World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document The World Bank Report No: ISR4369 Implementation Status & Results Kenya Energy Sector Recovery Project (P083131) Operation Name: Energy Sector Recovery Project (P083131) Project Stage: Implementation Seq.No: 15 Status: ARCHIVED Archive Date: Country: Kenya Approval FY: 2005 Public Disclosure Authorized Product Line:IBRD/IDA Region: AFRICA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Ministry of Energy, Kenya Power and Lighting Co. Ltd., KenGen Key Dates Board Approval Date 13-Jul-2004 Original Closing Date 31-Mar-2010 Planned Mid Term Review Date 30-Nov-2011 Last Archived ISR Date 29-Mar-2011 Public Disclosure Copy Effectiveness Date 04-Nov-2004 Revised Closing Date 30-Sep-2013 Actual Mid Term Review Date Project Development Objectives Energy Sector Recovery Project (P083131) Project Development Objective (from Project Appraisal Document) (a) enhance the policy, institutional and regulatory environment for sector development, including private sector participation;and(b) increase access to electricity in urban and peri-urban areas while improving the efficiency, reliability and quality ofservice to customers. Has the Project Development Objective been changed since Board Approval of the Program? Public Disclosure Authorized ● Yes No Component(s) Component Name Component Cost INSTITUTIONAL AND CAPACITY BUILDING 7.50 STUDIES AND ENGINEERING SERVICES 18.70 GENERATION, OLKARIA II PLANT EXTENSION 119.10 DISTRIBUTION UPGRADING 229.60 Overall Ratings Previous Rating Current Rating Public Disclosure Authorized Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview Public Disclosure Copy The Generation component is completed. The 3rd geothermal generating unit of 35 megawatts at Olkaria II is operational since May 2010. In the Distribution component, about US$ 40 million of World Bank financing has been disbursed in goods and works contracts. These investments have contributed to a doubling of the number of KPLC customers from 735 Page 1 of 6 Public Disclosure Authorized The World Bank Report No: ISR4369 thousand in 2005 to 1.46 million in 2010 and to a reduction in KPLC system losses over the same period from 18.1 per cent to 16.2 per cent. In the project's capacity building component, KPLC and KenGen staff have benefited from a range of training programs. In the Technical Assistance component a number of important studies that support sector reform and development have been completed. They include a tariff study, development of regulatory instruments to implement the 2006 Energy Act, a geothermal resource optimization study for Olkaria, a business plan study for the Geothermal Development Corporation and a number of feasibility studies for network expansion such as one for the 220kV Nairobi ring as well as an LPG handling and storage study. Several other studies are ongoing such as for a Liquefied Natural Gas (LNG) terminal, wind resource mapping and an electricity network system study aimed at optimizing the design, function and operation of the system. The major activities of the institutional strengthening of KPLC have been completed with good results. Locations Country First Administrative Division Location Planned Actual Kenya Nairobi Area Westlands Public Disclosure Copy Kenya Coast Province Watamu Kenya Coast Province Voi Kenya Coast Province Tana River District Kenya Rift Valley Province Sondu Kenya Nairobi Area Ruaraka Kenya Rift Valley Province Olkaria Kenya Rift Valley Province Njoro Nyoka Sub-Location Kenya Not Entered Ngong Road Kenya Rift Valley Province Nakuru Kenya Rift Valley Province Naivasha Kenya Nairobi Area Nairobi South Kenya Nairobi Area Nairobi Kenya Coast Province Mombasa District Kenya Coast Province Mombasa Kenya Rift Valley Province Molo Kenya Coast Province Miwani Kenya Eastern Marsabit Public Disclosure Copy Kenya Coast Province Malindi Page 2 of 6 The World Bank Report No: ISR4369 Country First Administrative Division Location Planned Actual Kenya Central Province Makuyu Kenya Rift Valley Province Makutano Kenya Coast Province Likoni Kenya Rift Valley Province Lessos Sub-Location Kenya Rift Valley Province Lanet Kenya Coast Province Kwale District Public Disclosure Copy Kenya Nyanza Province Kisii Kenya Not Entered Mount Kenya Kenya Not Entered Republic of Kenya Kenya Nairobi Area Kariobangi Kenya Nairobi Area Karen Kenya Coast Province Kanamai Kenya Central Province Kamburu Sub-Location Kenya Eastern Embu Kenya Eastern Embori Farm Kenya Rift Valley Province Eldama Ravine Kenya Nairobi Area Dandora Kenya Central Province Chinga Location Kenya Rift Valley Province Cherangany Hills Kenya Western Province Butere Kenya Nyanza Province Bondo Kenya Coast Province Bamburi Kenya Eastern Athi River Public Disclosure Copy Results Page 3 of 6 The World Bank Report No: ISR4369 Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Energy Law to support implementation of the Text Value Electricity law inadequate to Energy Act is largely Energy Act implemented. National Energy Policy is passed and support envisaged regulatory implemented implemented changes. Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments A number of items of secondary legislation that were pending have been drafted and will be gazetted in September 2011 for 40 days Public Disclosure Copy of public review before submission to the Attorney General Number of Independent Power Producers Text Value 2 5 8 (IPPs). Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments Target is on track. Percentage of disputes & complaints resolved Text Value N/A Target is on track 95 annually by ERC. Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments Value for FY10 is pending Households connected to electricity under the Text Value 0 350,000 (estimate) 450,000 project (cumulative number) Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments Target is on track Number of combined monthly distribution line Text Value 4.7 3 2 interruptions per 100km for 66kV and 333kV lines Date 13-Dec-2004 08-Sep-2011 30-Sep-2013 Comments Target is on track Number of people in urban areas provided with Number Value 0.00 1750000.00 2250000.00 access to electricity under the project by household connections Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments Estimate. Target is on track Assumes average household size of 5 (5*450,000 =2,250,000 Intermediate Results Indicators Public Disclosure Copy Page 4 of 6 The World Bank Report No: ISR4369 Indicator Name Core Unit of Measure Baseline Current End Target Sector regulatory agency is established, fully Text Value No sector-wide energy ERC is fully operational ERC fully operational. staffed, and operational. regulatory agency. Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments Target is met. National energy policy for efficient development Text Value No national energy policy. National energy policy in National energy policy in and operation of the sector is adopted and place place. implemented by the GOK. Date 31-Dec-2013 08-Sep-2011 30-Sep-2013 Comments Target is met. Annual transmission and distribution losses (% Text Value 18.7 16.0 in FY10 and 16.2 in 15.0 Public Disclosure Copy of energy purchased by KPLC). FY11 Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments There was an increase in losses to 16.2% in FY11 due in part to increased transfers of power between regions. The regulated target was 15.4%. The Regulator is reviewing the explanations provided by KPLC and the Bank will be provided a report. Generating capacity added under the project Text Value 0 35 35 (MW). Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments Target met. Olkaria II Unit 3 (35MW) became fully operational in May 2010. Kilometers of distribution lines constructed or Text Value 0 1,200 (estimate) 1,775 rehabilitated under the project (66kV, 33 kV, 11kV) (cumulative). Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments Value to be provided by KPLC is pending. Number of substations constructed or Text Value 0 30 (estimate) 45 rehabilitated under the project (cumulative). Date 31-Dec-2004 08-Sep-2011 30-Sep-2013 Comments Value to be provided by KPLC is pending. Public Disclosure Copy Data on Financial Performance (as of 15-Sep-2011) Financial Agreement(s) Key Dates Page 5 of 6 The World Bank Report No: ISR4369 Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P083131 IDA-39580 Effective 13-Jul-2004 04-Aug-2004 04-Nov-2004 30-Sep-2013 P083131 IDA-45720 Effective 02-Apr-2009 08-May-2009 03-Jul-2009 30-Sep-2013 P103458 TF-57573 Effective 14-Nov-2006 14-Nov-2006 11-Jun-2010 31-Dec-2018 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P083131 IDA-39580 Effective USD 80.00 80.00 0.00 75.49 9.91 94.00 P083131 IDA-45720 Effective USD 80.00 80.00 0.00 14.52 70.28 18.00 P103458 TF-57573 Effective USD 8.70 8.70 0.00 0.25 5.88 3.00 Public Disclosure Copy Disbursement Graph Key Decisions Regarding Implementation No decisions for disclosure Restructuring History CD Approved on 26-Nov-2008, Board Approved on 02-Apr-2009 Public Disclosure Copy Related Projects P103458-Kenya KenGen Carbon Finance umbrella, P110173-Kenya - Energy Sector Recovery Project Additional Financing Page 6 of 6.
