2021 Invasive Spartina Project Treatment Schedule

Total Page:16

File Type:pdf, Size:1020Kb

2021 Invasive Spartina Project Treatment Schedule 2021 Invasive Spartina Project Treatment Schedule Updated: 7/26/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering 01a Channel Mouth X Lower Channel (not including 01b X mouth) 01c Upper Channel X Alameda Flood 4 years with no 1 Upper Channel - Union City Blvd to Control Channel 01d invasive Spartina I-880 (2017-2020) 01e Strip Marsh No. of Channel Mouth X No Invasive 01f Pond 3-AFCC Spartina 2020 02a.1a Belmont Slough Mouth X X X 02a.1b Belmont Slough Mouth South X X X Upper Belmont Slough and 02a.2 X X X Redwood Shores 02a.3 Bird Island X 02a.4 Redwood Shores Mitigation Bank X 02b.1 Corkscrew Slough X X Steinberger Slough South, 02b.2 X X Redwood Creek Northwest 02c.1a B2 North Quadrant West 8/14 X X 02c.1b B2 North Quadrant East 8/24 X X 02c.2 B2 North Quadrant South 8/12-8/13 X X 02d.1a B2 South Quadrant West X 02d.1b B2 South Quadrant East X 02d.2 B2 South Quadrant (2) X 2 Bair/Greco Islands 02d.3 B2 South Quadrant (3) X 02e Westpoint Slough NW X X 02f Greco Island North X X 02g Westpoint Slough SW and East X X 02h Greco Island South X X 02i Ravenswood Slough & Mouth X Ravenswood Open Space Preserve 02j.1 X (north Hwy 84) * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 1 of 10 2 Bair/Greco Islands 2021 Invasive Spartina Project Treatment Schedule Updated: 7/26/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering Ravenswood Open Space Preserve 02j.2 X (south Hwy 84) Redwood Creek and Deepwater 02k X X X Slough 02l Inner Bair Island Restoration X Alameda Flood 1 Pond B3 - Middle Bair Island Control Channel 02m X Restoration 3 years with no 02n SF2 Invasive Spartina (2018-2020) 02o Central Bair 8/2-8/3 X 2 years with no 03a Blackie's Creek (above bridge) Invasive Spartina (2019-2020) 3 Blackie's Pasture 4 years with no 03b Blackie's Creek Mouth Invasive Spartina (2017-2020) Corte Madera Ecological Reserve 04a X X (CMER) College of Marin Ecology Study No invasive 04b Area Spartina 2020 04c Piper Park East X 2 years with no 04d Piper Park West Invasive Spartina (2019-2020) 04e Larkspur Ferry Landing Area X 04f Riviera Circle 6/4 (COI) X X Corte Madera 4 Creek Complex 04g Creekside Park 6/8 (COI); 8/5 X X Upper Corte Madera Creek (Above 04h X X Bon Air Road) Lower Corte Madera Creek 04i 6/9 (COI) X X (between Bon Air Rd & HWY 101) Corte Madera Creek Mouth - North 04j.1 X X Bank Corte Madera Creek Mouth - South 04j.2 X X Bank 04k Boardwalk No. 1 (Arkites) 6/10 (COI) X 04l Murphy Creek X 05a.1 Mowry Marsh & Slough X X 05a.2 Calaveras Marsh 7/30 X X X * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 2 of 10 Coyote 5 Creek/Mowry Complex 2021 Invasive Spartina Project Treatment Schedule Updated: 7/26/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering 05b Dumbarton/Audubon X X 05c.1 Newark Slough West X X 05c.2 Newark Slough East X X Alameda Flood 1 ControlCoyote Channel 5 Creek/Mowry 05d LaRiviere Marsh X Complex 05e Mayhew's Landing X 05f Coyote Creek- Alameda County X X 05g Cargill Pond (W Hotel) X 05h Plummer Creek Mitigation X 05i Island Ponds X 06a Emeryville Crescent East X Emeryville 6 Crescent 06b Emeryville Crescent West 7/29 X 07a Oro Loma Marsh-East 10/28-10/29 X X 7 Oro Loma Marsh 07b Oro Loma Marsh-West 10/28-10/29 X X 8 Palo Alto Baylands 8 Palo Alto Baylands X X X 9 Tiscornia Marsh 9 Tiscornia Marsh X 10a Whittell Marsh X 10b Southern Marsh X X Point Pinole 10 Marshes 10c Giant Marsh X X 10d Breuner Marsh X Southampton 11 11 Southampton Marsh X Marsh 5 years with no 12a Pier 94 invasive Spartina (2016-2020) 3 years with no 12b Pier 98/Heron's Head Invasive Spartina (2018-2020) 7 years with no 12c India Basin invasive Spartina (2014-2020) 4 years with no 12d Hunters Point Naval Reserve