Proposed New Julau 33Kv Substation Level 2, Menara Sarawak Energy, (2° 1'46.61"N, 111°54'42.38"E) No

Total Page:16

File Type:pdf, Size:1020Kb

Proposed New Julau 33Kv Substation Level 2, Menara Sarawak Energy, (2° 1'46.61 THE SUPPLY AND INSTALLATION OF RES LAST MILES PHASE 2 AT JULAU, SARIKEI UNDER RURAL ELECTRIFICATION PROJECT (PARTIAL TURNKEY) (TENDER REF. NO.: RE/39/2019) TENDER NOTICE Suitably qualified tenderers are invited for The Supply and Installation of RES Last Miles Phase 2 at Julau, Sarikei Under Rural Electrification Project (Tender Ref. No.: RE/39/2019) stated as follows: Tender Reference No. Title Eligibility RE/39/2019 The Supply and Installation of RES Last Miles UPK Registered Tenderers Class II or above Phase 2 at Julau, Sarikei Under Rural Head VIIB (Electrical Works): Electrification Project (Partial Turnkey) Sub-Head 2b or above & Sub-Head 3b or above CIDB Grade G7, Category ME (E04 & E05) General Instructions 1. This tender exercise will be conducted on an online Ariba platform. The entire event will be managed by SEPRO (Sarawak Energy e-Procurement) Team. Tender details are available for viewing at http://www2.sesco.com.my 2. Please note that all Tenderers are required to register in SEPRO to participate in this tender. If your company is not registered in SEPRO, please allow ample time to complete registration. Vendors can self-register to SEPRO via the URL provided: http://bit.ly/register2SEPRO. The registration is free of charge. 3. Interested Tenderer that meets the eligibility is required to do the following steps: A) Email your interest to participate for this tender exercise to [email protected]. Please include the following details: • Tender Reference: • Tender Title: • Company Contact Person: • Company Name: • Phone Number: • Email Address: • (Attach all softcopy of evidence for mandatory requirement) 4. Tenderers shall attend the briefing and site visit held as follows. Tender Briefing Site Visit Date and Time 4 October 2019, 2.30pm 9 & 10 October 2019, 9am Venue Auditorium, Proposed New Julau 33kV Substation Level 2, Menara Sarawak Energy, (2° 1'46.61"N, 111°54'42.38"E) No. 1, The Isthmus, Kuching, Sarawak. (Tenderer are advised to contact the contact person 3 days before this site visit to confirm the date, time and meeting point.) ONLY shareholders, directors or Company's authorized personnel (thru company's authorization letter) shall be allowed to attend the Tender briefing and Site Visit (if necessary). All tenderers must bring along Original Copies (for verification) of Company Registration (Form 24 and Form 49) or Form I (The Businesses, Professions and Trading Licensing Ordinance) and Company Official Stamp during the Tender Briefing. 5. Tender documents can only be accessible to the Tenderer after registration. A) SEPRO team will acknowledge receipt upon receiving your email on interest to participate. If you have any inquiries on SEPRO please contact us at the following channel: • Email: [email protected] • Phone: 082-330127 Monday to Thursday : 9.00am – 1.00pm and 2.00pm – 4.00pm Friday : 9.00am – 11.30am and 2.30pm – 4.00pm Note: Sarawak Energy (RES) Sdn. Bhd. is not liable for any cost incurred by the Tenderer in preparing the tenders. Tender submission shall be submitted online through SEPRO system no later than 3:00 p.m. (Malaysia Local Time) on the date specified below. Tender Reference Number Closing Date Closing Time RE/39/2019 Wednesday, 6 November 2019 3pm All enquiries regarding the Tender should be addressed to: Rural Electrification Sarawak Energy (RES) Sdn. Bhd., Level 2, Menara Sarawak Energy, No.1, The Isthmus, 93050 Kuching, Sarawak. Attention: Senior Electrical Engineer (Rural Electrification Scheme) Tel. No.: +6 082 – 388 388 (ext 8781) Fax No.: +6 082 – 342 493 Email: [email protected] INTRODUCTION 1. PURPOSE The purpose of this tender process is to procure Tender Offers from suitably-qualified and experienced contractors to undertake all Works required to be performed in connection with the Employer's RES Last Miles Phase 2 at Julau, Sarikei, Sarawak under Rural Electrification Project. Sarawak Energy (RES) Sdn. Bhd. (the "Employer"), invites suitably qualified and experienced contractors to participate in this invitation to tender process and submit its Tender Offer to undertake the Works required to be performed in connection with RES Last Miles Phase 2 at Julau, Sarikei, Sarawak under Rural Electrification Project. 