Recommended publications
  • Comparative Overview of Gases Discharged from Menengai and Olkaria High Temperature Geothermal Fields, Kenya
    Proceedings 5th African Rift geothermal Conference Arusha, Tanzania, 29-31 October 2014 Comparative Overview of Gases Discharged from Menengai and Olkaria High Temperature Geothermal Fields, Kenya 1Jeremiah K., Ochieng L., Mibei G., Kanda K. and Suwai J. Geothermal Development Company P.O.Box 17700 – 20100, Nakuru Kenya [email protected] Key words: Menengai, reservoir characteristics, Olkaria, discharge vapors, triangular diagrams ABSTRACT An analogy of representative gas compositions from wells drilled into the Menengai and Olkaria volcanic geothermal systems is presented in this paper with a view of drawing parallels as well as identifying variances in the characteristics of the reservoirs tapped by the wells. This contribution seeks to provide an insight into the possible processes that govern the composition of well discharge vapors as well as characterize the Menengai and Olkaria geothermal reservoirs. To achieve this, triangular diagrams comprising two major chemical constituents, H2O and CO2, together with other gas species H2S, H2, CH4 and N2 were employed to compare the chemical characteristics of vapors discharged from these two systems. It is found that the Olkaria reservoir fluids generally exhibit high H2O/CO2 ratios relative to the Menengai fluids. This is attributed to variations in CO2 gas content. High H2S content seems to characterize Menengai wells, particularly those that discharge from the vapor dominated zones. This inference is indicative of either a higher flux of magmatic gas or enhanced boiling in the reservoir as a consequence of a higher heat flux. The latter is found to be common in the wells as this inference is also complemented by the significantly high H2 content reported.
    [Show full text]
  • Download Publication
    BRIEFING NOTE November 2013 UP IN SMOKE? MAASAI RIGHTS IN THE OLKARIA GEOTHERMAL AREA, KENYA he Olkaria geothermal power generation project is Ttouted as the largest such project in the world. Lo- cated approximately 120 km west of Nairobi, in Nakuru County, Kenya, the Olkaria geothermal field covers ap- proximately 75 sq. km and was gazetted as a Geothermal Resource Area in 1971. Three power stations are cur- rently adding 158 MW1 to the national grid while a fourth is under construction. The Kenya Electricity Generating Company (KENGEN), a wholly-owned state corporation, operates three of the four power stations while Orpower4 Inc, a wholly-owned subsidiary of US-based Ormat Tech- nologies, will operate the fourth. The Olkaria geothermal power projects generate in- come by selling electricity to the Kenya Power and Light- ing Company, a government-owned power distribution monopoly. Olkaria is also registered as a Clean Develop- ment Mechanism (CDM) project under the Kyoto Protocol to the United Nations Framework Convention on Climate Change. 2 The Olkaria geothermal power generation project is being funded by the Government of Kenya, and through loans from the World Bank, European Investment Bank, Deutsche Investitions- und Entwicklungsgesellschaft mbH,3 KfW Entwicklungsbank (KfW Development Bank) and the Overseas Private Investment Corporation.4 While the Olkaria geothermal power project lights up the nation, however, the Maasai people living in the area have consistently raised concerns that the project is dimming their lives. Olkaria has been their only home since the 18th century. And not only are they having to 1 Olkaria I (45 MW) and Olkaria II (65 MW), with a third private plant Olkaria III (48 MW) 2 An international agreement linked to the United Nations Framework Con- vention on Climate Change, which commits its Parties by setting interna- tionally binding emission reduction targets: http://cdm.unfccc.int/Projects/ DB/DNV-CUK1276170328.71/view.
