Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan

Total Page:16

File Type:pdf, Size:1020Kb

Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan Submitted by Trustees of Boston University Submitted to Boston Redevelopment Authority Prepared by Fort Point Associates, Inc. in association with: CBT Architects Greenberg Consultants, Inc. Tetra Tech TABLE OF CONTENTS EXECUTIVE SUMMARY CHAPTER 1: INTRODUCTION 1.1 CAMPUS HISTORY AND BACKGROUND ..................................................................... 1-1 1.2 UNIVERSITY VALUES, MISSION, AND GOALS ............................................................. 1-3 1.3 2012–2022 INSTITUTIONAL MASTER PLAN ................................................................. 1-4 1.3.1 PROGRESS SINCE THE LAST INSTITUTIONAL MASTER PLAN .......................... 1-5 1.4 MASTER PLANNING PROCESS ...................................................................................... 1-8 1.4.1 BOSTON UNIVERSITY COMMUNITY TASK FORCE .......................................... 1-8 1.4.2 INSTITUTIONAL MASTER PLAN PROJECT TEAM .............................................. 1-9 CHAPTER 2: CAMPUS DEMOGRAPHICS 2.1 INTRODUCTION ............................................................................................................ 2-1 2.2 STUDENT POPULATION ............................................................................................... 2-1 2.2.1 HISTORICAL ENROLLMENT TRENDS ................................................................ 2-1 2.2.2 CURRENT POPULATION ................................................................................... 2-2 2.2.3 FUTURE STUDENT ENROLLMENT PROJECTIONS ............................................ 2-3 2.3 EMPLOYMENT ............................................................................................................... 2-3 2.3.1 PROJECTED EMPLOYMENT FIGURES ................................................................ 2-5 CHAPTER 3: EXISTING PROPERTY AND USES 3.1 INTRODUCTION ............................................................................................................ 3-1 3.2 RESIDENTIAL PROPERTIES ............................................................................................. 3-2 3.3 ACADEMIC, ADMINISTRATIVE, AND OTHER PROPERTIES .......................................... 3-8 Table of Contents 1 CHAPTER 4: PLANNING AND URBAN DESIGN 4.1 HISTORICAL CONTEXT ................................................................................................. 4-1 4.2 NEIGHBORHOOD CONTEXT ....................................................................................... 4-3 4.3 TRANSPORTATION CONTEXT ...................................................................................... 4-8 4.4 FRAMEWORK AND VISION: CHARLES RIVER CAMPUS ............................................. 4-10 4.4.1 CENTRAL CAMPUS ........................................................................................... 4-11 4.4.2 SOUTH CAMPUS .............................................................................................. 4-12 4.4.3 EAST CAMPUS .................................................................................................. 4-12 4.4.4 WEST CAMPUS ................................................................................................. 4-17 4.4.5 COMMONWEALTH LANDING ........................................................................ 4-17 4.5 URBAN DESIGN PRINCIPLES ...................................................................................... 4-17 4.5.1 MIXED-USE, HIGH-DENSITY URBAN CAMPUS MASSING AND URBAN INFILL ............................................................................................................... 4-17 4.5.2 FORGING NORTH-SOUTH CONNECTIONS/RECONNECTING TO THE CHARLES RIVER ............................................................................................................... 4-18 4.5.3 ENHANCING THE PUBLIC REALM .................................................................. 4-18 4.5.4 FUTURE INFRASTRUCTURE PLANNING AND ITS RELATIONSHIP TO CAMPUS PLANNING ...................................................................................................... 4-20 4.6 RELATIONSHIP OF PROPOSED INSTITUTIONAL PROJECTS TO URBAN DESIGN PRINCIPLES .................................................................................................................. 4-21 4.6.1 STUDENT VILLAGE RESIDENCE III (SITE AA) ................................................... 4-21 4.6.2 BOSTON UNIVERSITY SCHOOL OF LAW (SITE BB) ........................................ 4-21 4.6.3 ACADEMIC BUILDINGS (SITE CC) ................................................................... 4-22 4.6.4 ACADEMIC BUILDING ADDITION (SITE DD) ................................................. 