2. BACKGROUND Sarawak Energy (RES) Sdn. Bhd. which is wholly-owned by the State Government of Sarawak, is responsible for the generation, transmission and distribution of electricity to industrial and residential customers within Sarawak. 3. THE PROJECT Sarawak’s Rural Electrification Masterplan identifies the villages in rural areas that need to be electrified as the State moves to achieve full electrification coverage by 2025. It identifies those villages and rural households that can be connected to the state electricity grid and those that require off-grid alternative schemes of supply. The Project consists of four (4) major developments which are the construction of Substations, construction of Covered Conductor Overhead Lines, Last Miles or grid extension to villages and Off-grid schemes. 4. THE WORKS RES Last Mile Phase 2 project covers the supply, delivery, installation, testing and commissioning of overhead line, aerial cable, submarine cable and substation equipment throughout Sarawak. For Turnkey tender, all materials except for covered conductor materials, shall be supplied by Contractor. For Partial Turnkey tender, major materials such as pole, covered conductor, overhead conductor, Aerial Bundled Cable (ABC), underground cable, submarine cable, transformer, Auto- Recloser (AR) and Voltage Regulator (VR) shall be supplied by the Employer. The scope of Works shall include all associated project management, administration and compliance work required to be performed in accordance with the matters set out in the Tender Documents to ensure the Contractor’s strict adherence to the Employer's requirements for the Works. Based upon the current Project schedule, the Commencement Date of the Works is scheduled to be on or around Quarter 4 of year 2019, with scheduled completion of the Works being Quarter 4 of year 2020. 5. COMMERCIAL BASIS FOR TENDER OFFERS Tender Offers shall be submitted in accordance with the requirements set out in the Tender Documents. The Conditions of Contract are based upon the Employer’s standard terms and supported by Contract Appendices that collectively set out and describe the Employer’s requirements for the Works. The quotation shall be in the form of Bills of Quantities with estimated quantities of work and Tenderer shall quote for the unit rates on each item. The Employer’s base rate (benchmark cost) consisting of the material cost & its installation service contract cost is indicated in the Form of Tender to act as a reference for the Tenderer to quote to own rate. DESCRIPTION / SPECIFICATIONS 1. SCOPE OF WORK This specification covers all works associated with the following construction/installation, testing and commissioning of: - a) HT and LT overhead lines, aerial cables, HT spacer cables / covered conductor on steel, belian or concrete poles, the running out of conductors, bonding wire, sagging and binding in and the erection of stays, lightning arrestors, switches, earthing, installation of normal service lines, twin-twisted PVC or XLPE services cum mains wiring; b) Underground cables laying for LV and HV cables including trenching, sand filling, bricks and concrete slab laying, storm drain crossing, reinstatement, cable markers installation and indicator warning tape installation, trenching of man hole of cable joint but excluding paved road remaking and cable jointing; inclusive of termination on circuit breaker and poles from Substation to first pole; c) Submarine cable laying including bakau piling, cable anchoring, trenching, laying, backfilling complete with cable protection; d) Underground, submarine, aerial