LOCAL DEVELOPMENT PLAN CONTENTS
Foreword 2
How to use this plan 3 Influences on the plan 4 Vision for the plan 5 New Spatial strategy 7 Shaping Banff and Buchan 9 Shaping Buchan 12 Shaping Formartine 15 Shaping Garioch 18 Shaping Kincardine and Mearns 21 Shaping Marr 24 Shaping business development 27 Shaping development in the countryside 33 Shaping homes and housing 39 Shaping places 45 Natural heritage and landscape 51 The historic environment 57 Protecting resources 63 Climate change 69 The responsibilities of developers 75
Business land allocations 81 Retail centres 87 Boundaries of the greenbelt 91 Identified settlements under policy R2 103 New housing land allocations 107 Existing conservation areas 123 Standards for household waste facilities 129 Settlement statements 133 Schedule of land ownership 639
Glossary 645 SECTION 11
SHAPING BUSINESS DEVELOPMENT
– 27 –
– 28 – SHAPING BUSINESS DEVELOPMENT
Developing business is very important to the economic health of the region. Aberdeenshire must be ‘open for business’ to become a successful sustainable place, meeting the many different and changing needs and locational requirements of the different sectors and sizes of business. The plan is closely matched to the priorities of the Economic Development Strategy 2011 to 2016.
We take the view that business development those for primary industries, which generate is not just about industrial estates and more than 10 Heavy Goods Vehicle that it is important to provide a policy movements per day will only be permitted framework that supports existing business on land accessible to suitable railheads, sectors and promotes and protects new harbours or the trunk road network. ones as part of the way land is used within settlements. Policies promote a ‘town Existing land used for business, usually centres first’ principle and consider the identified as BUS within settlement specific development needs of both the statements, will be retained for this use regeneration area and the Energetica unless there is a constraint on the site area, an area where a particular emphasis whereby there is no reasonable prospect of is being placed on high-quality, low-impact it ever becoming marketable for business developments to support the continued development or it is poorly located for growth of energy-related companies in employment use. The alternative use must the North East. Overall we will support the benefit the local community and must not development of business and sustainable prejudice the strategic employment land economic growth in all areas by taking requirement. It must respect the character account of the economic benefits of of the area and be compatible with nearby proposed development when we make uses. Proposals for the change of use of decisions in managing developments. business use will not normally be permitted if it removes all business land opportunities The business land allocations are listed in within the settlement. appendix 1. We will not allow houses, even if also Policy B1 Employment and business land designed as workplaces, on land identified in the plan specifically for business We will approve new employment uses uses. Home/ work proposals may be on land allocated or identified in the plan appropriate on land identified for mixed- for business as set out in the settlement use development depending on the criteria statements in Appendix 8. We will not set out in Policy P3 Infill and householder approve non-employment uses on these developments within settlements (including sites. In exceptional circumstances, home and work proposals). the early release of strategic reserve employment land will be supported if there is a justified economic need or if it is required for design reasons. Developments other than
– 29 – Policy B2 Town centres and office We will also support shops which will act as a development new tourist destination or support an existing one, and which will make a contribution We will allow retail and other uses which a to the development of the area. The lot of people will visit only in defined town expansion or intensification of existing retail centres unless a sequential assessment uses in the countryside, including established shows that another site is more appropriate. farm shops, will be supported as long as Other uses include office developments, the increased scale of development is commercial leisure uses, community and appropriate to the rural character of the cultural facilities and, where appropriate, area. In any of these cases, the applicant other public buildings such as libraries and will need to demonstrate that there will be education and healthcare facilities. In no significant negative effect on existing the case of office developments, where town centres by submitting a retail impact it can be shown that