Native Oyster Reef Construction Underway in Richmond San

Total Page:16

File Type:pdf, Size:1020Kb

Native Oyster Reef Construction Underway in Richmond San FOR IMMEDIATE RELEASE Media Contact: Taylor Samuelson [email protected] 510-286-4182 April 19, 2019 Native Oyster Reef Construction Underway in Richmond San Francisco Bay Living Shorelines Project 350 Reef Structures will become habitat for Native Oysters and Pacific Herring Richmond, CA - From April 9-30, 350 oyster reef elements are being placed in nearshore areas to create a living shoreline near Giant Marsh at Point Pinole Regional Shoreline managed by East Bay Regional Park District in the City of Richmond. Eelgrass beds will be planted next to the reefs in the following weeks to create a habitat ideal for the recruitment of native Olympia oysters and other aquatic species. Living shorelines use nature-based infrastructure to create shoreline buffers that reduce the impacts from sea level rise and erosion, while creating habitat for fish and wildlife. Though a relatively new climate adaptation technique, living shorelines are proving to be an effective approach to protecting coastal resources and shoreline communities. The Giant Marsh project is one of a small number of living shoreline trial projects taking place in the San Francisco Bay, but is the only one that connects the submerged underwater habitats with adjacent wetlands and upland ecotone plant communities. This innovative demonstration project is testing a combined living shorelines approach with habitat elements at different tidal elevations at the same site, with a goal of encouraging other cities and partners to undertake this kind of climate adaptation habitat restoration project at additional sites in the bay. The multi-habitat project at Giant Marsh builds on lessons learned from the Coastal Conservancy’s living shoreline project constructed directly across the bay in San Rafael in 2012, which included the construction of oyster reefs and eelgrass beds. The next phase approach at Giant Marsh integrates subtidal habitat restoration of native oyster (Ostrea lurida) and native eelgrass (Zostera marina) beds with designs that test the use of these natural structures to buffer and protect adjacent tidal wetlands of Giant Marsh, in combination with additional restoration treatments in the tidal marsh that include plantings of native Pacific cordgrass and the endangered California seablite plant, and higher elevation plantings in the upland ecotone transition zone. Each of these areas are critical habitat zones of the San Francisco Bay shoreline vulnerable to sea level rise and shoreline erosion. “This integrated climate adaptation approach includes strong science-based design and monitoring, and directly implements and a variety of regional habitat recommendations that benefit waterfowl and salmon and many other species in the bay.” said Matt Graul, Chief of Stewardship at the East Bay Regional Park District. The State Coastal Conservancy is leading the San Francisco Bay Living Shorelines Project in partnership with the East Bay Regional Park District, Ducks Unlimited, Triton Marine, San Francisco State University, Smithsonian Environmental Research Center, ESA, North Bay Conservation Corps, and other partners. Giant Marsh is directly adjacent to newly restored Dotson Family Marsh, all part of the Point Pinole Regional Shoreline and an area of rich cultural history and current sea level rise adaptation efforts. The project is using a combination of state Conservancy and federal grant funding to implement this innovative integrated enhancement project, that includes multiple native habitat elements to increase vertical habitat structure and food availability for birds and aquatic species, while also testing new approaches to climate adaptation and shoreline protection in the face of sea level rise. These actions are recommended as part of the North Richmond Shoreline Vision, completed by the San Francisco Estuary Partnership and many local, state, and federal partners in 2018. “We are so excited to work with such a great group of partners on this next phase living shorelines effort. It truly takes a village to design, permit, and construct habitat features in shallow bay waters.” said Marilyn Latta, Project Manager for the Coastal Conservancy. “While this is still a pilot project, we see this approach as a great solution to protecting our shoreline while also providing local jobs and educational opportunities that can include Conservation Corps groups, small companies, and university students. This is a living laboratory and by carefully testing pilot methods, we can learn which methods will work best to move forward with larger scale reef projects in San Francisco Bay.” The $3 million dollar project is funded by the State Coastal Conservancy, the Ocean Protection Council, a US Fish and Wildlife Service National Coastal Wetlands Conservation grant, and oil spill funds from the Cosco Busan Trustee Council through the National Fish and Wildlife Foundation. “This was a critical project to be funded through our San Francisco Bay oil spill restoration efforts,” said