cable and HT spacer cables/covered conductor jointing/termination; e) Pillar, switchgear, transformer, auto recloser, voltage regulator and substation accessories installation on plinths/platforms/poles, concrete walkway including their civil works; f) Preliminary and administrative works such as project signboard, CIDB levy, insurances, performance bond, reports, drawings and worker vest; and any other apparatus or equipment as may be specified elsewhere in this Contract. For Turnkey tender, all materials except for covered conductor materials, shall be supplied by Contractor, as stated in Part 6 – Materials. For Partial Turnkey tender, major materials such as pole, covered conductor, overhead conductor, Aerial Bundled Cable (ABC), underground cable, submarine cable, transformer, Auto-Recloser (AR) and Voltage Regulator (VR) shall be supplied by the Employer, as stated in Part 6 – Materials. 2. COVERAGE AREAS UNDER THIS CONTRACT This tender covers areas under Julau, Sarikei. Villages under each areas or clusters are as follows: - 2.1 Cluster 1 – Julau (23 villages) No. Village Name District Area Households Rh Ngelambai anak Meringing (Rh 1 Mujuk Julau 23 Bangom,Ng Kesindu) 2 Rh Gramong, Pasir Putih Julau Julau 23 3 Rh Janting, Nanga Senapak Julau Sayong 3 4 Rh Ading, Nanga Jemak Entabai Julau Sayong 9 5 Rh Unjan, Nanga Langgu Entabai Julau Sayong 27 6 Rh Luyoh, Nanga Tok Lango Entabai Julau Sayong 23 7 Rh Amba, Ng Bulo Julau Ulu Kanowit 14 8 Rh Batik, Ng Mujuk Julau Ulu Kanowit 17 9 Rh Buna, Ng Engkaramoh Julau Ulu Kanowit 5 No. Village Name District Area Households 10 Rh Gani, Wong Bar, Sg Kanowit Julau Ulu Kanowit 29 11 Rh Lani, Ng Engkeramoh Julau Ulu Kanowit 20 12 Rh Lau, Rantau Bar, Sg Kanowit Julau Ulu Kanowit 7 13 Rh Nunying, Ng Bulo Julau Ulu Kanowit 10 14 Rh Sirai, Rantau Jempai, Sg Kanowit Julau Ulu Kanowit 17 Rh Laman, Ng Nunyau (Rh Tambang,Ng 15 Julau Ulu Kanowit 30 Lunyau, Sg Kanowit) 16 Rh Julin, Kerangan Asam Manis Julau Ulu Kanowit 7 17 Rh Awit, Nanga Mujuk Julau Ulu Kanowit 26 18 Rh Guyu, Ng Bulo Julau Ulu Kanowit 16 19 Rh Kelukut, Ng Telesa Julau Mujuk 40 20 Rh Bajau, Rantau Kuyang, Mujuk Julau Mujuk 14 21 Rh Robert, Ng Maong, Mujuk Julau Mujuk 23 22 Rh Tinting, Mujuk Julau Mujuk 23 23 Rh Ringgit, Mujuk Julau Mujuk 5 Total: 411 .
Recommended publications
  • SUPPLY, ERECTION and COMMISSIONING of JULAU 33/11Kv SUBSTATION, SARIKEI
    Volume 1 – Part I, Section 2 – Tender Particulars SUPPLY, ERECTION AND COMMISSIONING OF JULAU 33/11kV SUBSTATION, SARIKEI SARAWAK ENERGY BERHAD TENDER DOCUMENTS – CONTRACT REF. NO.: PLS-188006-E VOLUME 1 PART I – TENDER PROCEDURES SECTION 2 – TENDER PARTICULARS This Section specifies those matters particular to this tender process and should also be read in conjunction with the Instructions to Tenderer set out in Section 3 of Part I of the Tender Documents. Julau 33/11kV Substation Distribution Project Execution (Contract Ref. No. PLS-188006-E) Volume 1 - Part I, Section 2 – Tender Particulars TENDER PARTICULARS No. Clause Reference Description Details 1. Sub-Clause 1.1.4 Closing Date and 3:00 p.m. on 8 May 2019 (Wednesday). and Sub-Clause Time 5.1 [Closing Date and Time] 2. Sub-Clause 1.1.12 Eligibility Tenderers must be registered Contractor with the and Sub-Clause Requirements following: 2.4 [Eligibility to a) Unit Pendaftaran Kontraktor (UPK) Electrical Tender] Works Class II or above, Head VIIB under the following subheads:- - Subhead 4a (Switchgear & Substation No Limit) or - Subhead 4b (Switchgear & Substation up to 33kV) b) CIDB Grade 4 or above Category ME, E04 (Low Voltage Installation) & E05 (High Voltage Installation) The tenderers must also provide details in the tender submission (Volume 2 – Unpriced Commercial, Schedule 8) of successfully completing at least one a) Substation Projects for 33kV or higher voltage switchgears, transformers and ancillaries contract of similar magnitude and complexity; or b) Transformer Uprating up to 33kV or higher voltage; or c) Switchgear Extension up to 33kV or higher voltage 3.
