Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan

Total Page:16

File Type:pdf, Size:1020Kb

Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan Submitted by Trustees of Boston University Submitted to Boston Redevelopment Authority Prepared by Fort Point Associates, Inc. in association with: CBT Architects Greenberg Consultants, Inc. Tetra Tech TABLE OF CONTENTS EXECUTIVE SUMMARY CHAPTER 1: INTRODUCTION 1.1 CAMPUS HISTORY AND BACKGROUND ..................................................................... 1-1 1.2 UNIVERSITY VALUES, MISSION, AND GOALS ............................................................. 1-3 1.3 2012–2022 INSTITUTIONAL MASTER PLAN ................................................................. 1-4 1.3.1 PROGRESS SINCE THE LAST INSTITUTIONAL MASTER PLAN .......................... 1-5 1.4 MASTER PLANNING PROCESS ...................................................................................... 1-8 1.4.1 BOSTON UNIVERSITY COMMUNITY TASK FORCE .......................................... 1-8 1.4.2 INSTITUTIONAL MASTER PLAN PROJECT TEAM .............................................. 1-9 CHAPTER 2: CAMPUS DEMOGRAPHICS 2.1 INTRODUCTION ............................................................................................................ 2-1 2.2 STUDENT POPULATION ............................................................................................... 2-1 2.2.1 HISTORICAL ENROLLMENT TRENDS ................................................................ 2-1 2.2.2 CURRENT POPULATION ................................................................................... 2-2 2.2.3 FUTURE STUDENT ENROLLMENT PROJECTIONS ............................................ 2-3 2.3 EMPLOYMENT ............................................................................................................... 2-3 2.3.1 PROJECTED EMPLOYMENT FIGURES ................................................................ 2-5 CHAPTER 3: EXISTING PROPERTY AND USES 3.1 INTRODUCTION ............................................................................................................ 3-1 3.2 RESIDENTIAL PROPERTIES ............................................................................................. 3-2 3.3 ACADEMIC, ADMINISTRATIVE, AND OTHER PROPERTIES .......................................... 3-8 Table of Contents 1 CHAPTER 4: PLANNING AND URBAN DESIGN 4.1 HISTORICAL CONTEXT ................................................................................................. 4-1 4.2 NEIGHBORHOOD CONTEXT ....................................................................................... 4-3 4.3 TRANSPORTATION CONTEXT ...................................................................................... 4-8 4.4 FRAMEWORK AND VISION: CHARLES RIVER CAMPUS ............................................. 4-10 4.4.1 CENTRAL CAMPUS ........................................................................................... 4-11 4.4.2 SOUTH CAMPUS .............................................................................................. 4-12 4.4.3 EAST CAMPUS .................................................................................................. 4-12 4.4.4 WEST CAMPUS ................................................................................................. 4-17 4.4.5 COMMONWEALTH LANDING ........................................................................ 4-17 4.5 URBAN DESIGN PRINCIPLES ...................................................................................... 4-17 4.5.1 MIXED-USE, HIGH-DENSITY URBAN CAMPUS MASSING AND URBAN INFILL ............................................................................................................... 4-17 4.5.2 FORGING NORTH-SOUTH CONNECTIONS/RECONNECTING TO THE CHARLES RIVER ............................................................................................................... 4-18 4.5.3 ENHANCING THE PUBLIC REALM .................................................................. 4-18 4.5.4 FUTURE INFRASTRUCTURE PLANNING AND ITS RELATIONSHIP TO CAMPUS PLANNING ...................................................................................................... 4-20 4.6 RELATIONSHIP OF PROPOSED INSTITUTIONAL PROJECTS TO URBAN DESIGN PRINCIPLES .................................................................................................................. 4-21 4.6.1 STUDENT VILLAGE RESIDENCE III (SITE AA) ................................................... 4-21 4.6.2 BOSTON UNIVERSITY SCHOOL OF LAW (SITE BB) ........................................ 4-21 4.6.3 ACADEMIC BUILDINGS (SITE CC) ................................................................... 4-22 4.6.4 ACADEMIC BUILDING ADDITION (SITE DD) ................................................. 