganj, Purnea, Madhepura and Khagaria, Begusarai, Saran, Lakheesarai) out of 38 districts. • Numbers of Blocks Affected: 203 • No of Panchayats :2,242 • Numbers of Villages affected: 8,150 • Life loss: 351 [Govt. sources ] • Cattle Loss: 1366 • Population affected: 15.44 million • Houses damaged: 372,009 estimated value is Rs.4,390.2 million • Total Area affected: 1.84 million hac. DISTRICT DETAILS : Districts Numbers of Blocks affected in district Sitamarhi 17 Nalanda 9 Muzaffarpur district has suffered a loss of more than Rs 42,430 million due to the floods, 8 which damaged standing crops and houses and affected more than a million people. The floodwaters have receded from a major area of the district now, but a large part of Aurai and Katra blocks remains inundated by the Bagmati river and the situation is unlikely to improve before September 15. Darbhanga: 18 Patna 4 Page 1 of 8 Situation: Bihar Flood SITREP 26/08/2002 East Champaran 19 Seohar: 4 Goplalganj 8 Samastipur: 9 Madhubani: 19 Saharsa 1 Sekhpura 6 West Champaran 7 Supaul 8 Araria: 9 Kathiar 10 Khagaria : 6 Saran 5 Siwan 5 Madhepura 3 Purnea 8 Kisanganj 7 Begusarai 4 Lak heesarai 4 Nalanda 9 Sheikhpura 6 IMPACT: (DAMAGE BY SECTOR) Lifeline and critical facilities: Public Utilities: Estimated Value of damaged public properties – 2,914.6 million Agriculture: • Cropped area affected: .8 million hactare • Estimated value of crop loss: 3,963.7 million • Standing crops in 0.2 million hectares worth 1,730 million.
    [Show full text]
  • Madhubani Introduction
    DISTRICT PROFILE MADHUBANI INTRODUCTION Madhubani district is one of the thirty-eight administrative districts of Bihar. Formerly the northern sub-division of the erstwhile Darbhanga district, Madhubani was notified as a district in 1972. Madhubani district is a part of Darbhanga division. Madhubani is the cultural heart of Mithilanchal, being the birthplace of many literary people and home to Madhubani paintings . Madhubani has maintained a distinct individuality of its own. Madhubani is bounded in the north by the hilly region of Nepal, and districts of Darbhanga, Sitamarhi and Supaul in south , west and east respectively. The rivers that flow near Madhubani are Kosi river, Kamla Balan, Bhutahi Balan, Adhwara, Kareh, Gehuan, Supen, Trishula, Jeevachh, Bachharaja, Dhous and Ghaghr. HISTORICAL BACKGROUND The name Madhubani is derived from the word "Madhuban" meaning “ forest of honey". Also, the word Madhubani is got by joining the words "madhu" and "vaani", meaning "sweet voice/language". There are no pre-historic sites in Madhubani though remains of the earliest aboriginal population known as the Tharus, Bhars, Kiratas, etc., can be seen here. They wielded power in Madhubani region prior to its Aryanisation and Shiva worship was in vogue. The kingdom of Videha, ruled by a successive line of kings known as Janakas, included Madhubani. The royalty and nobility- although the vanguard of Aryan culture, took to worshipping Shiva in consonance with the faith of their subjects. According to Mahabharata tradition, the Pandavas during their exile stayed in the region of Madhubani district. Bimbisar, the founder of the Magadhan empire, and his son Ajatshatru aspired to rule over the whole of Aryan land.
    [Show full text]
  • MADHUBANI Profile
    The Madhubani district was carved out of the old Darbhanga district in the year 1972 as a result of reorganisation of the districts in the State. This was formerly the northern sub-division of Darbhanga district. It occupies a total area of 3501 sq. kms , consists of 5 Sub -divisions and 21 Development Blocks . Bounded on the north by a hill region of Nepal and extending to the border of its parent district Darbhanga in the south, Sitamarhi in the west and Supaul in the east, Madhubani fairly represent the centre of the territory once known as Mithila and the district has maintained a distinct individuality of its own. It is located at a Longitude of 25º-59' to 26º-39' East and the Latitude is 85º-43' to 86º-42' North. It is 80 meters above the sea level. Practically there are no prehistoric sites in the district though remains of the earliest aboriginal population can be seen in some parts of the district. Hunter in his "Statistical Accounts" has referred to the existence of the people, known as the Tharus in the erstwhile old subdivision of Madhubani. The Bhars are also believed to have belonged to some aboriginal race though nothing positive about them is known from any reliable source. The Bihar settlements Page 1 of 6 in the north-eastern part of the district indicate that they possibly wielded some power in the remote part. From the work of Dr. Suniti Kumar Chatterji entitled 'Kiratajanakirti' it appears that Kiratas also inhabi ted the district for a considerable period.
