Human Spaceflights (Overview)

Total Page:16

File Type:pdf, Size:1020Kb

Human Spaceflights (Overview) Human Spaceflights (Overview) No. Nation Mission Time Main tasks 1961 1 Vostok 12.04.1961 First human spaceflight 2 Vostok 2 06.08.1961 - 07.08.1961 Second human spaceflight 1962 3 Mercury 6 20.02.1962 First American in orbit 4 Mercury 7 24.05.1962 "Repeat" of Mercury 6 mission 5 Vostok 3 11.08.1962 - 15.08.1962 Rendezvous flight with Vostok 4 6 Vostok 4 12.08.1962 - 15.08.1962 Rendezvous flight with Vostok 3 7 Mercury 8 03.10.1962 Several test needed for longer, more complex flights 1963 8 Mercury 9 15.05.1963 - 16.05.1963 Final mission of the Mercury program 9 Vostok 5 14.06.1963 - 19.06.1963 Further study of the effect of various spaceflight factors in the human organism 10 Vostok 6 16.06.1963 - 19.06.1963 First woman in space 1964 11 Voskhod 12.10.1964 - 13.10.1964 First time a spacecraft with three crewmembers 1965 12 Voskhod 2 18.03.1965 - 19.03.1965 First EVA 13 Gemini 3 23.03.1965 Test of the new Gemini capsule 14 Gemini 4 03.06.1965 - 07.06.1965 First EVA of an U.S. astronaut 15 Gemini 5 21.08.1965 - 29.08.1965 New flight duration record 16 Gemini 7 04.12.1965 - 18.12.1965 Rendezvous with Gemini 6A 17 Gemini 6A 15.12.1965 - 16.12.1965 Rendezvous with Gemini 7 1966 18 Gemini 8 16.03.1966 - 17.03.1966 First orbital docking 19 Gemini 9A 03.06.1966 - 06.06.1966 Rendezvous with Augmented Target Docking Adapter (ATDA) 20 Gemini 10 18.07.1966 - 21.07.1966 Docking with GATV-10 21 Gemini 11 12.09.1966 - 15.09.1966 Docking with an Agena target vehicle 22 Gemini 12 11.11.1966 - 15.11.1966 Docking with GATV-12 1967 23 Soyuz 1 23.04.1967 - 24.04.1967 Test of the Soyuz spacecraft; death of Komarov 1968 24 Apollo 7 11.10.1968 - 22.10.1968 Testflight of the modificated Apollo spacecraft 25 Soyuz 3 26.10.1968 - 30.10.1968 Testing of all spacecraft systems 26 Apollo 8 21.12.1968 - 27.12.1968 First manned lunar orbital mission 1969 27 Soyuz 4 14.01.1969 - 17.01.1969 Docking with Soyuz 5 28 Soyuz 5 15.01.1969 - 18.01.1969 Docking with Soyuz 4 29 Apollo 9 03.03.1969 - 13.03.1969 First manned flight of all lunar hardware in Earth orbit 30 Apollo 10 18.05.1969 - 26.05.1969 Second manned lunar orbital mission 31 Apollo 11 16.07.1969 - 24.07.1969 First manned lunar landing 32 Soyuz 6 11.10.1969 - 16.10.1969 Groupflight with Soyuz 7 and Soyuz 8 33 Soyuz 7 12.10.1969 - 17.10.1969 Groupflight with Soyuz 6 and Soyuz 8 34 Soyuz 8 13.10.1969 - 18.10.1969 Groupflight with Soyuz 6 and Soyuz 7 35 Apollo 12 14.11.1969 - 24.11.1969 Second manned lunar landing 1970 36 Apollo 13 11.04.1970 - 17.04.1970 Third lunar landing attempt (cancelled) 37 Soyuz 9 01.06.1970 - 19.06.1970 New spaceflight duration record 1971 38 Apollo 14 31.01.1971 - 09.02.1971 Third manned moon landing 39 Soyuz 10 22.04.1971 - 24.04.1971 Docking to space station Salyut 1 40 Soyuz 11 06.06.1971 - 29.06.1971 First resident crew of Salyut 1; crew died 41 Apollo 15 26.07.1971 - 07.08.1971 Fourth manned moon landing 1972 42 Apollo 16 16.04.1972 - 27.04.1972 Fifth manned moon landing 43 Apollo 17 07.12.1972 - 19.12.1972 Final manned moon landing 1973 44 Skylab 2 25.05.1973 - 22.06.1973 First resident crew of Skylab 45 Skylab 3 28.07.1973 - 25.09.1973 Second resident crew of Skylab 46 Soyuz 12 27.09.1973 - 29.09.1973 Test flight of modificated Soyuz capsule 47 Skylab 4 16.11.1973 - 08.02.1974 Third and final resident crew of Skylab 48 Soyuz 13 18.12.1973 - 26.12.1973 Testflight of Soyuz spacecraft 1974 49 Soyuz 14 03.07.1974 - 19.07.1974 First resident crew of Salyut 3 50 Soyuz 15 26.08.1974 - 28.08.1974 Failed docking maneuver to Salyut 3 51 Soyuz 16 02.12.1974 - 08.12.1974 Dress rehearsal for ASTP 1975 52 Soyuz 17 10.01.1975 - 09.02.1975 First resident crew of Salyut 4 53 Soyuz 18 24.05.1975 - 26.07.1975 Second resident crew of Salyut 4 54 Soyuz 19 EPAS 15.07.1975 - 21.07.1975 