6214 - 7331 South Terwillegar Drive Nw, Edmonton MLS® #E4250311

Total Page:16

File Type:pdf, Size:1020Kb

6214 - 7331 South Terwillegar Drive Nw, Edmonton MLS® #E4250311 Courtesy Of Kaylie Cole Of Purplebricks $174,999 - # 6214 - 7331 South Terwillegar Drive Nw, Edmonton MLS® #E4250311 $174,999 2 Bedroom, 2.00 Bathroom, 829 sqft Condo / Townhouse on 0.00 Acres South Terwillegar, Edmonton, AB Spacious CORNER UNIT offering 2 bed, 2 bath and green belt facing balcony. Walk in and be greeted by a foyer with adjacent laundry and storage. 2 generously sized bedrooms including the primary suite with 4pc ensuite & large walk-in closet. Kitchen is bright and open with ample cabinetry. Off the kitchen find the living room which gives access to the west facing balcony. Enjoy your 2 parking stalls plus lots of visitor parking. Located in family friendly Terwillegar with quick access to the Anthony Henday, as well as downtown, Edmonton International airport, schools and all amenities. Built in 2007 Essential Information MLS® # E4250311 Price $174,999 Bedrooms 2 Bedrooms Above Grade 2 Bathrooms 2.00 Full Baths 2 Square Footage 829 Acres 0.00 Year Built 2007 Type Condo / Townhouse Sub-Type Lowrise Apartment Style Single Level Apartment Status ACTIVE Community Information Address # 6214 - 7331 South Terwillegar Drive Nw Area Edmonton Community South Terwillegar Condo Park Place South Terwillegar City Edmonton County ALBERTA Province AB Postal Code T6R 0L9 Amenities Features Laundry-In-Suite, Parking-Visitor Parking Spaces 2 Parking Stall Interior Interior Carpet, Linoleum Interior Features Dishwasher-Built-In, Hood Fan, Refrigerator, Stove-Electric, Stacked Washer/Dryer Heating Baseboard # of Stories 1 Basement No Basement, None Exterior Exterior Vinyl Exterior Features Landscaped, Schools, Shopping Nearby, Public Transportation Roof Asphalt Shingles Construction Wood Frame Foundation Concrete Additional Information Date Listed June 17th, 2021 Condo Fee $345 Disclaimer: Data is deemed reliable but is not guaranteed accurate by the REALTORS® Association of Edmonton. Listing information last updated on September 23rd, 2021 at 8:31am CDT.
Recommended publications
  • 170 Street Planning Study (Ellerslie Rd- 41 Ave
    170th Street Concept Planning Public Information Session (Ellerslie Rd to 41 Street SW) Responses to Stakeholder Comments www.edmonton.ca/roadplans November 2010 Public Involvement Introduction The following is a summary of the written questions and comments received after the June 22, 2010 Public Open House covering Ellerslie Road to 41 Avenue SW. Where possible, the project team has included a response for clarification. Philosophy Why does this proposal create a free flow facility through the Windermere community to serve what we must assume are non-residents of the community? 170 Street has been identified by the City of Edmonton and Alberta Transportation as a “Highway Penetrator” since the 1990’s. Both parties have since prepared plans for the 170 Street corridor based on that understanding. Although 170 Street will provide regional connections to the south, the infrastructure proposed for this corridor serves mostly City residents. Immediately north of Ellerslie Road, approximately 85% of the northbound traffic in the AM Peak hour and 60% of the southbound traffic in the PM Peak hour is development traffic accessing one of the three crossing arterials (Ellerslie Road, 25 Avenue SW, or 41 Avenue SW). The remainder of the traffic is regional traffic. Will land access to the Windermere ASP area be sacrificed for free flow movements in and out of Edmonton? Land access is not being sacrificed. Within the south study area, no accesses proposed by the Windermere Area Structure Plan Traffic Impact Assessment have been removed. The only change in access occurs at the four collector accesses that have become right-in/right-out intersections onto the one-way frontage roads.