there is no suitable analysis. Such development is encouraged town centre location, they will normally be on brownfield land where possible. accommodated on identified employment and business land in accordance with Policy We will also consider new tourist facilities B1. Sites are required to be conveniently against other appropriate policies in the accessible by modes other than the plan. These will mainly be Policy R2 Housing private car to the projected catchment and business development elsewhere of the facility. In the case of major retail in the countryside, and Policy P3 Infill proposals, a retail impact assessment and householder developments within must demonstrate there will not be a settlements (including home and work significant adverse effect on theviability proposals). or vitality of existing town centres and does not make worse any issue identified by a Town Centre Health Check or Town Policy B4 Special development areas Centre Strategy. In the case of office We will consider helping start-up businesses developments, no account will be taken of in the regeneration priority area (as defined public car parking in assessing compliance on the proposals maps and in detail in the with parking standards. Small convenience “Regeneration Priority Area” supplementary shops designed to meet a need in a local guidance) by allowing co-funding through neighbourhood are not covered by this modest housing developments where these policy. are essential to allow the development to proceed and this is not a substitute Retail and commercial facilities must be for normal development funding. Wider appropriate to the scale and function of the public benefit must significantly override settlement and support an appropriate mix the disadvantages of the development. of uses within the town centre. The network The level of development should not of centres is set out on the proposals map exceed five houses in all but exceptional and in appendix 2. cases. For clarity, housing development allowed under this policy is not considered Policy B3 Tourist facilities a ‘housing cluster’ under the terms of Policy R2 for a period of at least five years from the We will support the development of new completion of the development. tourist facilities or accommodation that are well related to settlements and deliver net Development in the Energetica area will economic and social benefits.Proposals need to keep to a design and sustainability must take account of the potential vision agreed with Aberdeen City and as cumulative impact of similar developments presented in the supplementary guidance in close proximity. With the exception of “Energetica”. reinstatement to a dwelling from bed and breakfast accommodation, we will protect existing tourist sites from being converted to other uses unless there is evidence that the business has been marketed for at least 12 months, including in the local area, and is no longer viable.
– 30 – Rosehearty Fraserburgh Portsoy Macduff A98
A98 Crimond Moray
Aberchirder
Turriff Cuminestown
Auchnagatt A952 Huntly Ardallie
Hatton A90 Rothienorman Cruden Bay
Tarves Ellon
Kennethmont Pitmedden Insch Oldmeldrum Rhynie & Milldale Oyne West Newburgh Udny Station Pitmillan Foveran A96 Inverurie Lumsden Rashierieve Foveran Newmachar Belhelvie Balmedie Kintore Kemnay Kingseat Alford Whitehouse A90 Blackdog Blackburn Muir of Fowlis
Aberdeen City Westhill Shaping Tarland Business Development Marywell Kincardine O'Neil Business Land A93 AWPR Size Guide (Ha) Aboyne Banchory Portlethen Chapelton 0 - 10 (Elsick) Cairngorms National Park 10.1 - 20 Newtonhill
AWPR
20.1 - 30 Stonehaven
> 30 Drumlithie
Auchenblae A92 Existing Business ! Land Fordoun New Business ! Land Allocations Laurencekirk Gourdon Edzell Woods Long Term Angus Luthermuir Strategic A90 Marykirk Reserve St Cyrus ± Energetica Regeneration
0 5 10 20 KM Copyright 2014 Esri Priority Areas (c) Crown Copyright. OS Licence No. 0100020767 Copyright:© 2014 Esri – 31 –
– 32 – SECTION 12
SHAPING DEVELOPMENT IN THE COUNTRYSIDE
– 33 –
– 34 – SHAPING DEVELOPMENT IN THE COUNTRYSIDE
We want to create a welcoming approach to development in the countryside that meets needs and encourages prosperous, sustainable communities and businesses while protecting and improving the quality of the environment. We need to recognise the effect that rural living can have on wider aims shared with stakeholders on reducing the need to travel and on issues of climate change and sustainable development. Policies and allocations promote a pattern of development that is considered to be appropriate to the ‘pressured’ and ‘intermediate’ character of the area. (Pressured and intermediate areas are terms used in paragraphs 76 to 78 of Scottish Planning Policy. The Aberdeen housing market area boundary marks the boundary of the two areas.)
