North American LRV/Streetcar Procurements…Since We Last

Total Page:16

File Type:pdf, Size:1020Kb

North American LRV/Streetcar Procurements…Since We Last North American LRV/Streetcar Procurements … since we last met Steven C. Apanian, P.E. Vice President, North Central Region LTK Engineering Services Minneapolis, MN Thomas B. Furmaniak, P.E. Senior Director LTK Engineering Services Ambler, PA Information Presented • Agency • Carbuilder • Car length (over anticlimbers) • % Low Floor (by vehicle length) • Total fixed seats (+ folding seats) • Purchase quantity • Unit price (less spares, special tools and test equipment) • Delivery/in-service year(s) North American LRV/Streetcar Procurements … since we last met Light Rail Vehicles Calgary • C-Train • Siemens • 84.8’ (24.8m) • High Floor • 60 seats • 6 cars • $4.0M • 2019 Denver • RTD • Siemens • 77.4’ (23.6m) • High Floor • 56 seats • 29 cars • $3.9M* • 2018 * Includes spare parts, tools and special equipment Edmonton (Valley Line) • Edmonton Transit • Bombardier • 133.2’ (40.6m) • 100% Low Floor • 78 seats (+4) • 26 cars • $ n/a (P3) • 2018-20 Houston • Metro • Siemens • 94.5’ (28.8m) • 70% Low Floor • 64 (+ 8) • 14 cars • $4.7M • 2022 Maryland (Purple Line) • MDMTA • CAF • 137.4’ (41.8m) • 80% Low Floor • 40 seats (+ 40) • 14 cars • $ n/a (P3) • 2021 Ottawa (Confederation Line - Stage 2) • City of Ottawa • Alstom • 158.7’ (48.4m) • 100% Low Floor • 104 seats (+ 16) • 38 cars • <US$5.9M* • 2019-21 * Includes spare parts, tools and special equipment Phoenix • Valley Metro • Siemens • 88.4’ (27.0m) • 70% Low Floor • 54 seats (+ 12) • 11 cars • $4.8M • 2019-22 Seattle • Sound Transit • Siemens • 93.0’ (28.3m) • 70% Low Floor • 66 seats (+ 8) • 152 cars • $4.1M • 2019-23 Toronto (and Hurontario?) • Metrolinx • Alstom • 158.7’ (48.4m) • 100% Low Floor • 104 seats (+ 16) • 61 cars • <US$6.5M* • Thru ~2023 * Includes spare parts, tools and special equipment North American LRV/Streetcar Procurements … since we last met Streetcars Charlotte • CATS • Siemens • 83.4’ (25.4m) • 70% Low Floor • 52 seats (+ 4) • 6 cars • $6.3M • 2019 Onboard Energy Storage Kansas City • Kansas City • CAF • 77.5’ (23.6m) • 100% Low Floor • 32 seats (+ 6) • 2 cars • $5.2M • 2019 Portland • City of Portland • Brookville • 66’ (20m) • 50% Low Floor • 22 seats (+ 4) • 3 cars (Option in Sound Transit contract for Tacoma) • $4.5M • 2020-21 Orange County, CA • OCTA • Siemens • 90’ (27.4m) • 70% Low Floor • 54 Seats (+ 16) • 8 cars • $5.5M • 2020-21 Seattle • City of Seattle • CAF • 75.3’ (22.9m) • 100% Low Floor • 31 seats • 10 cars • $5.8M • TBD Onboard Energy Storage Tacoma • Sound Transit • Brookville • 66’ • 50% Low Floor • 22 seats (+ 4) • 5 cars • $4.8M • 2020 Tempe • Valley Metro • Brookville • 72’ (22m) • 50% Low Floor • 36 seats (+ 4) • 6 cars • $5.2M • 2020 Onboard Energy Storage What’s Next? Light Rail Vehicles Boston Green Line (~165 + options) Calgary (70 - Low floor) Hamilton (~22) (P3) Portland (26) Sacramento (20 - Low Floor) … more? What’s Next? Streetcars Atlanta Los Angeles (8-12) Philadelphia (120) Sacramento (6) Tampa Toronto (60) Washington, DC … more? North American LRV/Streetcar Procurements … since we last met Thank you! Steven C. Apanian, P.E. [email protected] Thomas B. Furmaniak, P.E. [email protected].