    [Show full text]
  • City of Edmonton Speed Zones Bylaw Bylaw No. 6894
    CITY OF EDMONTON SPEED ZONES BYLAW BYLAW NO. 6894 (CONSOLIDATED NOVEMBER 26, 2019) OFFICE OF THE CITY CLERK CONSOLIDATION BYLAW NO. 6894 A Bylaw to Establish Certain Speed Zones in the City of Edmonton Whereas pursuant to: Section 14 of the Traffic Safety Act, RSA 2000, c T-6, Council may prescribe speed limits for lanes and other thoroughfares used by vehicles on privately owned property within the City to which vehicles driven by members of the public generally have access; Section 108 of the Traffic Safety Act, Council may prescribe a maximum speed limit for a highway or any portion of a highway under the direction, control, and management of the City that is greater or lower than 50km/h; Section 108 of the Traffic Safety Act, a road authority may prescribe a lower maximum speed limit by erecting signs along a highway; Section 108 of the Traffic Safety Act, a person authorized by a road authority may prescribe a maximum speed limit for highways under construction, repair, or in a state of disrepair by erecting signs along a highway; Sections 107 and 108 of the Traffic Safety Act, Council may prescribe maximum speed limits for school zones located on highways under the direction, control, and management of the City and may vary the prescribed periods of time during which the speed limit is in effect for school zones; Section 107 of the Traffic Safety Act, if Council varies the prescribed periods of time during which the speed limit is in effect for school zones, it must cause traffic control devices to be displayed identifying the hours
    [Show full text]
  • 2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan
    2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan August 12, 2021 2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan Contents 1 Introduction .......................................................................................................................................... 1 2 2021 Regional Transportation Priorities .............................................................................................. 1 2.1 Transit Projects ......................................................................................................................... 1 2.2 Roadway Projects ..................................................................................................................... 2 2.3 Active Transportation Projects .................................................................................................. 2 3 2021 Prioritization Results ................................................................................................................... 2 Appendix A - Project Grouping.................................................................................................................... 12 Appendix B - Project Maps......................................................................................................................... 15 Tables Table 1 - Advance to Planning Priorities ....................................................................................................... 4 Table 2 - Ready for Design Priorities
    [Show full text]
  • Terwillegar Drive Expressway Draft Concept Plan
    Terwillegar Drive Expressway Draft Concept Plan advise Anthony Henday Drive to Whitemud Drive November 28 5:00 - 8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Learn more by going to: edmonton.ca/terwillegardrivestudy Let’s Talk advise Today you can: Learn about the new direction for Terwillegar Drive View and ask questions about the draft concept plan Provide feedback on proposed plans for transit, pedestrians and cyclists, and landscape naturalization of the corridor Learn more by going to: edmonton.ca/terwillegardrivestudy Project Overview advise Study Purpose: To validate and update the plan for the future of Terwillegar Drive from Anthony Henday Drive to Whitemud Drive Need: Terwillegar Drive is an important roadway for the movement of goods and services, transit and commuters. It is an important connector to 170 Street (Terwillegar Drive south extension) south of Anthony Henday Drive, which is planned to be a freeway to Leduc. Corridor is congested during peak hours. Goals: Alleviate congestion Provide for efficient, safe movement of all users, locally and regionally Learn more by going to: edmonton.ca/terwillegardrivestudy Project Timeline Where we are today advise strategy concept design build operate Late Spring 2019 October 2, 2018 Phase 3 Public February 27, 2018 Presentation to Urban Planning December 2018 Information Sessions Motion from City Council Committee of both freeway Budget decision for - report back and Fall 2017 resulting in development and expressway options. funding Terwillegar Drive share recommended Study start of additional options. Direction to advance expressway. Stage 1 concept plan. November 2017 - Spring 2018 - January - 2019/2020 February 2018 Fall 2018 November - May 2019 Engineering design (if Public Engagement Draft Further development December 2018 Develop funding is approved) Freeway Options of the freeway plan Phase 2 Public Engagement - recommended and introduction of report back on study progress concept plan.