Docking with US Apollo spacecraft ASTP 55 ASTP 15.07.1975 - 24.07.1975 Docking with Soyuz 19 EPAS 1976 56 Soyuz 21 06.07.1976 - 24.08.1976 First resident crew of Salyut 5 57 Soyuz 22 15.09.1976 - 23.09.1976 Using the GDR built multispectral camera MKF-6 58 Soyuz 23 14.10.1976 - 16.10.1976 Docking with Salyut 5 failed 1977 59 Soyuz 24 07.02.1977 - 25.02.1977 Second resident crew of Salyut 5 60 Soyuz 25 09.10.1977 - 11.10.1977 Docking with Salyut 5 failed 61 Soyuz 26 10.12.1977 - 16.03.1978 First resident crew of Salyut 6 1978 62 Soyuz 27 10.01.1978 - 16.01.1978 First guest crew visiting the first resident crew on Salyut 6 63 Soyuz 28 02.03.1978 - 10.03.1978 First Interkosmos mission 64 Soyuz 29 15.06.1978 - 02.11.1978 Second resident crew of Salyut 6 65 Soyuz 30 27.06.1978 - 05.07.1978 Second Interkosmos mission 66 Soyuz 31 26.08.1978 - 03.09.1978 Third Interkosmos mission 1979 67 Soyuz 32 25.02.1979 - 19.08.1979 Third resident crew of Salyut 6 68 Soyuz 33 10.04.1979 - 12.04.1979 Fourth Interkosmos mission; docking failed 1980 69 Soyuz 35 09.04.1980 - 11.10.1980 Fourth resident crew of Salyut 6 70 Soyuz 36 26.05.1980 - 03.06.1980 Fifth Interkosmos mission 71 Soyuz T-2 05.06.1980 - 09.06.1980 Testflight of new developed Soyuz T spacecraft 72 Soyuz 37 23.07.1980 - 31.07.1980 Sixth Interkosmos mission 73 Soyuz 38 18.09.1980 - 26.09.1980 Seventh Interkosmos mission 74 Soyuz T-3 27.11.1980 - 10.12.1980 Overhauling and reactivating Salyut 6 1981 75 Soyuz T-4 12.03.1981 - 26.05.1981 Fifth and final resident crew of Salyut 6 76 Soyuz 39 22.03.1981 - 30.03.1981 Eighth Interkosmos mission 77 STS-1 12.04.1981 - 14.04.1981 First orbital test flight of the Space Shuttle 78 Soyuz 40 14.05.1981 - 22.05.1981 Ninth Interkosmos mission 79 STS-2 12.11.1981 - 14.11.1981 Second testflight of the Space Shuttle 1982 80 STS-3 22.03.1982 - 30.03.1982 Third test flight of the Space Shuttle 81 Soyuz T-5 13.05.1982 - 10.12.1982 First resident crew of Salyut 7 82 Soyuz T-6 24.06.1982 - 02.07.1982 First visiting crew of Salyut 7; French-Soviet mission 83 STS-4 27.06.1982 - 04.07.1982 Fourth and final test flight of the Space Shuttle 84 Soyuz T-7 19.08.1982 - 27.08.1982 Second visiting crew of Salyut 7; second woman in space 85 STS-5 11.11.1982 - 16.11.1982 Deploying of communications satellites 1983 86 STS-6 04.04.1983 - 09.04.1983 Deploying of communications satellite TDRS-A 87 Soyuz T-8 20.04.1983 - 22.04.1983 Docking to Salyut 7 failed 88 STS-7 18.06.1983 - 24.06.1983 Deploying of communications satellites 89 Soyuz T-9 27.06.1983 - 23.11.1983 Second resident crew of Salyut 7 90 STS-8 30.08.1983 - 05.09.1983 Deploying of communications satellite Insat-1B 91 STS-9 28.11.1983 - 08.12.1983 Spacelab 1 1984 92 STS-41B 03.02.1984 - 11.02.1984 Test of the Manned Maneuvering Unit 93 Soyuz T-10 08.02.1984 - 02.10.1984 Third resident crew of Salyut 7 94 Soyuz T-11 03.04.1984 - 11.04.1984 Third visiting crew of Salyut 7; India-Soviet mission 95 STS-41C 06.04.1984 - 13.04.1984 Repair of Solar Maximum 96 Soyuz T-12 17.07.1984 - 29.07.1984 First EVA of a woman 97 STS-41D 30.08.1984 - 05.09.1984 Deploying of communications satellites 98 STS-41G 05.10.1984 - 13.10.1984 Earth Radiation Budget Satellite (ERBS) deployed 99 STS-51A 08.11.1984 - 16.11.1984 Deploying of communications satellites 1985 100 STS-51C 24.01.1985 - 27.01.1985 First Shuttle mission dedicated to Department of Defense 101 STS-51D 12.04.1985 - 19.04.1985 Deploying of communications satellites 102 STS-51B 29.04.1985 - 06.05.1985 Spacelab 3 103 Soyuz T-13 06.06.1985 - 26.09.1985 Fourth resident crew of Salyut 7 104 STS-51G 17.06.1985 - 24.06.1985 Deploying of three communications satellites 105 STS-51F 29.07.1985 - 06.08.1985 Spacelab 2 106 STS-51I 27.08.1985 - 03.09.1985 Deploying communications satellites 107 Soyuz T-14 17.09.1985 - 21.11.1985 Partly exchange of Salyut 7 resident crew 108 STS-51J 