ESIA 1279 Ruiru II Dam Report ATHI WATER SERVICES BOARD RUIRU II DAM WATER SUPPLY PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT STUDY REPORT JULY 2016 Environmental Safeguards Consultants (ESC) Limited Page | 1 If you have to print, we suggest you use, for economic and ecological reasons, double‐sided printas much as possible. Page | 2 TABLE OF CONTENTS ACRONYMS AND ABBREVIATIONS ..................................................................................7 EXECUTIVE SUMMARY ........................................................................................................9 Project Background............................................................................................................................ 9 Project Need and Justification............................................................................................................ 9 The ESIA Study and Objective .......................................................................................................... 9 Project Description and Components................................................................................................. 9 Project Cost...................................................................................................................................... 11 ESIA Approach and Methodology................................................................................................... 11 Public Consultation, Participation and Disclosure........................................................................... 12 Policy, Legal and Administrative Framework ................................................................................. 12 Project Impacts................................................................................................................................. 12 Anticipated Positive Impacts (Socio-Economic).............................................................................. 12 Adverse Project Impacts and Mitigation Measures (Biophysical and Socio-Economic)................. 13 Cumulative Effect Assessment (CEA)............................................................................................. 18 Induced Impacts ............................................................................................................................... 19 Socio-Economic Adverse Impacts and Mitigation Measures .......................................................... 19 Dam Safety....................................................................................................................................... 21 Environmental and Social Management Plan .................................................................................. 23 Conclusion ....................................................................................................................................... 23 1 INTRODUCTION............................................................................................................25 1.1 Background and Context ................................................................................................... 25 1.2 The Project......................................................................................................................... 25 1.3 ESIA Terms of Reference................................................................................................... 26 1.4 ESIA Objectives.................................................................................................................. 27 1.4.1 The Approach.................................................................................................................. 28 1.4.2 Scoping Process .............................................................................................................. 28 1.4.3 Documentary Review ...................................................................................................... 28 1.4.4 Field Assessment............................................................................................................. 29 1.4.5 Detailed ESIA Study Activities ........................................................................................ 29 1.4.6 Public and Stakeholder Consultations ............................................................................ 30 1.5 Format and Content of the Report ................................................................................... 31 1.6 ESIA Study Team................................................................................................................ 31 2 PROJECT DESCRITION.................................................................................................32 2.1 Background Information..................................................................................................... 32 2.2 Project Overview............................................................................................................... 33 2.2.1 Components of Ruiru II Water Supply Project................................................................ 33 2.3 Project Location................................................................................................................. 34 2.4 Project Justification............................................................................................................. 37 2.5 Dam Description................................................................................................................ 38 2.5.1 Overview ......................................................................................................................... 38 2.5.2 Hydrological Design ....................................................................................................... 38 2.5.3 Geological and Geotechnical Dam Design..................................................................... 39 2.5.4 Sourcing of Materials – Earthwork Hauling................................................................... 39 2.5.5 Main Annexes and Building Description......................................................................... 39 2.6 Raw Water Transfer .......................................................................................................... 42 2.7 Water Treatment Plant...................................................................................................... 42 2.8 Treated Water Transfer and Reservoirs ........................................................................... 43 2.9 Project Implementation Schedule ...................................................................................... 44 2.10 Project Cost Estimate ...................................................................................................... 45 Page | 3 3 POLICY LEGAL AND INSTITUTIONAL FRAMEWORK ..........................................46 3.1 Context .............................................................................................................................. 46 3.2 Governance and Administrative Structure ........................................................................ 46 3.2.1 Ministry of Environment, Natural Resources and Regional Development Authorities... 47 3.2.2 Ministry of Water and Irrigation..................................................................................... 47 3.2.3 National Environment Management Authority ............................................................... 47 3.2.4 Water Resources Management Authority........................................................................ 47 3.2.5 Water Services Regulatory Board (WASREB) ................................................................ 47 3.2.6 Water Services Trust Fund (WSTF) ................................................................................ 47 3.2.7 Water Services Boards .................................................................................................... 48 3.2.8 Water Services Providers................................................................................................ 48 3.2.9 Other Government Agencies ........................................................................................... 48 3.3 IFC Performance Standards ............................................................................................... 56 3.4 World Bank Safeguard Policies .......................................................................................... 59 3.4.1 OP/BP 4.01 (Environmental Assessment)....................................................................... 59 3.4.2 OP/BP 4.04 (Natural Habitats)....................................................................................... 61 3.4.3 OP/BP 4.11 (Physical Cultural Resources) .................................................................... 61 3.4.4 OP/BP 4.12 (Involuntary Resettlement).......................................................................... 62 3.4.5 OP/BP 4.36 (Forests)...................................................................................................... 62 3.4.6 OP/BP 4.10 (Indigenous Peoples) .................................................................................. 62 3.4.7 OP/BP 4.09 (Pests Management).................................................................................... 63 3.4.8 Activities Triggering World Bank Safeguards................................................................. 63 OP/BP 4.09 (Pests Control Management) ................................................................................... 64 OP/BP 4.37 (Safety of Dams).....................................................................................................