Invasive Spartina (2017-2020) Southeast San 12 Franciso * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 3 of 10 2021 Invasive Spartina Project Treatment Schedule Updated: 7/26/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering Southeast San 12 12e Yosemite Channel X Franciso 6 years with no 12f Candlestick Cove invasive Spartina (2015-2020) 7 years with no Alameda Flood 1 12g Crissy Field invasive Spartina Control Channel (2014-2020) 7 years with no 12h Yerba Buena Island invasive Spartina (2014-2020) 7 years with no 12i Mission Creek invasive Spartina (2014-2020) 13a Old Alameda Creek North Bank X 13b Old Alameda Creek Island X 13c Old Alameda Creek South Bank X 13d Whale's Tail North Fluke X 13e Whale's Tail South Fluke X 13f Cargill Mitigation Marsh X Whale's Tail 13g Upstream of 20 Tide Gates 13 X Complex 13h Eden Landing-North Creek X No invasive 13i Eden Landing-Pond 10 Spartina 2020 13j Eden Landing-Mt Eden Creek X Eden Landing Reserve South- 13k X North Creek Marsh Eden Landing Reserve North- Mt 13l X Eden Creek Marsh Eden Landing - Pond E8A, E9, and 13m 8/2 X X E8X Charleston Slough to Mountain 15a.1 X View Slough 15a.2 Stevens Ck to Guadalupe Sl 7/29 X 15a.3 Guadalupe Slough 7/29 15a.4 Alviso Slough 8/31-9/1 X X South Bay 15 Marshes 15a.5 Coyote Creek to Artesian Slough 9/15 X X 15a.6 Knapp Tract (Pond A6) 9/2 X 15b Faber/Laumeister Marsh X * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 4 of 10 2021 Invasive Spartina Project Treatment Schedule Updated: 7/26/21 South Bay Environmental Review 15 Where: Site Locations (map) How: Treatment Methods Herbicide Use: Marshes of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering 15c Shoreline Regional Park X Cooley Landing 16.1 Cooley Landing Central X X X 16 Salt Pond Restoration 16.2 Cooley Landing East X X X Alameda Flood 1 Control Channel Alameda Island South (Elsie 17a Roemer Bird Sanctuary, Crown X Memorial State Beach, Crab Cove) 17b Bay Farm Island X 17c.1 Arrowhead Marsh West 9/28-9/29 X X 17c.2 Arrowhead Marsh East WILL NOT BE TREATED IN 2021 MLK Regional Shoreline - Fan 17d.1 7/19 X Marsh Shoreline 17d.2 Airport Channel - MLK Shoreline 7/19 X 17d.3 East Creek -MLK Shoreline 7/19 X MLK Regional Shoreline-Damon 17d.4 X X Marsh Damon Sl/Elmhurst Cr - MLK 17d.5 7/19 X Shoreline Alameda/ 17e.1 San Leandro Creek North 7/19 X 17 San Leandro Bay Complex 17e.2 San Leandro Creek South 7/19 X 17f Oakland Inner Harbor X X 17g Coast Guard Island X 17h MLK New Marsh WILL NOT BE TREATED IN 2021 17i Coliseum Channels X 17j.1 Fan Marsh Wings 7/20 Yes X 17j.2 Fan Marsh Main WILL NOT BE TREATED IN 2021 17k Airport Channel 7/19 X X 17l Doolittle Pond 7/19 X Alameda Island East: Aeolian 17m X Yacht Club & Eastern Shoreline 3 years with no 18a Colma Creek invasive Spartina (2018-2020) * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 5 of 10 Colma Creek/ 18 San Bruno Marsh Complex 2021 Invasive Spartina Project Treatment Schedule Updated: 7/26/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering 4 years with no 18b Navigable Slough invasive Spartina (2017-2020) 2 years with no 18c Old Shipyard invasive Spartina (2019-2020) Alameda Flood 1 7 years with no Control Channel 18d Inner Harbor invasive Spartina Colma Creek/ (2014-2020) 18 San Bruno Marsh Complex 18e Sam Trans Peninsula X 4 years with no 18f Confluence Marsh invasive Spartina (2017-2020) 2 years with no 18g San Bruno Marsh invasive Spartina (2019-2020) 18h San Bruno Creek X 19a Brisbane Lagoon X 6 years with no 19b Sierra Point invasive Spartina (2015-2020) 5 years with no 19c Oyster Cove invasive Spartina (2015-2020) 6 years with no 19d Oyster Point Marina invasive Spartina (2015-2020) 19e Oyster Point Park X 19f Point San Bruno X 3 years with no 19g Seaplane Harbor invasive Spartina (2018-2020) 19h SFO X X 19i Mills Creek Mouth X X West San 19 19j Easton Creek Mouth X X Francisco Bay 19k Sanchez Marsh 7/28 X X 19l Burlingame Lagoon 7/28 X X 9 years with no 19m Fisherman's Park invasive Spartina (2012-2020) 19n Coyote Point Marina / Marsh X * Scheduling occurs throughout the treatment season.