Some development proposals, such as • the sensitive restoration, conversion or extracting minerals, need a rural location extension of a vernacular building or or can have a significant effect on our other building of architectural merit; landscape, and as such we design policies • accommodation within the immediate to tackle these concerns. We consider our vicinity of the place of employment policy on wind turbines under the ‘Climate required for a worker in a primary change’ section. industry which is appropriate to the countryside and where the presence of Policy R1 Special rural areas a worker is essential to the operation of the enterprise and there is no suitable Housing and employment development alternative residential accommodation opportunities will be significantly restricted available; in the greenbelt and coastal zone to reflect • development identified as a national the special nature of these areas. We will priority in the National Planning only allow development if it is essential Framework; and cannot be located elsewhere. In the greenbelt the following development is • development of minerals under Policy R3 permitted: and waste facilities under Policy PR3 may be permitted where an essential need is identified; • the extension of an existing building or use that is ancillary to the main use; • developments (including community infrastructure) under Policy PR2 may be • development for the purposes of permitted in the greenbelt where they agriculture, forestry, horticulture, meet an established need and where it nature conservation or essential public can be adequately demonstrated that infrastructure; no alternative location can be found; • development for a recreational use and that is compatible with its agricultural or • it is the replacement of a single non natural setting; vernacular building on the same
– 35 – footprint, and for the same use. The Small-scale growth of settlements where replacement building must be consistent a particular need for development has in scale, and no more intrusive than the been identified, by the addition of groups existing building. In addition, it is generally of no more than 3 houses within 200m of expected that the new building will the settlement boundary, is also promoted. demonstrate a significant improvement These identifiedsettlements are listed in in design to that of the existing building. appendix 4. No more than an additional 20% growth of the settlement, up to a maximum In the coastal zone development must of 10 new homes, will be permitted under require a coastal location, and the social this policy during the plan period. and economic benefits must outweigh any adverse environmental impact or it must be Single homes will also be permitted for the redevelopment of an existing building, or the retirement succession of a viable farm within the curtilage of an existing building. In holding. any case there must be no coalescence of coastal developments or significant adverse impacts on natural coastal processes or We will also allow development proposals habitats. Great care must be taken to in the rural housing market area (which are assess flood and erosion risk. classed as ‘intermediate’ rural areas) if they are small-scale employment proposals, or a small-scale addition to an existing cluster We will approve proposals for coastal or group of at least five houses which is of protection works if an assessment of the a scale and character that is in keeping implications of the works shows that they with that cluster or group. No more than an work with natural processes and there additional 20% growth of the cluster, up to a will be no significant adverse impact on maximum of 2 new homes, will be permitted coastal processes or habitats, and that the under this policy during the plan period. development will not result in increased coastal erosion or flooding elsewhere on the Because of the problems associated coastline. The full range of management with restricting use and occupancy, we options should be considered over the treat all forms of lodge or chalet leisure lifetime of the development and against accommodation as housing proposals appropriate climate change projections. under this policy. (Proposals for new The boundaries of the greenbelt are shown tourist accommodation will be assessed in in appendix 3. Coastal zone areas are accordance with Policy B3: Tourist facilities.) shown on the proposals maps and shown in detail in the supplementary guidance “The Siting and design of any new development Coastal Zone”. will be a primary consideration. The retention and refurbishment of vernacular buildings Policy R2 Housing and employment and the reuse of brownfield land will development elsewhere in the always be preferred and the character of countryside these buildings should be retained. Where development relates to a building with We will restrict development proposals in vernacular architectural merit, physical the countryside area outwith the Aberdeen replacement will only be supported in greenbelt and coastal zone to small-scale exceptional circumstances. In such cases, development that would: retention, redevelopment and re-modelling should be undertaken. • be appropriate in the greenbelt (see Policy R1: Special rural areas); or Policy R3 Minerals and hill tracks • involve the refurbishment or replacement, on the same site, of an We generally only allow minerals existing house or disused building; or development if sufficient information is provided to enable the full likely effects of • involve remediation of redundant the development to be assessed, together brownfield land opportunities. with proposals for appropriate control, mitigation and monitoring. Details of
