Ulaanbaatar City District Competitiveness Report 2021 Dаа-338.5 Нна-65.012.1 U-33

Total Page:16

File Type:pdf, Size:1020Kb

Ulaanbaatar City District Competitiveness Report 2021 Dаа-338.5 Нна-65.012.1 U-33 ULAANBAATAR CITY DISTRICT COMPETITIVENESS REPORT 2021 DАА-338.5 ННА-65.012.1 U-33 ULAANBAATAR CITY DISTRICT COMPETITIVENESS REPORT 2021 Ulaanbaatar. 2021 ECONOMIC POLICY AND COMPETITIVENESS RESEARCH CENTER San Business Center, 9th floor, Prime Minister Amar street 29, Sukhbaatar duureg, Ulaanbaatar, Mongolia Tel: 976-11-321927 Fax: 976-11-321926 E-mail: [email protected] Website: www.ecrc.mn | www.aimagindex.mn | www.nogoonhutuch.mn Facebook: http://www.facebook.com/ecrcmn Twitter: http://twitter.com/ursulduhchadvar Printed in Tushig design LLC. ISBN 978-9919-9722-1-9 © All rights reserved. No part of this publication may be transmitted in any form or by any means, including photocopying and recording, or by any information storage and retrieval system. CONTENTS FOREWORD 4 3.1 BAGANUUR 44 GREETINGS 8 3.2 BAGAKHANGAI 52 ABBREVIATIONS 10 3.3 BAYANGOL 60 RESEARCH TEAM 10 3.4 BAYANZURKH 68 PREFACE 11 3.5 NALAIKH 76 3.6 SONGINOKHAIRKHAN 84 01 PRINCIPLES OF ANALYSIS 3.7 SUKHBAATAR 92 AND METHODOLOGY 14 3.8 KHAN-UUL 100 1.1 PURPOSE OF THE RESEARCH 15 3.9 CHINGELTEI 108 1.2 MEASURING DISTRICT 3.10 ULAANBAATAR CITY 116 COMPETITIVENESS 16 1.3 DATA SOURCES 19 1.4 SURVEY SAMPLING 20 04 STATISTICAL TABLES 122 1.5 COMPETITIVENESS INDEX METHODOLOGY 25 4.1 QUALITY OF LIFE 125 4.2 LIVING ENVIRONMENT 134 02 DISTRICT COMPETITIVENESS 4.3 SAFETY AND SECURITY 148 SCOREBOARD 28 4.4 GOVERNANCE 157 4.5 ECONOMIC PERFORMANCE 166 2.1 OVERALL DISTRICT COMPETITIVENESS INDEX 30 2.2 COMPETITIVENESS FACTOR INDEX 31 05 APPENDIX 170 2.3 COMPETITIVENESS SUB-FACTOR INDEX 36 5.1 DISTRICT COMPETITIVENESS CRITERIA 172 03 DISTRICT COMPETITIVENESS PROFILES 42 5.2 CHARACTERISTICS OF THE SAMPLE 190 EPCRC DISTRICT COMPETITIVENESS REPORT 2021 FOREWORD 004 FOREWORD I am pleased to present to you the increased by 27 percent in the past third “Ulaanbaatar City: District 10 years, making it home to 46 per- Competitiveness Report”. The Eco- cent of Mongolia’s population. The nomic Policy and Competitiveness total internal migration to Ulaan- Research Center has been conduct- baatar city amounted to 39,515 ing research on Mongolia’s com- people in the year 2020, which is the petitiveness for the past 10 years greatest record of the past 10 years. including district and provincial The shift from traditional nomadic competitiveness studies incorpo- lifestyles where people would move rating international methodologies with the seasons following climate and made them available for public situations to more sedentary and use. urban lifestyles which offer more opportunities and choices contin- By analyzing the competitiveness of ues to be observed. Ulaanbaatar city, the political and economic center of Mongolia, using Even though internal migration to cutting edge international method- the city has greatly increased in ologies we obtain crucial source of quantities, can we say the same information regarding the country’s about the quality of life? If there is development status in all areas. The a change in quality, is it getting bet- population of Ulaanbaatar city has ter or worse? Are the cities and dis- EPCRC DISTRICT COMPETITIVENESS REPORT 2021 FOREWORD 005 This report illustrates the results of policies and activities taken place and implemented by district and government authorities. By evaluating current and past situations, we are better posi- tioned to deal with problems in the future and plan our actions having learned from our past mistakes. tricts able to support health, safe- have become an essential part of ty and life quality of its residents? our lives. Many scientists and re- Questions like these can come close searchers warn that COVID-19 will to being answered by our District not completely disappear from our Competitiveness Report, giving our future. We are all faced with the readers opportunity to come to need to adapt to ever-changing life- their own conclusions using avail- styles brought on by the pandemic. able data, thus making it different The matters regarding digitalization from other types of research out- of government services cannot just lets. stay undone in papers but they must be addressed with utmost pri- Even though the overall compet- ority so that we can effectively deal itiveness index, published for the with the impacts of the pandemic. third time and in every 2 years, Is digital transformation happening has improved when compared to at the district offices and services? 