4-23 4.6.5 SCIENCE AND ENGINEERING RESEARCH BUILDING (SITE EE) ....................... 4-23 4.6.6 ACADEMIC/ADMINISTRATIVE BUILDING (SITE FF) ........................................ 4-24 4.6.7 MYLES STANDISH AND MYLES STANDISH ANNEX RESIDENCE HALL REHABILITATION (SITE GG) ............................................................................. 4-25 CHAPTER 5: DEVELOPMENT PROGRAM 5.1 INTRODUCTION ........................................................................................................... 5-1 5.2 ACADEMIC FACILITIES .................................................................................................. 5-1 5.2.1 BOSTON UNIVERSITY SCHOOL OF LAW (SITE BB) .......................................... 5-1 5.2.2 ACADEMIC BUILDING (SITE CC) ....................................................................... 5-2 5.2.3 ACADEMIC/ADMINISTRATIVE BUILDING (SITE FF) .......................................... 5-3 5.2.4 ACADEMIC BUILDING ADDITION (SITE DD) .................................................... 5-3 Table of Contents 2 5.3 RESEARCH FACILITIES ................................................................................................... 5-4 5.3.1 SCIENCE AND ENGINEERING RESEARCH BUILDING (SITE EE) ......................... 5-4 5.4 STUDENT HOUSING .................................................................................................... 5-5 5.4.1 STUDENT VILLAGE RESIDENCE III (SITE AA) ..................................................... 5-5 5.4.2 MYLES STANDISH RESIDENCE HALL AND MYLES STANDISH ANNEX REHABILITATION (SITE GG) .............................................................................. 5-5 5.5 PUBLIC REALM AND OPEN SPACE ............................................................................... 5-6 5.5.1 BAY STATE ROAD/BEACON STREET POCKET PARK ......................................... 5-6 5.5.2 COMMONWEALTH AVENUE PHASE 1A IMPROVEMENTS ............................... 5-6 5.5.3 COMMONWEALTH AVENUE PHASE 2A IMPROVEMENTS ............................... 5-7 5.5.4 COMMONWEALTH AVENUE AREA AT BU BRIDGE ......................................... 5-7 5.5.5 CUMMINGTON PEDESTRIAN MALL ................................................................. 5-7 5.5.6 GRANBY STREET TO SILBER WAY PEDESTRIAN WAY ...................................... 5-8 5.5.7 GRANBY STREET POCKET PARK ....................................................................... 5-8 5.6 PROJECT PLANNING ..................................................................................................... 5-8 5.7 ZONING ........................................................................................................................ 5-9 5.7.1 GROUNDWATER CONSERVATION OVERLAY DISTRICT ............................... 5-10 5.7.2 RESTRICTED PARKING OVERLAY DISTRICT ................................................... 5-11 5.7.3 ARTICLE 37 GREEN BUILDINGS ...................................................................... 5-11 5.7.4 GREENBELT PROTECTION OVERLAY DISTRICT ............................................. 5-12 5.7.5 NEIGHBORHOOD DESIGN OVERLAY DISTRICT ............................................ 5-12 5.7.6 BAY STATE ROAD/BACK BAY WEST ARCHITECTURAL CONSERVATION DISTRICT ......................................................................................................... 5-13 5.8 POTENTIAL DEVELOPMENT SITES .............................................................................. 5-13 CHAPTER 6: STUDENT HOUSING PLAN 6.1 MISSION ........................................................................................................................ 6-1 6.2 UNDERGRADUATES LIVING ON CAMPUS .................................................................. 6-1 6.3 UNDERGRADUATES LIVING OFF CAMPUS ................................................................. 6-3 6.4 STUDENT HOUSING POLICIES ...................................................................................... 6-3 6.4.1 RESIDENCY REQUIREMENTS ............................................................................. 6-3 6.4.2 ASSIGNMENT PROCESS .................................................................................... 6-4 6.4.3 SPECIAL RESIDENCY PROGRAMS ..................................................................... 6-5 6.5 STUDENT HOUSING PLAN OVERVIEW ....................................................................... 6-5 Table of Contents 3 CHAPTER 7: UTILITIES AND INFRASTRUCTURE 7.1 INTRODUCTION ........................................................................................................... 7-1 7.2 SANITARY SEWER SYSTEM ............................................................................................ 7-1 7.2.1 SYSTEM-WIDE PLANNING WITH BWSC ..........................................................