Recommended publications
  • Sediment Dynamics and Improvised Control Technologies in the Athi River Drainage Basin, Kenya
    Sediment Dynamics in Changing Environments (Proceedings of a symposium held 485 in Christchurch, New Zealand, December 2008). IAHS Publ. 325, 2008. Sediment dynamics and improvised control technologies in the Athi River drainage basin, Kenya SHADRACK MULEI KITHIIA Postgraduate Programme in Hydrology, Department of Geography and Environmental Studies, University of Nairobi, PO Box 30197, 00100 GPO, Nairobi, Kenya [email protected] Abstract In Kenya, the changing of land-use systems from the more traditional systems of the 1960s to the present mechanized status, contributes enormous amounts of sediments due to water inundations. The Athi River drains areas that are subject to intense agricultural, industrial, commercial and population settlement activities. These activities contribute immensely to the processes of soil erosion and sediment transport, a phenomenon more pronounced in the middle and lower reaches of the river where the soils are much more fragile and the river tributaries are seasonal in nature. Total Suspended Sediments (TSS) equivalent to sediment fluxes of 13 457, 131 089 and 2 057 487 t year-1 were recorded in the headwater areas, middle and lower reaches of the river, respectively. These varying trends in sediment transport and amount are mainly due to the chemical composition of the soil coupled with the land-soil conservation measures already in practice, and which started in the 1930s and reached their peak in the early 1980s. This paper examines trends in soil erosion and sediment transport dynamics progressively downstream. The land-use activities and soil conservation, control and management technologies, which focus on minimizing the impacts of overland flow, are examined to assess the economic and environmental sustainability of these areas, communal societal benefits and the country in general.
    [Show full text]
  • Baseline Review and Ecosystem Services Assessment of the Tana River Basin, Kenya
    IWMI Working Paper Baseline Review and Ecosystem Services Assessment of the Tana 165 River Basin, Kenya Tracy Baker, Jeremiah Kiptala, Lydia Olaka, Naomi Oates, Asghar Hussain and Matthew McCartney Working Papers The publications in this series record the work and thinking of IWMI researchers, and knowledge that the Institute’s scientific management feels is worthy of documenting. This series will ensure that scientific data and other information gathered or prepared as a part of the research work of the Institute are recorded and referenced. Working Papers could include project reports, case studies, conference or workshop proceedings, discussion papers or reports on progress of research, country-specific research reports, monographs, etc. Working Papers may be copublished, by IWMI and partner organizations. Although most of the reports are published by IWMI staff and their collaborators, we welcome contributions from others. Each report is reviewed internally by IWMI staff. The reports are published and distributed both in hard copy and electronically (www.iwmi.org) and where possible all data and analyses will be available as separate downloadable files. Reports may be copied freely and cited with due acknowledgment. About IWMI IWMI’s mission is to provide evidence-based solutions to sustainably manage water and land resources for food security, people’s livelihoods and the environment. IWMI works in partnership with governments, civil society and the private sector to develop scalable agricultural water management solutions that have
    [Show full text]
  • Geology of the Nairobi Region, Kenya
    % % % % % % % % %% %% %% %% %% %% %% % GEOLOGIC HISTORY % %% %% % % Legend %% %% %% %% %% %% %% % % % % % % HOLOCENE: %% % Pl-mv Pka %%% Sediments Mt Margaret U. Kerichwa Tuffs % % % % %% %% % Longonot (0.2 - 400 ka): trachyte stratovolcano and associated deposits. Materials exposed in this map % %% %% %% %% %% %% % section are comprised of the Longonot Ash Member (3.3 ka) and Lower Trachyte (5.6-3.3 ka). The % Pka' % % % % % % L. Kerichwa Tuff % % % % % % Alluvial fan Pleistocene: Calabrian % % % % % % % Geo% lo% gy of the Nairobi Region, Kenya % trachyte lavas were related to cone building, and the airfall tuffs were produced by summit crater formation % % % % % % % % % % % % % % % % % Pna % % % % %% % (Clarke et al. 1990). % % % % % % Pl-tb % % Narok Agglomerate % % % % % Kedong Lake Sediments Tepesi Basalt % % % % % % % % % % % % % % % % %% % % % 37.0 °E % % % % 36.5 °E % % % % For area to North see: Geology of the Kijabe Area, KGS Report 67 %% % % % Pnt %% % PLEISTOCENE: % % %% % % % Pl-kl %% % % Nairobi Trachyte % %% % -1.0 ° % % % % -1.0 ° Lacustrine Sediments % % % % % % % % Pleistocene: Gelasian % % % % % Kedong Valley Tuff (20-40 ka): trachytic ignimbrites and associated fall deposits created by caldera % 0 % 1800 % % ? % % % 0 0 % % % 0 % % % % % 0 % 0 8 % % % % % 4 % 4 Pkt % formation at Longonot. There are at least 5 ignimbrite units, each with a red-brown weathered top. In 1 % % % % 2 % 2 % % Kiambu Trachyte % Pl-lv % % % % % % % % % % %% % % Limuru Pantellerite % % % % some regions the pyroclastic glass and pumice has been
    [Show full text]
  • Republic of Kenya Ministry of Roads and Publicworks Feasibility Study, Detailed Engineering Design, Tender Administration and C
    ORIGINAL REPUBLIC OF KENYA COPY A I P O MINISTRY OF ROADS AND PUBLICWORKS I H T E O T T HI KA R IV ER CHANIA THIKA FEASIBILITY STUDY, DETAILED ENGINEERING DESIGN, TENDER ADMINISTRATION AND THIKA CONSTRUCTION SUPERVISION OF NAIROBI – THIKA ROAD (A2) PHASE 1 AND 2 JUJ A FEASIBILITY AND DETAILED ENGINEERING DESIGN RUIRU ENVIRONMENTAL AND SOCIAL IMPACT GITHURAIASSESSMENT STUDY REPORT KASSAR ANI FINAL REPORT RUARKA ` MUTHAI JULY 2007 GA PANGA MUSE NI UM NAIROBI GLOBE CINEMA R/A CONSULTING ENGINEERING SERVICES (INDIA) PRIVATE LIMITED 57, NEHRU PLACE, (5TH FLOOR), NEW DELHI - 110 019 in association with APEC LIMITED, NAIROBI Nairobi – Thika Road Upgrading project Sheet 1 of 88 2007025/Report 2/Environmental and Social Impact Assessment Study Report Proponent: Ministry of Roads and Public Works. Activity: Environmental and Social Impact Assessment Study on the proposed Rehabilitation and Upgrading of Nairobi – Thika road, A2. Report Title: Environmental Project Report (Scoping): Proposed Rehabilitation and Upgrading of Nairobi – Thika Road, A2. Consulting Engineers Consulting Engineers Services (India) Private Limited In association with APEC Consortium Limited P. O. Box 3786 – 00100, NAIROBI, KENYA, Tel. 254 020 606283 NEMA Registration No. 0836 of Firm of Experts: Signed: ____________________________ Date: _____________________ Mr. Harrison W. Ngirigacha (MSc. WERM, BSc. Chem. Reg. Expert (NEMA)) LEAD EIA EXPERT NEMA Reg. No. 0027 For: Consulting Engineers Name and Address of Proponent: The Permanent Secretary, Ministry of Roads and Public
    [Show full text]
  • Kenya, Groundwater Governance Case Study
    WaterWater Papers Papers Public Disclosure Authorized June 2011 Public Disclosure Authorized KENYA GROUNDWATER GOVERNANCE CASE STUDY Public Disclosure Authorized Albert Mumma, Michael Lane, Edward Kairu, Albert Tuinhof, and Rafik Hirji Public Disclosure Authorized Water Papers are published by the Water Unit, Transport, Water and ICT Department, Sustainable Development Vice Presidency. Water Papers are available on-line at www.worldbank.org/water. Comments should be e-mailed to the authors. Kenya, Groundwater Governance case study TABLE OF CONTENTS PREFACE .................................................................................................................................................................. vi ACRONYMS AND ABBREVIATIONS ................................................................................................................................ viii ACKNOWLEDGEMENTS ................................................................................................................................................ xi EXECUTIVE SUMMARY ............................................................................................................................................... xiv 1. INTRODUCTION ............................................................................................................................................. 1 1.1. GROUNDWATER: A COMMON RESOURCE POOL ....................................................................................................... 1 1.2. CASE STUDY BACKGROUND .................................................................................................................................