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • AECOM Top Projects 2017
    AECOM Top Projects 2017 #13 Turcot Interchange #6 Romaine Complex #59 Region of Waterloo ION LRT #53 Giant Mine Remediation #65 Lions Gate Secondary Wastewater Treatment Plant #82 Wilson Facility Enhancement and Yard Expansion AECOM Top Projects 2017 With $186.4 billion invested in Canada’s Top100 Projects of 2017, the country is experiencing record investment in creating AECOM Top Projects 2017 and improving public sector infrastructure from coast-to-coast. Those investments are creating tens of thousands of jobs and providing a foundation for the country’s growing economy. EDITOR In 2017, AECOM again showed why it is a leader in Canada’s Andrew Macklin infrastructure industry. In this year’s edition of the ReNew Canada Top100 projects report, AECOM was involved in PUBLISHER 29 of the 100 largest public sector infrastructure projects, Todd Latham one of just a handful of businesses to reach our Platinum Elite status. Those 29 projects represented just under $61.5 billion, close to one-third of the $186.4 billion list. ART DIRECTOR & DESIGN Donna Endacott AECOM’s involvement on the Top100 stretches across multiple sectors, working on big infrastructure projects in the transit, ASSOCIATE EDITOR energy, transportation, health care and water/wastewater Katherine Balpatasky sectors. That speaks to the strength of the team that the company has built in Canada to deliver transformational assets across a multitude of industries. Through these projects, AECOM has also shown its leadership in both putting together teams, and working as a member of a team, to help produce the best project possible for the client. As a company that prides itself on its ability “to develop and implement innovative solutions to the world’s most complex challenges,” they have shown they are willing to work with AECOM is built to deliver a better all involved stakeholders to create the greatest possible world.
    [Show full text]
  • Paris: Trams Key to Multi-Modal Success
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com JANUARY 2016 NO. 937 PARIS: TRAMS KEY TO MULTI-MODAL SUCCESS Innsbruck tramway enjoys upgrades and expansion Bombardier sells rail division stake Brussels: EUR5.2bn investment plan First UK Citylink tram-train arrives ISSN 1460-8324 £4.25 Sound Transit Swift Rail 01 Seattle ‘goes large’ A new approach for with light rail plans UK suburban lines 9 771460 832043 For booking and sponsorship opportunities please call +44 (0) 1733 367600 or visit www.mainspring.co.uk 27-28 July 2016 Conference Aston, Birmingham, UK The 11th Annual UK Light Rail Conference and exhibition brings together over 250 decision-makers for two days of open debate covering all aspects of light rail operations and development. Delegates can explore the latest industry innovation within the event’s exhibition area and examine LRT’s role in alleviating congestion in our towns and cities and its potential for driving economic growth. VVoices from the industry… “On behalf of UKTram specifically “We are really pleased to have and the industry as a whole I send “Thank you for a brilliant welcomed the conference to the my sincere thanks for such a great conference. The dinner was really city and to help to grow it over the event. Everything about it oozed enjoyable and I just wanted to thank last two years. It’s been a pleasure quality. I think that such an event you and your team for all your hard to partner with you and the team, shows any doubters that light rail work in making the event a success.
    [Show full text]
  • Dayton, Ohio Invests in High Tech Trolleybuses with In-Motion Charging
    Published by the Electric Traction Committee, Edmonton Trolley Coalition Edited by Retired Employees of the Edmonton Transit Service VOL. 36 Adopting Tomorrow’s Technology Today: Dayton, Ohio invests in High Tech Trolleybuses with In-Motion Charging After lengthy testing, the Greater Dayton Regional Transit Authority (GDRTA) is buying 26 NexGen Electric Trolleys and will put the first production model in service by 2019. The RTA Board authorized spending up to $57.4 million for the 26 vehicles and parts, plus 15 more NexGen Trolleys that will be bought once federal funding is in place, Executive Director Mark Donaghy told reporters. It is the largest bus contract in RTA history. The NexGen Electric Trolleybus bus costs 63 percent more than a standard diesel transit bus, but has a 20-year, 800,000 mile life compared to the diesel’s 12-year, 500,000 mile life, Donaghy said. Electric trolleys are cheaper to operate, better for the environment and quieter than a diesel bus, he explained. “Using electric instead of diesel buses is a step towards a clean air environment for Dayton,” said Peggy Ann Berry, an occupational safety and health professional and Climate Reality Project leader in Dayton. “Diesel buses release dirty fossil fuel emissions into the environment. These emissions exacerbate asthma attacks as well as add to the cardiac burden of older adults.” RTA is now finalizing the cost of the NexGen after making several modifications to the prototype. The US Federal Transit Administration (FTA) is picking up 80 percent of the cost, and the rest comes from the local sales tax and rider fares.
