Slu@Beni List Grada Beograda

Total Page:16

File Type:pdf, Size:1020Kb

Slu@Beni List Grada Beograda ISSN 0350-4727 SLU@BENI LIST GRADA BEOGRADA Godina XLIX Broj 14 28. jun 2005. godine Cena 150 dinara Skup{tina grada Beograda na sednici odr`anoj 30. ma- 308, 309, 310/1, 310/2, 311/2, 311/3, 312/1, 312/2, 312/3, 312/4, ja 2005. godine, a na osnovu ~lana 54. Zakona o planirawu 313, 314, 315, 316, 317, 318/2, 763, 592/2, 592/1, 593, 802/8, i izgradwi („Slu`beni glasnik RS”, broj 47/03) i ~lana 792/4, 793/4, 828/2, 829/1, 758, 609/2, 609/1, 610, 611, 612, 31. Statuta grada Beograda („Slu`beni list grada Beo- 614/1, 616/2, 616/1, 616/3, 617/2, 617/1, 215/1, 214, 213, 755, grad”, br. 14/04 i 30/04) donela je 196/2, 754, 197/2, 197/1, 200, 201, 2203/4, 848/7, 848/8, 848/9, 180, 177/2, 176, 752, 163, 164, 165, 147/1, 158, 1043, 1038, PLAN DETAQNE REGULACIJE 1037/2, 1059, 1037/1, 1057, 865/1, 858/2, 864/2, 863/2, 862/2, 861/2, 860/2, 848/10, 2203/2, 2203/1, 830/1, 792/2, 792/3, 792/1, ^ETIRI MESNE ZAJEDNICE OP[TINA ZVEZDARA 793/2, 795/4, 799/3, 798/2, 797, 796/3, 796/2, 796/1, 795/2, 794/3. I VO@DOVAC – NASEQE „PADINA” Cele parcele: A. UVOD 865/2, 858/3, 864/3, 863/3, 859/2, 859/1, 862/3, 861/3, 860/3, 848/4, 848/3, 848/2, 848/9, 848/8, 848/7, 848/1, 848/5, 848/6, 847, A.1. Povod i ciq izrade plana 846/1, 846/2, 845/1, 845/2, 850/1, 850/2, 849, 851, 852, 2203/3, Neposredan povod je Re{ewe o pripremawu izmene i 2203/4, 2203/5, 844/1, 844/2, 844/3, 844/4, 844/5, 853/1, 853/2, dopune detaqnog plana ~etiri mesne zajednice op{tina 853/3, 853/4, 853/5, 853/6, 854, 855, 856/1, 856/2, 856/3, 856/4, Vo`dovac i Zvezdara („Slu`beni list grada Beograda”, 856/5, 856/6, 856/7, 857, 892/1, 892/2, 891, 890, 889/2, 889/1, broj 3/95) 881/1, 881/2, 880/1, 880/2, 879, 878, 751, 882, 883, 884, 885, 886, Ciqevi izrade plana su: 887/1, 887/2, 888/1, 888/2, 888/3, 900/6, 900/4, 900/5, 900/3, – definisawe javnog interesa; 900/2, 900/1, 899/1, 899/2, 899/3, 898/1, 898/2, 898/3, 898/4, – opremawe naseqa infrastrukturnim vodovima; 897/2, 897/1, 896, 895, 894/1, 894/2, 893/1, 893/2, 893/3, 842/1, – opremawe naseqa objektima javne namene ({kole, de- 842/2, 842/3, 842/4, 843, 841, 840/1, 840/2, 839, 838/1, 838/2, ~je ustanove) i planirawe lokacije za socijalno-zdravstve- 837, 836, 835, 834, 833, 832, 831/1, 831/2, 831/3, 1041, 866/1, ne objekte; 866/2, 867/1, 867/2, 868/1, 868/2, 869/1, 869/2, 870/1, 870/2, 871, – izgradwa nedostaju}ih centralnih funkcija, snabde- 872, 873, 874/1, 874/2, 875, 876/1, 876/2, 877/1, 877/2, 973, va~kih