APPENDIX 1 Element 3 Tackling Congestion

Total Page:16

File Type:pdf, Size:1020Kb

APPENDIX 1 Element 3 Tackling Congestion APPENDIX 1 Element 3 Tackling congestion - Minor alterations in discussion with Bus Operator to improve punctuality and reduce congestion Location 2012/13 2013/14 Highway works Parking Measures Cost 50k Clearways and Lining Cost £50k Road tables are unstable and access too steep incurring damage to vehicles. review on street parking which Eastwood Old Road £15,000 Improve road tables to recommended add bus stop clearways impacts on congestion at bus stops length, height and entry to avoid vehicle damage Signal Junction with Eastwood Rd Nth, causes delays due to bus The Fairway/ Eastwood Road North incl incl turning circle. Review position of stop line to enable free fllowing traffic. High congestion at Signal Junction with Rayleigh Road, impact of box junction. Slow moving traffic in shopping areas Rayleigh Road/Progress Road - Bell causing congestion and delays to £10,000 house Road services. Assess the possibility of a dedicated bus lane to the lay by at signals, review need for box at Junction bus stop located in left hand turn lane, delays on service caused by crossing lanes to access right turn lane. Relocate further north towards junction Rayleigh Road/Kent Elms £15,000 of Snakes lane, this will allow the bus stop to be moved away from the congestion and provide easier access for lane delineation APPENDIX 1 Congestion as a result of parking close to signal junction, review parking congestion between Add clearways to improve access Elmsleigh Drive incl incl Manchester Drv and Coombes Cnr. at all bus stops Review parking measures to reduce congestion. delays to service caused by congestion review signal heads lines to at signalised junction. reduce impact on turning Mountdale Gdns/Blenhiem chase £100,000 Investigate the addition of a left turn manoeuvres Junction west to lane from Mountdale Gdns and review south, north to east signal setup. Congestion at junction with London Road caused by parked vehicles Thames Drive incl incl remove obstructions to reduce congestion congestion at junction review Rectory Grove/Elm Road incl incl giveway lines Congestion at Signalised junction Hadleigh Road incl incl review parking measures to reduce congestion. Junctions cause traffic congestion Parking near junctions review Elm Rd/Broadway /Leigh Church incl incl review giveway lines, add bus measures and enforcement strop clearway Congested road review parking Grand Drive/Grand Parade incl incl measures particularly at junction with Grand Parade Move signal head line back for right turn into Chalkwell Avenue The Ridgeway incl incl to allow easier turning manoeuvre set signal line for straight ahead Chalkwell Avenue incl incl back 3 metres safety measure, review bus stop access Chalkwell Esplanade £30,000 from within cycle route by alteration to cycle lane to rear of bus stop APPENDIX 1 safety measure, Bus stop near Palmeria review parking area and impact of Station Road £5,000 Avenue obstructs sight lines at crossing add new clearway new bus stop position relocate bus stop Kent Elms junction impact of traffic crossing junction and turning review parking measures congestion Add clearways to improve access Bridgwater Drive £20,000 manoeuvres. Bus stops located in grass throughout at all bus stops areas, review positions and provide hard standing Provision of hard standing to bus stops review parking around bus stops add clearway markings to bus Southbourne Grove £15,000 located in grass areas congestion caused by double parking stop sites Busy location causing delays to service, Bus stop obstructed by lack of space and lorry movements to Morrisons add clearway markings to bus Western Approaches £35,000 review parking areas supermarket, high levels of passengers. stop sites install bus bay at Repton Green to give greater safety and access add clearways to bus stops, service delays caused by junction with review parking as causing congestion review signal head line placement Prince Ave high congestion, review throughout its length removal of box Hobleythick Lane £3,000 at Prittlewell Chase move head junction and garage access, review of junction and keep clear markings line to accomodate turning the keep clear may help movements set right