– 36 – phased working; waste management; land As appropriate we will require financial restoration and aftercare; after use; and guarantees through planning conditions public road maintenance and restoration or legal agreements to ensure that a will require to be agreed with the planning high standard of site restoration and authority as part of any application. aftercare is managed effectively and that such work is undertaken at the earliest opportunity. Provision will be made for the Development will not be permitted monitoring and review of such guarantees if a transport assessment shows that as necessary. development will have significant negative transport impacts on local communities, or a waste management plan does not Where development would result in three show how secondary materials from mineral or more consented mineral developments workings, such as overburden, waste rock within a 5km radius of a settlement and fines, will be reused. With respect to consideration will be required of cumulative sand and gravel construction aggregates impacts and any adverse impacts identified we will seek to maintain a minimum adequately mitigated. landbank of permitted reserves of at least 10 years within the market area, but we All conditions attached to mineral will generally not allow development that permissions will be reviewed every 15 years would result in the minerals landbank within (subject to the flexibility provided by Scottish the market area exceeding 15 years, in Planning Policy to postpone reviews), order to avoid unnecessary blight from to ensure that the development is not unimplemented permissions. The market adversely affecting the natural or historic area is defined as a 50km travel distance environment, landscape character or local from the Aberdeen City boundary and amenity. Guidance is given in Scottish Office the strategic growth areas defined in the Development Department Circular 34/1996 strategic development plan. We may allow and Scottish Executive Development the extraction of construction aggregates Department Circular 3/2011. to meet the needs of a specific local area where it can be demonstrated that A buffer distance restricting development these cannot be adequately served by around minerals sites will be agreed with existing sites or reserves within the overall the developer in consultation with the market area. local community. This will need to take into account the specific circumstances of the In all cases an environmental statement will proposals, including factors such as site have to show acceptable environmental location, topography, expected duration of impacts. Proposals will need to address, operations, and method of working. amongst other considerations, landscape and visual impacts, taking into account Protecting important minerals development Policy E2: Landscape; the effect on natural sites is achieved through Policy PR1 heritage and habitats, taking into account Protecting important resources. Policy E1: Natural heritage; the effect on the historic environment, taking into account Policy HE1: Protecting listed buildings, sites We will only allow development involving hill and monuments and Policy HE2: Protecting tracks if it can be satisfactorily integrated historic and cultural areas; impacts on local in the landscape and it respects existing communities, individual houses, sensitive and historic pathways. Hill tracks will only be receptors and economic sectors important permitted if they minimise environmental to the local economy; disturbance from impacts, such as soil erosion, on habitats noise, blasting and vibration; and potential and water bodies, and a satisfactory pollution of land, air and water. maintenance programme has been agreed with the planning authority.
– 37 – RoseheartyFraserburgh Portsoy A98 Macduff Banff
A98 Moray
Aberchirder
Turriff
A952 Peterhead
Huntly
Ellon
Oldmeldrum
Inverurie & Port Elphinstone Newmachar
A90
Alford Kintore A90
A96
Westhill Aberdeen City
Aboyne A90 Banchory A93
AWPR
Cairngorms National Park
Stonehaven
Development in Angus the Countryside
A90 Greenbelt A92 Coastal Zones Aberdeen HMA 0 5 10 20 KM Copyright 2014 Esri Rural HMA (c) Crown Copyright. OS Licence No. 0100020767 Copyright:© 2014 Esri
– 38 – SECTION 13
SHAPING HOMES AND HOUSING
– 39 –
– 40 – SHAPING HOMES AND HOUSING
Providing land for housing development is a central way in which the plan will contribute to Aberdeenshire being a successful sustainable place.
This plan allocates housing sites for the amenity can be addressed and where period 2017 to 2026 in line with Schedule 1 justified through an approved masterplan or of the Aberdeen City and Shire Strategic design statement that has been subject to Development Plan. The allocations are appropriate public consultation. summarised in appendix 5 and are also identified in the settlement statements in Policy H2 Affordable housing appendix 8. Policies allow us to develop land on allocated sites to make sure there is The 2011 Housing Need and Demand a continuing five-yeareffective housing land Assessment identified a requirement for supply. We will monitor the maintenance around 38% of new homes to be affordable. of a five-year effective land supply using While it will not be possible to meet all the Housing Land Audit (see https:// affordable housing needs through the www.aberdeenshire.gov.uk/council-and- plan’s housing allocations, this is still an democracy/statistics/Housing-Market/) while important part of creating sustainable mixed the Action Programme will monitor progress communities. with delivering the allocated sites (https:// www.aberdeenshire.gov.uk/planning/plans- All new housing