World Bank Document The World Bank Implementation Status & Results Report Nairobi Metropolitan Services Improvement Project (P107314) Nairobi Metropolitan Services Improvement Project (P107314) AFRICA | Kenya | Urban, Resilience and Land Global Practice | IBRD/IDA | Investment Project Financing | FY 2012 | Seq No: 15 | ARCHIVED on 03-Nov-2019 | ISR39071 | Public Disclosure Authorized Implementing Agencies: Government of Kenya, Ministry of Transport, Infrastructure, Housing, and Urban Development Key Dates Key Project Dates Bank Approval Date: 10-May-2012 Effectiveness Date: 17-Dec-2012 Planned Mid Term Review Date: 01-Oct-2015 Actual Mid-Term Review Date: 22-Sep-2015 Original Closing Date: 30-Jun-2017 Revised Closing Date: 31-Mar-2020 pdoTable Public Disclosure Authorized Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective (PDO) is to strengthen urban services and infrastructure in the Nairobi metropolitan region. Thiswill be achieved by (i) investing in local infrastructure (roads, markets, street lighting, bicycle and pedestrian pathways, drainage, and the like), (ii) investing in large- scale metropolitan infrastructure including supporting improvements in integrated solid waste management, sewerage collection and disposal, and transport, and (iii) strengthening the current and future entities responsible for service delivery, including the central ministry, current local authorities and future county governments, utilities and otherservice providers, and possible future metropolitan authorities responsible for planning, transport, and other services. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Public Disclosure Authorized Name Component 1: Institutional Reform and Planning:(Cost $20.00 M) Component 2: Local Infrastructure and Services:(Cost $62.00 M) Component 3: Metropolitan Infrastructure and Services:(Cost $243.00 M) Component 4: Project Management, Monitoring and Evaluation:(Cost $5.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Public Disclosure Authorized Implementation Status and Key Decisions Overall project implementation has improved significantly upon granting of the project extension, thereby making progress towards achieving the project's development objectives. Completed works (majority of roads and pedestrian walkways, storm water drainage works, street lighting, fire stations, bus parks, parking bays, sewerage works, and majority of the commuter stations) have provided significant benefits with positive social 11/3/2019 Page 1 of 8 The World Bank Implementation Status & Results Report Nairobi Metropolitan Services Improvement Project (P107314) impact and beneficiary satisfaction. The direct project beneficiaries have significantly increased, exceeding the original target of 2.2 million, as major infrastructure works are completed and handed over for operation. The project-supported strategic metropolitan planning integrating land use, transport, environment, economic activities, social services, and municipal finance is yielding sound planning documents and revenue enhancement tools to support sustainable growth in the Nairobi Metropolitan Region. Close collaboration among the PCT, county governments and other critical stakeholders as KRC, and utility companies, creates a platform for sustainable operation of infrastructure post project closure. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Substantial Moderate Institutional Capacity for Implementation and -- Sustainability Substantial Substantial Fiduciary -- Substantial Substantial Environment and Social -- Substantial Substantial Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Substantial Substantial Results PDO Indicators by Objectives / Outcomes The Project Development Objective (PDO) is to strengthen urban services and infrastructure in the Na IN00759549 ►Direct project beneficiaries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3,200,000.00 3,350,000.00 3,200,000.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 IN00759550 Female beneficiaries (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 50.00 50.00 50.00 IN00759551 ►People provided with access to "improved sanitation facilities” under the proj. (Number, Corporate) 11/3/2019 Page 2 of 8 The World Bank Implementation Status & Results Report Nairobi Metropolitan Services Improvement Project (P107314) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 21,600.00 31,500.00 14,000.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 IN00759552 People provided with access to “improved sanitation facilities” - urban (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 21,600.00 31,500.00 14,000.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 IN00759553 ►Number of people in urban areas provided with access to all-season roads within a 500 meter range under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 387,600.00 411,400.00 350,000.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 IN00759554 ►People in the Nairobi Metropolitan region living within a one kilometer radius of a location for a commuter rail station, benefitting from improved access to that location (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 274,700.00 300,000.00 280,000.