03.10.1985 - 07.10.1985 SDI mission, deploying of two military communications satellites 109 STS-61A 30.10.1985 - 06.11.1985 Mission D-1 110 STS-61B 27.11.1985 - 03.12.1985 Deploying of communications satellites 1986 111 STS-61C 12.01.1986 - 18.01.1986 Deploying communications satellite 112 Soyuz T-15 13.03.1986 - 16.07.1986 First resident crew of Mir; sixth resident crew of Salyut 7 1987 113 Soyuz TM-2 05.02.1987 - 29.12.1987 Second resident crew of Mir 114 Soyuz TM-3 22.07.1987 - 30.07.1987 First visiting crew of Mir; Syria-Soviet mission 115 Soyuz TM-4 21.12.1987 - 21.12.1988 Third resident crew of Mir 1988 116 Soyuz TM-5 07.06.1988 - 17.06.1988 Second visiting crew of Mir; Bulgaria-Soviet mission 117 Soyuz TM-6 29.08.1988 - 07.09.1988 Third visiting crew of Mir; Afghanistan-Soviet mission 118 STS-26 29.09.1988 - 03.10.1988 First flight of a space shuttle after the Challenger disaster 119 Soyuz TM-7 26.11.1988- 27.04.1989 Fourth resident crew of Mir 120 STS-27 02.12.1988 - 06.12.1988 Third mission dedicated to Department of Defense 1989 121 STS-29 13.03.1989 - 18.03.1989 Deploying of communications satellite TDRS-D 122 STS-30 04.05.1989 - 08.05.1989 Deploying of Magellan 123 STS-28 08.08.1989 - 13.08.1989 Fourth mission dedicated to Department of Defense 124 Soyuz TM-8 05.09.1989 - 19.02.1990 Fifth resident crew of Mir 125 STS-34 18.10.1989 - 23.10.1989 Deploying of Galileo 126 STS-33 23.11.1989 - 28.11.1989 Fifth mission dedicated to Department of Defense 1990 127 STS-32 09.01.1990 - 20.01.1990 Retrieval of "Long Duration Exposure Facility" (LDEF) 128 Soyuz TM-9 11.02.1990 - 09.08.1990 Sixth resident crew of Mir 129 STS-36 28.02.1990 - 04.03.1990 Sixth mission dedicated to Department of Defense 130 STS-31 24.04.1990 - 29.04.1990 Deploying of Hubble Space Telescope 131 Soyuz TM-10 01.08.1990 - 10.12.1990 Seventh resident crew of Mir 132 STS-41 06.10.1990 - 10.10.1990 Deploying of Ulysses 133
Recommended publications
  • NASA Johnson Space Center Houston, Texas 77058 October 1999 Volume 4, Issue 4
    A publication of The Orbital Debris Program Office NASA Johnson Space Center Houston, Texas 77058 October 1999 Volume 4, Issue 4. NEWS Marshall Researchers Developing Patch Kit to Mitigate ISS Impact Damage Stephen B. Hall, FD23A procedure and developmental status. external patching for several reasons: time KERMIt Lead Engineer constraints, accessibility, work envelope, Marshall Space Flight Center External Repair Rationale collateral damage and EVA suit compatibility. KERMIt, a Kit for External Repair of The decision was made to develop a kit for A primary risk factor in repairing Module Impacts, is now punctured modules is the being developed at the time constraint involved. Marshall Space Flight Even given the relatively Center in Huntsville, Ala. large volume of air within Its purpose: to seal the Space Station upon punctures in the assembly completion, International Space Station analyses have shown that a caused by collisions with 1-inch-diameter hole can meteoroids or space cause pressure to drop to debris. The kit will enable unacceptable levels in just crewmembers to seal one hour. In that timeframe, punctures from outside the crew must conclude a damaged modules that module has been punctured, have lost atmospheric determine its location, pressure. Delivery of the remove obstructions kit for operational use is restricting access, obtain a scheduled for next year. repair kit and seal the leak. This article -- which This action would be a expands on material challenge even if the crew appearing in the July 1999 was not injured and no issue of “Orbital Debris significant subsystem Quarterly” -- discusses the damage had occurred. rationale for an externally applied patch, Astronaut installing toggle bolt in simulated puncture sample plate on Laboratory requirements influencing Module in Neutral Buoyancy Laboratory.