2017, attention needs to be paid to Or are we still seeing queues domi- its growth inconsistency over the nated by people holding paper doc- years. Due to the global pandemic uments to get government services COVID-19, information and tech- at the district and khoroo offices in nology and digital services industry similar ways as in the 1980s? EPCRC DISTRICT COMPETITIVENESS REPORT 2021 006 FOREWORD Mongolia has the most land per could use this report to their capita in the world, yet the residents advantage to bring positive changes of Ulaanbaatar city are facing many to all areas, whether it is already problems—lack of parking space, doing well or not doing so well. pedestrian road, green space and traffic congestion, air and soil 2020 has been an unusual year pollution—in their day to day lives of challenges and choices for making life very stressful, all because Mongolia. While some countries urban planning and standards have had postponed their elections and never been properly implemented. sports events due to COVID-19, It is very sad that Mongolia is among Mongolia had held its parliamentary the countries with the most soil and local elections, choosing its and air pollution even though we representatives for the next 4 years. have this spacious land available at our disposal. This speaks to how I would like to congratulate you on unorganized and left behind we are. reading the District Competitiveness Report. As of 2020, Chingeltei, Baganuur and Nalaikh districts experienced This report illustrates the results improvements in their of policies and activities taken competitiveness scores while all place and implemented by district the other districts had their scores and government authorities. declined. Of the 9 districts of By evaluating current and past Ulaanbaatar, Khan-Uul came first in situations, we are better positioned the District Competitiveness Report to deal with problems in the future and Bayanzurkh and Bayangol and plan our actions having learned districts came second and third. You from our past mistakes. We are can see the detailed information inspired when this report helps on each indicator from the report not only provinces and districts but and demand changes from your also their residents in making their local authorities in the sectors that works advance further. The districts are not performing so well, so that must learn from each other and our city and districts can improve educate themselves on what is or collectively. Also, local authorities is not working thus creating a space EPCRC DISTRICT COMPETITIVENESS REPORT 2021 007 for improvement, while fixing past We, at the Economic Policy and mistakes and getting better as one. Competitiveness and Research Center, wish our readers the best of We thank the Asia Foundation, luck and abundance in your future other institutions and those who endeavors. By measuring your work made this report possible and for performance, you will have better supporting informed decision- control. By having better control, making process based on research you will lead successfully. and data. Dr. Tsagaan Puntsag Chairman of the Board EPCRC DISTRICT COMPETITIVENESS REPORT 2021 GREETINGS 008 GREETINGS The EPCRC District Competitiveness Since starting our work, we have Report is one of the most important observed significant increases in data sets that comes available to us the data that is available to help us every two years in Ulaanbaatar. The understand the dynamics that are Asia Foundation has been partner- shaping the development of this ing with the Municipality of Ulaan- vibrant and ever-changing city, and baatar for more than a decade on how we can best contribute to the a range of initiatives to improve the improvements being made. The in- quality of services across the city, troduction of the District Compet- especially in the ger areas. One of itiveness Survey conducted by the the core areas of work we have fo- EPCRC every two year since 2017 cused on has been collaborating has certainly been one of the most with our partners to gather infor- important data sets to emerge re- mation about the city as it is, and lating to the city’s development. turn it in to useful data in various formats, such as GIS maps, tables This is a tool that helps us under- and graphics that can help citizens, stand the complexities of gover- officials and decision makers alike. nance and local economies across EPCRC DISTRICT COMPETITIVENESS REPORT 2021 GREETINGS 009 the city, and how they interplay with ed by having clear, consistent stan- each other. With the longitudinal dards of performance measured data set now taking shape as the over time is invaluable in trying to EPCRC keeps adding new data sets, create an environment of positive we can also use this data to monitor development in Ulaanbaatar. our impact, as well as seek to under- stand what policies are behaviors For these reasons, The Asia Foun- shaping positive change the most. dation is very proud to again have We have also noticed the growing supported this 2021 District Com- interest among decision makers petitiveness report. I would like to and local officials in understanding congratulate the EPCRC for their ex- and using the data being produced cellent work this year, and offer my to try and determine how they can sincere best wishes for those who make improvements within their would use this report and make own scope and powers.
