Administration's Paper on Latest Scheme for Proposed Boardwalk
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
Annex III of TPB Paper No. 10260
Annex III of TPB Paper No. 10260 Summary of Representations and Comments to Representations and the Planning Department’s Responses in respect of the Draft North Point Outline Zoning Plan (OZP) No. S/H8/25 Representation No. Representer Subject of Representation Responses to Representations (TPB/R/S/H8/25-) 1 Angel Tse Support Amendment Item A Grounds of representation: 1.1 There are objections from environmentalists against 1.1 Noted. construction of housing, reclamation, and development of new towns and country parks which lead to high land price and rental cost. 1.2 Many people live in small flats or partitioned flats (劏 1.2 Noted. 房). They urgently need the government to provide housing to tackle the long term housing supply problem. 2 陳淑莊議員 Oppose Amendment Item A (立法會議員) Hon. Tanya Grounds of representation: Chan 2.1 Paragraph 8.7.8 of the Explanatory Statement (ES) of the 2.1 (a) The representation site is separated from adjacent (Legislative OZP states that Air Ventilation Assessment (AVA) street blocks by Java Road, Tin Chiu Street and Marble Council Expert Evaluation (EE) has been carried out and Road, which have a width of not less than 17m and Member) concluded that “design measures including corner splays conducive to air and sunlight penetration. The proposed design with setbacks from the site boundary and a ground public housing development does not reduce the width of floor empty bay would facilitate wind flow and alleviate Java Road/Tin Chiu Street/Marble Road and is generally the potential ventilation impact to the surrounding area”. aligned with the surrounding developments. -
Sai Wan Ho (Grand Promenade)
TRAFFIC ADVICE Service Adjustment of Cross Harbour Route No. 608 Kowloon City (Shing Tak Street) - Sai Wan Ho (Grand Promenade) Members of the public are advised that service of Cross Harbour Route No. 608 will be adjusted with effect from 2 December 2018 (Sunday). The service details after the adjustment are as follows: (i) Routeing: KOWLOON CITY (SHING TAK STREET) TO SAI WAN HO (GRAND PROMENADE): via Shing Tak Street, Fu Ning Street, Ma Tau Chung Road, Mok Cheo ng Street, To Kwa Wan Road, Shing Kai Road, Muk On Street, Muk Ning Street*, roundabout, Muk Ning Street*, Muk On Street, Shing Kai Road, Wang Chiu Road, Kai Cheung Road, Kai Fuk Road, Kwun Tong Bypass, Lei Yue Mun Road, Eastern Harbour Crossing, Island Ea stern Corridor, Man Hong Street, King's Road, Shau Kei Wan Road and Tai Hong Street. SAI WAN HO (GRAND PROMENADE) TO KOWLOON CITY (SHING TAK STREET): via Tai On Street, Shau Kei Wan Road, King's Road, Kornhill Road, King's Road, Healthy Street West, Tsat Tsz Mui Road, Tin Chiu Street, Java Road, Man Hong Street, Island Eastern Corridor, Eastern Harbour Crossing, Lei Yue Mun Road, Kwun Tong Bypass, Wang Chiu Road, Shing Kai Road, Muk On Street, Muk Ning Street*, roundabout, Muk Ning Street*, Muk On Street, Shing Kai Road, To Kwa Wan Road, Ma Tau Wai Road, San Lau Street, Chatham Road North, Ma Tau Wai Road, Ma Tau Chung Road, Ma Tau Kok Road and Shing Tak Street. (ii) Frequency and Operation Period: Mondays to Fridays (except Public Holidays): Depart from Kowloon City (Shing Tak Street): from 5:40 a.m. -
Final Report
Transport and Housing Bureau The Government of the Hong Kong SAR FINAL REPORT Consultancy Services for Providing Expert Advice on Rationalising the Utilization of Road Harbour Crossings In Association with September 2010 CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT September 2010 WILBUR SMITH ASSOCIATES LIMITED CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT TABLE OF CONTENTS Chapter Title Page 1 BACKGROUND AND INTRODUCTION .......................................................................... 1-1 1.1 Background .................................................................................................................... 