Euskotren to Offer Metro and Railway Night Services from Next Weekend.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Euskotren to Offer Metro and Railway Night Services from Next Weekend.Pdf Euskotren to offer Metro and Railway night services from next weekend • The Friday and Saturday night service on the Line 3 of the Bilbao Metro underground will start on Friday 3 July • Railway services on Saturday nights in Bizkaia and Gipuzkoa will be run from the 4th Euskotren, a publicly-run company of the Basque Government, will run night underground (Line 3 in Bilbao) and railway (Bizkaia and Gipuzkoa) services from next weekend. The Company will partially restore an interrupted service, with it ending earlier, as part of the process to adapt the schedule to the different measures implemented during the situation caused by COVID-19. In view of the evolving demand after the lifting of the state of alarm and in order to facilitate mobility between our municipalities, Euskotren brought forward the start of the summer service to 8 June in order to meet the specific travel needs of the summer period. It is now increasing the night service at weekends and will be partially running the Line 3 underground services in Bilbao on Fridays and Saturdays and the rail services on Saturdays. The night service schedule will be as follows: METRO UNDERGROUND (LINE 3 IN BILBAO BETWEEN MATIKO AND KUKULLAGA) • Friday nights. From Kukullaga/Etxebarri, 9 circulations between 0:08 a.m. and 2:08 a.m. In the other direction, from Matiko/Bilbao, 10 circulations between 0:00 (midnight) and 2:15 a.m. • Saturday nights. From Kukullaga/Etxebarri, 10 circulations between 0:08 a.m. and 3:08 a.m. In turn, from Matiko/Bilbao, 9 circulations between 0:00 (midnight) and 2:15 a.m. RAILWAY (Saturday nights) • Bilbao-Deba: from Bilbao, one train circulation Deba (departure at 23:45 from Matiko and another to Traña (departure from Matiko at 1:45 a.m.). From Deba, one circulation to Bilbao departing at 1:40 a.m. • Kukullaga-Lezama: from Kukullaga/Etxebarri two circulations (departing at 0:08 a.m. and 2:08 a.m.). And from Lezama one circulation departing at 0:51 a.m.) • Amorebieta-Bermeo: one circulation in each direction (from Amorebieta, departing at 0:19 a.m. and from Bermeo at 1:18 a.m.). And another one from Amorebieta to Gernika, departing at 2:19 a.m. • Topo (Lasarte Oria-Hendaia): from Lasarte, three circulations to Hendaye, departing at 0:00 midnight, 1:00 a.m. and 2:00 a.m. A further two circulations from Amara to Altza departing at 0:52 a.m. and 1:52 a.m. In the other direction, three circulations from Hendaye to Lasarte, departing at 0:03 a.m., 1:03 a.m. and 2:03 a.m. (this train ends in Amara), and a further three from Altza to Amara, departing at 0:05 a.m., 1:05 a.m. and 2:05 a.m. Further information by phoning 944 333 333, www.euskotren.eus, @euskotren and on the Euskotren official app. Release date: 1 July 2020 .
Recommended publications
  • Horario Y Mapa De La Ruta E4 De Tren
    Horario y mapa de la línea E4 de tren E4 Bermeo →Amorebieta Geltokia Ver En Modo Sitio Web La línea E4 de tren (Bermeo →Amorebieta Geltokia) tiene 8 rutas. Sus horas de operación los días laborables regulares son: (1) a Bermeo →Amorebieta Geltokia: 1:18 (2) a Bermeo →Gernika: 22:35 (3) a Bermeo →Matiko-Bilbao: 6:18 - 21:48 (4) a Gernika →Bermeo: 5:52 - 6:41 (5) a Gernika →Matiko-Bilbao: 6:15 (6) a Matiko-Bilbao →Bermeo: 6:10 - 21:10 (7) a Matiko- Bilbao →Gernika: 19:40 - 22:10 Usa la aplicación Moovit para encontrar la parada de la línea E4 de tren más cercana y descubre cuándo llega la próxima línea E4 de tren Sentido: Bermeo →Amorebieta Geltokia Horario de la línea E4 de tren 12 paradas Bermeo →Amorebieta Geltokia Horario de ruta: VER HORARIO DE LA LÍNEA lunes Sin servicio martes Sin servicio Bermeo miércoles Sin servicio Mundaka Geltoki Kalea, Mundaka jueves Sin servicio Itsasbegi-Busturia viernes Sin servicio sábado 23:39 Axpe-Busturia domingo 1:18 San Kristobal-Busturia Forua Gernika Información de la línea E4 de tren 8 Bekoibarra kalea, Errentería Dirección: Bermeo →Amorebieta Geltokia Paradas: 12 Lurgorri-Gernika Duración del viaje: 39 min 60 Iparragirre kalea, Guernica Resumen de la línea: Bermeo, Mundaka, Itsasbegi- Busturia, Axpe-Busturia, San Kristobal-Busturia, Muxika Forua, Gernika, Lurgorri-Gernika, Muxika, Zugaztieta- Muxika, Amorebieta Geralekua, Amorebieta Geltokia Zugaztieta-Muxika Amorebieta Geralekua Amorebieta Geltokia Sentido: Bermeo →Gernika Horario de la línea E4 de tren 8 paradas Bermeo →Gernika Horario de ruta:
    [Show full text]
  • Horario Y Mapa De La Ruta E1 De Tren
    Horario y mapa de la línea E1 de tren E1 Amara-Donostia Ver En Modo Sitio Web La línea E1 de tren (Amara-Donostia) tiene 10 rutas. Sus horas de operación los días laborables regulares son: (1) a Amara-Donostia: 5:39 - 22:30 (2) a Azitain-Eibar: 7:42 - 17:12 (3) a Deba: 1:45 (4) a Deba: 6:50 (5) a Durango: 20:50 (6) a Eibar: 6:42 - 21:12 (7) a Elgoibar: 6:09 - 14:25 (8) a Ermua: 7:00 - 22:00 (9) a Matiko-Bilbao: 5:50 - 21:41 (10) a Zumaia: 6:20 - 21:50 Usa la aplicación Moovit para encontrar la parada de la línea E1 de tren más cercana y descubre cuándo llega la próxima línea E1 de tren Sentido: Amara-Donostia Horario de la línea E1 de tren 42 paradas Amara-Donostia Horario de ruta: VER HORARIO DE LA LÍNEA lunes 5:39 - 22:30 martes 5:39 - 22:30 Matiko-Bilbao 29A Tiboli kalea, Bilbao miércoles 5:39 - 22:30 Uribarri-Bilbao jueves 5:39 - 22:30 15 Trauko kalea, Bilbao viernes 5:39 - 22:30 Zazpikaleak/Casco Viejo-Bilbao sábado 6:52 - 22:30 2 San Nikolas plazatxoa, Bilbao domingo 6:52 - 22:30 Zurbaranbarri-Bilbao Arabella kalea, Bilbao Txurdinaga-Bilbao 32 Gabriel Aresti etorbidea, Bilbao Información de la línea E1 de tren Dirección: Amara-Donostia Otxarkoaga-Bilbao Paradas: 42 7 Txotena kalea, Bilbao Duración del viaje: 119 min Resumen de la línea: Matiko-Bilbao, Uribarri-Bilbao, Kukullaga-Etxebarri Zazpikaleak/Casco Viejo-Bilbao, Zurbaranbarri- Bilbao, Txurdinaga-Bilbao, Otxarkoaga-Bilbao, Etxebarri Kukullaga-Etxebarri, Etxebarri, Ariz-Basauri, 16 Calle Errekaondo, Doneztebe Zuhatzu-Galdakao, Usansolo-Galdakao, Bedia, Lemoa, Amorebieta Geltokia,
    [Show full text]
  • L1 L2 L3 E3 E5 E4 E1 E2 Tr Fe
    Tarifak Tarifas E2 HENDAIA Irun Galtza- Ficoba raborda Pasaia (Errenteria) Irun Belaskoenea E4 Errenteria (Irun) Fanderia Bentak BidezabalBerangoLarrabasterraSopelanaUrduliz L1 BERMEO (Errenteria) (Irun) PLENTZIA Oiartzun L2 Algorta Mundaka KABIEZES Aiboa Larrondo Elotxelerri Itsasbegi Deba Arroa (Zumaia)ZumaiaZarautzSan PelaioAia-Orio (Zarautz)UsurbilErrekaldeAñorga (Donostia)Lugaritz (Donostia) (Donostia) Santurtzi (Loiu) (Loiu) (Busturia) AnoetaLoiola (Donostia)Intxaurrondo (Donostia)Herrera (Donostia) (Donostia) Gaintxurizketa Neguri Axpe (Lezo) Peñota Derio (Busturia) Gobela Portugalete Lekunbiz FE Sondika San Kristobal Areeta (Zamudio) Ola (Busturia) E1 TRAPAGARAN Abatxolo Zamudio Lamiako (Sondika) Mendaro Sestao Kurtzea Forua E5 Urbinaga Leioa (Lezama) Institutua LASARTE AMARA- ALTZA Bagatza Astrabudua (Gernika) Altzola -ORIA DONOSTIA/ (Elgoibar) SAN SEBASTIÁN FE Erandio E3 Barakaldo Gernika LARREINETA Toletxegain Lutxana LEZAMA Ansio Lurgorri (Elgoibar) (Gernika) Gurutzeta/Cruces E1 Elgoibar SAN INAZIO L3 Muxika Sarriko Sabino Deusto MATIKO- Zugaztieta Arana BILBAO (Muxika) Azitain (Eibar) TR ATXURI > LA CASILLA ZurbaranbarriTxurdinagaOtxarkoaga Uribarri (Bilbao) (Bilbao) (Bilbao) San Mamés Euskalduna (Bilbao) Eibar E1 BILBAO > DONOSTIA/SAN SEBASTIÁN Amorebieta Ospitalea/ Indautxu Abandoibarra Geralekua Hospital Moyua Guggenheim Euba Ardantza E2 LASARTE-ORIA > HENDAIA (Amorebieta) (Eibar) Basurto Uribitarte E3 Pio Baroja BOLUETA- E3 SantutxuBasarrate BILBAO Durango Amaña KUKULLAGA-ETXEBARRI > LEZAMA TR L3 Amorebieta (Eibar) Geltokia