punktova, opremawe naseqa komercijalnim i kul- 972/1, 972/2, 971, 970/1, 970/2, 970/3, 969, 968/1, 968/2, 967, turnim delatnostima; 966, 965/1, 965/2, 964, 963, 962, 961, 930/1, 930/2, 929/1, 929/2, – poboq{awe uslova `ivqewa; 928, 927, 926, 925, 934/3, 934/2, 934/1, 935, 936, 937/1, 937/2, – za{tita `ivotne sredine; 938, 939, 940, 941/1, 941/2, 942, 943/3, 943/2, 943/1, 944/1, – sanacija terena nepovoqnih za izgradwu. 944/2, 954/1, 954/9, 954/2, 954/8, 954/7, 954/3, 954/6, 954/5, 954/4, 1542, 953, 952, 951, 950, 949/1, 949/2, 948/1, 948/2, 948/3, A.2. Obuhvat plana 948/4, 947, 946, 945/1, 945/2, 933, 932, 931/1, 931/2, 960, 959, 958/1, 958/2, 957, 956/1, 956/2, 955/1, 955/2, 981/1, 981/2, 997/3, A.2.1. Granice plana 997/1, 997/2, 996/1, 996/2, 998, 999, 995, 994, 993, 992, 991, 990, Ovaj plan detaqne regulacije obuhvata delove podru~ja 989, 988, 987, 983, 984, 985, 986, 982/1, 982/2, 980/1, 980/2, 979, 978, 974, 975/1, 975/2, 976, 977, 1000, 1001, 1002/2, 1002/1, op{tina Zvezdara i Vo`dovac, u povr{ini od oko 200 ha, sa slede}im granicama: 1002/4, 1002/3, 1002/5, 1003, 1004, 1005, 1006, 1007, 1008, severna granica – regulaciona linija delimi~no izve- 1009/3, 1009/2, 1009/1, 1010, 1011/5, 1011/1, 1011/2, 1011/3, dene saobra}ajnice ulice Bra}e Jerkovi} – Nova 1-1; 1011/4, 1011/6, 1011/7, 1012, 1009/4, 1009/5, 1009/6, 1009/7, ju`na granica – planirana saobra}ajnica Kumodra` – 1009/8, 1013, 1014, 1015, 1016/1, 1016/2, 1017/1, 1017/2, 1018/1, Veliki Mokri Lug Nova – (S101); 1018/2, 1019, 1020, 1021, 1022, 1023, 1024, 1025, 1026, 1027, isto~na granica – planirani koridor ul. Mokrolu{ke 1028, 1029/1, 1029/2, 1030, 1031, 1032/1, 1032/2, 103/1, 1033/2, – (S100), 1034, 1035, 1036, 1055, 1056, 1054, 1058, 1053, 1052, 1051, zapadna granica – planirana ulica Bra}e Jerkovi} 1050/1, 1050/2, 1050/3, 1049, 1048/1, 1048/2, 1048/3, 1047, 1046, (biv{a Ju`na magistrala) – Nova kumodra{ka ul. (S102). 1045, 1044/1, 1044/2, 1044/3, 157, 156, 153, 154, 152/1, 151, 149/2, 150/2, 1039/1, 1039/2, 1040, 152/2, 115/2, 119/2, 124/1, A.2.2. Popis katastarskih parcela 124/2, 120, 119/1, 115/3, 115/1, 114/4, 114/3, 114/2, 114/1, 750, KO Veliki Mokri Lug DL: 3, 4 i 5 R=1:2500 111, 110, 109/1, 109/2, 108/1, 108/2, 107, 749, 104, 106, 105/1, 105/2, 90/4, 90/3, 88/2, 85/2, 84, 79/1, 79/2, 79/5, 917/1, 917/2, Delovi parcela: 917/3, 917/4, 916, 915, 914, 913, 912/1, 912/2, 911, 910/1, 910/2, 1036, 745, 199, 196/2, 609/3, 603, 762/1, 318/3, 293/1, 745/6, 909, 908, 906/2, 906/1, 904, 903, 902/1, 902/2, 901/2, 901/1, 80/6, 80/2, 80/7, 