Natalie Cosentino-Manning, Restoration Program Manager with NOAA Fisheries Restoration Center. “We chose it because it’s innovative and has multiple benefits for the bay, especially for native Olympia oysters and their habitat.” The project will be monitored by the Coastal Conservancy to gather data on the success of native oyster establishment and future eelgrass plantings, and to construct the additional tidal marsh and upland transition zone plantings. Native oysters are a keystone species that support fish, crabs, bird and other wildlife populations. ### Notes to Editors: The oyster reef installation is being completed by construction manager Ducks Unlimited, a national non-profit conservation organization, and marine contractor Triton Marine from Washington State, local partner CS Marine, and others. Triton conducts the work via a barge and crane, which lowers the oyster reef elements into the water. The 350 oyster reef elements are made of a mixture of native sand and oyster shell mixed with cement, and were constructed from June-August 2018 in Antioch by a diverse set of partners, including the CA Wildlife Foundation, Dixon Marine Services, Reef Innovations, CiviCorps, and the North Bay Conservation Corps. The construction of oyster reefs and living shorelines is a key recommendation as part of the San Francisco Bay Subtidal Habitat Goals Project (www.sfbaysubtidal.org) and the Baylands and Climate Change Report (www.baylandsgoals.org). The project is permitted by NOAA, the Army Corps of Engineers, the San Francisco Bay Regional Water Quality Control Board, the SF Bay Conservation and Development Commission, the State Lands Commission, East Bay Regional Park District, and others. .
Recommended publications
  • Proposal for Pillar Point Rvpark Public Restroom and Green Space Design,Engineering,Permitting
    PPRROOPPOOSSAALL FFOORR PPIILLLLAARR PPOOIINNTT RRVV PPAARRKK PPUUBBLLIICC RREESSTTRROOOOMM AANNDD GGRREEEENN SSPPAACCEE DDEESSIIGGNN,, EENNGGIINNEEEERRIINNGG,, PPEERRMMIITTTTIINNGG AANNDD CCOONNSSTTRRUUCCTTIIOONN SSUUPPPPOORRTT SSEERRVVIICCEESS Submitted to: San Mateo County Harbor District Submitted by: Questa Engineering Corporation In Association with: Ware Associates Zeiger Engineers, Inc. mack5 October 7, 2019 October 7, 2019 San Mateo County Harbor District Attn: Deputy Secretary of the District 504 Ave Alhambra, Ste. 200 El Granada, CA 94018 Subject: Proposal for Pillar Point RV Park Public Restroom and Green Space Design, Engineering, Permitting and Construction Support Services Dear Mr. Moren: Questa Engineering Corporation is pleased to present this Proposal for the Pillar Point Project. We have assembled a highly qualified team, including Ware Associates (architecture/engineering services), Zeiger Engineers, Inc. (electrical engineering), and mack5 (cost estimating). Questa is widely recognized as one of California’s leading park and trail planning and engineering design firms for open space and natural park areas in constrained and challenging sites, including coastal and beach areas. We also have extensive experience in trail planning and design in parks, and sites with complex environmental and geotechnical issues. Questa provides complete services in planning, landscape architecture and engineering design of recreational improvement projects, from preliminary engineering investigations/feasibility studies and constraints
    [Show full text]
  • Bothin Marsh 46
    EMERGENT ECOLOGIES OF THE BAY EDGE ADAPTATION TO CLIMATE CHANGE AND SEA LEVEL RISE CMG Summer Internship 2019 TABLE OF CONTENTS Preface Research Introduction 2 Approach 2 What’s Out There Regional Map 6 Site Visits ` 9 Salt Marsh Section 11 Plant Community Profiles 13 What’s Changing AUTHORS Impacts of Sea Level Rise 24 Sarah Fitzgerald Marsh Migration Process 26 Jeff Milla Yutong Wu PROJECT TEAM What We Can Do Lauren Bergenholtz Ilia Savin Tactical Matrix 29 Julia Price Site Scale Analysis: Treasure Island 34 Nico Wright Site Scale Analysis: Bothin Marsh 46 This publication financed initiated, guided, and published under the direction of CMG Landscape Architecture. Conclusion Closing Statements 58 Unless specifically referenced all photographs and Acknowledgments 60 graphic work by authors. Bibliography 62 San Francisco, 2019. Cover photo: Pump station fronting Shorebird Marsh. Corte Madera, CA RESEARCH INTRODUCTION BREADTH As human-induced climate change accelerates and impacts regional map coastal ecologies, designers must anticipate fast-changing conditions, while design must adapt to and mitigate the effects of climate change. With this task in mind, this research project investigates the needs of existing plant communities in the San plant communities Francisco Bay, explores how ecological dynamics are changing, of the Bay Edge and ultimately proposes a toolkit of tactics that designers can use to inform site designs. DEPTH landscape tactics matrix two case studies: Treasure Island Bothin Marsh APPROACH Working across scales, we began our research with a broad suggesting design adaptations for Treasure Island and Bothin survey of the Bay’s ecological history and current habitat Marsh.
