Proposed Comprehensive Development

Total Page:16

File Type:pdf, Size:1020Kb

Proposed Comprehensive Development Design of the Public Transport Interchange at Inland Lot No. 9027 and adjoining Government Land at J/O Java Road and Tin Chiu Street, North Point, Hong Kong Presentation Outline • BACKGROUND • LOCATION AND SITE CONTEXT • MLP APPROVED BY TPB IN NOV 2013 • PTI ACCOMMODATIONS • PTI INTERFACE WITH ADJACENCY Background Submission History PREVIOUS PRESENTATION TO TASK FORCE FEB & OCT 2013 (THE WHOLE DEVELOPMENT) PLANNING APPROVAL BY TPB 8 NOV 2013 st 1 GBP APPROVAL BY BUILDINGS MAR 2014 DEPARTMENT Location and Site Context The Site Local Site Context Existing PTI Location of New PTI Urban Design and Development Context New PTI Site Java Road Municipal Services Building Vehicular Ferry Pier Java Road Development North Point Ferry Pier West Master Layout Plan Approved by TPB in Nov 2013 Proposed Comprehensive Development • PTI/ Public Toilet / Public Coach Parking on Eastern Site • GI/C facilities on Western Site • Public Open Space and Waterfront Promenade • 9 Residential Towers + Clubhouse • Retail / Commercial Facilities Master Layout Plan Development Schedule: Application Site Area 29,280m2 Development Site Area 23,400m2 Site Coverage Not more than 60% of development site area Total GFA Not more than 83,675m2 • Total Domestic GFA 53,680m2 • Total Non-Domestic GFA 29,995m2 Maximum Building Height Not more than +80(mPD) Master Layout Plan – G/F & M/F Island Eastern Corridor Lift lobby Public Bus Regulator For coach park Toilet Office Development Ingress/ egress Proposed New PTI Kam Hong Street Street Hong Kam Tin Chiu Street Street Chiu Tin Shu Kuk Street Street Kuk Shu Java Road Ground Floor Plan Mezzanine Floor Plan Master Layout Plan – 1/F & 2/F First Floor Plan Second Floor Plan Master Layout Plan – P/F Podium Floor Plan Site Section (View from Harbour Side) Site Context – Upon Completion of Development Island Eastern Corridor North Point Point North Pier Ferry North Point Point North Pier Ferry New Promenade Hotel Site New Public (By another consultant) Open Space Proposed (Western Site) New PTI (Eastern Site) Tin Chiu Street Street Chiu Tin Kam Hong Street Street Hong Kam Java Road Shu Kuk Street Street Kuk Shu Site Context – Accessibility Island Eastern Corridor North Point Point North Pier Ferry North Point Point North Pier Ferry New Promenade New Public Open Space Proposed (Western Site) New PTI (Eastern Site) Tin Chiu Street Street Chiu Tin Kam Hong Street Street Hong Kam Java Road Shu Kuk Street Street Kuk Shu Access to/ from nearby public transport system Accommodations of PTI Schedule of Accommodation Requirements in Technical Schedule: •11 bus bays (25m to 60m in length) •1 green mini bus bay (60m in length) •2 bus regulator offices (for NWFB and CityBus) •Ancillary M&E services PTI Interface with Adjacency Interface with Extensive Landscaping Public Open Space & Waterfront Promenade Reference Images Long frontage facing landscaping public open space and promenade Soften building edge of PTI New Promenade New Public Open Space (Western Site) Proposed PTI (Eastern Site) Tin Chiu Street Street Chiu Tin Kam Hong Street Street Hong Kam Java Road Shu Kuk Street Street Kuk Shu Design of the Public Open Space and Waterfront Promenade Passive Landscape Fitness Station Pet Garden Area Tin Chiu Street Street Chiu Tin Kam Hong Street Street Hong Kam Shu Kuk Street Street Kuk Shu Java Road • Amalgamated POS to maximize openness • Removal of Existing Canopy to open up the view towards Victoria Harbour • Provisions of Civic Plaza at junctions • Connection of Promenade/ POS with GIC/ PTI Elevation Design of PTI Extensive greenery and soft landscape in front of building Increase visual interest and nature appearance when viewing from Victoria Harbour Key plan Hong Street Hong Tin Chiu Street Chiu Tin Kam Landscape Features – Greenery on Podium Roof Extensive greenery on podium roof provide a landscaped island when viewing from building at adjacency Reference Images Java Road Java Road Thank You .