Recommended publications
  • San Francisco Bay Area Integrated Regional Water Management Plan
    San Francisco Bay Area Integrated Regional Water Management Plan October 2019 Table of Contents List of Tables ............................................................................................................................... ii List of Figures.............................................................................................................................. ii Chapter 1: Governance ............................................................................... 1-1 1.1 Background ....................................................................................... 1-1 1.2 Governance Team and Structure ...................................................... 1-1 1.2.1 Coordinating Committee ......................................................... 1-2 1.2.2 Stakeholders .......................................................................... 1-3 1.2.2.1 Identification of Stakeholder Types ....................... 1-4 1.2.3 Letter of Mutual Understandings Signatories .......................... 1-6 1.2.3.1 Alameda County Water District ............................. 1-6 1.2.3.2 Association of Bay Area Governments ................. 1-6 1.2.3.3 Bay Area Clean Water Agencies .......................... 1-6 1.2.3.4 Bay Area Water Supply and Conservation Agency ................................................................. 1-8 1.2.3.5 Contra Costa County Flood Control and Water Conservation District .................................. 1-8 1.2.3.6 Contra Costa Water District .................................. 1-9 1.2.3.7
    [Show full text]
  • Section 3.4 Biological Resources 3.4- Biological Resources
    SECTION 3.4 BIOLOGICAL RESOURCES 3.4- BIOLOGICAL RESOURCES 3.4 BIOLOGICAL RESOURCES This section discusses the existing sensitive biological resources of the San Francisco Bay Estuary (the Estuary) that could be affected by project-related construction and locally increased levels of boating use, identifies potential impacts to those resources, and recommends mitigation strategies to reduce or eliminate those impacts. The Initial Study for this project identified potentially significant impacts on shorebirds and rafting waterbirds, marine mammals (harbor seals), and wetlands habitats and species. The potential for spread of invasive species also was identified as a possible impact. 3.4.1 BIOLOGICAL RESOURCES SETTING HABITATS WITHIN AND AROUND SAN FRANCISCO ESTUARY The vegetation and wildlife of bayland environments varies among geographic subregions in the bay (Figure 3.4-1), and also with the predominant land uses: urban (commercial, residential, industrial/port), urban/wildland interface, rural, and agricultural. For the purposes of discussion of biological resources, the Estuary is divided into Suisun Bay, San Pablo Bay, Central San Francisco Bay, and South San Francisco Bay (See Figure 3.4-2). The general landscape structure of the Estuary’s vegetation and habitats within the geographic scope of the WT is described below. URBAN SHORELINES Urban shorelines in the San Francisco Estuary are generally formed by artificial fill and structures armored with revetments, seawalls, rip-rap, pilings, and other structures. Waterways and embayments adjacent to urban shores are often dredged. With some important exceptions, tidal wetland vegetation and habitats adjacent to urban shores are often formed on steep slopes, and are relatively recently formed (historic infilled sediment) in narrow strips.