    [Show full text]
  • Point Pinole POINT PINOLE REGIONAL SHORELINE Regional Shoreline 24 Parking Spots S T DOTSON FAMILY MARSH AGING AREA
    Point Pinole Point Regional Shoreline Richmond, Pinole, San Pablo - 80 . PINOLE . R D E M U L B E. AV RICHMOND PKWY SAN PABLO ABLO ABLO SAN P SAN . LTO DR RICHMOND HIL P . Rev. 7/18 Rev. R DR. L D MILLER TA R O . O D P BL R 20 PA S San Pablo Bay Pablo San EL E. A SAN L OAD AV T R A . D V L B . Y L W L R. I H D R T M BROOKSIDE N U A I . H G OAD R NT NT A GI District Regional Park East Bay Oaks Court, 2950 Peralta CA 94605-0381 Oakland, 1-888-327-2757 (1-888-EBPARKS) www.ebparks.org .5 Miles RICHMOND PKWY RICHMOND . D A VE. V L B G OOD RICK POINT PINOLE REGIONAL SHORELINE .25 R R North A F 0 Addresses: Addresses: Giant Highway, 5551 Richmond,1. CA 94806 2. 3000 Atlas Road, Richmond, CA 94806 Transit Information:AC serve Transit and lines #376 AC Point #71 Pinole daily and connect with the Richmond BART station and the Richmond Parkway Transit See Center. map inside for bus stop locations. confirm,Transit To AC call informa or see 817-1717 tion at (510) www.511.org. Fishing Pier POINT PINOLE REGIONAL SHORELINE .19 .07 .13 L San Pablo Bay I A R T W E I .07 V .21 Y . .22 A R T B 50 Y A W .16 AM W TR .12 AIL O R .05 T .08 P O AC .05 E WHITTELL .06 .10 K D V H O S C MARSH O .08 Historic Bunker .23 U A N S CHI P E IN .06 L O T .10 O .14 R L O E A P OWL .06 I .07 L P .07 O .07 I .17 .05 .30 N T IL .05 .17 A .15 .48 .22 .17 ALLEY TRAIL R .09 T T .05 .12 H 50 R MARS Historic A Powder I ANGEL BUGGY L Press .07 TRAIL.22 .11 IL .14 .32 T A W INT R O O O .23 P NI .
