Physical Activity and Recreation Directory for Older Adults

Total Page:16

File Type:pdf, Size:1020Kb

Physical Activity and Recreation Directory for Older Adults Physical Activity and Recreation Directory for Older Adults What is the directory? Table of Contents The Physical Activity and Recreation Directory List of Contributors 2 for Older Adults is a listing of recreational and Program Listings wellness opportunities for adults 55+ in the • Computers and Electronics 6 Edmonton area. • Crafts and Hobbies 12 • Dance 18 With over 1000 program listings covering • Drawing and Painting 20 fitness, arts, educational, health and • Educational 23 recreational activities, the directory is an • Fitness 31 invaluable resource for seniors and service • Games 39 providers. • Health and Wellness 44 • Music, Song and Drama 50 The directory is produced by the Edmonton • Social Events 54 Seniors Coordinating Council (ESCC) and • Special Events 57 provides an overview of the activities offered • Sports 61 by many organizations in the Edmonton area. Announcements 63 Consult these organizations directly for more Other Opportunities to Get Involved 64 details. What is the ESCC? Edmonton Seniors Coordinating Council The Edmonton Seniors Coordinating Council #255 Bonnie Doon Shopping Centre (ESCC) takes the lead in bringing stakeholders 8330 - 82 Avenue together to plan for improvements to services Edmonton AB T6C 4E3 for seniors. We facilitate and support 780-423-5635 collaboration, coordination, and resource sharing among senior-serving organizations in www.seniorscouncil.net Edmonton to enhance the capacity of Twitter: @ESCC255 organizations to provide effective, accessible Facebook: www.facebook.com/Edmonton services to meet the diverse needs of seniors. SeniorsCoordinatingCouncil We are the communication hub for the senior sector through our newsletters, A searchable form of the directory is website, reports and publications such as the available on our website at Physical Activity and Recreation Directory for www.seniorscouncil.net/programs. Older Adults and the Seniors Scene published monthly in the Edmonton Examiner. Physical Activity and Recreation Directory for Older Adults 1 Contributors by Area of Edmonton 50 St THE CITY OF 17 St NE EDMONTON 227 Ave 195 Ave 195 Ave ) 97 St 66 St NORTHEAST 127 St Meridian St (1 ST 167 Ave 167 Ave 167 Ave 50 St 82 St 153 Ave 153 Ave St Albert 137 Ave 137 Ave NE 137 Ave 156 St T rai l 66 St 17 St NE 199 St 97 St 149 St 184 St 170 St 127 St 127 Ave Yellowhead Trail 50 St Trail 82 St 118 Ave Yellowhead 118 Ave 142 St NORTHWEST 111 Ave 97 St 107 Ave 109 St 101 St 124 St 199 St 156 St CENTRAL Stony Plain Road Jasper Ave 100 Ave 98 Ave Anthony Henday Driv n Road 149 St 50 St 75 St 170 St 178 St 87 Ave Winterbur Whyte Ave (82 Ave) 99 St 104 St e Whitemud Drive 114 St l Rd yl 109 St rg A 34 St 63 Ave Gateway Blvd 50 St 51 Ave Whitemud Drive 45 Ave Whitemud Drive SOUTHEAST e iv Dr 119 St 34 Ave 34 Ave 34 Ave willegar Ter 23 Ave 23 Ave Gateway Blvd ) 199 St 50 St rail SOUTHWEST 17 St 34 St Calgary T Meridian St (1 ST Ellerslie Rd (9 Ave) Ellerslie Rd (9 Ave) 111 St rail T y Calgar 91 St 50 St 17 St Gateway Blvd 41 Ave CENTRAL: River to 111 Avenue, between 82 and 124 Street NORTHEAST: North of the river, east of 97 Street, excluding Central NORTHWEST: North of the river, west of 97 Street, excluding Central SOUTHEAST: South of the river, east of Gateway Boulevard SOUTHWEST: South of the river, west of Gateway Boulevard 2 Contributors by Area of Edmonton Central Alzheimer Society of Alberta Edmonton Seniors Centre Minerva Senior Studies Institute 10531 Kingsway Avenue 3Y, 11111 Jasper Avenue 628, 10050 MacDonald Drive 780-488-2266 780-342-8625 MacEwan University Alberta www.alzheimer.ab.ca www.edmontonseniorscentre.ca College Campus 780-497-5082 Canadian Hard of