4-23 4.6.5 SCIENCE AND ENGINEERING RESEARCH BUILDING (SITE EE) ....................... 4-23 4.6.6 ACADEMIC/ADMINISTRATIVE BUILDING (SITE FF) ........................................ 4-24 4.6.7 MYLES STANDISH AND MYLES STANDISH ANNEX RESIDENCE HALL REHABILITATION (SITE GG) ............................................................................. 4-25 CHAPTER 5: DEVELOPMENT PROGRAM 5.1 INTRODUCTION ........................................................................................................... 5-1 5.2 ACADEMIC FACILITIES .................................................................................................. 5-1 5.2.1 BOSTON UNIVERSITY SCHOOL OF LAW (SITE BB) .......................................... 5-1 5.2.2 ACADEMIC BUILDING (SITE CC) ....................................................................... 5-2 5.2.3 ACADEMIC/ADMINISTRATIVE BUILDING (SITE FF) .......................................... 5-3 5.2.4 ACADEMIC BUILDING ADDITION (SITE DD) .................................................... 5-3 Table of Contents 2 5.3 RESEARCH FACILITIES ................................................................................................... 5-4 5.3.1 SCIENCE AND ENGINEERING RESEARCH BUILDING (SITE EE) ......................... 5-4 5.4 STUDENT HOUSING .................................................................................................... 5-5 5.4.1 STUDENT VILLAGE RESIDENCE III (SITE AA) ..................................................... 5-5 5.4.2 MYLES STANDISH RESIDENCE HALL AND MYLES STANDISH ANNEX REHABILITATION (SITE GG) .............................................................................. 5-5 5.5 PUBLIC REALM AND OPEN SPACE ............................................................................... 5-6 5.5.1 BAY STATE ROAD/BEACON STREET POCKET PARK ......................................... 5-6 5.5.2 COMMONWEALTH AVENUE PHASE 1A IMPROVEMENTS ............................... 5-6 5.5.3 COMMONWEALTH AVENUE PHASE 2A IMPROVEMENTS ............................... 5-7 5.5.4 COMMONWEALTH AVENUE AREA AT BU BRIDGE ......................................... 5-7 5.5.5 CUMMINGTON PEDESTRIAN MALL ................................................................. 5-7 5.5.6 GRANBY STREET TO SILBER WAY PEDESTRIAN WAY ...................................... 5-8 5.5.7 GRANBY STREET POCKET PARK ....................................................................... 5-8 5.6 PROJECT PLANNING ..................................................................................................... 5-8 5.7 ZONING ........................................................................................................................ 5-9 5.7.1 GROUNDWATER CONSERVATION OVERLAY DISTRICT ............................... 5-10 5.7.2 RESTRICTED PARKING OVERLAY DISTRICT ................................................... 5-11 5.7.3 ARTICLE 37 GREEN BUILDINGS ...................................................................... 5-11 5.7.4 GREENBELT PROTECTION OVERLAY DISTRICT ............................................. 5-12 5.7.5 NEIGHBORHOOD DESIGN OVERLAY DISTRICT ............................................ 5-12 5.7.6 BAY STATE ROAD/BACK BAY WEST ARCHITECTURAL CONSERVATION DISTRICT ......................................................................................................... 5-13 5.8 POTENTIAL DEVELOPMENT SITES .............................................................................. 5-13 CHAPTER 6: STUDENT HOUSING PLAN 6.1 MISSION ........................................................................................................................ 6-1 6.2 UNDERGRADUATES LIVING ON CAMPUS .................................................................. 6-1 6.3 UNDERGRADUATES LIVING OFF CAMPUS ................................................................. 6-3 6.4 STUDENT HOUSING POLICIES ...................................................................................... 6-3 6.4.1 RESIDENCY REQUIREMENTS ............................................................................. 6-3 6.4.2 ASSIGNMENT PROCESS .................................................................................... 6-4 6.4.3 SPECIAL RESIDENCY PROGRAMS ..................................................................... 6-5 6.5 STUDENT HOUSING PLAN OVERVIEW ....................................................................... 6-5 Table of Contents 3 CHAPTER 7: UTILITIES AND INFRASTRUCTURE 7.1 INTRODUCTION ........................................................................................................... 7-1 7.2 SANITARY SEWER SYSTEM ............................................................................................ 7-1 7.2.1 SYSTEM-WIDE PLANNING WITH BWSC ..........................................................