    [Show full text]
  • Recreation and Wellness Directory for Older Adults
    Recreation and Wellness Directory for Older Adults Overview of the Directory Table of Contents The Recreation and Wellness Directory for List of Contributing Organizations 2 Older Adults outlines arts, fitness, technology, Program Listings health and recreational activities for adults • Computers and Technology 8 55+ in the Edmonton area. • Crafts and Hobbies 15 • Dance 22 With more than 1400 group programs, clubs, • Drawing and Painting 26 courses, and events listed, the directory is a • Fitness 31 valuable resource for older adults and those • Games and Sports 41 who support older adults. • General Interest 49 The directory is produced by the Edmonton • Health and Wellness 59 Seniors Coordinating Council (ESCC) with • Music, Song and Drama 66 contributions this year from 53 organizations. • Social and Special Events 70 Provide feedback on the directory 78 At the time of printing, the activities Seniors’ Centre Without Walls 79 included in the directory were scheduled, Connecting Edmonton Seniors 79 but they may change throughout the year Reciprocal Program Registration 80 and new activities may be added. We encourage you to contact the organizations A searchable form of the directory is for details and availability of the activities. available on our website at www.seniorscouncil.net/programs. Edmonton Seniors Coordinating Council To order print copies of the directory, The Edmonton Seniors Coordinating Council contact ESCC at 780-423-5635 or works with senior service agencies and other [email protected]. stakeholders in the seniors sector to enhance the lives of Edmonton seniors. Contact ESCC We help organizations collaborate to #255 Bonnie Doon Shopping Centre improve coordination of services for seniors 8330 82 Avenue by facilitating sector meetings, planning for Edmonton, AB T6C 4E3 service improvements, coordinating projects and producing resources.
    [Show full text]
  • What We Heard Report: Terwillegar Drive Expressway Draft Concept Plan
    What We Heard Report: Terwillegar Drive Expressway Draft Concept Plan October to December 2018 Public Engagement Summary: January 2019 What We Heard Report: Terwillegar Drive Expressway Draft Concept Plan Project Overview The City is currently developing a plan to upgrade Terwillegar Drive, between Anthony Henday Drive and Whitemud Drive, to an expressway. An expressway is a high-capacity roadway which includes widely spaced signalized intersections. The Terwillegar Drive expressway will include up to four travel lanes in each direction, increased capacity at all intersections and the Whitemud Drive/Terwillegar Drive interchange, the potential for dedicated transit lanes and bus stops, and a shared-use path on the east side of the roadway. This is the second phase of engagement for the current Terwillegar Drive Study. Phase one was completed in early 2018 and presented freeway options for Terwillegar Drive. After analyzing the public and technical needs, an alternative solution to the freeway, an expressway, was developed. In October 2018, the City’s Urban Planning Committee unanimously accepted a motion to advance on the expressway option. For detailed information about the study and to view the draft concept plan visit: edmonton.ca/terwillegardrivestudy 2 What We Heard Report: Terwillegar Drive Expressway Draft Concept Plan Public Engagement Process This phase of public engagement was designed to gather feedback and perspectives on the Terwillegar Drive expressway draft concept plan, including the following elements of the design: + Shared-use path: location and connections + Transit accommodation: dedicated + 142 Street pedestrian/cyclist bridge: transit lanes and bus stops bridge styles + Naturalized landscaping: locations Between October and December 2018 engagement activities were conducted with property owners, community leagues and the public.