Recommended publications
  • Conceptual Plan
    About the Cover Photo The photo on the cover of this report was taken on December 17, 2010, around 8:00 AM. The view is from the Savin Hill Avenue overpass and looks almost directly south. This overpass is shown in Figure 3-3 of the report, and the field of view includes land shown in Figure 3-2. At the right is the recently completed headhouse of the Savin Hill Red Line station. Stopped at the station platform is an inbound Red Line train that started at Ashmont and will travel to Alewife. The station is fully ADA-compliant, and the plan presented in this report requires no modification to this station. Next to the Red Line train is an inbound train from one of the three Old Colony commuter rail branches. There is only one track at this location, as is the case throughout most of the Old Colony system. This train has a mixed consist of single-level and bi-level coaches, and is being pushed by a diesel locomotive, which is mostly hidden from view by the bi-level coaches. Between the two trains is an underpass beneath the Ashmont branch of the Red Line. This had been a freight spur serving an industrial area on the west side of the Ashmont branch tracks. Sections A-2.3 and A-2.4 of this report present an approach to staging railroad reconstruction that utilizes the abandoned freight spur and underpass. The two tracks to the left of the Old Colony tracks serve the Braintree Red Line branch.
    [Show full text]
  • Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan
    Boston University Charles River Campus August 10, 2012 2012–2022 Institutional Master Plan Submitted by Trustees of Boston University Submitted to Boston Redevelopment Authority Prepared by Fort Point Associates, Inc. in association with: CBT Architects Greenberg Consultants, Inc. Tetra Tech TABLE OF CONTENTS EXECUTIVE SUMMARY CHAPTER 1: INTRODUCTION 1.1 CAMPUS HISTORY AND BACKGROUND ..................................................................... 1-1 1.2 UNIVERSITY VALUES, MISSION, AND GOALS ............................................................. 1-3 1.3 2012–2022 INSTITUTIONAL MASTER PLAN ................................................................. 1-4 1.3.1 PROGRESS SINCE THE LAST INSTITUTIONAL MASTER PLAN .......................... 1-5 1.4 MASTER PLANNING PROCESS ...................................................................................... 1-8 1.4.1 BOSTON UNIVERSITY COMMUNITY TASK FORCE .......................................... 1-8 1.4.2 INSTITUTIONAL MASTER PLAN PROJECT TEAM .............................................. 1-9 CHAPTER 2: CAMPUS DEMOGRAPHICS 2.1 INTRODUCTION ............................................................................................................ 2-1 2.2 STUDENT POPULATION ............................................................................................... 2-1 2.2.1 HISTORICAL ENROLLMENT TRENDS ................................................................ 2-1 2.2.2 CURRENT POPULATION ..................................................................................