    [Show full text]
  • Sediment Dynamics and Improvised Control Technologies in the Athi River Drainage Basin, Kenya
    Sediment Dynamics in Changing Environments (Proceedings of a symposium held 485 in Christchurch, New Zealand, December 2008). IAHS Publ. 325, 2008. Sediment dynamics and improvised control technologies in the Athi River drainage basin, Kenya SHADRACK MULEI KITHIIA Postgraduate Programme in Hydrology, Department of Geography and Environmental Studies, University of Nairobi, PO Box 30197, 00100 GPO, Nairobi, Kenya [email protected] Abstract In Kenya, the changing of land-use systems from the more traditional systems of the 1960s to the present mechanized status, contributes enormous amounts of sediments due to water inundations. The Athi River drains areas that are subject to intense agricultural, industrial, commercial and population settlement activities. These activities contribute immensely to the processes of soil erosion and sediment transport, a phenomenon more pronounced in the middle and lower reaches of the river where the soils are much more fragile and the river tributaries are seasonal in nature. Total Suspended Sediments (TSS) equivalent to sediment fluxes of 13 457, 131 089 and 2 057 487 t year-1 were recorded in the headwater areas, middle and lower reaches of the river, respectively. These varying trends in sediment transport and amount are mainly due to the chemical composition of the soil coupled with the land-soil conservation measures already in practice, and which started in the 1930s and reached their peak in the early 1980s. This paper examines trends in soil erosion and sediment transport dynamics progressively downstream. The land-use activities and soil conservation, control and management technologies, which focus on minimizing the impacts of overland flow, are examined to assess the economic and environmental sustainability of these areas, communal societal benefits and the country in general.
    [Show full text]
  • Baseline Review and Ecosystem Services Assessment of the Tana River Basin, Kenya
    IWMI Working Paper Baseline Review and Ecosystem Services Assessment of the Tana 165 River Basin, Kenya Tracy Baker, Jeremiah Kiptala, Lydia Olaka, Naomi Oates, Asghar Hussain and Matthew McCartney Working Papers The publications in this series record the work and thinking of IWMI researchers, and knowledge that the Institute’s scientific management feels is worthy of documenting. This series will ensure that scientific data and other information gathered or prepared as a part of the research work of the Institute are recorded and referenced. Working Papers could include project reports, case studies, conference or workshop proceedings, discussion papers or reports on progress of research, country-specific research reports, monographs, etc. Working Papers may be copublished, by IWMI and partner organizations. Although most of the reports are published by IWMI staff and their collaborators, we welcome contributions from others. Each report is reviewed internally by IWMI staff. The reports are published and distributed both in hard copy and electronically (www.iwmi.org) and where possible all data and analyses will be available as separate downloadable files. Reports may be copied freely and cited with due acknowledgment. About IWMI IWMI’s mission is to provide evidence-based solutions to sustainably manage water and land resources for food security, people’s livelihoods and the environment. IWMI works in partnership with governments, civil society and the private sector to develop scalable agricultural water management solutions that have
    [Show full text]
  • Geology of the Nairobi Region, Kenya