    [Show full text]
  • Interconexión Occidental España-Francia Por El Golfo De Bizkaia-Gascogne
    DOCUMENTO INICIAL DEL PROYECTO Interconexión occidental España-Francia por el Golfo de Bizkaia-Gascogne AGOSTO 2017 Documento Inicial del Proyecto Interconexión occidental España‐Francia por el Golfo de Bizkaia‐Gascogne ÍNDICE 1. INTRODUCCIÓN .............................................................................................................. 3 1.1. Objeto ......................................................................................................................... 4 1.2. Antecedentes .............................................................................................................. 6 1.1.1 Planificación Energética 2015‐2020 ...................................................................... 7 1.1.2 La Planificación Energética y su carácter vinculante ............................................. 8 1.1.3 Evaluación Ambiental Estratégica ......................................................................... 9 1.3. Necesidad y objetivos de las instalaciones ................................................................. 11 2. ÁMBITO DE ESTUDIO ................................................................................................... 12 2.1. Ámbito de estudio terrestre ...................................................................................... 12 2.2. Ámbito de estudio marino ......................................................................................... 13 3. DESCRIPCIÓN DEL PROYECTO ......................................................................................
    [Show full text]
  • 4. Linea Conectando Bilbao Línea 4 Conectando Bilbao
    4. Linea Conectando Bilbao : Por un transporte más sostenible : Por Línea 4 Línea 4 Conectando Bilbao L4 La eficacia del Modelo Euskadi La eficacia del Modelo Euskadi : Garraio jasangarriago batengatik 4. Linea Mikel Torres Bizkaiko Garraio Partzuergoko Lehendakaria Presidente del Consorcio de Transportes de Bizkaia El metro de Bilbao continúa avanzando a un ritmo vertiginoso. El metro de Bilbao continúa avanzando a un ritmo vertiginoso. Un trazado que hace sólo 15 años abarcaba desde Casco Vie- Un trazado que hace sólo 15 años abarcaba desde Casco Vie- jo hasta Plentzia y recorría la margen derecha de Bilbao, hoy jo hasta Plentzia y recorría la margen derecha de Bilbao, hoy en día se ha convertido en una red con dos Líneas, una tercera en día se ha convertido en una red con dos Líneas, una tercera en construcción y otras dos en proyecto. en construcción y otras dos en proyecto. La línea 4 supone otroL de los grandes retos que va a afrontar La línea 4 supone otro de los grandes retos que va a afrontar Metro Bilbao en los próximos años y un claro ejemplo más de4 Metro Bilbao en los próximos años y un claro ejemplo más de la eficacia del Modelo Euskadi. La importante apuesta que se la eficacia del Modelo Euskadi. La importante apuesta que se ha realizado en favor del crecimiento de la red metropolitana, ha realizado en favor del crecimiento de la red metropolitana, es la mejor muestra de que el suburbano vizcaíno mira hacia es la mejor muestra de que el suburbano vizcaíno mira hacia el futuro y de que se trabaja por ofrecer un servicio de calidad el futuro y de que se trabaja por ofrecer un servicio de calidad y cada vez más completo para los ciudadanos.