79/6, 79/5, 79/4, 799/4, 793/6, 595/1, 595/2, , 905/1, 905/2, 905/3, 905/4, 907, 922, 923, 924, 918, 919, 920, 921, 284/2, 284/1, 283/2, 283/1, 282/1, 287/2, 287/1, 288/1, 748/1, 815, 816, 817, 818, 819, 820, 821, 8212, 823, 824, 825, 826/1, 748/2, 296/2, 296/1, 295, 294/4, 294/3, 294/2, 293/1,54/1, 259/1, 826/2, 826/3, 826/4, 826/5, 827/1, 827/2, 827/3, 827/4, 827/5, 258/2, 257, 256, 255, 762/1, 302/1, 304/1, 305/1, 305/2, 306, 307, 827/6, 828/1, 828/2, 829/1, 829/2, 830/2, 792/4, 793/5, 793/1, Broj 14 – 2 SLU@BENI LIST GRADA BEOGRADA 28. jun 2005. 793/3, 793/6, 799/4, 799/2, 799/1, 798/1, 796/6, 796/5, 796/4, Planski osnov sadr`i se u: 795/1, 794/4, 79/4, 79/3, 802/8, 802/7, 802/3, 802/2, 802/4, 802/5, – Generalnom planu Beograda do 2021. („Slu`beni list 802/1, 802/6, 803/1, 803/2, 808/1, 808/2, 808/3, 809/1, 809/2, 812, grada Beograda”, broj 27/03). 813, 814/1, 814/2, 814/3, 89, 811, 810/1, 810/2, 805/1, 805/2, Prema navedenom Generalnom planu Beograda 2021. go- 807/1, 807/2, 806, 804, 801, 800, 154, 149/1, 149/3, 148, 147/2, dine u planiranom obuhvatu predmetnog plana predvi|ene 146, 145, 144, 143, 142, 141, 140, 139, 138/1, 138/2, 138/3, 138/4, su slede}e namene povr{ina: 138/5, 138/6, 137, 136, 135, 134, 133, 125/1, 125/2, 125/3, 125/4, – javne slu`be, javni objekti i kompleksi, 125/5, 126/1, 126/2, 126/3, 127, 116/1, 116/2, 116/3, 117/1, 117/2, – saobra}aj i saobra}ajne povr{ine, 118/1, 118/2, 121/1, 121/2, 121/3, 122, 123/1, 123/2, 128/2, 128/5, – komunalne delatnosti i infrastrukturne povr{ine, 128/3, 128/4, 128/1, 129/1, 129/2, 130, 131/1, 131/2, 132/1, 132/2, – zelene povr{ine, 751/2, 113/1, 113/2, 112, 103, 102, 101, 100, 99/1, 99/2, 98, 97, 96, – stanovawe i stambeno tkivo, 95, 94/1, 94/2, 94/3, 93, 92, 91, 90/1, 90/2, 86/1, 86/2, 87/1, 87/2, – komercijalne zone i gradski centri, 88/1, 85/1, 83, 82, 81, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 80/7, 80/9, – sport, sportski objekti i kompleksi. 80/8, 284/4, 284/3, 283/4, 283/3, 282/2, 281, 280/1, 280/2, 279, 278, 277, 276, 287/3, 287/4, 287/5, 288/2, 289, 290, 293/3, 293/2, Javne slu`be, javni objekti i kompleksi 292, 291, 275/2, 275/1, 275/3, 274, 273, 272, 271, 270, 269, 268, De~je ustanove – rekapitulacija potrebnih kapaciteta 267, 266, 265, 264, 263, 262/1, 262/2, 261/1, 261/2, 260, 259/2, –––––––––––––––––––––––––––––––––––––––––––––––––––––– 258/1, 294/1, 254/5, 254/4, 254/3, 254/2, 254/1, 253/1, 253/2, Objekat m²/korisniku 6.5–7.5 253/3, 252, 251, 303, 311/1, 318/1, 249, 248, 247, 246/1, 246/2, Kapacitet maks.
