Second Article Modern Railways

Total Page:16

File Type:pdf, Size:1020Kb

Second Article Modern Railways High Speed 2 in London let’s get it right Jonathan Roberts of the JRC consultancy discusses the route of the new line in the capital ith 70-80% of all High Speed When HS2 Phase 2 opens around 2033 the entirely within the present railway. Already 2 travel being to or from the fi rst main lines will have been around for it is proving simpler and no more expensive capital, it is vital to get HS2 nearly two centuries. The quality of the new to put the new line into tunnel under the proposals right in the London main line should also stand the test of time. Chiltern line from Marylebone, between Wand Home Counties regions. HS2 takes over part of the latest ‘classic’ Northolt Junction and West Ruislip. This article addresses the four conditions main line built in north west London. The raised in the Mayor of London’s 2011 Great Western / Great Central Joint Railway Old Oak Common: the future ‘Park Royal consultation response on HS2 and shared by opened in 1904-10 through Middlesex and City’ other London area stakeholders. They are: the Chilterns, to shorten the journey to the Old Oak Common is foreseen as large-scale in n environmental mitigation along the north West and East Midlands. HS2 is set to take both development and railway terms. Space west London corridor; over part of the route used by the GW from prevents elaboration of the full thinking for n inclusion of more than just Crossrail in Old Paddington to reach the Joint line. the development planning, but it aligns with Oak Common interchange; The Mayor is arguing about environmental one of HS2’s core objectives, to stimulate n solving the weaknesses of the HS2-HS1 factors on this North Acton to Northolt economic growth. link; section of HS2, with 6,300 homes aff ected Creation of 20,000 jobs was the ambition n mitigating Euston interchange pressures. by noticeable noise increase. The desire is to in early HS2 documentation. Now, a put this section into tunnel. The current HS2 150-hectare zone will be designated ‘Park Environmental mitigation position is to mitigate, not tunnel. Royal City’: a premier development at one London is no exception to the environmental Bolstering the mayor’s position is the fact of the country’s largest interchanges. Over imperative. Its population, heading towards that a re-engineered railway accommodating a 40-year timescale (about the history of 10 million over the next two decades with GC-gauge vehicles and a High Speed air- the current Canary Wharf) should see the higher density, merits a lot of mitigation. pressure-related ‘kinematic’ gauge doesn’t fi t creation of 100,000 jobs and 19,000 homes 56 Modern Railways May 2013 www.modernrailways.co.uk BAKER MAP HERE Euston: set to be adapted to handle high-speed trains under HS2 Ltd plans. Pendolino No 390019 in the station on 8 May 2009. Brian Morrison Extract from Stuart Baker’s Rail Atlas of Great Britain and Ireland (Ian Allan Publishing) showing the lines in the Old Oak Common area today. directly and indirectly at London’s largest Crossrail 1-West Coast link via Park Royal City 4,000 peak passengers with the West London Opportunity Area, with a Gross Value Added Plans for only 10 Crossrail trains per hour (tph) line. Park Royal City would become a radial/ of £54billion. west of Paddington are out-of-date. Crossrail and orbital interchange improving public transport’s A transport working party including HS2, sponsors are reviewing a timetable with most appeal on the west side of London. DfT, Network Rail, Transport for London and the of the 24tph from the central section heading Options that were studied included a south- local authorities has been involved alongside further westwards. There is potential for a spur side station and Overground route from the the property development planning work. via Park Royal City, for trains towards Watford West London line, or a central station. Of various Interchange and rail permutations will have to and Tring. This would relieve passenger and train links to the North London line, the most eff ective work in a complex environment. North Acton pressures at Euston terminus. One option uses were ‘Shoreditch-type’ curves to minimise land and Willesden Junction stations are nearby the tail of the GW Birmingham line then tunnels use impact. The central station is now considered and can stimulate some early development towards the West Coast main line. Another might diffi cult to build concurrently with works for HS2 zones, and may merit links to Park Royal City be via the Dudding Hill line. and Crossrail/GW. interchange. Stakeholders have also considered It may be too late for a scheme to be included The station options are now to the south or personal rapid transit (PRT) for local connections. in the HS2 Hybrid Bill, needing separate powers at Acton Wells Junction. The station would be The Underground at Euston will not be able to to progress the scheme ahead of HS2. We wait shared by West London and North London line accommodate all HS2 passengers coming into to hear from the Secretary of State as regards the trains. There would be an option of Overground London, so Park Royal City will provide a safety extent of DfT support for this proposal. serving the Dudding Hill line. Also, Southern to valve with one-third of passengers interchanging West Coast trains could run via the Acton Canal here with Crossrail/Heathrow trains. 