Hearing Edmonton Oliver Primary Care www.macewan.ca/minerva Association – Edmonton Branch Network 10, 9912 106 Street 10155 120 Street River Valley Programs 780-428-6622 780-701-5393 Edmonton River Valley www.chha-ed.com www.edmontonoliverpcn.com 311 www.edmonton.ca/rivervalley Central Lions Seniors Association Jewish Senior Citizens’ Centre programs (CLSA) @ Central Lions Seniors (Jewish Drop-In Centre) Recreation Centre 10052 117 Street Seniors Association of Greater 11113 113 Street 780-488-4241 Edmonton (Sage) 780-496-7369 www.jdic.ca 15 Sir Winston Churchill Square www.clsaedmonton.ca 780-701-9016 Ji Hong Wu Shu & Tai Chi College www.mysage.ca Don Wheaton YMCA (Downtown) 10211 102 Avenue 11203 105 Avenue The Arthritis Society 780-452-9622 780-424-8924 307, 10109 106 Street www.edmonton.ymca.ca www.jihongtaichi.com 780-424-1740 www.arthritis.ca Northeast North Edmonton Seniors Forest Terrace Heights Highlands Lawn Bowling Club Association (NESA) @ Northgate Community League 6112 113 Avenue Lions Seniors Recreation Centre 10150 80 Street NW 780-686-9493 7524 139 Avenue www.forestterrace.org www.highlandsbowls.com 780-496-6969 www.nesa1.ca 3 Contributors by Area of Edmonton Northwest Alberta Council on Aging Edmonton Valley Zoo Sons of Norway, Scandinavian 11808 St. Albert Trail 13315 Buena Vista Road Seniors and Edmonton 780-423-7781 311 Scandinavian Centre Association www.acaging.ca www.edmonton.ca/attractions_ 13312 - 142 Street (Dutch events/edmonton-valley-zoo. Canadian Centre) Edmonton West Primary Care aspx 780-628-5005 or 780-434-6532 Network www.sofnedmonton.ca 707 – 155 Street North West Edmonton Seniors 780-443-7477 Society (formerly Calder Seniors Westend Seniors Activity Centre www.edmontonwestpcn.com Drop-In Society) 9629 176 Street 12963 120 Street Edmonton 780-483-1209 780-451-1925 www.westendseniorsactivity www.calderseniors.org centre.com Southeast Alberta Caregivers Association John Walter Museum Multicultural Women and Seniors 10310 56 Street 9180 Walterdale Hill Services Association (MWSSA) 1-877-453-5088 or 780-453-5088 311 329 Woodvale Road W www.albertacaregivers.org www.edmonton.ca/attractions_ 780-465-2992 events/john-walter-museum.aspx www.mwssa.org Family Yoga Centre Ltd. 4740 99 Street Matsui No Kai Club Muttart Conservatory 780-465-4668 6750 - 88 Street (Argyll 9626 96A Street www.familyoga.ca Community League/Edmonton 311 Japanese Community www.edmonton.ca Idylwylde Community League Association) www.edmonton.ca/attractions_ 8631 81 St NW 780-487-7099 events/muttart-conservatory. 780-466-7383 www.ejca.org aspx www.idylwylde.org Mill Woods Seniors Activity Ritchie Bridge Club Ji Hong Wu Shu & Tai Chi College Centre 77 Avenue & 98 Street (Ritchie (South) 7207 28 Ave Community Hall) #219, 9148 - 23 Ave 780-496-2997 780-439-4884 780-424-8924 www.mwsac.ca www.jihongtaichi.com South East Edmonton Seniors Association (SEESA) 9350 82 Street 780-468-1985 www.seesa.ca 4 Contributors by Area of Edmonton Southwest City Arts Centre SCONA Seniors Centre Strathcona Place Senior Centre 10943 84 Avenue 10440 84 Avenue 10831 University Avenue 311 780-433-5377 780-433-5807 www.edmonton.ca/cityarts www.seniorcentre.org South-West Senior’s Outreach Empire Park Community League Society Twin Brooks Community League 4804 107 Street 10832 62 Avenue 1120 113 Street 780-232-0869 780-435-9515 780-989-6541 www.facebook.com/ www.twinbrooks.ca empireparksw South West Edmonton Seniors Association (SWESA) William Lutsky YMCA Heritage Seniors Stop-In Centre 10710 19 Ave (Yellowbird East 1975 111 Street 316 Saddleback Road Community Centre) 780-439-9622 780-437-8759 587-987-3200 www.edmonton.ymca.ca www.swedmontonseniors.ca John Janzen Nature Centre 7000 143 Street 311 www.edmonton.ca/attrac- tions_events/john-janzen-nature- centre.aspx City Wide Alberta Health Services Edmonton Marigold Plus 55 www.albertahealthservices.ca 11113 113 St 780-454-6560 www.alberta55plus.ca Thank you to all our contributors! We rely on contributing organizations to help us keep the directory current and comprehensive. Their dedication to quality senior programming makes this directory possible. To submit your programming information for the next edition of the directory, please contact the Edmonton Seniors Coordinating Council at 780-423-5635 or [email protected]. 