    [Show full text]
  • No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx
    2020 No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx Top100 Projects 2020 One Man Changes the Face of 2020’s Top 10 Top100 Projects — 2020 f not for one individual, this year’s Top100 may have looked An annual report inserted in familiar. ReNew Canada’s I When this year’s research process began, there was little change within this year’s Top 10, as many of the nation’s January/February 2020 issue megaprojects were still in progress. Significant progress has been made on all of the projects we saw grace the Top 10 in our report last year, but completion dates extend beyond the end of the MANAGING Andrew Macklin 2019 calendar year. EDITOR [email protected] Enter Matt Clark, Metrolinx’s Chief Capital Officer, who took GROUP over the position from Peter Zuk. You see, when Zuk was in charge Todd Latham PUBLISHER of publicly expressing capital budgets, particularly in the context of the GO Expansion project, he had done so by breaking down PUBLISHER Nick Krukowski the $13.5 billion spend by corridor. That breakdown led to the full expansion represented by as many as nine projects in the content ART DIRECTOR AND Donna Endacott SENIORDESIGN of the Top100. Clark does it differently. In the quarterly reports made public ASSOCIATE following Metrolinx board meetings, the capital projects for the Simran Chattha EDITOR GO Expansion are broken down into three allotments (on corridor, off corridor, and early works). The result? Six less GO Expansion CONTENT AND MARKETING Todd Westcott projects in the Top100, but two new projects in our Top 10 MANAGER including a new number one.
    [Show full text]
  • Canadian Rail I
    Canadian Rail i No. 288 January 1976 I -- -----1l. ElN THE Sl1B Hal Riegger Photos by the Author. round here, they all say that the last train to run over that track was the "National Dream". And, in -R a way, they're right, although the "National Dream" was not a train , but the title of Pierre Berton's novel about the history of an idea that resulted in Canada's first transcontinental railway, known, for simplicity's sake, as the CPR. For ninety years, Canadian Pacific Railway has been in the minds of Canadians and others, and especially in 1974, when a television series, based onMr. Berton's two volumes on the construction of the CPR was- shown in eight installments on television in Canada. People around Penticton, British Columbia and the Carmi Subdivision of the Kootenay Division were and are particularly conscious - and proud, for it was a mere 50 miles away from their town that filming of some of the most spectacular country was done for the television series. Ex-Canadian Pacific steam locomotive Number 136, a 4-4-0, lea­ sed from Ontario Rail Association of Brampton, Ontario and fitted with a mushroom stack for the occasion, with a boxcar, baggage car and coach of early vintage, was brought all the way out west, via Crowsnest Pass, along CP RAIL's tracks in southern British Columbia. This was during the summer of 1973. THE MOST APPROPRIATE EXPLANATION OF THIS MONTH'S PECULIAR COVER LIES in the brief note which accompanied it: "This picture, which may in- terest you, was taken on June 30, 1974 at Crowsnest, B.C.
    [Show full text]
  • Progress on Edmonton's Valley Line
    Progress on Edmonton’s Valley Line LRT – General Project Update Moderator Georg Josi, DIALOG Design Review Manager Owner’s Engineer – connectEd Transit Partnership Panel Chris Gentile City of Edmonton Technical Manager Valley Line Stage 1 B.Sc., M.Sc., University of Manitoba Panel Josh Jones AECOM Project Manager Valley Line Stage 1 Owner’s Engineer – connectEd Transit Partnership Panel Johanna Hoyt EllisDon Design Project Manager Valley Line Stage 1 TransEd Partners Panel Colin Hill EllisDon Deputy Project Director Valley Line Stage 1 TransEd Partners LRT Development in Edmonton 6 LRT Development in Edmonton 7 LRT Development in Edmonton Capital Line Clareview to University of Alberta 1978 - 1992 Capital Line – Extension University of Alberta to Century Park 2006 - 2010 Metro Line University of Alberta to NAIT 2015 Edmonton’s LRT Vision 9 Edmonton’s LRT Vision Edmonton’s Future LRT Network 11 Edmonton’s LRT Expansion Valley Line - Stage 1 Downtown to Mill Woods 2020 Valley Line - Stage 2 Downtown to Lewis Farms Beyond 2020 Metro Line NAIT to Blatchford Beyond 2020 Balance of LRT Network Multiple Line Expansions 2025 - 2040 Valley Line - Stage 1 Overall Plan Low floor, urban-style LRT line 13 km 11 At-grade Stops 1 Elevated Station Interchange at Churchill Station (Downtown) 1 Tunnel 2 LRT Bridges 2 Elevated Guideways 2 Pedestrian Bridges 1 O&M Facility Valley Line - Stage 1 14 Valley Line - Stage 1 Scope • 13 km Line running from Millwoods Town Centre Mall in the South East of Edmonton to 102 Ave and 102 Street in Downtown Edmonton •
    [Show full text]
  • REAL PROPERTY CHALLENGES New Light Rail Project Revitalizes Ottawa’S Downtown Core