    [Show full text]
  • Curriculum Vitae
    Curriculum Vitae Name: Isaiah Bosire Omosa Sex: Male Date of birth: 8th April 1974 Passport number: A037571 Nationality: Kenyan Profession: Civil and Environmental Engineer Address: Kenyatta University, Department of Civil Engineering, P.O Box 43844-00100, Thika Road, Nairobi, Kenya. OR P.O Box 966-00520 (Ruai) Nairobi. E-mail: [email protected] Membership in Professional Societies -Registered Graduate Engineer, Engineers’ Registration Board of Kenya. -Graduate Member, Institution of Engineers of Kenya. Education 2009-2013 Doctor of Engineering ( Environmental Science), UNEP-TongJi, Institute of Environment for Sustainable Development, TongJi University, Shanghai, China. Doctoral Research Topic: Tertiary Treatment of Municipal Wastewater Using Horizontal Subsurface Flow Constructed Wetlands and UV irradiation- with reference to Kenya. 1999-2005 Master of Science (MSc.) in Civil Engineering (Environmental Health Engineering option), University of Nairobi, Kenya. M.Sc. Thesis Title: Assessment of the biological treatability of black tea processing effluent 1993-1998 Bachelor of Science (B.Sc Hons) in Civil Engineering, University of Nairobi, Kenya. Employment Records 1999-2002 Masosa construction Ltd, Projects Engineer 2004 United Nations Environment Programme (UNEP), Research Assistant (Internship) 2005 - 2006 Ministry of Roads and Public Works, Civil Engineer (Storm Water drainage, Sewerage/Foul water drainage and Estate Roads design and construction supervision). 2009-2011 Kenyatta University, Water & Environmental Engineering Department, Tutorial Fellow / Assistant Lecturer. 2011- to date Kenyatta University, Civil Engineering Department, Lecturer. Professional Experience 2001 Research on a study of water demand management for the City of Nairobi under the ‘Managing water for African Cities’ project undertaken by UN- Habitat/Nairobi City Council. 2002 Site Agent on El nino emergency repairs and extensions to Kisii, Keroka and Gesusu Water supplies in Kisii District (Contract No.
    [Show full text]
  • Nairobi-Thika-Transp
    FOREWORD I am pleased to introduce this 10-plan year which is a road map on how the Nairobi - Thika Superhighway Transport Corridor (NTTC) is geared to develop. This is the first comprehensive spatial plan covering the NTTC, which is within Ruiru and Juja Sub-Counties and it has been prepared at a time when Kiambu County is grappling with the challenges of tackling rapid urbanisation. I am happy to note that, this plan has been prepared in a participatory manner taking into account the contributions of various stakeholders whose role in the implementation of the proposals is fundamental. Kiambu is the third most urbanised County after Nairobi and Mombasa and has witnessed rapid urbanisation in the few decades with people moving into the County to settle, set business, and undertake other development activities. The NTTC has witnessed rapid urbanisation coupled with high population growth and economic activities in the last ten years since the onset of devolved government and the upgrading of the Nairobi-Thika Highway thus changing the corridor’s character. Due to this rapid growth as a County, we are expected to commit more investments to cope with this expansion. More people need to be accommodated in a suitable environment with ease of movement, adequate physical and social infrastructure and employment opportunities. However, most of this urbanisation is happening with little or no planning intervention as characterised by piecemeal subdivision and land-use conversions. Due to the absence of planning tools like the Plan to guide and manage this rapid urbanisation, the current development in these areas is suffering from uncoordinated growth, land use conflict, inadequate basic infrastructure facilities and services, poor housing, and inefficient public transportation system, amongst other challenges.