    [Show full text]
  • Counseling Psychology and Applied Human Development Doctoral Program Boston University – Wheelock College of Education and Human Development
    Counseling Psychology and Applied Human Development Doctoral Program Boston University – Wheelock College of Education and Human Development Doctoral Student Handbook 2020-2021 Table of ContentsI. Welcome........................................................................................................................................... 4 II. Overview of Programs ................................................................................................................................................... 5 Applied Human Development Program ................................................................................................................... 6 A. Mission Statement........................................................................................................................................................ 6 B. Brief Program History & Current Status of CPAHD................................................................................... 7 C. Program Goals ................................................................................................................................................................ 9 III. Academic Requirements.......................................................................................................................................... 10 A. Coursework................................................................................................................................................................... 10 B. Clinical Practica (Counseling Psychology program
    [Show full text]
  • Pepsi Machine Inventory 2013 Web Site.Xlsx
    ACCOUNT ADDRESS ASSET LOCATION BU/POLICE STATION 32 Haw, Boston 2nd Fl Hall On Left BU/UNIVERSITY RELATIONS 25 Buick St, Boston 1st Fl BU/UNIVERSITY RELATIONS 25 Buick St, Boston 3rd Fl -Soda By Overpass BU/UNIVERSITY RELATIONS 25 Buick St, Boston 2nd Floor Breakroom BU/BIODMEDICAL RESEARCH 609 Albany St, Boston Basement Aquafina Vendor BU/GILMORE VIVES BUILDING 801 Albany St, Roxbury 1st Floor BU/SCHOOL OF MANAGEMENT 595 Commonwealth Ave, Boston 7th Flr BU/HOSPITALITY 928 Commonwealth Ave, Boston 2nd Fl Next To Rm 206 BU/HA SPORTS SERVICE/AGGANIS ARENA 925 Commonwealth Ave, Boston Ice Rink Level BU/DENTAL SCHOOL 100 East Newton St, Boston Cafe--Aqua BU/STUDENT VILLAGE 10 Buick St, Boston 1st Fl By P.O.-Glfr BU/TOWERS 140 Bay State Rd, Boston Csd Left Side BU/TOWERS 140 Bay State Rd, Boston Csd Right Side BU/808 COMMONWEALTH AVE 808 Commonwealth Ave, Boston 1st Fl Noncarb Side Door BU/WARREN TOWERS #1824 700 Commonwealth Ave, Boston 4th Fl Noncarb On Left BU/575 COMMONWEALTH AVE 575 Commonwealth Ave, Boston Glfr Inside Lounge BU/PHOTONICS 8 St Marys St, Boston Glfr 1st Fl Lounge BU/CLAFLIN HALL 273 Babcock St, Boston Lobby By Security-Glfr BU/MYLES STANDISH HALL 610 Beacon St, Boston Glfr 1st Fl Vending BU/TSAI PERFORMANCE CENTER 685 Commonwealth Ave, Boston Basement-Glassfront BU MARKETING & COMMUNICATIONS 985 Commonwealth Ave, Boston Brrm Soda BU/METROPOLITAN COLLEGE 96-100 Cummington St, Boston Inside Vendor BU/METROPOLITAN CAFE 755 Commonwealth Ave, Boston Basement BU/RESIDENCE HALL 509 Park Dr, Boston Residence Hall BU/INTERNATIONAL
    [Show full text]
  • Boston University Theta Tau
    Boston University Theta Tau Table of Contents Letter from the Colony President………………………………………………………………………….3 Member Signatures……………………………………………………………………………………………...4 Member Profiles……..……………………………………………………………………………………………5 History of Boston University……………………………………………………………………………….16 History of the Boston University College of Engineering………………………………….......19 College of Engineering General Information………………………………………………………...22 History of the Boston University Colony……………………………………………………………...23 Letters of Recommendation………………………………………………………………………………..32 Boston University Colony of Theta Tau 2 Mr. Michael T. Abraham, Executive Director Theta Tau Professional Engineering Fraternity 1011 San Jacinto, Suite 205 Austin, TX 78701 Dear Brothers, I am honored to represent the Boston University Colony of Theta Tau in presenting our petition for chapter status. Over the past year, our colony has developed as an organization that truly respects and embodies the three pillars of Theta Tau: Service, Profession, and Brotherhood. Our colony has had the privilege of interacting with the national brotherhood on several occasions. This past summer, brothers from our colony represented Boston University at Theta Tau’s Leadership Academy. Their most important takeaway from this experience was the powerful sense of brotherhood that Theta Tau fosters and practices on a national level. As a colony, we seek to emulate that connection both between brothers, and with alumni in our immediate area. At our first annual Boston Local Alumni Networking Panel, we were lucky enough to host supportive alumni living in Boston. These brothers have since remained in contact with us as a support network to aid our colony in growing and succeeding as part of Theta Tau. As a member of our colony’s founding class I have seen firsthand the success our colony has achieved this past year.