    REAL PROPERTY CHALLENGES New light rail project revitalizes Ottawa’s downtown core BY GORDON E. MACNAIR, SR/WA, AACI, P.APP The Canadian city of Ottawa has long suffered operational in 2018, it will provide rapid and high- the effects of severe bus bottlenecks through the quality transit service from the Tunney’s Pasture downtown core area. With increasingly slowing mixed-use center/employment node in the west service and the declining reliability of the city’s transit to Blair Station Mixed Use Center/employment system, action was clearly needed to address the node in the east. This 13-station electric Light Rail ongoing congestion problem. Transit system will span 12.5-kilometres (7.7 miles), including a 2.5-km (1.5 mile) tunnel that connects the In December 2012, the Ottawa City Council awarded downtown core. the contract to design, build, finance and maintain the first leg of Ottawa’s Light Rail Transit system – the The real property challenges associated with a Confederation Line – to the Rideau Transit Group. project of this magnitude were considerable, as were The project is part of the city’s overarching and long- encouraging transit-oriented development and other term smart-growth objectives laid out in the Official initiatives to support intensification. Plan, Transportation Master Plan and Infrastructure Master Plan. Together, these plans call for the creation Securing the Rights of densified, mixed-use neighborhoods surrounding Confederation Line stations. The property requirements for the Confederation Line consist of four project components: the Confederation The $2.13 billion line is the largest infrastructure Line guideway and stations, the integrated station project in the City of Ottawa since the construction entrances, a maintenance and storage facility and the of the Rideau Canal in 1826.
    [Show full text]
  • The Confederation Line Ottawa LRT Project
    The Confederation Line Ottawa LRT Project Tom Middlebrook, P.Eng Senior Vice President, Business Development – Canada Dragados Canada PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook Project Stakeholders Sponsors Equity Developers Project Co Design Build Joint Venture Maintenance Team Engineering Joint Venture PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 1 City of Ottawa • Canada’s Capital City with population of 950,000 • Problem: saturated with buses (BRT) • Solution: replace BRT with Light Rail Transit (LRT) Yukon Northwest Territories Nunavut Newfoundland / Labrador British Columbia Alberta Manitoba Quebec Saskatchewan Ontario Prince Edward Island New Brunswick Nova Scotia PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 2 Confederation Line • 12.5 km LRT line with 13 stations • 10 km at grade in existing BRT Right-of-Way • 2.5 km tunnel between Ottawa University (uOttawa) and Pimisi • 3 underground stations: Lyon, Parliament and Rideau PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 3 Initial Design Approach • Running tunnel: TBM tunnel (mono tube or twin-tube) • Underground stations: cut- and-cover PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 4 Design Options Option Pros Cons Design Single • Lower cost • Higher risk of settlement minimized by Scheme Tunnel • Flexibility in operation rock quality • Multiple faces • Higher cost and longer
    [Show full text]
  • Appendix a Consultation Record
    APPENDIX A CONSULTATION RECORD MEETING REPORT Date: July 14, 2014 Project: O-Train Extension EA Date of meeting: June 26, 2014 Project Number: 3414015-000 Location: Honeywell Room, Author: E. Sangster Ottawa City Hall Purpose: Transit Design and Operations Workshop Attendees: Initial E-Mail Steven Boyle, City of Ottawa SB [email protected] Alex Carr, City of Ottawa AC [email protected] Vivi Chi, City of Ottawa VC [email protected] Dennis Gratton, City of Ottawa DG [email protected] Frank McKinney, City of Ottawa FM [email protected] Kornel Mucsi, City of Ottawa KM [email protected] Pat Scrimgeour, City of Ottawa PSC [email protected] Colin Simpson, City of Ottawa CS [email protected] Derek Washnuk, City of Ottawa DW [email protected] Yvon Larochelle, OMCIAA YL [email protected] Alex Stecky-Efantis, OMCIAA AS [email protected] Paul Croft, Parsons Corporation PC [email protected] David Hopper, Parsons Corporation DH [email protected] Scott Bowers, MMM Group SB [email protected] Tim Dickinson, MMM Group TD [email protected] Paul Nimigon, MMM Group PN [email protected] Emily Sangster, MMM Group ES [email protected] Peter Steacy, MMM Group PST [email protected] DISTRIBUTION: All Attendees Item Details Action By 1. Introductions CS and PST provided an introduction to the study team, objectives, process and rationale. 2. Operational Considerations DH provided an overview of the existing OC Transpo network, which the O-Train extension will support. Transit network planning principles to be considered as part of this study include coverage, capacity, reliability, and legibility.