    [Show full text]
  • Industrialization of Athi River Town
    \l INDUSTRIALIZATION OF ATHI ( f RIVFR TOWN ' BY CALEB (m o * MIRERI This Thesis is submitted in partial fulfilment of the requ i rements of the degree of Masters of Arts in Planning in the Department of Urban and Regional Planning, Faculty of Architecture, Design and Development of the University of Nairobi. May 21st., 1992 DECLARATION This thesis is my original work and has not been presented for a degree in any other university. Cand idate---- 's“-— ^ ------ ignature ) Caleb Mc’Mireri DEPARTMENT OF URBAN AND REGIONAL PLANNING Faculty of Architecture. Design and Development P. 0. Bex 3 0 19 7 . Tel. 2 7 4 41 UNIVERSITY Of NAIROBI. This thesis has been submitted for examination with my approval as the University Supervisor. S i g n e d -^*3^l __ Dr. George Ngugi (Supervisor) June 21st, 1992. ITT DEDICATION In Memorium of Jaduong’ James Mireri IV Acknowledgement A great many people helped me develop this thesis most of whom I cannot mention their names here. 1 am indebted to them all but in particular to my Supervisor Dr. George Ngugi of the University of Nairobi. His comments were consistently thoughtful and insightful and he persistently sought to encourage and support me. Also, Dr. Peter Ngau of the University of Nairobi gave me a far reaching support throughout the time of this thesis writing, by his incisive comments. T also want to thank all academic members of staff and students of D.U.R.P, who listened to the early versions of this study in seminars and the information they offered was of great help.
    [Show full text]
  • KENYA POPULATION SITUATION ANALYSIS Kenya Population Situation Analysis
    REPUBLIC OF KENYA KENYA POPULATION SITUATION ANALYSIS Kenya Population Situation Analysis Published by the Government of Kenya supported by United Nations Population Fund (UNFPA) Kenya Country Oce National Council for Population and Development (NCPD) P.O. Box 48994 – 00100, Nairobi, Kenya Tel: +254-20-271-1600/01 Fax: +254-20-271-6058 Email: [email protected] Website: www.ncpd-ke.org United Nations Population Fund (UNFPA) Kenya Country Oce P.O. Box 30218 – 00100, Nairobi, Kenya Tel: +254-20-76244023/01/04 Fax: +254-20-7624422 Website: http://kenya.unfpa.org © NCPD July 2013 The views and opinions expressed in this report are those of the contributors. Any part of this document may be freely reviewed, quoted, reproduced or translated in full or in part, provided the source is acknowledged. It may not be sold or used inconjunction with commercial purposes or for prot. KENYA POPULATION SITUATION ANALYSIS JULY 2013 KENYA POPULATION SITUATION ANALYSIS i ii KENYA POPULATION SITUATION ANALYSIS TABLE OF CONTENTS LIST OF ACRONYMS AND ABBREVIATIONS ........................................................................................iv FOREWORD ..........................................................................................................................................ix ACKNOWLEDGEMENT ..........................................................................................................................x EXECUTIVE SUMMARY ........................................................................................................................xi
    [Show full text]
  • Download List of Physical Locations of Constituency Offices
    INDEPENDENT ELECTORAL AND BOUNDARIES COMMISSION PHYSICAL LOCATIONS OF CONSTITUENCY OFFICES IN KENYA County Constituency Constituency Name Office Location Most Conspicuous Landmark Estimated Distance From The Land Code Mark To Constituency Office Mombasa 001 Changamwe Changamwe At The Fire Station Changamwe Fire Station Mombasa 002 Jomvu Mkindani At The Ap Post Mkindani Ap Post Mombasa 003 Kisauni Along Dr. Felix Mandi Avenue,Behind The District H/Q Kisauni, District H/Q Bamburi Mtamboni. Mombasa 004 Nyali Links Road West Bank Villa Mamba Village Mombasa 005 Likoni Likoni School For The Blind Likoni Police Station Mombasa 006 Mvita Baluchi Complex Central Ploice Station Kwale 007 Msambweni Msambweni Youth Office Kwale 008 Lunga Lunga Opposite Lunga Lunga Matatu Stage On The Main Road To Tanzania Lunga Lunga Petrol Station Kwale 009 Matuga Opposite Kwale County Government Office Ministry Of Finance Office Kwale County Kwale 010 Kinango Kinango Town,Next To Ministry Of Lands 1st Floor,At Junction Off- Kinango Town,Next To Ministry Of Lands 1st Kinango Ndavaya Road Floor,At Junction Off-Kinango Ndavaya Road Kilifi 011 Kilifi North Next To County Commissioners Office Kilifi Bridge 500m Kilifi 012 Kilifi South Opposite Co-Operative Bank Mtwapa Police Station 1 Km Kilifi 013 Kaloleni Opposite St John Ack Church St. Johns Ack Church 100m Kilifi 014 Rabai Rabai District Hqs Kombeni Girls Sec School 500 M (0.5 Km) Kilifi 015 Ganze Ganze Commissioners Sub County Office Ganze 500m Kilifi 016 Malindi Opposite Malindi Law Court Malindi Law Court 30m Kilifi 017 Magarini Near Mwembe Resort Catholic Institute 300m Tana River 018 Garsen Garsen Behind Methodist Church Methodist Church 100m Tana River 019 Galole Hola Town Tana River 1 Km Tana River 020 Bura Bura Irrigation Scheme Bura Irrigation Scheme Lamu 021 Lamu East Faza Town Registration Of Persons Office 100 Metres Lamu 022 Lamu West Mokowe Cooperative Building Police Post 100 M.