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 Overall Comments PDO Beneficiaries: The number of beneficiaries has increased as a result of increase in the kilometer of drainage works constructed, increase in the number of street lights and high masts constructed and operationalized, increase in number of sewer connections and number of people that have access to an all-weather road. Impacts are expected to steadily increase upon commissioning of the commuter railway stations and complete handover and operationalizing of the Juja-Thika Sewerage works. Improved sanitation: Improved efforts by the Kiambu County in collaboration with utility companies in facilitating connections to the trunk sewer, has seen improvement of connections from 1800 to 2632 in six months, with over 10,000 more people having access to improved sanitation facilities in Kiambu county. Efforts in operationalizing Juja-Thika sewerage and public sensitization are underway. This has the potential in doubling the number of connections and significantly impacting a wider population. Access to roads: Approximately 121 km of urban and rural roads (78 Km for rural and 43 km for urban) have been completed under the project. As a result, an additional 20,000 people have benefitted. This has increased from 114 km in the previous reporting period as a result of addition of Tala Township road (substantially complete), Kitengela Off station road, Kikuyu underpass, which are above 50% completion and Githurai road alignment E, which has just commenced. Access to commuter rail: It is estimated that the total catchment population in the 10 urban centers, where the 10 commuter station have been constructed is 1.4 million people, with greater regional impact expected. Substantial completion of commuter railway stations in some of the most dense neighborhoods in the metropolitan region including Githurai, Kahawa, Ruiru and athi River has seen an increase in number of beneficiaries. Intermediate Results Indicators by Components 11/3/2019 Page 3 of 8 The World Bank Implementation Status & Results Report Nairobi Metropolitan Services Improvement Project (P107314) Component 1: Institutional Reform and Planning IN00759555 ►Physical address system prepared for counties (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 3.00 3.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 IN00759558 ►Revenue enhancement plans prepared for counties (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.00 4.00 4.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 IN00759561 ►Integrated strategic development plans prepared (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 1.00 24.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 Component 2: Local Infrastructure and Services IN00759556 ►Drainage systems constructed under the NaMSIP (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 157.00 157.00 158.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 IN00759559 ►Street and security lights installed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1,499.00 1,509.00 1,400.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 IN00759562 ►Markets rehabilitated (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 09-Apr-2012 28-Feb-2019 30-Aug-2019 31-Mar-2020 11/3/2019 Page 4 of 8 The World Bank Implementation Status & Results Report Nairobi Metropolitan
Recommended publications
  • Nairobi County
    Nairobi County Nairobi County at a glance Nairobi is the Capital City of Kenya and borders Kiambu County to the north west, north and north east, Machakos to the east and south east, Kajiado to the south, south west and west Area: 695 km² Population: 3,138,369 (Male - 51%, Female - 49%) Accountability and Governance The Constitution of Kenya (2010) has provided the opportunity for resources to be transferred to a new level of government at the grassroots. While devolution has created a new reform space for more responsive, equitable, efficient and accountable local service delivery, converting this into actual transformation at the grassroots will depend on the quality of county institutions charged with this responsibility. Since devolution entails the simultaneous transfer of power and resources to an entire new level of government, counties face unique challenges that demand innovative solutions. The EU is therefore working with the Government of Kenya to promote transparency and accountability in the management of county public finances. Sound economic and political governance will allow the residents of all counties to reap the benefits that devolution promises to bring to the people. Sustainable Infrastructure The EU together with its development partners, has committed to continue supporting Kenya in its infrastructure projects with a focus on energy, transport, water and sanitation and housing. This is in line with Vision 2030 (MTPII) and the government’s Big Four agenda. The EU is also supporting the country towards the modernisation its energy infrastructure with a special focus on development of renewable, affordable and reliable energy sources. This support is also targeting access to energy in rural areas in Kenya in order to increase the economic and social development of communities, households, and to spur the creation and growth of energy-based and reliant small enterprises.