    [Show full text]
  • IBI Group to Lead Hurontario LRT Design As Part of Mobilinx
    Media Contact: Julia Harper, IBI Group [email protected] 1-416-596-1930 ext. 61187 or 1-647-330-4706 - For immediate release - IBI Group to Lead Hurontario LRT Design as Part of Mobilinx Preferred Proponent Consortium – Global design and technology firm will lead multidisciplinary team on major GTA transit infrastructure project – TORONTO, ON (September 3, 2019) – Infrastructure Ontario (IO) and Metrolinx announced on August 26 that Mobilinx is the preferred proponent to design, build, finance, operate and maintain the Hurontario Light Rail Transit (LRT) project. IBI Group (TSX:IBG) will be leading the design team as part of this significant project expected to commence in the fall of 2019. The Hurontario LRT will provide 18km of rapid transit to the cities of Mississauga and Brampton, addressing transportation demand and enhancing the urban environment. The project adds to the firm’s global expertise designing transit infrastructure, including current projects Eglinton Crosstown LRT, Edmonton Valley Line LRT, Ottawa Confederation Line, and the Tel Aviv Light Rail Red Line. “Our leadership role within the Mobilinx team reaffirms our position as experts in world-class transit infrastructure design,” said Scott Stewart, IBI Group CEO. “I am very proud of our team whose experience and leadership have brought us to this stage on this prestigious project, and whose track record working with the consortium partners have encouraged Mobilinx to embrace design as an integral part of the project.” As design lead, IBI Group will be managing a multidisciplinary team of architecture and engineering partners. The firm will be leveraging its roster of design technology tools to streamline the collaboration across disciplines and teams, and to ensure an efficient digital design process that will aid Mobilinx with future maintenance and management of the project.
    [Show full text]
  • Project Overview-OLRT-June2021update3
    Project: Ottawa Light Rail Transit (OLRT) Project Overview Confederation Line Trillium Line Client: Ottawa Light Rail Daily Ridership: 159,000 Daily ridership: 20,000 Transit (OLRT) Length: 12.5 km Current Length: 8 km Current Stations: 13 Current Stations: 5 Ottawa Light Rail Constructors (OLRTC JV) wanted a solution for their expanding Ottawa Integrated Subsystems metro rail, O-Train, that would enable the integration of both control (SCADA) and • Closed Circuit Television (CCTV) communications, including multimedia. They • Communication Based Train Control were looking for a exible integration partner, (CBTC) so they chose us to provide our enterprise • Communication Transmission System Integrated Control and Communication System (CTS) (ICCS) solution, SCADACOM. • Fire Detection Alarm System (FDAS) • Guideway Intrusion Detection System Along with our ICCS, Willowglen provided (GIDS) Station E&M and Traction Power RTUs, • High Speed Data Radio (HSDRS) project management, professional software • Intrusion Access Control (IAC) development, conguration, and integration • Overhead Catenary System (OCS) services for the Confederation Line. We delivered • Passenger Information Display (PID) our latest generation SCADA (SCADACOM6) • Passenger Information System (PIS) server and workstation products for the Transit • Public Announcement (PA) Services Control Centre, Back-Up Control • Supervisory Control and Data Centre, and Yard Control Centre. Acquisition (SCADA) • Telephone System (Telephony) The O-Train Confederation Line saw the • Traction Power Sub System (TPSS) introduction of a modern light rail transit service • Tunnel Ventilation System (TVS) to Ottawa, Canada. The O-Train is a multimodal light metro system consisting of two lines, east–west electried Confederation Line and and the Trillium Line. Once Stage 2 is the north–south diesel-powered Trillium Line.
    [Show full text]