    [Show full text]
  • Parks and Waterfront Commission
    PARKS AND WATERFRONT COMMISSION Regular Meeting Wednesday, October 10, 2018, 7:00 P.M. Frances Albrier Community Center 2800 Park Street, Berkeley, CA Parks and Waterfront Commission Agenda The Commissions may discuss any items listed on the agenda, but may take action only on items identified as Action. Preliminary Matters 1. Call to Order (Chair). 2. Roll Call (Secretary). 3. Announcements (Chair). 4. Approval of Agenda (Chair). 5. Approval Minutes for September 12, 2018 * (Chair). 6. Public Comment 7. Director’s Report (Ferris): Parks CIP Project List; Special Events; Waterfront Leases; 7:30 Berkeley Marina Area Specific Plan (BMASP); Parks Division; Waterfront Division. Discussion 8. Discussion Item: East Bay Regional Park District – presentation on the upcoming 7:45 November 6, 2018 general election Measure FF to extend the existing Measure CC $12 per year parcel tax to fund parks projects within the Measure CC zone which includes Berkeley * (EBRPD staff). 9. Discussion item: Update on the Parking Study at the Marina – next steps * (Ferris). 8:00 Action 10. Action Item: Update on marina fiscal issues, and send a communication to Council 8:15 in support of a one-time funding request for the Berkeley Waterfront * (Ferris/Lee). 11. Action Item: Update from Urban Pollinator Habitat subcommittee and authorize the 8:45 chair to share update at next Community Environmental Advisory Commission (CEAC) meeting (Diehm). Discussion 12. Discussion Item: Update on Traffic Circle Vegetation Policy * (Diehm). 9:00 13. Discussion Item: Presentation on existing City Tree Planting Program and existing 9:10 Parks Donation Policy (Ferris). 14. Future Agenda Items: Commemorative Tree Donation Policy; Marina Parking Study and 9:30 Community feedback, public meetings on Oct 9 and Oct 23, 2018; Traffic Circle Vegetation Maintenance Policy.
    [Show full text]
  • Climate Change Adaptation Study APPENDIX
    City of Richmond Climate Change Adaptation Study APPENDIX City of Richmond Climate Action Plan Appendix F: Climate Change Adaptation Study Acknowledgements The City of Richmond has been an active participant in the Contra Costa County Adapting to Rising Tides Project, led by the Bay Conservation Development Commission (BCDC) in partnership with the Metropolitan Transportation Commission, the State Coastal Conservancy, the San Francisco Estuary Partnership, the San Francisco Estuary Institute, Alameda County Flood Control and Water Conservation District and the San Francisco Public Utilities Commission, and consulting firm AECOM. Environmental Science Associates (ESA) completed this Adaptation Study in coordination with BCDC, relying in part on reports and maps developed for the Adapting to Rising Tides project to assess the City of Richmond’s vulnerabilities with respect to sea level rise and coastal flooding. City of Richmond Climate Action Plan F-i Appendix F: Climate Change Adaptation Study This page intentionally left blank F-ii City of Richmond Climate Action Plan Appendix F: Climate Change Adaptation Study Table of Contents Acknowledgements i 1. Executive Summary 1 1.1 Coastal Flooding 2 1.2 Water Supply 2 1.3 Critical Transportation Assets 3 1.4 Vulnerable Populations 3 1.5 Summary 3 2. Study Methodology 4 2.1 Scope and Organize 4 2.2 Assess 4 2.3 Define 4 2.4 Plan 5 2.5 Implement and Monitor 5 3. Setting 6 3.1 Statewide Climate Change Projections 6 3.2 Bay Area Region Climate Change Projections 7 3.3 Community Assets 8 3.4 Relevant Local Planning Initiatives 9 3.5 Relevant State and Regional Planning Initiatives 10 4.
    [Show full text]
  • And Ohlone College Is Excited to Present
    Operators share Designer dreams Amateur come true at Radio skills GARNET + grace Chihuahua Palooza Page 7 Page 4 Page 16 Scan for our FREE App or Search App Store for TCVnews 510-494-1999 [email protected] www.tricityvoice.com May 1, 2018 Vol. 16 No. 18 Continued on page 19 SUBMITTED BY OHLONE COLLEGE theatres such as The Public Theater, New PHOTOS BY RAVI MASAND York Theatre Workshop, Playwrights Horizons, Ma-Yi Theater Company, The The “Ohlone College Playwrights Fes- Lark, La MaMa, Actors Theatre of tival” is back for its fourth year, showcas- Louisville, Eugene O’Neill Theater Cen- ing world premieres of ter, Berkeley Repertory Theatre, Goodman thought-provoking, humorous, and enter- Theatre, Magic Theatre, San Francisco taining 10-minute plays written by profes- Mime Troupe, San Francisco Playhouse. sional and emerging playwrights around They have written for film and TV, such the country. Presented by the award-win- as “This Is Us,” “The Good Fight,” and ning Ohlone College Department of The- the 20th Century Fox film “Ferdinand.” atre and Dance, this exciting selection of In addition, this year the festival will in- comedic and dramatic plays explore topics clude two Ohlone student playwrights, oriented toward college students and gen- Kayla Martinez and Nick Saud, who are eral audiences. Some of the themes ex- also directing and acting in this student- plored in this year’s plays deal with human run theatre company. The Student Reper- connection, self-acceptance, freedom of tory Theatre Company, a class of student speech and expression, loneliness, hope, directors, producers, actors, and designers ignorance, following your dreams, and ap- at Ohlone, is producing the festival.