Recommended publications
  • Annex III of TPB Paper No. 10260
    Annex III of TPB Paper No. 10260 Summary of Representations and Comments to Representations and the Planning Department’s Responses in respect of the Draft North Point Outline Zoning Plan (OZP) No. S/H8/25 Representation No. Representer Subject of Representation Responses to Representations (TPB/R/S/H8/25-) 1 Angel Tse Support Amendment Item A Grounds of representation: 1.1 There are objections from environmentalists against 1.1 Noted. construction of housing, reclamation, and development of new towns and country parks which lead to high land price and rental cost. 1.2 Many people live in small flats or partitioned flats (劏 1.2 Noted. 房). They urgently need the government to provide housing to tackle the long term housing supply problem. 2 陳淑莊議員 Oppose Amendment Item A (立法會議員) Hon. Tanya Grounds of representation: Chan 2.1 Paragraph 8.7.8 of the Explanatory Statement (ES) of the 2.1 (a) The representation site is separated from adjacent (Legislative OZP states that Air Ventilation Assessment (AVA) street blocks by Java Road, Tin Chiu Street and Marble Council Expert Evaluation (EE) has been carried out and Road, which have a width of not less than 17m and Member) concluded that “design measures including corner splays conducive to air and sunlight penetration. The proposed design with setbacks from the site boundary and a ground public housing development does not reduce the width of floor empty bay would facilitate wind flow and alleviate Java Road/Tin Chiu Street/Marble Road and is generally the potential ventilation impact to the surrounding area”. aligned with the surrounding developments.
    [Show full text]
  • Sai Wan Ho (Grand Promenade)
    TRAFFIC ADVICE Service Adjustment of Cross Harbour Route No. 608 Kowloon City (Shing Tak Street) - Sai Wan Ho (Grand Promenade) Members of the public are advised that service of Cross Harbour Route No. 608 will be adjusted with effect from 2 December 2018 (Sunday). The service details after the adjustment are as follows: (i) Routeing: KOWLOON CITY (SHING TAK STREET) TO SAI WAN HO (GRAND PROMENADE): via Shing Tak Street, Fu Ning Street, Ma Tau Chung Road, Mok Cheo ng Street, To Kwa Wan Road, Shing Kai Road, Muk On Street, Muk Ning Street*, roundabout, Muk Ning Street*, Muk On Street, Shing Kai Road, Wang Chiu Road, Kai Cheung Road, Kai Fuk Road, Kwun Tong Bypass, Lei Yue Mun Road, Eastern Harbour Crossing, Island Ea stern Corridor, Man Hong Street, King's Road, Shau Kei Wan Road and Tai Hong Street. SAI WAN HO (GRAND PROMENADE) TO KOWLOON CITY (SHING TAK STREET): via Tai On Street, Shau Kei Wan Road, King's Road, Kornhill Road, King's Road, Healthy Street West, Tsat Tsz Mui Road, Tin Chiu Street, Java Road, Man Hong Street, Island Eastern Corridor, Eastern Harbour Crossing, Lei Yue Mun Road, Kwun Tong Bypass, Wang Chiu Road, Shing Kai Road, Muk On Street, Muk Ning Street*, roundabout, Muk Ning Street*, Muk On Street, Shing Kai Road, To Kwa Wan Road, Ma Tau Wai Road, San Lau Street, Chatham Road North, Ma Tau Wai Road, Ma Tau Chung Road, Ma Tau Kok Road and Shing Tak Street. (ii) Frequency and Operation Period: Mondays to Fridays (except Public Holidays): Depart from Kowloon City (Shing Tak Street): from 5:40 a.m.