developments of four or and-policies/delivering-development/). more houses must include 25% of the service plots for affordable housing according to Policy H1 Housing land the definitions in the currentHousing Need and Demand Assessment (i.e. housing made We will support the development of housing available at a cost below full market value, on sites allocated for that purpose within the to meet an identified need. It includes social local development plan and as shown in the rented housing, subsidised low cost housing settlement statements. for sale (discounted, shared ownership or shared equity) and low cost housing We will not allow other types of without subsidy (entry level housing for sale). development on designated housing land Private rented accommodation available unless it is linked to the housing use and at lower cost than market rents should still allows the site to be developed to also be considered within the affordable approximately the housing numbers shown housing category). Only in exceptional in the settlement statements. circumstances will we accept a lower figure. The “Affordable Housing” supplementary guidance supports this policy by providing Capacities of sites shown in appendix 5 of further detail on the forms that the this plan and the settlement statements affordable housing contribution could take, are indicative at this stage. Higher and outlining the exceptional circumstances densities would only be considered where where a lower contribution or an alternative any associated negative impacts on to onsite provision may be appropriate. infrastructure, open space and residential
– 41 – Policy H3 Special needs housing Policy H5 Gypsies and travellers Where there is an obvious need which can Specific gypsy/ traveller sites have been be demonstrated, we will generally support identified in the settlement statements to housing proposals for the elderly or those meet an identified need and to provide with special support needs. If the developer certainty to both gypsy/ travellers and the demonstrates there are no suitable sites settled community. within a settlement, we will allow special needs housing to be developed on the We will generally approve permanent or edge of a settlement provided the site is temporary halting sites for gypsies and compatible with neighbouring uses; that travellers on sites allocated for that purpose there is easy access to public transport, in the plan, or on unallocated sites where local services and public open space; and there is a proven need. In either case, the that the site’s topography and access are applicant must demonstrate that the site appropriate for those with disabilities. would not appreciably detract from the character, appearance or amenity of the Self-contained continuing care retirement area. Developers of private gypsy/ traveller communities which provide health care will sites for their own use do not have to prove be approved outwith edge of settlement a specific need for their proposals but they sites providing the applicant demonstrates will still need to meet the remaining policy that the development will be self-sufficient in tests. the provision of facilities or would otherwise not have an adverse impact on the existing Proposals must also provide a secure facilities enjoyed by local residents. environment and essential services (in the case of halting sites: water connection, Policy H4 Residential caravans refuse facilities and portable toilet), and allow reasonable access to employment, We will not generally support proposals for education and other community permanent residential caravans, residential infrastructure, and the main road network. caravan parks, or residential caravan park In the case of sites that are not intended extensions. In cases where a temporary solely for private use, applicants will need need has been demonstrated by the to demonstrate that the site will be properly applicant, we will allow the temporary siting managed. of a residential caravan providing the siting respects the character and amenity of the surrounding area and the caravan can be satisfactorily serviced. Conditions will be imposed to limit the duration of permission and to ensure the caravan is removed and the site made good after the permission lapses.
– 42 – Rosehearty Fraserburgh Sandend Portsoy Whitehills Sandhaven Inverallochy Macduff Gardenstown & Pitulie & Cairnbulg Fordyce New Aberdour A98 Tyrie Memsie St Combs Banff Rathen
Cornhill Crudie New Crimond A98 Pitsligo Strichen Moray New Byth Aberchirder Garmond St Fergus Fetterangus Turriff Cuminestown Rora Mintlaw
Maud A952 Old Deer Longside Peterhead Ruthven New Deer Stuartfield Cairnie Forgue
Drumdelgie Auchnagatt Boddam Huntly Longhaven Glass Drumblade Ardallie Methlick Hatton A90
St Katherines Ythanbank Cruden Bay Ellon Gartly Tarves
Kennethmont Pitmedden Insch Old Rayne Moray Daviot Oldmeldrum & Milldale Rhynie Clatt Oyne Udny Green Newburgh Foveran Chapel of Garioch Inverurie & Udny Station Lumsden Port Elphinstone
A96 Keithhall Newmachar AWPR Kinmuck Balmedie Keig Hatton Alford Belhelvie Kemnay Kintore of Fintray Monymusk A90
Glenkindie Blackburn Blackdog Towie Muir of Fowlis Cluny & Sauchen
Millbank Dunecht
Westhill Logie Echt Aberdeen City Coldstone Tarland Lumphanan
Torphins Shaping Homes & Kincardine Kirkton of Housing Aboyne O'Neil Maryculter Marywell Drumoak A90 Park Chapelton nq Traveller Sites A93 Inchmarlo Crathes (Elsick)
AWPR Banchory Woodlands Newtonhill New Housing Land Cairngorms National Park of Durris Finzean Strachan Allocations
! 1 Stonehaven
A92 ! 10
Drumlithie Mill of Uras Auchenblae ! 100 Roadside of Kinneff Fordoun
Fettercairn 1,000 Laurencekirk Inverbervie !