    [Show full text]
  • Proposal for Pillar Point Rvpark Public Restroom and Green Space Design,Engineering,Permitting
    PPRROOPPOOSSAALL FFOORR PPIILLLLAARR PPOOIINNTT RRVV PPAARRKK PPUUBBLLIICC RREESSTTRROOOOMM AANNDD GGRREEEENN SSPPAACCEE DDEESSIIGGNN,, EENNGGIINNEEEERRIINNGG,, PPEERRMMIITTTTIINNGG AANNDD CCOONNSSTTRRUUCCTTIIOONN SSUUPPPPOORRTT SSEERRVVIICCEESS Submitted to: San Mateo County Harbor District Submitted by: Questa Engineering Corporation In Association with: Ware Associates Zeiger Engineers, Inc. mack5 October 7, 2019 October 7, 2019 San Mateo County Harbor District Attn: Deputy Secretary of the District 504 Ave Alhambra, Ste. 200 El Granada, CA 94018 Subject: Proposal for Pillar Point RV Park Public Restroom and Green Space Design, Engineering, Permitting and Construction Support Services Dear Mr. Moren: Questa Engineering Corporation is pleased to present this Proposal for the Pillar Point Project. We have assembled a highly qualified team, including Ware Associates (architecture/engineering services), Zeiger Engineers, Inc. (electrical engineering), and mack5 (cost estimating). Questa is widely recognized as one of California’s leading park and trail planning and engineering design firms for open space and natural park areas in constrained and challenging sites, including coastal and beach areas. We also have extensive experience in trail planning and design in parks, and sites with complex environmental and geotechnical issues. Questa provides complete services in planning, landscape architecture and engineering design of recreational improvement projects, from preliminary engineering investigations/feasibility studies and constraints
    [Show full text]
  • Bothin Marsh 46
    EMERGENT ECOLOGIES OF THE BAY EDGE ADAPTATION TO CLIMATE CHANGE AND SEA LEVEL RISE CMG Summer Internship 2019 TABLE OF CONTENTS Preface Research Introduction 2 Approach 2 What’s Out There Regional Map 6 Site Visits ` 9 Salt Marsh Section 11 Plant Community Profiles 13 What’s Changing AUTHORS Impacts of Sea Level Rise 24 Sarah Fitzgerald Marsh Migration Process 26 Jeff Milla Yutong Wu PROJECT TEAM What We Can Do Lauren Bergenholtz Ilia Savin Tactical Matrix 29 Julia Price Site Scale Analysis: Treasure Island 34 Nico Wright Site Scale Analysis: Bothin Marsh 46 This publication financed initiated, guided, and published under the direction of CMG Landscape Architecture. Conclusion Closing Statements 58 Unless specifically referenced all photographs and Acknowledgments 60 graphic work by authors. Bibliography 62 San Francisco, 2019. Cover photo: Pump station fronting Shorebird Marsh. Corte Madera, CA RESEARCH INTRODUCTION BREADTH As human-induced climate change accelerates and impacts regional map coastal ecologies, designers must anticipate fast-changing conditions, while design must adapt to and mitigate the effects of climate change. With this task in mind, this research project investigates the needs of existing plant communities in the San plant communities Francisco Bay, explores how ecological dynamics are changing, of the Bay Edge and ultimately proposes a toolkit of tactics that designers can use to inform site designs. DEPTH landscape tactics matrix two case studies: Treasure Island Bothin Marsh APPROACH Working across scales, we began our research with a broad suggesting design adaptations for Treasure Island and Bothin survey of the Bay’s ecological history and current habitat Marsh.
