FORT POINT ASSOCIATES, INC. 33 Union Street, 3rd Floor . , MA 02108

Boston University Institutional Master Plan Notification Form

December 21, 2011

submitted to: prepared by: Boston Redevelopment Authority Fort Point Associates, Inc. submitted by: in association with: Trustees of CBT Architects, Inc. Greenberg Consultants, Inc. Tetra Tech, Inc.

BOSTON UNIVERSITY IMPNF

TABLE OF CONTENTS

1.0 INTRODUCTION ...... 1-1 1.1 Master Plan Progress ...... 1-1 1.2 New Master Plan ...... 1-1 2.0 BOSTON UNIVERSITY MISSION AND GOALS ...... 2-1 3.0 PROGRESS ON THE 2003 MASTER PLAN ...... 3-1 3.1 Enrollment ...... 3-1 3.2 Student Housing ...... 3-2 3.3 Academic Facilities ...... 3-2 3.4 Other Facilities and Improvements ...... 3-3 4.0 EXISTING PROPERTY AND USES ...... 4-1 4.0 Introduction ...... 4-1 4.1 Residential Properties ...... 4-1 4.2 Academic, Administrative and Other Properties ...... 4-6 5.0 PLANNING FRAMEWORK ...... 5-1 5.0 Introduction ...... 5-1 5.1 Campus Districts ...... 5-1 5.2 Campus Growth ...... 5-2 5.2.1 Campus Facilities ...... 5-2 5.2.2 Athletics ...... 5-3 5.2.3 Public Realm ...... 5-3 5.2.4 Transportation Infrastructure ...... 5-3 5.3 Summary ...... 5-4 6.0 DEVELOPMENT PROGRAM ...... 6-1 6.1 Introduction ...... 6-1 6.1 Campus Context ...... 6-1 6.2 Proposed Institutional Projects ...... 6-1 6.2.1 Projects Previously Approved in the Planned Development Area Master Plan ...... 6-2 6.2.2 Proposed Institutional Projects approved in the 2010 Master Plan Renewal ...... 6-3 6.2.3 New Proposed Institutional Projects for the 2012 Master Plan ...... 6-5 6.2.4 Public Realm Projects ...... 6-8 6.3 Potential Development Sites ...... 6-10 7.0 TRANSPORTATION AND PARKING ...... 7-1 7.1 Transportation Goals ...... 7-1 7.2 Changes at the Campus Since 2003 ...... 7-4 BOSTON UNIVERSITY IMPNF

7.3 Changes to the Transportation Network Since 2003 ...... 7-5 7.4 Expected Changes to the Transportation Network (2012 – 2022) ...... 7-6 8.0 ENVIRONMENT AND SUSTAINABILITY ...... 8-1 8.1 Introduction ...... 8-1 8.2 Operations ...... 8-1 8.3 Education and Research ...... 8-2 8.4 Public Engagement ...... 8-3 8.5 Transportation ...... 8-4 8.6 Stormwater and Groundwater ...... 8-4 8.7 Historic Preservation ...... 8-5 9.0 COMMUNITY BENEFITS ...... 9-1 9.1 Introduction ...... 9-1 9.2 Community Benefits ...... 9-1 9.3 Economic Impact ...... 9-3 APPENDIX A – LIST OF BOSTON UNIVERSITY COMMUNITY TASK FORCE MEMBERS ...... A-1

Table of Contents

BOSTON UNIVERSITY IMPNF

LIST OF TABLES

Table 3-1, Full Time Undergraduate Enrollment – Charles River Campus ...... 3-1 Table 3-2, Projected Undergraduate Enrollment - Charles River Campus ...... 3-2 Table 3-3, Full Time Undergraduates Residing in Boston ...... 3-2 Table 4-1, List of Residential Properties ...... 4-1 Table 4-2, List of Academic, Administrative and Other Properties ...... 4-7 Table 9-1, Overview of BU's Economic and Employment Impact in 2010 ...... 9-3

LIST OF FIGURES

Figure 6-1, Boston University Properties ...... 6-11 Figure 6-2, Proposed Institutional Projects ...... 6-12 Figure 6-3, Public Realm Improvements ...... 6-13 Figure 6-4, Potential Development Sites ...... 6-14

Table of Contents

BOSTON UNIVERSITY IMPNF

1.0 INTRODUCTION Boston University was the first university in the City of Boston to prepare an Institutional Master Plan (“Master Plan”). The first Charles River Campus Master Plan was approved in 1986, followed by the second in 1997, and finally the third in 2003. The third Master Plan was renewed in October 2010 for a two year period in order to allow for the preparation of a new, fourth Master Plan.

Over the past 25 years, the University has completed a host of important improvements to the campus outlined in the various Master Plans. Most prominent among these projects are the John Hancock Student Village with housing for more than 1,700 students, the Harry , the Boston University Fitness and Recreation Center, the School of Management, the Center for Photonics Research, the Life Sciences and Engineering Building, the graduate student residence at 580 Commonwealth Avenue, and the Track and Tennis Center. The University has successfully partnered with the City of Boston and the Commonwealth on several redevelopment efforts, including Kenmore Square and the beautification of Commonwealth Avenue between Deerfield Street and the BU Bridge.

The Master Plan development objectives of Boston University for this new Master Plan include the completion of existing projects, the improvement of the visual appearance and livability of the campus, and the addition of some new academic, recreational, residential, and research facilities.

1.1 Master Plan Progress The 2003 Master Plan and the 2010 Master Plan Renewal documented many programmatic and facility improvements to support the ongoing goals of the University. The University is pleased that many of these improvements have been accomplished over the course of the Master Plan, though some remain to be implemented. The 2010 Master Plan Renewal included four new proposed projects; the East Campus Student Center, the renovation and expansion of the Law School, a new Admissions Reception Center, and a new multipurpose playing field on Babcock Street. The East Campus Student Center at 100 Bay State Road is under construction and is projected to be open in the fall of 2012. The other three proposed projects are all under design with construction expected to commence in 2012 and 2013. While the completion of these projects will greatly enrich campus life, there are still unmet needs for academic, recreational and residential facilities.

1.2 New Master Plan The current 2003 Master Plan with the 2010 Master Plan Renewal will expire in October, 2012. The University has begun the process of gathering information related to the new Master Plan and identifying its needs over the next decade in light of the

1.0 Introduction 1-1

BOSTON UNIVERSITY IMPNF

recently completed strategic plan entitled “Boston University Strategic Plan – Choosing to be Great”1. The University is committed to taking the time necessary to thoroughly evaluate the future needs of the Charles River Campus and to develop a creative and thoughtful plan to achieve the University’s overall goals and objectives. The University is working with its faculty, staff, and students, along with the surrounding community, to define its next steps. This document is a framework for setting forth those goals and working with the community and the City to define a new ten-year Master Plan.

1 www.bu.edu/president/strategic-plan

1.0 Introduction 1-2

BOSTON UNIVERSITY IMPNF

2.0 BOSTON UNIVERSITY MISSION AND GOALS Boston University is an international, comprehensive, private research university, committed to educating students to be reflective, resourceful individuals ready to live, adapt, and lead in the interconnected world. Boston University is committed to generating new knowledge to benefit society.

The University remains dedicated to its founding principles: that higher education should be accessible to all and that research, scholarship, artistic creation, and professional practice should be conducted in the service of the wider community – local and international. These principles endure in the University’s insistence on the value of diversity, in its tradition and standards of excellence, and in its dynamic engagement with the City of Boston and the world.

Boston University comprises a remarkable range of undergraduate, graduate, and professional programs built on a strong foundation of the liberal arts and sciences. With the support and oversight of the Board of Trustees, the University, through its faculty, continually innovates in education and research to ensure that it meets the needs of students in an ever-changing world.

In 2007, Boston University completed the “Boston University Strategic Plan – Choosing to be Great.” The Plan includes eight concrete goals in support of the University’s mission, with each goal being the product of extensive discussions undertaken as a community involving its students, faculty, alumni and friends.

Boston University’s goals include:

1. To support and enhance a world-class faculty whose members are dedicated to teaching and engaged in research, scholarship, and their professions.

2. To continue to develop the special undergraduate educational environment that combines its commitment to a liberal arts and sciences education with professional opportunities, while creating flexible educational opportunities to leverage the depth of the College of Arts and Sciences (CAS) and our other schools and colleges. To continue its commitment to inclusiveness based on merit for all students, irrespective of race, religion, or economic status, and to raise the financial aid needed to do this.

3. To expand and enhance the College of Arts and Sciences as the core of the University and our undergraduate programs. Boston University is committed to increasing the number of CAS faculty members and expanding and renewing the College’s facilities.

2.0 Mission and Goals 2-1

BOSTON UNIVERSITY IMPNF

4. To enhance the residential campus and student life experience for its undergraduate students in the special urban environment of Boston.

5. To strengthen scholarship and research throughout the University by support of key disciplinary graduate programs.

6. To enhance its nationally recognized professional schools and colleges, including Medicine, Management, Law, and Fine Arts. Boston University’s commitments to Medicine, Management, and Law are key to its prominence as a major urban research university. The College of Fine Arts offers a special opportunity for projecting Boston University on campus, in the city, and around the world.

7. To increase its emphasis on interdisciplinary research and graduate education in order to expand its leadership in important fields and the collaborative atmosphere across our campuses.

8. To continue to foster the engagement of Boston University in the city and the world, through public service and by extending the reach of its educational programs, including both study-abroad opportunities for Boston-based students and the creation of new opportunities for students from around the world to experience a BU education.

2.0 Mission and Goals 2-2

BOSTON UNIVERSITY IMPNF

3.0 PROGRESS ON THE 2003 MASTER PLAN Since the adoption of the 2003 Master Plan, Boston University has made great strides in implementing many of the objectives in the plan. This section reviews the progress made in the areas of enrollment, housing, and construction of academic, recreational, housing and public realm improvements.

3.1 Enrollment Full-time undergraduate enrollment at Boston University’s Charles River Campus has increased during the past decade from 14,976 to 15,573 (See Table 3-1, Full-Time Undergraduate Enrollment – Charles River Campus). The number of students seeking enrollment at Boston University has increased even more dramatically over the same period, allowing the University to be more selective about the students it accepts. Enrollment is projected to be relatively stable over the next two years (See Table 3-2, Projected Undergraduate Enrollment - Charles River Campus). The University's current goal is to enroll a freshman class of 4,000 each year. Approximately one half of the undergraduate students come from , New York, New Jersey and Connecticut. The other half come from every state in the union and over 100 countries throughout the world.

Table 3-1, Full-Time Undergraduate Enrollment – Charles River Campus Students Undergraduate Percent Freshman Fall Enrollment Needing Occupancy Housed Class Size Housing 2003 14,976 10,650 14,059 76% 3,961 2004 15,186 10,746 14,397 75% 4,352 2005 15,690 10,860 14,774 74% 4,209 2006 15,681 10,879 14,678 74% 4,124 2007 15,771 10,675 14,723 73% 4,163 2008 15,540 10,629 14,486 73% 4,131 2009 15,386 10,825 14,288 76% 4,130 2010 15,573 11,134 14,635 76% 4,409 2011 15,476 11,109 14,553 76% 4,025

3.0 Progress On The 2003 Master Plan 3-1

BOSTON UNIVERSITY IMPNF

Table 3-2, Projected Undergraduate Enrollment - Charles River Campus Students Undergraduate Percent Freshman Fall Enrollment Needing Occupancy Housed Class Size Housing 2012 15,331 11,022 14,264 77% 4,000

3.2 Student Housing In response to concerns of the City and the surrounding neighborhoods, the University has sustained its commitment to increasing the supply of on-campus housing for undergraduate students. The University was challenged to create housing that would be attractive to upperclassmen who are most likely to reside off campus. The University has made great strides in increasing the availability and variety of on-campus housing options. With the construction of two new residential buildings at 10 Buick Street and 33 Harry Agganis Way and a number of other housing and dining improvement projects, including historically sensitive renovations of Bay State Road undergraduate residences, the University has increased the percentage of students housed on campus from 67% in 1994 to 76% in 2011. The University will continue to work toward increasing on- campus housing opportunities.

The University provides information to the City of Boston in response to the University Accountability Ordinance regarding the number of students housed on-campus and off- campus within the City of Boston. These figures are presented in Table 3-3, Full Time Undergraduates Residing in Boston. Table 3-3 includes only students residing within the City of Boston and thus differs somewhat from Table 3-1. As the tables show, the number of students needing housing has remained fairly stable over time, while the number of students living on campus has increased, and the number of student living off campus within the City of Boston has declined significantly.

Table 3-3, Full Time Undergraduates Residing in Boston School Year Fall 2008 Fall 2009 Fall 2010 Residing in Boston On-campus 10,376 10,825 11,134 Residing in Boston Off-campus 2,119 1,713 1,402 Total 12,495 12,594 12,536

3.3 Academic Facilities Life Sciences & Engineering Building (25 Cummington Street)

In 1998, the University began an exciting program of expansion in the fields of biology and chemistry. The Life Sciences & Engineering Building, with 42 research labs and 188,500 sf of space, opened on Cummington Street in May 2005. The Department of

3.0 Progress On The 2003 Master Plan 3-2

BOSTON UNIVERSITY IMPNF

Biology currently occupies approximately 47,000 sf for cell molecular biology and neurobiology. The Department of Chemistry accommodates 28,000 sf of research activities related to organic synthetic chemistry and biochemistry. In addition to the administrative space for Bioinformatics, the building provides research facilities for faculty from the Department of Biomedical Engineering and a computational lab for instruction and research.

School of Hospitality Administration (928 Commonwealth Avenue)

Opened in 2006, 928 Commonwealth Avenue in Brookline became the new home of the School of Hospitality Administration for 400 students. The project developed instructional spaces, team meeting rooms and faculty offices that were designed to reflect hotel elements that offer the ambience its graduates can expect to find in their professional careers.

3.4 Other Facilities and Improvements John Hancock Student Village (915-925 Commonwealth Avenue)

The John Hancock Student Village has been one of the most important and visible campus developments in the University’s history. The approved plan for development of the 10.2 acre site includes housing for 2,300 students, indoor recreational facilities, an arena/convocation center and structured parking for 1,000 cars. The first building, at 10 Buick Street, opened in 2000 and provides housing for 817 students. Subsequently, the Agganis Arena opened in December 2004, and the Fitness and Recreation Center opened in March 2005.

Student Village Phase II (33 Harry Agganis Way)

The second phase of the John Hancock Student Village project represented a significant step towards the University's goal of increasing the number of undergraduate students housed on campus. Completed in August 2009, Boston University's newest residence at 33 Harry Agganis Way accommodates 960 residents in two towers. In response to student preference surveys, the building includes a mix of singles and doubles in suite configuration as well as a number of singles in apartment style units.

Commonwealth Avenue Improvements – Phase I

A highly successful public-private partnership between the University, the City of Boston Department of Public Works, the Boston Transportation Department and the State Executive Office of Transportation has resulted in major safety, aesthetic and transportation improvements to the portion of Commonwealth Avenue from Kenmore Square to the BU Bridge. These improvements were accomplished through the installation of wider sidewalks, street tree plantings, period streetlights, and articulated crosswalks. The removal of an unnecessary third travel lane allowed for the installation of the first bike lanes in the City of Boston. Boston University contributed funds toward

3.0 Progress On The 2003 Master Plan 3-3

BOSTON UNIVERSITY IMPNF

the design and construction of this phase of improvements and will provide ongoing maintenance.

Graduate Student Housing, 580 Commonwealth Avenue

The Graduate Housing Building at 580 Commonwealth Avenue was completed in 2004, providing 220 studio and one-bedroom units of housing. This highly successful building provides much needed on-campus housing for graduate students.