Recommended publications
  • Conceptual Plan
    About the Cover Photo The photo on the cover of this report was taken on December 17, 2010, around 8:00 AM. The view is from the Savin Hill Avenue overpass and looks almost directly south. This overpass is shown in Figure 3-3 of the report, and the field of view includes land shown in Figure 3-2. At the right is the recently completed headhouse of the Savin Hill Red Line station. Stopped at the station platform is an inbound Red Line train that started at Ashmont and will travel to Alewife. The station is fully ADA-compliant, and the plan presented in this report requires no modification to this station. Next to the Red Line train is an inbound train from one of the three Old Colony commuter rail branches. There is only one track at this location, as is the case throughout most of the Old Colony system. This train has a mixed consist of single-level and bi-level coaches, and is being pushed by a diesel locomotive, which is mostly hidden from view by the bi-level coaches. Between the two trains is an underpass beneath the Ashmont branch of the Red Line. This had been a freight spur serving an industrial area on the west side of the Ashmont branch tracks. Sections A-2.3 and A-2.4 of this report present an approach to staging railroad reconstruction that utilizes the abandoned freight spur and underpass. The two tracks to the left of the Old Colony tracks serve the Braintree Red Line branch.
    [Show full text]
  • Esplanade Cultural Landscape Report - Introduction 1
    C U L T U R A L L A N D S C A P E R E P O R T T H E E S P L A N A D E B O S T O N , M A S S A C H U S E T T S Prepared for The Esplanade Association 10 Derne Street Boston, MA 02114 Prepared by Shary Page Berg FASLA 11 Perry Street Cambridge, MA 02139 April 2007 CONTENTS Introduction . 1 PART I: HISTORICAL OVERVIEW 1. Early History (to 1893) . 4 Shaping the Land Beacon Hill Flat Back Bay Charlesgate/Bay State Road Charlesbank and the West End 2. Charles River Basin (1893-1928) . 11 Charles Eliot’s Vision for the Lower Basin The Charles River Dam The Boston Esplanade 3. Redesigning the Esplanade (1928-1950) . 20 Arthur Shurcliff’s Vision: 1929 Plan Refining the Design 4. Storrow Drive and Beyond (1950-present) . 30 Construction of Storrow Drive Changes to Parkland Late Twentieth Century PART II: EXISTING CONDITIONS AND ANALYSIS 5. Charlesbank. 37 Background General Landscape Character Lock Area Playground/Wading Pool Area Lee Pool Area Ballfields Area 6. Back Bay. 51 Background General Landscape Character Boating Area Hatch Shell Area Back Bay Area Lagoons 7. Charlesgate/Upper Park. 72 Background General Landscape Character Charlesgate Area Linear Park 8. Summary of Findings . 83 Overview/Landscape Principles Character Defining Features Next Steps BIBLIOGRAPHY. 89 APPENDIX A – Historic Resources . 91 APPENDIX B – Planting Lists . 100 INTRODUCTION BACKGROUND The Esplanade is one of Boston’s best loved and most intensively used open spaces.