    [Show full text]
  • Weekly Projects Bidding 8/13/2021
    Weekly Projects Bidding 8/13/2021 Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to be reliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies. Plan# Name Bid Date & Time OPR# Location Estimate Project Type Monday, August 16, 2021 OUTREACH MEETING (VIRTUAL) EVERGREEN VALLEY COLLEGE (EVC) STUDENT SERVICES Addenda: 0 COMPLEX (REQUEST FOR SUB BIDS) SC 8/16/21 10:00 AM 21-02526 San Jose School ONLINE Plan Issuer: XL Construction 408-240-6000 408-240-6001 THIS IS A VIRTUAL OUTREACH MEETING. REGISTRATION IS REQUIRED. SEE FLYER FOR DETAILS. The 74,000 sf Student Services Complex at Evergreen Valley College is part of the San Jose Evergreen Community College District's Measure X Bond Program. This is a new ground-up two -story complex including collaboration spaces, offices, storage, restrooms and supporting facilities. All subcontractors must be prequalified with XL Construction to bid the project. Please email [email protected] for a prequalification application link, and [email protected] if you are an Under Utilized Business Enterprise (SBE, WBE, MBE, VBE...). REFINISHING GYM AND STAGE FLOORS AT CALIFORNIA SCHOOL FOR THE BLIND Addenda: 0 8/16/21 12:00 PM 21-02463 Fremont State-Federal Plan Issuer: California Department of Education - Personnel Service Division 916-319-0800 000-000-0000 Contract #: BF210152 The Contractor shall provide all labor, equipment and materials necessary for preparing and refinishing the stage and gym floors, twice a year, at the California School for the Blind (CSB), located at 500 Walnut Avenue, Fremont.
    [Show full text]
  • Tidal Marsh Recovery Plan Habitat Creation Or Enhancement Project Within 5 Miles of OAK
    U.S. Fish & Wildlife Service Recovery Plan for Tidal Marsh Ecosystems of Northern and Central California California clapper rail Suaeda californica Cirsium hydrophilum Chloropyron molle Salt marsh harvest mouse (Rallus longirostris (California sea-blite) var. hydrophilum ssp. molle (Reithrodontomys obsoletus) (Suisun thistle) (soft bird’s-beak) raviventris) Volume II Appendices Tidal marsh at China Camp State Park. VII. APPENDICES Appendix A Species referred to in this recovery plan……………....…………………….3 Appendix B Recovery Priority Ranking System for Endangered and Threatened Species..........................................................................................................11 Appendix C Species of Concern or Regional Conservation Significance in Tidal Marsh Ecosystems of Northern and Central California….......................................13 Appendix D Agencies, organizations, and websites involved with tidal marsh Recovery.................................................................................................... 189 Appendix E Environmental contaminants in San Francisco Bay...................................193 Appendix F Population Persistence Modeling for Recovery Plan for Tidal Marsh Ecosystems of Northern and Central California with Intial Application to California clapper rail …............................................................................209 Appendix G Glossary……………......................................................................………229 Appendix H Summary of Major Public Comments and Service
    [Show full text]
  • Native Oyster Reef Construction Underway in Richmond San
    FOR IMMEDIATE RELEASE Media Contact: Taylor Samuelson [email protected] 510-286-4182 April 19, 2019 Native Oyster Reef Construction Underway in Richmond San Francisco Bay Living Shorelines Project 350 Reef Structures will become habitat for Native Oysters and Pacific Herring Richmond, CA - From April 9-30, 350 oyster reef elements are being placed in nearshore areas to create a living shoreline near Giant Marsh at Point Pinole Regional Shoreline managed by East Bay Regional Park District in the City of Richmond. Eelgrass beds will be planted next to the reefs in the following weeks to create a habitat ideal for the recruitment of native Olympia oysters and other aquatic species. Living shorelines use nature-based infrastructure to create shoreline buffers that reduce the impacts from sea level rise and erosion, while creating habitat for fish and wildlife. Though a relatively new climate adaptation technique, living shorelines are proving to be an effective approach to protecting coastal resources and shoreline communities. The Giant Marsh project is one of a small number of living shoreline trial projects taking place in the San Francisco Bay, but is the only one that connects the submerged underwater habitats with adjacent wetlands and upland ecotone plant communities. This innovative demonstration project is testing a combined living shorelines approach with habitat elements at different tidal elevations at the same site, with a goal of encouraging other cities and partners to undertake this kind of climate adaptation habitat restoration project at additional sites in the bay. The multi-habitat project at Giant Marsh builds on lessons learned from the Coastal Conservancy’s living shoreline project constructed directly across the bay in San Rafael in 2012, which included the construction of oyster reefs and eelgrass beds.