turn lane back 2 metres congestion at junction with Fairfax Drive to allow easier turn from Prince Prittlwell Chase £3,000 review access arrangements lane widths Avenue add clearway lines to and turning manoeuvres Hospital stops signal junctions East Street and Priory Victoria Avenue £3,000 Park cause congestion need to review lane positions cars parking under blue badge causes displace double yellow lines and add Essex Street £13,000 traffic queues on chichester Road. footway Review parking APPENDIX 1 Prevention of parking required to reduce congestion at signal set to Southchurch Avenue incl incl Eastern Esplanade caused by cars parking to access the Tesco Express store delays on service caused by crossing lanes to access right turn lane. Eastern Esplanade £7,000 add clearways to stops Move bus stop east to Sea Life Centre, raise kerbs Move signal head line 3 metres north to give better turning Liftstan Way incl incl access from Woodgrange Drive add clearways to stops Highway changes and effects on bus services now make it possible to move this bus stop from its current location. Bournes Green £7,000 Relocation of bus stop to Southchurch Boulevard will resolve the safety issues for pedestrians and passengers as well as save time for bus operators relocate bus stop within parking area remove parking area to allow for bus St Thomas More School £10,000 and away from crossing south bound add clearway to new location stop stop parking congestion reduced road review clearways and replace in Leigh Road incl incl widths making it difficult for buses to correct positions manoeuvre Relocation of Bus stop nearer Coleman Street away from hazard on corner. Sutton Road £17,000 South bound near Swanage Road, add clearways to stops extension of lay-by and removal of build out to provide easy access to bus stop APPENDIX 1 Current bus stops are located in grass areas opposite Alweyn Court and Thorpe Hall schools, the bus stop opposite the Rose Inn is located in a hedge with no hard standing for Wakering Road £100,000 passengers. provide hard standing and access via footways so passengers can wait at the bus stop, services currently have to wait whilst passengers cross the road Congestion due to parking around junctions at Ravendale Way and Mountbatten Drive incl incl add clearways to stops Mountbatten Drive which delays buses Movement of the bus stop from Current bus stop located with build out outside the shops will allow greater at shops , movement of the stop to Hamstel Road £10,000 capacity for parking and remove junction of North Avenue will increase current parking from the junction parking and resolve bus access with North Avenue Pantile Avenue parking near junction Royston Avenue/Norwich Sutton Road widen junction with of Norwich Avenue causes traffic to Avenue/Pantile Avenue/Cokefield £7,000 roundabout at Royston Avenue to allow add clearways at Stops back on to corner. Avenue easier access Review parking South side bus stops located in grass, add clearways at bus stop passengers find it difficult to access. Eagle Way £20,000 locations to allow easier access Provide footway and hard standing at for buses both stops for increased safety. parking in high street often blocks signal set near Blackgate Road, this add clearways to allow better Shoebury High Street incl incl occurs on both sides of the junction access for buses add signal protection with double yellow lines parking impacts at junctions of Ness Delaware Road incl incl add clearways Road, extend junction protection APPENDIX 1 review bus stop location which is parking at junctions of Cambridge located near the junction and amongst Road and Westcliff Parade impacts Trinity Avenue £3,000 parking. on the access to the bus stop and the Move bus stop to Cambridge Road turning manoeuvre parking at junctions causes Caulfield Road incl incl congestion. add clearways at stops Extend junction protection extend access through signals to layby Woodgrange Drive £7,000 add clearways at stops at junction of Lifstan Way Review build out at junction of Hamstel Road signals. Southchurch Boulevard £7,000 add clearways at stops Extend length to the bus stop to allow easier access Delays to buses, review parking London Road near Avenue Road incl incl change clearway provision layout to provide access to bus stop .