    [Show full text]
  • Raumstationen.Pdf
    LARS WEILER ‹[email protected]› GPN14 – 19. JUNI 2014 RAUMSTATIONEN Bilder: NASA, ESA ÜBERSICHT • Motivation • Vorraussetzungen • Raumstationen • Zukunft MOTIVATION LEBEN IM WELTRAUM MOTIVATION FORSCHUNG ANFORDERUNGEN AN RAUMFAHRER VORRAUSSETZUNGEN ORBITING VORRAUSSETZUNGEN DOCKING VORRAUSSETZUNGEN DOCKING VORRAUSSETZUNGEN DOCKING VORRAUSSETZUNGEN DOCKING VORRAUSSETZUNGEN DOCKING RAUMSTATIONEN • Салют – Salyut • Skylab • Мир – Mir • Raumlabor • ISS/МКС • 天宫 一号 – Tiangong СССР – UDSSR САЛЮТ – SALYUT ДОС – Долговременная орбитальная станция (Langzeit-Orbital-Station) Алмаз – Almaz (Diamant) СССР – UDSSR САЛЮТ 1 – SALYUT 1 СССР – UDSSR АЛМАЗ – ALMAZ СССР – UDSSR САЛЮТ 4 – SALYUT 4 СССР – UDSSR САЛЮТ 6 – SALYUT 6 ТРАНСПОРТНЫЙ КОРАБЛЬ СНАБЖЕНИЯ ТКС – TKS СССР – UDSSR САЛЮТ 7 – SALYUT 7 СССР – UDSSR САЛЮТ 7 – SALYUT 7 USA – NASA SKYLAB USA – NASA SKYLAB USA – NASA SKYLAB СССР/РУССИЯ – UDSSR/RUSSLAND МИР – MIR DAS BAIKONUR-MYSTERIUM INKLINATION DAS BAIKONUR-MYSTERIUM INKLINATION МИР – MIR BESATZUNG MIRCORP ZEITGLEICH ZUR ISS МИР – MIR FEUER МИР – MIR KOLLISION МИР – MIR KOLLISION МИР – MIR VERSCHROTTUNG EUROPA – ESA / USA – NASA SPACELAB USA – NASA SPACEHAB РОСКОСМОС / NASA / ESA / JAXA / CSA ASC ISS / МКС ! INTERNATIONAL SPACE STATION ! МЕЖДУНАРОДНАЯ КОСМИЧЕСКАЯ СТАНЦИЯ ISS AUFBAU ISS ORBIT RAUMSCHIFFE СОЮЗ – SOYUZ RAUMSCHIFFE HERMES ISS TRASPORTFRACHTER DRAGON CARGO ISS TRASPORTFRACHTER DRAGON RETURN ISS TRASPORTFRACHTER ПРОГРЕСС – PROGRESS ISS TRASPORTFRACHTER ПРОГРЕСС – PROGRESS ISS TRANSPORTFRACHTER MPLM ISS TRANSPORTFRACHTER ATV ISS
    [Show full text]
  • Spring 2018 Undergraduate Law Journal
    SPRING 2018 UNDERGRADUATE LAW JOURNAL The Final Frontier: Evolution of Space Law in a Global Society By: Garett Faulkender and Stephan Schneider Introduction “Space: the final frontier!” These are the famous introductory words spoken by William Shatner on every episode of Star Trek. This science-fiction TV show has gained a cult-following with its premise as a futuristic Space odyssey. Originally released in 1966, many saw the portrayed future filled with Space-travel, inter-planetary commerce and politics, and futuristic technology as merely a dream. However, today we are starting to explore this frontier. “We are entering an exciting era in [S]pace where we expect more advances in the next few decades than throughout human history.”1 Bank of America/Merrill Lynch has predicted that the Space industry will grow to over $2.7 trillion over the next three decades. Its report said, “a new raft of drivers is pushing the ‘Space Age 2.0’”.2 Indeed, this market has seen start-up investments in the range of $16 billion,3 helping fund impressive new companies like Virgin Galactic and SpaceX. There is certainly a market as Virgin Galactic says more than 600 customers have registered for a $250,000 suborbital trip, including Leonardo DiCaprio, Katy Perry, Ashton Kutcher, and physicist Stephen Hawking.4 Although Space-tourism is the exciting face of a future in Space, the Space industry has far more to offer. According to the Satellite Industries 1 Michael Sheetz, The Space Industry Will Be Worth Nearly $3 Trillion in 30 Years, Bank of America Predicts, CNBC, (last updated Oct.