    [Show full text]
  • Public Sediment / Unlock Alameda Creek
    PUBLIC SEDIMENT / UNLOCK ALAMEDA CREEK WWW.RESILIENTBAYAREA.ORG ◄ BAYLANDS = LIVING INFRA STR CTY\, E' j(II( ........ • 400 +-' -L C Based on preliminary 0 analysis by SFfl. A more , detailed analysis is beinq E TIDAL MARSH conducted as part of -l/) the Healthy Watersheds l/) ro Resilient Aaylands E project (hwrb.sfei.org) +-' C QJ E "'O MUDFLAT QJ V1 SAC-SJ DELTA 0 1 Sediment supply was estimated by 'Sediment demand was estimated multiplying the current average using a mudflat soil bulK density of annual c;ediment load valuec; from 1.5 q c;ediment/rm c;oil (Brew and McKee et al. (in prep) by the number Williams :?010), a tidal marsh soil of years between 201 r and2100. bulK density ot 0.4 g sed1m ent / cm 3 c;oil (Callaway et al. :?010), and baywide mudflat and marsh area circa 2009 (BAARI vl). BAYLANDS TODAY BAYLANDS 2100 WITH 3' SLR LOW SEDIMENT SUPPLY BAYLANDS 2100 WITH 7' SLR LOW SEDIMENT SUPPLY WE MUST LOOK UPSTREAM TRIBUTARIES FEED THE BAY SONOMA CREEK NAPA RIVER PETALUMA CREEK WALNUT CREEK ALAMEDA CREEK COYOTE CREEK GUADALUPE CREEK ALAMEDA CREEK SEDIMENTSHED ALAMEDA CREEK ALAMEDA CREEK WATERSHED - 660 SQMI OAKLAND ALAMEDA CREEK WATERSHED SAN FRANCISCO SAN JOSE THE CREEK BUILT AN ALLUVIAL FAN AND FED THE BAY ALAMEDA CREEK SOUTH BAY NILES CONE ALLUVIAL FAN HIGH SEDIMENT FEEDS MARSHES TIDAL WETLANDS IT HAS BEEN LOCKED IN PLACE OVER TIME LIVERMORE PLEASANTON SUNOL UNION CITY NILES SAN MATEO BRIDGE EDEN LANDING FREMONT NEWARK LOW SEDIMENT CARGILL SALT PONDS DUMBARTON BRIDGE SEDIMENT FLOWS ARE HIGHLY MODIFIED SEDIMENT IS STUCK IN CHANNEL IMPOUNDED BY DAMS UPSTREAM REDUCED SUPPLY TO THE BAY AND VULNERABILITIES ARE EXACERBATED BY CLIMATE CHANGE EROSION SUBSIDENCE SEA LEVEL RISE THE FLOOD CONTROL CHANNEL SAN MATEO BRIDGE UNION CITY NILES RUBBER DAMS BART WEIR EDEN LANDING PONDS HEAD OF TIDE FREMONT 880 NEWARK TIDAL EXTENT FLUVIAL EXTENT DUMBARTON BRIDGE.