    [Show full text]
  • 06 Management
    A landscape park requires, more than most works of men, continuity of management. Its perfection is a slow process. Its directors must thoroughly Standard maintenance apprehend the fact that the beauty of its landscape is all that justifies the includes cutting grass, picking existence of a large public space in the midst, or even on the immediate up litter three times a week in borders, of a town. As trustees of park scenery, they will be especially watchful to prevent injury thereto from the intrusion of incongruous or obtrusive the summer (daily when nec- structures, statues, gardens (whether floral, botanic, or zoologic), speedways, essary), repairing potholes, or any other instruments of special modes of recreation, however desirable such sweeping parkways, and emp- may be in their proper place. tying trash barrels. A separate CHARLES WILLIAM ELIOT, CHARLES ELIOT, LANDSCAPE ARCHITECT, crew prunes and removes dead and hazardous trees. The or the Charles River Basin to continue as Boston’s Central Park, MDC Engineering and substantial investments of time, funds, and staff will be required Construction Division con- over the next fifteen years. When the master plan for New York’s tracts out work for larger park Central Park was completed in , a partnership between the city projects, such as bridges and parkland restoration. MAINTAINING THE SHORE LINE IS ONE OF and the Central Park Conservancy spent millions of dollars over THE MOST CHALLENGING MAINTENANCE TASKS IN THE BASIN. (MDC photo) ten years to restore this neglected resource. Crews trained in park Existing Conditions and Issues restoration were added to existing maintenance crews, dramatically A detailed study of maintenance operations, budgets, and staffing was improving care.
    [Show full text]
  • Section E Western Avenue Bridge to Boston University Bridge
    Section E Western Avenue Bridge to Boston University Bridge The Charles River Reservation between the Western Avenue Bridge and Boston University both sides of Memorial Drive. Raised crossings should be added to enhance the visibility of (BU) Bridge is very narrow, with the exception of Magazine Beach. The River Street and the path and to prioritize the path users over the turning motor vehicles. Western Avenue Bridges are both currently in redesign by MassDOT. The City of Cambridge has long-term redevelopment plans for the shopping center between Cycle tracks are currently part of the design for both the River Street and Western Avenue Pleasant Street and Magazine Street. In the short term, bicycle and pedestrian improvements Bridges. There is an existing cycle track and bike lane on the Boston side of Western should be made through the parking lot, a portion of which is a public right-of-way. Avenue, and a cycle track is currently under construction for the Cambridge side of South Bank. The segment of the path on the Boston side, downriver from the River Street Western Avenue (Figure 56). Bridge, is extremely narrow and makes two-way bicycle and pedestrian traffic uncomfortable. North Bank. On the Cambridge side of the river, there is a gap in the existing and planned MassDOT is widening the path as part of the River Street Bridge rehabilitation. However, bicycle infrastructure on River Street between the River Street Bridge and Putnam Avenue. additional widening is recommended to bring the clear path width to 10 feet. This additional There are existing bike lanes on River Street between Putnam Avenue and Central Square, widening may require a cantilever to allow the path to extend over the seawall.
