Results of Railway Privatization in Australia and New Zealand Public Disclosure Authorized

Total Page:16

File Type:pdf, Size:1020Kb

Results of Railway Privatization in Australia and New Zealand Public Disclosure Authorized THE WORLD BANK GROUP WASHINGTON, D.C. TP-7 TRANSPORT PAPERS SEPTEMBER 2005 Public Disclosure Authorized Results of Railway Privatization in Australia and New Zealand Public Disclosure Authorized Robert Williams David Greig Ian Wallis Public Disclosure Authorized Public Disclosure Authorized TRANSPORT SECTOR BOARD RESULTS OF RAILWAY PRIVATIZATION IN AUSTRALIA AND NEW ZEALAND Robert Williams David Greig Ian Wallis TRANSPORT THE WORLD BANK SECTOR Washington, D.C. BOARD © 2005 The International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington, DC 20433 Telephone 202-473-1000 Internet www/worldbank.org Published September 2005 The findings, interpretations, and conclusions expressed here are those of the authors and do not necessarily reflect the views of the Board of Executive Directors of the World Bank or the governments they represent. To order additional copies of this publication, please send an e-mail to the Transport Help Desk [email protected] Transport publications are available on-line at http://www.worldbank.org/transport/ RESULTS OF RAILWAY PRIVATIZATION IN AUSTRALIA AND NEW ZEALAND iii TABLE OF CONTENTS List of Figures and Tables........................................................................................................iv Preface ................................................................................................................................ v Authors’ Acknowledgements ...................................................................................................vii Executive Summary ...............................................................................................................ix 1. Introduction ...................................................................................................................... 1 1.1 History of Railways in Australia and New Zealand...................................................... 1 1.2 The Rail Industry in 1993 ...................................................................................... 2 1.3 Rail Privatization and Concessioning in Australia and New Zealand............................... 3 1.4 Objectives of This Paper ........................................................................................ 3 2 .Rail Reforms...................................................................................................................... 5 2.1 Background to Reforms in Australia......................................................................... 5 2.2 Market Reforms and Open Access ........................................................................... 7 2.3 Structural Reforms ............................................................................................... 8 2.4 Australian Rail Track Corporation ............................................................................ 8 2.5 New Zealand Rail Reforms ..................................................................................... 9 3. Privatization Transactions .................................................................................................... 9 3.1 Introduction ........................................................................................................ 9 3.2 New Zealand Rail Ltd .......................................................................................... 10 3.3 Australian National ............................................................................................. 17 3.4 Westrail Freight ................................................................................................. 22 3.5 V/Line Freight .................................................................................................... 26 3.6 FreightCorp and NRC .......................................................................................... 28 3.7 Comparative Analysis of Australian Rail Freight Railways .......................................... 32 4. Public Private Partnerships..................................................................................................35 4.1 Introduction ...................................................................................................... 35 4.2 Melbourne Rail Passenger Franchising ................................................................... 36 4.3 Australasia Railway BOOT Project ......................................................................... 46 4.4 Sydney Light Rail BOOT Project ............................................................................ 47 4.5 Sydney Airport Rail Link ...................................................................................... 48 4.6 Brisbane Airport Rail Link .................................................................................... 49 5. Summary of Key Findings ...................................................................................................51 5.1 Freight and Passenger Privatizations ..................................................................... 51 5.2 Passenger Concessioning..................................................................................... 52 5.3 Overall Assessment ............................................................................................ 