    [Show full text]
  • What Light Rail Can Do for Cities
    WHAT LIGHT RAIL CAN DO FOR CITIES A Review of the Evidence Final Report: Appendices January 2005 Prepared for: Prepared by: Steer Davies Gleave 28-32 Upper Ground London SE1 9PD [t] +44 (0)20 7919 8500 [i] www.steerdaviesgleave.com Passenger Transport Executive Group Wellington House 40-50 Wellington Street Leeds LS1 2DE What Light Rail Can Do For Cities: A Review of the Evidence Contents Page APPENDICES A Operation and Use of Light Rail Schemes in the UK B Overseas Experience C People Interviewed During the Study D Full Bibliography P:\projects\5700s\5748\Outputs\Reports\Final\What Light Rail Can Do for Cities - Appendices _ 01-05.doc Appendix What Light Rail Can Do For Cities: A Review Of The Evidence P:\projects\5700s\5748\Outputs\Reports\Final\What Light Rail Can Do for Cities - Appendices _ 01-05.doc Appendix What Light Rail Can Do For Cities: A Review of the Evidence APPENDIX A Operation and Use of Light Rail Schemes in the UK P:\projects\5700s\5748\Outputs\Reports\Final\What Light Rail Can Do for Cities - Appendices _ 01-05.doc Appendix What Light Rail Can Do For Cities: A Review Of The Evidence A1. TYNE & WEAR METRO A1.1 The Tyne and Wear Metro was the first modern light rail scheme opened in the UK, coming into service between 1980 and 1984. At a cost of £284 million, the scheme comprised the connection of former suburban rail alignments with new railway construction in tunnel under central Newcastle and over the Tyne. Further extensions to the system were opened to Newcastle Airport in 1991 and to Sunderland, sharing 14 km of existing Network Rail track, in March 2002.
    [Show full text]
  • Horario Y Mapa De La Ruta E3 De Tren
    Horario y mapa de la línea E3 de tren E3 Kukullaga-Etxebarri →Lezama Ver En Modo Sitio Web La línea E3 de tren (Kukullaga-Etxebarri →Lezama) tiene 4 rutas. Sus horas de operación los días laborables regulares son: (1) a Kukullaga-Etxebarri →Lezama: 5:36 - 22:21 (2) a Lezama →Kukullaga-Etxebarri: 6:07 - 22:22 (3) a Lezama →Zazpikaleak/Casco Viejo-Bilbao: 22:52 (4) a Sondika →Kukullaga-Etxebarri: 5:56 Usa la aplicación Moovit para encontrar la parada de la línea E3 de tren más cercana y descubre cuándo llega la próxima línea E3 de tren Sentido: Kukullaga-Etxebarri →Lezama Horario de la línea E3 de tren 16 paradas Kukullaga-Etxebarri →Lezama Horario de ruta: VER HORARIO DE LA LÍNEA lunes 5:36 - 22:21 martes 5:36 - 22:21 Kukullaga-Etxebarri miércoles 5:36 - 22:21 Otxarkoaga-Bilbao 7 Txotena kalea, Bilbao jueves 5:36 - 22:21 Txurdinaga-Bilbao viernes 5:36 - 22:21 32 Gabriel Aresti etorbidea, Bilbao sábado 7:24 - 22:24 Zurbaranbarri-Bilbao domingo 0:08 - 22:24 Arabella kalea, Bilbao Zazpikaleak/ Casco Viejo 4 Itxaropen kalea, Bilbao Información de la línea E3 de tren Uribarri-Bilbao