    [Show full text]
  • Polski Sektor Kosmiczny EN.Indd
    Cassini-Huygens Mars Express POLAND IN ESA BRITE-PL „Lem” Meteor 2 Kopernik 500 Integral Rosetta Mikołaj Kopernik REACHING STARS Jan Heweliusz Mirosław — Hermaszewski POLISH SPACE SECTOR 4 years in ESA PW-SAT BRITE-PL „Heweliusz” Herschel Vertical-1 ExoMars TABLE OF CONTENTS Poland 3 History of space activities 4 Space policy 6 In space and on Earth 8 Companies 12 Selected scientific and research institutions 19 Competence map 22 2 WTO UN 01 OECD POLAnd Population: 38.4 million NATO Area: 312 000 km2 Economy: 23rd place in the world* Capital city: Warsaw Government system: parliamentary republic Currency: złoty (PLN) EU ESA * World Bank, 2015, GDP based on PPP EDA EUMETSAT ESO POLAND POLAND CENTRAL AND EasterN EUROPE EU28 GDP (PPP) per capita of Poland compared Economic growth in Poland and EU28 to other countries of Central and Eastern Europe Source: own compilation based on data from Eurostat Source: The Global Competitiveness Report, World Economic Forum 3 02 HISTORY OF SPACE ACTIVITIES The beginning of Polish engagement in space flights presence of Polish instruments on the majority of the stemmed from participation in the international pro- Agency’s research missions. Meanwhile, the first private gramme Interkosmos, based on collaboration with the Polish companies offering satelite-based applications Soviet Union. The first Polish research device was sent and services were created. into orbit on board the satellite Kopernik-500 (Interkos- In 2007, the signing of the Plan for European Coope- mos-9) in 1973. Three years later the Space Research rating States (PECS) enabled significant extension of Centre of the Polish Academy of Sciences was estab- Poland’s cooperation with ESA.
    [Show full text]
  • Gnc 2021 Abstract Book
    GNC 2021 ABSTRACT BOOK Contents GNC Posters ................................................................................................................................................... 7 Poster 01: A Software Defined Radio Galileo and GPS SW receiver for real-time on-board Navigation for space missions ................................................................................................................................................. 7 Poster 02: JUICE Navigation camera design .................................................................................................... 9 Poster 03: PRESENTATION AND PERFORMANCES OF MULTI-CONSTELLATION GNSS ORBITAL NAVIGATION LIBRARY BOLERO ........................................................................................................................................... 10 Poster 05: EROSS Project - GNC architecture design for autonomous robotic On-Orbit Servicing .............. 12 Poster 06: Performance assessment of a multispectral sensor for relative navigation ............................... 14 Poster 07: Validation of Astrix 1090A IMU for interplanetary and landing missions ................................... 16 Poster 08: High Performance Control System Architecture with an Output Regulation Theory-based Controller and Two-Stage Optimal Observer for the Fine Pointing of Large Scientific Satellites ................. 18 Poster 09: Development of High-Precision GPSR Applicable to GEO and GTO-to-GEO Transfer ................. 20 Poster 10: P4COM: ESA Pointing Error Engineering
    [Show full text]
  • Information Summaries