1-1 1.2 Introduction .................................................................................................................... 1-1 1.3 Report Structure ............................................................................................................. 1-3 2 STUDY METHODOLOGY .................................................................................................. 2-1 2.1 Overview of methodology ............................................................................................. 2-1 2.2 7-stage Study Methodology ........................................................................................... 2-2 3 IDENTIFICATION OF EXISTING PROBLEMS ............................................................. 3-1 3.1 Existing Problems -
TFHK/01/2021 on 17 May 2021
Task Force on Harbourfront Developments on Hong Kong Island For discussion TFHK/01/2021 on 17 May 2021 Boardwalk underneath Island Eastern Corridor PURPOSE The purpose of this paper is to brief the Task Force on the latest architectural and landscaping design of the proposed Boardwalk underneath Island Eastern Corridor (IEC) (Boardwalk). The paper will also update the Task Force on the latest progress, works area requirements and proposed management arrangement of the Boardwalk. BACKGROUND 2. The proposed Boardwalk is a major harbourfront enhancement initiative on Hong Kong Island. Successful implementation of the proposed Boardwalk could set a role model for the forth-coming promenade projects, especially those coastal areas which cannot be developed into a promenade due to various reasons. 3. The proposed Boardwalk is approximately 2.2 kilometres (km) long and maintains a width of at least 10 metres (m) wide throughout and comprises a western and eastern section. The western section will run from Oil Street to Tong Shui Road (approximately 0.7 km long), while the eastern section will run from Tin Chiu Street to Hoi Yu Street (approximately 1.1 km long). These two sections will be connected by the North Point Promenade (approximately 0.4 km long). Upon completion, the proposed Boardwalk will connect the existing or planned promenade at Shek Tong Tsui in Western District and Aldrich Bay in Shau Kei Wan, providing a continuous promenade of some 12 km long for public enjoyment. 4. Both the Task Force and the Eastern District Council (EDC) have been closely engaged in the planning of the Boardwalk project over the past few years. -
List of Projects Under the “Universal Accessibility” Programme and Their Present Status (As at 28 February 2021)
List of projects under the “Universal Accessibility” Programme and their present status (as at 28 February 2021) Expanded Programme: Highways Location Present Status Department Structure No. Central & Western District HF46 Across Possession Street near Lower Lascar Completed Row HF135 Along Cochrane Street near Tun Wo Lane Completed HF142 Across Connaught Road West leading to Completed Sun Yat Sen Memorial Park Eastern District HF63 Across Chai Wan Road near Shan Tsui Completed Court HF92 & HF92A# Across Island Eastern Corridor near Quarry Completed Bay Park HF163 Across Siu Sai Wan Road near Harmony Completed Road Southern District HF104 Across Aberdeen Praya Road near Nam Completed Ning Street HF105 Across Aberdeen Praya Road near Ocean Completed Court H186 Elevated walkway connecting Tin Wan Completed Praya Road and Tin Wan Hill Road Wan Chai District HF154 Across Gloucester Road and Percival Street Under construction near Sino Plaza HS9 Across Canal Road East near Sports Road Completed HF85 At the Junction of Yee Wo Street, Implementation Pennington Street and Sugar Street programme under review Kowloon City District K14 Pui Ching Road Flyover across Princess Completed Margaret Road KF102 Across Hung Hom South Road near Hung Under construction Ling Street and Whampoa Street KF106 Across Hung Hom South Road near Hung Completed Hom Road Kwun Tong District KF90 Across Lei Yue Mun Road near Tsui Ping Completed Road Highways Location Present Status Department Structure No. KF109 Across Shun Lee Tsuen Road near Shun Completed Lee Estate -