16 platforms Overground at Park Royal City Wharf route, which comes off the Dudding Hill will give a ‘Stratford scale’ of connectivity: two There is strong Mayoral, TfL and local authority line and joins the West Coast main line near each way for HS2, two HS2-HS1, four Crossrail/ support for an Overground interchange within Stonebridge Park (although journey times are GW local, four GW fast, 2+ for Overground. The Park Royal City. This would remove about likely to be slow and the alignment might need station could eventually handle 200,000 daily 10% of HS2 fl ows from Euston, aiding access improving). passengers from its catchment area and rail to HS2 from other parts of London. Projected Network Rail has looked at these and many interchange. Overground interchange volumes are high, eg other options for both the Southern services and www.modernrailways.co.uk May 2013 Modern Railways 57 appears to have been no examination of the inter-regional demand that could be served by the link. So the case for investment has had to rest on the important, but smaller, international demand fl ows’. Greengauge will look at inter- regional and international demand levels, and ways of addressing border control. It expected to have initial results by 30 April. JRC has already modelled HS2-based international services in various economic circumstances, for the East and South East London Transport Partnership (ESELTP) and others. This extrapolates airline travel fl ows between the UK and western Europe in 2010. Park Royal City, showing HS2 and Crossrail/GW stations, and a ‘Poirot moustache’ option for Overground links. In the east Some domestic fl ows were modelled via HS1 the moustache joins with the West London line from Willesden Junction to Clapham Junction, while on the west it joins and the East London quadrant, through a with the North London line from Willesden Junction to Richmond. At the top left is the Dudding Hill line to Acton Canal potential link to Queen’s Park and on to the Wharf Junction and Neasden. Source: GLA with JRC input West Coast main line / Old Oak / HS2. The JRC modelling suggested inter-regional the Crossrail to West Coast main line services. built, the North London line was upgraded, but demand in this corridor far outweighs the Passive provision for a south-side route was no services ever ran because low-cost airlines potential international fl ows. Long term agreed in the Inter-city Express Programme (IEP) appeared. There still isn’t much commercial case demand forecasting points to a requirement depot planning approval. To remind readers, in for slow, infrequent rail services. for 4-6 Overground tph to be routed Camden order from south to north, the planned layout HS2 Ltd’s current plans are for two Road-Queen’s Park, four additional Javelin at Old Oak is IEP maintenance in the former international-only platforms at Park Royal City. tph to link Kent with the West Coast main line, Eurostar North Pole depot adjoining Wormwood Trains would run in a single-track tunnel from and up to 3tph for long-distance inter-city or Scrubs, then the Great Western main lines, then Park Royal City to Camden Roundhouse (‘the international travel. This used a limited data Crossrail maintenance depot, then Crossrail mousehole’), then surface to run via the existing base and didn’t allow for extra passenger fl ows stabling sidings, then the Grand Union Canal. Primrose Hill link to Camden Road on the North associated with the Railway Lords’ Euston Cross The Mayor and TfL require the Overground at London line and then on an existing single- proposal. (The Railway Lords’ proposal - so Park Royal City either to be included as part of track chord into the HS1 tunnel. Traffi c forecasts called because House of Lords members Tony the HS2 proposals, or have separate powers - a suggest little demand for these trains early on. Berkeley and Bill Bradshaw are proposing highly worthwhile element, which should be However, a single-track route would constrain it - was announced on p8 last month and is safeguarded and funded.