East Campus Student Services Center, 100 Bay State Road

The new East Campus Student Services Center is under construction at 100 Bay State Road. The project will become the new location for undergraduate academic services and a dining facility for students living in the East Campus area. The building is scheduled to be ready for occupancy in August 2012

Kenmore Square Improvements

Over the past three decades, Boston University has played a major role in the successful redevelopment of Kenmore Square. With the University’s opening of the Hotel Commonwealth in 2005 anchoring those redevelopment efforts, the University also contributed its resources to the planning and designing of streetscape improvements in the Square. The new Kenmore Square bus rapid transit head house entrance located adjacent to the Hotel Commonwealth was made possible in part by funding from the University. The University will provide ongoing maintenance for City sidewalks, crosswalks, plazas and landscape areas.

Acquisition of Cummington and Blandford Streets

A long-time goal of the Master Plan, the University acquired Cummington and Blandford Streets from the City of Boston in 2011. These streets will be private ways, retaining pedestrian access from Blandford Street to Beacon Street through a public pedestrian easement. Future plans include the construction of a pedestrian mall and the reconfiguration of building parcels.

3.0 Progress On The 2003 Master Plan 3-4

BOSTON UNIVERSITY IMPNF

4.0 EXISTING PROPERTY AND USES

4.0 Introduction The Boston University Charles River Campus consists of some 112 acres of land and 274 buildings containing approximately 11.8 million sf of space. The campus is centered on Commonwealth Avenue, extending from Kenmore Square to Packard’s Corner. The existing Boston University properties are shown in Figure 6-1, Boston University Properties. In addition, the lists of properties covered by the Master Plan have been updated. These properties can be found below in Table 4-1, List of Residential Properties and Table 4-2, List of Academic, Administrative and Other Properties.

4.1 Residential Properties The University’s housing stock consists of a wide range of building types and ages. Housing ranges from the historic brownstones along Bay State Road, constructed in the late 1800s, to the large scale dormitories of and West Campus built during the 1960s, to the modern suite style units constructed on the Student Village in the last decade. In total the University has the ability to house over 11,100 students on campus, as well as some faculty, staff and graduate students. Maintaining this housing stock over the years has been a major undertaking requiring constant refurbishment and renewal of existing buildings, along with the occasional construction of entirely new housing.

Table 4-1, List of Residential Properties

Year Building Large Residence Halls Stories Height Built Area (gsf) 273 Babcock Street- Claflin Hall 1963 B+13 125' 143,076 275 Babcock Street- Sleeper Hall 1963 B+13 136' 153,259 277 Babcock Street- Rich Hall 1964 B+13 136' 161,348 91 Bay State Road- Shelton Hall 1923 B+9 95'6" 118,821 140 Bay State Road- The Towers 1958 B+9 79'2" 128,887 512 Beacon Street, Danielsen Hall 1926 B+10 103' 70,768 610 Beacon Street- Myles Standish 1926 B+9 80' 185,149 575 Commonwealth Avenue 1963 B+8 60' 87,619 700 Commonwealth Avenue- Warren Towers Fairfield Tower 1966 18 196' 110,168 Marshall Tower 1967 18 196' 164,563 Shields Tower 1966 18 196' 110,168 1019 Commonwealth Avenue 1989 B+6 70' 78,294 10 Buick Street 2000 B+18 195' 384,971

4.0 Existing Property And Uses 4-1

BOSTON UNIVERSITY IMPNF

33 Harry Agganis Way 2009 B+26 284' 399,578

Year Building Small Residence Halls Built Stories Height Area (gsf) 11 Bay State Road 1895 B+5 60' 8,165 56-58 Bay State Road 1900 B+4 48' 5,700 59 Bay State Road 1893 B+4 55' 9,768 60 Bay State Road 1895 B+4 51' 6,138 61 Bay State Road 1893 B+4 55' 9,988 62 Bay State Road 1895 B+4 42' 6,057 65 Bay State Road 1897 B+5 55' 10,388 68 Bay State Road 1896 B+4 45' 5,700 69-71 Bay State Road 1897 B+4 50'-48' 18,275 70 Bay State Road 1896 B+4 45' 5,700 73 Bay State Road 1901 B+4 50' 10,889 74 Bay State Road 1896 B+4 48' 5,800 75 Bay State Road 1901 B+4 56' 10,210 76 Bay State Road 1896 B+4 48' 6,146 77 Bay State Road 1900 B+5 60' 13,298 78 Bay State Road 1896 B+4 55' 5,375 79 Bay State Road 1902 B+5 58' 11,116 80 Bay State Road 1896 B+5 45' 5,020 81-83 Bay State Road 1900 B+4 45' 10,445 82 Bay State Road 1899 B+4 58'-49' 6,613 84 Bay State Road 1899 B+5 45' 5,700 86 Bay State Road 1899 B+4 42' 5,700 88 Bay State Road 1899 B+4 45' 6,516 90-92 Bay State Road 1899 B+4 22'6" 11,901 94 Bay State Road 1899 B+4 47' 5,900 96 Bay State Road 1905 B+5 69' 28,600 110 Bay State Road 1910 B+4 50' 5,045 112 Bay State Road 1910 B+4 44' 5,000 113 Bay State Road 1897 B+4 40' 9,140 115 Bay State Road 1899 B+4 40' 9,488 117 Bay State Road 1899 B+5 62' 9,280 124 Bay State Road 1913 B+3 36' 4,970 131 Bay State Road 1900 B+4 48' 8,813 133 Bay State Road 1900 B+3 42' 7,249 135 Bay State Road 1902 B+3 42' 10,412 139 Bay State Road 1895 B+4 41' 5,100

4.0 Existing Property And Uses 4-2

BOSTON UNIVERSITY IMPNF

Year Building Small Residence Halls (cont.) Built Stories Height Area (gsf) 153 Bay State Road, French / Masterman Hall 1893 B+4 51'6" 7,838 157 Bay State Road, Limited Parietal House 1903 B+4 45' 9,157 158-162 Bay State Road, Intercultural House 1900 B+4 78',60',60' 14,513 159-163 Bay State Road 1902 B+4 42',52',52' 20,280 164 Bay State Road, Spanish House 1900 B+4 50' 5,942 166-168 Bay State Road 1901 B+4 40'-50' 10,873 167-169 Bay State Road 1902 B+4 50'-40' 13,349 171 Bay State Road 1900 B+4 40' 7,075 172 Bay State Road 1902 B+3 42' 4,826 173 Bay State Road 1900 B+4 46' 7,151 175 Bay State Road 1900 B+4 47' 6,955 176 Bay State Road, Classics House 1902 B+3 43' 4,668 177 Bay State Road 1900 B+4 52' 6,580 178 Bay State Road, Russian House 1902 B+3 42' 5,025 179 Bay State Road, Education House 1900 B+4 48' 6,768 180 Bay State Road 1902 B+3 40' 4,846 181 Bay State Road 1900 B+4 52' 6,580 182-190 Bay State Road 1904 B+3 40'-42',42' 22,960 183 Bay State Road 1899 B+4 40' 7,590 191 Bay State Road 1897 B+4 58' 10,486 192 Bay State Road 1906 B+3 41' 4,100 193 Bay State Road, Italian House 1899 B+4 42' 6,900 194 Bay State Road 1907 B+3 46' 4,963 195-197 Bay State Road, Dean's House 1899 B+5 50'-40' 13,424 196 Bay State Road 1900 B+3 40' 4,724 198 Bay State Road 1900 B+3 46' 4,787 199 Bay State Road 1899 B+4 42' 6,702 200-202 Bay State Road, Trustee Scholar House 1900 B+4 46' 13,446 201 Bay State Road 1899 B+4 52' 6,490 203 Bay State Road, Management House 1899 B+4 45' 6,191 204 Bay State Road 1899 B+4 48' 6,819 205 Bay State Road 1899 B+4 45' 7,064 206-212 Bay State Road 1901 B+4 52',51',45',40' 25,063 207 Bay State Road 1899 B+4 45' 7,573

4.0 Existing Property And Uses 4-3

BOSTON UNIVERSITY IMPNF

Year Building Small Residence Halls (cont.) Built Stories Height Area (gsf) 209 Bay State Road, German House 1899 B+4 47' 7,641 214 Bay State Road 1901 B+4 42' 5,738 517-521 Beacon Street 1901 B+4 55',45',54' 20,401 531 Beacon Street 1901 B+4 54' 9,071 632 Beacon Street 1920 B+4 49'5" 24,395 806-820 Beacon Street 1887 B+6 60' 19,310 822 Beacon Street 1890? B+3 40' 4,600 824-826 Beacon Street 1890 B+3 40' 9,041 828 Beacon Street 1890 B+4 50' 6,400 830 Beacon Street 1890 B+4 50' 8,000 832 Beacon Street 1890 B+4 50' 5,959 834-836 Beacon Street 1890 B+3 40',35' 9,381 844 Beacon Street 1911 B+5 40' 20,700 848 Beacon Street 1894 B+4 50' 6,700 850 Beacon Street 1894 B+4 50' 7,126 852 Beacon Street 1894 B+4 50' 6,380 856-862 Beacon Street 1893 B+6 67'-79' 35,364 864 Beacon Street 1900 B+4 55' 5,700 866 Beacon Street 1892 B+4 50' 8,600 870-872 Beacon Street 1892 B+4 48'-48' 13,500 906-908 Beacon Street 1891 B+4 48' 14,839 1053 Beacon Street 1891 B+4 48' 7,652 1 Buswell Street, Engineering House 1907 B+4 49' 7,568 1A Buswell Street 1907 B+4 60' 7,600 2 Buswell Street 1908 B+4 45' 11,300 3 Buswell Street 1894 B+4 46' 5,749 5 Buswell Street 1900 B+4 48' 6,070 6 Buswell Street 1914 B+4 46' 25,780 7 Buswell Street 1894 B+4 55'6" 5,800 10-18 Buswell Street 1924 6 68' 66,456 11 Buswell Street 1894 B+4 44' 6,268 15 Buswell Street 1900 B+4 40' 5,500 17 Buswell Street 1900 B+4 40' 5,975 22-24 Buswell Street 1914 B+4 48'-50' 35,036 29 Buswell Street, Earth/Environment House 1896 B+3 39' 5,736 31 Buswell Street 1896 B+3 40' 4,116 33 Buswell Street 1896 B+4 40' 4,915

4.0 Existing Property And Uses 4-4

BOSTON UNIVERSITY IMPNF

Year Building Small Residence Halls (cont.) Built Stories Height Area (gsf) 34 Buswell Street 1912 B+5 55' 17,220 35 Buswell Street 1896 B+3 39' 4,612 37 Buswell Street 1896 B+3 55' 4,727 38 Buswell Street 1911 B+5 55' 9,486 39 Buswell Street 1896 B+3 39' 4,612 40-48 Buswell Street 1911 B+5 60' 58,302 41 Buswell Street 1896 B+3 34' 5,000 43 Buswell Street 1896 B+3 39' 4,884 45 Buswell Street 1896 B+3 40' 5,382 47 Buswell Street 1896 B+3 40' 5,314 50-52 Buswell Street 1909 B+4 48' 15,117 55 Buswell Street 1910 B+4 45' 15,000 37-39 Carlton Street 1893 B+4 32' 9,217 141 Carlton Street 1864 B+3 45' 9,335 146 Commonwealth Avenue 1896 B+5 60' 10,276 481-483 Commonwealth Avenue 1920 B+4 62'-45' 16,250 580 Commonwealth Avenue 2004 B+11 116' 126,333 625 Commonwealth Avenue 1901 B+4 48' 7,803 627-629 Commonwealth Avenue 1906 B+4 48' 5,400 708 Commonwealth Avenue 1875 B+3 40' 15,605 714 Commonwealth Avenue 1875 B+3 30' 5,300 722-728 Commonwealth Avenue 1911 B+5 51' 87,469 53-57 Deerfield Street 1900 B+3 46'6" 8,900 7 Euston Street 1912 B+3 36' 10,100 19 Euston Street 1915 B+3 36' 5,891 80-82 Ivy Street 1920 B+3 33,700 83 Ivy Street 1912 B+4 48' 39,700 46 Mountfort Street 1908 B+4 48' 28,250 96 Mountfort Street 1908 B+4 45' 8,750 98 Mountfort Street 1909 B+4 45' 9,750 100 Mountfort Street 1909 B+4 45' 6,500 500-504 Park Drive 1903 B+3 37' 13,300 509 Park Drive 1912 B+5 56' 32,800 514-522 Park Drive 1915 B+3 36' 36,968 515 Park Drive 1908 B+4 43' 9,900 37-47 St. Mary's Street 1928 B+3 36' 39,130 90 St. Mary's Street 1905 B+3 328' 26,700 2 Raleigh Street 1890 B+4 60' 11,610

4.0 Existing Property And Uses 4-5

BOSTON UNIVERSITY IMPNF

Apartments South of Beacon Year Building Street 3 Built Stories Height Area (gsf) 25 Aberdeen Street 1899 B+3 36' 7,000 27 Aberdeen Street 1899 B+3 36' 6,720 845 Beacon Street 1895 B+4 45' 6,600 853 Beacon Street 1894 B+4 51' 6,475 855 Beacon Street 1894 B+4 48' 5,700 867 Beacon Street 1893 B+4 48' 7,594 875 Beacon Street 1894 B+4 6,600 455-457 Park Drive 1900 B+4 36' 25,047

Administrative/Faculty Year Building Residences Built Stories Height Area (gsf) 132 Carlton Street 1908 B+3 16,478 10 Cottage Farm Road 1936 B+3 32' 6,040 24 Cottage Farm Road 1850 B+2 27' 14,387 135 Ivy Street 1850 B+3 22' 16,068 25 Lenox Street 1853 B+3 27' 8,200 150 Mountfort Street 1956 B+2 34' 2,000 50 Worthington Road 2001 B+3 34' 11,261 53 Worthington Road 1939 B+3 5,530

4.2 Academic, Administrative and Other Properties The University’s portfolio of academic, administrative and commercial buildings is extensive. Although the buildings are primarily centered along the 1.5 mile stretch of Commonwealth Avenue, they also include buildings in the Ashford/Babcock Street area, non-residential buildings along Bay State Road, the science and engineering buildings along Cummington Street, and assorted other buildings across the campus.