53 Glossary ..............................................................................................................................55 Bibliography.........................................................................................................................56 RESULTS OF RAILWAY PRIVATIZATION IN AUSTRALIA AND NEW ZEALAND iv LIST OF FIGURES AND TABLES Figure 1-1. Structure of the Australian Rail Industry in 1993. ............................................... 2 Figure 1-2. Map of the Australian Rail Network. .................................................................. 4 Figure 2-1. Rail Industry Reform, 1995-2005. .................................................................... 8 Figure 3-1. Total Revenue (Net) Tonne Kilometers for NZ Railways...................................... 12 Figure 3-2. Total Revenue for NZ Railways....................................................................... 12 Figure 3-3. Total Staff Numbers for NZ Railways............................................................... 13 Figure 3-4. Total Revenue (Net) Tonne Kilometers /Staff Numbers for NZ Railways................ 13 Figure 3-5. Tranz Rail Operating Margin. ......................................................................... 15 Figure 3-6. Tranz Rail Debt and Return on Investment ...................................................... 15 Figure 3-7. Australian Railroad Group Operating Structure. ................................................ 24 Figure 3-8. Rail Market Share (Eastern States to WA)........................................................ 34 Figure 3-9. Key Ownership and Structural Changes by State. ............................................. 35 Figure 4-1. Train Use in Melbourne. ................................................................................ 39 Figure 4-2. Cancellations of Trains = Percent of Services Scheduled. ................................... 41 Figure 4-3. On time Performance.................................................................................... 41 Figure 4-4. Passenger Satisfaction.................................................................................. 42 Figure 4-5. Passenger Figures for Sydney Airport Link. ...................................................... 49 Figure 4-6. Passengers for Brisbane Airport Link............................................................... 50 Table 2-1. Total Domestic Freight and Passenger Task, 2001-2002........................................ 5 Table 2-2. Break Up of Australian Rail Freight Task by Commodity (Million Tonnes). ................ 6 Table 2-3. The Australian Passenger Task, 2002-2003......................................................... 7 Table 3-1. Key Transaction Details for NZ Rail. ................................................................. 11 Table 3-2. Tranz Rail Key Financial Performance Statistics.................................................. 16 Table 3-3. Key Transaction Details for Australian National.................................................. 19 Table 3-4. Key transaction details for WestRail. ................................................................ 23 Table 3-5. Australian Railroad Group Operating Statistics................................................... 25 Table 3-6. Consolidated revenues of ARG 2002- 2004 (US$ millions). .................................. 25 Table 3-7. Comparison of Pre- and Post-Sale EBITDA. ....................................................... 25 Table 3-8. V/Line Freight Commodity Mix. ....................................................................... 26 Table 3-9. Key Transaction Details for V/Line Freight......................................................... 27 Table 3-10. Aspect of Transaction................................................................................... 30 Table 3-11.Comparison of Pre- and Post-sale Revenues, 2001-2004. ................................... 31 Table 3-12. Analysis of QR’s Operating Statistics. ............................................................. 33 Table 3-13. Analysis of QR’s Financial Information (A$ millions).......................................... 33 Table 3-14. Key Measures on Australia’s Railways (excluding private railways)...................... 34 RESULTS OF RAILWAY PRIVATIZATION
Recommended publications
  • WODONGA Train Crash 6.02
    RAIL INVESTIGATION REPORT Derailment of passenger train 8622, Sydney – Melbourne daylight XPT service Wodonga, Victoria 25 April 2001 ATSB Derailment of passenger train 8622, Sydney – Melbourne daylight XPT service ISBN 0 642 20047 5 odonga 6.02 W 1800 621 372 621 1800 www.atsb.gov.au Department of Transport and Regional Services Australian Transport Safety Bureau RAIL INVESTIGATION REPORT Derailment of passenger train 8622, Sydney – Melbourne daylight XPT service, Wodonga, Victoria 25 April 2001 ISBN 0 642 20047 5 June 2002 This report was produced by the Australian Transport Safety Bureau (ATSB), PO Box 967, Civic Square ACT 2608. Readers are advised that the ATSB investigates for the sole purpose of enhancing safety. Consequently, reports are confined to matters of safety significance and may be misleading if used for any other purpose. As ATSB believes that safety information is of greatest value if it is passed on for the use of others, copyright restrictions do not apply to material printed in this report. Readers are encouraged to copy or reprint for further distribution, but should acknowledge ATSB as the source. ii CONTENTS 1. EXECUTIVE SUMMARY 1 2. INTRODUCTION 5 3. INVESTIGATION METHODOLOGY 7 4. FACTUAL INFORMATION 9 4.1.1 XPT background 9 4.1.2 Wodonga 10 4.2 Sequence of events 11 4.2.1 The incident 11 4.2.2 Subsequent events 13 4.3 Injuries 15 4.4 Damage 15 4.4.1 Damage to the train 15 4.4.2 Damage to the rail infrastructure 18 4.5 Train crew involved 20 4.6 Train Information 21 4.6.1 Train Consist 21 4.6.2 Rolling stock date