Recommended publications
  • Helsinki Committee for Human Rights in Serbia HUMAN RIGHTS AND
    Helsinki Committee for Human Rights in Serbia Helsinki Committee for Human Rights in Serbia Helsinki Committee for Human Rights in Serbia HUMAN RIGHTS AND ACCOUNTABILITY Serbia 2003 0 1 Helsinki Committee for Human Rights in Serbia Helsinki Committee for Human Rights in Serbia Helsinki Committee for Human Rights in Serbia HUMAN RIGHTS AND ACCOUNTABILITY Serbia 2003 Helsinki Committee for Human Rights in Serbia PUBLISHER: Helsinki Committee for Human Rights in Serbia FOR PUBLISHER: Sonja Biserko * * * TRANSLATED BY: Ivana Damjanovic Dragan Novakovic Spomenka Grujicic LAYOUT BY: Nebojsa Tasic HUMAN RIGHTS COVER DESIGNE: Ivan Hrasovec AND PRINTED BY: "Zagorac", Belgrade 2004 ACCOUNTABILITY NUMBER OF COPIES: 500 - Serbia 2003 - ISBN - 86-7208-090-4 This book was published thanks to the support of the Swedish Helsinki Committee for Human Rights Belgrade, 2004 2 3 Helsinki Committee for Human Rights in Serbia Helsinki Committee for Human Rights in Serbia I am here to work for you and in behalf of you. But I cannot work instead of you. Zoran Djindjic 4 5 Helsinki Committee for Human Rights in Serbia Helsinki Committee for Human Rights in Serbia Introduction The Premier Zoran Djindjic assassination not only marked the year 2003 but will also – judging by ongoing developments – face Serbia with a historical crossroads: with one road leading towards Europe and another away from it. The murder of a reformist premier stalled reforms and put an end to the cooperation with The Hague Tribunal. And, moreover, it opened the door to Serbia’s radicalization. The DOS coalition's incapability and unwillingness to make a break with Milosevic’s policy, particularly the warring one, gave scope to restoration of the ancien regime that triumphed in the early parliamentary election.
    [Show full text]
  • Housing in Serbia
    Contradictions and Antagonisms in (Anti-) Social(ist) Housing in Serbia Ana Vilenica London South Bank University [email protected] Abstract This article tackles contradictions of social housing in contemporary Serbia. It shows how residualised social housing does not bring justice to marginalised groups affected by capitalist expropriation. In this article, the term (anti-)social(ist) housing will be introduced to describe the historically grounded, incomplete, and contradictory solutions that social housing is currently offering in Serbia, as well as its anti-social nature. By focusing on a particular case study, the Kamendin project situated in Zemun Polje, one of the very few social housing projects in Belgrade, the article explores debt crises produced by mechanisms of social housing; the production of racism, segregation, and responsibilisation; and mechanisms of passing responsibility on all levels in an attempt of the state to spend as little money as possible. (Anti-)social(ist) housing is further assessed as a space of struggle that includes different survival and resistance tactics that are used in order to oppose social housing violence. Following that, the article will focus on the possibilities of the activist art project Kamendynamics and the theatre peace How does fascism not disappear? Zlatija Kostić: I sued myself to confront the racialisation and culturalisation of problems by introducing collaborative visual, class-based, and historical-materialist analyses. By documenting and conceptualising mechanisms of social housing and reflecting on the role of activist art within housing struggles, I aim to contribute to anti-segregation and anti-racist housing struggles in Eastern European cities and beyond.
    [Show full text]
  • "The Problem Is They See Us As a Whole"
    "The Problem Is They See Us As A Whole" Explaining Gender and Ethnicity-based Inequalities Among the Roma in Serbia “The Problem Is They See Us As A Whole”: Explaining Gender and Ethnicity-based Inequalities Among the Roma in Serbia © 2019 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org This work is a product of the staff of The World Bank with external contributions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. This publication was produced with the financial support of the Umbrella Facility for Gender Equality. Its contents are the sole responsibility of the authors and do not necessarily reflect the views of the World Bank. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this work is subject to copyright. Because the World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial purposes as long as full attribution to this work is given. Any queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625; e-mail: [email protected].
    [Show full text]
  • AN EXAMPLE of NOISE ABATEMENT MEASURES for RAILWAY LINE Aleksandar Gajicki1, Momir Praščević2
    AN EXAMPLE OF NOISE ABATEMENT MEASURES FOR RAILWAY LINE Aleksandar Gajicki1, Momir Praščević2 1 PhD Student, University of Nis, Faculty of Occupational Safety, Serbia, [email protected] 1 Institute of Transportation CIP, Nemanjina 6,11000 Beograd, Serbia, [email protected] 2 University of Nis, Faculty of Occupational Safety, Serbia, [email protected] Abstract - Reconstruction and modernization of railway modeling software package “Predictor-LimA Software Suite - section from Beograd Centar to Stara Pazova with total Type 7810“. length of 34.7 kilometers, provides upgrading of existing railway line in double-track line with the designed speed up 2. PROJECT DESCRIPTION to 200 km/h. The paper discusses the current state of the The existing double-track line from Beograd Centar to environment in terms of noise, and possible impacts during Batajnica will continue as it is but overhaul and construction and exploitation of the railway line. Procedure modernization works will be undertaken. Only passenger for developing a simulation model of railway traffic, noise traffic was planned on this section; freight traffic will be mapping, annoyance analysis, design procedure for possible in exceptional circumstances. optimizing of noise barriers and a proposal of noise abatement measures are presented. The calculation of noise Passenger and freight traffic will be merged and split in propagation, annoyance analysis and optimization of noise Batajnica station within the group of tracks belonging to barriers were made using simulation modeling software Belgrade Railway Junction. In addition, Batajnica will be the package “Predictor-LimA Software Suite - Type 7810“. For terminal station for urban-suburban railway traffic in the City 477 houses which were exposed to excessive noise levels of Belgrade.