Recommended publications
  • Narrative Report on Study Tour of Mongolian Delegates to Jaipur
    A Study Tour of Municipal Government Official from Ulaanbaatar, Mongolia to Jaipur, India Organised by CUTS International With the support of The Asia Foundation, India December 08-10, 2015 Introduction Mongolia is a landlocked country in east-central Asia. It is bordered by Russia to the north and China to the south, east and west. While they do not share a border, Mongolia is separated from Kazakhstan by only 36.76 kilometres (22.84 mi). Ulaanbaatar, the capital and largest city, is home to about 45 percent of the population. Mongolia is divided into 21 provinces (aimags), which are in turn divided into 329 districts (sums). The capital Ulaanbaatar is administrated separately as a capital city (municipality) with provincial status. Thus being a federal municipality, the city is not part of any province. Ulaanbaatar is divided into nine districts: Baganuur, Bagakhangai, Bayangol, Bayanzürkh, Chingeltei, Khan Uul, Nalaikh, Songino Khairkhan, and Sükhbaatar. Each district is subdivided into Khoroos, of which there are 121. The capital and provinces have Citizens’ Representative Meeting (Local parliament) elected every 4 years. Governors exercise executive power in the capital and provinces and are appointed by the Prime Minister as recommended by Citizens’ Representative Meetings. Local administrations provide support for Governors. CUTS International with the support of The Asia Foundation (TAF) organised a three- day study tour for the Municipal Officials from the city of Ulaanbaatar of Mongolia. A 15- member delegation along with two representatives from TAF India visited Jaipur from December 07-11, 2015. 1 Objective The purpose of the study tour was to enhance capacities of the government officials with respect to informed decision making, community participation and implementation of activities for service improvement in their respective areas through exposure to relevant areas in India.
    [Show full text]
  • Proposed Future Environmental Security Project for Mongolia
    PROPOSED FUTURE ENVIRONMENTAL SECURITY PROJECT FOR MONGOLIA OYUNTSETSEG Luvsandash. Senior Desk Officer, Strategic Policy & Planning Department, Ministry of Defense, Mongolia Legal Environment . National Security Concept . Law on Hygienic; of Mongolia; . Law on soil Protection & . Concept of Sustainable Desertification; Development of Mongolia- . Law on Environmental 2030; Protection; . Program of the Mongolian . Law on Land; Government 2016-2020; . Law on Subsoil; . National Soil Protection . Law on Allocation of Land Program. to Mongolian Citizen; . Law on Rehabilitation to Citizens and Town. • In urban areas, bacteriological Mining contamination related to ger district sanitation is high; Air Processing • In the rural areas, waste from Pollution factories the aimag centers and soums is the main cause of soil pollution Ger district Waste sanitation Comparison of soil quality MNS 5850: 2008: The soil of Baganuur, Bagakhangai, Bayanzurkh, Sukhbaatar, Songinokhairkhan, Chingeltei, Khan-Uul and Nalaikh districts has no heavy metals such as cadmium, lead, mercury, zinc, copper, cobalt, and strontium. However, mercury, chromium, zinc, and strontium in the soil have increased in previous years. According to the results of the heavy metals monitoring of soil quality in Bayan-Ulgii, Dornogovi, Dornod, Dundgovi, Uvurkhangai, Umnugovi, Sukhbaatar and Khentii aimags, it is normalized to exceed the MNS 5850: 2008 standard. Total area 10.9 thousand hectares STATUS OF ABANDONED MILITARY SITES Waste - 143,882.10 м3/ha Soil disturbance - 20,077.30 м3 18 30 . A soil pollution assessment survey was conducted at 18 sites. The main pollutants are metal products such as petroleum, lead, zinc and chromium. Bayan nexus point: cadmium content was 4.6 mg/kg, lead content was 680.5 mg/kg, or 580.5 mg/kg from the maximum permissible level and reached toxic levels.