5 Computers and Electronics Computers can help us connect, organize, create and have fun! Explore something new with these informative courses. Activity Offered by Contact COMPUTER LITERACY Apple’s Mac Computers: Getting Started Central Lions (CLSA) 780-496-7369 Basic Computer Classes Multicultural Women & Seniors Serv 780-465-2992 Computer (basic to advanced levels) Edmonton Seniors Centre 780-342-8625 Computer Basics Westend Seniors Activity Centre 780-483-1209 Computer Literacy* SCONA Seniors Centre 780-433-5377 Computer Skills and Tutorials (one-on-one) Central Lions (CLSA) 780-496-7369 Computer Skills and Tutorials (one-on-one) Northgate Lions (NESA) 780-496-6969 Computer Tutorials (one-on-one) North West Edmonton Seniors 780-451-1925 Computers for Beginners Mill Woods Seniors Activity Centre 780-496-2997 Computers for Beginners Sage 780-701-9016 Computers: Introduction North West Edmonton Seniors 780-451-1925 Cyber Seniors Edmonton Seniors Centre 780-342-8628 Entry Level One Northgate Lions (NESA) 780-496-6969 Intro to Computers Central Lions (CLSA) 780-496-7369 Where Did All the Buttons Go? Central Lions (CLSA) 780-496-7369 E-READERS & ELECTRONIC RESOURCES E-Book Reader Introduction Edmonton Seniors Centre 780-342-8625 EPL E-Books: On the iPad & Tablets Central Lions (CLSA) 780-496-7369 EPL E-Readers: All About Kobo & Sony Central Lions (CLSA) 780-496-7369 EPL Hidden Gems: Electronic Databases at the Library Central Lions (CLSA) 780-496-7369 6 * Offered evenings and/or weekends Computers and Electronics EPL Travel Resources Central Lions (CLSA) 780-496-7369 E-Reader
Recommended publications
  • 170 Street Planning Study (Ellerslie Rd- 41 Ave
    170th Street Concept Planning Public Information Session (Ellerslie Rd to 41 Street SW) Responses to Stakeholder Comments www.edmonton.ca/roadplans November 2010 Public Involvement Introduction The following is a summary of the written questions and comments received after the June 22, 2010 Public Open House covering Ellerslie Road to 41 Avenue SW. Where possible, the project team has included a response for clarification. Philosophy Why does this proposal create a free flow facility through the Windermere community to serve what we must assume are non-residents of the community? 170 Street has been identified by the City of Edmonton and Alberta Transportation as a “Highway Penetrator” since the 1990’s. Both parties have since prepared plans for the 170 Street corridor based on that understanding. Although 170 Street will provide regional connections to the south, the infrastructure proposed for this corridor serves mostly City residents. Immediately north of Ellerslie Road, approximately 85% of the northbound traffic in the AM Peak hour and 60% of the southbound traffic in the PM Peak hour is development traffic accessing one of the three crossing arterials (Ellerslie Road, 25 Avenue SW, or 41 Avenue SW). The remainder of the traffic is regional traffic. Will land access to the Windermere ASP area be sacrificed for free flow movements in and out of Edmonton? Land access is not being sacrificed. Within the south study area, no accesses proposed by the Windermere Area Structure Plan Traffic Impact Assessment have been removed. The only change in access occurs at the four collector accesses that have become right-in/right-out intersections onto the one-way frontage roads.