    [Show full text]
  • Via on King Street, Unnamed Road, Tai Chung Kiu Road, Sha Tin Rural Committee Road and Tai Po Road
    L. S. NO. 2 TO GAZETTE NO. 50/2004L.N. 203 of 2004 B1965 Air-Conditioned New Territories Route No. 284 Ravana Garden—Sha Tin Central RAVANA GARDEN to SHA TIN CENTRAL: via On King Street, unnamed road, Tai Chung Kiu Road, Sha Tin Rural Committee Road and Tai Po Road. SHA TIN CENTRAL to RAVANA GARDEN: via Sha Tin Centre Street, Wang Pok Street, Yuen Wo Road, Sha Tin Rural Committee Road, Tai Chung Kiu Road and On King Street. Air-Conditioned New Territories Route No. 285 Bayshore Towers—Heng On (Circular) BAYSHORE TOWERS to HENG ON (CIRCULAR): via On Chun Street, On Yuen Street, Sai Sha Road, Ma On Shan Road, Kam Ying Road, Sai Sha Road, Hang Hong Street, Hang Kam Street, Heng On Bus Terminus, Hang Kam Street, Hang Hong Street, Ma On Shan Road, On Chiu Street and On Chun Street. Special trips are operated from the stop on Kam Ying Road outside Kam Lung Court to Heng On. Air-Conditioned New Territories Route No. 286M Ma On Shan Town Centre—Diamond Hill MTR Station (Circular) MA ON SHAN TOWN CENTRE to DIAMOND HILL MTR STATION (CIRCULAR): via Sai Sha Road, Hang Hong Street, Chung On Estate access road, Chung On Bus Terminus, Chung On Estate access road, Sai Sha Road, roundabout, Hang Fai Street, Ning Tai Road, Po Tai Street, Ning Tai Road, Hang Tai Road, Hang Shun Street, A Kung Kok Street, Shek Mun Interchange, *(Tate’s Cairn Highway), Tate’s Cairn Tunnel, Hammer Hill Road, roundabout, Fung Tak Road, Lung Poon Street, Diamond Hill MTR Station Bus Terminus, Lung Poon Street, Tai Hom Road, Tate’s Cairn Tunnel, Tate’s Cairn Highway, Shek Mun Interchange, A Kung Kok Street, Hang Shun Street, Hang Tai Road, Ning Tai Road, Hang Fai Street, roundabout, Sai Sha Road, On Yuen Street, On Chun Street, On Chiu Street and Sai Sha Road.
    [Show full text]
  • (North Lantau and Hong Kong International Airport) Order 2021 年第 10 號法律公告  L.N
    《2021 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港國際機場 ) 令》 Schedule of Routes (Citybus Limited) (North Lantau and Hong Kong International Airport) Order 2021 2021 年第 10 號法律公告 L.N. 10 of 2021 B354 第 1 條 Section 1 B355 2021 年第 10 號法律公告 L.N. 10 of 2021 《2021 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港 Schedule of Routes (Citybus Limited) (North Lantau and 國際機場 ) 令》 Hong Kong International Airport) Order 2021 ( 由行政長官會同行政會議根據《公共巴士服務條例》( 第 230 章 ) (Made by the Chief Executive in Council under section 5(1) of the 第 5(1) 條作出 ) Public Bus Services Ordinance (Cap. 230)) 1. 生效日期 1. Commencement 本命令自 2021 年 4 月 30 日起實施。 This Order comes into operation on 30 April 2021. 2. 指明路線 2. Specified routes 現指明附表所列的路線為城巴有限公司有權經營公共巴士服 The routes set out in the Schedule are specified as the routes on 務的路線。 which Citybus Limited has the right to operate a public bus service. 3. 廢 除《 2019 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港國 3. Schedule of Routes (Citybus Limited) (North Lantau and Hong 際機場 ) 令》 Kong International Airport) Order 2019 repealed 《2019 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港國際機場 ) The Schedule of Routes (Citybus Limited) (North Lantau and 令》(2019 年第 121 號法律公告 ) 現予廢除。 Hong Kong International Airport) Order 2019 (L.N. 121 of 2019) is repealed. 《2021 年路線表 ( 城巴有限公司 ) ( 大嶼山北部及香港國際機場 ) 令》 Schedule of Routes (Citybus Limited) (North Lantau and Hong Kong International Airport) Order 2021 2021 年第 10 號法律公告 附表 Schedule L.N. 10 of 2021 B356 B357 附表 Schedule [ 第 2 條 ] [s. 2] 指明路線 Specified Routes 機場巴士路線第 A10 號 Airbus Route No. A10 鴨脷洲 ( 利樂街 )——機場 ( 地面運輸中心 ) Ap Lei Chau (Lee Lok Street)—Airport (Ground Transportation