    [Show full text]
  • Report 1.13 Review of Literature
    CONTENTS CHAPTERS PARTICULARS PAGE NO. Preface i-ii List of Tables iii-vi One Introduction 1-33 1.1 Background 1.2 Global View 1.3 Indian Scenario 1.4 Fisheries in Bihar 1.5 Kosi River System 1.6 Objectives 1.7 Hypothesis 1.8 Methodology 1.9 Research Design and Sampling Procedure 1.10 Research Procedure 1.11 Limitations of the Study 1.12 Layout of the Report 1.13 Review of Literature Two Profile of the Study Area 34-70 2.1 Section I: Profile of the State of Bihar 2.2 Land Holding Pattern 2.3 Flood Prone Areas 2.4 Section II : Profile of the Kosi River Basin 2.5 Siltation Problem of Kosi 2.6 Shifting Courses of Kosi 2.7 Water Logged Areas 2.8 Production potentiality 2.9 Section III : Profile of the sampled districts 2.10 Madhubani 2.11 Darbhanga 2.12 Samastipur 2.13 Khagaria 2.14 Supaul 2.15 Purnea 2.16 Section IV : Profile of Sampled Blocks 2.17 Section V: Water Reservoirs of the Sampled Area Three Economics of Fish Farming: 71-108 Results & Discussions 3.1 Background 3.2 Educational Status 3.3 Martial Status, Sex and Religion 3.4 Occupational Pattern 3.5 Size of Fishermen 3.6 Kinds of Family 3.7 Ownership of House 3.8 Sources of Income 3.9 Type of Houses 3.10 Details of Land 3.11 Cropping Pattern 3.12 Sources of Fish Production 3.13 Membership 3.14 Awareness of Jalkar Management Act 3.15 Cost of Fish Production 3.16 Pattern and Sources of Technical Assistance 3.17 Training for Fish Production 3.18 Awareness of the Assistance 3.19 Fishing Mechanism And Resources 3.20 Market System 3.21 Problems of Fish Production 3.22 Suggestions by the
    [Show full text]
  • Supaul District, Bihar State
    1 भूजल सूचना पुस्तिका सुपौल स्जला, बिहार Ground Water Information Booklet Supaul District, Bihar State के न्द्रीय भमू िजल िो셍 ड Central Ground water Board Ministry of Water Resources जल संसाधन िंत्रालय (Govt. of India) (भारि सरकार) Mid-Eastern Region िध्य-पूर्वी क्षेत्र Patna पटना मसिंिर 2013 September 2013 GWIB | Supaul 1 2 GWIB | Supaul 2 3 PREPARED BY - Sri S. Sahu Sc. C GWIB | Supaul 3 4 CONTENTS DISTRICT AT A GLANCE 1.0 INTRODUCTION 1.1 Location, Area and Administrative Details 1.2 Basin/Sub-Basin and Drainage 1.3 Water use habits 1.4 Land use, Agriculture and Irrigation Practices 2.0 CLIMATE AND RAINFALL 3.0 GEOMORPHOLOGY AND SOIL 3.1 Geomorphology 3.2 Soil 4.0 GROUND WATER SCENARIO 4.1 Water Bearing Formations 4.2 Depth to Water Level 4.3 Ground Water Quality 4.4 Ground Water Resources 5.0 GROUND WATER MANAGEMENT STRATEGY 5.1 Ground Water Development 5.2 Design and construction of Tube Wells 5.3 Water Conservation and Artificial Recharge 6.0 GROUND WATER RELATED ISSUES AND RELATED PROBLEMS: 7.0 MASS AWARENESS AND TRAINING PROGRAMME AREA NOTIFIED BY CENTRAL GROUND WATER AUTHORITY/ STATE GROUND 8.0 WATER AUTHORITY 9.0 RECOMMENDATION GWIB | Supaul 4 5 LIST OF TABLES Table No Title Table 1 Demographics of Supaul district, Bihar. Table 2 Agriculture and irrigation status in Supaul district. Table 3 Ground water quality of Supaul district. Table 4 Blockwise Dynamic Ground Water Resource (ham) of Supaul District (As on 31st March Table 5 Proposed Model of DTWs in Supaul district Table 6 Proposed slot openings for tube wells in Supaul district.