Recommended publications
  • The Gibraltar Highway Code
    P ! CONTENTS Introduction Rules for pedestrians 3 Rules for users of powered wheelchairs and mobility scooters 10 Rules about animals 12 Rules for cyclists 13 Rules for motorcyclists 17 Rules for drivers and motorcyclists 19 General rules, techniques and advice for all drivers and riders 25 Road users requiring extra care 60 Driving in adverse weather conditions 66 Waiting and parking 70 Motorways 74 Breakdowns and incidents 79 Road works, level crossings and tramways 85 Light signals controlling traffic 92 Signals by authorised persons 93 Signals to other road users 94 Traffic signs 96 Road markings 105 Vehicle markings 109 Annexes 1. You and your bicycle 112 2. Vehicle maintenance and safety 113 3. Vehicle security 116 4. First aid on the road 116 5. Safety code for new drivers 119 1 Introduction This Highway Code applies to Gibraltar. However it also focuses on Traffic Signs and Road Situations outside Gibraltar, that as a driver you will come across most often. The most vulnerable road users are pedestrians, particularly children, older or disabled people, cyclists, motorcyclists and horse riders. It is important that all road users are aware of The Code and are considerate towards each other. This applies to pedestrians as much as to drivers and riders. Many of the rules in the Code are legal requirements, and if you disobey these rules you are committing a criminal offence. You may be fined, or be disqualified from driving. In the most serious cases you may be sent to prison. Such rules are identified by the use of the words ‘MUST/ MUST NOT’.
    [Show full text]
  • Scope of Services Template
    November 2018 SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). To Be Determined by Task Work Order Continuing Services Existing Roadway Condition Assessment Report (ERCAR) Development District-Wide Florida’s Turnpike Enterprise 1 PURPOSE ............................................................................................................................. 4 2 PROJECT DESCRIPTION ................................................................................................. 6 3 PROJECT COMMON AND PROJECT GENERAL TASKS....................................... 34 4 ROADWAY ANALYSIS ................................................................................................... 44 5 ROADWAY PLANS .......................................................................................................... 51 6A DRAINAGE ANALYSIS ................................................................................................... 52 6B DRAINAGE PLANS .......................................................................................................... 56 7 UTILITIES .......................................................................................................................... 57 8 ENVIRONMENTAL PERMITS, COMPLIANCE, AND ENVIRONMENTAL CLEARANCES .................................................................................................................. 61 9 STRUCTURES - SUMMARY AND MISCELLANEOUS TASKS AND DRAWINGS .............................................................................................................................................
    [Show full text]
  • Formalisation and Implementation of Road Junction Rules on an Autonomous Vehicle Modelled As an Agent
    Formalisation and Implementation of Road Junction Rules on an Autonomous Vehicle Modelled as an Agent Gleifer Vaz Alves1[0000−0002−5937−8193], Louise Dennis2[0000−0003−1426−1896], and Michael Fisher2[0000−0002−0875−3862] 1 UTFPR - Universidade Tecnol´ogicaFederal do Paran´a- Brazil [email protected] 2 Department of Computer Science, Univ. Liverpool, UK fL.A.Dennis, [email protected] Abstract. The design of autonomous vehicles includes obstacle detec- tion and avoidance, route planning, speed control, etc. However, there is a lack of an explicitely representation of the rules of the road on an autonomous vehicle. Additionally, it is necessary to understand the be- haviour of an autonomous vehicle in order to check whether or not it works according to the rules of the road. Here, we propose an agent- based architecture to embed the rules of the road into an agent repre- senting the behaviour of an autonomous vehicle. We use temporal logic to formally represent the rules of the road in a way it should be possible to capture when and how a given rule of the road can be applied. Our contributions include: i. suggestion of changes in the rules of the road; ii. representation of rules in a suitable way for an autonomous vehicle agent; iii. dealing with indeterminate terms in the Highway Code. Keywords: Agent · Autonomous Vehicles · Temporal Logic · Rules of the Road. 1 Introduction Usually, the design of current control software in autonomous vehicle does not explicitely implement the rules of the road. Here, we propose an architecture, where an agent represents the behaviour of an autonomous vehicle and temporal logic is used to formally specify a subset from the rules of the road.