    [Show full text]
  • Hayward Regional Shoreline Adaptation Master Plan Appendix a Stakeholder and Public Comments
    SCAPE ARCADIS CONVEY RE:FOCUS SFEI HAYWARD REGIONAL SHORELINE ADAPTATION MASTER PLAN FOR THE HAYWARD AREA SHORELINE PLANNING AGENCY (HASPA) PART OF A JOINT POWERS AGREEMENT OF THE CITY OF HAYWARD, HAYWARD AREA RECREATION AND PARK DISTRICT, AND EAST BAY REGIONAL PARK DISTRICT HAYWARD REGIONAL SHORELINE MASTER PLAN APPENDIX A STAKEHOLDER AND PUBLIC COMMENTS SUBMITTED 10/02/2020 PUBLIC ONLINE SURVEY 02/27/19 - 03/15/19 ONLINE SURVEY SUMMARY A 23-question survey was conducted on behalf of the Hayward Area Shoreline Planning Agency (HASPA) to assess the public’s general understanding of Hayward Regional Shoreline, mainly in regard to sea level rise, potential flooding, and participants’ feelings, concerns, and predictions regarding these issues. In the spring of 2019, this survey was completed by approximately 900 people throughout the Bay Area, primarily those who live, work, commute through, or recreate at or near the shoreline. 1. Are you familiar with the Hayward Regional Shoreline that is managed by East Bay Regional Park District and Hayward Area Recreation and Park District? The majority of people surveyed are familiar with the Hayward Regional Shoreline. 2. What’s your association with the project area? The majority of those surveyed either drive through the area or enjoy the views of the Shoreline. Approximately two thirds of those surveyed visit the Shoreline and about one third live near the Shoreline. A smaller percentage (about ten percent) specified that they enjoy activities such as birding, cycling, jogging or walking along the Shoreline. A negligible amount of those surveyed stated they’d like to see restaurants built on the area.
    [Show full text]
  • Active Wetland Habitat Projects of the San
    ACTIVE WETLAND HABITAT PROJECTS OF THE SAN FRANCISCO BAY JOINT VENTURE The SFBJV tracks and facilitates habitat protection, restoration, and enhancement projects throughout the nine Bay Area Projects listed Alphabetically by County counties. This map shows where a variety of active wetland habitat projects with identified funding needs are currently ALAMEDA COUNTY MAP ACRES FUND. NEED MARIN COUNTY (continued) MAP ACRES FUND. NEED underway. For a more comprehensive list of all the projects we track, visit: www.sfbayjv.org/projects.php Alameda Creek Fisheries Restoration 1 NA $12,000,000 McInnis Marsh Habitat Restoration 33 180 $17,500,000 Alameda Point Restoration 2 660 TBD Novato Deer Island Tidal Wetlands Restoration 34 194 $7,000,000 Coyote Hills Regional Park - Restoration and Public Prey enhancement for sea ducks - a novel approach 3 306 $12,000,000 35 3.8 $300,000 Access Project to subtidal habitat restoration Hayward Shoreline Habitat Restoration 4 324 $5,000,000 Redwood Creek Restoration at Muir Beach, Phase 5 36 46 $8,200,000 Hoffman Marsh Restoration Project - McLaughlin 5 40 $2,500,000 Spinnaker Marsh Restoration 37 17 $3,000,000 Eastshore State Park Intertidal Habitat Improvement Project - McLaughlin 6 4 $1,000,000 Tennessee Valley Wetlands Restoration 38 5 $600,000 Eastshore State Park Martin Luther King Jr. Regional Shoreline - Water 7 200 $3,000,000 Tiscornia Marsh Restoration 39 16 $1,500,000 Quality Project Oakland Gateway Shoreline - Restoration and 8 200 $12,000,000 Tomales Dunes Wetlands 40 2 $0 Public Access Project Off-shore Bird Habitat Project - McLaughlin 9 1 $1,500,000 NAPA COUNTY MAP ACRES FUND.