    [Show full text]
  • Republic of Kenya
    SFG1405 V12 REPUBLIC OF KENYA Public Disclosure Authorized MINISTRY OF TRANSPORT, INFRASTRUCTURE, Public Disclosure Authorized HOUSING AND URBAN DEVELOPMENT ENVIRONMENTAL AND SOCIAL ASSESSMENT PROJECT REPORT Public Disclosure Authorized (ESIA) PROPOSED CONSTRUCTION OF KIKUYU RAILWAY STATION 29th March 2017 Public Disclosure Authorized Project Ref No.EHS-5240-522708-03 Kikuyu Railway Station ESIA Report Version: Final CERTIFICATION SGS Kenya Limited was commissioned by the Ministry of Transport, Infrastructure, housing and Urban Development to undertake Environmental and Social Impact Assessment for the proposed construction of Kikuyu Railway Station in Kiambu County. The Report has been written in accordance with the Environmental Management and Coordination Act no. 8 of 1999 and The Environmental (Impact Assessment and Audit) Regulations, 2003 for submission to the National Environmental Management Authority (NEMA). SGS Kenya Limited submits this Environmental and Social Impact Assessment Report, to NEMA Kenya. To the best of our knowledge, all the information in this report is true and correct. Proponent: Ministry of Transport, Infrastructure, Housing and Urban Development Eng. John Ndirangu Maina Project Coordinator Name of Officer Designation ………………………………. ……………………………… Signature / Official Stamp Date Submitted by: Firm of Experts: SGS Kenya Limited Reg. No. 0280 ………………………………. Official Stamp Approved by: ………………………………….. ………………………………….. Signature Date Mr. Philip Abuor: Environmental Services Manager EIA/EA Lead Expert Reg. No.1710 NAMSIP
    [Show full text]
  • Appendix 11 Future Socio-Economic Framework
    APPENDIX 11 FUTURE SOCIO-ECONOMIC FRAMEWORK Page 11.1 DEVELOPMENT POTENTIAL AND CONSTRAINT A11-1 11.2 URBAN LAND USE TYPES AND DISTRIBUTING PRINCIPLES A11-4 NUTRANS The Study on Master Plan for Urban Transport in the Nairobi Metropolitan Area APPENDIX 11 FUTURE SOCIO-ECONOMIC FRAMEWORK 11.1 DEVELOPMENT POTENTIAL AND CONSTRAINT Water Supply Capacity The existing water supply in the Nairobi City has four sources, namely Kikuyu Spring, Sasumua Dam, Ruiru Dam, and Ngethu. Water shortage is a growing problem in the Nairobi Metropolitan Area because of the water loss reportedly amounting to some 50% of total water supply and expanding population. Water supply plan with target year 2000 was formulated in the “Third Nairobi Water Supply Project". The projected population of Nairobi City would be 3.86 million and corresponding projected water demand would be 752.2 thousand cubic meters per day in 2010. Planned area of piped water supply covers the whole Nairobi City and some part of Ruiru to the north, and Syokimau to the southeast. Local area water supply projects are proposed in Ngong and Ongata Rongai to the southwest and Western Shamba Area to the northwest of Nairobi City. Gravity type water supply system can be applicable to the areas less than 1,700m above sea level in the Nairobi Metropolitan Region (See Figure 11.1-1). FIGURE 11.1-1 WATER SUPPLY SCHEME IN NAIROBI CITY Final Report Appendix A11-1 NUTRANS The Study on Master Plan for Urban Transport in the Nairobi Metropolitan Area Sewerage Treatment Plan The whole Nairobi City is not covered by the existing sewerage system managed by Nairobi City Water and Sewerage Company.