    [Show full text]
  • Road Markings
    Road Markings Sketch A [A] Painted Island Marking [E] Mandatory Direction Arrows [I] Guideline Listing Markings [B] Edge Line Marking [F] Lane Line Markings [J] Pedestrian Crossing Lines [C] Furcation Arrow Markings [G] Lane Reduction Arrow Markings [K] Channelizing Line Marking [D] Mandatory Direction Arrows [H] Lane Line Markings EXCLUSIVE PARKING BAY MARKINGS L (Loading Bay) F (Fire Fighting Vehicles) A (Ambulances) B (Busses) T (Taxis) MB (Mini-Busses) Pedestrian Crossing Line Yellow Island Marking Yield Road Marking Boundary and Lane Line Markings Block Pedestrian Crossing No Overtaking or Crossing Lines Bus Lane No Overtaking Line Markings Box Junction Mandatory Direction Arrows Ahead Mandatory Direction Arrows Escape Road Ahead No overtaking/crossing ahead Arrester Bed Ahead Information Arrow Information Arrow Increase in Number of Lanes Increase in Number of Lanes Increase in Number of Lanes Ahead Ahead Ahead Word Marking for additional Word Marking for additional Guidance Guidance Painted Island vehicle may not Painted Island vehicle may not cross or stop on this marking cross or stop on this marking No Stopping Line No Parking Line No Overtaking Line Q When you approach this road marking: Ans Stop before the line & drive on when it is safe to do so Q In Sketch A above - when you are driving & want to change lanes from G to H - you must.. Only change lanes when safe to do so. Switch your indicators on in time to show what you are going to do. Ans Use the mirrors of your vehicle to ensure that you know of other traffic. Q In this Sketch: Vehicle B must stop behind vehicle A Drive nearer if that vehicle has driven off stop immediately behind the Ans stop line & drive on when is safe to do so Q In Sketch A - Label B is pointing to..
    [Show full text]
  • Cedral Lap Vertical Construction Details New Zealand
    Cedral Lap Vertical Construction Details New Zealand Table of contents General information 3 Ventilation 4 General components 5 Cedral Lap Vertical with timber batten construction 8 Cedral Lap Vertical with metal top hat construction 24 2 General information This document provides generic construction details for Cedral Lap façade systems to assist with the design of Cedral Lap façade. Construction details in this document have been independently certified for the purpose of compliance with Clause E2, External moisture, of the New Zealand Building Code within the scope of E2/VM1. The weatherproofing performance of any project specific detail or application that is different from or not included in the construction details of this document shall be evaluated by the project engineer or consultant. It is the responsibility of the project designer, architect and engineer to ensure that the information and construction details provided in this document are appropriate for the intended application. Cladding support frame and its connection to substructure shall be designed by the project engineer in accordance with the relevant standards. The support frame maximum deflection under the influence of load shall be limited to Span/250. The support frame, fixings, flashings and the like shall be of adequate corrosion resistance appropriate to the corrosivity category of the project location. Non-proprietary flashings and capping shall be designed with respect to project wind loading, relevant standards and regulations. This document is not designed to serve as an installation guide, and is intended to be used in conjunction with other relevant technical and installation documents. Construction details contained in this document are not to a specific scale, and are for illustration purposes only.