    [Show full text]
  • Capacity Development Project for Air Pollution Control in Ulaanbaatar City Phase 2 in Mongolia Technical Manual 06 PM10
    Mongolia Air Pollution Reduction Department (APRD) Capacity Development Project for Air Pollution Control in Ulaanbaatar City Phase 2 in Mongolia Technical Manual 06 PM10 and PM2.5 Measurement and PM Composition Analysis Manual September 2016 Japan International Cooperation Agency SUURI-KEIKAKU CO., LTD. Capacity Development Project for Air Pollution Control in Ulaanbaatar City Phase 2 in Mongolia Technical Manual 06 PM10 and PM2.5 Measurement and PM Composition Analysis Manual Introduction In this project JICA Experts have planned filter sampling of PM10 and PM2.5 of the ambient air at some sites in every season and analyze the components of the samples. JICA Experts will use the result for identification of PM sources throughout the year including winter season when the air pollution is severe and achieve information which will be useful for the policy making. Samplings and composition analysis of 120 points in total are scheduled in 3 years from 2014 to 2016. Considering the matters of power source and security, sampling points were selected from 10 local monitoring stations (6 stations of CLEM and 4 stations of APRD (AQDCC)) in UB City. And JICA Expert Team also used one local residence in northern gel area, Chingeltei from December 2014. Mass concentration of PM10 and PM2.5 is calculated by comparing the mass weight of sampled filter from before to after sampling. Major chemical compositions of PM are various elements, carbon components, and water soluble ionic species. However, analysis instruments were not in Mongolian country, above samples of filter on which PM was collected were used for composition analysis in Japan.
    [Show full text]
  • Thermo-Technical Retrofitting of State-Owned Schools and Kindergartens in Ulaanbaatar, Mongolia
    Thermo-Technical Retrofitting of State-owned Schools and Kindergartens In Ulaanbaatar, Mongolia Preliminary study Main Report Ulaanbaatar, Mongolia, 2014 Contents Introduction 6 1. Rationale 6 2. Background, objectives and the methods of the study 9 2.1. Background 9 2.3 Method and approach of the study 11 2.3.1 Scope of the study 12 2.3.2 Study tools 12 3. Issues related to the education sector of Mongolia and conditions of school and kindergarten buildings in Ulaanbaatar 12 3.1. Current situation and objectives of education development 12 3.2 School and kindergarten buildings, learning environment and challenges facing 15 3.3 School and kindergarten buildings in Ulaanbaatar 17 3.4 Need for thermo-technical retrofitting of buildings, legal frame work (Building norms and regulations (BNR), other legislation) 17 3.5 Tariff system 19 3.6 Experience and results of the demonstration project GIZ/USAID 19 4. The study results and analysis 22 4.1. The study results on kindergartens in Ulaanbaatar 22 4.1.1 General information 22 4.1.2 The current physical and operational conditions of buildings 26 4.1.3 Operational conditions of buildings 27 4.1.4. Kindergarten budget, expenses for heating, maintenance and overhaul work 43 4.2. The survey results and analysis of schools 45 4.2.1 General Information 45 4.2.2. The current physical and operational conditions of buildings 48 4.2.4 Engineering infrastructure provision 53 4.2.5 School budget, expenses for heating, maintenance and overhaul work 63 5. Recommendations for selection of buildings for TTR 66 6.