    [Show full text]
  • Terwillegar Drive Improvements
    Integrated Infrastructure Services Infrastructure Planning and Design Terwillegar Drive Improvements Urban Planning Committee October 2, 2018 Integrated Infrastructure Services | CR_5730 Council Approved Motion That Administration: 1. Suspend any public engagement activities regarding the ultimate long term Terwillegar Drive/Whitemud Drive interchange and any roadway modifications that may limit access in the interim. 2. Optimize the concept plan for the Terwillegar corridor between Whitemud Drive and Anthony Henday Drive, including provision for opportunities of mass transit and active transportation. 3. Advance the Preliminary Design for Terwillegar Drive/40 Avenue interchange. 4. Advance the Preliminary Design for an optimized Stage 2 of the Whitemud Drive/Terwillegar Drive interchange, with consideration for reduced design parameters (i.e. design speeds) with the intent of reducing overall complexity and cost. 5. Continue to advance preliminary design on the basis of a number of $75-100M packages in support of staged completion of the Terwillegar corridor, including full access for Rabbit Hill Road, 23 Avenue, and Haddow Drive. 6. Present a list of potential shared funding opportunities with the provincial and federal government that take advantage of infrastructure and innovation funding. 7. and bring back a report to Council in third Quarter 2018 summarizing progress on the aforementioned design elements. © City of Edmonton 2 | Integrated Infrastructure Services | Infrastructure Planning and Design | CR_5730 Terwillegar Drive Improvements
    [Show full text]
  • Community Meeting to Bring Neighbours Together
    Art in Our Park September 15! P a g e 1 6 Three amazing fundraisers by kids Page07 Back to School in Terwillegar Page23 Seniors Connect in Southwest Page 26 www.terwillegar.org Issue 43 September 2012 Terwillegar Tribune Community Meeting to Bring Neighbours Together Are you interested in learning what your community league can do for you? Do you want to meet the people who are volunteering to make our community a great place to live? Do you have ideas for how we could make it even better? The Terwillegar Community League will be hosting a meeting on October 25 at the Holy Trinity Riverbend Church at 7:30 p.m. to discuss what we have done, what we are doing, and what we plan to do in the future. We will be sharing updates on topics such as finances, programs, fundraising, communications, park initiatives, traffic concerns, crime rates and bylaw revisions. Your comments and concerns will be heard on any issues you feel are relevant to our neighbourhood. Current board members will be available to answer your questions and hear your ideas. We will also be voting in new board members and discussing volunteer opportunities. The Terwillegar Community League is a volunteer organization formed to meet the needs and Above: Four young volunteers at the Toonie interests of our community. Our community is the Carnival in August make a difference and help What`s Inside region within the boundaries of Anthony Henday, raise money for park development. 2 Community 25 Teens Terwillegar Drive, 23 Ave., and Blackmud Creek.
    [Show full text]
  • Recreation and Wellness Directory for Older Adults
    Recreation and Wellness Directory for Older Adults What is the directory? Table of Contents The Recreation and Wellness Directory for List of Contributors 2 Older Adults provides an overview of arts, Program Listings fitness, technology, health and recreational • Computers and Technology 8 activities for adults 55+ in the Edmonton area. • Crafts and Hobbies 15 • Dance 22 With more than 1200 courses, clubs, programs • Drawing and Painting 24 and events listed, the directory is a valuable • Fitness 28 resource for older adults and those who • Games and Sports 38 support older adults. • General Interest 48 The directory is produced by the Edmonton • Health and Wellness 55 Seniors Coordinating Council (ESCC) with • Music, Song and Drama 63 contributions this year from 54 organizations. • Social and Special Events 67 Healthy Aging Info Series 74 At the time of printing the activities Age Friendly Edmonton 76 included in the directory were scheduled, but Reciprocal Program Registration 78 they may change throughout the year and More Opportunities to Get Involved 79 new activities may be added. We encourage you to contact the organizations for details A searchable form of the directory is and availability of the activities. available on our website at www.seniorscouncil.net/programs. What is the ESCC? To order print copies of the directory, The Edmonton Seniors Coordinating Council contact ESCC at 780-423-5635 or works with senior service agencies and other [email protected]. stakeholders in the seniors sector to enhance the lives of Edmonton seniors. Edmonton Seniors Coordinating Council We help organizations collaborate to #255 Bonnie Doon Shopping Centre improve coordination of services for seniors 8330 - 82 Avenue by facilitating sector meetings, planning for Edmonton, AB T6C 4E3 service improvements, coordinating projects and producing resources.
    [Show full text]
  • Terwillegar Drive Update
    Project Background In October 2018, Edmonton’s Urban Planning Committee accepted a motion to advance engagement on the expressway option for Terwillegar Drive. A public information session was hosted in September 2019 to share the recommended concept plan. The plan included three stages of upgrades to accommodate all users safely and efficiently, and support planned rapid bus transit services between the future site of the Ambleside Park n’ Ride and South Campus LRT Station: ● Stage 1: ○ Widening Terwillegar Drive to four lanes in each direction between Anthony Henday Drive and Whitemud Drive (three lanes for motor vehicles and one ​segregated*​ lane for transit), intersection upgrades, enhanced bus stops, and a shared-use path on the east side of the corridor. ● Stage 2: ○ Whitemud Drive/Terwillegar Drive interchange improvements and rehabilitation/widening of the Rainbow Valley Bridges ○ Pedestrian/cyclist bridge over Whitemud Drive at 142 Street ● Stage 3: ○ Anthony Henday Drive interchange upgrades More information, including what was shared at the event, can be found at edmonton.ca/terwillegardrivestudy​. What’s New On July 8, 2020, the Government of Alberta announced funding for upgrading Terwillegar Drive. The investment provides construction funding towards the south portion of Stage 1, from Anthony Henday Drive to Rabbit Hill Road, the shared-use path on the east side of Terwillegar Drive, the pedestrian/cyclist bridge and Stage 3. The City is continuing to advance planning and design of Stages 1 and 2 and is currently conducting a technical study to further refine the concept plans for Stage 2. The study includes planning for transit priority measures (e.g., bus lanes, transit stops, etc.) to connect the planned rapid bus transit services to South Campus LRT Station.