    [Show full text]
  • City of Edmonton Speed Zones Bylaw Bylaw No. 6894
    CITY OF EDMONTON SPEED ZONES BYLAW BYLAW NO. 6894 (CONSOLIDATED NOVEMBER 26, 2019) OFFICE OF THE CITY CLERK CONSOLIDATION BYLAW NO. 6894 A Bylaw to Establish Certain Speed Zones in the City of Edmonton Whereas pursuant to: Section 14 of the Traffic Safety Act, RSA 2000, c T-6, Council may prescribe speed limits for lanes and other thoroughfares used by vehicles on privately owned property within the City to which vehicles driven by members of the public generally have access; Section 108 of the Traffic Safety Act, Council may prescribe a maximum speed limit for a highway or any portion of a highway under the direction, control, and management of the City that is greater or lower than 50km/h; Section 108 of the Traffic Safety Act, a road authority may prescribe a lower maximum speed limit by erecting signs along a highway; Section 108 of the Traffic Safety Act, a person authorized by a road authority may prescribe a maximum speed limit for highways under construction, repair, or in a state of disrepair by erecting signs along a highway; Sections 107 and 108 of the Traffic Safety Act, Council may prescribe maximum speed limits for school zones located on highways under the direction, control, and management of the City and may vary the prescribed periods of time during which the speed limit is in effect for school zones; Section 107 of the Traffic Safety Act, if Council varies the prescribed periods of time during which the speed limit is in effect for school zones, it must cause traffic control devices to be displayed identifying the hours
    [Show full text]
  • 2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan
    2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan August 12, 2021 2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan Contents 1 Introduction .......................................................................................................................................... 1 2 2021 Regional Transportation Priorities .............................................................................................. 1 2.1 Transit Projects ......................................................................................................................... 1 2.2 Roadway Projects ..................................................................................................................... 2 2.3 Active Transportation Projects .................................................................................................. 2 3 2021 Prioritization Results ................................................................................................................... 2 Appendix A - Project Grouping.................................................................................................................... 12 Appendix B - Project Maps......................................................................................................................... 15 Tables Table 1 - Advance to Planning Priorities ....................................................................................................... 4 Table 2 - Ready for Design Priorities
    [Show full text]
  • Terwillegar Drive Expressway Draft Concept Plan
    Terwillegar Drive Expressway Draft Concept Plan advise Anthony Henday Drive to Whitemud Drive November 28 5:00 - 8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Learn more by going to: edmonton.ca/terwillegardrivestudy Let’s Talk advise Today you can: Learn about the new direction for Terwillegar Drive View and ask questions about the draft concept plan Provide feedback on proposed plans for transit, pedestrians and cyclists, and landscape naturalization of the corridor Learn more by going to: edmonton.ca/terwillegardrivestudy Project Overview advise Study Purpose: To validate and update the plan for the future of Terwillegar Drive from Anthony Henday Drive to Whitemud Drive Need: Terwillegar Drive is an important roadway for the movement of goods and services, transit and commuters. It is an important connector to 170 Street (Terwillegar Drive south extension) south of Anthony Henday Drive, which is planned to be a freeway to Leduc. Corridor is congested during peak hours. Goals: Alleviate congestion Provide for efficient, safe movement of all users, locally and regionally Learn more by going to: edmonton.ca/terwillegardrivestudy Project Timeline Where we are today advise strategy concept design build operate Late Spring 2019 October 2, 2018 Phase 3 Public February 27, 2018 Presentation to Urban Planning December 2018 Information Sessions Motion from City Council Committee of both freeway Budget decision for - report back and Fall 2017 resulting in development and expressway options. funding Terwillegar Drive share recommended Study start of additional options. Direction to advance expressway. Stage 1 concept plan. November 2017 - Spring 2018 - January - 2019/2020 February 2018 Fall 2018 November - May 2019 Engineering design (if Public Engagement Draft Further development December 2018 Develop funding is approved) Freeway Options of the freeway plan Phase 2 Public Engagement - recommended and introduction of report back on study progress concept plan.