    [Show full text]
  • Tuul River Basin Basin
    GOVERNMENT OF MINISTRY OF ENVIRONMENT MONGOLIA I II III AND GREEN DEVELOPMENT Physical, Tuul river Socio-Economic geographical basin water Development and natural resource and and Future condition of water quality trend of the Tuul river Tuul River basin Basin IV V VI Water Water use Negative TUUL RIVER BASIN supply, water balance of the impacts on consumption- Tuul river basin basin water INTEGRATED WATER MANAGEMENT PLAN use and water resources demand, hydro- constructions VII VIII IX Main challenges River basin The organization and strategic integrated and control of objectives of the water resources the activities to river basin water management implement the Tuul management plan plan measures River Basin IWM INTEGRATED WATER MANAGEMENT PLAN plan Address: TUUL RIVER BASIN “Strengthening Integrated Water Resources Management in Mongolia” project Chingunjav Street, Bayangol District Ulaanbaatar-16050, Mongolia Tel/Fax: 362592, 363716 Website: http://iwrm.water.mn E-mail: [email protected] Ulaanbaatar 2012 Annex 1 of the Minister’s order ¹ A-102 of Environment and Green Development, dated on 03 December, 2012 TUUL RIVER BASIN INTEGRATED WATER MANAGEMENT PLAN (Phase 1, 2013-2015; Phase 2, 2016-2021) Ulaanbaatar 2012 DDC 555.7’015 Tu-90 This plan was developed within the framework of the “Strengthening Integrated Water Resources Management in Mongolia” project, funded by the Government of the Kingdom of the Netherlands at Ministry of Environment and Green Development of Mongolia Project Project Project Consulting Team National Director
    [Show full text]
  • 50% 31% 10% 9% 50%
    MONGOLIA : COVID-19 PREPAREDNESS SITREP # 19 FLOW MONITORING AT MAJOR CHECKPOINTS OF ULAANBAATAR 17-Mar-2020 (Data collected: 08:00 hrs Feb 27th - 24:00 hrs March 16th, 2020) 12:00 (GMT+8) The Mongolian Government has taken early and very active measures to prevent and stop an eventual spread of the COVID-19. Besides closing all the educational institutions starting with January 27th and imposing international travel restrictions that are expanding along with the growing number of countries affected by COVID-19 globally, on 13 February 2020 the government also declared state of high alert. To prevent a possible spread of COVID during the Mongolian Lunar New Year (February 24-26, 2020), the Emergency Commission restricted all travel between aimags (provinces), as well as incoming and outgoing flows in the capital city. Ulaanbaatar is by far the biggest urban settlement in Mongolia concentrating almost half of the country’s population. It is a major destination, transition point and origin for population movements and as such may represent a powerful source for spreading COVID-19 to the entire country. To increase its preparedness and also an eventual response to COVID-19, the Governor’s Office of the Capital City has requested the assistance of International Organization for Migration, Mission to Mongolia (IOM) to take evidence of all the incoming and outgoing flows of people by implementing its Displacement Tracking Matrix (DTM) methodology. Based on a joint agreement to implement DTM between IOM and the Governor’s Office of the Capital City, a total of over 300 health and education system personnel have been trained as data enumerators and technical assistance was provided to set up the overall data collection and analysis framework.
    [Show full text]
  • 50% 31% 10% 9% 50%
    MONGOLIA : COVID-19 PREPAREDNESS SITREP # 20 FLOW MONITORING AT MAJOR CHECKPOINTS OF ULAANBAATAR 18-Mar-2020 (Data collected: 08:00 hrs Feb 27th - 24:00 hrs March 17th, 2020) 12:00 (GMT+8) The Mongolian Government has taken early and very active measures to prevent and stop an eventual spread of the COVID-19. Besides closing all the educational institutions starting with January 27th and imposing international travel restrictions that are expanding along with the growing number of countries affected by COVID-19 globally, on 13 February 2020 the government also declared state of high alert. To prevent a possible spread of COVID during the Mongolian Lunar New Year (February 24-26, 2020), the Emergency Commission restricted all travel between aimags (provinces), as well as incoming and outgoing flows in the capital city. Ulaanbaatar is by far the biggest urban settlement in Mongolia concentrating almost half of the country’s population. It is a major destination, transition point and origin for population movements and as such may represent a powerful source for spreading COVID-19 to the entire country. To increase its preparedness and also an eventual response to COVID-19, the Governor’s Office of the Capital City has requested the assistance of International Organization for Migration, Mission to Mongolia (IOM) to take evidence of all the incoming and outgoing flows of people by implementing its Displacement Tracking Matrix (DTM) methodology. Based on a joint agreement to implement DTM between IOM and the Governor’s Office of the Capital City, a total of over 300 health and education system personnel have been trained as data enumerators and technical assistance was provided to set up the overall data collection and analysis framework.