    [Show full text]
  • Summer-Projects-2014-Final.Pdf
    Facilities Management & Planning Summer 2014 Projects 22 3 21 9 13 20 8 19 6 7 11 17 4 5 14 15 10 16 18 MEDICAL CAMPUS: 12 75 East Newton Street 1 (E Building) 72 East Concord Street (L Building) 2 From routine maintenance to meeting milestones, it’s all in a day’s work for FM&P. The University’s city within a city spans two campuses with 322 buildings on 135 acres. And it’s bustling year round for Facilities Management & Planning (FM&P). After a long, cold winter, we’re looking forward to longer days and shortening our project list. Please take a moment to look over our summer break projects. Questions? Contact Lauren Stanton at [email protected] or 617-358-5650. 1 KEEFER AUDITORIUM SEATING UPGRADE 4 IS&T HELP CENTER 75 East Newton Street (E Building) 179 Amory Street Seating will be upgraded in the Keefer Auditorium. The Information Services & Technology (IS&T) Project scope includes replacement of 132 tablet Help Center provides tech support (software, arm chairs and cosmetic improvements in the 2,384 hardware, account services) to the BU community sf auditorium. via phone, email, and walk-in locations. This summer, IS&T locations at 111 Cummington Mall and 533 2 L-11 TESTING FACILITY Commonwealth Avenue will be consolidated at this 72 East Concord Street (L Building) new location. 7,488 sf of the L Building’s library on the 11th floor The single Help Center location, will allow IS&T to will be transitioned into a dedicated testing and better support students and instructors.
    [Show full text]
  • Charles River Campus Map 2010/2011 Campus Guide
    Charles River Campus Map 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Cambridge MASSACHUSETTS AVE. SOLDIERS FIELD ROAD To E A MEMORIAL DRIV A 619 M A 285 SS 120 AC 512 100 300 HU C3 S BOSTON UNIVERSITY BRIDGE ET TS ASHFORD ST. T 277 U R 519 NickersonField NP B 33 IK B BU E 531 Softball P STORROW DRIVE CHARLESGATE EAST Field 11 P 53 CHARLESGATE WEST 2 275 53 91 10 83–65 61 GARDNER ST. P 147–139 115 117 Alpert 121 125 131 P 185–167 133 RALEIGH 209–191 153 157 163 32 225 213 273 Mall 632 610 481 BAY STATE ROAD DEERFIELD ST. 70 6056 25 P 765 P 96 94–74 264 C 771 270 172–152 118–108 C 122 767 124 236–226 214–182 140 128 P 19 176 178 656 1 660 648 735 2 565 BEACON STREET To Downtown 949 925 915 P 775 GRANBY ST. Boston 1 595 P 575 1019 P P 985 881 871 855 725 705 685 675 621 SILBER WAY P ALCORN ST. 755 745 635 C4 541–533 BUICK ST. BABCOCK ST. HARRY AGGANIS WAY HARRY M1 629 625 C6 UNIVERSITY RD. C5 MALVERN ST. MALVERN P AVENUE COMMONWEALTH AVENUE Kenmore LTH COMMONWEALTH AVENUE A Square E M2 M3 M4 D W D N 940 928 890–882 846–832 808 766–730 700 P 602 580 918 115 1010 728–718 710 704 500 O P P P M 940W M M FU MOUNTFORT ST.