Transport Department Notice
TRANSPORT DEPARTMENT NOTICE Special Traffic and Public Transport Arrangements for the Hong Kong Marathon 2010, 28 February 2010 Notice is hereby given that the following special traffic and public transport arrangements will be implemented on Sunday, 28 February 2010 to facilitate the holding of Hong Kong Marathon 2010. I. SPECIAL TRAFFIC ARRANGEMENTS FOR 10KM RACE AT ISLAND EASTERN CORRIDOR, HONG KONG ISLAND (A) Road Closures and Traffic Diversion (Please refer to Plans 2 and 3): The following roads will be closed to all vehicular traffic at the time as specified below (except vehicles with labels issued by the organizer): Phase I From 2.00 am to about 9.00 am (depending on the exact finishing time of 10Km race, and it is safe to re-open the roads to vehicular traffic): Road Closures: (i) Island Eastern Corridor eastbound between Victoria Park Road eastbound and Tung Hei Road slip road; (ii) Hing Fat Street slip road leading to Island Eastern Corridor eastbound; (iii) Man Hong Street slip road leading to Island Eastern Corridor eastbound; (iv) Taikoo Wan Road slip road leading to Island Eastern Corridor eastbound; and (v) The slip roads leading from Eastern Harbour Crossing Exit to Island Eastern Corridor eastbound. Traffic Diversion: (i) Vehicles on Victoria Park Road eastbound heading for Island Eastern Corridor eastbound and Eastern Harbour Crossing will be diverted via Gordon Road, Electric Road and Java Road; (ii) Vehicles on Hing Fat Street heading for Island Eastern Corridor eastbound and Eastern Harbour Crossing will be diverted -
Proposed Comprehensive Development
Design of the Public Transport Interchange at Inland Lot No. 9027 and adjoining Government Land at J/O Java Road and Tin Chiu Street, North Point, Hong Kong Presentation Outline • BACKGROUND • LOCATION AND SITE CONTEXT • MLP APPROVED BY TPB IN NOV 2013 • PTI ACCOMMODATIONS • PTI INTERFACE WITH ADJACENCY Background Submission History PREVIOUS PRESENTATION TO TASK FORCE FEB & OCT 2013 (THE WHOLE DEVELOPMENT) PLANNING APPROVAL BY TPB 8 NOV 2013 st 1 GBP APPROVAL BY BUILDINGS MAR 2014 DEPARTMENT Location and Site Context The Site Local Site Context Existing PTI Location of New PTI Urban Design and Development Context New PTI Site Java Road Municipal Services Building Vehicular Ferry Pier Java Road Development North Point Ferry Pier West Master Layout Plan Approved by TPB in Nov 2013 Proposed Comprehensive Development • PTI/ Public Toilet / Public Coach Parking on Eastern Site • GI/C facilities on Western Site • Public Open Space and Waterfront Promenade • 9 Residential Towers + Clubhouse • Retail / Commercial Facilities Master Layout Plan Development Schedule: Application Site Area 29,280m2 Development Site Area 23,400m2 Site Coverage Not more than 60% of development site area Total GFA Not more than 83,675m2 • Total Domestic GFA 53,680m2 • Total Non-Domestic GFA 29,995m2 Maximum Building Height Not more than +80(mPD) Master Layout Plan – G/F & M/F Island Eastern Corridor Lift lobby Public Bus Regulator For coach park Toilet Office Development Ingress/ egress Proposed New PTI Kam Hong Street Street Hong Kam Tin Chiu Street Street Chiu Tin -
Via on King Street, Unnamed Road, Tai Chung Kiu Road, Sha Tin Rural Committee Road and Tai Po Road