    [Show full text]
  • EQ Damage Scenario.Pdf
    DAMAGE SCENARIO UNDER HYPOTHETICAL RECURRENCE OF 1934 EARTHQUAKE INTENSITIES IN VARIOUS DISTRICTS IN BIHAR Authored by: Dr. Anand S. Arya, FNA, FNAE Professor Emeritus, Deptt. of Earthquake Engg., I.I.T. Roorkee Former National Seismic Advisor, MHA, New Delhi Padmashree awarded by the President, 2002 Member BSDMA, Bihar Assisted by: Barun Kant Mishra PS to Member BSDMA, Bihar i Vice Chairman Bihar State Disaster Management Authority Government of Bihar FOREWORD Earthquake is a natural hazard that can neither be prevented nor predicted. It is generated by the process going on inside the earth, resulting in the movement of tectonic plates. It has been seen that wherever earthquake occurs, it occurs again and again. It is quite probable that an earthquake having the intensity similar to 1934 Bihar-Nepal earthquake may replicate again. Given the extent of urbanization and the pattern of development in the last several decades, the repeat of 1934 in future will be catastrophic in view of the increased population and the vulnerable assets. Prof A.S.Arya, member, BSDMA has carried out a detailed analysis keeping in view the possible damage scenario under a hypothetical event, having intensity similar to 1934 earthquake. Census of India 2011 has been used for the population and housing data, while the revised seismic zoning map of India is the basis for the maximum possible earthquake intensity in various blocks of Bihar. Probable loss of human lives, probable number of housing, which will need reconstruction, or retrofitting has been computed for various districts and the blocks within the districts. The following grim picture of losses has emerged for the state of Bihar.
    [Show full text]
  • Workers Participation Rate (15 59) by District, Caste and Class
    Chapter - V LABOUR, EMPLOYMENT AND WAGES A large proportion of households in Bihar is still dependent on agriculture for sustenance. The availability of work and wages given to the workers determine the level of welfare of the households. As agriculture is largely subsistence in nature a very large proportion of the populace is engaged in wage labour for a number of months in a year to meet additional needs. In order to capture labour market dynamism in rural Bihar, in this chapter we will discuss workers’ participation rates, their migration pattern, and changes in the patron-client relationship and different types of prevailing wage rate vis-à-vis the prevailing wage in different villages. Work Participation Rate The work participation rate (WPR) was calculated as the ratio of workers to the total population in the age group 15-59 years (i.e. WPR= workers/population 15-59 years). The workers were identified on the basis of the primary as well as secondary status. In other words, to be counted into the workforce the primary as well as secondary occupation was taken into consideration. The main workers were identified on the basis of their primary occupation while a person was called as worker under main and subsidiary status if he/she is involved in some economic activities either on the basis of his/her primary and/or secondary occupations. The non-workers include students, household workers, beggars, retired, old, disabled etc. However if a person was non- worker as per his/her primary occupation and was a worker as per his/her secondary occupation he/she was classified into main and subsidiary workers for calculating the WPR.
    [Show full text]
  • OPEN TENDER (For Civil Engg
    Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month : From APRIL 2012 To MARCH 2013) Works Awarded : APRIL 2012 Quantity Rate (for supply (for supply Contractor’s contract)/ contract)/ Scheduled S. Tender Date of Description of Item/ LOA No. Value of Name and Estimated Cost Tendered Cost completion N. No. opening Work and date Contract address (For Engg./Elect. (For date /S&T/ Mech. etc Engg./Elect./S&T/ Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 23.02.2012 System design, supply, IRCON/9038/SLR.S& M/s Kiran Infra USD 2,381,349 6.5% below the USD 18 - months from 9038/ installation, testing & T/TELE.WORKS.PKG Engineers Ltd., B- estimated cost. 2,226,561.32 the date of issue of SLR.S&T/ commissioning of STM-4, -1/18/LOA/251 141, Road No. 9D, LOA TELE. STM-1, ADMs systems, dated 04.04.2012 Vishwakarma WORKS. GPS clock, Public Industrial Area, PKG-I/18 Address System, VHF Jaipur-302 013 Dated system and trenching, Fax: 0141-2331808, 11.01.2012 laying, splicing/jointing, 2260073 back filling, terminating, testing and commissioning of 24 fiber underground armoured OFC with 6 Quad/PIJF cable, provision of Emergency Socket, Headquarter/ Wayside Control Equipment and communication at L-Xing and important locations over section of Anuradhapura to Kankasanthurei and Medawachchiya to Talaimannar Pier of Sri Lanka Railway Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 2 IRCON/101 14.02.2012 Construction of IRCON/1014/J&K- M/s Dineshchandra `1276.00 Lacs `13,72,52,693.26 06 - months from 4/J&K- Infrastructure Facilities DQ/ T-80 Circulating R.
    [Show full text]