    [Show full text]
  • SARAWAK GOVERNMENT GAZETTE PART II Published by Authority
    For Reference Only T H E SARAWAK GOVERNMENT GAZETTE PART II Published by Authority Vol. LXXI 25th July, 2016 No. 50 Swk. L. N. 204 THE ADMINISTRATIVE AREAS ORDINANCE THE ADMINISTRATIVE AREAS ORDER, 2016 (Made under section 3) In exercise of the powers conferred upon the Majlis Mesyuarat Kerajaan Negeri by section 3 of the Administrative Areas Ordinance [Cap. 34], the following Order has been made: Citation and commencement 1. This Order may be cited as the Administrative Areas Order, 2016, and shall be deemed to have come into force on the 1st day of August, 2015. Administrative Areas 2. Sarawak is divided into the divisions, districts and sub-districts specified and described in the Schedule. Revocation 3. The Administrative Areas Order, 2015 [Swk. L.N. 366/2015] is hereby revokedSarawak. Lawnet For Reference Only 26 SCHEDULE ADMINISTRATIVE AREAS KUCHING DIVISION (1) Kuching Division Area (Area=4,195 km² approximately) Commencing from a point on the coast approximately midway between Sungai Tambir Hulu and Sungai Tambir Haji Untong; thence bearing approximately 260º 00′ distance approximately 5.45 kilometres; thence bearing approximately 180º 00′ distance approximately 1.1 kilometres to the junction of Sungai Tanju and Loba Tanju; thence in southeasterly direction along Loba Tanju to its estuary with Batang Samarahan; thence upstream along mid Batang Samarahan for a distance approximately 5.0 kilometres; thence bearing approximately 180º 00′ distance approximately 1.8 kilometres to the midstream of Loba Batu Belat; thence in westerly direction along midstream of Loba Batu Belat to the mouth of Loba Gong; thence in southwesterly direction along the midstream of Loba Gong to a point on its confluence with Sungai Bayor; thence along the midstream of Sungai Bayor going downstream to a point at its confluence with Sungai Kuap; thence upstream along mid Sungai Kuap to a point at its confluence with Sungai Semengoh; thence upstream following the mid Sungai Semengoh to a point at the midstream of Sungai Semengoh and between the middle of survey peg nos.
    [Show full text]
  • Language Use and Attitudes As Indicators of Subjective Vitality: the Iban of Sarawak, Malaysia
    Vol. 15 (2021), pp. 190–218 http://nflrc.hawaii.edu/ldc http://hdl.handle.net/10125/24973 Revised Version Received: 1 Dec 2020 Language use and attitudes as indicators of subjective vitality: The Iban of Sarawak, Malaysia Su-Hie Ting Universiti Malaysia Sarawak Andyson Tinggang Universiti Malaysia Sarawak Lilly Metom Universiti Teknologi of MARA The study examined the subjective ethnolinguistic vitality of an Iban community in Sarawak, Malaysia based on their language use and attitudes. A survey of 200 respondents in the Song district was conducted. To determine the objective eth- nolinguistic vitality, a structural analysis was performed on their sociolinguistic backgrounds. The results show the Iban language dominates in family, friend- ship, transactions, religious, employment, and education domains. The language use patterns show functional differentiation into the Iban language as the “low language” and Malay as the “high language”. The respondents have positive at- titudes towards the Iban language. The dimensions of language attitudes that are strongly positive are use of the Iban language, Iban identity, and intergenera- tional transmission of the Iban language. The marginally positive dimensions are instrumental use of the Iban language, social status of Iban speakers, and prestige value of the Iban language. Inferential statistical tests show that language atti- tudes are influenced by education level. However, language attitudes and useof the Iban language are not significantly correlated. By viewing language use and attitudes from the perspective of ethnolinguistic vitality, this study has revealed that a numerically dominant group assumed to be safe from language shift has only medium vitality, based on both objective and subjective evaluation.