3 Properties will not be used for undergraduate student housing during the term of the Master Plan.

4.0 Existing Property And Uses 4-6

BOSTON UNIVERSITY IMPNF

Table 4-2, List of Academic, Administrative and Other Properties Year Bldg Area Land Address Built Stories Height (gsf) Area Use 163-179 Amory St 2 28,860 Admin/Coml 100 Ashford Street, Track and Tennis Center 2002 2 30' 96,262 71,764 Athl 120 Ashford Street 1958 M + 2 30' 84,079 88,224 Admin 278 Babcock Street 1919 B+2+M 79,387 108,900 Admin/Pkg/Cm 285 Babcock Street - Case Center 1972 B + 5 68' 131,857 Athl 300 Babcock Street 1926 B + 3 42' 88,000 4,960 Athl 53 Bay State Road 1893 B + 6 67' 16,055 5,830 Athl 67 Bay State Road 1897 B + 4 45' 7,294 2,750 Acad 108 Bay State Road 1939 B + 4 4,603 4,769 Admin 114 Bay State Road NA NA NA 2,560 Open/Pkg 116-118 Bay State Road 1910 B + 4 44' 9,185 5,104 Acad 121-125 Bay State 1899 B + 4 48' 6" 22,764 10,158 Admin 122 Bay State Road 1913 B + 4 5,280 Acad 128 Bay State Road 1901 B + 3 37' 5,152 1,490 Acad 141 Bay State Road 1900 B + 3 42' 7,758 3,039 Acad 143 Bay State Road 1900 6 63' 11,037 3,656 Admin 145-147 Bay State Road 1903 B + 5 56' - 73' 26,596 10,170 Acad 152 Bay State Road 1902 B + 5 58' 11,201 3,339 Acad 154 Bay State Road 1896 B + 4 46' 8,965 2,940 Acad 156 Bay State Road 1899 B + 4 46' 5,100 2,464 Acad 170 Bay State Road NA NA NA 3,475 Pkg 185 Bay State Road 1899 B + 4 50' 7,649 2,449 Acad 187 Bay State Road (leased portion) 1899 2,941 Acad 213-217 Bay State Road B + 4 57' 130,704 7,877 Opn Sp 216 Bay State Road NA NA NA 6,276 Opn Sp 225 Bay State Road 1905 B + 3 50' 14,701 6,267 St Act 226 Bay State Road 1913 B + 5 65' 18,048 Acad 232 Bay State Road 1913 B + 5 60' 34,022 Acad 233 Bay State Road 1953 B + 3 50' 15,591 4,036 Admin 236 Bay State Road 1913 B + 5 60' 27,149 Acad 264-270 Bay State Road 1913 B + 5 58' 65,016 Acad 347 Bay State Road 1935 1 2,123 2,123 Athl

4.0 Existing Property And Uses 4-7

BOSTON UNIVERSITY IMPNF

Year Bldg Area Land Address (cont.) Built Stories Height (gsf) Area Use 648 Beacon Street 1910 B + 4 79' 49,950 10,000 Athl, Acad 650 Beacon Street 1910 B + 6 60' 22,882 4,178 Coml 654 Beacon Street 1918 B + 4 23,911 4,178 Coml 656 Beacon Street 1918 B + 4 78' 25,848 10,000 Coml 660 Beacon Street B + 7 79' 74,431 11,483 Coml 677-679 Beacon Street 1915 B + 3 43' 25,997 Acad 25 Buick Street 1928 B + 3 59' 122,742 53,583 Admin 500-528 Comm Ave 2003 B + 6 83' 184,208 64,821 Coml 533 Comm Ave 1916 B + 2 15,293 Coml 535-539 Comm Ave B + 3 31,495 Coml 541 Comm Ave 1919 B + 6 70' 21,196 Coml 565 Comm Ave 1952 B + 2 21' 4" 12,908 16,216 Acad 577-601 Comm Ave, 3L+ 9+ SMG 1996 P 166' 2" 481,119 49,686 Acad 582-588 Comm Ave, Sci Ctr B + 5 60' 115,000 23,395 Pkg 590-596 Comm Ave, Sci Ctr 1983 B + 4 57' 168,338 52,048 Acad 602 Comm Ave , Morse 1907 B + 3 21,919 13,508 Acad 617-621 Comm Ave 1901 B + 4 51' 4" 22,762 9,422 Acad 622-640 Comm Ave, COM 1956 B + 3 47' 84,022 67,232 Acad 631-639 Comm Ave, Sargent Col 1957 B + 7 75' 113,621 19,225 Acad 645-665 Comm Ave NA NA NA 41,574 Pkg 675 Comm Ave, Stone Science 1938 B + 5 62' 54,527 Acad 675-775 Comm Ave, Central Campus Land NA NA 561,605 Acad 685 Comm Ave B + 5 + Building 1938 P 79' 141,257 Acad 700 Comm Ave, Warren Towers Pkg/Coml 1966 B + 3 251,712 63,472 Pkg/ Coml 704 Comm Ave 1910 B + 5 31,552 6,480 Acad/Res 710 Comm Ave 1912 B + 4 5,300 Coml 718 Comm Ave, CLA 1910 B + 5 58' 22,068 5,549 Acad B + 6 + 725 Comm Ave, CAS 1948 P 80' 132,261 Acad 730-732 Comm Ave, Eng B + 3 58,264 Acad/Coml

4.0 Existing Property And Uses 4-8

BOSTON UNIVERSITY IMPNF

Year Bldg Area Land Address (cont.) Built Stories Height (gsf) Area Use 735 Comm Ave, Marsh Chapel 1935 B + 2 14,964 Acad 736-738 Comm Ave 1939 B + 1 5,840 Coml 742 Comm Ave B + 2 64,788 Pkg 745-755 Comm Ave, B + 6 + School Theology 1947 P 114,978 Acad 750 Comm Ave B + 2 44,749 118,483 Acad 756-766 Comm Ave NA NA NA Pkg gsf comb. 763 Comm Ave, Htg w/ 765 Plt 1962 Comm. Acad 765 Comm Ave, Law School 1962 B + 21 232' 5" 167,671 6,480 Acad 767 Comm Ave, Law Library 1964 B + 3 28,616 Acad 771 Comm Ave, B + 6 + Mugar Library 1965 P 114' 218,657 Acad 775 Comm Ave, Student Union 1963 B + 5 202,105 Acad 785 Comm Ave, BU Acad 1937 B + 3 27' 54,767 84,404 Acad 795 Comm Ave NA NA 35,474 open 808 Comm Ave, B + 6 + Fuller Building 1928 P 77' 266,029 138,710 Acad 830-846 Comm Ave. B + 2 36,153 35,433 Coml 855 Comm Ave, School of Fine Arts 1919 B + 5 81' 5" 207,318 76,456 Acad 871 Comm Ave, Coll of General Studies 5 43' 95,968 41,520 Acad 881 Comm Ave 1926 B + 7 95' 107,773 26,000 Admin 888 Comm Ave B + 3 99,352 Admin/Coml 890 Comm Ave 1915 B + 3 72,389 Acad 915-925 Comm Ave Land NA NA 443,875 various 915 Comm Ave, Fit - Rec 2004 B + 4 286,901 Athl/Acad 925 Comm Ave, Agganis Arena 2004 2L + 3 548,634 Athl/Pkg 900-940 Comm Ave B + 3 233,000 165,000 Coml 928 Comm. Ave., School of Hospitality 3 28,560 9,885 Acad 949 Comm Ave 1916 B + 2 28' 17,968 12,000 Acad 975 Comm Ave 7,941 Admin 985 Comm Ave 1920 2 36,865 12,000 Acad

4.0 Existing Property And Uses 4-9

BOSTON UNIVERSITY IMPNF

Year Bldg Area Land Address (cont.) Built Stories Height (gsf) Area Use 2 Cummington Street, Biology B + 5 54' 61,754 11,795 Acad 3-5 Cummington Street, Phys./Biology B+ 5+ P 30' 149,118 47,039 Acad 24 Cummington Street, Life Science & B+ 10+ Engineering 2005 P 188,575 14,551 Acad 30-38 Cummington Street, Science Library B + 3 40' 36,563 12,157 Acad 42-44 Cummington Street, Engineering 1986 B + 7 112' 5" 96,500 12,141 Acad 48-52 Cummington Street, Eng. B + 2 35' 17,800 14,927 Acad 64-86 Cummington Street, Soc Psych. B + 2 35' 49,163 16,112 Acad 96-100 Cummington Street, Soc Psych. B + 2 35' 25,430 8,634 Acad 110-112 Cummington Street, Eng B + 4 48,901 11,635 Acad 111 Cummington Street Math/Comp Sci B + 2 28' 9" 93,831 38,525 Acad/Admin 10 Deerfield St 21,138 Pkg 11-15-19 Deerfield Street 1925 B + 4 60' 69,435 14,008 Admin/ Coml 20-22 Deerfield Street NA NA NA 17,648 Pkg 143 Essex St. 1960 NA NA 1,500 Pkg 32 Harry Agganis Way, Nickerson Fld and Bldg 1915 3 + P 15,078 458,873 Admin/Athl 10 Lenox Street 1904 B + 4 17,903 22,998 Admin Malvern Ashford Street NA NA 73,500 Athl 619 Memorial Drive, Dewolfe Boat House 2001 2 19,561 10,976 Athl 138 Mountfort Street 1903 B + 3 6,254 13,750 Acad 601 Newbury Street 1915 B+3 24,000 Coml 6-8 St. Mary's Street Photonics Building 1996 B + 9 162' 6" 289,059 46,205 Acad 15 Saint Mary's 1920- Street, Engineering 25 ca. B + 1 52,739 118,582 Acad 2 Silber Way B + 8 85' 85,000 18,148 Acad

4.0 Existing Property And Uses 4-10

BOSTON UNIVERSITY IMPNF

5.0 PLANNING FRAMEWORK

5.0 Introduction Since its establishment in the early 20th century, Boston University’s Charles River Campus has grown to encompass 112 acres of land and 274 buildings. This linear campus is centered along a 1½ mile stretch of Commonwealth Avenue, from Kenmore Square to Packard’s Corner. The campus includes a mix of uses comprised of student residences, athletic and recreational facilities, faculty and staff offices, and the core academic and research facilities. At the same time, the campus is an integral part of the urban fabric of the City and includes commercial and retail uses, streetscapes, and open spaces. In addition to Commonwealth Avenue, the defining public elements of the campus are the adjacent Charles River and the parkland of the Esplanade, and the urban core at Kenmore Square (see Figure 6-1, Boston University Properties).

Like many urban areas, the BU campus has been extensively fragmented by urban redevelopment and transportation infrastructure projects. The construction of in the1950s severed the formerly waterfront University from the Charles River. The Extension, constructed in the mid-1960s, split the heart of the campus and created an urban void at the intersection of Commonwealth Avenue and Boston University Bridge. These transportation infrastructure elements present both opportunities and constraints for campus development.

Recent improvements to Commonwealth Avenue have tremendously enhanced the public realm of the University in the East-West direction. Yet the campus is still effectively disconnected from the Charles River and its South Campus as a result of the Massachusetts Turnpike, presenting major opportunities for improvement. Future development reflecting new priorities for compact, pedestrian and transit-oriented urban form will bring about opportunities to incrementally fill these voids and overcome barriers to the Charles River.

5.1 Campus Districts Boston University’s campus consists of four very active and distinct districts separated by major infrastructure elements (see Figure 6-1, Boston University Properties).

The districts include:

 West Campus – Consisting of the area west of the BU Bridge, the West Campus is a focal point for student housing, and the University’s athletics and recreational core. West Campus also includes the School of Hospitality Administration, the College of Fine Arts and the College of General Studies.

 Central Campus – The Central Campus, the area north of the Turnpike between the BU Bridge and Silber Way, comprises the academic core of the University

5.0 Planning Context 5-1

BOSTON UNIVERSITY IMPNF

and includes the original Cram-Ferguson buildings, the Sert complex and major academic buildings and libraries, including the science and engineering buildings along Cummington Street.

 East Campus – The East Campus is centered at Kenmore Square with its commercial and retail activities forming a gateway to the University Campus. The East Campus also includes portions of Bay State Road and a mix of student housing and academic facilities.

 South Campus – Located south of the Massachusetts Turnpike, the South Campus includes a mix of residential and academic facilities, generally of a smaller scale than the rest of the campus.

5.2 Campus Growth To provide a framework for growth over the next decade the University has considered the need for (1) new and rehabilitated campus facilities, (2) athletics, (3) public realm improvements, and (4) transportation infrastructure.

5.2.1 CAMPUS FACILITIES In assessing its needs for new facilities, the University has drawn upon the long-term vision of the University as expressed in the “Boston University Strategic Plan - Choosing to be Great.” The eight core objectives of this plan include:

1. Strengthening the quality of the faculty

2. Strengthening the excellence of our undergraduate education

3. Strengthening the College of Arts and Sciences as central to the quality of our academic programs

4. Strengthening the student residential community and the student experience

5. Strengthening targeted programs in graduate research and education

6. Strengthening four key professional Schools: Law, Medicine, Management, and Fine Arts

7. Strengthening our commitment to interdisciplinary programs in research, education, and outreach

8. Strengthening our leadership as an urban and global research university.

Development of new campus projects will adopt a context-sensitive density strategy. In the planning for new development projects, the University will consider:

5.0 Planning Context 5-2

BOSTON UNIVERSITY IMPNF

 Utilizing existing surface parking lots for new building sites

 Preserving opportunities for air rights development over the Massachusetts Turnpike

 Promoting activation and transparency of ground floors by including academic and retail activities that will engage the public realm.

5.2.2 ATHLETICS Building on the success of the John Hancock Student Village and other West Campus facilities, the University will continue to look for opportunities to expand intercollegiate and intramural athletic facilities. With a large number of students, faculty and staff seeking recreational and athletic opportunities on an urban campus where space is at a premium, the University will search for ways of to incorporate athletic facilities into mixed use projects, such as the Babcock Field project in West Campus.

5.2.3 PUBLIC REALM In all campus districts, there will be a renewed focus on the establishment of a robust and interconnected public realm. To affirm its stature as a true river campus, strategic public realm improvements are proposed along a North-South axis, linking the central campus to the river at key junctures. Improvements will be targeted at the following areas:

 Kenmore Square to Deerfield Street

 Blandford Street and Silber Way

 Granby Street

 St. Mary’s Street.

Boston University’s unique infrastructure and high levels of foot traffic provide the ideal conditions for the creation of true pedestrian malls, which are often not feasible elsewhere in the city. Improvements to the Cummington Street Mall will create a central meeting space for this part of the campus. A similar pedestrian-centered transformation is proposed for the alleyway between Silber Way and Granby Street.

5.2.4 TRANSPORTATION INFRASTRUCTURE The University recognizes the important role transportation and mobility plays in the success of its campus and the region. Boston University will continue to work closely with the City of Boston and the MassDOT to partner on transportation infrastructure improvements projects, as it has on projects such as the Kenmore Square T Stations, Boston University Bridge renovations, and Green Line Station improvements.

5.0 Planning Context 5-3

BOSTON UNIVERSITY IMPNF

The University is already working to extend safety and traffic flow improvements westward on Commonwealth Avenue through the Commonwealth Avenue Phase II project. This project will enhance Commonwealth Avenue as a boulevard by extending the streetscape improvements from the BU Bridge to Alcorn Street.

As additional transportation projects arise, the University will seek to ensure that these projects enhance its campus planning objectives and provide improved safety and traffic flows.

5.3 Summary These planning context objectives of the 2012 Master Plan serve the social, environmental, and economic aspirations of the University. As part of the University’s strategy to improve the sustainability of its operations, these improvements serve to create a denser campus core while at the same time greening the campus and reducing vehicular traffic. They improve the campus experience by providing contemplative and gathering spaces that are vital to the education process. With these in mind, the University is committed to integrating these planning objectives into future development projects, public realm improvements and transportation infrastructure.

5.0 Planning Context 5-4

BOSTON UNIVERSITY IMPNF

6.0 DEVELOPMENT PROGRAM

6.1 Introduction The “Boston University Strategic Plan – Choosing to be Great”, articulates the University’s mission and its underlying long-range academic, research, teaching and residential aspirations. By extension, some of these institutional goals and objectives require new or rehabilitated facilities in order to facilitate the mission of the University. This section addresses the physical building needs of the University for which planning, design or construction is anticipated to begin within the ten-year Institutional Master Plan period.

As the University advances the planning of these projects, it will be cognizant of the need to advance its sustainability goals through the construction of Leadership in Energy and Environmental Design (LEED) certifiable buildings. Measures such as green roofs, stormwater recharge/reuse, recycling, bicycle storage, and rapidly renewable building materials will be carefully considered in the design process. In areas of filled land and other sensitive locations, the University will also ensure that groundwater levels are not adversely affected by new development projects.

In addition, the University will carefully consider how new projects will integrate into the historic fabric of the campus. As the largest private owner of historic properties in the City of Boston, the University seeks to maintain its historic properties to a high standard and to develop new buildings to meet University needs that respect the historic setting.