Dirección: Kukullaga-Etxebarri →Lezama 15 Trauko kalea, Bilbao Paradas: 16 Duración del viaje: 36 min Matiko-Bilbao Resumen de la línea: Kukullaga-Etxebarri, 29A Tiboli kalea, Bilbao Otxarkoaga-Bilbao, Txurdinaga-Bilbao, Zurbaranbarri-Bilbao, Zazpikaleak/ Casco Viejo, Ola-Sondika Uribarri-Bilbao, Matiko-Bilbao, Ola-Sondika, Sondika, Larrondo-Loiu, Elotxelerri-Loiu, Derio, Lekunbiz- Sondika Zamudio, Zamudio, Kurtzea-Lezama, Lezama Larrondo-Loiu Elotxelerri-Loiu Derio
    [Show full text]
  • • Datu Teknikoak: O Linearen Luzera Osoa: 5.885 Metro O
    • Datu teknikoak: • Datos técnicos: o Linearen luzera osoa: 5.885 metro o longitud total de la línea: 5.885 metros o Aurrekontu osoa: 153 milioi euro o presupuesto total: 153 Millones de Euros o Linearen osoaren epea: martxan 2012an o plazo total línea: operativa en 2012 o 7 geltoki (Zazpi Kaleetako geltokiaren berriztapena o 7 estaciones (incluyendo la remodelación de la barne): San Antonio, Otxarkoaga, Txurdinaga, estación de Casco Viejo): San Antonio, Otxarkoaga, Zurbaranbarri, Zazpi Kaleak, Uribarri eta Matiko Txurdinaga, Zurbaranbarri, Casco Viejo, Uribarri y o Zerbitzua jasoko duen biztanleria (isokronak): Matiko 71.086 (10’ ) Matiko barne o Población atendida (isocronas): 71.086 (10’ ) o Zerbitzuaren maiztasuna: sistema, gehienez ere 5 incluyendo Matiko minutuko maiztasunerako diseinatuko da. o Frecuencias del servicio: el sistema se diseña para o Zazpi Kaleetarako ibilbiderako aurreikusitako una frecuencia máxima de 5 min. denborak. o Tiempos estimados de recorrido a Casco Viejo: Bidaiarako Tiempos TRAZATU BERRIA denborak (1) NUEVO TRAZADO de Viaje (1) Etxebarri-Otxarkoaga 2´31" Etxebarri-Otxarkoaga 2´31" Otxarkoaga-Txurdinaga 1´14" Otxarkoaga-Txurdinaga 1´14" Txurdinaga-Zurbaranbarri 1´46" Txurdinaga-Zurbaranbarri 1´46" Zurbaranbarri-Zazpi Zurbaranbarri-Casco Viejo 2´05" Kaleak 2´05" Casco Viejo-Uribarri 2´32" Zazpi Kaleak -Uribarri 2´32" Uribarri-Matiko 0´52" Uribarri-Matiko 0´52" total: Matiko-Etxebarri 9´58" Guztira: Matiko-Etxebarri 9´58" (1) Inlcuido el tiempo de parada en estaciones (1) Geltokietan geldik egoten den denbora
    [Show full text]
  • Rigid Catenary March 2021
    SECTOR REFERENCE LIST Rigid Catenary March 2021 Project Name Location Date Length Voltage Design (km) Speed (km/h) Metro Buenos Aires Line B Alem-Rosas Argentina 2014 25 600 V 90 Metro Buenos Aires Line E Bolívar-Retiro Argentina 2018 4 1,5 kV 90 Perth- Forestfield Airport link Australia 2019 15 25 kV 140 Melbourne Metro Rail Project Australia Design 1 1,5 kV 90 ÖBB Marchtrent-Traun Austria 1993 0.5 15 - SNCV Charleroi Belgium 1992 0.7 750 V 80 STIB Schaerbeek Depot Brussels Belgium 1998 0.77 750 V 20 STIB Rogier Tunnel Brussels Belgium 2008 0.5 750 V 80 STIB Haren Depot Belgium 2008 3 750 V 20 STIB Thomas Tunnel Brussels Belgium 2009 