    [Show full text]
  • Boston University Data Sciences Center – 665 Commonwealth Avenue
    KPMB ARCHITECTS Boston Planning and Development Agency PUBLIC MEETING Boston University Data Sciences Center 665 Commonwealth Ave June 04, 2019 Agenda Data Sciences Center Project Introduction • Tim Czerwienski, AICP BPDA Project Manager • Paul Rinaldi, Boston University Building • Luigi LaRocca, KPMB Architects Landscape • Skip Burck, Richard Burck Associates Sustainability • Jacob Knowles, BR+A • Matt Smith, The Green Engineer Transportation • Jay Doyle, AECOM Warren Towers Digital Signage • Paul Rinaldi, Boston University Boston University Data Sciences Center KPMB ARCHITECTS june 04, 2019 BPDA PUBLIC MEETING 2 Lead Consultants Data Sciences Center Project KPMB Architects Architect Fort Point Associates Planning and Permitting Richard Burck Associates Landscape Architect Bard, Rao + Athanas Consulting Engineering MEP Engineers AECOM Transportation Transsolar KlimaEngineering Sustainability Engineers Haley & Aldrich Geotechnical & Geothermal Nitsch Engineering Civil Engineer Suffolk Construction Pre-Construction Services The Green Engineer LEED Consulting Boston University Data Sciences Center KPMB ARCHITECTS june 04, 2019 BPDA PUBLIC MEETING 3 2013 -2023 IMP Projects Campus Development MASS AVE 502 619 504 506 608 SOLDIERS FIELD ROAD 518 512 316 491 493 497 520 499 MASSACHUSETTS TURNPIKE 501 503 285 505 507 509 MUDDY BOSTON UNIVERSITY BRIDGE STREET 511 120 Student Village Residence III CHARLES RIVER Academic Academic / 513 515 100 Myles Standish Residence 517 76 300 519 521 523 STREET 525 ASHFORD 427 527 531 429 431 33 Building Administration
    [Show full text]
  • HOUSE ...No. 2129
    HOUSE DOCKET, NO. 2313 FILED ON: 1/19/2017 HOUSE . No. 2129 The Commonwealth of Massachusetts _________________ PRESENTED BY: Jay D. Livingstone and Byron Rushing _________________ To the Honorable Senate and House of Representatives of the Commonwealth of Massachusetts in General Court assembled: The undersigned legislators and/or citizens respectfully petition for the adoption of the accompanying bill: An Act protecting sunlight in certain public parks. _______________ PETITION OF: NAME: DISTRICT/ADDRESS: DATE ADDED: Jay D. Livingstone 8th Suffolk 1/19/2017 Byron Rushing 9th Suffolk 1/19/2017 Denise Provost 27th Middlesex 10/24/2017 1 of 1 HOUSE DOCKET, NO. 2313 FILED ON: 1/19/2017 HOUSE . No. 2129 By Messrs. Livingstone of Boston and Rushing of Boston, a petition (accompanied by bill, House, No. 2129) of Jay D. Livingstone, Byron Rushing and Denise Provost relative to the building of structures which may impact sunlight in certain public parks. Environment, Natural Resources and Agriculture. The Commonwealth of Massachusetts _______________ In the One Hundred and Ninetieth General Court (2017-2018) _______________ An Act protecting sunlight in certain public parks. Be it enacted by the Senate and House of Representatives in General Court assembled, and by the authority of the same, as follows: 1 SECTION 1. Section 1 of chapter 362 of the acts of 1990 is hereby amended by striking 2 out the definition of “new shadow” and inserting in place thereof the following definition:- 3 “New shadow”, the casting of a shadow at any time of day on an area which is not cast in 4 shadow at such time by a structure.
    [Show full text]
  • Boston-Organ-Club-Newsletter-1980
    THE BOSTON ORGA!'l CLUB NEWSLETTER Vol. 16, No. 1, Whole No. 126 Spring & Summer 1980 The next Club meeting will be a joint 11 organ crawl" with the Merr.i.maok Valley Chapter of the American Guild of Organists on Saturday afternoon and evening, Octo­ ber n. Five old Massachusetts tra.oker organs northwest of Boston are to be demon­ strated. If you plan to a.rrive after the tour starts, and desire a din.1'ler reserv-a­ tion or details, call David or Permelia Sears in advance at ( 617) 649-93 79. The schedule is below. 2a00 - Congregational Church, Dunstable, on Route ll3 in the oenter of the town; 2-9 1913 Geo. w. Reed organ, rebuilt and en.J..arged to 13 ranks by the Andover Organ Company in 1973 • 3a00 - Sears residence Hi Street Dunstable, on the right side, 9/lO of a mile from the center of town; -10 1 Hook & Hastings organ, Opus 1394, built for Trinity Episcopal Ohurch, Marlborough, Mass., and ~ntly being set up in the former garage .. 4a30 - Baptist Church, West Townsend, on Route 119 i.."l the village; 1-9 c.l860 George stevens organ • .5t30 - Dinner at the Groton Inn Restaurant, behind the former inn on Route 119 in the center of Groton. 7s30 - St. James Roman Catholic Church, West Groton, a field stone building off Route 22.5; 2-17 col847 George Stevens organ, said to have been moved from the Congregational Church in Groton in 1932. 8:30 .. First Parish Church, Unitarian, Groto:q, on Route 119, next to the Inn; 2-J2 l876 E.