    [Show full text]
  • Registered Voters Per Constituency for 2017 General Elections
    REGISTERED VOTERS PER CONSTITUENCY FOR 2017 GENERAL ELECTIONS COUNTY_ CONST_ NO. OF POLLING COUNTY_NAME CONSTITUENCY_NAME VOTERS CODE CODE STATIONS 001 MOMBASA 001 CHANGAMWE 86,331 136 001 MOMBASA 002 JOMVU 69,307 109 001 MOMBASA 003 KISAUNI 126,151 198 001 MOMBASA 004 NYALI 104,017 165 001 MOMBASA 005 LIKONI 87,326 140 001 MOMBASA 006 MVITA 107,091 186 002 KWALE 007 MSAMBWENI 68,621 129 002 KWALE 008 LUNGALUNGA 56,948 118 002 KWALE 009 MATUGA 70,366 153 002 KWALE 010 KINANGO 85,106 212 003 KILIFI 011 KILIFI NORTH 101,978 182 003 KILIFI 012 KILIFI SOUTH 84,865 147 003 KILIFI 013 KALOLENI 60,470 123 003 KILIFI 014 RABAI 50,332 93 003 KILIFI 015 GANZE 54,760 132 003 KILIFI 016 MALINDI 87,210 154 003 KILIFI 017 MAGARINI 68,453 157 004 TANA RIVER 018 GARSEN 46,819 113 004 TANA RIVER 019 GALOLE 33,356 93 004 TANA RIVER 020 BURA 38,152 101 005 LAMU 021 LAMU EAST 18,234 45 005 LAMU 022 LAMU WEST 51,542 122 006 TAITA TAVETA 023 TAVETA 34,302 79 006 TAITA TAVETA 024 WUNDANYI 29,911 69 006 TAITA TAVETA 025 MWATATE 39,031 96 006 TAITA TAVETA 026 VOI 52,472 110 007 GARISSA 027 GARISSA TOWNSHIP 54,291 97 007 GARISSA 028 BALAMBALA 20,145 53 007 GARISSA 029 LAGDERA 20,547 46 007 GARISSA 030 DADAAB 25,762 56 007 GARISSA 031 FAFI 19,883 61 007 GARISSA 032 IJARA 22,722 68 008 WAJIR 033 WAJIR NORTH 24,550 76 008 WAJIR 034 WAJIR EAST 26,964 65 008 WAJIR 035 TARBAJ 19,699 50 008 WAJIR 036 WAJIR WEST 27,544 75 008 WAJIR 037 ELDAS 18,676 49 008 WAJIR 038 WAJIR SOUTH 45,469 119 009 MANDERA 039 MANDERA WEST 26,816 58 009 MANDERA 040 BANISSA 18,476 53 009 MANDERA
    [Show full text]
  • County Government of Kiambu Registration of Contractors
    COUNTY GOVERNMENT OF KIAMBU REGISTRATION OF CONTRACTORS (Lot 1,2,3,4,5,6,7,8 and 9) DEPARTMENT OF ROADS, TRANSPORT, PUBLIC WORKS & UTILITIES The County Government of Kiambu wishes to invite competent and qualified contractors to submit their business or companies profiles as here under requested: Table 1 No Registration Requirements 1 Certified copy of the incorporation certificate or certificate of business name registration. 2 Duly filled business questionnaire Form S 33 3 A copy of the firms valid tax compliance certificate 4 Proof of financial capability being certified bank statements for the immediate previous TWO years 5 Valid Single Business Permit 6 Qualifications of site foreman and other staff with a minimum of 3 years’ experience (show letters of appointment or contracts entered into and attach academic certificates) 7 List of construction equipment and tools showing ownership or lease agreements being but not limited to the following: grader, bulldozer, back hoe ,trucks and lorries, concrete mixers, compactors, vibrators etc. 8 Declare your firm’s litigation history 9 Attach with referees the evidences of 2 completion certificates of similar works. 10 Attach a copy of the current and valid NCA permit certificate of licences for Road construction, Civil works and other category relevant. For the avoidance of doubt and so as to avoid unnecessary duplicity of effort the following clusters or lots shall apply as per your NCA certifications: Table 2 No Cluster / Lot NCA Category Point of Tender Registration No. Certification Submitting
    [Show full text]
  • Sediment Dynamics and Improvised Control Technologies in the Athi River Drainage Basin, Kenya