    [Show full text]
  • Recreation and Wellness Directory for Older Adults
    Recreation and Wellness Directory for Older Adults Overview of the Directory Table of Contents The Recreation and Wellness Directory for List of Contributing Organizations 2 Older Adults outlines arts, fitness, technology, Program Listings health and recreational activities for adults • Computers and Technology 8 55+ in the Edmonton area. • Crafts and Hobbies 15 • Dance 22 With more than 1400 group programs, clubs, • Drawing and Painting 26 courses, and events listed, the directory is a • Fitness 31 valuable resource for older adults and those • Games and Sports 41 who support older adults. • General Interest 49 The directory is produced by the Edmonton • Health and Wellness 59 Seniors Coordinating Council (ESCC) with • Music, Song and Drama 66 contributions this year from 53 organizations. • Social and Special Events 70 Provide feedback on the directory 78 At the time of printing, the activities Seniors’ Centre Without Walls 79 included in the directory were scheduled, Connecting Edmonton Seniors 79 but they may change throughout the year Reciprocal Program Registration 80 and new activities may be added. We encourage you to contact the organizations A searchable form of the directory is for details and availability of the activities. available on our website at www.seniorscouncil.net/programs. Edmonton Seniors Coordinating Council To order print copies of the directory, The Edmonton Seniors Coordinating Council contact ESCC at 780-423-5635 or works with senior service agencies and other [email protected]. stakeholders in the seniors sector to enhance the lives of Edmonton seniors. Contact ESCC We help organizations collaborate to #255 Bonnie Doon Shopping Centre improve coordination of services for seniors 8330 82 Avenue by facilitating sector meetings, planning for Edmonton, AB T6C 4E3 service improvements, coordinating projects and producing resources.
    [Show full text]
  • What We Heard Report: Terwillegar Drive Expressway Draft Concept Plan
    What We Heard Report: Terwillegar Drive Expressway Draft Concept Plan October to December 2018 Public Engagement Summary: January 2019 What We Heard Report: Terwillegar Drive Expressway Draft Concept Plan Project Overview The City is currently developing a plan to upgrade Terwillegar Drive, between Anthony Henday Drive and Whitemud Drive, to an expressway. An expressway is a high-capacity roadway which includes widely spaced signalized intersections. The Terwillegar Drive expressway will include up to four travel lanes in each direction, increased capacity at all intersections and the Whitemud Drive/Terwillegar Drive interchange, the potential for dedicated transit lanes and bus stops, and a shared-use path on the east side of the roadway. This is the second phase of engagement for the current Terwillegar Drive Study. Phase one was completed in early 2018 and presented freeway options for Terwillegar Drive. After analyzing the public and technical needs, an alternative solution to the freeway, an expressway, was developed. In October 2018, the City’s Urban Planning Committee unanimously accepted a motion to advance on the expressway option. For detailed information about the study and to view the draft concept plan visit: edmonton.ca/terwillegardrivestudy 2 What We Heard Report: Terwillegar Drive Expressway Draft Concept Plan Public Engagement Process This phase of public engagement was designed to gather feedback and perspectives on the Terwillegar Drive expressway draft concept plan, including the following elements of the design: + Shared-use path: location and connections + Transit accommodation: dedicated + 142 Street pedestrian/cyclist bridge: transit lanes and bus stops bridge styles + Naturalized landscaping: locations Between October and December 2018 engagement activities were conducted with property owners, community leagues and the public.