    [Show full text]
  • A-306 Peat and Organic Soils Challenges in Road
    15TH INTERNATIONAL PEAT CONGRESS 2016 Abstract No: A-306 PEAT AND ORGANIC SOILS CHALLENGES IN ROAD CONSTRUCTION IN SARAWAK: JKR SARAWAK EXPERIENCE Vincent Tang Chok Khing Public Works Department Sarawak *Corresponding author: [email protected] SUMMARY Road construction on peat/organic soils has always posed challenges to Engineers, Contractors and policy-makers, be it a technical, contractual obligation, or cost implication. The success of road construction on soft soils relies on various important factors such as proper planning, analysis, design, construction, control and supervision. For Engineers, the primary boundary conditions are the stability and allowable settlement in terms of serviceability limits both as a function of time. Our current observation reveals that many of the road embankments and culvert foundation failures are associated with geotechnical factors. Majority of these failures are still repeating and quite identical / similar in nature that they are caused by failure to comply with one or a combination of the above factors. This paper presents some of the case histories of the road embankment construction closely related to the geotechnical factors investigated by the Author. Lastly, some simple guidelines on Method of Treatment, Cost and Design Principle to prevent future embankment failures related to geotechnical factors on soft ground are presented. INTRODUCTION Sarawak has approximately 1.7 million ha of tropical peat that covers 13% of the total land area (12.4 million ha.). It is the largest area of peatland in Malaysia. It constitutes nearly 63% of the total peatland of the country. More than 80% of the peats are more than 2.5 m depth.
    [Show full text]
  • The Response of the Indigenous Peoples of Sarawak
    Third WorldQuarterly, Vol21, No 6, pp 977 – 988, 2000 Globalizationand democratization: the responseo ftheindigenous peoples o f Sarawak SABIHAHOSMAN ABSTRACT Globalizationis amulti-layered anddialectical process involving two consequenttendencies— homogenizing and particularizing— at the same time. Thequestion of howand in whatways these contendingforces operatein Sarawakand in Malaysiaas awholeis therefore crucial in aneffort to capture this dynamic.This article examinesthe impactof globalizationon the democra- tization process andother domestic political activities of the indigenouspeoples (IPs)of Sarawak.It shows howthe democratizationprocess canbe anempower- ingone, thus enablingthe actors to managethe effects ofglobalization in their lives. Thecon ict betweenthe IPsandthe state againstthe depletionof the tropical rainforest is manifested in the form of blockadesand unlawful occu- pationof state landby the former as aform of resistance andprotest. Insome situations the federal andstate governmentshave treated this actionas aserious globalissue betweenthe international NGOsandthe Malaysian/Sarawakgovern- ment.In this case globalizationhas affected boththe nation-state andthe IPs in different ways.Globalization has triggered agreater awareness of self-empow- erment anddemocratization among the IPs. These are importantforces in capturingsome aspects of globalizationat the local level. Globalization is amulti-layered anddialectical process involvingboth homoge- nization andparticularization, ie the rise oflocalism in politics, economics,
    [Show full text]
  • Research Public Health Issues P Oce 0 Aworkshop Zhe1din Ottawa, Canada, 31 May -2 June 1982 Editors: F
    ARCHIV DRC-207e AHLUWA 54172 casE?vatoxicity thyroid: research public health issues p oce 0 aworkshop Zhe1din Ottawa, Canada, 31 May -2 June 1982 Editors: F. Delange and R. Ahiuwalia The International Development Research Centre is a public corporation created by the Parliament of Canada in 1970 to support research designed to adapt science and technology to the needs of developing countries. The Centre's activity is concentrated in five sectors: agriculture, food and nutrition sciences; health sciences; information sciences; social sciences; and communications. JDRC is financed solely by the Parliament of Canada; its policies, however, are set by an international Board of Governors. The Centre's headquarters are in Ottawa, Canada. Regional offices are located in Africa, Asia, Latin America, and the Middle East. ©Interriational Development Research Centre 1983 Postal Address: Box 8500, Ottawa, Canada K1G 3H9 Head Office: 60 Queen Street, Ottawa, Canada Delange, F. Ahiuwalia, R. IDRC, Ottawa CA IDRC-207e Cassava toxicity and thyroid: research and public health issues : proceedings of a workshop held in Ottawa, Canada, 31 May -2 June 1982. Ottawa, Ont., IDRC, 1983. 