    Sediment Dynamics in Changing Environments (Proceedings of a symposium held 485 in Christchurch, New Zealand, December 2008). IAHS Publ. 325, 2008. Sediment dynamics and improvised control technologies in the Athi River drainage basin, Kenya SHADRACK MULEI KITHIIA Postgraduate Programme in Hydrology, Department of Geography and Environmental Studies, University of Nairobi, PO Box 30197, 00100 GPO, Nairobi, Kenya [email protected] Abstract In Kenya, the changing of land-use systems from the more traditional systems of the 1960s to the present mechanized status, contributes enormous amounts of sediments due to water inundations. The Athi River drains areas that are subject to intense agricultural, industrial, commercial and population settlement activities. These activities contribute immensely to the processes of soil erosion and sediment transport, a phenomenon more pronounced in the middle and lower reaches of the river where the soils are much more fragile and the river tributaries are seasonal in nature. Total Suspended Sediments (TSS) equivalent to sediment fluxes of 13 457, 131 089 and 2 057 487 t year-1 were recorded in the headwater areas, middle and lower reaches of the river, respectively. These varying trends in sediment transport and amount are mainly due to the chemical composition of the soil coupled with the land-soil conservation measures already in practice, and which started in the 1930s and reached their peak in the early 1980s. This paper examines trends in soil erosion and sediment transport dynamics progressively downstream. The land-use activities and soil conservation, control and management technologies, which focus on minimizing the impacts of overland flow, are examined to assess the economic and environmental sustainability of these areas, communal societal benefits and the country in general.
    [Show full text]
  • Baseline Review and Ecosystem Services Assessment of the Tana River Basin, Kenya
    IWMI Working Paper Baseline Review and Ecosystem Services Assessment of the Tana 165 River Basin, Kenya Tracy Baker, Jeremiah Kiptala, Lydia Olaka, Naomi Oates, Asghar Hussain and Matthew McCartney Working Papers The publications in this series record the work and thinking of IWMI researchers, and knowledge that the Institute’s scientific management feels is worthy of documenting. This series will ensure that scientific data and other information gathered or prepared as a part of the research work of the Institute are recorded and referenced. Working Papers could include project reports, case studies, conference or workshop proceedings, discussion papers or reports on progress of research, country-specific research reports, monographs, etc. Working Papers may be copublished, by IWMI and partner organizations. Although most of the reports are published by IWMI staff and their collaborators, we welcome contributions from others. Each report is reviewed internally by IWMI staff. The reports are published and distributed both in hard copy and electronically (www.iwmi.org) and where possible all data and analyses will be available as separate downloadable files. Reports may be copied freely and cited with due acknowledgment. About IWMI IWMI’s mission is to provide evidence-based solutions to sustainably manage water and land resources for food security, people’s livelihoods and the environment. IWMI works in partnership with governments, civil society and the private sector to develop scalable agricultural water management solutions that have
    [Show full text]
  • Geology of the Nairobi Region, Kenya
    % % % % % % % % %% %% %% %% %% %% %% % GEOLOGIC HISTORY % %% %% % % Legend %% %% %% %% %% %% %% % % % % % % HOLOCENE: %% % Pl-mv Pka %%% Sediments Mt Margaret U. Kerichwa Tuffs % % % % %% %% % Longonot (0.2 - 400 ka): trachyte stratovolcano and associated deposits. Materials exposed in this map % %% %% %% %% %% %% % section are comprised of the Longonot Ash Member (3.3 ka) and Lower Trachyte (5.6-3.3 ka). The % Pka' % % % % % % L. Kerichwa Tuff % % % % % % Alluvial fan Pleistocene: Calabrian % % % % % % % Geo% lo% gy of the Nairobi Region, Kenya % trachyte lavas were related to cone building, and the airfall tuffs were produced by summit crater formation % % % % % % % % % % % % % % % % % Pna % % % % %% % (Clarke et al. 1990). % % % % % % Pl-tb % % Narok Agglomerate % % % % % Kedong Lake Sediments Tepesi Basalt % % % % % % % % % % % % % % % % %% % % % 37.0 °E % % % % 36.5 °E % % % % For area to North see: Geology of the Kijabe Area, KGS Report 67 %% % % % Pnt %% % PLEISTOCENE: % % %% % % % Pl-kl %% % % Nairobi Trachyte % %% % -1.0 ° % % % % -1.0 ° Lacustrine Sediments % % % % % % % % Pleistocene: Gelasian % % % % % Kedong Valley Tuff (20-40 ka): trachytic ignimbrites and associated fall deposits created by caldera % 0 % 1800 % % ? % % % 0 0 % % % 0 % % % % % 0 % 0 8 % % % % % 4 % 4 Pkt % formation at Longonot. There are at least 5 ignimbrite units, each with a red-brown weathered top. In 1 % % % % 2 % 2 % % Kiambu Trachyte % Pl-lv % % % % % % % % % % %% % % Limuru Pantellerite % % % % some regions the pyroclastic glass and pumice has been