Edzell Woods Angus Strategic Luthermuir Johnshaven Growth Areas A90 Marykirk ± St Cyrus Aberdeen HMA 0 5 10 20 KM Copyright 2014 Esri Rural HMA (c) Crown Copyright. OS Licence No. 0100020767 Copyright:© 2014 Esri
– 43 –
– 44 – SECTION 14
SHAPING PLACES - LAYOUT, SITING AND THE DESIGN OF NEW DEVELOPMENT
– 45 –
– 46 – SHAPING PLACES - LAYOUT, SITING AND THE DESIGN OF NEW DEVELOPMENT
Scottish Planning Policy encourages planning authorities to create high-quality places by taking a design-led approach to development and to direct the right development to the right place. The Aberdeenshire Design Review Panel recognises that good design needs an overall approach, from the choice of site to its layout and detailed design, and covering the whole range of factors that contribute. It is not about copying the past, but promoting appropriate design, whether that is new or traditional.
We promote a broad approach to design • welcoming through visual appeal, which provides a template for a complete style and the creation of a welcoming and effective process, and from which high- environment; quality design can begin to emerge. This • adaptable to future needs through the in turn will involve using design statements, balance of land uses, building types, methods of design assessment, and public density, sizes and tenures (including involvement when developing the designs. housing for people on modest incomes), and the flexibility to adapt to the Policy P1 Layout, siting and design changing circumstances of occupants; • efficient in terms of resources used in We will support major developments (more terms of waste management, water than 50 homes, or more than 2 hectares use, heating and electricity, the use of of employment, retail or mixed use recycled materials and materials with development), or new development on sites low embodied energy, and responding we have identified within the settlement to local climatic factors associated with statements as requiring a development cold winds, rain, snow and solar gain; framework or masterplan, if they keep to and a previously agreed statement(s) on the proposed design for the site. We will assess • well connected to create well all development, whether on sites we have connected places that promote allocated or elsewhere, using a process that intermodal shifts and active travel. includes appropriate public consultation. Measures require to be identified to We will only approve development designs enhance biodiversity or geodiversity in that demonstrate the six qualities of proportion to the opportunities available successful places, which are to be: and the scale of the development opportunity and to accord with the Zero Waste Plan, a Site Waste Management • distinctive with a sense of local identity Plan will be submitted to demonstrate that through creation of a sense of place and developers have minimised the generation the aesthetics of the design features and of waste during the construction and elements; operational phases of new development. • safe and pleasant, encouraging both These obligations may be controlled by activity and privacy, providing security conditions. and protecting amenity; – 47 – Policy P2 Open space and access in new in design frameworks or masterplans or development submitted with the planning application. Construction of new paths must comply with All new developments should be published best practice. accompanied by adequate public open space appropriate to the standards Policy P3 Infill and householder shown in the Aberdeenshire Parks and developments within settlements Open Spaces Strategy and which is safe, welcoming, distinctive, well connected (including home and work proposals) and accessible. Open space may make a Sites within settlements that have no significant contribution togreen networks in specific land use designation may provide communities, particularly when it is natural development opportunities that can in form and has a significant impact in both usefully contribute towards housing and area and the edges it presents to other employment land requirements. We will land uses. Community woodlands are support development on vacant sites within encouraged. a settlement boundary that have no specific land use allocation (also known as infill We will generally expect 40% of each developments), as long as the development major development site to be devoted to respects the scale, density and character good quality open space. In each case of its surroundings and will not erode the the actual proportion will take account of character or amenity of the surrounding the location, function and characteristics area. Applicants will also need to of the development proposal and site; demonstrate that there will be no significant the function of the open space proposed; interference with the existing or proposed and, where appropriate, the function and use of neighbouring sites, or the accessibility characteristics of existing open space in the of future potential development areas. For area. Alternatively, the developer should clarity, this policy also applies to applications demonstrate that the site is a constituent to change the use of existing buildings within part of an approved development settlements. framework or masterplan, and will contribute to the 40% open space component within We will approve a house extension or an that area. ancillary development associated with an existing house providing it respects both At least 120m2 of public open space per the character of the surrounding area and home must be provided for proposals the design/ scale of the existing house, and on allocated sites of less than 50 homes. does not significantly reduce the amenity Alternatively, and expressly for windfall sites, of neighbouring residents. We encourage this may take the form, in whole or part, to “working from home” proposals if they improving existing open space within the do