    [Show full text]
  • Rules of Harris County, Texas
    RULES OF HARRIS COUNTY, INCLUDING THE HARRIS COUNTY TOLL ROAD AUTHORITY, A DIVISION OF HARRIS COUNTY, AND THE HARRIS COUNTY FLOOD CONTROL DISTRICT FOR THE CONSTRUCTION OF FACILITIES WITHIN HARRIS COUNTY AND THE HARRIS COUNTY FLOOD CONTROL DISTRICT RIGHTS-OF-WAY JOHN R. BLOUNT, P.E. HARRIS COUNTY ENGINEER GARY K. TRIETSCH, P.E. HCTRA EXECUTIVE DIRECTOR RUSSELL A. POPPE, P.E. EXECUTIVE DIRECTOR - FLOOD CONTROL DISTRICT Formatted: Normal, Left, Border: Top: (No border), Bottom: (No border), Left: (No border), Right: (No border) Formatted: Font: (Default) Courier New, Not Bold, Not Expanded by / Condensed by 1 AS AMENDED: EFFECTIVE: 2 I N D E X SECTION 1 AUTHORITY SECTION 2 JURISDICTION SECTION 3 PURPOSE SECTION 4 CONSTRUCTION OF RULES SECTION 5 DEFINITIONS SECTION 6 RIGHT-OF-ENTRY TO COUNTY OR HCFCD ROW SECTION 7 CONSTRUCTION DRAWING SUBMITTALS SECTION 8 TRAFFIC CONTROL SECTION 9 SEALING OF CONSTRUCTION DRAWINGS SECTION 10 CERTIFICATES, FEES AND BONDS SECTION 11 EMERGENCY REPAIRS SECTION 12 INTERFERENCE WITH USE OF THE ROW SECTION 13 TRENCHING SECTION 14 USE OF THE ROADWAY SECTION 15 NOTIFICATION PRIOR TO WORK SECTION 16 UTILITIES SECTION 17 UTILITY POLES SECTION 18 PERMANENT UTILITIES SECTION 19 HIGH PRESSURE PIPELINES SECTION 20 EXCAVATION AND BACKFILL SECTION 21 PAVING SECTION 22 MONUMENTS SECTION 23 SOIL BORING AND MONITORING WELL REQUIREMENTS SECTION 24 DAMAGE TO HARRIS COUNTY OR HCFCD ROW SECTION 25 VEGETATION MANAGEMENT SECTION 26 LIABILITY SECTION 27 VARIANCES SECTION 28 CONSTRUCTION PER DRAWINGS SECTION 29 INSPECTIONS SECTION 30
    [Show full text]
  • Sheet 5 of 5
    DEPARTMENT SHEET OF 5 OF TRANSPORT © N a t i o n a l D e p a r t m e n t o f Tr a n s p o r t , 2 0 0 0 5 2 0 0 0 REGULATORY SIGNS Control signs R 1 Stop sign R226 Midibus prohibited sign R341 Tram stop reservation sign TRAFFIC SIGNALS R 1 . 1 S t o p s i g n R227 Bus prohibited sign R342 Bus & tram reservation sign Standard traffic signal faces (S1-S15) Steady “red man” signal R 1 . 2 Stop/Yield R228 Delivery vehicle prohibited sign R343 Bus & tram lane reservation sign Steady red disc Indicates to pedestrians to remain stationary on the sidewalk R 1 . 3 3 -Wa y s t o p s i g n R229 Goods vehicle prohibited sign R344 Bus & tram lane reservation begins sign Stop vehicle behind line until green signal is displayed, then until a “green man “ signal is displayed R 1 . 4 4 -Wa y s t o p s i g n R230 Goods vehicle over indicated GVM prohibited sign R345 Bus, minibus & tram reservation sign proceed with caution R 1 . 5 S t o p / G o s i g n R231 Construction vehicle prohibited sign R346 Bus, minibus & tram lane reservation sign Flashing “red man” signal indicates to pedestrians R 2 Y i e l d s i g n R232 Vehicle conveying dangerous goods prohibited sign R347 Bus, minibus & tram lane reservation begins sign Flashing red disc signal 1 who have not yet started to cross road to remain R 2 .