    [Show full text]
  • Volume – 25 Number – 3 September to November 2018 Edition
    Volume – 25 Number – 3 September to November 2018 Edition Steam locomotive 3801 (4-6-2) was operated by the New South Wales Government Railways between 1943 and 1976. It is arguably Australia’s most famous steam locomotive, being the only one to have visited all main line states and territories. The 38 Class numbered 30. The first 5 units, with the streamlined design, were built by Clyde Engineering, Granville, New South Wales. The other 25 units were built, semi-streamlined, at the New South Wales Eveleigh (even numbers) and Cardiff (odd numbers) Locomotive Workshops. 3801 entered service on 22 January 1943 and worked the “Newcastle Flyer” for the first time on 23 February 1943 to express passengers to and from Sydney. 2018 celebrates the 75th anniversary of this iconic steam locomotive. See page 9 for a history and restoration update. Image – Wikipedia – 3801 leads the Newcastle Flyer on 1 October 2005 1 OFFICE BEARERS President: Daniel Cronin Secretary: David Patrick Treasurer: Geoff Crow Membership Officer: David Patrick Electrical Engineer: Ben Smith Way & Works Engineer: Ben Smith Mechanical Engineer: Warwick Brisbane Development Engineer: Peter Riggall Club Rooms: Old Parcels Office Auburn Railway Station Victoria Road Auburn Telephone: 0419 414 309 Friday evenings Web Address: www.mmrs.org.au Web Master: Mark Johnson Call Board Production: John Ford Meetings: Friday evenings at 7:30 pm Committee Meetings 2nd Tuesday of the month (Refer to our website for our calendar of events) Index Page: 3 AGM Meeting Notice Page: 4 President’s Report Page: 6 What’s Happening Page: 7 Naradhan Images: Caulfield August 2018 Page: 9 Feature Article: History of Steam Locomotive 3801 Page: 14 Calendars for September 2018 to November 2018 2 THE 53rd ANNUAL GENERAL MEETING OF THE MELBOURNE MODEL RAILWAY SOCIETY INC WILL BE HELD AT 8.00 PM ON FRIDAY OCTOBER 19th, 2018 AT THE MMRS CLUB ROOMS VICTORIA STREET, HAWTHORN (at the Auburn railway station) Business: A.
    [Show full text]
  • David Hill, by David Hill, the Other David Hill, David Dale, Mr
    The Times January 2019 A journal of transport timetable history and analysis RRP $4.95 Inside: That Scrofulous Cad Incl. GST Timetables of Australia and New Zealand The Times A journal of the Australian Timetable Association Inc. (A0043673H) Print Publication No: 349069/00070, ISSN 0813-6327 January 2019 Vol 36 No. 01, Issue No. 420 The Times welcomes all contributions. Our Authors’ Guide is available on our web-site at https://www.timetable.org.au/ Reproduction Provided a Creative Commons acknowledgement is made, material appearing in The Times may be repro- duced anywhere. Disclaimer Opinions expressed in our magazines are not necessarily those of the Association or its members. Editor Geoff Lambert 179 Sydney Rd FAIRLIGHT 2094 NSW email: [email protected] The Times is posted in full colour to our website https://www.timetable.org.au/times.html, two months after publi- cation in paper and to the National Library website 6 months after publication. Colour PDF versions of previous issues of our magazines are at http://www.austta.org.au —Contents— Various THE BLUE CHEESE THEFT 3 Geoff Lambert & Noel Farr ANZR PTT 7 There is no such a font The Art Deco style timetable shown on our pages 7-12 has many interesting aspects—one of which is the typography. The “What the Font” web-site cannot identify it. Art Deco fonts were all the rage for railways of that era - most notably Gill Sans, which was actually created for a railway—the LNER—by Eric Gill. The text illustrated above appears to be an attempt by the Victorian Railways printing works at North Melbourne to create its own font style.
    [Show full text]
  • Spark and Cannon Transcript of Proceedings
    SPARK AND CANNON Telephone: Adelaide (08) 8212-3699 TRANSCRIPT Melbourne (03) 9670-6989 Perth (08) 9325-4577 OF PROCEEDINGS Sydney (02) 9211-4077 _______________________________________________________________ PRODUCTIVITY COMMISSION DRAFT REPORT ON PROGRESS IN RAIL REFORM MRS H. OWENS, Presiding Commissioner PROF D. SCRAFTON, Associate Commissioner TRANSCRIPT OF PROCEEDINGS AT SYDNEY ON WEDNESDAY, 12 MAY 1999, AT 2.33 PM Continued from 12/11/98 in Melbourne Rail 639 ra120599.doc MRS OWENS: Good afternoon and welcome to the public hearing of the Productivity Commission's inquiry on progress in rail reform. This public hearing in Sydney is the first of four sets of hearings. The others are scheduled for the next two weeks in Perth, Adelaide and Melbourne. The hearings are designed for people to raise issues in relation to our draft report entitled Progress in Rail Reform issued in March. They give people the opportunity to provide an input into the final report which is due to be released in early August. While people who provide information are protected in the inquiry as if they were giving evidence to a court, this is not a court of law. We shall try to make the hearings as relaxed as possible, despite the microphones. However, there are some formalities which we try to follow each time we conduct public hearings. First, for the benefit of the transcript, we will ask participants to introduce themselves and to indicate in which capacity they appear - and I will come back to that in a minute. Secondly, information provided at these hearings is often used in our reports.