    [Show full text]
  • Republic of Kenya Ministry of Roads and Publicworks Feasibility Study, Detailed Engineering Design, Tender Administration and C
    ORIGINAL REPUBLIC OF KENYA COPY A I P O MINISTRY OF ROADS AND PUBLICWORKS I H T E O T T HI KA R IV ER CHANIA THIKA FEASIBILITY STUDY, DETAILED ENGINEERING DESIGN, TENDER ADMINISTRATION AND THIKA CONSTRUCTION SUPERVISION OF NAIROBI – THIKA ROAD (A2) PHASE 1 AND 2 JUJ A FEASIBILITY AND DETAILED ENGINEERING DESIGN RUIRU ENVIRONMENTAL AND SOCIAL IMPACT GITHURAIASSESSMENT STUDY REPORT KASSAR ANI FINAL REPORT RUARKA ` MUTHAI JULY 2007 GA PANGA MUSE NI UM NAIROBI GLOBE CINEMA R/A CONSULTING ENGINEERING SERVICES (INDIA) PRIVATE LIMITED 57, NEHRU PLACE, (5TH FLOOR), NEW DELHI - 110 019 in association with APEC LIMITED, NAIROBI Nairobi – Thika Road Upgrading project Sheet 1 of 88 2007025/Report 2/Environmental and Social Impact Assessment Study Report Proponent: Ministry of Roads and Public Works. Activity: Environmental and Social Impact Assessment Study on the proposed Rehabilitation and Upgrading of Nairobi – Thika road, A2. Report Title: Environmental Project Report (Scoping): Proposed Rehabilitation and Upgrading of Nairobi – Thika Road, A2. Consulting Engineers Consulting Engineers Services (India) Private Limited In association with APEC Consortium Limited P. O. Box 3786 – 00100, NAIROBI, KENYA, Tel. 254 020 606283 NEMA Registration No. 0836 of Firm of Experts: Signed: ____________________________ Date: _____________________ Mr. Harrison W. Ngirigacha (MSc. WERM, BSc. Chem. Reg. Expert (NEMA)) LEAD EIA EXPERT NEMA Reg. No. 0027 For: Consulting Engineers Name and Address of Proponent: The Permanent Secretary, Ministry of Roads and Public
    [Show full text]
  • Kenya, Groundwater Governance Case Study
    WaterWater Papers Papers Public Disclosure Authorized June 2011 Public Disclosure Authorized KENYA GROUNDWATER GOVERNANCE CASE STUDY Public Disclosure Authorized Albert Mumma, Michael Lane, Edward Kairu, Albert Tuinhof, and Rafik Hirji Public Disclosure Authorized Water Papers are published by the Water Unit, Transport, Water and ICT Department, Sustainable Development Vice Presidency. Water Papers are available on-line at www.worldbank.org/water. Comments should be e-mailed to the authors. Kenya, Groundwater Governance case study TABLE OF CONTENTS PREFACE .................................................................................................................................................................. vi ACRONYMS AND ABBREVIATIONS ................................................................................................................................ viii ACKNOWLEDGEMENTS ................................................................................................................................................ xi EXECUTIVE SUMMARY ............................................................................................................................................... xiv 1. INTRODUCTION ............................................................................................................................................. 1 1.1. GROUNDWATER: A COMMON RESOURCE POOL ....................................................................................................... 1 1.2. CASE STUDY BACKGROUND .................................................................................................................................