    TIROS 8 12/21/63 Delta-22 TIROS-H (A-53) 17B S National Aeronautics and TIROS 9 1/22/65 Delta-28 TIROS-I (A-54) 17A S Space Administration TIROS Operational 2TIROS 10 7/1/65 Delta-32 OT-1 17B S John F. Kennedy Space Center 2ESSA 1 2/3/66 Delta-36 OT-3 (TOS) 17A S Information Summaries 2 2 ESSA 2 2/28/66 Delta-37 OT-2 (TOS) 17B S 2ESSA 3 10/2/66 2Delta-41 TOS-A 1SLC-2E S PMS 031 (KSC) OSO (Orbiting Solar Observatories) Lunar and Planetary 2ESSA 4 1/26/67 2Delta-45 TOS-B 1SLC-2E S June 1999 OSO 1 3/7/62 Delta-8 OSO-A (S-16) 17A S 2ESSA 5 4/20/67 2Delta-48 TOS-C 1SLC-2E S OSO 2 2/3/65 Delta-29 OSO-B2 (S-17) 17B S Mission Launch Launch Payload Launch 2ESSA 6 11/10/67 2Delta-54 TOS-D 1SLC-2E S OSO 8/25/65 Delta-33 OSO-C 17B U Name Date Vehicle Code Pad Results 2ESSA 7 8/16/68 2Delta-58 TOS-E 1SLC-2E S OSO 3 3/8/67 Delta-46 OSO-E1 17A S 2ESSA 8 12/15/68 2Delta-62 TOS-F 1SLC-2E S OSO 4 10/18/67 Delta-53 OSO-D 17B S PIONEER (Lunar) 2ESSA 9 2/26/69 2Delta-67 TOS-G 17B S OSO 5 1/22/69 Delta-64 OSO-F 17B S Pioneer 1 10/11/58 Thor-Able-1 –– 17A U Major NASA 2 1 OSO 6/PAC 8/9/69 Delta-72 OSO-G/PAC 17A S Pioneer 2 11/8/58 Thor-Able-2 –– 17A U IMPROVED TIROS OPERATIONAL 2 1 OSO 7/TETR 3 9/29/71 Delta-85 OSO-H/TETR-D 17A S Pioneer 3 12/6/58 Juno II AM-11 –– 5 U 3ITOS 1/OSCAR 5 1/23/70 2Delta-76 1TIROS-M/OSCAR 1SLC-2W S 2 OSO 8 6/21/75 Delta-112 OSO-1 17B S Pioneer 4 3/3/59 Juno II AM-14 –– 5 S 3NOAA 1 12/11/70 2Delta-81 ITOS-A 1SLC-2W S Launches Pioneer 11/26/59 Atlas-Able-1 –– 14 U 3ITOS 10/21/71 2Delta-86 ITOS-B 1SLC-2E U OGO (Orbiting Geophysical
    [Show full text]
  • Moscow Defense Brief Your Professional Guide Inside # 1, 2011
    Moscow Defense Brief Your Professional Guide Inside # 1, 2011 Russian Army’s New Look CONTENTS Defense Industries #1 (23), 2011 New Management at the United Aircraft Corporation 2 PUBLISHER Centre for Analysis of Arms Trade Strategies and Russian Arms Trade in 2010 4 Technologies CAST Director & Publisher Procurement Ruslan Pukhov Editor-in-Chief Russian Military Spending in 2011-2020 12 Mikhail Barabanov Advisory Editors Konstantin Makienko Space Alexey Pokolyavin Russian Space Industry in 2010 17 Researchers Ruslan Aliev Polina Temerina Armed Forces Dmitry Vasiliev Russia’s “New-Look” Army: the Medical Service 20 Editorial Office 3 Tverskaya-Yamskaya, 24, office 5, Demographics vs the Russian Army 25 Moscow, Russia 125047 phone: +7 499 251 9069 fax: +7 495 775 0418 Our Authors 28 http://www.mdb.cast.ru/ To subscribe, contact phone: +7 499 251 9069 or e-mail: [email protected] Moscow Defense Brief is published by the Centre for Analysis of Strategies and Technologies All rights reserved. No part of this publication may be reproduced in any form or by any means, electronic, mechanical or photocopying, recording or otherwise, without reference to Moscow Defense Brief. Please note that, while the Publisher has taken all reasonable care in the compilation of this publication, the Publisher cannot accept responsibility for any errors or omissions in this publication or for any loss arising therefrom. Authors’ opinions do not necessary reflect those of the Publisher or Editor Translated by: Ivan Khokhotva Computer design & pre-press: B2B design bureau Zebra www.zebra-group.ru Cover Photo: Soldiers of the 5th Independent Motorized Rifle Brigade on a rest break during an exercise Photo by: Vadim Savitsky © Centre for Analysis of Strategies and Technologies, 2011 Printed in Russia # 1, 2011 Moscow Defense Brief 1 Defense Industries New Management at the United Aircraft Corporation Konstantin Makienko ew management has arrived at the United Aircraft Sukhoi company.