    [Show full text]
  • NORTH WEST Freight Transport Strategy
    NORTH WEST Freight Transport Strategy Department of Infrastructure NORTH WEST FREIGHT TRANSPORT STRATEGY Final Report May 2002 This report has been prepared by the Department of Infrastructure, VicRoads, Mildura Rural City Council, Swan Hill Rural City Council and the North West Municipalities Association to guide planning and development of the freight transport network in the north-west of Victoria. The State Government acknowledges the participation and support of the Councils of the north-west in preparing the strategy and the many stakeholders and individuals who contributed comments and ideas. Department of Infrastructure Strategic Planning Division Level 23, 80 Collins St Melbourne VIC 3000 www.doi.vic.gov.au Final Report North West Freight Transport Strategy Table of Contents Executive Summary ......................................................................................................................... i 1. Strategy Outline. ...........................................................................................................................1 1.1 Background .............................................................................................................................1 1.2 Strategy Outcomes.................................................................................................................1 1.3 Planning Horizon.....................................................................................................................1 1.4 Other Investigations ................................................................................................................1
    [Show full text]
  • 2.0 Current Freight Rail System and Services in Florida
    Investment Element of the 2010 Florida Rail System Plan 2.0 Current Freight Rail System and Services in Florida 2.1 Overview The Florida rail system is comprised of 2,786 miles of mainline track, which are owned by 15 operating line-haul railroads and terminal or switching companies, as well as 81 miles owned by the State of Florida. Florida’s rail system includes 2 Class I Railroads (CSX Transportation and Norfolk Southern Corporation), 1 Class II (Florida East Coast Railway), 11 Class III (Alabama and Gulf Coast Railway AN Railway, Bay Line Railroad, First Coast Railroad, Florida West Coast Railroad, Florida Central Railroad, Florida Midland Railroad, Florida Northern Railroad, Georgia and Florida Railway, Seminole Gulf Railway, and South Central Florida Express) and 1 railroad specializing in switching and terminals (Talleyrand Terminal).9 The largest operator in the State is CSX Transportation, which owns more than 53 percent of the statewide track mileage. In 2008, Florida’s railroads carried nearly 1.6 million carloads – 19 percent less than in 2006 – and approximately 83 million tons of freight, representing a 25 million ton (23 percent) decrease from 2006.10 During that year, railroads handled freight equivalent to roughly 5.0 million heavy trucks.11 Nonetheless, railroads continue to support thousands of jobs throughout the State and assist Florida’s industries to remain competitive with international and domestic markets for fertilizer, construction rock, consumer goods, paper products, processed 9 U.S. Class I Railroads are line-haul freight railroads with 2007 operating revenue in excess of $359.6 million (2006 operating revenues exceeding $346.7 million).
    [Show full text]
  • 'Ugly Sydney' Or an Enhancement of the Greatest Rail
    Australian Folklore 21, 2006 157 The Fate of Eveleigh: More of ‘Ugly Sydney’ or an Enhancement of the Greatest Rail Heritage Site in the World? Brian Dunnett and Robert J. Haworth Lovers of heritage and of a human-scale city alike are alarmed at the latest proposal for the old Eveleigh Railway Workshops site that covers many hectares of inner Sydney.1 The New South Wales Government Planning Minister Frank Sartor has recently excised the area from heritage protection legislation in order to allow maximum possible development of the site for high-rise apartment blocks.2 Of particular concern is the current threat3 to close the still functioning Large Erecting Shed and transform it into either a completely new 12 storey office tower or an ‘adaptive re-use’ four storey block. Unfortunately, the concerns of community groups, even if they represent a majority of citizens, mean little to contemporary Governments, especially at the State level. This is particularly true of the New South Wales Government, which is in the perverse position, after 15 years of uninterrupted economic boom, of being squeezed between accelerated development brought on by the boom and declining tax revenue4 exacerbated by the increasingly unequal power distribution between the States and Canberra. Developer Section 94 contributions allowed for under the NSW EPA Act5 go to Local Government, thus giving the State Minister an incentive to excise choice areas and over- develop them as a means of much-needed revenue raising from special developers’ contributions which go direct to the State Government. The 1 The best pictorial presentation of is in danger of being lost is in: D.