6.1 Campus Context The Boston University Charles River Campus consists of some 112 acres of land and 274 buildings containing approximately 11.8 million sf of space. The campus is centered on the 1 1/2 mile stretch of Commonwealth Avenue running west from Kenmore Square. The existing Boston University properties are shown in Figure 6-1, Boston University Properties. The lists of properties covered by the Master Plan have been updated as of the fall of 2011 and may be found in Chapter 4.0 in Table 4-1, List of Residential Properties and Table 4-2, List of Academic, Administrative and Other Properties.

6.2 Proposed Institutional Projects The projects the University would like to undertake during the term of the Institutional Master Plan are described below and are shown in Figure 6-2, Proposed Institutional Projects. The majority of these projects are listed as “Proposed Institutional Projects” as defined in Article 80D of the Boston Zoning Code. For clarity, we have distinguished between those projects that have been previously approved through the Planned Development Area designation, those that have been previously approved in the 2010

6.0 Development Program 6-1

BOSTON UNIVERSITY IMPNF

Institutional Master Plan Renewal, those that are altogether new proposed projects, and those that are enhancements to the public realm but do not require zoning relief.

Three of these projects have already been approved as part of the 2010 Master Plan Renewal, but are repeated here to ensure that they will be carried forward as Proposed Institutional Projects. The fourth project listed in the 2010 Master Plan Renewal, the East Campus Student Services Center, is already under construction.

It is important to note that the final residential building on the John Hancock Student Village (Site F) is also likely to be constructed during the period of this Master Plan, but as the project was previously approved under a Planned Development Area zoning approval, it is not listed as a Proposed Institutional Project in this Master Plan.

6.2.1 PROJECTS PREVIOUSLY APPROVED IN THE PLANNED DEVELOPMENT AREA MASTER PLAN STUDENT VILLAGE RESIDENCE III (SITE F)

Previously approved in the Planned Development Area overlay zoning for the former Commonwealth Armory site, this one remaining residential building would be sited between 33 Harry Agganis Way and 10 Buick Street and would accommodate up to 523 students.

Location – Student Village

Site Size – N/A.

Existing Use – Surface Parking

Proposed Use – Student residence

Proposed Height – 11 stories 4

Proposed Size – TBD

Proposed FAR – 3.3

Current Zoning – PDA

Estimated Commencement – TBD

4 Height subject to further BRA design review.

6.0 Development Program 6-2

BOSTON UNIVERSITY IMPNF

6.2.2 PROPOSED INSTITUTIONAL PROJECTS APPROVED IN THE 2010 MASTER PLAN RENEWAL 233 BAY STATE ROAD – RENOVATIONS FOR ACADEMIC AND ADMINISTRATION SPACE

As a result of increased demand for academic and administrative space in the center of the campus, the University has identified 233 Bay State Road, as an ideal candidate for redevelopment and reuse. The building was constructed in 1953 and served as the location for Hillel House until 2007 when that program was relocated to 213 Bay State Road. The building has been vacant since that time. The building is an uncommon example of the International Style of architecture found in the Boston area. A small addition of about 2,300 sf is needed to meet current access and egress codes. It is proposed to be renovated and expanded to make it suitable for administrative and academic uses, such as offices and meeting space.

Location – 233 Bay State Road

Site Size – 5,000 sf

Existing Use – Vacant building

Proposed Use – University Use (Administrative/Academic uses: offices, lectures, meetings, etc.

Proposed Height – Three stories, 45 feet (existing height)

Proposed Size – 18,000 sf

Proposed FAR – 4.0

Current Zoning – H-4

Estimated Commencement – Spring 2012

BOSTON UNIVERSITY SCHOOL OF LAW (SITE U)

The Boston University School of Law has long been recognized as needing dramatically improved facilities to support contemporary methods of legal education. These educational approaches create the need for differently designed classrooms and more collaboration space for the students. Although the enrollment in the Law School has actually decreased since 1986, the total space needed has increased to reflect

6.0 Development Program 6-3

BOSTON UNIVERSITY IMPNF

new teaching methods. The existing facilities at 763-767 Commonwealth Avenue were constructed in the early 1960s and no longer serve well the functions of the Law School. Further, the 46 year old building systems are approaching the end of their useful life. The University is cognizant of the need for additional space for the classrooms and library space for the Law School while recognizing the importance of the existing buildings as part of the complex of historically important buildings designed by Jose Luis Sert. The proposed project includes two separate elements consisting of the renovation of the 195,000 sf. existing law school and an addition of 125,000 sf.

Location – 763-767 Commonwealth Avenue

Site Size – 593,586 sf

Existing Use – Academic Uses (School of Law)

Proposed Use – Academic Use (School of Law)

Proposed Height – Existing tower at 233 feet ( with lower addition)

Proposed Size –Existing 195,000 sf., addition of 125,000sf

Proposed FAR – 4.0 (existing)

Current Zoning – H-4

Estimated Commencement – T.B.D.

BABCOCK FIELD (SITE B)

Boston University has only one general purpose athletic field, . (The University has only one other field which is a softball field). Nickerson Field supports the practice and competition requirements of the University Athletics program, and at the same time supports the various needs of the Physical Education program. Due to the high demand for Nickerson Field and lack of on campus fields, the Women’s Field Hockey team must practice and play at a neighboring university.

The project proposes to retain the current capacity of the surface parking lot of 340 vehicles and locate them below a structured athletic field. Seating for 500 people will be included on the field level. Locker room needs will be met in adjacent University buildings.

6.0 Development Program 6-4

BOSTON UNIVERSITY IMPNF

Location – 278 Babcock Street

Site Size - 141,068 sf.

Existing Use – Building of 79,000 sf. and surface parking for 340 vehicles

Proposed Use – Athletic Field with structured parking below

Proposed Height – 20 feet

Proposed Size –140,000 sf.

Proposed FAR – Approximately 1.0

Current Zoning – H-4

Estimated Commencement – TBD

6.2.3 NEW PROPOSED INSTITUTIONAL PROJECTS FOR THE 2012 MASTER PLAN ACADEMIC BUILDINGS (SITE N)

The site at the corner of Commonwealth Avenue and Granby Street has been identified as a potential development site since the first Master Plan was approved in 1987. Acquisition of the entire site parcel was completed in 2003 and it is currently an open, public surface parking lot. New academic space is proposed for the site which could be developed as either a single or two-phase project. The size of the parcel suggests that below grade parking could be considered for the site.

Location – 645-665 Commonwealth Avenue

Site Size – 42,000 sf.

Existing Use – Surface parking lot

Proposed Use – University Use, primarily academic uses for instruction, research, offices, and ancillary uses. Below grade parking.

Proposed Height – 11 Stories

Proposed Size – 280,000 sf.

6.0 Development Program 6-5

BOSTON UNIVERSITY IMPNF

Proposed FAR – 6.7

Current Zoning – H-4

Estimated Commencement – TBD

ACADEMIC/ADMINISTRATIVE BUILDING (SITE ZZ)

The proposed site at 130 Bay State Road offers an opportunity to integrate two existing brownstones with a new addition to the west to create an approximately 53,000 sf of academic and administrative space.

Location – 130 Bay State Road

Site Size – +/- 19,000 sf.

Existing Use – Academic and Administrative

Proposed Use – University Use, including Academic/Research/Office/Administrative

Proposed Height – 45 feet on Bay State Road, stepping up to 75 feet

Proposed Size – 53,000 sf

Proposed FAR – 4.0 (existing)

Current Zoning – H-4

Estimated Commencement – TBD

MYLES STANDISH AND MYLES STANDISH ANNEX RESIDENCE HALL REHABILITATION (SITE Y)

Myles Standish Hall, originally constructed in 1926 as a residence hotel, has served as a University dormitory since 1949. The building currently provides 660 student bed spaces. In 1980, the University acquired an abutting property and converted it to a residence hall housing 100 students, which is now known as the Myles Standish Annex. A total rehabilitation is planned for the building to bring it up to modern housing standards and to ensure it remains an attractive option for on-campus student housing. It is anticipated that a minor expansion of the building may be recommended as part of the renovation project. A reduction in

6.0 Development Program 6-6

BOSTON UNIVERSITY IMPNF

the number of student beds may result from the project’s adherence to current building standards and codes.

Location – 610 Beacon Street (aka 30 Bay State Road) and 632 Beacon Street

Site Size – 26,500 sf (both properties)

Existing Use – Student Dormitory

Proposed Use – Student Dormitory

Proposed Height – Nine Stories, 80 feet (existing height)

Proposed Size – 255,000 sf.5

Proposed FAR – 9.6 (8.9 existing)

Current Zoning – H-4

Estimated Commencement – TBD

SCIENCE AND ENGINEERING RESEARCH BUILDING (SITE W)

With the acquisition of Cummington Street from the City of Boston, the University has the opportunity to make better use of some of the smaller land parcels abutting the Massachusetts Turnpike along Cummington Street. These parcels, from 30-100 Cummington Street, are too narrow to support modern academic buildings, but using the additional area along or above Cummington Street a more efficient footprint can be obtained. The proposed project is a science/engineering research building at 30-38 Cummington Street which will replace an existing 38,000 sf. building.

Location – 30-38 Cummington Street

Site Size – 25,000 sf (including street)

Existing Use – Academic

Proposed Use – University Use, primary academic uses including instruction, research, offices, and student study spaces

5 Existing building size is 235,000 sf.

6.0 Development Program 6-7

BOSTON UNIVERSITY IMPNF

Proposed Height – 11 stories

Proposed Size – 165,000 sf

Proposed FAR – 7.0

Current Zoning – M-2

Estimated Commencement – TBD

ACADEMIC BUILDING ADDITION (SITE Z)

The proposed academic building project would add 50,000 sf to the existing 84,000 sf building at 640 Commonwealth Avenue in an addition oriented toward Hinsdale Street and Commonwealth Avenue.

Location – 640 Commonwealth Avenue

Site Size – 67,232 sf.

Existing Use – Academic

Proposed Use – University Use, primary academic uses including instruction, research, and offices.

Proposed Height – 3 stories

Proposed Size – 50,000 sf

Proposed FAR – 4.0 (existing)

Current Zoning – H-4

Estimated Commencement – TBD

6.2.4 PUBLIC REALM PROJECTS In addition to the list of Proposed Institutional Projects, the University has identified potential projects that will enhance the public realm of the University campus. These projects include new pedestrian ways, pocket parks, landscaped areas, and roadway and streetscape improvements. Figure 6-3, Public Realm Improvements illustrates the location of these potential public realm improvements.

6.0 Development Program 6-8

BOSTON UNIVERSITY IMPNF

Bay State Road/ Beacon Street Pocket Park

To enhance the improvements proposed to and this important entry to the campus, the University proposes to create a pocket park at the intersection of Beacon Street and Bay State Road. The intersection of these two thoroughfares is an unnecessarily large expanse of pavement that encourages high automobile speeds and discourages pedestrian activity. Conversion of this triangular area to a green space would provide additional open space for students and area residents, while reducing vehicular speeds, improving the pedestrian environment and beautifying the entry to the campus.

Commonwealth Avenue Phase 2A Improvements

The proposed project would improve access to surrounding neighborhoods and communities and Boston University, both through improved pedestrian facilities and optimized intersection operations. The project site spans one half of a mile from Amory Street to Alcorn Street. Phase 2-A is the westward extension of similar improvements made to the Kenmore Square area of Commonwealth Avenue. Improvements are primarily aimed at street beautification with the installation of boulevard- like elements, including street furniture, trees, benches, trash receptacles, and bike racks; and upgrades to lighting fixtures.

Improvements also aim at pedestrian safety including upgrades to traffic signal equipment, and vehicle and trolley detection equipment connected to the BTD Traffic Management Center, and bump-outs. Improvements also include ADA compliant sidewalk cross slopes, ramps, and MBTA platform modifications to all four MBTA stations within the project site. Commonwealth Avenue typically consists of three lanes outbound and two lanes inbound within the proposed project limits. This project proposes exclusive left turn pockets at intersections where left turns are allowed.

Commonwealth Avenue Area at BU Bridge

In order to enhance safety and improve the pedestrian flows, the University intends to widen the sidewalks along Commonwealth Avenue between the BU Bridge and University Road. The existing sidewalk is fairly narrow in this high traffic area, particularly behind the bus shelter. This expansion would reduce the crossing times for the 15,000 pedestrians that traverse this area daily. Widening the sidewalk also will increase the perceived security of those walking along it and effectively calm automobile traffic nearby.

6.0 Development Program 6-9

BOSTON UNIVERSITY IMPNF

Cummington Street Pedestrian Mall

To capitalize on the recent acquisition of Cummington Street from the City of Boston and to complement the proposed Engineering Research Building at 30-38 Cummington Street, the University proposes to create a pedestrian mall along Cummington Street. Streetscape improvements would be made to eliminate automobile access on the street and to create a pedestrian friendly open space linking the Science and Engineering Campus buildings along Cummington Street.

Granby Street to Silber Way Pedestrian Way

To improve campus connectivity, a pedestrian way running from Silber Way to Granby Street will be constructed to provide a quiet, landscaped pedestrian area connecting the Central Campus to the School of Management. The pedestrian way is centered on the service alley running parallel to Commonwealth Avenue and Bay State Road. While the way will need to remain accessible for service vehicles, there is a substantial width available by including rear yard areas adjacent to the alley.

Granby Street Pocket Park

In support of the Charles River access improvements and the development of Parcel N and N-1, the University will create a pocket park along the Granby Street edge of Parcel N to provide pedestrian open space and a greener streetscape leading to the Charles River. This pocket park will align with the existing green space at the corner of Granby Street and Bay State Road

6.3 Potential Development Sites In addition to the list of Proposed Institutional Projects, the University has identified nine locations that are potential development sites for future projects. These sites include parcels that the University currently owns and parcels that may become available for lease, acquisition or development in the future.

The potential development sites are shown in Figure 6-4, Potential Development Sites. These identified parcels are simply being flagged as potential sites for development and there are no specific projects proposed for these sites in this Master Plan. The list of sites has been updated since the 2010 Master Plan Renewal and includes new sites that the University believes offer some potential for future acquisition and/or development. In addition, sites that already have been developed or that are proposed for Proposed Institutional Projects have been removed.