    [Show full text]
  • 313-Warren-20-2055 with Addenda
    eProposal Jan-2009 CALL NO. 313 CONTRACT ID. 202055 WARREN COUNTY FED/STATE PROJECT NUMBER FD05 114 031W 014-017 DESCRIPTION LOUISVILLE ROAD (US 31W) WORK TYPE ASPHALT SURFACING ULTRA THIN PRIMARY COMPLETION DATE 9/30/2020 LETTING DATE: February 21,2020 Sealed Bids will be received electronically through the Bid Express bidding service until 10:00 am EASTERN STANDARD TIME February 21,2020. Bids will be publicly announced at 10:00 am EASTERN STANDARD TIME. NO PLANS ASSOCIATED WITH THIS PROJECT. DEFERRED PAYMENT REQUIRED BID PROPOSALUNOFFICIAL GUARANTY: Not less than 5% of the total bid. WARREN COUNTY Contract ID: 202055 FD05 114 031W 014-017 Page 2 of 54 TABLE OF CONTENTS PART I SCOPE OF WORK · PROJECT(S), COMPLETION DATE(S), & LIQUIDATED DAMAGES · CONTRACT NOTES · STATE CONTRACT NOTES · DEFERRED PAYMENT · NATIONAL HIGHWAY · SURFACING AREAS · ASPHALT MIXTURE · INCIDENTAL SURFACING · COMPACTION OPTION B · SPECIAL NOTE(S) APPLICABLE TO PROJECT · LIQUIDATED DAMAGES · AWARD OF CONTRACT · ASPHALT MIX PAVEMENT WEDGE MONOLITHIC OPERATION · EDGE KEY (BY LINEAR FEET) · TYPICAL SECTION DIMENSIONS · TRAFFIC CONTROL PLAN 4 LANE · SKETCH MAP(S) · SUMMARY SHEET(S) · TYPICAL SECTION(S) PART II SPECIFICATIONS AND STANDARD DRAWINGS · SPECIFICATIONS REFERENCE · SUPPLEMENTAL SPECIFICATION · [SN-1I] PORTABLE CHANGEABLE SIGNS · 2016 STANDARD DRAWINGS THAT APPLY PART III EMPLOYMENT, WAGE AND RECORD REQUIREMENTS · LABOR AND WAGE REQUIREMENTS · EXECUTIVE BRANCH CODE OF ETHICS · KENTUCKY EQUAL EMPLOYMENT OPPORTUNITY ACT OF 1978 LOCALITY / STATE · PROJECT WAGE
    [Show full text]
  • Excavation Application
    APPLICATION TO EXCAVATE IN PUBLIC RIGHT-OF-WAY DATE: APPLICANT NAME: ADDRESS : CONTACT NUMBER : EMAIL : CONTRACTOR INFORMATION: CONTRACTOR NAME: LOCATION / ADDRESS : CONTACT PERSON : CONTACT NUMBER : PROPOSED WORK: ESTIMATED START DATE: ESTIMATED COMPLETION DATE: LOCATION / ADDRESS : PURPOSE OF WORK: REPAIR REPLACE CABLE INSTALL CUT OFF TELECOMMUNICATIONS OTHER DESCRIBE: I HAVE READ AND REVIEWED THE ATTACHED ORDINANCE # 2018-6 DATE: Permit Fees payable to: Town of Osgood SIGNATURE: 147 West Ripley Street Osgood , IN 47037 FOR OFFICE USE ONLY : PERMIT APPROVED BY: APPROVED DENIED DATE RECEIVED: STEVE WILHOIT GAS / STREET SUPERINTENDENT PERMIT NUMBER : FEES COLLECTED: TONY WOOD WATER / SEWER SUPERINTENDENT ORDINANCE NO. 2018-6 AN ORDINANCE ESTABLISHING CUT PERMITS FOR PUBLIC WAY AND RESTORATION OF PUBLIC WAY WHEREAS, the Town of Osgood, Indiana, has determined that it is in the best interest of the town to adopt an ordinance to provide for the method and manner of construction, repair, replacement, of utilities and driveways within the streets or street ROW's of the town and provide for the method and manner of allocating the cost there of: NOW THEREFORE, BE IT HEREBY ORDAINED BY THE TOWN COUNCIL FOR THE TOWN OF OSGOOD, INDIANA, TITLE IX, CHAPTER 94, OF THE TOWN OF OSGOOD, INDIANA CODE OF ORDINANCES, IS ESTABLISHED AS FOLLOWS: 94.01 GENERAL PROVISIONS. It shall be unlawful to occupy areas along, under, upon, and across the streets, highways, or other public property within the Town of Osgood, Indiana, without having first fully complied with the provisions of this subchapter. 94.02 NEW INSTALLATIONS. No person or entity, including a public or private utility, may install or maintain any cable, wire, conduits, or other attachments or equipment over, on or under any such location, unless and until a permit for such installation shall have first been obtained from the Town.