    [Show full text]
  • Approved 2/4/2021
    Approved 2/4/2021 PLANNING COMMISSION REGULAR MEETING COUNCIL CHAMBERS, RICHMOND CITY HALL Teleconference November 19, 2020 6:30 p.m. COMMISSION MEMBERS David Tucker, Chair Michael Huang Alpa Agarwal VACANT Bruce Brubaker Jen Loy Masoomeh Sharifi Soofiani The regular meeting was called to order by Chair Tucker at 6:31 p.m. ROLL CALL Present: Chair David Tucker; Commissioner Alpa Agarwal, Bruce Brubaker, Jen Loy, Yu- Hsiang (Michael) Huang, and Masoomeh Sharifi Soofiani Absent: INTRODUCTIONS Staff Present: Planning Staff: Emily Carroll, Jonelyn Whales, Community Development Director Lina Velasco, and Attorney James Atencio MINUTES – October 15, 2020 ACTION: It was M/S/C (Loy, Huang) to approve the minutes of October 15, 2020; which carried by the following vote: 6-0 (Ayes: Tucker, Loy, Huang, Brubaker, Soofiani, Alpa; Noes: None; Absent: Baer). AGENDA Chair Tucker provided an overview of meeting procedures for speaker registration, public comment, and public hearing functions. He said items approved by the Commission may be appealed in writing to the City Clerk by Monday, November 30, 2020, by 5:00 p.m. and he announced the appeal process after each affected item, as needed. CONSENT CALENDAR – Chair Tucker gave a brief overview of the consent calendar’s policies and procedures. 1. PLN20-191: Crane City Nursery PUBLIC HEARING to consider a request for a Conditional Use Permit for a 4,000 San Francisco adult-use cannabis cultivation, distribution, and non- volatile manufacturing, and nursery facility within an existing building at 400 W. Ohio Ave. Planning Commission Minutes 1 November 19, 2020 Approved 2/4/2021 (APN: 550-050-020).
    [Show full text]
  • Solano Transportation Authority
    Solano Transportation Authority Member Agencies: Benicia Dixon Fairfield Rio Vista Suisun City Vacaville Vallejo Solano County One Harbor Center, Ste. 130, Suisun City, CA 94585-2473 Phone (707) 424-6075 / Fax (707) 424-6074 Email: [email protected] Website: sta.ca.gov TECHNICAL ADVISORY COMMITTEE (TAC) AGENDA 1:30 p.m., Wednesday, August 30, 2017 Solano Transportation Authority One Harbor Center, Suite 130 Suisun City, CA 94585 ITEM STAFF PERSON 1. CALL TO ORDER Daryl Halls, Chair 2. APPROVAL OF AGENDA 3. OPPORTUNITY FOR PUBLIC COMMENT (1:30 -1:35 p.m.) 4. REPORTS FROM CALTRANS, MTC, STA, AND LOCAL AGENCIES (1:35 – 1:45 p.m.) A. Caltrans SHOPP Projects Update Janet Adams B. SB 1 LS&R Requirements Anthony Adams 5. CONSENT CALENDAR Recommendation: Approve the following consent items in one motion. (1:45 – 1:50 p.m.) A. Minutes of the TAC Meeting of June 28, 2017 Johanna Masiclat Recommendation: Approve TAC Meeting Minutes of June 28, 2017. Pg. 5 B. Fiscal Year (FY) 2017-18 Transportation Development Act (TDA) Liz Niedziela Matrix – August 2017 Recommendation: Forward a recommendation to the STA Board to approve the September FY 2017-18 Solano TDA Matrix as shown in Attachment C that includes TDA claims from the City of Dixon, the City of Fairfield, the City of Rio Vista, and the revised TDA claim for STA. Pg. 11 TAC MEMBERS Graham Wadsworth Joe Leach George Hicks Dave Melilli Tim McSorley Shawn Cunningham Jill Mercurio Matt Tuggle City of City of City of City of City of City of City of County of Benicia Dixon Fairfield Rio Vista Suisun City Vacaville Vallejo Solano The complete STA TAC packet is available1 on STA’s website: www.sta.ca.gov 6.
