2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering

01a Channel Mouth X

Lower Channel (not including 01b X mouth)

01c Upper Channel X

Alameda Flood 4 years with no 1 Upper Channel - Union City Blvd to Control Channel 01d invasive Spartina I-880 (2017-2020)

01e Strip Marsh No. of Channel Mouth X

No Invasive 01f Pond 3-AFCC Spartina 2020

02a.1a Mouth X X X

02a.1b Belmont Slough Mouth South X X X

Upper Belmont Slough and 02a.2 X X X Redwood Shores

02a.3 Bird Island X

02a.4 Redwood Shores Mitigation Bank X

02b.1 Corkscrew Slough X X

Steinberger Slough South, 02b.2 X X Redwood Creek Northwest

02c.1a B2 North Quadrant West 8/14 X X

02c.1b B2 North Quadrant East 8/24 X X

02c.2 B2 North Quadrant South 8/12-8/13 X X

02d.1a B2 South Quadrant West X

02d.1b B2 South Quadrant East X

02d.2 B2 South Quadrant (2) X

2 Bair/Greco Islands 02d.3 B2 South Quadrant (3) X

02e NW X X

02f North X X

02g Westpoint Slough SW and East X X

02h Greco Island South X X

02i Ravenswood Slough & Mouth X

Ravenswood Open Space Preserve 02j.1 X (north Hwy 84)

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 1 of 10 2 Bair/Greco Islands

2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering

Ravenswood Open Space Preserve 02j.2 X (south Hwy 84)

Redwood Creek and Deepwater 02k X X X Slough

02l Inner Restoration X Flood 1 Pond B3 - Middle Bair Island Control Channel 02m X Restoration 3 years with no 02n SF2 Invasive Spartina (2018-2020)

02o Central Bair 8/2-8/3 X

2 years with no 03a Blackie's Creek (above bridge) Invasive Spartina (2019-2020) 3 Blackie's Pasture 4 years with no 03b Blackie's Creek Mouth Invasive Spartina (2017-2020)

Corte Madera Ecological Reserve 04a X X (CMER)

College of Marin Ecology Study No invasive 04b Area Spartina 2020

04c Piper Park East X

2 years with no 04d Piper Park West Invasive Spartina (2019-2020)

04e Larkspur Ferry Landing Area X

04f Riviera Circle 6/4 (COI) X X Corte Madera 4 Creek Complex 04g Creekside Park 6/8 (COI); 8/5 X X

Upper Corte Madera Creek (Above 04h X X Bon Air Road)

Lower Corte Madera Creek 04i 6/9 (COI) X X (between Bon Air Rd & HWY 101) Corte Madera Creek Mouth - North 04j.1 X X Bank Corte Madera Creek Mouth - South 04j.2 X X Bank

04k Boardwalk No. 1 (Arkites) 6/10 (COI) X

04l Murphy Creek X

05a.1 Mowry Marsh & Slough X X

05a.2 Calaveras Marsh 7/30 X X X

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 2 of 10

Coyote 5 Creek/Mowry Complex 2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering

05b Dumbarton/Audubon X X

05c.1 Newark Slough West X X

05c.2 Newark Slough East X X Alameda Flood 1 ControlCoyote Channel 5 Creek/Mowry 05d LaRiviere Marsh X Complex 05e Mayhew's Landing X

05f Coyote Creek- Alameda County X X

05g Cargill Pond (W Hotel) X

05h Plummer Creek Mitigation X

05i Island Ponds X

06a Emeryville Crescent East X Emeryville 6 Crescent 06b Emeryville Crescent West 7/29 X

07a Oro Loma Marsh-East 10/28-10/29 X X 7 Oro Loma Marsh 07b Oro Loma Marsh-West 10/28-10/29 X X

8 Palo Alto Baylands 8 Palo Alto Baylands X X X

9 Tiscornia Marsh 9 Tiscornia Marsh X

10a Whittell Marsh X

10b Southern Marsh X X Point Pinole 10 Marshes 10c X X

10d Breuner Marsh X

Southampton 11 11 Southampton Marsh X Marsh 5 years with no 12a Pier 94 invasive Spartina (2016-2020) 3 years with no 12b Pier 98/Heron's Head Invasive Spartina (2018-2020) 7 years with no 12c India Basin invasive Spartina (2014-2020) 4 years with no 12d Hunters Point Naval Reserve Invasive Spartina (2017-2020)

Southeast San 12 Franciso

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 3 of 10 2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering

Southeast San 12 12e Yosemite Channel X Franciso 6 years with no 12f Candlestick Cove invasive Spartina (2015-2020) 7 years with no Alameda Flood 1 12g invasive Spartina Control Channel (2014-2020) 7 years with no 12h invasive Spartina (2014-2020) 7 years with no 12i Mission Creek invasive Spartina (2014-2020)

13a Old North Bank X

13b Old Alameda Creek Island X

13c Old Alameda Creek South Bank X

13d Whale's Tail North Fluke X

13e Whale's Tail South Fluke X

13f Cargill Mitigation Marsh X

Whale's Tail 13g Upstream of 20 Tide Gates 13 X Complex

13h Eden Landing-North Creek X

No invasive 13i Eden Landing-Pond 10 Spartina 2020

13j Eden Landing-Mt Eden Creek X

Eden Landing Reserve South- 13k X North Creek Marsh

Eden Landing Reserve North- Mt 13l X Eden Creek Marsh

Eden Landing - Pond E8A, E9, and 13m 8/2 X X E8X

Charleston Slough to Mountain 15a.1 X View Slough

15a.2 Stevens Ck to Guadalupe Sl 7/29 X

15a.3 Guadalupe Slough 7/29

15a.4 Alviso Slough 8/31-9/1 X X South Bay 15 Marshes 15a.5 Coyote Creek to Artesian Slough 9/15 X X

15a.6 Knapp Tract (Pond A6) 9/2 X

15b Faber/Laumeister Marsh X

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 4 of 10 2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

South Bay Environmental Review 15 Where: Site Locations (map) How: Treatment Methods Herbicide Use: Marshes of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering

15c Shoreline Regional Park X

Cooley Landing 16.1 Cooley Landing Central X X X 16 Salt Pond Restoration 16.2 Cooley Landing East X X X

Alameda Flood 1 Control Channel Alameda Island South (Elsie 17a Roemer Bird Sanctuary, Crown X Memorial State Beach, Crab Cove)

17b Bay Farm Island X

17c.1 West 9/28-9/29 X X

17c.2 Arrowhead Marsh East WILL NOT BE TREATED IN 2021

MLK Regional Shoreline - Fan 17d.1 7/19 X Marsh Shoreline

17d.2 Airport Channel - MLK Shoreline 7/19 X

17d.3 East Creek -MLK Shoreline 7/19 X

MLK Regional Shoreline-Damon 17d.4 X X Marsh

Damon Sl/Elmhurst Cr - MLK 17d.5 7/19 X Shoreline

Alameda/ 17e.1 North 7/19 X 17 Complex 17e.2 San Leandro Creek South 7/19 X

17f Oakland Inner Harbor X X

17g X

17h MLK New Marsh WILL NOT BE TREATED IN 2021

17i Coliseum Channels X

17j.1 Fan Marsh Wings 7/20 Yes X

17j.2 Fan Marsh Main WILL NOT BE TREATED IN 2021

17k Airport Channel 7/19 X X

17l Doolittle Pond 7/19 X

Alameda Island East: Aeolian 17m X Yacht Club & Eastern Shoreline

3 years with no 18a Colma Creek invasive Spartina (2018-2020)

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 5 of 10

Colma Creek/ 18 San Bruno Marsh Complex 2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering

4 years with no 18b Navigable Slough invasive Spartina (2017-2020) 2 years with no 18c Old Shipyard invasive Spartina (2019-2020) Alameda Flood 1 7 years with no Control Channel 18d Inner Harbor invasive Spartina Colma Creek/ (2014-2020) 18 San Bruno Marsh Complex 18e Sam Trans Peninsula X

4 years with no 18f Confluence Marsh invasive Spartina (2017-2020)

2 years with no 18g San Bruno Marsh invasive Spartina (2019-2020)

18h San Bruno Creek X

19a Brisbane Lagoon X

6 years with no 19b Sierra Point invasive Spartina (2015-2020) 5 years with no 19c Oyster Cove invasive Spartina (2015-2020) 6 years with no 19d Oyster Point Marina invasive Spartina (2015-2020)

19e Oyster Point Park X

19f Point San Bruno X

3 years with no 19g Seaplane Harbor invasive Spartina (2018-2020)

19h SFO X X

19i Mills Creek Mouth X X

West San 19 19j Easton Creek Mouth X X Francisco Bay

19k Sanchez Marsh 7/28 X X

19l Burlingame Lagoon 7/28 X X

9 years with no 19m Fisherman's Park invasive Spartina (2012-2020)

19n Coyote Point Marina / Marsh X

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 6 of 10 West San 19 Francisco Bay 2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering

San Mateo Creek / No invasive 19o Ryder Park Spartina 2020 Mouth - 19p.1 8/19 X Central Marsh

Seal Slough Mouth - 19p.2 8/19 X Peripheral Marshes Alameda Flood 1 Control Channel 19q Foster City X

5 years with no 19r Anza Lagoon invasive Spartina (2016-2020) 2 years with no 19s Maple Street Channel invasive Spartina (2019-2020)

20a Oyster Bay Regional Shoreline 7/16 X

20b Oakland Metropolitan Golf Links 7/16 X

20c Dog Bone Marsh X

20d.1 Citation Marsh South X X

20d.2a Citation Marsh Upper X X

20d.2b Citation Marsh Central WILL NOT BE TREATED IN 2021

20e East Marsh X

20f North Marsh WILL NOT BE TREATED IN 2021

20g Bunker Marsh X X X

20h.1 & Mouth North X

20h.2 San Lorenzo Creek & Mouth South X

20i Bockmann Channel 7/29 X

20j Sulphur Creek 7/29 X

20k Hayward Landing 7/29 X

20 San Leandro / 20l Johnson's Landing 7/29 X Hayward Shoreline

20m Cogswell Marsh, Quadrant A 8/16 X

Cogswell Marsh, Quadrant B 20n.1 X X Bayfront

20n.2 Cogswell Marsh, Quadrant B South X X

20n.3 Cogswell Marsh, Quadrant B Main 8/24 X X

20o Cogswell Marsh, Quadrant C X X X

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 7 of 10 20 San Leandro / Hayward Shoreline 2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering

20p Hayward Shoreline Outliers X

20q San Leandro Shoreline Outliers X

Oakland Airport Shoreline and 20r X Channels Alameda Flood 1 Control Channel 20s H.A.R.D. Marsh 8/16 X

20t San Leandro Marina 7/20 X

20u Estudillo Creek Channel 7/20 X X

20v Hayward Landing Canal 7/29 X

20w Triangle Marsh 7/29 X

21a Ideal Marsh North X 21 Ideal Marsh 21b Ideal Marsh South X

22a X X

22b.1 San Pablo Marsh East X X

22b.2 San Pablo Marsh West X X

Two Points 22c 22 X X Complex No invasive 22d Spartina 2020

22e X

Richmond/ Albany /Pinole 22f X Shoreline

23a X

23b Beach Drive X

2 years with no 23c Loch Lomond Marina invasive Spartina (2019-2020)

23d.1 San Rafael Canal Mouth East X

23d.2 San Rafael Canal Mouth West X

23e Muzzi & Marta's Marsh 6/4 (COI) X X

3 years with no 23f Paradise Cay invasive Spartina (2018-2020)

23g 23 Marin Outliers Greenwood Cove X

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 8 of 10 2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or 23 Marin Outliers Covering

23h Strawberry Point X

23i Strawberry Cove X

23j Bothin Marsh X

Alameda Flood 6 years with no 1 Control Channel 23k Sausalito invasive Spartina (2015-2020) 5 years with no 23l Starkweather Park invasive Spartina (2016-2020) 3 years with no 23m Novato invasive Spartina (2016-2018) 2 years with no 23n Triangle Marsh & shoreline invasive Spartina (2019-2020) 4 years with no 23o China Camp invasive Spartina (2017-2020) Upper - Upstream 24a 8/24 X X of Grey's Field

24 Petaluma River 24b Grey's Field 8/24 X X

24c Petaluma Marsh 8/24 X X

25a Tom's Point (Tomales Bay) 6/11 (COI) X

7 years with no 25b Limantour Estero invasive Spartina (2012-2018) 6 years with no 25c Drakes Estero invasive Spartina 25 Outer Coast (2013-2018)

2 years with no 25d Bolinas Lagoon north invasive Spartina (2019-2020)

6 years with no 25e Bolinas Lagoon south invasive Spartina (2013-2018)

5 years with no 26a White Slough / invasive Spartina (2011-2015)

26b NWR & X X North San Pablo 26 Bay No invasive 26c Spartina 2020 8 years with no 26d Sonoma Baylands invasive Spartina (2011-2018)

27a Point Buckler 7/27-7/28 X

7/27-7/28; 27b MOTCO Islands X 8/10-8/11 27

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 9 of 10 2021 Invasive Spartina Project Treatment Schedule

Updated: 7/26/21

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering 27 Suisun Bay 7/27-7/28; 27c Honker Bay X 8/10-8/11

27d MOTCO mainland 7/28 X

Alameda Flood 1 Control Channel

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 10 of 10