    [Show full text]
  • Politika-Oduzimanje Mandata
    POLITIKA 201 ASFALTIZACIJA ("Bilten SNG ZZ" br. 9/ septembar 1998) 203 GODINE SAVEZA ZA PROMENE ("Bilten SNG ZZ" br. 13/ februar 1999.) 205 Posle rata PRELAZNI PERIOD - KO ]E KOGA PRE]I ? ("Bilten SNG ZZ" br. 14/ Jul 1999) 207 Da li su bira~i pogre{ili na izborima 1996.? NA IZBORIMA NEMA "POBEDNIKA" (“Hronika” Br. 13/ 2. septembar 2000) 208 Tribina „100 dana“ u organizaciji Saveza nezavisnih gra|ana MOGLO BI I O[TRIJE (Br. 26/ 10. mart 2001.) 213 "Zemun je grad" - tribina Saveza nezavisnih gra|ana za Zemun NEMA SAMOUPRAVE AKO NEMA PARA (Br. 26/ 10. mart 2001.) 216 Kako podi}i "kapacitet institucija lokalne samouprave" ZEMUN IMA MANJE PRAVA OD UBA (Br. 53/ 20. april 2002.) 217 Skandalozno pona{anje nekih op{tinskih ~elnika na tribini o korupciji SVETI \OR\E UBIVA "KOKO[KU" (Br. 54/ 11. maj 2002) 219 [ta se zbiva sa dobitnicima Povelje BIO JEDNOM JEDAN "OTPOR" (Br. 55/ 25. maj 2002) 220 Hronologija delovanja Saveza nezavisnih gra|ana Zemuna u okviru demokratske opozicije 1997. - 2000. NEMA PRI^E BEZ NEZAVISNIH GRA\ANA (Br. 54/ 11. maj 2002) 199 DOSIJE ZEMUN 1999 - 2003. 228 Hronologija doga|aja i zbivanja posle pobede Demokratske opozicije Srbije na lokalnim izborima septembra 2000.g. NOVA VLAST - STARI METODI (Br. 55/ 25. maj 2002) 234 Intervju: Nenad Bogdanovi}, predsednik Izvr{nog odbora Skup{tine grada Beograda ZEMUN NE MO@E SEBE DA IZDR@AVA BEZ BEOGRADA (Br. 75/ 26. april 2003.) 238 UBIJANJE ZEMUNA JE SAMOUBISTVO BEOGRADA (Br. 75/ 26. april 2003.) ODUZIMANJE MANDATA 242 Predsednik Saveza nezavisnih gra|ana za Zemun uputio „otvoreno pismo“ novim vlastima U ^EMU JE PROMENA? (Br.