    [Show full text]
  • Nairobi-Thika-Transp
    FOREWORD I am pleased to introduce this 10-plan year which is a road map on how the Nairobi - Thika Superhighway Transport Corridor (NTTC) is geared to develop. This is the first comprehensive spatial plan covering the NTTC, which is within Ruiru and Juja Sub-Counties and it has been prepared at a time when Kiambu County is grappling with the challenges of tackling rapid urbanisation. I am happy to note that, this plan has been prepared in a participatory manner taking into account the contributions of various stakeholders whose role in the implementation of the proposals is fundamental. Kiambu is the third most urbanised County after Nairobi and Mombasa and has witnessed rapid urbanisation in the few decades with people moving into the County to settle, set business, and undertake other development activities. The NTTC has witnessed rapid urbanisation coupled with high population growth and economic activities in the last ten years since the onset of devolved government and the upgrading of the Nairobi-Thika Highway thus changing the corridor’s character. Due to this rapid growth as a County, we are expected to commit more investments to cope with this expansion. More people need to be accommodated in a suitable environment with ease of movement, adequate physical and social infrastructure and employment opportunities. However, most of this urbanisation is happening with little or no planning intervention as characterised by piecemeal subdivision and land-use conversions. Due to the absence of planning tools like the Plan to guide and manage this rapid urbanisation, the current development in these areas is suffering from uncoordinated growth, land use conflict, inadequate basic infrastructure facilities and services, poor housing, and inefficient public transportation system, amongst other challenges.
    [Show full text]
  • Industrialization of Athi River Town
    \l INDUSTRIALIZATION OF ATHI ( f RIVFR TOWN ' BY CALEB (m o * MIRERI This Thesis is submitted in partial fulfilment of the requ i rements of the degree of Masters of Arts in Planning in the Department of Urban and Regional Planning, Faculty of Architecture, Design and Development of the University of Nairobi. May 21st., 1992 DECLARATION This thesis is my original work and has not been presented for a degree in any other university. Cand idate---- 's“-— ^ ------ ignature ) Caleb Mc’Mireri DEPARTMENT OF URBAN AND REGIONAL PLANNING Faculty of Architecture. Design and Development P. 0. Bex 3 0 19 7 . Tel. 2 7 4 41 UNIVERSITY Of NAIROBI. This thesis has been submitted for examination with my approval as the University Supervisor. S i g n e d -^*3^l __ Dr. George Ngugi (Supervisor) June 21st, 1992. ITT DEDICATION In Memorium of Jaduong’ James Mireri IV Acknowledgement A great many people helped me develop this thesis most of whom I cannot mention their names here. 1 am indebted to them all but in particular to my Supervisor Dr. George Ngugi of the University of Nairobi. His comments were consistently thoughtful and insightful and he persistently sought to encourage and support me. Also, Dr. Peter Ngau of the University of Nairobi gave me a far reaching support throughout the time of this thesis writing, by his incisive comments. T also want to thank all academic members of staff and students of D.U.R.P, who listened to the early versions of this study in seminars and the information they offered was of great help.