6.0 Development Program 6-10

MASSA CHARLES RIVER CHUSETTS AVE 5 619 0 2 5 50 0 4 6 6 08

518

316 512

4 49 9 1 3

520 4 97 4 5 99

285 01 5 03 50 EET 507 5 TR 50 M S

UD 51 9

BOS 120 SO 51 1

300 5 3 100 DY 1 LD 5 5

TON UN 17 76 IE 519 RS 52 5 1 ASHFORD STREET F 23 5 IE 25 427 LD 527 RO IVER 5 429 M 3 A 1 431 SSA AD 433 4

SITY BRIDG 437 35 CH 535 439 US STREET 44 44 1 ETTS TU 4 3 4 4

277 4 4 5 4 4 7 Central Campus 453 5 9 455 DRIVE 1

11 RN 13 9 15 7 E 4 ACK 17 STREET PIKE B 1 3 9 21 2 2 434 2 664 3 27 43 R 5

32 STORROW STREET STREET STREET 438 347 29

31 440 A 33 6

35 442 37 LEI 444 39

4 4 CHA 4

58 4

1 2 3 5 MARLBOROUGH 446 7

5 GH 450 448

3-57 53 452

59

61

63

67 65 RLES

73 383

77 75

81 79

83 454 DRIVE 91 385

387

BACK STREET 69 71 456 39

STORROW RIVER 389

97 39 391 99

HARRY AGGANIS WAY HARRY 3 278 284

1 397 5 GATE 401

2 ROAD

5 25 1

3 40 3

1 CHARLESGATE 11

119

31 5 405

5

7

3

9 407 1

1

113 7

13 83 9

3

115

1

47

117

14

1

7 3

14 13

141

5

9 1

13 58

12

12

1

7 1

275 225 3

155

1 233 63

5 9

15 65 7

15 587

6 16

9

1

1

1 5

77

1 169

17

17

183

1 175

17

18 30 18 WAY 1

18 5

7

5 9 3 18 BAY STATE STREET 19 409

GARDNER 59 89

11

193

195

19

20

199

207 20 20 20 217 2 1 10 52

32 56 ST

264 58 632 60 62

270 64

66

68

BAY STATE ROAD 70 0

72

74 R 4

6

76 4

78 4

22 8 4

82 84 (WESTBOUND)

6 8

90 63

763 96 88 EE

DEERFIELD 92 9 4 6

1 4 1 6 270 ACON 4 5 69 4 273 25 236 7 T 71

BE 75 8

765 4 4 8

4 636

10 48

79 77

10

16 20 2 2 1

216 112 483

114

122 1 1 1 126 118 1

140 638 4

6 1

4

2

232 8

4 2

4 85

5 5

20 4

66

226 1

15 0 87

4

1

68 2 15

16 16

160 4

0

1

72 8

1 49 91

6

76

4

6 8 170

1

0

17

02

1

14 18 178

90

18 12

08

04 0 18

186

18

1

20

192

2

19

2 19

19 19

2

21 3

2

2 2 767 648 495 771 497

650 ALCORN BUICK STREET 735 WEALTH AVENUE (EASTBOUND) 1 654 MON BABCOCK 1 COM 656 0 MALVERN 785 STREET 39 565 UNIVERSITY ROAD UNIVERSITY

10 660 416 1

775 2

3 5 881 755 745 7

675 21

29 2 2 2

997 989 985 983 969 963 961 957 949 725 685 645 19 533 6

975

6 6 617 6 6 6

1001 871 1005

971 535

1079 10751065 1055 1047 10451039 1037 1035 1033 1027 1023 1019 635 855 539 53 WEST

845 SILBER 541 665 655 575 7 595 EALTH AVENUE NW EAS 1089 S COMMO GRANBY STREET GRANBY BU MBTA AL IN T AVENUE COMMONWEALTH AVENUE TERM 464 468 4 466 472 70

474

476

478

4 482

484 8

0 KENM KENMORE 486 496 COMMONWEALTH AVENUE SQUARE BOSTON BOSTON ORE 1028 BROOKLINE 500 10861082 1066 1056 1050 1040 972966 950 BROOKLINE 1090 940 936 930 928 926 1010 996 910 900 530 890 888 882 880 874 860 846 834 808 750 742 730 532 N 918 916 536

922 SIO 920 N 766 1022 1032 1024 1020 1030 700 TE 540 1016 1018 736 738 584 E EX 872 580566 560 870 728 726 722 718 704 1034 PIK 602 TURN 1104 CARLT 712 714 710 708 S

TREE

241 548

110 ON STREET 6 240 STREET ON STREET BRIDGE COMMONWEALTH 110 179 T P 0 8 REET 645 2 LE BABBITT STREET 1110 HINSDALE A BOSTON 744 640 S D ST 586 111 70 8 10 A 22 9

CUMMINGTON STREET CUMMINGTON 6 592 594 590 596 N 7 0 IPSWICH STREET 35 2925 19 15 9 OR 0 T 2 39 15 VENUE 595-603 112 230 M A 24 231 DF NEWBURY OU 5 N 21 N CUMMINGTON 3 665 1114 E TF O 143 T IN OR L 163 100 BLAN 7 S K ADAMS STREET 115 T 706

110 67 1116 O 96 86 STREET B O 80 78 72 70 WINSLOW ROAD O STREET 64 60 R 227 48

B BROOKLINE 44 716 1118 26 2824 20 16 12 38

25 DUMMER BOSTON 30 STREET 28 93

226 6 20 2

112 ROAD 222 25 0 MASSACHUSETTS CHARLESGATE EAST 217 BEACON STREET 112 29 4 222

38 37 21 BROOKLINE 35 9 TURNPIKE 27 NEW YORK CENTRAL RAILROAD 5 LENOX STREET STREET STREET ROAD BABCOCK STREET

West CampusSTREET ELBA STREET 53 49 39 East Campus 15041 39 37 MOUNTFORT 10 138 120 519

141 100 TON ROAD C 96 STREET

FULLER 43 45 47 R WORTHINGTON ROAD 1 STREET 9 1A O STREET PARK 515 HAMIL W EGMONT STREET 518 3 N 5 B 2 ARUNDEL STREET 46 8 IN 7 20 AC

STREET 82 806 49 9 11 8 S 2 6 826 24 K H 50 16 STREET 13 IE 132 15 828

131 33 MAITLAND STREET 509 17 830 L OSBORNE ROAD STREET 832 D 2521 19 15 11 7 5 3 834 50 14 836 512 8 38 84 FARM 8 COPLEY STREET ESSEX EUSTON STREET 506 42 0 821 24 23 22 21 24 84 1 848 4 STREET 16 12 24 22 18 8 4 2 27 850 A 36 29 852 IPSWICH BBO 58 50 TTSF 31 854 MUDDY O 30 33 3 R 121 D 122 856 829 MASON STREET 35 85 37 499 833 860 8 39 86 4 35 R 1 8 8 43 64 2 O 866 3 R 45 504 84 OA A THATCHER DRIVE 868 STREET D STREET 47 D 35 870 111 34 872 38 BOYLSTON CARLTON ST. MARY'S ST. BUSWELL 40 500 845

PRESCOTT 55 874 847 135 42 MINER STREET 10 40 111 849 87 101 93 49 851 44 853 COTTAGE 83 855 IPSW 48 857 Y 50 A 96 WKEY 52 8 7 ICH STREET IVY STREET COOLIDGE STREET 867 AUDUBON 869 2 871 90 ABERDEEN STREET AY AMORY 906 900 873 EET 20 82 90 B 908 875 8 STR MA AY NCHE 910 877

S 95 912 3 TER PAUL ST. 98 0 10 2 FENW GIBBS 914 7 100 96 1 916 CIRCLE 879 2 12 45 ROAD 918 9 125 STREET 25 NAPLES 920 12 14 1 53 EWE STREET 100 922 11 924 20 12 55

89 102 15 12 465 BACK BAY FENS 1002 61

15 1004 17 1 8 265 17 1006 ST. MARY'S COURT 901 99 463

21 1008 27 23 29 25 19 28 1008A 903 1010 STREET 905 21 1012 PA 1 461 271 1250 1014 907 RK 23 CHILTON 1016 909 468 459

75 1018 DRIVE 1 STREET 2 1020 466 25 124 125 52 1020A 457 27 FULLERTON 1022 12 1022A 915 464 4 FREEMAN 1 56 STREET 1024 TERS 917 KESW 455 2 1 5 ERS FREEMAN STREET EXTENSION 1024A 1279 26 R 462 133 1 8 919 6 26 South Campus 0 1026 1264 PA W 2 921 460 ARKING S 12 1 1028 451 R S 266 ICK STREET 8 K E AY 95 1 IN 1270 1 DQUA 9 26 QUART 1

DRIVE 71 G N Figure 6-1: Boston University Properties 74 1030 23 458 AREAA N 68 5 129 8 R A EA 1032 10 P EA V ARKINRK 14 PARKING AREA AREA EAD 1 9 1272 7 447 ING AREA M H POWELL 12 G M H ST. PAUL A T 4 Boston University Property 999 R 127 E 10 9 A 145 BOYLSTON 67 1003 EE LAR 1042 01 124 14 80 1044 1036 100 STREET R 12 ST 15 EALAR HALL'S 1046 11 14 T 130 1048 1007 16 9 68 5 . MARY'S 126 S 1303 12 1050 1009 STREET POND FIRFIRE A EET 1 82 1 70 1052 12 Boston University 1011 15 13 130 12 1054 STR 128 132 84 12 05 1013 130 5 14 90 1286 CHURCHILL STREET 1015 17 155 13 130 16 9 64 1017 131 11 1 18 290 11 18 1019 157 136 1 3 1056 132 20 315 University-Owned 10 70 TOWN 299 19 22 159 72 AM 10 21 138 16 Boston University OF 1060 10 23 134 FIELD 24 72 N 24 21 10 25 ED 161 MUDDY RIVER BROOKLINE OR M 26 74 25 Charles River Campus 10 27 K 1064 28 Y 29 IL 76 10 30 163 Property M 1 5 1 AMORY 31 30 3 27 10 32 A 132 78 N PLAYGROUND 2 295 63 33 34 R 1 -13 35 1035 8 N 312 9 2 10 8 2 80 O 1 1037 31 2 7 39 C 6 103 8 4 December 2011 7 K 1 6 45 STILL STREET STILL 7 31 9 D E EET 1070 104 4 A 0 - 1324 O IN 132 STR Charles River Campus 291 1 L 38 10 101 STREET R K 1341 - 1355 86 WINTHROP 43 AIL O T 35 44 E 36 SQUARE R O RE 1080 143 Y R T 1053 S N B 40 ST A STREET 1055 STREET 77 2 41 R 1057 75 LB SEARS AND AND ROEBUCK ROEBUCK 9 4 E 1090 BEACON 105 7 A 136 6 Campus Precinct ET 45 3 4 D 1061 71 9 45 G AREA 1063 6 AN 9 50 34 1100 1065 43 Y PPARKINGARKIN AREA 1067 IT 11 R Boundaries 1069 41 O 287 STREET 1071 H 15 1110 39 6 MONMOUTH COURT 1073 59 1 184 - 176 1371 UT S 1075 57 A ORE 19 37 10 135 TR ILM OL TEMPTEM 30 1077 55 IT SEVENTSEVENTH 51 1373 ADVENTIST 105 1079 5 S 8 E IN M CHO 25 1120 3 12 N RT PLE E A RY S DAYD 1081 192 A LE T MMARTIN MILMORE AY BROWNE STREET 35 1083 14 RA - 186 1360 ENT 2 37 BROOKLINE N 7 29 1085 T BOSTON TO H 108 1124 N S ELEMELEMENTARY SCHOOL 4 1087 11 16 L 7 31 55 1126 Y 16 1089 O RY 194 B 1091 49 18 LITA ER ROUGH 76 35 ER 0Distance in feet 500 0 Distance in feet 500 1093 IV 85 SB 0 29 47 9 PO 8 107 112 2 1134 R 96 1395 7 20 O Y 1 1136 13 TR D QUEEN 24 61 0 1399 PETERBO 0 17 E 8 M UD 20 M 2 6 24 8 111 2 K 21 2 OUTH 3 R 19 5 NM 5 6 PA MO 10 36 84 - 100 40 MASSA

CHUSETTS AVE Babcock Field Student Residence III Admissions Academic/

EET TR M S

UD BOS Administration Myles Standish SO Reception Academic LD CHARLES RIVER DY IERS TON UN ASHFORD STREET F IELD M RO IVER ASSA AD C SITY BRIDG School of Law H Hall Renovation Center Buildings Building STREET US ETTS TU DRIVE RN PIKE E BACK STREET

STORROW R STREET STREET STREET

B A

LEI CHA MARLBOROUGH

GH

DRIVE BACK STREET RLES STORROW RIVER

HARRY AGGANIS WAY HARRY F ROAD GATE

CHARLESGATE

GARDNER STREET WAY BAY STATE

ST BAY STATE ROAD YY R DEERFIELD EE (WESTBOUND) ACON T YBE 1 U ZZ ALCORN BUICK STREET EALTH AVENUE MONW (EASTBOUND) BABCOCK COM

MALVERN STREET UNIVERSITY ROAD UNIVERSITY

WEST N SILBER EALTH AVENUE NW EAS S COMMO GRANBY STREET GRANBY BU MBTA AL IN T AVENUE COMMONWEALTH AVENUE TERM

KENM KENMORE COMMONWEALTH AVENUE SQUARE BOSTON BOSTON ORE BROOKLINE BROOKLINE NSION E EXTE TURNPIK CARLT S

TREE

STREET ON STREET BRIDGE COMMONWEALTH T P

REET LE BABBITT STREET HINSDALE

A BOSTON

S Z D ST

A CUMMINGTON STREET CUMMINGTON

N IPSWICH STREET

OR T VENUE M A DF NEWBURY OU N N CUMMINGTON E TF O IN O T L R S K ADAMS STREET T BLAN O STREET B O WINSLOW ROAD O STREET R

B BROOKLINE

DUMMER STREET BOSTON

ROAD MASSACHUSETTS W BEACON STREET CHARLESGATE EAST

TURNPIKE BROOKLINE NEW YORK CENTRAL RAILROAD LENOX STREET STREET STREET ROAD BABCOCK STREET STREET ELBA STREET MOUNTFORT Academic Building Addition

TON ROAD C STREET

FULLER R WORTHINGTON ROAD STREET O STREET PARK HAMIL W EGMONT STREET N ARUNDEL STREET B IN AC STREET S K

H STREET IE MAITLAND STREET OSBORNE ROAD L D STREET FARM COPLEY STREET ESSEX EUSTON STREET MUD

STREET FENWAY PARK ABBO Science and Engineering Building IPSWICH DY TTSF OR D MASON STREET

R

R O R IV OA A THATCHER DRIVE STREET D STREET D

ER BOYLSTON CARLTON ST. MARY'S ST. BUSWELL PRESCOTT MINER STREET

COTTAGE IPSW

Y A WKEY ICH STREET IVY STREET COOLIDGE STREET AUDUBON

ABERDEEN STREET AY AMORY EET STR B MAN AY CHES

TER PAUL ST. GIBBS FENW CIRCLE STREET ROAD NAPLES EWE STREET

BACK BAY FENS

ST. MARY'S COURT

STREET PA

RK CHILTON DRIVE STREET FULLERTON FREEMAN STREET KESW TERS

FREEMAN STREET EXTENSION R

P W AR S ICK STREET K ES AY IN DQUA

G N DRIVE Figure 6-2: Proposed Institutional Projects A N

R A EA P EA V ARK PARKING AREA

IN M H G POWELL Proposed Institutional Projects ST. PAUL T AR EA BOYLSTON EE STREET R ST EALAR HALL'S T . MARY'S STREET S POND EET FIR Boston University STR CHURCHILL STREET

TOWN OF AM FIELD Boston University ED N BROOKLINE OR M MUDDY RIVER Charles River Campus K New Projects IL Y AMORY M A PLAYGROUND R N O C K

December 2011 STREET STILL E D EET A N O IN STR L STREET R K WINTHROP AIL O ET SQUARE R O RE Y R ST N B ST A STREET STREET R LB SEARS AND ROEBUCK E BEACON A ET D AN Y PARKING AREA Previously Approved IT R O STREET H MONMOUTH COURT UT S A TR TEMP Projects IT SEVENT S E ADVENTIST N E DAY MARTIN MILMORE LE BROWNE STREET RA N T T BROOKLINEBOSTON TO H N LS ELEMENTARY SCHOOL OY RY LITA ER B ER IV ROUGH PO SB 0Distance in feet 500 R O Y TR D PETERBO QUEEN E M UD M K OUTH R

NM PA MO MASSA

CHUSETTS AVE Granby Street Granby Street to Bay State Road/Beacon

EET TR M S

UD SO BOS LD CHARLES RIVER Pocket Park DY TON UN Silber Way Street Pocket Park IERS ASHFORD STREET F IELD M RO IVER ASSA AD C SITY BRIDG HUS STREET ETTS TU Pedestrian Way DRIVE RN PIKE E BACK STREET