0.1 750 V 20 STIB Marconi depot Belgium 2016 5 750 V 20 STIB Simonis Belgium 2017 3.1 750 V 20 INFRABEL Tunnel Saint Martin Liege Belgium 2019 1.35 3 kV 80 INFRABEL Tunnel Pierreuse Belgium 2020 3.2 3 kV 80 Metro Sao Paulo Line 4 Brazil 2010 28 1.5 kV 110 Metro Sao Paulo Line 5 phase 1 Brazil 2013 2.3 1.5 kV 100 Metro Sao Paulo Line 5 phase 2 Brazil 2018 21 1.5 kV 100 Metro Sao Paulo Line 4 Extension Brazil 2021 4.5 1.5 kV 110 Metro Sofia Line 3 Bulgaria 2018-2019 23.04 1.5 kV 90 Toronto Saint Clair station Canada 2016 0.37 750 V 30 Ottawa Confederation Line Canada 2018 7.88 1.5 kV 90 Metro Santiago de Chine L3 & 6 Chile 2016 79.75 1.5 kV 80 Guangzhou China 1999 0.2 1.5 kV - MTR Hong Kong SIL-KTE China 2015 12 1.5 kV 90 MTR Hong Kong SCL China 2017 25 25 kV 130 March 2021 © Pandrol 2021 1 of 6 Rigid Catenary Helsinki-Vantaa Airport Finland 2012 16 25 kV 120 RATP Défense/Nation RER A France 1983 0.4 1.5 kV
    [Show full text]
  • Acuerdo Modelo
    BATZAR NAGUSIAK JUNTAS GENERALES B I Z K A I A ALDIZKARI OFIZIALA BOLETIN OFICIAL X LEGISLATURA X AGINTALDIA Serie B Información, control e impulso Informazinoa, kontrola eta sustapena B Saila VII Convenios y acuerdos marco (de Diputación) Hitzarmenak eta Esparru Akordioak (Aldundiarenak) VII Bilbo, 2016ko azaroaren 9a Número 10a Bilbao, 9 de noviembre de 2016 10a Alea ASUNTO: Ampliación temporal del Convenio de Colaboración entre GAIA: Bizkaiko Foru Aldundiaren, Euskal Autonomia Erkideko la Administración General de la Comunidad Autónoma del País Administrazioaren eta Red Ferroviaria Vasca-Euskal Trenbide Vasco, Red Ferroviaria Vasca-Euskal Trenbide Sarea y la Sarearen artean Bilboko hiri-trenbidearen 3. linea (Etxebarri-Matiko Diputación Foral de Bizkaia para la continuación de las obras de linea) eraiki eta finantzatzeko sinatu zen hitzarmenaren epea construcción y financiación de la línea 3 del ferrocarril metropolitano zabaltzea de Bilbao (Línea Etxebarri-Matiko AUTOR: Diputacion Foral de Bizkaia EGILEA: Bizkaiko Foru Aldundia Admisión a trámite Bideraketarako onartzea La Mesa de las Juntas Generales, en su sesión de fecha 2 de Aitatutako gaia dala-ta, hurrengo Erabagiak hartu ditu Batzar noviembre de 2016, con relación al asunto de referencia, adoptó los Nagusietako Mahaiak 2016ko azaroaren 2an izandako bileran: siguientes Acuerdos: Tramitación: Admitir a trámite. Bideraketea: Bideraketarako onartzea Calificación: Solicitud de autorización/acuerdo Sailkapena: Baimen/akordio eskaria Procedimiento de Tramitación: Normal Prozedurea: Arrunta Plazos: Aprobación tácita de la autorización por el transcurso Epea: Aurkakotsauna adierazo/aldaketea eskatu barik epea del plazo sin formular oposición/modificación: 15 días. Finaliza igaro izanagaitik baimena beste barik emoteko: 15 egun. el 30 de noviembre. Amaierea: azaroaren 30ekoa.