    [Show full text]
  • Terwillegar Drive Improvements
    Integrated Infrastructure Services Infrastructure Planning and Design Terwillegar Drive Improvements Urban Planning Committee October 2, 2018 Integrated Infrastructure Services | CR_5730 Council Approved Motion That Administration: 1. Suspend any public engagement activities regarding the ultimate long term Terwillegar Drive/Whitemud Drive interchange and any roadway modifications that may limit access in the interim. 2. Optimize the concept plan for the Terwillegar corridor between Whitemud Drive and Anthony Henday Drive, including provision for opportunities of mass transit and active transportation. 3. Advance the Preliminary Design for Terwillegar Drive/40 Avenue interchange. 4. Advance the Preliminary Design for an optimized Stage 2 of the Whitemud Drive/Terwillegar Drive interchange, with consideration for reduced design parameters (i.e. design speeds) with the intent of reducing overall complexity and cost. 5. Continue to advance preliminary design on the basis of a number of $75-100M packages in support of staged completion of the Terwillegar corridor, including full access for Rabbit Hill Road, 23 Avenue, and Haddow Drive. 6. Present a list of potential shared funding opportunities with the provincial and federal government that take advantage of infrastructure and innovation funding. 7. and bring back a report to Council in third Quarter 2018 summarizing progress on the aforementioned design elements. © City of Edmonton 2 | Integrated Infrastructure Services | Infrastructure Planning and Design | CR_5730 Terwillegar Drive Improvements
    [Show full text]
  • Community Meeting to Bring Neighbours Together
    Art in Our Park September 15! P a g e 1 6 Three amazing fundraisers by kids Page07 Back to School in Terwillegar Page23 Seniors Connect in Southwest Page 26 www.terwillegar.org Issue 43 September 2012 Terwillegar Tribune Community Meeting to Bring Neighbours Together Are you interested in learning what your community league can do for you? Do you want to meet the people who are volunteering to make our community a great place to live? Do you have ideas for how we could make it even better? The Terwillegar Community League will be hosting a meeting on October 25 at the Holy Trinity Riverbend Church at 7:30 p.m. to discuss what we have done, what we are doing, and what we plan to do in the future. We will be sharing updates on topics such as finances, programs, fundraising, communications, park initiatives, traffic concerns, crime rates and bylaw revisions. Your comments and concerns will be heard on any issues you feel are relevant to our neighbourhood. Current board members will be available to answer your questions and hear your ideas. We will also be voting in new board members and discussing volunteer opportunities. The Terwillegar Community League is a volunteer organization formed to meet the needs and Above: Four young volunteers at the Toonie interests of our community. Our community is the Carnival in August make a difference and help What`s Inside region within the boundaries of Anthony Henday, raise money for park development. 2 Community 25 Teens Terwillegar Drive, 23 Ave., and Blackmud Creek.
    [Show full text]
  • Recreation and Wellness Directory for Older Adults
    Recreation and Wellness Directory for Older Adults What is the directory? Table of Contents The Recreation and Wellness Directory for List of Contributors 2 Older Adults provides an overview of arts, Program Listings fitness, technology, health and recreational • Computers and Technology 8 activities for adults 55+ in the Edmonton area. • Crafts and Hobbies 15 • Dance 22 With more than 1200 courses, clubs, programs • Drawing and Painting 24 and events listed, the directory is a valuable • Fitness 28 resource for older adults and those who • Games and Sports 38 support older adults. • General Interest 48 The directory is produced by the Edmonton • Health and Wellness 55 Seniors Coordinating Council (ESCC) with • Music, Song and Drama 63 contributions this year from 54 organizations. • Social and Special Events 67 Healthy Aging Info Series 74 At the time of printing the activities Age Friendly Edmonton 76 included in the directory were scheduled, but Reciprocal Program Registration 78 they may change throughout the year and More Opportunities to Get Involved 79 new activities may be added. We encourage you to contact the organizations for details A searchable form of the directory is and availability of the activities. available on our website at www.seniorscouncil.net/programs. What is the ESCC? To order print copies of the directory, The Edmonton Seniors Coordinating Council contact ESCC at 780-423-5635 or works with senior service agencies and other [email protected]. stakeholders in the seniors sector to enhance the lives of Edmonton seniors. Edmonton Seniors Coordinating Council We help organizations collaborate to #255 Bonnie Doon Shopping Centre improve coordination of services for seniors 8330 - 82 Avenue by facilitating sector meetings, planning for Edmonton, AB T6C 4E3 service improvements, coordinating projects and producing resources.