Recommended publications
  • SUGGESTED LAYOUT and SERVICES for OLD OAK
    98 Manor Way, Beckenham, Kent BR3 3LR 07843 234002 www.westlondonlinegroup.org.uk March 2014 SUGGESTED LAYOUT and SERVICES FOR OLD OAK COMMON FOR WEST LONDON LINE, NORTH LONDON LINE, GREAT WESTERN MAIN LINE, CROSSRAIL and HS2 plus WEST COAST MAIN LINE and MIDLAND MAIN LINE There is a lack of detailed and complete information in Network Rail’s London & South East Route Utilisation Strategy regarding demand on the West London Line and others in the area that would arise from an interchange with the Great Western Main Line (GWML), Crossrail and High Speed 2 (HS2) at Old Oak Common that would also be integrated with the regeneration proposals in this area. We have therefore set out below our suggested revisions to TfL’s proposed Option A for the layout for the Old Oak Common interchange. Our suggestions should accommodate anticipated increased rail demand arising generally, from growth on the WLL, WLL and other lines’ connections with Crossrail/GWML and HS2, and the need to produce a Premier Interchange that is ‘future-proofed’ until at least 2080. We believe these suggestions are workable and provide better rail capacities and integration, with lesser impacts on residents and ecological areas, and with no sprawl. Our suggested curves are no tighter than elsewhere in Option A; ideally these should be eased to minimise ‘wheel squeal’ and running times. The feasibility of our suggestions in terms of gradients and height clearances for running tracks would need to be checked. The HS2 and Crossrail/GWML platforms are unchanged, although we would urge that the HS2 platforms are elevated to reduce vertical interchange distances between them and other lines (and presumably the spoil to be removed for the HS2 station box): this elevation should also ease our suggested connections between the HS2 tracks and those of Crossrail and the WLL.
    [Show full text]
  • West London Line Group Calls for New Station
    98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk WEST LONDON LINE GROUP CALLS FOR NEW STATION The West London Line Group is calling for Westway Circus, a new West London Line station, to be built underneath the roundabout at the junction of the A40(M) Westway and the A3220 (West Cross Route). Westway Circus will be at the heart of a very high rail transport use area (Wood Lane is recorded as having the highest usage of all new stations opened in the last few years), while offering a new and extensive set of destinations not reachable from Wood Lane station. Westway Circus users would access a wide range of destinations directly by:- London Overground on the West London Line between Clapham Junction and Willesden Junction and on the North London Line from Willesden Junction to Stratford; and Southern’s West London Line Metro service between South Croydon and Milton Keynes Westway Circus users would also benefit from a number of interchanges, such as Willesden Junction, Watford Junction, Milton Keynes, Clapham Junction, East Croydon and later Old Oak Common and Imperial Wharf, which between them would offer an even wider choice of destinations (see below). Westway Circus should combine features seen elsewhere on the West London Line, viz.:- (i) a single ticket office below the tracks for all users – as at Imperial Wharf; (ii) a shared public and railway access – as at Kensington Olympia; (iii) eight-car platforms, with passive provision for twelve-car trains – throughout At Westway Circus the public access would be used by both cycles and pedestrians, but would be overseen by railway staff in the ticket office, thus making the access more secure for non-rail users.
    [Show full text]
  • Transport Strategy
    8. TRANSPORT STRATEGY 113 TRANSPORT STRATEGY Strategic Transport Study a substantial increase in rail capacity to the 8.1 This transport chapter is supported by e. Seek to embed existing and future West End, City and Canary Wharf and the a Strategic Transport Study, which is a sup- technology to inform station design to station will bring excellent regional and porting document to this OAPF. The Study maximise integration with the wider area. sub-regional connectivity to Old Oak. was undertaken by Transport for London in conjunction with the GLA and Hammer- 8.2 The new Old Oak Common station and 8.4 Subject to a positive business case a smith & Fulham, Ealing and Brent Councils. surrounding interchange will be the key potential link from Crossrail to the West The Strategic Transport Study provides an driver for development in the area and will Coast Main Line (WCML) could provide evidence base for the transport measures be the focus of future transport connections. additional connections from northwest proposed in this document and responds to It could have the same regenerative London and Hertfordshire including, major transport infrastructure proposals in- benefits to that of the improved Kings Cross potentially, Wembley Central. The most cluding High Speed 2 (HS2) and Crossrail 1. station. The station itself is being designed recent proposals for a Crossrail to WCML to accommodate 250,000 passengers a extension would also be compatible PRINCIPLE T1: day, making it comparable in passenger with aspirations for operating passenger RAIL & UNDERGROUND numbers to Waterloo. HS2 will provide up services on the Dudding Hill Line although to 18 trains per hour between Old Oak and a business case for this has not yet been Proposals should: the North, with Birmingham Airport just 31 established.