    [Show full text]
  • Esplanade Cultural Landscape Report - Introduction 1
    C U L T U R A L L A N D S C A P E R E P O R T T H E E S P L A N A D E B O S T O N , M A S S A C H U S E T T S Prepared for The Esplanade Association 10 Derne Street Boston, MA 02114 Prepared by Shary Page Berg FASLA 11 Perry Street Cambridge, MA 02139 April 2007 CONTENTS Introduction . 1 PART I: HISTORICAL OVERVIEW 1. Early History (to 1893) . 4 Shaping the Land Beacon Hill Flat Back Bay Charlesgate/Bay State Road Charlesbank and the West End 2. Charles River Basin (1893-1928) . 11 Charles Eliot’s Vision for the Lower Basin The Charles River Dam The Boston Esplanade 3. Redesigning the Esplanade (1928-1950) . 20 Arthur Shurcliff’s Vision: 1929 Plan Refining the Design 4. Storrow Drive and Beyond (1950-present) . 30 Construction of Storrow Drive Changes to Parkland Late Twentieth Century PART II: EXISTING CONDITIONS AND ANALYSIS 5. Charlesbank. 37 Background General Landscape Character Lock Area Playground/Wading Pool Area Lee Pool Area Ballfields Area 6. Back Bay. 51 Background General Landscape Character Boating Area Hatch Shell Area Back Bay Area Lagoons 7. Charlesgate/Upper Park. 72 Background General Landscape Character Charlesgate Area Linear Park 8. Summary of Findings . 83 Overview/Landscape Principles Character Defining Features Next Steps BIBLIOGRAPHY. 89 APPENDIX A – Historic Resources . 91 APPENDIX B – Planting Lists . 100 INTRODUCTION BACKGROUND The Esplanade is one of Boston’s best loved and most intensively used open spaces.
    [Show full text]
  • Applied Human Development and Counseling Psychology Doctoral Program Boston University – Wheelock College of Education and Human Development
    Applied Human Development and Counseling Psychology Doctoral Program Boston University – Wheelock College of Education and Human Development Student Handbook Table of Contents Forms for Qualifying Tasks…………………………………………...…………………………………………64 .... 4 I. Welcome ............................................................................................................................................................... 5 II. Overview of Programs ................................................................................................................................... 7 Applied Human Development Program ....................................................................................................... 7 A. Mission Statement ........................................................................................................................................ 8 B. Brief Program History & Current Status of CPAHD .......................................................................... 8 C. Program Goals ............................................................................................................................................ 11 III. Academic Requirements ........................................................................................................................... 13 A. Coursework ................................................................................................................................................. 13 CPAHD Policy on Students Taking Courses Remotely .................................................................................
    [Show full text]
  • 06 Management
    A landscape park requires, more than most works of men, continuity of management. Its perfection is a slow process. Its directors must thoroughly Standard maintenance apprehend the fact that the beauty of its landscape is all that justifies the includes cutting grass, picking existence of a large public space in the midst, or even on the immediate up litter three times a week in borders, of a town. As trustees of park scenery, they will be especially watchful to prevent injury thereto from the intrusion of incongruous or obtrusive the summer (daily when nec- structures, statues, gardens (whether floral, botanic, or zoologic), speedways, essary), repairing potholes, or any other instruments of special modes of recreation, however desirable such sweeping parkways, and emp- may be in their proper place. tying trash barrels. A separate CHARLES WILLIAM ELIOT, CHARLES ELIOT, LANDSCAPE ARCHITECT, crew prunes and removes dead and hazardous trees. The or the Charles River Basin to continue as Boston’s Central Park, MDC Engineering and substantial investments of time, funds, and staff will be required Construction Division con- over the next fifteen years. When the master plan for New York’s tracts out work for larger park Central Park was completed in , a partnership between the city projects, such as bridges and parkland restoration. MAINTAINING THE SHORE LINE IS ONE OF and the Central Park Conservancy spent millions of dollars over THE MOST CHALLENGING MAINTENANCE TASKS IN THE BASIN. (MDC photo) ten years to restore this neglected resource. Crews trained in park Existing Conditions and Issues restoration were added to existing maintenance crews, dramatically A detailed study of maintenance operations, budgets, and staffing was improving care.