    [Show full text]
  • Avoiding Fines Avoiding Fines
    NEXUS’ GLOVEBOX GUIDE AVOIDING FINES AVOIDING FINES 01 02 DRIVING DOWN COSTS Nexus is the UK’s leading tech-driven business mobility provider. Working with companies and fleets of all sizes, we combine unrivalled vehicle choice and service with a keen value for money focus. Our award-winning IRIS software provides access to more than 550,000 vehicles across more than 2,000 locations across the UK, enabling customers to make bookings within 30 seconds at the click of a mouse or via smartphone. Our Glovebox Guides are inspired by the old HOW OUR TECHNOLOGY HELPS saying, ‘Forewarned is forearmed’. They’re part of Nexus’ world-leading IRIS platform our always-on drive to ensure you and your team are up-to-date with regulation, and that your business automatically settles any fines your mobility costs are kept to a minimum. drivers incur promptly, preventing late payment penalties. It also pinpoints ‘repeat offenders’ so you can tackle them. But why not also actively brief your people on the rules and regulations that could be taking thousands of pounds off your bottom line each year? AVOIDING FINES 03 DON’T BE CAUGHT OUT Ever-rising numbers of CCTV cameras catch out many drivers and they are even used by some organisations to issue automatic fines. Although some motoring breaches listed can also lead to court appearances for staff, they are either at the lowest end of the criminal scale or civil, administrative alternatives to prosecution. We have not included major criminal offences that can even result in imprisonment - such as drink/drug driving, dangerous driving or road rage - and which should be covered in contracts of employment.
    [Show full text]
  • Strood Draft Action Plan Consultation Report Transforming Strood Town Centre Medway Council October 2016
    Strood Draft Action Plan Consultation Report Transforming Strood Town Centre Medway Council October 2016 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from Medway Council. Project Centre shall not be liable for the use of any information contained herein for any purpose other than the sole and specific use for which it was prepared. Report Issue Description Originator Checked Authorised Reference 2542 01 Consultation Alex Frankcombe Sam Neal Sam Neal Report 08.09.2016 28.09.2016 13.09.2016 CONTACT Sam Neal Associate Director - Major Projects, Public Realm and Regeneration [email protected] 020 7203 8400 1st Floor Holborn Gate 330 High Holborn London WC1V 7QT © Project Centre 2016 Strood Draft Action Plan Consultation Report i EXECUTIVE SUMMARY Background This report details the consultation process, including activities, events and findings for the consultation of the draft Action Plan for Strood Town Centre undertaken in July 2016. Following a number of visioning workshops with key stakeholders and the community in late 2015 and early 2016, a set of measures and key objectives were developed that informed the design of the draft Action Plan. The proposals aim to: Improve journey times and reduce congestion; Deliver a safe and attractive environment for those that walk, cycle or use public transport; Renew and refresh the urban realm and retail environment; and Create a feeling of place and pride. The shared vision for this project is to deliver a transformational change to Strood Town Centre. The consultation period ran from Wednesday 29 June 2016 to Wednesday 27 July 2016.
    [Show full text]
  • Nycdot-Traffic-Signal-Specifications.Pdf
    City of New York DOT Systems Engineering SPECIFICATIONS for Furnishing All Labor and Material Necessary and Required for Removal, Installation, Relocation and Maintenance of Traffic Signals and Intelligent Transportation Systems June 2018 January 2017 NYCDOT Specifications for Traffic Signals & ITS Systems NOTICE TO CONTRACTORS ........................................................................................................................................................... 15 DEFINITIONS OF WORDS AND PHRASES ..................................................................................................................................... 17 ABBREVIATIONS .............................................................................................................................................................................. 19 GS.1. NYCDOT GENERAL SPECIFICATIONS ................................................................................................................................. 23 GS.1.1. SCOPE OF PROJECT............................................................................................................................................................ 23 GS.1.2. WORK INCLUDED ................................................................................................................................................................ 23 GS.1.3. TIME .................................................................................................................................................................................
    [Show full text]