    [Show full text]
  • This Document and Supports the Document‟S Aims and Approach
    WEST LONDON LINE GROUP 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 29 July 2011 Consultation Manager High Speed Rail Consultation Department for Transport PO Box 59628 London SE21 9AX Dear Sir or Madam High Speed Rail Consultation : February 2011 Introduction 1. I am writing on behalf of the West London Line Group to give the Group‟s responses to this welcome document. We would ask that these be read in conjunction with the Group‟s recent documents, “West London Line Developments – 2008-2015” (May 2008), “Development Proposals for the West London Line 2009-2019” (June 2009), and “Key Concerns regarding the L&SE and WCML RUS‟s” (February 2011), plus the Group‟s responses to the Electrification and the London & South East RUS documents. 2. This response first sets out the Group‟s advice on how HS2 should be see in the context of rail connectivity, problems of rail capacity and regeneration in inner north-west and west London and how these factors can strengthen considerably the case for HS2, assuming that infrastructure developments assumed in some documents, notably the London & South East RUS, will be delivered alongside Crossrail and HS2 schemes. 3. We then highlight the political advantage of ensuring better access by more UK taxpayers to HS2, HS1 and Crossrail, principally by a new link between HS2 and HS1 via the West London Line, Brighton Main Line and the Merstham M23/M25 interchange. 4. We then comment on the detail in the HS2 document that concern us. 5. Finally, we have attached seven Appendices, the first five of which were attached to our response to Network Rail‟s draft London & South East RUS.
    [Show full text]
  • West London Orbital Rail Technical Analysis and Conclusions
    WEST LONDON ORBITAL RAIL TECHNICAL ANALYSIS AND CONCLUSIONS OCTOBER 2017 WEST LONDON ORBITAL RAIL TECHNICAL ANALYSIS AND CONCLUSIONS West London Alliance Report Project no: 70034419 Date: October 2017 WSP WSP House, 70 Chancery Lane London WC2A 1AF www.wsp.com QUALITY MANAGEMENT ISSUE/REVISION FIRST ISSUE REVISION 1 REVISION 2 FINAL Remarks Draft for comments Final draft Incorporation of client Final comments Date 27 July 2017 1 September 2017 8 September 2017 17 October 2017 Prepared by NL, JM NL, JM, CB, LE CW EOL, NL Checked by CW CW EO’L EOL Authorised by EO’L EO’L EO’L CW Project number 70034419 70034419 70034419 70034419 Report number Draft v1.0 Draft v2.0 Draft v3.0 FINAL File reference 70034419 - Services on Dudding Hill Line\02 WIP\TP Transport planning\03 Document\Technical Report Issued\ ii TABLE OF CONTENTS 1 INTRODUCTION .........................................................................10 1.1 CONTEXT ..................................................................................................... 10 1.2 THIS DOCUMENT ........................................................................................ 11 2 STRATEGIC OPTIONS ..............................................................12 2.1 INTRODUCTION ........................................................................................... 12 2.2 CONSIDERATION OF STRATEGIC OPTIONS ............................................. 12 2.3 FINDINGS OF ASSESSMENT ...................................................................... 12 3 DEMAND ANALYSIS: APPROACH
    [Show full text]
  • Public Transport Update
    Thursday, 15 March 2018 Public Transport Improvements IBAF Update 15-03 Mark Frost Head of Traffic & Transport West London Orbital • Scheme initially developed as Hounslow to Old Oak Common service to make use of ‘kew curve’ freight alignment • Scheme picked up by West London Alliance (WLA) and extended to Midland Mainline (Cricklewood) via the Dudding Hill Line, another freight alignment • Now in new Mayor’s Transport Strategy and being developed jointly by TfL/WLA • Proposed new station at Lionel Road will help reduce impact of new developments in the area and serve new stadium. • Could be operational early 2020s. Southall – Brentford Crossrail Link Southall Crossrail Link (phase 1) - 4.9km - Estimated journey time 8mins Southall Crossrail Link (phase 2) - Possible link to Brentford station. Southall – Brentford Crossrail Link • Analysis of scheme suggests it could increase the number of working age adults that can access the area by public transport in one hour by 50% or c1 million people. • Council commissioned Network Rail to progress the designs. These are currently at option selection stage (GRIP 3) • Option selection process complete by June 2018, detailed design would follow until summer 2019. • Linked to potential development at West Cross industrial park, owned by Legal & General. • Could be operational early 2020s, if funding is forthcoming. • Current cost c£40-60m Southern Rail Link to Heathrow • Scheme consulted on locally in 2015, approved by cabinet Jan 2016 • Summer 2017 Network Rail undertook a review of our proposal
    [Show full text]
  • London Assembly Transport Committee
    London Assembly Transport Committee Submissions to Broken rails: a rail service fit for passengers transport investigation and additional notes November 2018 Organisation Page Meeting notes 1 Round table presentations 8 LONDONASSEMBLY Transport Committee 16 July 2018 Meeting with Ben Condry – the Railway and Transport Strategy Centre Background Transport Committee members met with Ben Condry from the Railway and Transport Strategy Centre (RTSC). Ben is Associate Director and Head of Railway Benchmarking and leads the RTSC’s international railway benchmarking groups. The Railway and Transport Strategy Centre (RTSC) was established in 1992 as a centre of excellence serving the railway industry on strategic, economic and technology issues. The RTSC facilitates and manages eight programmes of public transport benchmarking, including on rail. The RTSC also carries out research and consultancy. The RTSC has expertise in many areas including transport economics and policy. The rail network in London and the south east It is important to think about the purpose of the rail network and how it fits within the hierarchy of other transport modes. There is a challenge that rail fulfils a number of different functions, including national, regional and local passenger transport and freight. Thus, is it important to ensure rail – and investment in rail - is focussed on the sectors of the transport market where it is most efficient and can provide the greatest benefits compare to other modes (e.g. relative to investment). Sometimes these markets could be better accommodated by metro, bus or light rail, for example – short local trips which could otherwise create localised congestion on the rail network (and be costly to provide for) at the expense of longer distance trips.