    [Show full text]
  • Highlights of Boston University Charles River Campus
    Cambridge MASSACHUSETTS AVE. MA SSAC H To USE DRIVE TTS MEMORIAL T S UR O NP LD IK IE BOSTON UNIVERSITY BRIDGE E RS 4 51 1 FIE C3 LD Construction ASHFORD ST. RO site of AD Student Village Malvern NickersonField Phase II Admissions P Reception Center Field P STORROW DRIVE P 45 CHARLESGATE EAST GARDNER ST. 5 Alpert 29 43 CHARLESGATE WEST 9 P RALEIGH John Hancock 19 Mall 26 BAY STATE ROAD DEERFIELD ST. 50 Student Village 10 18 P 39 P HARRY AGGANIS WAY HARRY 16 22 6 8 BUICK ST. 17 46 2 P P 36 41 P 44 48 To Downtown 13 P SILBER WAY 40 Boston ALCORN ST. 11 C4 BABCOCK ST. 14 33 P 27 GRANBY ST. UNIVERSITY 20 21 25 M1 C6 C5 28 P 47 MALVERN ST. MALVERN Kenmore EALTH AVE. COMMONWEALTH AVE. COMMONWEALTH AVE. NW University Shuttle Bus Square O M2 M3 M4 PLEASANT ST. M P P 49 M P 30 37 O 3 7 P 15 C F 12 U MOUNTFORT ST. 31 34 L CUMMINGTON HINSDALE ST. 38 L 23 E 42 R DUMMER ST. AMORY ST. AMORY BLANDFORD ST. NAPLES RD. 32 S ST. PAUL ST. PAUL ST. 35 ST. MARY’S ST. MARY’S ST. BEACON STREET MASSACHUSETTS TURNPIKE T . LENOX ST. WORTHINGTON RD. MOUNTFORT ST. EGMONT ST. ARUNDEL ST. BROOKLINE AVE. ESSEX ST. EUSTON ST. 24 Fenway Park BUSWELL ST. CARLTON ST. CARLTON PRESCOTT ST. MINER COTTAGE FARM RD. FARM COTTAGE IVY ST. ABERDEEN LEGEND KESWICK PARK DRIVE MBTA Stops, Green line “B” cars ST.
    [Show full text]
  • Section E Western Avenue Bridge to Boston University Bridge
    Section E Western Avenue Bridge to Boston University Bridge The Charles River Reservation between the Western Avenue Bridge and Boston University both sides of Memorial Drive. Raised crossings should be added to enhance the visibility of (BU) Bridge is very narrow, with the exception of Magazine Beach. The River Street and the path and to prioritize the path users over the turning motor vehicles. Western Avenue Bridges are both currently in redesign by MassDOT. The City of Cambridge has long-term redevelopment plans for the shopping center between Cycle tracks are currently part of the design for both the River Street and Western Avenue Pleasant Street and Magazine Street. In the short term, bicycle and pedestrian improvements Bridges. There is an existing cycle track and bike lane on the Boston side of Western should be made through the parking lot, a portion of which is a public right-of-way. Avenue, and a cycle track is currently under construction for the Cambridge side of South Bank. The segment of the path on the Boston side, downriver from the River Street Western Avenue (Figure 56). Bridge, is extremely narrow and makes two-way bicycle and pedestrian traffic uncomfortable. North Bank. On the Cambridge side of the river, there is a gap in the existing and planned MassDOT is widening the path as part of the River Street Bridge rehabilitation. However, bicycle infrastructure on River Street between the River Street Bridge and Putnam Avenue. additional widening is recommended to bring the clear path width to 10 feet. This additional There are existing bike lanes on River Street between Putnam Avenue and Central Square, widening may require a cantilever to allow the path to extend over the seawall.
    [Show full text]