    [Show full text]
  • AUTOBUS GELTOKIAK, HERRIZ-HERRI PARADAS DE AUTOBÚS, POR MUNICIPIOS ABADIÑO: • Erdialde • Muntsaratz AMOREBIETA-ETXANO
    AUTOBUS GELTOKIAK, HERRIZ-HERRI PARADAS DE AUTOBÚS, POR MUNICIPIOS ABADIÑO: Autonomía 45 // Autonomía 50 (arratsaldez) Olabarrieta/Hirubide Erdialde Basurto hospitalea Zabalgane plaza Muntsaratz Cam. Volantin, 1 (Ayuntamiento) Zabalea kalea, 14 AMOREBIETA-ETXANO: Cam. Volantin, 23 (Zubizuri) GERNIKA: Euba Auzoa Deusto.- Lehen. Agirre, 11 Carlos Gangoiti San Pedro K./Geralekua/Apeadero General. Concha, 2 (goizez) // Iparragirre, 42 (arratsaldez) Lurgorri (Juan Calzada) Gudari Kalea/Iruarriren aurrean Gran Via, 63 (Renault) Saraspe Plaza (goizez)/ Autobusen geraleku zentrala Katia Auzoa Hurtado de Amezaga, 2 (goizez) // Quinta Parroquia (arratsaldez) Laminor, Rotonda de (arratsaldez) IGORRE: Larrea (Eskoletan) Juan de Garai, Torre Urizar Elexalde (Pda Bizkaibus) San Juan kalea/Sukoiren aurrean Miribilla, J. Gernika 10 Garbe S. Miguel K. 21 /Anbulategiaren aurrean Miribilla, J. Gernika 24 Urkuzu Txirriena (goizez), Gane (arratsaldez) Parque Etxebarria (goizez) // Zumalakarregi 105 (arratsaldez) IURRETA: APATAMONASTERIO: Pda. Bizkaibus Zumalakarregi Kalea- 56 (goizez) // Zumalakarregi Kalea- Calle Maspe (Pda Bizkaibus) ARANTZAZU: Zelaia/Pda. Bizkaibus Makua plaza (arratsaldez) LARRABETZU: AREATZA: Parrokiaren aurrean Zabalburu.- Autonomia, 3 (goizez) // Alda. S. Mames, 2 Errebale (Frontoian) ARRANKUDIAGA: Arene Pda. Bizkaibus (arratsaldez) Goikolexea ARRIGORRIAGA: Zabalburu. Juan de Garai 2 (goizez) // Quinta Parroquia LEMOA: Cristo K. 10-12 (Rotonda) (Arratsaldez) Bolunburu S. Ochoa K.13.- (goizez)
    [Show full text]
  • 63 Special Issue
    revistaitransporte.com ineco.com itransporteTRANSPORT ENGINEERING & CONSULTANCY | | aniversario 63 SPECIAL ISSUE THE FIRST FIFTY YEARS THE JOURNEY HAS ONLY 50JUST BEGUN Ready to travel? contents EDITORIAL / PRESIDENTS 04 50 YEARS OF NEWS (1968-2018) 06 THE FIRST PROJECTS (1968-1982) 12 A GIANT LEAP FORWARD (1983-1992) 16 MAJOR INFRASTRUCTURE (1993-1999) 22 THE NEW MILLENNIUM (2000-2007) 28 Aena’s network of airports makes it easy CREATING BRAND SPAIN (2008-2018) 42 • The best selection of leisure, dining and shopping facilities • The widest selection of parking options, and the best price • Renovated VIP Lounges UNIQUE AND OUT OF THE ORDINARY 58 • Free Wi-Fi And all the services you need to start enjoying your trip even before you reach your destination. published by ineco Paseo de La Habana, 138 - 28036 Madrid – Tel. 91 452 12 56 – www.revistaitransporte.com Editor-in-Chief: BÁRBARA JIMÉNEZ-ALFARO – [email protected] Editorial Staff: LIDIA AMIGO – [email protected] Editorial Board: ISABEL ÁLVAREZ, MICHAEL ASHIABOR, NATALIA DÍAZ, JosÉ Gonzalez, JUAN R. HERNÁNDEZ, RAFAEL HERRERA, rafael MOLINA, SERGIO NAVARRO, Javier SANCHO, JARA valbuenA Design, layout, editing and web: ESTUDIO 2729 | juanjo JIMÉNEZ, almudena VALDECANTOS, TERESA COMPAIRÉ, YOLANDA MARTÍNEZ Printed by: NILO GRÁFICA Legal Deposit: M-26791-2007 ©Ineco. All rights reserved (2018). If you wish to reprint these articles or unsubscribe, please, contact the Editor-in-Chief. Follow us: itransporte — 3 P R E S I D E N T S and the story continues Carlos Roa Juan de Arespacochaga Emilio Magdalena Pelayo Martínez (TIFSA) editorial 1968 | 1971-1983 1968-1971 1983-1988 1983-1989 o celebrate Ineco’s 50th anniversary, this special issue of Itransporte is ❝Special thanks also go dedicated to looking back on the most important events of the company’s history as recounted by some of the key people who participated and wit- to all of those friends nessed it.
    [Show full text]