    % % % % % % % % %% %% %% %% %% %% %% % GEOLOGIC HISTORY % %% %% % % Legend %% %% %% %% %% %% %% % % % % % % HOLOCENE: %% % Pl-mv Pka %%% Sediments Mt Margaret U. Kerichwa Tuffs % % % % %% %% % Longonot (0.2 - 400 ka): trachyte stratovolcano and associated deposits. Materials exposed in this map % %% %% %% %% %% %% % section are comprised of the Longonot Ash Member (3.3 ka) and Lower Trachyte (5.6-3.3 ka). The % Pka' % % % % % % L. Kerichwa Tuff % % % % % % Alluvial fan Pleistocene: Calabrian % % % % % % % Geo% lo% gy of the Nairobi Region, Kenya % trachyte lavas were related to cone building, and the airfall tuffs were produced by summit crater formation % % % % % % % % % % % % % % % % % Pna % % % % %% % (Clarke et al. 1990). % % % % % % Pl-tb % % Narok Agglomerate % % % % % Kedong Lake Sediments Tepesi Basalt % % % % % % % % % % % % % % % % %% % % % 37.0 °E % % % % 36.5 °E % % % % For area to North see: Geology of the Kijabe Area, KGS Report 67 %% % % % Pnt %% % PLEISTOCENE: % % %% % % % Pl-kl %% % % Nairobi Trachyte % %% % -1.0 ° % % % % -1.0 ° Lacustrine Sediments % % % % % % % % Pleistocene: Gelasian % % % % % Kedong Valley Tuff (20-40 ka): trachytic ignimbrites and associated fall deposits created by caldera % 0 % 1800 % % ? % % % 0 0 % % % 0 % % % % % 0 % 0 8 % % % % % 4 % 4 Pkt % formation at Longonot. There are at least 5 ignimbrite units, each with a red-brown weathered top. In 1 % % % % 2 % 2 % % Kiambu Trachyte % Pl-lv % % % % % % % % % % %% % % Limuru Pantellerite % % % % some regions the pyroclastic glass and pumice has been
    [Show full text]
  • Kenya, Groundwater Governance Case Study
    WaterWater Papers Papers Public Disclosure Authorized June 2011 Public Disclosure Authorized KENYA GROUNDWATER GOVERNANCE CASE STUDY Public Disclosure Authorized Albert Mumma, Michael Lane, Edward Kairu, Albert Tuinhof, and Rafik Hirji Public Disclosure Authorized Water Papers are published by the Water Unit, Transport, Water and ICT Department, Sustainable Development Vice Presidency. Water Papers are available on-line at www.worldbank.org/water. Comments should be e-mailed to the authors. Kenya, Groundwater Governance case study TABLE OF CONTENTS PREFACE .................................................................................................................................................................. vi ACRONYMS AND ABBREVIATIONS ................................................................................................................................ viii ACKNOWLEDGEMENTS ................................................................................................................................................ xi EXECUTIVE SUMMARY ............................................................................................................................................... xiv 1. INTRODUCTION ............................................................................................................................................. 1 1.1. GROUNDWATER: A COMMON RESOURCE POOL ....................................................................................................... 1 1.2. CASE STUDY BACKGROUND .................................................................................................................................
    [Show full text]
  • Industrialization of Athi River Town
    \l INDUSTRIALIZATION OF ATHI ( f RIVFR TOWN ' BY CALEB (m o * MIRERI This Thesis is submitted in partial fulfilment of the requ i rements of the degree of Masters of Arts in Planning in the Department of Urban and Regional Planning, Faculty of Architecture, Design and Development of the University of Nairobi. May 21st., 1992 DECLARATION This thesis is my original work and has not been presented for a degree in any other university. Cand idate---- 's“-— ^ ------ ignature ) Caleb Mc’Mireri DEPARTMENT OF URBAN AND REGIONAL PLANNING Faculty of Architecture. Design and Development P. 0. Bex 3 0 19 7 . Tel. 2 7 4 41 UNIVERSITY Of NAIROBI. This thesis has been submitted for examination with my approval as the University Supervisor. S i g n e d -^*3^l __ Dr. George Ngugi (Supervisor) June 21st, 1992. ITT DEDICATION In Memorium of Jaduong’ James Mireri IV Acknowledgement A great many people helped me develop this thesis most of whom I cannot mention their names here. 1 am indebted to them all but in particular to my Supervisor Dr. George Ngugi of the University of Nairobi. His comments were consistently thoughtful and insightful and he persistently sought to encourage and support me. Also, Dr. Peter Ngau of the University of Nairobi gave me a far reaching support throughout the time of this thesis writing, by his incisive comments. T also want to thank all academic members of staff and students of D.U.R.P, who listened to the early versions of this study in seminars and the information they offered was of great help.