    [Show full text]
  • Na Osnovu Člana 191. Zakona O Vodama („Službeni Glasnik RS”, Br
    Na osnovu člana 191. Zakona o vodama („Službeni glasnik RS”, br. 30/10, 93/12 i 101/16) i člana 42. stav 1. Zakona o Vladi („Službeni glasnik RS”, br. 55/05, 71/05 – ispravka, 101/07, 65/08, 16/11, 68/12 – US, 72/12, 7/14 – US i 44/14), Vlada donosi UREDBU o visini naknada za vode "Službeni glasnik RS", broj 14 od 23. februara 2018. 1 . Uvodna odredba Član 1. Ovom uredbom utvrđuje se visina naknade za korišćenje voda, naknade za ispuštenu vodu, naknade za odvodnjavanje, naknade za korišćenje vodnih objekata i sistema i naknade za izvađeni rečni nanos, u skladu sa kriterijumima utvrđenim Zakonom o vodama. 2 . Naknada za korišćenje voda Član 2. Naknada za korišćenje voda utvrđuje se u visini, i to za: 1 ) sirovu vodu koja se koristi za pogonske namene 0,2762 dinara po 1 m ³ vode; 2 ) vodu kvaliteta za piće koja se koristi za svoje potrebe 0,3782 dinara po 1 m ³ vode; 3 ) vodu koja se koristi za navodnjavanje: (1 ) ako postoji uređaj za merenje količine isporučene vode 0,1132 dinara po 1 m ³ vode, (2 ) ako ne postoji uređaj za merenje količine isporučene vode 679,1678 dinara po hektaru; 4 ) vodu koja se koristi za uzgoj riba u: (1 ) hladnovodnim ribnjacima , ako postoji uređaj za merenje količine isporučene vode,0,0227 dinara po m ³ vode, a ako ne postoji mogućnost merenja količine isporučene vode prema projektovanom kapacitetu zahvaćene vode na vodozahvatu, (2 ) toplovodnim ribnjacima 5.659,7321 dinar po hektaru ribnjaka, (3 ) ribnjacima za sportski ribolov 2.829,8661 dinar po hektaru ribnjaka; 5 ) vodu za piće koja se sistemom javnog vodovoda
    [Show full text]
  • Report 1/2017 on Implementation of the Action Plan for the Realization of Rights of National Minorities
    REPORT 1/2017 ON IMPLEMENTATION OF THE ACTION PLAN FOR THE REALIZATION OF RIGHTS OF NATIONAL MINORITIES ~ CONTENT ~ INTRODUCTORY REMARKS ................................................................................................ 3 I PERSONAL STATUS POSITION ................................................................................ 5 II PROHIBITION OF DISCRIMINATION .................................................................... 18 III AREA OF CULTURE AND MEDIA .......................................................................... 42 IV FREEDOM OF RELIGION ....................................................................................... 108 V THE USE OF LANGUAGE AND SCRIPT .............................................................. 111 VI EDUCATION ............................................................................................................. 125 VII DEMOCRATIC PARTICIPATION .......................................................................... 188 VIII APPROPRIATE REPRESENTATION OF NATIONAL MINORITIES IN PUBLIC SECTOR AND PUBLIC ENTERPRISES ................................................................. 190 IX NATIONAL COUNCILS OF NATIONAL MINORITIES ....................................... 206 XI INTERNATIONAL COOPERATION ...................................................................... 249 2 REPORT ON IMPLEMENTATION OF THE ACTION PLAN FOR THE REALIZATION OF RIGHTS OF NATIONAL MINORITIES (for activities due until the I quarter of 2017, including continuing activities) INTRODUCTORY
    [Show full text]
  • Human Rights, Democracy and – Violence HELSINKI COMMITTEE for HUMAN RIGHTS in SERBIA
    HELSINKI COMMITTEE FOR HUMAN RIGHTS IN SERBIA SERBIA 2008 ANNUAL REPORT : SERBIA 2008 H HUMAN RIGHTS, DEMOCRACY AND – VIOLENCE U M A N R I G H T S , D E M O C R A HHUMANUMAN RIGHTS,RIGHTS, C Y A N D – DDEMOCRACYEMOCRACY V I O L E N C E AANDND – VIOLENCEVIOLENCE Human Rights, Democracy and – Violence HELSINKI COMMITTEE FOR HUMAN RIGHTS IN SERBIA Annual Report: Serbia 2009 Human Rights, Democracy and – Violence BELGRADE, 2009 Annual Report: Serbia 2009 HUMAN RIGHTS, DEMOCRACY AND – VIOLENCE Publisher Helsinki Committee for Human Rights in Serbia On behalf of the publisher Sonja Biserko Translators Dragan Novaković Ivana Damjanović Vera Gligorijević Bojana Obradović Spomenka Grujičić typesetting – Ivan Hrašovec printed by Zagorac, Beograd circulation: 500 copies The Report is published with help of Swedish Helsinki Committee for Human Rights Swedish Helsinki Committee for Human Rights ISBN 978-86-7208-161-9 COBISS.SR–ID 167514380 CIP – Katalogizacija u publikaciji Narodna biblioteka Srbije, Beograd 323(497.11)”2008” 316.4(497.11) “2008” HUMAN Rights, Democracy and – Violence : Annual Report: Serbia 2008 / [prepared by] Helsinki Committee for Human Rights in Serbia; [translators Dragan Novaković ... et al.]. – Belgrade : Helsinki Committee for Human Rights in Serbia, 2009 (Beograd : Zagorac). – 576 str. ; 23 cm Izv. stv. nasl. : Ljudska prava, demokratija i – nasilje. Tiraž 500. – Napomene i Bibliografske reference uz tekst. 1. Helsinški odbor za ljudska prava u Srbiji (Beograd) a) Srbija – Političke prilike – 2008 b) Srbija – Društvene prilike – 2008 5 Contents Conclusions and Recommendations . 9 No Consensus on System of Values . 17 I SOCIAL CONTEXT – XENOPHOBIA, RACISM AND INTOLERANCE Violence as a Way of Life .