L. S. NO. 2 TO GAZETTE NO. 50/2004L.N. 203 of 2004 B1965 Air-Conditioned New Territories Route No. 284 Ravana Garden—Sha Tin Central RAVANA GARDEN to SHA TIN CENTRAL: via On King Street, unnamed road, Tai Chung Kiu Road, Sha Tin Rural Committee Road and Tai Po Road. SHA TIN CENTRAL to RAVANA GARDEN: via Sha Tin Centre Street, Wang Pok Street, Yuen Wo Road, Sha Tin Rural Committee Road, Tai Chung Kiu Road and On King Street. Air-Conditioned New Territories Route No. 285 Bayshore Towers—Heng On (Circular) BAYSHORE TOWERS to HENG ON (CIRCULAR): via On Chun Street, On Yuen Street, Sai Sha Road, Ma On Shan Road, Kam Ying Road, Sai Sha Road, Hang Hong Street, Hang Kam Street, Heng On Bus Terminus, Hang Kam Street, Hang Hong Street, Ma On Shan Road, On Chiu Street and On Chun Street. Special trips are operated from the stop on Kam Ying Road outside Kam Lung Court to Heng On. Air-Conditioned New Territories Route No. 286M Ma On Shan Town Centre—Diamond Hill MTR Station (Circular) MA ON SHAN TOWN CENTRE to DIAMOND HILL MTR STATION (CIRCULAR): via Sai Sha Road, Hang Hong Street, Chung On Estate access road, Chung On Bus Terminus, Chung On Estate access road, Sai Sha Road, roundabout, Hang Fai Street, Ning Tai Road, Po Tai Street, Ning Tai Road, Hang Tai Road, Hang Shun Street, A Kung Kok Street, Shek Mun Interchange, *(Tate’s Cairn Highway), Tate’s Cairn Tunnel, Hammer Hill Road, roundabout, Fung Tak Road, Lung Poon Street, Diamond Hill MTR Station Bus Terminus, Lung Poon Street, Tai Hom Road, Tate’s Cairn Tunnel, Tate’s Cairn Highway, Shek Mun Interchange, A Kung Kok Street, Hang Shun Street, Hang Tai Road, Ning Tai Road, Hang Fai Street, roundabout, Sai Sha Road, On Yuen Street, On Chun Street, On Chiu Street and Sai Sha Road. -
Hong Kong Streetathon 2020”
Transport Department Notice Special Traffic and Transport Arrangements for the “HONG KONG STREETATHON 2020” Notice is hereby given that to facilitate the holding of “HONG KONG STREETATHON 2020” on 12 January 2020, the following special traffic and transport arrangements will be implemented at the time specified below: I. Special Traffic Arrangements (A) Road Closure and Traffic Diversions The following road closures and traffic diversions will be implemented at the times specified below: Phase 1: From 1:00 a.m. to 8:30 a.m. on 12 January 2020 (a) Road Closures The following road sections will be closed to all vehicles: (i) Central – Wan Chai Bypass Tunnel eastbound; (ii) Island Eastern Corridor eastbound between Hing Fat Street and its ramp leading to Chai Wan Road (Exit 3A); (iii) Slip roads leading from Hing Fat Street, Man Hong Street and Tai Koo Wan Road to Island Eastern Corridor eastbound; (iv) Slip roads leading from Island Eastern Corridor eastbound to Tong Shui Road, Java Road, Tai Koo Wan Road, Hong On Street, Oi Shun Road, Nam On Lane and Tung Hei Road; and (v) Eastern Harbour Crossing (North bound tube) (b) Traffic Diversions (i) Vehicles on Rumsey Street Flyover eastbound heading to Wan Chai (North) via Central – Wan Chai Bypass Tunnel will be diverted to Man Po Street eastbound, , Man Yiu Street southbound, Connaught Place, Connaught Road Central eastbound, Harcourt Road eastbound, Gloucester Road eastbound, Fleming Road northbound and Expo Drive East northbound; (ii) Vehicles on Rumsey Street Flyover eastbound heading to -
Road Harbour Crossings
Statistical Highlights Transport Research Office Legislative Council Secretariat ISSH23/16-17 Road harbour crossings Figure 1 – Distribution of average daily cross Highlights harbour traffic (2016)* • There is wide public concern about the 67 400 (26%) 114 700 (44%) uneven distribution of traffic among the WHC CHT Cross-Harbour Tunnel ("CHT"), Eastern 2016 average Harbour Crossing ("EHC") and Western cross harbour traffic: Harbour Crossing ("WHC"). 258 000 vehicles daily • Among the above three road harbour 75 800 (29%) crossings ("RHCs"), CHT is the most heavily EHC utilized which accounted for 44% of the daily average cross harbour traffic in * Figures may not add up to the total due to rounding. 2016 (Figure 1). Its all-day throughput of about 114 700 vehicles exceeded the Figure 2 – Daily average traffic flows and designed tunnel's design capacity by nearly 50% in capacities of the three RHCs (2016) 2016 (Figure 2). In comparison, EHC was ('000 vehicles/day) Capacity: 78.0 close to saturation and WHC was running CHT 114.7 well below its design capacity. Capacity: 78.0 • Reflecting the heavy use of EHC and CHT, the EHC average speeds at both tunnels in morning 75.8 peak hours were both about 40% slower Capacity: 118.0 than that of WHC in 2016 (Figure 3). The WHC 67.4 average speed at EHC was reduced from 44 km/hour to 32 km/hour during 2007-2016 04080120amid increased daily traffic flow of the tunnel / / Average traffic flow over the period. CHT fared no better as the tunnel's average speed in 2016 remained Figure 3 – Average speeds in morning peak hours unchanged at the 2007 level of 34 km/hour. -