    [Show full text]
  • Java Road, North Point Date of Preparation: Jan 7, 2019 3:27:35 PM 1
    PLANNING BRIEF PROJECT NAME: Java Road, North Point Date of Preparation: Jan 7, 2019 3:27:35 PM 1. Site Particulars Current Proposal Remarks 1.1 District Location Eastern 1.2 Site Location Java Road, North Point Class C site based on B(P)R. 1.3 Site Area 1.3.1 Gross Site Area (approx) 0.12 Subject to detailed site (ha) survey. 1.3.2 Net Site Area (approx) (ha) 0.12 Subject to detailed design and site survey. 1.4 Existing Zoning "Residential (Group A)" Approved North Point OZP No. S/H8/26. 1.5 Existing Land Use Tin Chiu Street (TCS) Playground The existing TCS Playground will be reprovisioned nearby. It will only be closed upon the new playground is in operation. 1.6 Existing Land Status Government Land Currently occupied by TCS Playground under the management of Leisure and Cultural Services Department. 2. Development Parameters Current Proposal Remarks 2.1 Proposed Housing Type Public Housing Flexibility should be allowed to change the housing type to cater for demand change between Public Rental Housing (PRH)/ Green Form Subsidised Home Ownership Scheme (GSH) and Other Subsidised Sale Flats (SSF) subject to pro- rata adjustments to the provision of ancillary facilities in accordance with the HKPSG. 2.2 No. of Flats Proposed 248 "±10%" variation is allowed for flexibility in detailed design subject to pro-rata adjustments to ancillary facilities and consultation with departments concerned. 1 2. Development Parameters Current Proposal Remarks 2.3 Design Population (approx) 695 Based on an average household size of 2.8. "±10%" variation is allowed for flexibility in detailed design subject to pro-rata adjustments to ancillary facilities and consultation with departments concerned.
    [Show full text]
  • List of Public Payphone Kiosks Authorised for Wi-Fi Installation by PCCW-HKT Telephone Limited Kiosk ID Location District Region
    List of Public Payphone Kiosks Authorised for Wi-Fi Installation by PCCW-HKT Telephone Limited Kiosk ID Location District Region HKT-1488 Caine Road. Outside Ho Shing House, near Central - Mid-Levels Escalators Central and HK Western HKT-1052 Caine Road. Outside Long Mansion Central and HK Western HKT-1042 Chater Road. Outside St George's Building, near Exit F, MTR's Central Station Central and HK Western HKT-1031 Chater Road. Outside Statue Square Central and HK Western HKT-1076 Chater Road. Outside Statue Square Central and HK Western HKT-1050 Chater Road. Outside Statue Square, near Bus Stop Central and HK Western HKT-1062 Chater Road. Outside Statue Square, near Court of Final Appeal Central and HK Western HKT-2321 Chater Road. Outside Statue Square, near Prince's Building Central and HK Western HKT-2323 Chater Road. Outside Statue Square, near Prince's Building Central and HK Western HKT-1915 Connaught Road Central. Outside Shun Tak Centre Central and HK Western HKT-1325 Connaught Road West. Outside Block 2, Connaught Garden Central and HK Western HKT-1231 Connaught Road West. Outside Kai Fat Building Central and HK Western HKT-1376 Des Voeux Road Central / Wing Lok Street. Outside Golden Centre Central and HK Western HKT-1086 Des Voeux Road Central. Outside Statue Square, near Court of Final Appeal Central and HK Western HKT-1036 Des Voeux Road Central. Outside Statue Square, near Prince's Building Central and HK Western HKT-1071 Des Voeux Road Central. Outside Statue Square, near Prince's Building Central and HK Western HKT-2320 Des Voeux Road Central.