    [Show full text]
  • Uputstvo Za Pripremu Radova
    BG:VOZ - CONCEPT OF URBAN RAILWAY SERVICE IN BELGRADE Mirjana Bugarinović1*, Stanko Kantar2 1University of Belgrade, Faculty of Transport and Traffic Engineering, Belgrade, Serbia 2City of Belgrade, Secretariat for City Traffic, Directorate for Public Transport *Contact person: [email protected] Abstract: The concept of urban rail service, BG:voz, represents a new urban rail public transport in Belgrade. So far, it is functioning on a 25 km long line with 9 stations. Today, after three years of BG:voz operations, realized traffic volume, quality of service and financial results show the feasibility of this concept and justify the need to enhance the system. Analysis of the system performances indicates that with the introduction of new stations, the improvement of existing ones and increase of the number of train departures will result in even more modern rail public transport services with a comparatively small investment compared to the effect. Key Words: BG:voz, Urban rail service 1. INTRODUCTION Urban rail refers to passenger rail systems in urban areas, which have high capacity and provide high frequency of service, with grade separation from other traffic, typically running underground or on elevated tracks [3]. Different cities may have different names for these systems. The system is referred to as mass rapid transit in Chennai, Queensland, Singapore, metro in Madrid, Paris and Budapest, subway in New York, Chicago and Boston and tube or underground in London. What about rail service that used railway infrastructure in urban area and operate as mass rapid transit? It’s called the urban railway or “almost” metro.
    [Show full text]
  • Knjižica O Zemunu
    Dejan Arsić KNJIŽICA O ZEMUNU Februar 2010 0 Zemun Prvi naziv je bio Taurunum. Najstariji pisani tragovi o današnjem imenu grada datiraju iz XII. stoleća. Nastao je od slovenske reči "zemlin" i pretpostavlja se da je ime u vezi sa zemljanim gradom, odnosno sa zemunicama. Za vreme turskih osvajanja po Evropi, Zemun su nekoliko puta pljačkale i napadale turske snage. Nakon višekratnih pokušaja, Zemun je pod tursku vlast pao 8. jula 1521., nakon što je Sulejman Veličanstveni napao grad sa zapada, prethodno zauzevši Mitrovicu, Slankamen i Karlovce. Nakon žestoke odbrane grada kojeg su držale jedinice od 500 šajkaša (sastavljene od Srba i Hrvata) koje je predvodio Hrvat Marko Skoblić. Beogradskim mirom 1739. područje dolazi pod vlast Austrije, a Zemun postaje pogranični grad. 1745. se osniva Sremska županija, kojoj je Zemun glavni grad, a koja je upravno pripala Kraljevini Hrvatskoj i Slavoniji. Smirivanjem stanja na granicama je usledio priliv novih stanovnika i ekonomski napredak. 8. juna 1871. grad dobija status slobodnog carskog grada. Hrvatski jezik 1882. postaje službeni jezik u gradu. 1895. grad je podpao pod direktnu vlast Zemaljske vlade u Zagrebu. Tako je ostalo do Prvog svetskog rata. 5. novembra 1918. jedinice Kraljevine Srbije oslobodile su grad koji su napustile austro-ugarske snage. Zemun, nekada zaseban grad, danas u sastavu grada Beograda odlukom NOO Zemuna, na godišnjicu "oslobođenja" 22. oktobra 1945.. Onda je donesena odluka o izdvajanju Zemuna iz sastava Vojvodine i pripajanja Beogradu, a istu odluku istog dana donosi NOO Vojvodine. To nije bio prvi pokušaj pripajanja Beogradu. Još za vreme Kraljevine Jugoslavije, 1934. se pripojio Beogradu, ali je to ukinuto padom Jugoslavije i njegovom dodelom Nezavisnoj Državi Hrvatskoj 1941.