    [Show full text]
  • Terwillegar Drive Update
    Project Background In October 2018, Edmonton’s Urban Planning Committee accepted a motion to advance engagement on the expressway option for Terwillegar Drive. A public information session was hosted in September 2019 to share the recommended concept plan. The plan included three stages of upgrades to accommodate all users safely and efficiently, and support planned rapid bus transit services between the future site of the Ambleside Park n’ Ride and South Campus LRT Station: ● Stage 1: ○ Widening Terwillegar Drive to four lanes in each direction between Anthony Henday Drive and Whitemud Drive (three lanes for motor vehicles and one ​segregated*​ lane for transit), intersection upgrades, enhanced bus stops, and a shared-use path on the east side of the corridor. ● Stage 2: ○ Whitemud Drive/Terwillegar Drive interchange improvements and rehabilitation/widening of the Rainbow Valley Bridges ○ Pedestrian/cyclist bridge over Whitemud Drive at 142 Street ● Stage 3: ○ Anthony Henday Drive interchange upgrades More information, including what was shared at the event, can be found at edmonton.ca/terwillegardrivestudy​. What’s New On July 8, 2020, the Government of Alberta announced funding for upgrading Terwillegar Drive. The investment provides construction funding towards the south portion of Stage 1, from Anthony Henday Drive to Rabbit Hill Road, the shared-use path on the east side of Terwillegar Drive, the pedestrian/cyclist bridge and Stage 3. The City is continuing to advance planning and design of Stages 1 and 2 and is currently conducting a technical study to further refine the concept plans for Stage 2. The study includes planning for transit priority measures (e.g., bus lanes, transit stops, etc.) to connect the planned rapid bus transit services to South Campus LRT Station.
    [Show full text]
  • CR 8462 Terwillegar Drive
    . Terwillegar Drive Expressway Upgrades Capital Profile Amendment Recommendation That Executive Committee recommend to City Council: That amended Capital Profile 19-22-9006 Terwillegar Drive Expressway Upgrades - Alternate Staging, as set out in Attachment 2 of the November 9, 2020, Integrated Infrastructure Services report CR_8462, be approved. Executive Summary This report requests approval of amendments to Capital Profile 19-22-9006 Terwillegar Drive Expressway Upgrades - Alternate Staging. Administration has been completing planning and design work in support of Terwillegar Drive expressway improvements over the past several years. In July 2020, the Government of Alberta committed funds for the completion of additional work toward the expansion of Terwillegar Drive. The additional scope captured in the amended capital profile is to be fully funded by the Province of Alberta. Report In December 2019, as part of the Fall 2019 Supplemental Capital Budget Adjustment (SCBA), funding was approved for the Terwillegar Drive Alternative Staging Plan, bringing the project budget to a total of $104 million for the following scope of work: ● planning, design and delivery for the widening of Terwillegar Drive to four lanes in each direction between Rabbit Hill Road and 40 Avenue (three lanes for motor vehicles and one lane for transit); ● planning, design and delivery of the widening and rehabilitation of the Rainbow Valley Bridges, including transit priority measures; ● planning, design and delivery of upgrades to the Whitemud Drive and Terwillegar Drive interchange; and ● planning and design of the 142 Street pedestrian/cyclist bridge. In July 2020, the Government of Alberta announced a commitment of up to $116.5 million towards further improvements to Terwillegar Drive.
    [Show full text]
  • Attachment 1 Terwillegar Drive Project History the Intent of This
    Attachment 1 Terwillegar Drive Project History The intent of this attachment is to provide a short summary of the history of the Terwillegar Drive project, including a list of the studies Admininstration has conducted and recommendations from them. Terwillegar Drive is currently configured as a major arterial roadway with traffic signals at major intersections, including Haddow Drive, 23 Avenue, Rabbit Hill Road and 40 Avenue. Terwillegar Drive, as it currently exists, was constructed starting in the 1980’s. In the 1980s, it was the intent of the planners of the time that Terwillegar Drive would ultimately be converted to a freeway, and since this time policy has been developed around upgrading Terwillegar Drive to a freeway. To allow for the conversion of Terwillegar Drive to a freeway, the intersections at 23 Avenue, Rabbit Hill Road and 40 Avenue were built along the ultimate interchange ramps and space in the middle was protected to construct the ultimate interchanges. Haddow Drive was built at a later date and has not been constructed to allow for an interchange to be constructed. Administration has conducted four planning studies for Terwillegar Drive to define the scope (design), develop cost estimates and explore project scheduling and construction staging. These studies were conducted in 2001, 2007, 2012 and 2014. The most comprehensive study was conducted in 2001, which resulted in recommendations for the corridor from 23 Avenue to Whitemud Drive. Updates to the plan occured in 2007. The 2012 study provided recommendations for the Terwillegar corridor from Anthony Henday Drive to 23 Avenue. Additional updates to the plan were conducted in the 2012 study.
    [Show full text]