    [Show full text]
  • Inside: L – R: Grandson Amarie (7), Son Jelani; Grandson Koby (9), Swim Lessons and Jr
    July – August 2017 Photo: Bruce Beyaert Dotson Family Marsh Restored See “New Park Amenities” page 2. EBRPD Board Member Whitney Dotson and family celebrate dedication of Dotson Family Marsh. Inside: L – r: grandson Amarie (7), son Jelani; grandson Koby (9), Swim Lessons and Jr. Lifeguards • page 4 son Sule, Whitney, son Lukman Kayaking Opportunities • page 5 Outdoor Movie Night • page 6 Independence Day at Ardenwood • page 6 Campfire Programs • page 13 Photo: Sukirat Kaur Contents New Park Amenities For You Thanks to Measure CC Aquatics/Jr. Lifeguards ......... 4 A MESSAGE FROM GENERAL MANAGER ROBERT E. DOYLE Recreation Programs ...... 4-5 Ardenwood ........................5-7 he East Bay is loaded with beautiful places to enjoy outdoors, Big Break ................................ 7 Tand the East Bay Regional Park District just added some new Black Diamond ..............10 -11 amenities we think you’ll really like, thanks to voter-approved funding from Measure CC. The $12 annual parcel tax goes a long Coyote Hills .........................11 way to invest in regional trail improvements, fire hazard reduction, Crab Cove ...................... 11-12 shoreline restoration and infrastructure repairs through twenty of the oldest and busiest regional parks in western Alameda and Del Valle ............................... 12 Contra Costa counties. Some newly completed projects include: Sukirat Kaur Sunol ..................................... 12 • Miller/Knox Regional Shoreline, Richmond: Renovation/ Photo replacement of 79 family and group picnic tables, barbecues and Atlas Road Bridge dedication Tilden Nature Area ......12-13 drinking fountains; addition of four flush restrooms; and accessibility improvements Other Regional Parks ..13-14 including pathway upgrades and restroom renovations. Volunteer Programs .......... 14 • Nearby Richmond Bay Trail: Installation of a one-mile Bay Trail segment around the West County Wastewater District facility, connecting Wildcat Creek Trail to San Registration & Fees ..........
    [Show full text]
  • Control Calendar (PDF
    2007 San Francisco Estuary Invasive Spartina Control Program Schedule Updated: 9/14/07 More information on: Treatment methods Imazapyr Site Locations Treatment Location Treatment Method (gray areas denote sites where treatment was not planned this year or was completed) Imazapyr Herbicide Manual Sub-Area Amphibious Aerial: Aerial: Spray Covering with Manual Site # Site Name Sub-Area Name County Treatment date Truck Backpack Boat Excavation Number vehicle Broadcast Ball Geotextile Fabric Digging 01a Channel Mouth Alameda 7/31-8/2/07 XX 01b Lower Channel (not including mouth) Alameda 7/31-8/2/07 XX 01c Upper Channel Alameda 7/31-8/2/07 Alameda Flood Control XX 1 Upper Channel - Union City Blvd to I- Channel 01d Alameda 7/23-7/27/07 XX 880 01e Strip Marsh No. of Channel Mouth Alameda 7/31-8/2/07 X 01f Pond 3-AFCC Alameda 7/31-8/2/07 XX Belmont Slough/Island, North Point, 02a Bird Island, Steinberger Slough/ San Mateo 9/10-9/13/07 XX Redwood Shores Steinberger Slough South, Corkscrew 02b San Mateo 7/31-8/2/07 XXX Slough, Redwood Creek North 02c B2 North Quadrant San Mateo 7/31-8/2/07 XX 02d B2 South Quadrant - Rookery San Mateo 7/31-8/2/07 X 2 Bair/Greco Islands 02e West Point Slough NW San Mateo 7/31-8/2/07 XX 02f Greco Island North San Mateo 7/31-8/2/07 X 02g West Point Slough SW and East San Mateo 8/27- 8/30/07 XX 02h Greco Island South San Mateo 7/31-8/2/07 X 02i Ravenswood Slough & Mouth San Mateo 7/31-8/2/07 XX 02j Ravenswood Open Space Preserve San Mateo 9/10-9/13/07 X 03a Blackie's Creek (above bridge) Marin 8/29/07 X 3 Blackie's