    [Show full text]
  • DECISION on the Classification of Securities Admitted to the Unregulated Market to Segments and Market Segments of the Belgrade Stock Exchange
    Belgrade Stock Exchange 01/1 No. 3461/12 Pursuant to the Article 65 Paragraph 2 Point 7 of the Articles of Association of the Belgrade Stock Exchange for the purpose of complying with the Law on Companies (Exchange number: 04/1 No. 1395‐1/09, ver. No. of the Fourth Municipal Court in Belgrade III Ov. br.954/09), in relation to the Article 241 of the Rules of Business Operations of the Belgrade Stock Exchange (04/2‐3242‐1/12, hereinafter: Rules of the Exchange), Managing Director of the Belgrade Stock Exchangeon 27.4.2012 adopted the following: DECISION On the Classification of Securities Admitted to the Unregulated Market to Segments and Market Segments of the Belgrade Stock Exchange Article 1 By this Decision, securities included in the Unregulated Market are classified to: 1) The Segment of the Regulated Market which is not listing ‐Open Market (hereinafter: Open Market),or 2) Multilateral Trading Facility operated by the Exchange ‐ MTP Belex. CUT­OFF DATE ­ 26.4.2012, in accordance with the Article 241 of the Rules of the Exchange,is a date of obtaining the approval of the SEC on the Rules of Business Operations of the Belgrade Stock Exchange(04/2‐3242‐1/12, hereinafter: ExchangeRules). Article 2 To the segment­ OPEN MARKET, Market segment– Open Market‐Shares, are admitted securities of issuers: (1) In trading of which there were transactions concluded in the period of 180 days preceding the Cut‐Off Date from the Article 1 Paragraph 2, (2) Which do not carry the mark „BP“ (3) Who meet requirements from the Article 64 Paragraph 1 of the Exchange Rules.
    [Show full text]
  • Referenc Lista
    Referenc lista Marija OSTOJIĆ - dipl.inž.šum. za pejzažnu arhitekturu odgovorni projektant – licenca br. 373 3934 03 odgovorni izvodjač radova - licenca br. 474 H503 13 Referenc lista uradjenih projekata, tehničkih kontrola, Poslova stručnog nadzora, izvedenih radova PROJEKTOVANJE 2002 *Objekat: Tržni centar ‘Mercator’, blok 31,Novi Beograd Investitor: “Mercator” d.o.o. Pasterova 14a, Beograd Projekat: Izmena projekta za ozelenjavanje terena oko objekta Projketna org.: “ARP” d.o.o., Beograd Datum: Novembar 2002. *Objekat: Poslovno – proizvodni centar Bulevar kralja Aleksandra, Beograd Investitor: “OKRUGLICA - IGM” , Beograd Projekat: Glavni projekat ozelenjavanja Projketna org.: “ARP” d.o.o., Beograd Datum: Novembar 2002. 2003 *Objekat: Benzinska stanica, blok 63, Novi Beograd Investitor: Korać Slobodan , Beograd Projekat: Glavni projekat ozelenjavanja Projketna org.: “ARP” d.o.o., Beograd Datum: Februar 2003. *Objekat: Poslovni objekat GTC,blok 30, Novi Beograd Investitor: GTC INTERNACIONAL DEVELOPMENTS, M. Pupina 165a, N. Beograd Projekat: Glavni projekat ozelenjavanja Projketna org.: “ARP” d.o.o., Beograd Datum: Mart 2003. *Objekat: Porodični stambeni objekat Investitor: G-din. Dragan Karadžić, Beograd Neznanog Junaka 21,Beograd Projekat: Glavni projekat ozelenjavanja sa analizom postojećeg stanja Projketna org.: Kompanija “KOLING” a.d., Beograd Datum: April 2003. *Objekat: O-1,G-1, Miljakovac III, Beograd Investitor: Građevinska Direkcija Srbije d.o.o., Beograd Projekat: Glavni projekat uređenja terena sa ozelenjavanjem Projketna
    [Show full text]