    [Show full text]
  • Heritage Impact Assessment for Conversion of the Former
    HHeritageeritage ImpactImpact AssessmentAssessment forfor ConversionConversion ofof tthehe FFormerormer CClubhouselubhouse ooff RRoyaloyal HHongong KKongong YYachtacht CClublub aatt 1212 OOilil SStreet,treet, NorthNorth PointPoint iintonto a CCommunityommunity aandnd PublicPublic ArtArt CentreCentre - ArtspaceArtspace @ OilOil StreetStreet VVolumeolume 11-- BBaselineaseline SStudytudy SSeptembereptember 22011011 AArchitecturalrchitectural ServicesServices DepartmentDepartment AArtrt PPromotionromotion OOfficeffice LLeisureeisure andand CulturalCultural ServicesServices DepartmentDepartment HERITAGE IMPACT ASSESSMENT FOR THE FORMER CLUBHOUSE OF ROYAL HONG KONG YACHT CLUB AT 12, OIL STREET, NORTH POINT, HONG KONG VOL. 1 – BASELINE STUDY September 2011 Acknowledgements We would like to acknowledge the permission given by the following organizations and person for the use of their records, maps, photos and information in the report: Antiquities and Monuments Office Building Information Centre, Buildings Department Information Services Department Public Records Office Survey & Mapping Office, Lands Department i Research Team Team Members Position and Discipline/Work Undertaken Ho Puay-peng Architectural historian, Conservation MA(Hons), DipArch(Edin.), PhD(London), RIBA specialist Director, CAHR, CUHK - research supervision Professor, School of Architecture, CUHK Honorary Professor, Department of Fine Art, CUHK Lo Ka Yu Henry Researcher BSSc(AS), MArch, MPhil(Arch), HKICON - research coordination Research Project Manager, CAHR, CUHK Ho
    [Show full text]
  • (New World First Bus Services Limited) Order 2021
    《2021 年路線表 ( 新世界第一巴士服務有限公司 ) 令》 Schedule of Routes (New World First Bus Services Limited) Order 2021 2021 年第 14 號法律公告 L.N. 14 of 2021 B1550 第 1 條 Section 1 B1551 2021 年第 14 號法律公告 L.N. 14 of 2021 《2021 年路線表 ( 新世界第一巴士服務有限公司 ) 令》 Schedule of Routes (New World First Bus Services Limited) Order 2021 ( 由行政長官會同行政會議根據《公共巴士服務條例》( 第 230 章 ) (Made by the Chief Executive in Council under section 5(1) of the 第 5(1) 條作出 ) Public Bus Services Ordinance (Cap. 230)) 1. 生效日期 1. Commencement 本命令自 2021 年 4 月 30 日起實施。 This Order comes into operation on 30 April 2021. 2. 指明路線 2. Specified routes 現指明附表所列的路線為新世界第一巴士服務有限公司有權 The routes set out in the Schedule are specified as the routes on 經營公共巴士服務的路線。 which New World First Bus Services Limited has the right to operate a public bus service. 3. 廢 除《 2019 年路線表 ( 新世界第一巴士服務有限公司 ) 令》 3. Schedule of Routes (New World First Bus Services Limited) 《2019 年路線表 ( 新世界第一巴士服務有限公司 ) 令》(2019 年 Order 2019 repealed 第 125 號法律公告 ) 現予廢除。 The Schedule of Routes (New World First Bus Services Limited) Order 2019 (L.N. 125 of 2019) is repealed. 《2021 年路線表 ( 新世界第一巴士服務有限公司 ) 令》 Schedule of Routes (New World First Bus Services Limited) Order 2021 2021 年第 14 號法律公告 附表——第 1 部 Schedule—Part 1 L.N. 14 of 2021 B1552 B1553 附表 Schedule [ 第 2 條 ] [s. 2] 指明路線 Specified Routes 第 1 部 Part 1 港島路線 Hong Kong Island Routes 市區路線第 2 號 Urban Route No. 2 西灣河 ( 嘉亨灣 )——中環 ( 港澳碼頭 ) Sai Wan Ho (Grand Promenade)—Central (HK-Macau Ferry Terminal) 西灣河 ( 嘉亨灣 ) 往中環 ( 港澳碼頭 ):途經太安街、愛勤道、 愛賢街、愛秩序灣道、東喜道、南安里、南安街、筲箕灣巴 SAI WAN HO (GRAND PROMENADE) to CENTRAL 士總站、未命名道路、南安里、筲箕灣道、英皇道、康山道、
    [Show full text]
  • TRAFFIC ADVICE Hong Kong Island GMB Route No. 61 Siu Sai Wan