    [Show full text]
  • L AUNCH SYSTEMS Databk7 Collected.Book Page 18 Monday, September 14, 2009 2:53 PM Databk7 Collected.Book Page 19 Monday, September 14, 2009 2:53 PM
    databk7_collected.book Page 17 Monday, September 14, 2009 2:53 PM CHAPTER TWO L AUNCH SYSTEMS databk7_collected.book Page 18 Monday, September 14, 2009 2:53 PM databk7_collected.book Page 19 Monday, September 14, 2009 2:53 PM CHAPTER TWO L AUNCH SYSTEMS Introduction Launch systems provide access to space, necessary for the majority of NASA’s activities. During the decade from 1989–1998, NASA used two types of launch systems, one consisting of several families of expendable launch vehicles (ELV) and the second consisting of the world’s only partially reusable launch system—the Space Shuttle. A significant challenge NASA faced during the decade was the development of technologies needed to design and implement a new reusable launch system that would prove less expensive than the Shuttle. Although some attempts seemed promising, none succeeded. This chapter addresses most subjects relating to access to space and space transportation. It discusses and describes ELVs, the Space Shuttle in its launch vehicle function, and NASA’s attempts to develop new launch systems. Tables relating to each launch vehicle’s characteristics are included. The other functions of the Space Shuttle—as a scientific laboratory, staging area for repair missions, and a prime element of the Space Station program—are discussed in the next chapter, Human Spaceflight. This chapter also provides a brief review of launch systems in the past decade, an overview of policy relating to launch systems, a summary of the management of NASA’s launch systems programs, and tables of funding data. The Last Decade Reviewed (1979–1988) From 1979 through 1988, NASA used families of ELVs that had seen service during the previous decade.
    [Show full text]
  • Soviet Steps Toward Permanent Human Presence in Space
    SALYUT: Soviet Steps Toward Permanent Human Presence in Space December 1983 NTIS order #PB84-181437 Recommended Citation: SALYUT: Soviet Steps Toward Permanent Human Presence in Space–A Technical Mere- orandum (Washington, D. C.: U.S. Congress, Office of Technology Assessment, OTA- TM-STI-14, December 1983). Library of Congress Catalog Card Number 83-600624 For sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402 Foreword As the other major spacefaring nation, the Soviet Union is a subject of interest to the American people and Congress in their deliberations concerning the future of U.S. space activities. In the course of an assessment of Civilian Space Stations, the Office of Technology Assessment (OTA) has undertaken a study of the presence of Soviets in space and their Salyut space stations, in order to provide Congress with an informed view of Soviet capabilities and intentions. The major element in this technical memorandum was a workshop held at OTA in December 1982: it was the first occasion when a significant number of experts in this area of Soviet space activities had met for extended unclassified discussion. As a result of the workshop, OTA prepared this technical memorandum, “Salyut: Soviet Steps Toward Permanent Human Presence in Space. ” It has been reviewed extensively by workshop participants and others familiar with Soviet space activities. Also in December 1982, OTA wrote to the U. S. S. R.’s Ambassador to the United States Anatoliy Dobrynin, requesting any information concerning present and future Soviet space activities that the Soviet Union judged could be of value to the OTA assess- ment of civilian space stations.
    [Show full text]
  • Grail): Extended Mission and Endgame Status
    44th Lunar and Planetary Science Conference (2013) 1777.pdf GRAVITY RECOVERY AND INTERIOR LABORATORY (GRAIL): EXTENDED MISSION AND ENDGAME STATUS. Maria T. Zuber1, David E. Smith1, Sami W. Asmar2, Alexander S. Konopliv2, Frank G. Lemoine3, H. Jay Melosh4, Gregory A. Neumann3, Roger J. Phillips5, Sean C. Solomon6,7, Michael M. Watkins2, Mark A. Wieczorek8, James G. Williams2, Jeffrey C. Andrews-Hanna9, James W. Head10, Wal- ter S. Kiefer11, Isamu Matsuyama12, Patrick J. McGovern11, Francis Nimmo13, G. Jeffrey Taylor14, Renee C. Weber15, Sander J. Goossens16, Gerhard L. Kruizinga2, Erwan Mazarico3, Ryan S. Park2 and Dah-Ning Yuan2. 1Dept. of Earth, Atmospheric and Planetary Sciences, Massachusetts Institute of Technology, Cambridge, MA 02129, USA ([email protected]); 2Jet Propulsion Laboratory, California Institute of Technol- ogy, Pasadena, CA 91109, USA; 3NASA Goddard Space Flight Center, Greenbelt, MD 20771, USA; 4Dept. of Earth and Atmospheric Sciences, Purdue University, West Lafayette, IN 47907, USA; 5Planetary Science Directorate, Southwest Research Institute, Boulder, CO 80302, USA; 6 Lamont-Doherty Earth Observatory, Columbia University, Palisades, NY 10964, USA; 7Dept. of Terrestrial Magnetism, Carnegie Institution of Washington, Washington, DC 20015, USA; 8Institut de Physique du Globe de Paris, 94100 Saint Maur des Fossés, France; 9Dept. of Geophysics and Center for Space Resources, Colorado School of Mines, Golden, CO 80401, USA; 10Dept. of Geological Sciences, Brown University, Providence, RI 02912, USA; 11Lunar and Planetary Institute, Houston, TX 77058, USA; 12Lunar and Planetary Laborato- ry, University of Arizona, Tucson, AZ 85721, USA; 13Dept. of Earth and Planetary Sciences, University of California, Santa Cruz, CA 95064, USA; 14Hawaii Institute of Geophysics and Planetology, University of Hawaii, Honolulu, HI 96822, USA; 15NASA Marshall Space Flight Center, Huntsville, AL 35805, USA, 16University of Maryland, Baltimore County, Baltimore, MD 21250, USA.