148 p. : ill. /Cassava/, /toxicity/, /endocrine system!, !endemic diseases!, ,1buman nutrition!, !public health! - !diet!, !epidemiology!, /agricultural research!, !ariimal nutrition!, !agriproduct processing,!, !health education/, !mental retardation,!, !food consumption!, !conference report!, !recommendation!, !list of participants!. UDC: 616.441-006.5:633.68 ISBN: 0-88936-368-4 Microfiche edition available 11 existe également une edition francaise de cette publication La edicián española de esta publicación también se encuentra disponible CASSAVA TOXICITY AND THYROID: RESEARCH AND PUBLIC HEALTH ISSUES IDRC-207e CASSAVA TOXICITY AND THYROID: RESEARCH AND PUBLIC HEALTH ISSUES Proceedings of a workshop held in Ottawa, Canada, 31 May-2 June 1982 Editors: F.
    [Show full text]
  • Palace Tours − Luxury Tours Collection Into the Heart of Borneo Into the Heart of Borneo
    Palace Tours − Luxury Tours Collection Into the Heart of Borneo Into the Heart of Borneo Join Palace Tours on an unforgettable 9−day cruise journey on the Rajang River into the lush rainforests of Borneo, the third largest island in the world. Though the name is familiar to many from Redmon O’Hanlon’s classic Into the Heart of Borneo, there is very little tourism here due to the river’s remoteness and lack of facilities. There is much to do and see upriver, whether just gazing at the amazing scenery or visiting traditional and modern Iban long houses. In these river towns, you can explore the architectural vestiges of the Brooke Raj, and experience jungle treks and longboat trips as your journey continues to the Pelagus Rapids. Wildlife is in abundance and crocodiles, monitor lizards and the hornbill (national bird of Sarawak) are common sights. Downriver, the prosperous Chinese city of Sibu with its old shop houses, markets and friendly inhabitants, is a calm reflection of old China. At Sareiki, enjoy visits to pepper farms and exotic fruit plantations, and experience textile production at the sea port of Thanjung Manis. ITINERARY • Day 1 − Arrive in Sibu and board your cruise ship You are met upon arrival at the airport in Sibu, a bustling Malaysian port city set close to local markets and temples. Transfer to the cruise ship and settle in to your comfortable cabin. The afternoon is yours at leisure to explore the town on foot with its attractive streets of old Chinese shop houses, redolent of Malacca or Penang but without the tourists.
    [Show full text]
  • (Pkpb) Negeri Sarawak Dikemaskini: 15 April 2021
    SOP PERINTAH KAWALAN PERGERAKAN BERSYARAT (PKPB) NEGERI SARAWAK DIKEMASKINI: 15 APRIL 2021 Aktiviti dibenarkan Waktu 24 Jam Waktu Aktiviti Seperti Ketetapan Pergerakan Dibenarkan dalam Zon Berkuatkuasa Dibenarkan Penduduk masing-masing kecuali ke ▪ Rantaian aktiviti ekonomi dan Kawasan PKPD industri ▪ Melaksanakan Tugas Rasmi AKTIVITI DAN PROTOKOL Kerajaan ▪ Mendapatkan rawatan kesihatan, Tindakan Penerangan Ringkas urusan kecemasan dan kematian Kawasan Yang ▪ ZON KUCHING (Bahagian Kuching, Bahagian Samarahan dan Bahagian Serian) Terlibat ▪ ZON SRI AMAN (Bahagian SriAman) ▪ ZON SARIKEI (Bahagian Sarikei dan Bahagian Betong) ▪ ZON MUKAH (Bahagian Mukah) Aktiviti tidak dibenarkan ▪ ZON BINTULU (BahagianBintulu) Senarai aktiviti yang TIDAK DIBENARKAN ▪ ZON MIRI (Daerah Miri) (Negative List) ▪ ZON BELURU (Daerah Beluru) ▪ ZON SUBIS (Daerah Subis) ▪ ZON TELANG USAN (Daerah Telang Usan) ▪ ZON MARUDI (Daerah Marudi) ▪ ZON LIMBANG (Bahagian Limbang) ▪ ZON SIBU (Daerah Sibu) Arahan Tetap ▪ ZON KANOWIT (Daerah Kanowit) ▪ Peraturan 18 P.U. (A) 97/2021 ▪ ZON SELANGAU (Daerah Selangau) ▪ Ordinan Darurat (Pencegahan dan ▪ ZON KAPIT (Daerah Kapit) Pengawalan Penyakit Berjangkit) ▪ ZON SONG (Daerah Song) (Pindaan) 2021 ▪ ZON BELAGA (Daerah Belaga) ▪ Tertakluk kepada ketetapan yang dikeluarkan oleh MKN, KKM dan ▪ ZON BUKIT MABONG (Daerah Bukit Mabong) JPBN Sarawak ▪ Lain- lain arahan dari semasa ke semasa yang dikeluarkan oleh Ketua Tempoh 13 April Mac 2021 (mulai 12.01 pagi) sehingga 26 April 2021 (11.59 malam) Pengarah Kesihatan Berkuatkuasa 1 SOP PERINTAH