    [Show full text]
  • Locolines Edition 68
    LOCOLINES Contents EDITION 68 APR 2017 Loco Lines is published by the Locomotive Secretary’s Report 3 Division of the Australian Rail, Tram & Bus Industry Union – Victorian Branch. Presidents Report 8 Loco Lines is distributed free to all financial Assistant Sec Report 10 members of the Locomotive Division. Retired Enginemen also receive the V/Line S.C.S Report 13 magazine for free. It is made available to non-members at a cost of $20.00 per year. V/Line Stranded Gauge 15 Advertisements offering a specific benefit to Locomotive Division members are Where is it? 1 6 published free of charge. Heritage groups are generally not charged for advertising or ‘A special train in half an hour’ Article 1 8 tour information. Maurice Blackburn 21 Views or opinions expressed in published contributions to Loco Lines are not necessarily those of the Union Office. V/Line Cab Committee Report 28 We also reserve the right to alter or delete text for legal or other purposes. ‘Livestock Traffic’ Article 30 Contributions are printed at the discretion Talkback with Hinch 3 2 of the publisher. Signal Sighting V/line 35 Loco Lines, or any part thereof, cannot be reproduced or distributed without the Nelsons Column 3 6 written consent of the Victorian Locomotive Division. ‘Australia’s forgotten Volunteers’ 38 Publisher Marc Marotta Retirements/ Resignations 40 Have your Say 4 1 Membership form 44 Locomotive Division Representatives Divisional Executive Divisional Councillors Secretary: ...........Marc Marotta 0414 897 314 Metropolitan : ……….......Paris Jolly 0422 790 624 Assist. Sec: ...Jim Chrysostomou 0404 814 141 Metropolitan :…….... President: .............Wayne Hicks 0407 035 282 Metropolitan : …....
    [Show full text]
  • Pacific National
    Pacific National Submission to the Economic Regulation Authority on the Review of the Western Australian Railways (Access) Code (2000) March 2005 Legal\100081618.3 1. Executive Summary and Outline 1.1 Executive summary The purpose of the review is to assess how effectively the Code meets the objectives of the CPA. The objective of access regulation is to promote efficiency and the CPA seeks to do this, relevantly in the case of rail, by ensuring: • the efficient use of natural monopoly infrastructure; • the efficient investment in natural monopoly infrastructure; and • promoting competition in activities that rely on the use of infrastructure services where it is uneconomic to develop alternative facilities. Pacific National's experience as an access seeker or access provider in virtually all jurisdictions in Australia means it is well placed to provide information about whether the Code meets the objectives of the CPA. Pacific National believes there are several key areas where the Code does not meet the objectives of the CPA as effectively as it could:- (a) Level and structure of access charges Inducing competition in dependent markets is one of the fundamental aims of the CPA. However, the approach taken to the calculation of ceiling prices in Western Australia permits very high access charges to be set by WNR. This ability presents the possible risk of an access provider setting access charges high enough to deter competitive entry in the haulage of freight on the intrastate network. No above rail competitor has been able to enter the Western Australian intrastate network where competing haulage services have been sought by customers for minerals haulage.
    [Show full text]
  • One Rail Australia Submission to ESCOSA
    One Rail Australia Submission to ESCOSA One Rail Australia welcomes the invitation from ESCOSA to respond to the South Australian Rail Access Regime Review Issues Paper (February 2020). The review is timely given recent developments in the rail industry in South Australia, which are set out in detail below. Overall, our position is: • There is no compelling case to change the current regime significantly. • Whilst volumes on intrastate main lines continue to reduce, this has been driven by increased competition from road transport, rather than deficiencies in the access regime. • Other than lower volumes, there has been no significant change in the operation of the market since 2015, such that ESCOSA’s conclusions at the time supporting the continuation of the existing regime should have altered; • The current regime is a cost-effective way to provide protection to both access seekers and access providers in South Australia and provides certainty for all parties through the negotiation and arbitration framework; • ESCOSA reflects a fit-for-purpose regulator for the South Australian rail market given its size relative to the national regulated market which allows for efficient communication and resolution of issues; and • Changing to a national regime would be a costly process during transition and would raise regulatory compliance costs of all parties in the long run. It would also generate risks around the process of transition and there may be opportunity for other parties, such as national transport carriers, to exert market power. The rest of this submission sets out some information about One Rail Australia, an update on the South Australian freight transport industry, an overview of our perceptions of strengths and weaknesses of the current regime.