STORROW R STREET STREET STREET

A

LEI CHA MARLBOROUGH

GH

DRIVE BACK STREET RLES STORROW RIVER HARRY AGGANIS WAY HARRY ROAD GATE

CHARLESGATE

GARDNER STREET WAY BAY STATE

ST

BAY STATE ROAD R DEERFIELD EE (WESTBOUND) ACON 1 T BE ALCORN BUICK STREET EALTH AVENUE MONW (EASTBOUND) BABCOCK COM

MALVERN STREET UNIVERSITY ROAD UNIVERSITY

WEST SILBER EALTH AVENUE NW EAS S COMMO GRANBY STREET GRANBY BU MBTA AL IN T AVENUE COMMONWEALTH AVENUE TERM

KENM KENMORE COMMONWEALTH AVENUE SQUARE BOSTON BOSTON ORE BROOKLINE BROOKLINE NSION E EXTE TURNPIK CARLT S

TREE

STREET ON STREET BRIDGE COMMONWEALTH T P

REET LE BABBITT STREET HINSDALE

A BOSTON

S

D ST

A CUMMINGTON STREET CUMMINGTON

N IPSWICH STREET

OR T VENUE M A DF NEWBURY OU N N CUMMINGTON E TF O IN O T L R S K ADAMS STREET T BLAN O STREET B O WINSLOW ROAD O STREET R

B BROOKLINE

DUMMER STREET BOSTON

ROAD MASSACHUSETTS BEACON STREET CHARLESGATE EAST

TURNPIKE BROOKLINE NEW YORK CENTRAL RAILROAD LENOX STREET STREET STREET ROAD BABCOCK STREET STREET ELBA STREET MOUNTFORT

TON ROAD C STREET

FULLER R WORTHINGTON ROAD STREET O STREET PARK HAMIL W EGMONT STREET N ARUNDEL STREET B IN AC STREET S K CommonwealthH Avenue STREET IE Commonwealth Avenue Cummington StreetMAITLAND STREET OSBORNE ROAD L D STREET FARM COPLEY STREET ESSEX EUSTON STREET MUD

Phase 2A ImprovementsSTREET FENWAY PARK A Area at BU Bridge IPSWICH DY BB Pedestrian Mall OTTSF OR D MASON STREET

R

R O R IV OA A THATCHER DRIVE STREET D STREET D

ER BOYLSTON CARLTON ST. MARY'S ST. BUSWELL PRESCOTT MINER STREET

COTTAGE IPSW

Y A WKEY ICH STREET IVY STREET COOLIDGE STREET AUDUBON

ABERDEEN STREET AY AMORY EET STR B MAN AY CHES

TER PAUL ST. GIBBS FENW CIRCLE STREET ROAD NAPLES EWE STREET

BACK BAY FENS

ST. MARY'S COURT

STREET PA

RK CHILTON DRIVE STREET FULLERTON FREEMAN STREET KESW TERS

FREEMAN STREET EXTENSION R

P W AR S ICK STREET K ES AY IN DQUA

G N DRIVE Figure 6-3: Public Realm Improvements A N

R A EA P EA V ARK PARKING AREA

IN M H G POWELL Proposed Institutional Projects ST. PAUL T AR Public Realm Improvements EA BOYLSTON EE STREET R ST EALAR HALL'S T . MARY'S STREET S POND EET FIR Boston University STR CHURCHILL STREET

TOWN OF AM FIELD Boston University ED N BROOKLINE OR M MUDDY RIVER Charles River Campus K Y IL AMORY M A PLAYGROUND R N O C K

December 2011 STREET STILL E Proposed Public D EET A N O IN STR L STREET R K WINTHROP AIL O ET SQUARE R O RE Realm Improvements Y R T S N B ST A STREET STREET R LB SEARS AND ROEBUCK E BEACON A ET D AN Y PARKING AREA IT R O STREET H MONMOUTH COURT UT S A TR TEMP IT SEVENT S E ADVENTIST N E DAY MARTIN MILMORE LE BROWNE STREET RA N T T BROOKLINEBOSTON TO H N LS ELEMENTARY SCHOOL OY RY LITA ER B ER IV ROUGH PO SB 0Distance in feet 500 R O Y TR D PETERBO QUEEN E M UD M K OUTH R

NM PA MO MASSACH

C-1 USETTS AVE 5 619 0 2 5 50 0 4 6 6 08

518

316 512

4 49 9 1 3

520 4 97 4 5 99

285 01 C 5 03 AA 50 507 5 50 MUDD STREET 51 9

BOSTO 120 S 51 1

300 OLDIERS FIELD ROA 5 3 100 CHARLES RIVER 1 5 5 Y 17 76 519

N UN 52 5 1 ASHFORD STREET 23 5 25 427 527 IV 5 429 M ERSIT 3 A D 1 431 SS 433 AC 4 437 35 HUSETTS TURN Y BRIDG 535 439 STREET 44 44 1 4 3 4 4

277 4 4 5 4 4 7 453 5 9 E 455 DRIVE 1

11

13

9 PIKE 15 7 4 K 17 STREET BAC 1 3 9 21 2 2 434 2 664 3 27 43 TORROW RA 5

32 S STREET STREET STREET 438 347 29

31 440 33 6

35 442

LEIGH 37 444 39

4 4 CHARLE A-1 A-2 4

58 4

1 2 3 5 MARLBOROUGH 446 7 5 450 448

3-57 53 452

59

61

63

67 65

73 383

77 75

81 79

83 454 DRIVE TREET 91 385

387

BACK S 69 71 456 39

STORROW RIV 389

97 SGAT 39 391 99

HARRY AGGANIS WAY AGGANIS HARRY 3 278 284

1 ER 397 5 401

2 ROAD

5 25 1

3 40 3

1 CHARLESGATE 11

119

31 5 405

5

7

3

9 407 1

1

113 7

13 83 9

3

115

1

47 E 117

14

1

7 3

14 13

141

5

9 1

13 58

12

12

1

7 1

275 225 3

155

1 233 63

5 9

15 65 7

15 587

6 16

9

1

1

1 5

77

1 169

17

17

183

1 175

17

18 30 18 STREET 1

18 5

7

5 9 3 18 BAY STATE STREET 19 409

GARDNER 59 89

11

193

195

19

20

199

207 20 20 20 217 2 1 10 52

32 56 STREET

264 58 632 60 62

270 64

66

68

BAY STATE ROAD 70 0

72

74 4

6

76 4

78 4

22 8 4

82 84 (WESTBOUND)

6 8

90 63

763 96 88

DEERFIELD 92 9 4 6

1 ON 4 1 6 270 4 5 69 4 273 25 236 7 71

BEAC 75 8

765 4 4 H 8

4 636

10 48

79 77

10

16 20 2 2 1

216 112 483

114

122 1 1 1 126 118 1

140 638 4

6 1

4

2

232 8

4 2

4 85

5 5

20 4

66

226 1

15 0 87

4

1

68 2 15

16 16

160 4

0

1

72 8

1 49 91

6

76

4

6 8 170

1

0

17

02

1

14 18 178

90

18 12

08

04 0 18

186

18

1

20

192

2

19

2 19

19 19

2

21 3

2 2 767 2 5 ZZ 648 49 771 497 K VENUE U 650 ALCORN BUICK STREET EALTH A 925 735 ONW (EASTBOUND) D 1 654 M BABCOCK 1 1 COM 656 0 MALVERN 785 STREET 39 E I UNIVERSITY ROAD 565 10 660 416

1 T

775 2

3 5 881 755 745 7

675 21

29 2 2 2

997 989 985 983 969 963 961 957 949 725 685 645 19 533 6

975

6 6 617 6 6 6

1001 871 1005

971 535 1079 10751055 1065 1047 104510271039 1037 1035 1033 1023 1019 905 635 855 539 53 WEST

SHERBORN Q 845 541 665655 575 7 VENUE 595 EALTH A ONW EAST 1089 S COMM GRANBY STREET GRANBY BTA BU M INAL AVENUE COMMONWEALTH AVENUE TERM 464 468 4 466 472 70

474

476

478

4 482

484 8

0 KENMO KENMORE 486 496 COMMONWEALTH AVENUE SQUARE BOSTON BOSTON RE 1050 1040 1028 BROOKLINE 500 1090 10861082 1066 1056 972966 950 BROOKLINE 1010 996 940 936 930 928 926 910 900 530 890 888 882 880 874 860 846 834 808 750 742 730 532 N 536

766 SIO 1022 1032 1024 1020 1030 700 540 1016 1018 736 738 584 TEN 920 922 918 916

872 580566 560 870 728 726 722 718 704 1034 PIKE EX 602 TURN 1104 CARLTON STREET BRIDGE 712 714 710 708 ST

REE 241 110 582 548 6 240 T STREET COMMONWEALTH 110 179 PLEA J P 0 8 2 L 645 2 BABBITT STREET 1110 HINSDALE BOSTON SA 744 640 586 8 10 22 111 70 9 N x CUMMINGTON STREET CUMMINGTON 6 ICH STREET 592 594 590 596

BB RD STREET G 7 0 IPSW T CC 35 2925 19 15 9 0 O 2 39 15 595-603 112

230 24 S1 231 M AVENUE NEWBURY OU CUM 5 21 N MINGTON 3 NDF 665 1114 N E TFO O 143 T R 163 T 100 S LIN ADAMS STREET 115 BLA 706 7

110 67 1116 K 96 86 STREET BO O 80 78 72 70 WINSLOW ROAD WINSLOW STREET v 64 60 O R 227 48 B BROOKLINE 44 716 1118 26 2824 20 16 12 38 25 DUMMER STREET 3 BOSTON 30 28 3 9

226 6 20 2

112 ROAD 222 25 0 MASSACHUSETTS CHARLESGATE EAST 217 BEACON STREET 112 29 4 222 38 4 37 21 BROOKLINE 35 9 TURNPIKE 27 NEW YORK CENTRAL RAILROAD 5 LENOX STREET 5 STREET STREET ROAD BABCOCK STREET

STREET 6 ELBA STREET 53 49 39 15041 39 37 MOUNTFORT 10 138 120 519

141 100 C 96 STREET

FULLER 43 45 47 R WORTHINGTON ROAD 9 1 STREET O 1A STREET PARK W 515 HAMILTON ROAD EGMONT STREET 518 3 N 5 B 2 ARUNDEL STREET 46 8 IN A 7 20

STREET 82 806 C 49 9 S 11 8 2 K H 6 826 24 STREET 13 IE 50 16 132 15 828

LD 131 33 MAITLAND STREET 509 17 830 OSBORNE ROAD 832 251921 15 11 7 5 3 STREET 834 50 14 836 512 8 38 84 FARM 8 COPLEY STREET ESSEX EUSTON STREET 506 42 0 821 24 23 22 21 24 84 M-2 848 1 4 STREET 16 12 FENWAY PARK 24 22 18 8 4 2 27 850 36 29 852 IPSWICH ABBO 58 50 TTSFO 31 854 M RD 30 33 3 121

122 856 829 UD MASON STREET 35 85 499 33 37 8 DY 860 8 39 86 4 35 R 1 8 8 OA 43 64 2 866 3 RO 45 504 84 A THATCHER DRIVE 868 STREET D STREET 47 D 35 870 111 34 872 38 BOYLSTON CARLTON ST. MARY'S ST. BUSWELL 40 500 845

PRESCOTT 55 874 847 135 42 MINER STREET 10 40 111 849 87 101 93 49 851 44 853 COTTAGE 83 855 IPSW 48 857 Y 50 A 96 W ICH STR 52 8 7 KEY OOLIDGE STREET IVY STREET C 867 AUDUBON 869 2

871 Y 90 EET ABERDEEN STREET AMORY 906 900 873 ET 20 82 90 B 908 875 8 MA STRE AY NCHESTER 910 877

95 912 3 ST. PAUL ST. 98 0 10 2 FENWA GIBBS 914 7 100 96 1 916 CIRCLE 879 2 12 45 ROAD 918 9 125 STREET 25 NAPLES 920 12 14 1 53 EWE STREET 100 922 11 924 20 12 55

89 102 15 12 465 BACK BAY FENS 1002 61

15 1004 17 1 8 265 17 1006 ST. MARY'S COURT 901 99 463

21 1008 27 23 29 25 19 28 1008A 903 1010 STREET 905 21 1012 P 1 1250 ARK DRIVE 461 271 1014 907 23 CHILTON 1016 909 468 459

75 1018 1 STREET 2 1020 466 25 124 125 52 1020A 457 27 FULLERTON 1022 12 1022A 915 464 4 FREEMAN STREET 1024 1 56 917 KESW 455 2 1 5 ERS FREEMAN STREET EXTENSION 1024A 1279 26 462 133 1 8 919 6 26 0 1026 1264 PA W 2 921 460 RKING 12 1 Figure 6-4: Potential Development Sites 1028 ICK STREET 451 266 8 ESS A 95 1 1270 1 9 26 QUART Y 1 DRIVE 74 71 1030 23 458 AREA N N 68 5 A 129 8 1032 10 P V ARKIN 14 PARKING AREA EAD 1 9 1272 7 447 G AREA POWELL 12 4 M H ST. PAUL 999 127 10 9 145 T BOYLSTON 67 1003 LAR 1042 01 124 14 EE 80 100 STREET 12 1044 1036 ST. M 15 HALL'S 1046 11 14 TR 130 1048 1007 16 9 68 5 126 S 1303 12 1050 1009 STREET Boston University POND FIRE A 82 70 1052 1 1 ARY'S 13 12 12 1054 1011 15 130 STREET 128 132 84 12 05 1013 130 5 14 90 1286 CHURCHILL STREET 1015 17 155 13 130 16 9 64 1017 131 11 1 18 290 11 18 1019 157 136 1 3 1056 132 20 315 299 10 70 19 72 10 21 22 159 N AM 138 16 24 1060 10 23 134 24 72 Y RIVER Charles River Campus 10 25 EDFIELD 161 21 MUDD Newly Proposed 26 4 5 ORY M 7 2 10 27 K 1064 28 29 ILM 76 10 30 163 5 1 1 AMORY 31 30 3 27 10 32 A 132 78 PLAYGROUND R 2 295 63 33 34 1 -13 35 Development Site 1035 8 N 312 2 10 9 80 O 8 2 1 2 1037 CK 31 7 39 December 2011 6 103 8 4 7 1 6 7 45 31 9 104 4 E 0 - 1324 1070 132 STREET 291 1 IN 10 101 STREET D L A K 1341 - 1355 86 43 O 35 44 O T 36 ILR O REE 1080 143 A 1053 ST 40 ST R BR N Y STREET O 1055 STREET 77 2 1 R 75 N 4 4 EET 1057 A SEARS AND ROEBUCK 9 1090 BEAC 105 7 136 6 45 3 LB 4 1061 71 9 45 A G AREA Previously Proposed 1063 6 D 0 34 1065 9 N ARKIN 5 1100 43 A PPARKING AREA 1067 Y 11 1069 41 RIT 287 STR 1071 15 1110 39 6 MONMOUTH COURT 1073 59 1 HO 184 - 176 1371 Development Site T S EET 1075 57 T ORE 19 37 10 U 135 ILM OL TEM 30 1077 55 R SEVENTH 51 A 105 1373 8 E CHO ADVENTIST 1120 1079 5 ET IN M 25 3 12 SIT RT PLE 1081 192 A RY S D N MMARTINA MILMORE AY BROWNE STREET 35 1083 14 A - 186 1360 ENT 2 37 BROOKLINE N 7 29 1085 BO O 108 1124 TR T ELEMELEMENTARY SCHOOL 4 1087 11 16 N LS 7 31 55 1126 STON Y 16 1089 A O 194 B 0500Distance in feet 1091 49 18 LIT ER UGH 76 35 1093 O IV 85 0 29 47 9 8 107 112 2 1134 P R 96 1395 7 20 O 1 UEENSBERRY 1136 13 DY PETERBORO Q 24 61 ETR D 0 1399 80 17 U M 20 M 2 6 24 8 111 2 K 21 OUTH 32 19 5 ONM 5 6 PAR M 10 36 84 - 100 40 BOSTON UNIVERSITY IMPNF

7.0 TRANSPORTATION AND PARKING

7.1 Transportation Goals The 2003 Transportation Master Plan was based on three interrelated transportation goals. They were created to improve sustainability and quality of life on the Charles River Campus (CRC), as well as to diminish the campus’ impact on the local transportation network and adjoining residential communities, and include:

1. Enhance pedestrian circulation along Commonwealth Avenue and within the Charles River Campus.

2. Limit or reduce trip generation levels at the Charles River Campus.

3. Improve traffic operations along Commonwealth Avenue.

Since the adoption of the 2003 Transportation Master Plan, Boston University has implemented a number of improvements and supported several City or state initiatives to fulfill the transportation goals that it set for itself.