    [Show full text]
  • Accessibility and Development in Rural Sarawak. a Case Study of the Baleh River Basin, Kapit District, Sarawak, Malaysia
    Accessibility and development in rural Sarawak. A case study of the Baleh river basin, Kapit District, Sarawak, Malaysia. Regina Garai Abdullah A thesis submitted to Victoria University of Wellington in fulfilment of the requirements for the degree of Doctor of Philosophy 2016 School of Geography, Environment and Earth Sciences, Victoria University of Wellington, New Zealand i Abstract To what degree does accessibility to markets correlate with levels of development? This is an important question for those living in remote, underdeveloped parts of Southeast Asia during the final phases of de-agrarianisation. My study recounts the experience of rural-based Iban households living in the Baleh river basin of the Kapit District (population of 54,200) within a day or less travel by river to the small market town of Kapit (with a population of 18,000). With no connecting roads to the rest of Sarawak and reliant almost entirely on river transport, the local economy remains underdeveloped and is losing population. My field work among 20 villages in three accessibility zones of the Baleh river basin was undertaken over the three month period of May-July 2014. Structured interviews were conducted with 20 village headmen (tuai rumah), 82 heads of household, and 82 individuals within the households. Data was also systematically collected on 153 other individuals, including both residents and non-resident members of these bilik-families. My conceptual framework draws on von Thünen’s model of agricultural land use in order to generate expectations about the possible effects of market accessibility. While the sale of vegetables and other commodities accords with expected patterns, most rural households are in fact dependent on other, largely non-agricultural sources of income.
    [Show full text]
  • Language Choice of Melanau Community in DARO District, Sarawak
    International Journal of Academic Research in Business and Social Sciences 2017, Vol. 7, No. 10 ISSN: 2222-6990 Language Choice of Melanau Community in DARO District, Sarawak Habibu Morsili, Karim Harun (PhD) and Azrizan Abu Bakar Faculty of Social Sciences and Humanities, National University of Malaysia, 43600 Bangi, Selangor, Malaysia DOI: 10.6007/IJARBSS/v7-i10/3373 URL: http://dx.doi.org/10.6007/IJARBSS/v7-i10/3373 Abstract The Melanau community in Sarawak is an ethnic minority that covers 5% of Sarawakians. The Melanau ethnic population dominates the central part of Sarawak. The Melanau ethnic group speaks in Melanau because Sarawak has more than 27 ethnic groups so these multi ethnicities cause them to communicate with each other in a shared language. The current study in the Daro area of Sarawak analyzes language selection patterns, describes aspects of code conversion in the communication process and describes the factors that influence the choice of Melanau society language during the communication process. Sociolinguistic approaches and qualitative methods are applied to this study. The data were collected using interview recording techniques, observation and recording interviews. The underlying theory of the study was Fishman's Domain Theory (1972). Keywords: Melanau Community, Sociolinguistic, Language Choice, Qualitative Approach, Domain INTRODUCTION One of the important aspects of sociolinguistic study is language choice. Language selection studies show signs of occurrence as a result of community-based multilingual and dialectic attitudes. Through the study of such language choices can explain the use of language in the community (Asmah 2008). The clashes of ethnic diversity during daily activities led them to choose the language they mastered and understood together to communicate.