    [Show full text]
  • Genesee & Wyoming Inc. 2016 Annual Report
    Genesee & Wyoming Inc. 2016 Annual Report Genesee & Wyoming Inc.*owns or leases 122 freight railroads worldwide that are organized into 10 operating regions with approximately 7,300 employees and 3,000 customers. * The terms “Genesee & Wyoming,” “G&W,” “the company,” “we,” “our,” and “us” refer collectively to Genesee & Wyoming Inc. and its subsidiaries and affiliated companies. Financial Highlights Years Ended December 31 (In thousands, except per share amounts) 2012 2013 2014 2015 2016 Statement of Operations Data Operating revenues $874,916 $1,568,643 $1,639,012 $2,000,401 $2,001,527 Operating income 190,322 380,188 421,571 384,261 289,612 Net income 52,433 271,296 261,006 225,037 141,096 Net income attributable to Genesee & Wyoming Inc. 48,058 269,157 260,755 225,037 141,137 Diluted earnings per common share attributable to Genesee & Wyoming Inc. common stockholders: Diluted earnings per common share (EPS) $1.02 $4.79 $4.58 $3.89 $2.42 Weighted average shares - Diluted 51,316 56,679 56,972 57,848 58,256 Balance Sheet Data as of Period End Total assets $5,226,115 $5,319,821 $5,595,753 $6,703,082 $7,634,958 Total debt 1,858,135 1,624,712 1,615,449 2,281,751 2,359,453 Total equity 1,500,462 2,149,070 2,357,980 2,519,461 3,187,121 Operating Revenues Operating Income Net Income Diluted Earnings ($ In Millions) ($ In Millions) ($ In Millions) 421.61,2 Per Common Share 2 2,001.5 401.6 1 $2,000 2,000.4 $400 394.12 $275 271.3 $5.00 1 2 4.79 1 374.3 1 380.21 384.3 261.0 4.581 1,800 250 4.50 350 1,639.0 225.01 225 2 1 1,600 233.5 4.00 2 3.89 1,568.6 4.10 2 300 2 200 213.9 213.3 2 3.78 2 1,400 1 3.50 3.69 289.6 183.32 3.142 250 175 1,200 3.00 211.
    [Show full text]
  • Economic Issues
    Economic Issues No. 7 Darwin: A Gateway to Asia? Implications of the Adelaide-Darwin Railway and Port of Darwin Developments for Australian Trade Author: Andrew Symon March 2004 South Australian Centre for Economic Studies Economic Issues ISSN 1445-6826 Copyright: All rights reserved. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism or review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Otherwise, no part of this publication may be reproduced, stored or transmitted in any form or by any means without the prior permission in writing of the Publisher. Disclaimer: While embodying the best efforts of the investigators/authors, and while every reasonable effort has been made to ensure accuracy, neither the South Australian Centre for Economic Studies, the parent Universities, nor the individual authors/investigators, take any responsibility or will accept any liability for any consequences that might arise from reliance on the information presented in this paper. The views expressed in this paper are the views of the author(s), and should not be taken to represent the views of the South Australian Centre for Economic Studies or of the two parent Universities of the Centre. Published by: South Australian Centre for Economic Studies PO Box 125 Rundle Mall SA 5000 AUSTRALIA Telephone: (61+8) 8303 5555 Facsimile: (61+8) 8232 5307 Internet: http://www.adelaide.edu.au/saces Email: [email protected] © SA Centre for Economic Studies, 2004 Subscription and Corporate Membership: Information on Corporate Membership of the SA Centre for Economic Studies may be obtained by contacting the Centre or at our website, www.adelaide.edu.au/saces ii The SA Centre for Economic Studies Economic Issues Director’s Note Welcome to the seventh issue of Economic Issues, a series published by the South Australian Centre for Economic Studies as part of its Corporate Membership Program.
    [Show full text]