    [Show full text]
  • San Francisco Bay Plan
    San Francisco Bay Plan San Francisco Bay Conservation and Development Commission In memory of Senator J. Eugene McAteer, a leader in efforts to plan for the conservation of San Francisco Bay and the development of its shoreline. Photo Credits: Michael Bry: Inside front cover, facing Part I, facing Part II Richard Persoff: Facing Part III Rondal Partridge: Facing Part V, Inside back cover Mike Schweizer: Page 34 Port of Oakland: Page 11 Port of San Francisco: Page 68 Commission Staff: Facing Part IV, Page 59 Map Source: Tidal features, salt ponds, and other diked areas, derived from the EcoAtlas Version 1.0bc, 1996, San Francisco Estuary Institute. STATE OF CALIFORNIA GRAY DAVIS, Governor SAN FRANCISCO BAY CONSERVATION AND DEVELOPMENT COMMISSION 50 CALIFORNIA STREET, SUITE 2600 SAN FRANCISCO, CALIFORNIA 94111 PHONE: (415) 352-3600 January 2008 To the Citizens of the San Francisco Bay Region and Friends of San Francisco Bay Everywhere: The San Francisco Bay Plan was completed and adopted by the San Francisco Bay Conservation and Development Commission in 1968 and submitted to the California Legislature and Governor in January 1969. The Bay Plan was prepared by the Commission over a three-year period pursuant to the McAteer-Petris Act of 1965 which established the Commission as a temporary agency to prepare an enforceable plan to guide the future protection and use of San Francisco Bay and its shoreline. In 1969, the Legislature acted upon the Commission’s recommendations in the Bay Plan and revised the McAteer-Petris Act by designating the Commission as the agency responsible for maintaining and carrying out the provisions of the Act and the Bay Plan for the protection of the Bay and its great natural resources and the development of the Bay and shore- line to their highest potential with a minimum of Bay fill.
    [Show full text]
  • Wildcat Creek Restoration Action Plan Version 1.3 April 26, 2010 Prepared by the URBAN CREEKS COUNCIL for the WILDCAT-SAN PABLO WATERSHED COUNCIL
    wildcat creek restoration action plan version 1.3 April 26, 2010 prepared by THE URBAN CREEKS COUNCIL for the WILDCAT-SAN PABLO WATERSHED COUNCIL Adopted by the City of San Pablo on August 3, 2010 wildcat creek restoration action plan table of contents 1. INTRODUCTION 5 1.1 plan obJectives 5 1.2 scope 6 Urban Urban 1.5 Methods 8 1.5 Metadata c 10 reeks 2. WATERSHED OVERVIEW 12 c 2.1 introdUction o 12 U 2.2 watershed land Use ncil 13 2.3 iMpacts of Urbanized watersheds 17 april 2.4 hydrology 19 2.5 sediMent transport 22 2010 2.6 water qUality 24 2.7 habitat 26 2.8 flood ManageMent on lower wildcat creek 29 2.9 coMMUnity 32 3. PROJECT AREA ANALYSIS 37 3.1 overview 37 3.2 flooding 37 3.4 in-streaM conditions 51 3.5 sUMMer fish habitat 53 3.6 bioassessMent 57 4. RECOMMENDED ACTIONS 58 4.1 obJectives, findings and strategies 58 4.2 recoMMended actions according to strategy 61 4.3 streaM restoration recoMMendations by reach 69 4.4 recoMMended actions for phase one reaches 73 t 4.5 phase one flood daMage redUction reach 73 able of 4.6 recoMMended actions for watershed coUncil 74 c ontents version 1.3 april 26, 2010 2 wildcat creek restoration action plan Urban creeks coUncil april 2010 table of contents 3 figUre 1-1: wildcat watershed overview to Point Pinole Regional Shoreline wildcat watershed existing trail wildcat creek highway railroad city of san pablo planned trail other creek arterial road bart Parkway SAN PABLO Richmond BAY Avenue San Pablo Point UP RR San Pablo WEST COUNTY BNSF RR CITY OF LANDFILL NORTH SAN PABLO RICHMOND San Pablo
    [Show full text]