    [Show full text]
  • Emissions from the Rajang River and Estuary, Malaysia
    Impact of peatlands on carbon dioxide (CO2) emissions from the Rajang River and Estuary, Malaysia Denise Müller-Dum1, Thorsten Warneke1, Tim Rixen2,3, Moritz Müller4, Antje Baum2, Aliki Christodoulou1, Joanne Oakes5, Bradley D. Eyre5, and Justus Notholt1 5 1 Institute of Environmental Physics, University of Bremen, Otto-Hahn-Allee 1, 28359 Bremen, Germany 2 Leibniz Center for Tropical Marine Research, Fahrenheitstr. 6, 28359 Bremen, Germany 3 Institute of Geology, University of Hamburg, Bundesstr. 55, 20146 Hamburg, Germany 4 Swinburne University of Technology, Faculty of Engineering, Computing and Science, Jalan Simpang Tiga, 93350 Kuching, Sarawak, Malaysia 10 5 Centre for Coastal Biogeochemistry, School of Environment, Science and Engineering, Southern Cross University, Lismore NSW 2480, Australia Correspondence to: Denise Müller-Dum, [email protected] 1 Abstract. Tropical peat-draining rivers are known as potentially large sources of carbon dioxide (CO2) to the atmosphere due to high loads of carbon they receive from surrounding soils. However, not many seasonally resolved data are available, limiting our understanding of these systems. We report the first measurements of carbon dioxide partial pressure (pCO2) in the Rajang River and Estuary, the longest river in Malaysia. The Rajang River catchment is characterized by extensive peat deposits found 5 in the delta region, and by human impact such as logging, land use and river damming. pCO2 averaged 2540 ± 189 µatm during the wet season and 2350 ± 301 µatm during the dry season. Using three different parameterizations for the gas transfer velocity, -2 -1 calculated CO2 fluxes to the atmosphere were 1.5 (0.5-2.0) g C m d (mean, minimum – maximum) during the wet season and 1.7 (0.6-2.6) g C m-2 d-1 during the dry season.
    [Show full text]
  • Case History – Kanowit Palm Oil Mill, Sibu, Sarawak, East Malaysia
    Prime power > Case History Kanowit Palm Oil Mill, Sibu, Sarawak, East Malaysia Our energy working for you.TM Where: Cummins engines drive prime power for Kanowit Palm Oil Mill, Sibu, Sarawak, East Malaysia palm oil factory and housing in remote What: East Malaysia One Cummins Power Generation generator set, powered by a QST30G2 engine, rated at 640 kW SIBU, SARAWAK, EAST MALAYSIA — Worldwide and two Cummins Power Generation gensets, production of palm oil nearly doubled during the period powered by KTA19G4 engines, each rated at 409 1990 to 2001, in response to increasing demand. kW, to complement the steam turbine Leading both the production and export is Malaysia, Purpose: which increased the land area planted with oil palm by To start up the boiler, as well as to generate power more than 150 percent during the period. Today, the for the electrical requirements of the plant and industry employs around 300,000 people in the eastern offices, and the residential units in the area, when and western states of the country. the steam turbine is not operational Malaysia’s output of palm oil is approximately 12 Primary choice factors: million tons, which is more than 50 percent of the Previous track record, product reliability, efficient approximately 23 million tons produced annually after-sales support and parts availability throughout the world. The country exports close to 11 million tons, which exceeds 60 percent of the total international exports of about 17 million tons. The Kanowit Palm Oil Mill, which commenced operations in July 2003, is wholly owned by listed Malaysian company, Boustead Holdings Bhd.
    [Show full text]