    [Show full text]
  • An Electrical Resistivity Study of the Area Between Mt. Suswa and The
    AN ELECTRICAL RESISTIVITY STUDY OF THE AREA BETWEEN MT. SUSWA AND * M THE OLKARIA GEOTHERMAL FIELD, KENYA STEPHEN ALUMASA ONACONACHA IIS TUF.sis n\sS rREEN e e n ACCEPTED m ^ e i t e d ^ fFOE HE DECREE of nd A COt'V M&vA7 BE PLACED IN 'TH& njivk.RSITY LIBRARY. A thesis submitted in accordance with the requirement for partial fulfillment of the V Degree of Master of Science DEPT. OF GEOLOGY UNIVERSITY OF NAIROBI 1989 DECLARATION jhis is my original work and has not b e e n submitted for a degree in any other university S . A . ONACHA The thesis has been submitted for examination with our Knowledge as University Supervisors: /] Mr. E. DINDI ACKNOWLEDGEMENTS I wish to thank my supervisors Dr. M.P. Tole and Mr. E. Dindi for their invaluable help and advice during the course of ray studies. I am grateful to the staff of the Ministry of Energy especially Mr. Kinyariro and Mr. Kilele for their tremendous help during the data acquisition. I also wish to express my appreciation of the University of Nairobi for their MSc Scholarship during my study. I am grateful to the British Council for their fellowship that enabled me to carry out data analysis at the University of Edinburgh. A ^ Finally, I wish to thank the members of my family for their love and understanding during my studies. ABSTRACT The D. C. electrical resistivity study of Suswa-Olkaria region was carried out from July 1987 to November, 1988. The main objective was to evaluate the sub-surface geoelectric structure with a view to determining layers that might be associated with geothermal fluid migrations.
    [Show full text]
  • Project: Menengai Geothermal Development Project Country: Kenya
    Language: English Original: English PROJECT: MENENGAI GEOTHERMAL DEVELOPMENT PROJECT COUNTRY: KENYA PROJECT APPRAISAL REPORT November, 2011 Team Leader T. BAH, Senior Power Engineer ONEC.2 3184 Team Members Y. ARFAOUI, Chief Renewable Energy Specialist ONEC.3 2308 K. NTOAMPE, Principal Environmentalist ONEC.3 2707 M. HASSANE, Principal Procurement Specialist KEFO 6243 D. MCIVER, Principal Legal Counsel GECL.1 2678 Project F. KANONDA, Senior Financial Analyst ONEC.2 2723 Appraisal R. ARON, Senior Social Development Specialist ONEC.3 2792 Team E. NGODE, Finance Management Specialist KEFO 6230 A. KLEVCHUK, Financial Modelling Specialist OPSM 1975 Sector Manager E. NEGASH, Officer In Charge ONEC.2 3081 Sector Director H. CHEIKHROUHOU ONEC 2140 Regional Director G. NEGATU OREA 2040 N. KULEMEKA, Chief Socio‐Economist ONEC.3 2336 M. CISSE, Chief Investment Officer OPSM.3 1906 Peer R. CLAUDET, Chief Investment Officer OPSM.3 2666 Reviewers G. MAKAJUMA , Infrastructure Specialist KEFO 6073 Martin Njoroge Mwangi, External Peer Reviewer n/a n/a TABLE OF CONTENTS 1 STRATEGIC THRUST AND RATIONALE .................................................................... 1 1.1 Project Linkages with Country Strategy and Objectives ............................................ 1 1.2 Rationale for Bank Involvement ................................................................................. 1 1.3 Aid Coordination ......................................................................................................... 3 2 PROJECT DESCRIPTION ...............................................................................................