    [Show full text]
  • Rex D. Hall and David J. Shayler
    Rex D. Hall and David J. Shayler Soyuz A Universal Spacecraft ruuiiMicPublishedu 11in1 aaaundiiuiassociationi witwimh ^^ • Springer Praxis Publishing PRHB Chichester, UK "^UF Table of contents Foreword xvii Authors' preface xix Acknowledgements xxi List of illustrations and tables xxiii Prologue xxix ORIGINS 1 Soviet manned spaceflight after Vostok 1 Design requirements 1 Sever and the 1L: the genesis of Soyuz 3 The Vostok 7/1L Soyuz Complex 4 The mission sequence of the early Soyuz Complex 6 The Soyuz 7K complex 7 Soyuz 7K (Soyuz A) design features 8 The American General Electric concept 10 Soyuz 9K and Soyuz 1 IK 11 The Soyuz Complex mission profile 12 Contracts, funding and schedules 13 Soyuz to the Moon 14 A redirection for Soyuz 14 The N1/L3 lunar landing mission profile 15 Exploring the potential of Soyuz 16 Soyuz 7K-P: a piloted anti-satellite interceptor 16 Soyuz 7K-R: a piloted reconnaissance space station 17 Soyuz VI: the military research spacecraft Zvezda 18 Adapting Soyuz for lunar missions 20 Spacecraft design changes 21 Crewing for circumlunar missions 22 The Zond missions 23 The end of the Soviet lunar programme 33 The lunar orbit module (7K-LOK) 33 viii Table of contents A change of direction 35 References 35 MISSION HARDWARE AND SUPPORT 39 Hardware and systems 39 Crew positions 40 The spacecraft 41 The Propulsion Module (PM) 41 The Descent Module (DM) 41 The Orbital Module (OM) 44 Pyrotechnic devices 45 Spacecraft sub-systems 46 Rendezvous, docking and transfer 47 Electrical power 53 Thermal control 54 Life support 54
    [Show full text]
  • Appendix a Apollo 15: “The Problem We Brought Back from the Moon”
    Appendix A Apollo 15: “The Problem We Brought Back From the Moon” Postal Covers Carried on Apollo 151 Among the best known collectables from the Apollo Era are the covers flown onboard the Apollo 15 mission in 1971, mainly because of what the mission’s Lunar Module Pilot, Jim Irwin, called “the problem we brought back from the Moon.” [1] The crew of Apollo 15 carried out one of the most complete scientific explorations of the Moon and accomplished several firsts, including the first lunar roving vehicle that was operated on the Moon to extend the range of exploration. Some 81 kilograms (180 pounds) of lunar surface samples were returned for anal- ysis, and a battery of very productive lunar surface and orbital experiments were conducted, including the first EVA in deep space. [2] Yet the Apollo 15 crew are best remembered for carrying envelopes to the Moon, and the mission is remem- bered for the “great postal caper.” [3] As noted in Chapter 7, Apollo 15 was not the first mission to carry covers. Dozens were carried on each flight from Apollo 11 onwards (see Table 1 for the complete list) and, as Apollo 15 Commander Dave Scott recalled in his book, the whole business had probably been building since Mercury, through Gemini and into Apollo. [4] People had a fascination with objects that had been carried into space, and that became more and more popular – and valuable – as the programs progressed. Right from the start of the Mercury program, each astronaut had been allowed to carry a certain number of personal items onboard, with NASA’s permission, in 1 A first version of this material was issued as Apollo 15 Cover Scandal in Orbit No.
    [Show full text]