    [Show full text]
  • ID33 Stoll Square Cricklewood Master Plan.Pdf
    , DUDDING HILL RAIL LINE CRICKLEWOOD BROADWAY STOLL SQUARE, GRATTON TERRACE 317, CRICKLEWOOD BROADWAY LONGLEY WAY RUSPER CLOSE OUTLINE MASTERPLAN STOLL CLOSE TEMPLE ROAD FINAL REPORT NOVEMBER 2019 PREPARED FOR: ZISER LONDON 4197 REPORT PRESENTED BY URBAN INITIATIVES STUDIO LTD IN ASSOCIATION WITH BB PARTNERSHIP ARCHITECTS, THE LANDSCAPE PARTNERSHIP, CANEPARO ASSOCIATES, PPM PLANNING STATUS FINAL REPORT ISSUE NO. 02 DATE ISSUED 22 NOVEMBER 2019 FILE NAME 4197_20191122_Stoll Square, Cricklewood_DRAFT v3.indd PROJECT DIRECTOR Hugo Nowell REVIEWED BY Matthias Wunderlich DESIGN DIRECTOR APPROVED BY DESIGN DIRECTOR This document has been prepared for the exclusive use of the commissioning party and unless otherwise agreed in writing by Urban Initiatives Studio Limited, no other party may copy, reproduce, distribute, make use of, or rely on its contents. No liability is accepted by Urban Initiatives Studio Limited for any use of this document, other than for the purposes for which it was originally prepared and provided. Opinions and information provided in this document are on the basis of Urban Initiatives Studio Limited using due skill, care and diligence in the preparation of the same and no explicit warranty is provided as to their accuracy. It should be noted and is expressly stated that no independent verification of any of the documents or information supplied to Urban Initiatives Studio Limited has been made. Exmouth House, 3-11 Pine Street All maps in this report are reproduced from Ordnance Survey material with the permission of Ordnance Survey on London EC1R 0JH behalf of the Controller of Her Majesty’s Stationery Office, Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.
    [Show full text]
  • Reg19: Transport Issues Contents: (1) Maps (2) Dudding Hill Line (3
    From: John Cox To: Subject: BRENT Reg19: Transport issues Date: 11 December 2019 15:02:30 Reg19: Transport issues Contents: (1) Maps (2) Dudding Hill Line (3) Willesden Junction station (4) Wembley Park station (5) Orbital Strategic Transport Corridors (6) Wembley Park station sidings (7) Chiltern Main Line stations (1) Every map in the Local Plan should show the borough’s railways. You have never offered any valid justification not to. Doing so does not make the maps too crowded. Having them also emphasises the close strategic link between land use and fixed transport infrastructure. Historically, construction happened on green-field land around Brent’s railway stations from the 1830s to the 1930s. It has been mainly reuse of brown-field land since then. However, for future strategic planning, showing both the interconnection of Brent’s districts by railways and the severance that the railway lines often create are both important. The only map in the Local Plan to show railway lines is, ironically, where they don’t matter, in Figure 38: “Existing and Proposed Cycling Routes” on page 371. Unfortunately, that map is poor quality, showing the lossy artefacts of maybe a reused JPG file. Replace it with a sharpened, loss-free image. All maps in the Local Plan should show a thin black line for every railway corridor and small black blobs for stations. None of that intrudes on valid reasons you may have for showing particular maps on particular pages. (2) Dudding Hill Freight Line upgrade: You support the intended reopening of the orbital Dudding Hill Freight Line across Brent for regular passenger traffic, sometime in the 2020s.