    [Show full text]
  • Invasive Spartina Project (Cordgrass)
    SAN FRANCISCO ESTUARY INVASIVE SPARTINA PROJECT 2612-A 8th Street ● Berkeley ● California 94710 ● (510) 548-2461 Preserving native wetlands PEGGY OLOFSON PROJECT DIRECTOR [email protected] Date: July 1, 2011 INGRID HOGLE MONITORING PROGRAM To: Jennifer Krebs, SFEP MANAGER [email protected] From: Peggy Olofson ERIK GRIJALVA FIELD OPERATIONS MANAGER Subject: Report of Work Completed Under Estuary 2100 Grant #X7-00T04701 [email protected] DREW KERR The State Coastal Conservancy received an Estuary 2100 Grant for $172,325 to use FIELD OPERATIONS ASSISTANT MANAGER for control of non-native invasive Spartina. Conservancy distributed the funds [email protected] through sub-grants to four Invasive Spartina Project (ISP) partners, including Cali- JEN MCBROOM fornia Wildlife Foundation, San Mateo Mosquito Abatement District, Friends of CLAPPER RAIL MONITOR‐ ING MANAGER Corte Madera Creek Watershed, and State Parks and Recreation. These four ISP part- [email protected] ners collectively treated approximately 90 net acres of invasive Spartina for two con- MARILYN LATTA secutive years, furthering the baywide eradication of invasive Spartina restoring and PROJECT MANAGER 510.286.4157 protecting many hundreds of acres of tidal marsh (Figure 1, Table 1). In addition to [email protected] treatment work, the grant funds also provided laboratory analysis of water samples Major Project Funders: collected from treatment sites where herbicide was applied, to confirm that water State Coastal Conser‐ quality was not degraded by the treatments. vancy American Recovery & ISP Partners and contractors conducted treatment work in accordance with Site Spe- Reinvestment Act cific Plans prepared by ISP (Grijalva et al. 2008; National Oceanic & www.spartina.org/project_documents/2008-2010_site_plans_doc_list.htm), and re- Atmospheric Admini‐ stration ported in the 2008-2009 Treatment Report (Grijalva & Kerr, 2011; U.S.
    [Show full text]
  • Bay Trail Richmond New Year 2021 Report
    Bay Trail Richmond New Year 2021 Report This has been an extraordinary year for the San Francisco Bay Trail in Richmond! The City of Richmond (City) completed the long-awaited Bay Trail connection with Point Pinole Regional Shoreline, and over $4 million in grant funds were secured by the City and East Bay Regional Park District (EBRPD) to construct new and improved sections of Bay Trail. The Bay Trail’s popularity soared as an excellent place to refresh the mind and exercise the body with adequate width for social distancing. This 22nd New Year report by TRAC, the Trails for Richmond Action Committee, describes progress during 2020 toward closing gaps and improving existing sections of the Bay Trail. The map on the last page of this report shows trail completed and gaps remaining. Richmond has 36 miles of Bay Trail in place, representing 10% of the existing 352 miles of this planned 500-mile walking and cycling path encircling San Francisco and San Pablo Bays. However, 6.0 miles of gaps remain in Richmond, despite having more Bay Trail completed than any other city in the Bay Area. Stay healthy and be well. See you on the Bay Trail! POINT PINOLE CONNECTED WITH THE BAY TRAIL The City completed construction of a two-way, multi-use trail east of Goodick Avenue between the Richmond Parkway Bay Trail and Dotson Family Marsh Staging Area. This project was funded by a $976,000 grant of Measure J gasoline tax revenues from Contra Costa Transportation Authority and $130,000 from the Bay Trail Project at the Association of Bay Area Governments.
    [Show full text]