not cause significant loss of amenity settlement where the Open Space Audit to neighbouring properties through noise, identifies a need. traffic movements or other nuisance, and do not change the overall character of the Open space contributions will only be property’s use as a single dwelling. acceptable when arrangements for the establishment and maintenance of the Policy P4 Hazardous and potentially open space have already been agreed and polluting developments and may be part of a Section 75 agreement for contaminated land the site. Permanent, temporary or advanced greening is encouraged. We will refuse development if there is a risk that it could cause significant pollution, create a significant nuisance, or Existing and potential public access routes present an unacceptable danger to the (including core paths) should be protected public or the environment. This includes and new developments must include developments we are told by the Health appropriate opportunities for informal and Safety Executive to be near facilities recreation, and promote walking or cycling they have identified as hazardous. Pipelines, as a means of transport. Statements or plans agricultural buildings, wastewater treatment detailing proposals should be included
– 48 – plants, waste disposal/ treatment facilities Any proposed development which could and heavy industrial uses are all examples have a significant detrimental impact on of development which could create air quality, including the exacerbation a nuisance, pollution or hazard. In any of existing air quality issues, must provide circumstances where development of this appropriate mitigation measures. kind is, on balance, considered acceptable by the appropriate authorities, satisfactory Policy P5 Digital infrastructure steps must be taken to mitigate any residual negative development impacts. We will support development that provides digital infrastructure to homes and In determining planning applications for businesses, subject to it complying with the development within the consultation zones other policies in this plan. for hazardous installations (including oil and gas pipelines) we will consult with, and take In considering proposals for full account of advice from, the Health and telecommunications equipment, we will Safety Executive (HSE) and the facility’s take into account the extent to which owners and operators, and will seek to the development involves mast or site ensure that any risk to public safety is not sharing; installation on buildings or other increased. Prospective applicants should existing structures; the installation of the check whether their proposed development smallest suitable equipment to meet the is within the consultation zone of a major technological requirements; concealing hazard site or a major accident hazard or disguising masts, antennas, equipment pipeline, and should seek further advice if housing and cable runs through design this is the case. This confirmation and advice or camouflage techniques; or whether it can be obtained from the HSE Planning involves the installation of a new ground- Advice Web App at www.hse.gov.uk/ based mast. landuseplanning/developers.htm or from the Council’s Development Management Team. Applications will be required to be Planning permission may be refused for accompanied by a range of additional potentially hazardous developments, information including: an explanation of or for other forms of development in how the proposed equipment fits into the close proximity to existing hazardous wider network; a description of the siting developments, in the event that insufficient and design options explored and the information has been submitted to reason for the chosen solution; details of the demonstrate the impacts or where the design, including height, materials and all impacts are unclear or unknown. components of the proposals; a landscaping and screen planting plan (if appropriate); We will not allow development on land that and an assessment of the cumulative effects is known or suspected to be contaminated of the development in combination with unless appropriate site investigations have existing equipment in the area. been undertaken to identify any actual or possible risk to public health or the Where necessary the application should be environment (including possible pollution accompanied by a declaration that the of the water environment), and effective equipment and installation is designed in full remedial actions are proposed to ensure compliance with the appropriate guidelines the site is made suitable for its new use. of the International Commission on Non- Where site conditions are appropriate, Ionising Radiation Protection on public consideration should be given to both exposure to radiofrequency radiation. radioactive and non-radioactive sources of contamination. Both the site investigations Policy P6 Community infrastructure and any remedial actions should be proportionate to the scale and nature of We will support the provision of new the proposed development, and be in community infrastructure which is in accordance with Planning Advice Note 33: accessible locations within settlements Development of Contaminated Land and and available to all community residents. the advice of the Council’s Infrastructure There may be circumstances (for example, Services (Contaminated Land) section. if development is taking place on land
– 49 – protected by Policy PR1) where we will seek Where existing community infrastructure to ensure through an appropriate legal within settlements has become surplus agreement that the new infrastructure is to requirements, due to new or updated available to all members of the community facilities being provided elsewhere, we for a reasonable amount of time on a will approve proposals for its re-use or regular basis. redevelopment subject to compliance with other policies in the plan. LSDPRINCIPLES