    [Show full text]
  • KENYA POPULATION SITUATION ANALYSIS Kenya Population Situation Analysis
    REPUBLIC OF KENYA KENYA POPULATION SITUATION ANALYSIS Kenya Population Situation Analysis Published by the Government of Kenya supported by United Nations Population Fund (UNFPA) Kenya Country Oce National Council for Population and Development (NCPD) P.O. Box 48994 – 00100, Nairobi, Kenya Tel: +254-20-271-1600/01 Fax: +254-20-271-6058 Email: [email protected] Website: www.ncpd-ke.org United Nations Population Fund (UNFPA) Kenya Country Oce P.O. Box 30218 – 00100, Nairobi, Kenya Tel: +254-20-76244023/01/04 Fax: +254-20-7624422 Website: http://kenya.unfpa.org © NCPD July 2013 The views and opinions expressed in this report are those of the contributors. Any part of this document may be freely reviewed, quoted, reproduced or translated in full or in part, provided the source is acknowledged. It may not be sold or used inconjunction with commercial purposes or for prot. KENYA POPULATION SITUATION ANALYSIS JULY 2013 KENYA POPULATION SITUATION ANALYSIS i ii KENYA POPULATION SITUATION ANALYSIS TABLE OF CONTENTS LIST OF ACRONYMS AND ABBREVIATIONS ........................................................................................iv FOREWORD ..........................................................................................................................................ix ACKNOWLEDGEMENT ..........................................................................................................................x EXECUTIVE SUMMARY ........................................................................................................................xi
    [Show full text]
  • Download List of Physical Locations of Constituency Offices
    INDEPENDENT ELECTORAL AND BOUNDARIES COMMISSION PHYSICAL LOCATIONS OF CONSTITUENCY OFFICES IN KENYA County Constituency Constituency Name Office Location Most Conspicuous Landmark Estimated Distance From The Land Code Mark To Constituency Office Mombasa 001 Changamwe Changamwe At The Fire Station Changamwe Fire Station Mombasa 002 Jomvu Mkindani At The Ap Post Mkindani Ap Post Mombasa 003 Kisauni Along Dr. Felix Mandi Avenue,Behind The District H/Q Kisauni, District H/Q Bamburi Mtamboni. Mombasa 004 Nyali Links Road West Bank Villa Mamba Village Mombasa 005 Likoni Likoni School For The Blind Likoni Police Station Mombasa 006 Mvita Baluchi Complex Central Ploice Station Kwale 007 Msambweni Msambweni Youth Office Kwale 008 Lunga Lunga Opposite Lunga Lunga Matatu Stage On The Main Road To Tanzania Lunga Lunga Petrol Station Kwale 009 Matuga Opposite Kwale County Government Office Ministry Of Finance Office Kwale County Kwale 010 Kinango Kinango Town,Next To Ministry Of Lands 1st Floor,At Junction Off- Kinango Town,Next To Ministry Of Lands 1st Kinango Ndavaya Road Floor,At Junction Off-Kinango Ndavaya Road Kilifi 011 Kilifi North Next To County Commissioners Office Kilifi Bridge 500m Kilifi 012 Kilifi South Opposite Co-Operative Bank Mtwapa Police Station 1 Km Kilifi 013 Kaloleni Opposite St John Ack Church St. Johns Ack Church 100m Kilifi 014 Rabai Rabai District Hqs Kombeni Girls Sec School 500 M (0.5 Km) Kilifi 015 Ganze Ganze Commissioners Sub County Office Ganze 500m Kilifi 016 Malindi Opposite Malindi Law Court Malindi Law Court 30m Kilifi 017 Magarini Near Mwembe Resort Catholic Institute 300m Tana River 018 Garsen Garsen Behind Methodist Church Methodist Church 100m Tana River 019 Galole Hola Town Tana River 1 Km Tana River 020 Bura Bura Irrigation Scheme Bura Irrigation Scheme Lamu 021 Lamu East Faza Town Registration Of Persons Office 100 Metres Lamu 022 Lamu West Mokowe Cooperative Building Police Post 100 M.
    [Show full text]