    TRAFFIC ADVICE Hong Kong Island GMB Route No. 61 Siu Sai Wan (Island Resort) – Mong Kok (Fife Street)(Overnight Service) Relocation of Terminus in Mong Kok Members of the public are advised that the terminus of overnight GMB route no. 61 in Mong Kok will be relocated from Mong Kok East Station to Fife Street with effect from 20 February 2017 (Monday). In connection with the above terminus relocation, its routing will be revised as follows: From Siu Sai Wan (Island Resort) to Mong Kok (Fife Street) via Siu Sai Wan R oad, Fu Yee Road, Siu Sai Wan Road, Chai Wan Road, Shau Kei Wan Road, Kornhill Road, King's Road, Healthy Street West, Tsat Tsz Mui Road, Tin Chiu Street, Java Road, Man Hong Street, flyover, Island Eastern Corridor, Eastern Harbour Crossing, Lei Yue Mun R oad, Kwun Tong Road, Prince Edward Road East, Argyle Street, Hak Po Street, Nelson Street, Sai Yee Street, Bute Street, Nathan Road and Fife Street. From Mong Kok (Fife Street) to Siu Sai Wan (Island Resort) via Fife Street, Tung Choi Street, Argyle Stree t, Prince Edward Road East, Kwun Tong Road, Lei Yue Mun Road, Eastern Harbour Crossing, Island Eastern Corridor, flyover, Man Hong Street, King's Road, Kornhill Road, Shau Kei Wan Road, Chai Wan Road, Wing Tai Road, Chai Wan Road, Siu Sai Wan Road, Fu Yee Road and Siu Sai Wan Road. The timetable and fares of this route will remain unchanged. Affected passengers may also take the below bus routes: Origin/ Destination Bus Route Bus Stop(s) in Mong Kok From Mong Kok to Chai Wan Cross Harbour Route N118 Nathan Road southbound near and Siu Sai Wan (Cheung Sha Wan (Sham Allied Plaza Mong Road) - Siu Sai Wan (Island Resort)) From Siu Sai Wan and Chai Cross Harbour Route N118 1.
    [Show full text]
  • Baseline Review
    Agreement No. CE 61/2008 (TP) Hong Kong Island East Harbour-front Study - Feasibility Study Final Report Table of Contents 1. INTRODUCTION AND BACKGROUND ............................................................................................................................. 1 1.1 Background .......................................................................................................................................................................... 1 1.2 Objectives of the Study ........................................................................................................................................................ 1 1.3 The Study Area .................................................................................................................................................................... 1 1.4 Preparation of the Final Recommended Enhancement Proposals ...................................................................................... 3 1.5 Report Structure .................................................................................................................................................................. 4 2. METHODOLOGY AND EVALUATION PROCESS ............................................................................................................. 5 2.1 Introduction .......................................................................................................................................................................... 5 2.2 Planning Context ................................................................................................................................................................