Transportation Objective 1: Enhance pedestrian circulation along Commonwealth Avenue and within the Charles River Campus.  Financial support and property donations toward the City’s Commonwealth Avenue Phase 1 improvements from Kenmore Square to Amory Street. Completed in 2011, the project has improved the pedestrian experience through the following: o Improved safety by reducing the pedestrian crossing distances at signalized intersections on Commonwealth Avenue o Expanded pedestrian waiting areas at intersection crossings o Expanded MBTA platforms to provide larger and safer waiting areas for riders.  Technical support and financial assistance for Phase 2 of the City’s Commonwealth Avenue Improvement project, which will extend the same improvements realized in Phase 1 into the West Campus area from Amory Street to Alcorn Street.  Technical design, planning and engineering at the intersection of Commonwealth Avenue, the BU Bridge and the Mountfort Street corridor to improve circulation and pedestrian safety.  Pedestrian safety training during freshman orientation.

7.0 Transportation And Parking 7-1

BOSTON UNIVERSITY IMPNF

Transportation Objective 2: Limit or reduce trip generation levels at the Charles River Campus.

 Construction of Phase 2 of the John Hancock Student Village. This project provides 960 additional on-campus beds for undergraduate students at this site, thereby reducing the number of students who commute to campus.  Construction of the Graduate Student Housing facility at 580 Commonwealth Avenue, which provides 220 units of housing with only 11 parking spaces. This project provides additional on-campus housing that has reduced the number of commuting trips to campus.  Construction of the Life Science and Engineering building on Cummington Street with no additional parking.  Installation of the city’s first bike lanes on the inbound and outbound sides of Commonwealth Avenue. Since their installation in 2007, bicycle traffic along this portion of Commonwealth Avenue increased by 50 percent.  Expansion of bicycle storage capacity on-campus. Indoor bicycle rooms and outdoor racks now accommodate up to 4,000 bicycles.  Promotion of public transit as an alternative to automobile trips to and from campus.  Promotion of car pooling as an alternative to single occupancy vehicles.  Through various Transportation Demand Management (TDM) strategies instituted by the University, the proportion of commuters who drive to the campus in single occupancy vehicles has been reduced to approximately 44 percent in 2010. TDM strategies that have been employed by BU include: o Ride Matching Program. The University provides a ride-matching service for car and van pools through the University’s Parking Services Office. Boston University faculty, staff and students can conveniently participate in the ride-matching services via the University’s web site. According to the most recent Ride Share Report filed with Mass DEP (December 2010), the proportion of all commuters who car pool to campus has increased from 1.5 percent in 2003 to 2.3 percent in 2010. o MBTA Pass Program. The University promotes use of public transportation by its employees by providing pre-tax payroll deduction for purchasing MBTA passes. The MBTA passes are delivered to the participants payroll address as an added convenience. o Student MBTA Semester Passes. Boston University students can purchase semester MBTA Passes through the Parking Services Office via the University web page. The semester pass is good for four

7.0 Transportation And Parking 7-2

BOSTON UNIVERSITY IMPNF

months and affords students a discount off the regular monthly MBTA pass costs. The most recent Ride Share Report filed by BU with Mass DEP documents that public transit use has doubled from the levels in the University’s 1997 Master Plan. Approximately 31 percent of commuters to campus (primarily faculty and staff) use transit, versus only 15 percent in 1997. o Parking Fees. Fees are charged for all Boston University Parking Permits for faculty, staff and students (no free parking). o Limiting Student Parking. The University prohibits underclassmen that live on campus from having vehicles. Parking availability for upperclassmen is severely limited.  The Boston University Shuttle (BUS) began operating in 2004 with service for students, faculty and staff along Commonwealth Avenue and to/from the Boston University Medical Campus area on Albany Street. The University has expanded shuttle services up to six buses per hour in peak times to accommodate the ridership demand.  The University has been a key stakeholder and active supporter of MassDOT’s Urban Ring circumferential transit planning initiative, which will improve public transportation access and options for those who live or work at the Charles River Campus. Transportation Objective 3: Improve traffic operations along Commonwealth Avenue  Implementation of Commonwealth Avenue Phase 1 project to improve traffic flow in the Central Campus area: o Upgrades of all signal equipment along Commonwealth Avenue. o Synchronization of the Commonwealth Avenue signals and the Boston Transportation Department’s central computer control system. o Installation of a protected and exclusive left turn lane on Commonwealth Avenue westbound at the intersection with St. Mary’s Street.  Technical and financial support of the City’s Commonwealth Avenue Phase 2 project, which will continue the same traffic safety and operational improvements achieved in Phase 1 into the West Campus area.  Supported technical planning and engineering efforts that would improve traffic safety and circulation at the intersection of Commonwealth Avenue and the BU Bridge and along the Mountfort Street corridor.

7.0 Transportation And Parking 7-3

BOSTON UNIVERSITY IMPNF

7.2 Changes at the Charles River Campus Since 2003 Campus Development. Since 2003, Boston University has undertaken the construction of five facilities in the East, Central or West Campus districts:

 The Life Sciences and Engineering Building, an academic facility at 24 Cummington Street.  Graduate Student Housing facility located at 580 Commonwealth Avenue.  John Hancock Student Village Phase 1, the Agganis Arena and the Fitness/Recreation Center, located at 899-925 Commonwealth Avenue.  John Hancock Student Village Phase 2, undergraduate student housing facility located on Harry Agganis Way.  East Campus Student Services Center at 100 Bay State Road. On-Campus Parking. Even with the construction of the five major projects mentioned above, there has been little impact on the local transportation infrastructure since 2003. The parking inventory at the Charles River Campus prior to construction of the projects was approximately 3,557 spaces, which included surface lots, parking decks and parking garages, as well as alley parking distributed throughout the campus. At present, the total parking inventory includes 3,636 spaces, a net increase of only 79 spaces.

With completion of 10 Buick Street (2000), the Agganis Arena (2004), the Fitness and Recreation Center (2005) and 33 Harry Agganis Way (2009) at the John Hancock Student Village, the University has a total of 742 spaces in a multi-level underground garage and two surface parking lots on the north side of the site. The Planned Development Area approvals for the site allow for the construction of up to 1,000 on- site parking spaces.

The University has adopted a two-part strategy for reducing on-campus parking demand by charging appropriate parking fees and restricting access to parking permits. Fees for employees with GREEN Permits (daily commuters) have increased by 28 percent. Student BLUE Permit fees have risen 31 percent. The University severely limits the number of permits available to students. In Spring 2011, only 182 student permits were issued for overnight parking and only 22 permits for daytime commuting students.

Pedestrians. With the construction of the new residential and recreational/fitness facilities at the Student Village site, pedestrian activity has increased dramatically on the Charles River Campus. Pedestrian counts taken in September 2011 document as much as a 40 percent increase in activity since 2003 at the BU Bridge/University Road area, which is the crossroads between Central and West campuses.

Bicycles. Bicycle activity at the CRC has increased at an even greater rate than pedestrian activity, a reflection of radically expanded facilities and programs initiated by

7.0 Transportation And Parking 7-4

BOSTON UNIVERSITY IMPNF

both the University and the City of Boston for the past decade. To illustrate the extent of this change in attitude, the 2003 Master Plan did not include bicycle counts as part of its streets analysis.

The installation of bicycle lanes on Commonwealth Avenue as part of the Phase 1 improvements project was a key stimulus for the dramatic increase in bicycle activity at the CRC. Counts taken at the BU Bridge/University Road area shortly after the installation in 2007 counted roughly 2,000 bicyclists per day. MassDOT’s most recent counts in September 2011 indicate a 57 percent increase in bicycle traffic in the four years since the lanes’ installation (approximately 3,000 bicyclists per day).

The University has installed nearly three thousand bicycle storage facilities since 2003, a threefold increase of its former inventory. The City of Boston has also proactively encouraged bicycle activity, having recently installed 142 storage racks and implemented the Hubway bicycle program with six stations and 90 bicycles in the CRC area.

Campus Shuttle Bus. In 2003, Boston University operated a shuttle bus service to service the CRC along Commonwealth Avenue between Kenmore Square and Harvard Avenue. That shuttle was replaced by the Boston University Shuttle (BUS) in 2004, which extends through the CRC along Commonwealth Avenue and connects to the Medical Campus on Albany Street. The BUS operates between 7:00 AM and 12:00 AM, five days a week. In peak periods, the BUS operates on 10 minute headways (six buses per hour) in order to accommodate the ridership demand. Often at capacity during peak hours and inclement weather (approximately 60 passengers per vehicle), the BUS has a potential ridership of 1.6 million passengers per academic year.

7.3 Changes to the Transportation Network Since 2003 Three major infrastructure improvement projects have been undertaken since the adoption of the 2003 Master Plan:

1. Commonwealth Avenue Reconstruction Project - Phase 1 2. Kenmore Square Improvements Project 3. Boston University Bridge Rehabilitation Project Commonwealth Avenue Phase 1 (CAP1). Completed in 2007, this project was designed by the City of Boston and constructed by the Massachusetts Highway Department (now MassDOT). The project made pedestrian, bicycle and vehicular improvements along Commonwealth Avenue between Kenmore Square and Amory Street. The critical elements of the project included curb extensions (neckdowns) to improve pedestrian safety, expanded platform areas at the MBTA stations to enhance rider safety, elimination of one travel lane westbound to slow down traffic and enhanced landscaping on both sides of Commonwealth Avenue and within the MBTA reservation. The project also included the first bike lanes in Boston. The project has been well

7.0 Transportation And Parking 7-5

BOSTON UNIVERSITY IMPNF

received by the community and has had a positive impact on pedestrian and bicycle safety/circulation along Commonwealth Avenue.

Kenmore Square Improvements. The project was designed and constructed by the MBTA (now part of MassDOT), with Boston University contributing significantly to the funding of the project. Construction was completed in 2009. Improvements included expanded/enhanced pedestrian facilities, re-organization of the traffic circulation and signal operations in the Square, bicycle lanes and a new MBTA bus station and Green Line headhouse.

Boston University Bridge Rehabilitation. This project is currently under construction and is scheduled to be completed by December 2011. It was originally designed by the Massachusetts Department of Conservation and Recreation (DCR) and is now under the jurisdiction of MassDOT, which is overseeing the construction. The project will replace the bridge deck and rehabilitate the bridge superstructure. The basic foot print of the bridge will not change. The project design includes two bike lanes on the bridge and a reduction in the number of vehicles travel lanes from four to three.

7.4 Expected Changes to the Transportation Network (2012 – 2022) Several transportation infrastructure improvement projects in the design and construction phases will be completed within the time frame of the next master plan:

 Commonwealth Avenue Reconstruction Project - Phase 2A  Commonwealth Avenue MBTA Safety Improvements – Phase 1  Commonwealth Avenue Turnpike Bridge Deck Replacement Project  Commonwealth Avenue Reconstruction Project - Phase 2B  Yawkey Commuter Rail Station Improvements  St. Mary’s Street Bridge Rehabilitation Project Commonwealth Avenue Phase 2A (CAP2A). This project will be a continuation of the CAP1 improvements, beginning at Amory Street where CAP1 ended and extending west to the intersection with Alcorn Street. The project includes pedestrian and bicycle improvements, traffic safety and operational improvements, and landscaping and street furniture improvements/enhancements. The project also envisions implementing safety improvements within the MBTA reservation, as well as modifications to the MBTA station platforms to bring them into compliance with ADA requirements. The Boston Transportation Department is directing the project design and Boston University is providing design funding as part of a public/private partnership. MassDOT will fund and manage the construction. The project design is currently at the 25% level and is being reviewed by MassDOT.

7.0 Transportation And Parking 7-6

BOSTON UNIVERSITY IMPNF

Commonwealth Avenue MBTA Safety Improvements – Phase 1 Area. This project will install and upgrade safety fencing along the MBTA reservation in Commonwealth Avenue between Kenmore Square and Carleton Street, completing safety improvements that were not undertaken as part of CAP1 improvements. This project will also make modifications to the station platforms at the Silber Way Station to make them ADA accessible. Design is expected to be completed by the end of 2012. Construction is currently anticipated for 2013 and should last one construction season. The MBTA will fund the construction through a grant from the USDOT that BU was instrumental in securing.

Commonwealth Avenue Deck Replacement. This project will replace the severely deteriorated bridge deck over the Turnpike. The condition of the deck is so poor that part of the CAP1 improvements could not be implemented and this portion of Commonwealth Avenue was skipped during construction of CAP1. MassDOT is responsible for the design, which they expect to complete by the fall of 2012. Construction would begin in 2013 and last for two construction seasons through 2014.

Commonwealth Avenue Phase 2B (CAP2B). This project addresses the portion of Commonwealth Avenue between University Road and Amory Street left out of CAP1 due to excessive complications with the deteriorating bridge deck over the Turnpike. It will extend to portions of Carlton Street, Mountfort Street, Essex Street and University Road. BTD and MassDOT are overseeing the design process with cooperation from the University, the Town of Brookline, the City of Cambridge, the MBTA, and the DCR. The goal of the project is to develop a set of improvements that will enhance safety and circulation in this “system” for all users: pedestrians, bicyclists MBTA passengers and drivers. This project will entail a reconfiguration of north and southbound lanes on the bridge and modifications to the jughandle. Conceptual design is anticipated to be complete by the end of 2011.

Yawkey Commuter Rail Station. The initial phase of Meredith Management Corporation’s Parcel 7 Air Rights Development will, upon its expected completion in 2013, transform Yawkey Station into a full-service multi-modal station. Major modifications will make the platforms fully ADA accessible from the headhouses on Beacon Street via elevators.

St. Mary’s Street Bridge. This project will repair the bridge deck, sidewalks, and railings on this critical thoroughfare. MassDOT is overseeing the project and anticipates redesign to be complete in late 2011. Construction will begin in 2012 and conclude within one season.

Other Long-Range Projects. In addition to the projects described above, there are other, long-range transportation initiatives that may be active in the planning and design phases within the next ten years, such as the Urban Ring Phase 2 project. The proposed circumferential Bus Rapid Transit (BRT) service would connect the MBTA’s existing radial transit lines. Boston University has been an active participant in the MassDOT

7.0 Transportation And Parking 7-7

BOSTON UNIVERSITY IMPNF

endeavor throughout the planning and design phases of this project as its proposed alignment passes through the CRC at the critical Commonwealth Avenue/BU Bridge nexus. MassDOT has suspended planning activities for the project as of January 2010 due to funding constraints. Planning could potentially be re-activated before the adoption of the next Institutional Master Plan if the state’s transportation funding landscape improves, in which case the University would resume its active participation in the planning process.