    [Show full text]
  • Dudding Hill Line: Brief for Feasibility Study
    Appendix 1: Specification for a Study Passenger service for the Dudding Hill line: brief for feasibility study Introduction The West London Alliance is currently investigating ways of accommodating the additional demand resulting from the growth of population and employment in the area and across London as a whole. One such option is to restore services utilising the Dudding Hill Line. This is an existing railway line in north-west London running from Acton to Cricklewood. The line itself has had no scheduled passenger service for over a century, no stations, no electrification, and a 30 miles per hour (48 km/h) speed limit with semaphore signalling, and is lightly used by freight and very occasional passenger charter trains. It is roughly 4 miles (6.4 km) long. On the face of it, this looks to meet a strategic need. Purpose of the brief The West London Alliance wishes to procure consultants in order to carry out a feasibility study into the case for running a new passenger service between Barnet, Brent, Ealing and Hounslow serving locations such as Cricklewood, Neasden , Harlesden, Acton Central, Old Oak Common, Brentford and Hounslow. The aim of the proposed feasibility study is to investigate the practicalities and timings of this, as well as identifying the strength of the strategic, economic, commercial and financial case for such a new service. Consultants should take as given the following which will be made available: 1. West London Transport Infrastructure Constraints: Evidence (February 2017, Regeneris Consulting Ltd.). The analysis in Section 5 of this report indicates material demand for movements along the equivalent A406 corridor.
    [Show full text]
  • Submissions to Call for Evidence from Individuals
    Submissions to call for evidence from individuals 1 Ref Individual Name RD-35 Andrew Bosi RD-36 Ann Lusmore RD-37 ‘Bruce’ Rail User RD-38 Chris Torrero RD-39 D.M. Byrne RD-40 David Dando RD-41 Fenella De Smet RD-42 Graham Larkbey RD-43 Guiliana Castle RD-44 Joe Webb RD-45 John Linwood RD-46 Jon Salmon RD-47 Joseph Barnsley RD-48 Laurel Rutledge RD-49 Laurence Mack RD-50a Lewis Cooke RD-50b Lewis Cooke RD-51 Luke Nicolaides RD-52 Cllr O Rybinkski RD-53 Matt Buck RD-54 Patricia Taylor RD-55 Phil Vasili RD-56 Peter Haggett RD-57 Phil Wass RD-58a Philip Ridley RD-58b Philip Ridley RD-58c Philip Ridley RD-59 Richard Logue RD-60a Rob Knight RD-60b Rob Knight RD-61 Robert Woolley RD-62 Simon Feldman RD-63 Steve Whitehead RD-64 Vic Heerah RD-65 Zara Stewart 2 RD - 35 Thank you for the invitation to comment. 1. What are the key problems with National Rail services in London that need to be addressed? They are less frequent than tubes and London Overground services, they end too early, there are insufficent staff members on stations. 2. What changes to the delivery, funding or governance of rail services in London should be considered? The concession arrangement granted to LOROL has transformed the services in question, proving that increasing the frequency and attractiveness of the service brings people off the roads and onto rail, or out of their homes to become economically active. 3.
    [Show full text]
  • High Speed 2 in London: Let's Get It Right
    High Speed Railways High Speed 2 in London let’s get it right Jonathan Roberts of the JRC consultancy discusses the route of the new line in the capital ith 70-80% of all High Speed When HS2 Phase 2 opens around 2033 the entirely within the present railway. Already 2 travel being to or from the first main lines will have been around for it is proving simpler and no more expensive capital, it is vital to get HS2 nearly two centuries. The quality of the new to put the new line into tunnel under the proposals right in the London main line should also stand the test of time. Chiltern line from Marylebone, between Wand Home Counties regions. HS2 takes over part of the latest ‘classic’ Northolt Junction and West Ruislip. This article addresses the four conditions main line built in north west London. The raised in the Mayor of London’s 2011 Great Western / Great Central Joint Railway Old Oak Common: the future ‘Park Royal consultation response on HS2 and shared by opened in 1904-10 through Middlesex and City’ other London area stakeholders. They are: the Chilterns, to shorten the journey to the Old Oak Common is foreseen as large-scale in n environmental mitigation along the north West and East Midlands. HS2 is set to take both development and railway terms. Space west London corridor; over part of the route used by the GW from prevents elaboration of the full thinking for n inclusion of more than just Crossrail in Old Paddington to reach the Joint line.
    [Show full text]