    [Show full text]
  • TTA 07:31 5 Conduit Road (Opposite to the Gate of Realty Garden) 13:19 4 Conduit Road (Gate at Imperial Court) West / Island Garden
    Feb 2021 Bus Routes and Costs 2020-2021 Tai Tam Campus Pick-up Drop-off bus fee Areas Bus Route Time Stop No. Bus Stops (Pick-up) Time Stop No. Bus Stops (Drop-off) per month Island Garden (outside Shau Kei Wan Fire Station, Chai Wan Hong Kong Island 07:20 1 The Belcher's (Tower 6, 8) 12:50 8 Road) 07:25 2 Babington Path (Opposite to Elegant Garden) 13:10 1 The Belcher's (Tower 6, 8) 07:27 3 Lyttelton Road (Hoover Mansion) 13:15 2 Babington Path (Opposite to Elegant Garden) 07:29 4 Conduit Road (Gate at Imperial Court) 13:17 3 Lyttelton Road (Hoover Mansion) $2,900 Hong Kong Island TTA 07:31 5 Conduit Road (Opposite to the Gate of Realty Garden) 13:19 4 Conduit Road (Gate at Imperial Court) West / Island Garden 07:42 6 Hospital Road (Centre Place) 13:21 5 Conduit Road (Opposite to the Gate of Realty Garden) Second Street 07:45 7 13:32 6 Hospital Road (Centre Place) (opposite to the staircase of Island Crest) Island Garden (bus stop outside Tower 3 towards Chai Wan, 08:05 8 13:35 7 Second Street (opposite to the staircase of Island Crest) Chai Wan Road) Pick-up Drop-off bus fee Areas Bus Route Time Stop No. Bus Stops (Pick-up) Time Stop No. Bus Stops (Drop-off) per month 07:20 1 Upper Baguio Villa (Mini Bus Terminus) 12:45 9 Pacific View (Platform) Hong Kong Island Bel-Air Phase 2 (Bus Stop opposite to Club House at 07:30 2 12:50 8 Stanley Village Road (Bus Stop at Stanford Villa) Cyberport Road) 07:33 3 Bel-Air Phase 4 (Fountain) 12:52 7 66 Stanley Village Road (Bus Stop at Stanley Court) 07:45 4 Larvotto (Road Entrance of Estate) 12:55
    [Show full text]
  • Administration's Paper on Latest Scheme for Proposed Boardwalk
    LC Paper No. CB(1)916/18-19(06) For discussion on 30 April 2019 Legislative Council Panel on Development Latest Scheme for Proposed Boardwalk underneath the Island Eastern Corridor PURPOSE The purpose of this paper is to brief Members on the Latest Scheme for the proposed Boardwalk underneath the Island Eastern Corridor (IEC) (the proposed Boardwalk) as presented under the Stage 3 community engagement exercise and on the tentative implementation timetable. PROPOSED BOARDWALK 2. To make our harbourfront more accessible, connected and enjoyable, the 2019-20 Budget has earmarked $6 billion for harbourfront enhancement. The proposed Boardwalk of about 2 kilometres (km) in length connecting Causeway Bay and Quarry Bay is amongst the nine projects supported by the Harbourfront Commission (HC) for implementation with the earmarked funding. Since 2015, we have been engaging key stakeholders proactively in developing and refining the alignment of the proposed Boardwalk and supporting facilities. Three rounds of community engagement including the lately launched Stage 3 have been held. PRESENT SITUATION 3. The harbourfront from Causeway Bay to Quarry Bay are occupied by private residential and commercial developments, public facilities, operating 1 piers and IEC, with some parts not being publicly accessible. By building a pedestrian walkway over the water area along the harbourfront, the proposed Boardwalk provides an innovative solution to overcome the existing physical constraint and to realise the vision of a joined up and easily accessible harbourfront. Its implementation is functionally important in the overall harbourfront planning for Hong Kong Island as the 2-km Boardwalk is a key piece of the jigsaw puzzle providing a continuous waterfront promenade of some 9 km from the Central to Sai Wan Ho.
    [Show full text]