7.0 Transportation And Parking 7-8

BOSTON UNIVERSITY IMPNF

8.0 ENVIRONMENT AND SUSTAINABILITY

8.1 Introduction Boston University recognizes the importance of reducing the impact of the University activities on both the local, regional and global environment. Toward that end, the University has been working to build into its planning, development and operational activities measures to make the University more environmentally sensitive and sustainable. One of the most significant accomplishments achieved to date is the appointment of a full-time Sustainability Director to provide leadership and accountability for sustainability within the University community and to generate a sustainability strategic plan.

Consistent with its mission to educate reflective, resourceful individuals ready to live, adapt, and lead in the interconnected world, Boston University approaches sustainability holistically: through its operations, research and education, and public engagement.

In developing its strategic plan, the Boston University Sustainability Committee has based its framework on the nationally recognized STARS (Sustainability Tracking, Assessment & Rating System) program developed by the Association for the Advancement of Sustainability in Higher Education (AASHE). Since its 2009 launch, BU has collaborated with the Sustainable Endowments Institute, Princeton Review, Sierra, AASHE and others to provide a consistent metrics system for reporting results.

8.2 Operations Since 2005, the amount of building space on the Charles River Campus has grown by 7%. Despite this growth, the University has made progress in reducing its total impact on the environment through operational efficiencies in the following key areas:

 Greenhouse Gas Emissions: The University has achieved a 7% reduction in Greenhouse Gas Emissions since 2005 despite an increase in total building area. These reductions in emissions are primarily due to a shift to cleaner burning fuels on campus, and building and equipment efficiency projects.  Energy Efficiency: When total energy consumption is measured on a per square foot of building area, the University has achieved a 13% reduction in building energy use intensity since 2005. This is due primarily to building energy efficiency improvements and better operating practices.  Water Efficiency: The University has seen a 2% reduction in gross water consumption since 2005, even with significant campus growth. A more significant reduction would have been achieved were it not for the increase in consumption attributable to 33 Harry Agganis Way coming on line with 960 new beds.

8.0 Environment and Sustainability 8-1

BOSTON UNIVERSITY IMPNF

 Waste Reduction: The University has managed to obtain a 7% reduction in total waste production since 2006. The recycling rate has increased by 24% since 2006 to a total of 15% in 2010. An additional 11% of the waste on the campus is composted and 2% donated to be reused.  Donated Goods: During the Sustainability@BU Move-out program at the end of every semester, the University partners with Goodwill Industries donating the goods students leave behind to support Goodwill’s local social programs including job training, career services, job training for individuals with special needs, and summer youth programs.  Green Buildings: Boston University’s commitment to green buildings is to meet LEED certifiable standards with energy performance at least 20% greater than current ASHRAE standards. All major new construction and most major renovation projects currently in design and construction are actively seeking LEED certification which total approximately 450,000 square feet of building space in Boston and Brookline. In addition, the University is piloting a LEED Existing Buildings Operations + Maintenance project with 114,000 square feet and is developing green building standards.  Energy Efficiency: To improve energy efficiency in its existing buildings, the University has created a program to calculate the energy use intensity of each of its 274 buildings on the Charles River Campus to prioritize energy efficiency projects. This program has successfully targeted many opportunities for savings and will be critical in the process of developing the 2012 Master Plan.

8.3 Education and Research Boston University is an international, comprehensive, private research university, committed to educating students to be reflective, resourceful individuals ready to live, adapt, and lead in an interconnected world. Boston University is committed to generating new knowledge to benefit society. The University’s sustainability curriculum and research support this mission, which extends beyond the classroom and laboratory. Boston University is a place where faculty and students from various disciplines are actively engaged in research to prepare for a world where increasing demands must be balanced with environmental, economic, and social sustainability. These issues are embedded in the curriculum across 13 of the University’s schools and colleges, with 25 sustainability-related certificate and degree programs, and over 170 courses related to sustainability.

Boston University faculty and students perform a wide range of research in an effort to develop a more effective understanding of the sustainability transition. This research spans multiple disciplines, national and global scales, science and policy, renewable and nonrenewable resources, and quantitative and qualitative research methods. The University is engaged in critical research across this broad range of sustainability issues.

8.0 Environment and Sustainability 8-2

BOSTON UNIVERSITY IMPNF

The Sustainable Neighborhood Living Lab collaborates with the City of Boston and business partners to research and explore the development and adoption of sustainable technologies and innovation in an urban neighborhood real-world setting. One element of the program includes the discovery and measurement of a major source of greenhouse gas emissions in the city.

Boston University’s Clean Energy and Environmental Sustainability Initiative (CEESI) is engaging University resources to help prepare for a world where increasing demand for energy resources must be balanced with environmental, economic and social sustainability. This interdisciplinary research initiative involves the collaboration of the Colleges of Engineering, and Arts and Sciences, and the School of Management.

8.4 Public Engagement Boston University is strongly engaged in the community through it faculty, staff, students, and programs. Recognizing that the University plays an important role within the community, it will continue to promote sustainability through service, engagement, and partnerships. Some highlights include:

 Support of the City’s Climate Action Plan through President Brown’s seat on Mayor Menino’s Green Ribbon Commission  Coordination with the Back Bay Neighborhood Association and the Electric Vehicle Urban Infrastructure Study for Carbon Day 2010  Donations from the sustainability@BU Move-out program with Goodwill Industries noted above  Fifteen student-run programs of the Community Service Center that involve interaction with the Greater Boston Area community  The Sustainable Neighborhood Living Laboratory, which combines research, education, and partnership with the residents of the City of Boston and local business leaders  Active membership in the: o Northeast Campus Sustainability Consortium (NECSC) o Massachusetts Schools Sustainability Coordinators Roundtable (MMSCOR) o Association for the Advancement of Sustainability in Higher Education (AASHE) o US Green Building Council (USGBC) o Urban Land Institute (ULI) Sustainability Committee A detailed account of the University’s sustainability activities, achievements, and objectives can be found at www.bu.edu/sustainability.

8.0 Environment and Sustainability 8-3

BOSTON UNIVERSITY IMPNF

8.5 Transportation The University has advocated for and undertaken a large number of measures that are aimed at changing individual behaviors towards transportation and encouraging alternative modes of transportation. While these measures are described in greater detail in Chapter 7, Transportation, some of the key outcomes are:

 The increase in pedestrian travel due to improved sidewalks along Commonwealth Avenue and increased on-campus student housing.  Increased bicycle use through the provision of dedicated bike lanes on Commonwealth Avenue and nearly 4,000 bike racks across the campus and support for the City of Boston’s new Hubway bike sharing program.  Reductions in single-occupancy vehicle commuting to campus due to increased parking fees and easier access to public transit, including the BUS shuttle.  Reductions in emissions from automobile use through improved traffic flows and reductions in delays.

8.6 Stormwater and Groundwater As part of the development of new facilities on the campus, the University has instituted new technologies and solutions to reduce the impact of dense urban development on the environment. Portions of the campus are located within a groundwater protection zone that the City has established to monitor and enhance groundwater levels to protect existing historic buildings from damage to foundation systems. All of the campus is tributary to the Charles River and there are ongoing public and private efforts to improve water quality. Toward this end, the University has implemented a number of measures to reduce the impact on the environment, including;

 Recharging roof runoff from new building projects to increase ground water levels, particularly in the Bay State Road area where older buildings have been constructed on wood piles.  Removing existing sources of infiltration and inflow into the Boston Water and Sewer Commission system, improving the ability to effectively treat wastewater, and reducing the occurrence and volume of combined sewer overflows.  Using permeable paving materials and reducing impervious area through landscaping to reduce total stormwater runoff.  Recharging roof runoff and stormwater runoff into the ground to provide a reduction in phosphorus contribution to the Charles River, thereby improving water quality.

8.0 Environment and Sustainability 8-4

BOSTON UNIVERSITY IMPNF

8.7 Historic Preservation The University is the largest private owner of historic properties in the City of Boston and is nationally known for its graduate academic program in Historic Preservation Studies. The University has a remarkable track record in the preservation of the many brownstones along Bay State Road and works closely with the Bay State Road/Back Bay West Architectural Conservation District to ensure that the architectural qualities of the district are maintained. Even when new construction is proposed, such as the new East Campus Student Center, the design seeks to integrate into the fabric of the historic district.

The University also recognizes the importance of the historic Cram-Ferguson buildings that form the core of the original academic campus as well as the importance of the Modern style Jose Luis Sert buildings, which comprise the Law School, the George Sherman Student Union and the Mugar Library.

As part of the evaluation of existing facilities on the campus, the University prepared the Charles River Campus Historic Preservation Plan. This study reviewed the existing building inventory of the campus and categorized the historic context of the University’s building stock. This plan has served as useful tool in campus planning projects.

8.0 Environment and Sustainability 8-5

BOSTON UNIVERSITY IMPNF

9.0 COMMUNITY BENEFITS

9.1 Introduction From its founding in 1869, Boston University has grown into a leading academic and research institution that attracts students and faculty to Boston from around the world. As the fourth largest private not-for-profit University in the country and the largest in Boston, the University recognizes that its continued success has been greatly influenced by its location in the City of Boston.

The University has established a symbiotic relationship with the City, encouraging its students to enrich their lives and education by taking advantage of the city’s resources and, in turn, by playing a vital role in the life of its neighbors by providing them with a wide range of educational, cultural, social, legal, and medical services.

The University contributes to the local and regional economy through direct employment, purchased services and student, faculty and staff spending. In addition the University makes financial contributions directly to the City of Boston in the form of real estate taxes, payments in lieu of taxes, and linkage payments. Indirectly, the University supports the City through the provision of scholarships, services and programs.

9.2 Community Benefits The University has a longstanding commitment to education that extends beyond its campus, as evident in its scholarship program, the nation’s first and most extensive program of its kind, to City residents and employees. Amounting to over $10.7 million, the University granted the following awards in 2010:

 Boston High School Scholarships  Boston High School Scholars Orientation & Retention  BU Community Service Awards  Boston City Employee Scholarships  Boston Teacher Scholarships  City Lab Academy scholarships  Cardinal Medeiros Scholarships  Roxbury Community College Scholarship  SPH Community Scholars

The University also sponsors many academic enrichment and remedial help programs through the Boston Public Schools Collaborative. This administrative organization oversees more than a dozen programs created in support of the Boston Public Schools. Boston University has been and continues to be an active participant. University

9.0 Community Benefits 9-1

BOSTON UNIVERSITY IMPNF

resources contribute to the support of a full-time director who involves faculty and students and seeks funding for new programs, such as the following:

STEP UP Initiative

Commissioned by Mayor Menino three years ago, the STEP UP initiative aims to close the achievement gap in Boston. Boston University partners with Boston College, Harvard University, Northeastern University, and Tufts University to distribute institutional resources among ten public schools. STEP UP provides specific programs and initiatives in response to needs identified by each partner school, ensuring that all support is aligned with the curricular goals of the Boston Public Schools and the Massachusetts Department of Education. A multifaceted approach, which includes academic support for schools, extended learning opportunities, health and wellness programs, and parent and community engagement, has helped these public schools to effectively deal with the complex issues facing them.

Upward Bound

Upward Bound provides academic enrichment and remedial help on an annual basis to potential first-generation college and low-income Boston Public High School students. It serves 75 students recruited from one of six target high schools. Students enter the program in either the 9th or 10th grade and remain with the program until their graduation from high school. Program services include an academically intensive six-week summer residential program and an afterschool program of tutoring and academic courses during the school year. Its services are located on campus, allowing students access to the University's many resources. The program is free, and students are paid a small stipend for their participation.

BUILD (BU Initiative for Literacy Development)

BUILD is a collaborative effort of the School of Education with the Boston Public Schools Collaborative, the Student Employment Office, the Office of Financial Assistance, and the athletics Department at Boston University. With federal Work Study funds made available by the University in support of the federal America Reads and the local Read Boston programs, 170 literacy tutors provide assistance in curricular, after-school and community-based programs. These programs serve elementary school children in Boston and Chelsea.

The University also has an extensive program of free or discounted concerts and lectures and University-owned and supported radio stations; the use of athletic and recreational facilities for high school competitions; and many community volunteer programs that are coordinated by the University’s Community Service Center. With a volunteer base of more than 2,000 people, the members of the Community Service

9.0 Community Benefits 9-2

BOSTON UNIVERSITY IMPNF

Center contribute an estimated 70,000 hours of community service to many organizations in Boston each year.

9.3 Economic Impact Boston University is the largest University in the City and fourth largest private University in the country with over 30,000 graduate and undergraduate students. With nearly 26,000 employees, the University is the largest private employer in the City of Boston and the 12th largest in the Commonwealth.

In FY2010, the University, its employees, students and their visitors in the City spent over $1.15 billion, with an impact of $3.9 billion statewide (see Table 9-1). BU and its subsidiary corporations generated 43,457 direct and indirect jobs in Massachusetts, including over 15,000 in Boston alone.

Table 9-1, Overview of BU's Economic and Employment Impact in 201019

Boston Metropolitan Commonwealth City of Boston Area of Massachusetts

Boston University's Direct Spending for Employee Salaries and Benefits $431,672,833 $1,245,691,730 $1,315,697,416 and the Purchase of Goods and Services

Direct Spending by Boston University Students and Their Out- $260,536,924 $393,456,946 $399,128,497 of-State Visitors

Additional Spending Created by Boston University's Spending and $456,153,072 $1,893,578,528 $2,210,735,322 the Spending by Boston University Students and Out-of-State Visitors

TOTAL ECONOMIC IMPACT $1.15 Billion $3.53 Billion $3.92 Billion

TOTAL EMPLOYMENT IMPACT 15,077 jobs 39,486 jobs 43,457 jobs

19 This information is based on the US Department of Commerce Bureau of Economic Analysis Regional Input- Output Modeling System (RIMS II)

9.0 Community Benefits 9-3

BOSTON UNIVERSITY IMPNF

The impact of the University within the City of Boston is substantial. During FY 2010, the University purchased nearly $200 million in goods and services from vendors within the City. The spending by students and their out of state visitors totaled over $260 million. Salaries and benefits for employees living in the City exceeded $238 million.

In addition to direct and indirect economic benefits to the City’s economy, Boston University actively seeks ways to reduce the demand on City services. Through its own Police Department, the University brings added security to the entire campus area, 24 hours a day, 7 days per week, responding to calls both in and outside campus boundaries. It also oversees the daily maintenance of the local MBTA stations and City sidewalks and streets around the campus; provides snow removal during winter months; plants and repairs street trees; and conducts pest control.

Since the last Master Plan was adopted in 2003, the University has, of its own accord, paid nearly $36.8 million in real estate property taxes and linkage payments to the City of Boston and an additional $33.3 million in lieu of taxes. BU’s subsidiary corporations paid nearly $1 million in taxes to Boston in FY 2010.

Boston University also contributes directly to projects which improve the University neighborhood, including contributions to the Commonwealth Avenue Improvement Project, by providing matching dollars to city, state, and federal sources.

9.0 Community Benefits 9-4

BOSTON UNIVERSITY IMPNF

APPENDIX A – LIST OF BOSTON UNIVERSITY COMMUNITY TASK FORCE MEMBERS

1. Pam Beale - Chair

2. Sonia Aleman

3. Paul Berkeley

4. Paul Creighton

5. Dan Cuddy

6. Jim Hynes

7. Yvette Lancaster

8. Archie Mazmanian

9. Terri North

10. Richard Ong

11. Shlomo Pinkas

12. Prutha Patel

13. Victor Themo

14. Elizabeth Walsh

15. Bob Webber

16. Alan Weinberger

Appendix A A-1