    [Show full text]
  • Physical Activity and Recreation Directory for Older Adults
    Physical Activity and Recreation Directory for Older Adults What is the directory? Table of Contents The Physical Activity and Recreation Directory List of Contributors 2 for Older Adults is a listing of recreational and Program Listings wellness opportunities for adults 55+ in the • Computers and Electronics 6 Edmonton area. • Crafts and Hobbies 12 • Dance 18 With over 1000 program listings covering • Drawing and Painting 20 fitness, arts, educational, health and • Educational 23 recreational activities, the directory is an • Fitness 31 invaluable resource for seniors and service • Games 39 providers. • Health and Wellness 44 • Music, Song and Drama 50 The directory is produced by the Edmonton • Social Events 54 Seniors Coordinating Council (ESCC) and • Special Events 57 provides an overview of the activities offered • Sports 61 by many organizations in the Edmonton area. Announcements 63 Consult these organizations directly for more Other Opportunities to Get Involved 64 details. What is the ESCC? Edmonton Seniors Coordinating Council The Edmonton Seniors Coordinating Council #255 Bonnie Doon Shopping Centre (ESCC) takes the lead in bringing stakeholders 8330 - 82 Avenue together to plan for improvements to services Edmonton AB T6C 4E3 for seniors. We facilitate and support 780-423-5635 collaboration, coordination, and resource sharing among senior-serving organizations in www.seniorscouncil.net Edmonton to enhance the capacity of Twitter: @ESCC255 organizations to provide effective, accessible Facebook: www.facebook.com/Edmonton services to meet the diverse needs of seniors. SeniorsCoordinatingCouncil We are the communication hub for the senior sector through our newsletters, A searchable form of the directory is website, reports and publications such as the available on our website at Physical Activity and Recreation Directory for www.seniorscouncil.net/programs.
    [Show full text]
  • CR 8462 Terwillegar Drive
    . Terwillegar Drive Expressway Upgrades Capital Profile Amendment Recommendation That Executive Committee recommend to City Council: That amended Capital Profile 19-22-9006 Terwillegar Drive Expressway Upgrades - Alternate Staging, as set out in Attachment 2 of the November 9, 2020, Integrated Infrastructure Services report CR_8462, be approved. Executive Summary This report requests approval of amendments to Capital Profile 19-22-9006 Terwillegar Drive Expressway Upgrades - Alternate Staging. Administration has been completing planning and design work in support of Terwillegar Drive expressway improvements over the past several years. In July 2020, the Government of Alberta committed funds for the completion of additional work toward the expansion of Terwillegar Drive. The additional scope captured in the amended capital profile is to be fully funded by the Province of Alberta. Report In December 2019, as part of the Fall 2019 Supplemental Capital Budget Adjustment (SCBA), funding was approved for the Terwillegar Drive Alternative Staging Plan, bringing the project budget to a total of $104 million for the following scope of work: ● planning, design and delivery for the widening of Terwillegar Drive to four lanes in each direction between Rabbit Hill Road and 40 Avenue (three lanes for motor vehicles and one lane for transit); ● planning, design and delivery of the widening and rehabilitation of the Rainbow Valley Bridges, including transit priority measures; ● planning, design and delivery of upgrades to the Whitemud Drive and Terwillegar Drive interchange; and ● planning and design of the 142 Street pedestrian/cyclist bridge. In July 2020, the Government of Alberta announced a commitment of up to $116.5 million towards further improvements to Terwillegar Drive.
    [Show full text]