    [Show full text]
  • Republic of Kenya
    SFG1405 V12 REPUBLIC OF KENYA Public Disclosure Authorized MINISTRY OF TRANSPORT, INFRASTRUCTURE, Public Disclosure Authorized HOUSING AND URBAN DEVELOPMENT ENVIRONMENTAL AND SOCIAL ASSESSMENT PROJECT REPORT Public Disclosure Authorized (ESIA) PROPOSED CONSTRUCTION OF KIKUYU RAILWAY STATION 29th March 2017 Public Disclosure Authorized Project Ref No.EHS-5240-522708-03 Kikuyu Railway Station ESIA Report Version: Final CERTIFICATION SGS Kenya Limited was commissioned by the Ministry of Transport, Infrastructure, housing and Urban Development to undertake Environmental and Social Impact Assessment for the proposed construction of Kikuyu Railway Station in Kiambu County. The Report has been written in accordance with the Environmental Management and Coordination Act no. 8 of 1999 and The Environmental (Impact Assessment and Audit) Regulations, 2003 for submission to the National Environmental Management Authority (NEMA). SGS Kenya Limited submits this Environmental and Social Impact Assessment Report, to NEMA Kenya. To the best of our knowledge, all the information in this report is true and correct. Proponent: Ministry of Transport, Infrastructure, Housing and Urban Development Eng. John Ndirangu Maina Project Coordinator Name of Officer Designation ………………………………. ……………………………… Signature / Official Stamp Date Submitted by: Firm of Experts: SGS Kenya Limited Reg. No. 0280 ………………………………. Official Stamp Approved by: ………………………………….. ………………………………….. Signature Date Mr. Philip Abuor: Environmental Services Manager EIA/EA Lead Expert Reg. No.1710 NAMSIP
    [Show full text]
  • ESIA 1279 Ruiru II Dam Report
    ATHI WATER SERVICES BOARD RUIRU II DAM WATER SUPPLY PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT STUDY REPORT JULY 2016 Environmental Safeguards Consultants (ESC) Limited Page | 1 If you have to print, we suggest you use, for economic and ecological reasons, double‐sided printas much as possible. Page | 2 TABLE OF CONTENTS ACRONYMS AND ABBREVIATIONS ..................................................................................7 EXECUTIVE SUMMARY ........................................................................................................9 Project Background............................................................................................................................ 9 Project Need and Justification............................................................................................................ 9 The ESIA Study and Objective .......................................................................................................... 9 Project Description and Components................................................................................................. 9 Project Cost...................................................................................................................................... 11 ESIA Approach and Methodology................................................................................................... 11 Public Consultation, Participation and Disclosure........................................................................... 12 Policy, Legal and Administrative
    [Show full text]
  • Appendix 11 Future Socio-Economic Framework
    APPENDIX 11 FUTURE SOCIO-ECONOMIC FRAMEWORK Page 11.1 DEVELOPMENT POTENTIAL AND CONSTRAINT A11-1 11.2 URBAN LAND USE TYPES AND DISTRIBUTING PRINCIPLES A11-4 NUTRANS The Study on Master Plan for Urban Transport in the Nairobi Metropolitan Area APPENDIX 11 FUTURE SOCIO-ECONOMIC FRAMEWORK 11.1 DEVELOPMENT POTENTIAL AND CONSTRAINT Water Supply Capacity The existing water supply in the Nairobi City has four sources, namely Kikuyu Spring, Sasumua Dam, Ruiru Dam, and Ngethu. Water shortage is a growing problem in the Nairobi Metropolitan Area because of the water loss reportedly amounting to some 50% of total water supply and expanding population. Water supply plan with target year 2000 was formulated in the “Third Nairobi Water Supply Project". The projected population of Nairobi City would be 3.86 million and corresponding projected water demand would be 752.2 thousand cubic meters per day in 2010. Planned area of piped water supply covers the whole Nairobi City and some part of Ruiru to the north, and Syokimau to the southeast. Local area water supply projects are proposed in Ngong and Ongata Rongai to the southwest and Western Shamba Area to the northwest of Nairobi City. Gravity type water supply system can be applicable to the areas less than 1,700m above sea level in the Nairobi Metropolitan Region (See Figure 11.1-1). FIGURE 11.1-1 WATER SUPPLY SCHEME IN NAIROBI CITY Final Report Appendix A11-1 NUTRANS The Study on Master Plan for Urban Transport in the Nairobi Metropolitan Area Sewerage Treatment Plan The whole Nairobi City is not covered by the existing sewerage system managed by Nairobi City Water and Sewerage Company.
    [Show full text]