Introduction of Overnight Airbus Route No. NA12 Siu Sai Wan (Island Resort) to Airport (Ground Transportation Centre)
TRAFFIC ADVICE Introduction of Overnight Airbus Route No. NA12 Siu Sai Wan (Island Resort) to Airport (Ground Transportation Centre) Members of the public are advised that Overnight Airbus Route No. NA12 [Siu Sai Wan (Island Resort) to Airport (Ground Transportation Centre)] will start operating with effect from 3 September 2018 (Monday). Details are as follows: Routeing Siu Sai Wan (Island Resort) to Airport (Ground Transportation Centre): via Siu Sai Wan Road, Chai Wan Road, Island Eastern Corridor Slip Road, Ning Foo Street, Chai Wan Station Public Transport Interchange, Kut Shing Street, Chai Wan Road, Wan Tsui Road, Chai Wan Road, Shau Kei Wan Road, King's Road, Kornhill Road, King's Road, Tong Shui Road, Flyover, Island Eastern Corridor, Victoria Park Road, Gloucester Road, Harcourt Road, Connaught Road Central, Rumsey Street Flyover, Connaught Road West, Ka On Street, Des Voeux Road West, Water Street, Western Harbour Crossing, West Kowloon Highway, Tsing Sha Highway, Stonecutters Bridge, Nam Wan Tunnel, Cheung Tsing Highway, North West Tsing Yi Interchange, Lantau Link, North Lantau Highway, Airport Road, Cheong Hong Road, Sky Plaza Road, Cheong Lin Road, Airport South Interchange, Cheong Lin Road and Ground Transportation Centre Bus Terminus. Fare From Siu Sai Wan (Island Resort) to Airport (Ground Transportation Centre) Full fare: $58.0 Section fares: Lantau Link Toll Plaza to Airport (Ground Transportation Centre): $40 Airport (Terminal 1) to Airport (Ground Transportation Centre): $10 Headway From Siu Sai Wan (Island Resort) -
(North Lantau and Hong Kong International Airport) Order 2021 年第 10 號法律公告 L.N
《2021 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港國際機場 ) 令》 Schedule of Routes (Citybus Limited) (North Lantau and Hong Kong International Airport) Order 2021 2021 年第 10 號法律公告 L.N. 10 of 2021 B354 第 1 條 Section 1 B355 2021 年第 10 號法律公告 L.N. 10 of 2021 《2021 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港 Schedule of Routes (Citybus Limited) (North Lantau and 國際機場 ) 令》 Hong Kong International Airport) Order 2021 ( 由行政長官會同行政會議根據《公共巴士服務條例》( 第 230 章 ) (Made by the Chief Executive in Council under section 5(1) of the 第 5(1) 條作出 ) Public Bus Services Ordinance (Cap. 230)) 1. 生效日期 1. Commencement 本命令自 2021 年 4 月 30 日起實施。 This Order comes into operation on 30 April 2021. 2. 指明路線 2. Specified routes 現指明附表所列的路線為城巴有限公司有權經營公共巴士服 The routes set out in the Schedule are specified as the routes on 務的路線。 which Citybus Limited has the right to operate a public bus service. 3. 廢 除《 2019 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港國 3. Schedule of Routes (Citybus Limited) (North Lantau and Hong 際機場 ) 令》 Kong International Airport) Order 2019 repealed 《2019 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港國際機場 ) The Schedule of Routes (Citybus Limited) (North Lantau and 令》(2019 年第 121 號法律公告 ) 現予廢除。 Hong Kong International Airport) Order 2019 (L.N. 121 of 2019) is repealed. 《2021 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港國際機場 ) 令》 Schedule of Routes (Citybus Limited) (North Lantau and Hong Kong International Airport) Order 2021 2021 年第 10 號法律公告 附表 Schedule L.N. 10 of 2021 B356 B357 附表 Schedule [ 第 2 條 ] [s. 2] 指明路線 Specified Routes 機場巴士路線第 A10 號 Airbus Route No. A10 鴨脷洲 ( 利樂街 )——機場 ( 地面運輸中心 ) Ap Lei Chau (Lee Lok Street)—Airport (Ground Transportation