    [Show full text]
  • Boston University Charles River Campus January 17, 2013 2013–2023 Institutional Master Plan
    Boston University Charles River Campus January 17, 2013 2013–2023 Institutional Master Plan Submitted by Trustees of Boston University Submitted to Boston Redevelopment Authority Prepared by Fort Point Associates, Inc. in association with: CBT Architects Greenberg Consultants, Inc. Tetra Tech TABLE OF CONTENTS TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................ ES-1 CHAPTER 1: INTRODUCTION 1.1 CAMPUS HISTORY AND BACKGROUND ..................................................................... 1-1 1.2 UNIVERSITY VALUES, MISSION, AND GOALS ............................................................. 1-3 1.3 2013–2023 INSTITUTIONAL MASTER PLAN ................................................................. 1-4 1.3.1 PROGRESS SINCE THE LAST INSTITUTIONAL MASTER PLAN .......................... 1-5 1.4 MASTER PLANNING PROCESS ...................................................................................... 1-8 1.4.1 BOSTON UNIVERSITY COMMUNITY TASK FORCE .......................................... 1-8 1.4.2 INSTITUTIONAL MASTER PLAN PROJECT TEAM .............................................. 1-9 CHAPTER 2: CAMPUS DEMOGRAPHICS 2.1 INTRODUCTION ............................................................................................................ 2-1 2.2 STUDENT POPULATION ............................................................................................... 2-1 2.2.1 HISTORICAL ENROLLMENT TRENDS ...............................................................
    [Show full text]
  • Boston University East Campus Student Services Center 100 Bay State Road Boston, Massachusetts Draft Project Impact Report
    FORT POINT ASSOCIATES, INC. 33 Union Street, 3rd Floor . Boston, MA 02108 Boston University East Campus Student Services Center 100 Bay State Road Boston, Massachusetts Draft Project Impact Report June 30, 2010 submitted to: prepared by: Boston Redevelopment Authority Fort Point Associates, Inc. submitted by: in association with: Trustees of Boston University Bruner/Cott & Associates, Inc. GZA GeoEnvironmental, Inc. Haley & Aldrich, Inc. Candace Jenkins Nitsch Engineering Tetra Tech Rizzo Boston University East Campus Student Services Center Draft Project Impact Report Table of Contents 1.0 PROJECT SUMMARY .................................................................................................... 1-1 1.1 Introduction ...................................................................................................... 1-1 1.2 Large Project Review– Boston University Student Services Center ........... 1-1 1.3 Proposed Institutional Project ........................................................................ 1-2 1.4 Project Proponent ............................................................................................ 1-2 1.5 Public Review Process .................................................................................... 1-3 1.6 Public Benefits ................................................................................................. 1-3 1.7 Project Team ..................................................................................................... 1-5 2.0 RELATIONSHIP TO THE INSTITUTIONAL MASTER
    [Show full text]
  • Pedestrian and Bicycle Connectivity Study
    Charles River Basin Pedestrian and Bicycle Study for Pathways and Bridges Pedestrian and Bicycle Connectivity Study December 2014 Charles River Basin Pedestrian and Bicycle Study for Pathways and Bridges Pedestrian and Bicycle Connectivity Study Prepared for Massachusetts Department of Transportation | Highway Division and Massachusetts Department of Conservation + Recreation by Commonwealth of Massachusetts Halvorson Design Partnership, Inc. Deval L. Patrick, Governor Alta Planning + Design Massachusetts Department of Transportation with assistance from Frank DePaola, Acting Secretary and CEO HDR, Inc. Nitsch Engineering, Inc. Executive Office of Energy and Environmental Affairs Maeve Vallely Bartlett, Secretary Massachusetts Department of Conservation + Recreation John P. Murray, Commissioner December 2014 Table of Contents Executive Summary I Part 1 | Background + Analysis Introduction 1 Existing Pedestrian and Bicycle Connectivity 5 Pedestrian Facility Toolbox 8 Bicycle Facility Toolbox 9 Regional Context 10 Part 2 | Recommendations Overview 11 Section A: Galen Street Bridge to North Beacon Street Bridge 12 Section B: North Beacon Street Bridge to Arsenal Street Bridge 16 Section C: Arsenal Street Bridge to Eliot Bridge 18 Section D: Eliot Bridge to Western Avenue Bridge 21 Section E: Western Avenue Bridge to Boston University Bridge 24 Section F: Boston University Bridge to Harvard Bridge 26 Section G: Harvard Bridge to Longfellow Bridge 30 Section H: Longfellow Bridge to Craigie Dam Bridge + Drawbridge 33 Implementation Project
    [Show full text]
  • Final Map Brochure
    The Charles With support from the community, we raise money for projects to restore and River Esplanade enhance the Park, employ two full-time horticulturists who maintain ten THE CHARLES RIVER Welcome to The Charles River Esplanade. ornamental gardens, as well as 1,700 The Esplanade is a continuous Park that trees, and host free Park programming Esplanade Map stretches over three miles from the such as Healthy, Fit & Fun free outdoor Museum of Science to the Boston University fitness classes, and Children in the Park, Bridge on the Boston side of the Charles which brings nearly 1,000 children with River. We encourage you to enjoy your time limited access to green space to the exploring this beautiful green space. Esplanade each summer. ABOUT THE ESPLANADE ASSOCIATION The Esplanade Association is a privately funded nonprofit organization that works to revitalize and enhance the Charles River Esplanade, preserve natural green space, and build community by providing educational, cultural, and recreational programs for everyone. © JB Parret Photography Help Us Make Life Better BECOME A MEMBER on the Esplanade The Esplanade Association receives no government funding. We depend on the Though the Esplanade Association has generosity of our members to support accomplished much since 2001, the Park the work we do to care for the Esplanade. requires significant and ongoing care to ensure that it remains beautiful and We have different levels of membership sustainable. Whether you make a financial so you can choose the one that is right for contribution, become a member, or you. To learn more or become a member, volunteer, your support helps to make life visit www.esplanadeassociation.org.
    [Show full text]
  • Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan
    Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan Submitted by Trustees of Boston University Submitted to Boston Redevelopment Authority Prepared by Fort Point Associates, Inc. in association with: CBT Architects Greenberg Consultants, Inc. Tetra Tech TABLE OF CONTENTS EXECUTIVE SUMMARY CHAPTER 1: INTRODUCTION 1.1 CAMPUS HISTORY AND BACKGROUND ..................................................................... 1-1 1.2 UNIVERSITY VALUES, MISSION, AND GOALS ............................................................. 1-3 1.3 2012–2022 INSTITUTIONAL MASTER PLAN ................................................................. 1-4 1.3.1 PROGRESS SINCE THE LAST INSTITUTIONAL MASTER PLAN .......................... 1-5 1.4 MASTER PLANNING PROCESS ...................................................................................... 1-8 1.4.1 BOSTON UNIVERSITY COMMUNITY TASK FORCE .......................................... 1-8 1.4.2 INSTITUTIONAL MASTER PLAN PROJECT TEAM .............................................. 1-9 CHAPTER 2: CAMPUS DEMOGRAPHICS 2.1 INTRODUCTION ............................................................................................................ 2-1 2.2 STUDENT POPULATION ............................................................................................... 2-1 2.2.1 HISTORICAL ENROLLMENT TRENDS ................................................................ 2-1 2.2.2 CURRENT POPULATION ..................................................................................
    [Show full text]