    [Show full text]
  • Economic Analysis
    Sustaining Access to and Quality of Education During Economic Difficulties Project (RRP MON 50091) ECONOMIC ANALYSIS A. Sector Context and Economic Rationale 1. The Government of Mongolia assigns high priority to education, spending 7.5% of the gross domestic product or 15.1% of total government expenditures in 2016. Five years of primary education and 4 years of junior secondary education are compulsory and provided free of charge. Of the total 768 schools, 636 or 82.8% are public. Three free years of pre-primary education are provided at public kindergartens (826 or 64.1% of kindergartens). In SY2015 the net enrollment rate (NER) reached 74.4% for pre-primary education, 96.3% for primary education, 94.1% for junior secondary education, and 68.7% for senior secondary education.1 Severe cuts in the education budgets in 2017 and beyond, however, greatly constrain the government’s capacity to sustain access to and quality of education, which has been deteriorating partly due to the growth of kindergartner and school-age population. 2. The deterioration in access to and quality of education is due to the lack of available seats at schools and kindergartens. From SY2012 to SY2015, student enrollment in schools increased by 7.8%, outpacing the rate of increase in the number of schools (1.7%). Enrollments in kindergartens have grown more dramatically, by 24.5%, though 343 more kindergartens (36.3% increase) have been built to offset the enrollment growth. Ulaanbaatar saw a particularly significant expansion in student enrollment, recording an 18.1% increase in schools and a 41.5% surge in kindergartens, largely because of rural–urban migration.
    [Show full text]
  • Aimag, the Capital City and Districts' IPPA
    Aimag, the capital city and districts’ IPPA 1 Aimag, the capital city and districts’ IPPA MINISTRY OF HEALTH MINISTRY OF FOOD, AGRICULTURE AND LIGHT INDUSTRY NATIONAL EMERGENCY MANAGEMENT AGENCY SPECIALIZED GENERAL INSPECTION AGENCY VETERINARY INSTITUTE NATIONAL CENTRE FOR COMMUNICABLE DISEASE STATE CENTRAL VETERINARY LABORATORY NATIONAL CENTRE FOR INFECTIOUS DISEASES WITH NATURAL FOCI “AVIAN INFLUENZA CONTROL AND HUMAN PANDEMIC INFLUENZA PREPAREDNESS AND RESPONSE’’ PROJECT INFLUENZA PANDEMIC PREPAREDNESS ASSESSMENT FINAL REPORT Ulaanbaatar 2009 2 Aimag, the capital city and districts’ IPPA INFLUENZA PANDEMIC PREPAREDNESS ASSESSMENT FINAL REPORT REPORT COMPILED BY: D.Naranzul, NCCD D.Nyamkhuu, NCCD N.Dondog, NCCD Ch.Мunkhtsetseg, NCCD L.Dashtseren, NCCD Ch.Batchuluun, NEMA R.Sodnomdarjaa, SCVL U.Munkhchuluun, “Avian Influenza Control and Human Pandemic Influenza Preparedness and Response” project CONSULTANT: Prof. P.Nymadawa, MD, PhD, DSc (Med) 3 Aimag, the capital city and districts’ IPPA TABLE OF CONTENTS: 1. Table of contents .......................................................................................................................... 4 2. Glossary of Abbreviations ............................................................................................................ 5 3. Preface .......................................................................................................................................... 8 4. Influenza Pandemic Preparedness Assessment Final Report .....................................................
    [Show full text]
  • Programme Update No.2 2
    MONGOLIA Date 17.12.2003 Appeal No. 01.68/2003 Appeal Target: CHF 770,524 CHF (USD 527,864 or EUR 523,425) Programme Update No. 2; Period covered: July to November, 2003 The Federation’s mission is to improve the lives of vulnerable people by mobilising the power of humanity. It is the world’s largest humanitarian organisation and its millions of volunteers are active in over 180 countries. For more information: www.ifrc.org In Brief Appeal coverage: 87 %; See attached Contributions List for details. Outstanding needs: CHF 101,905 Related Emergency or Annual Appeals: Emergency Appeal, Snowfalls (02/2003) Programme Summary: Progress on activities outlined in the annual appeal is, in most cases, going according to plan. The disaster management programme has implemented a number of its objectives through the snowfalls emergency appeal (02.2003) which has also highlighted a number of areas for improvement. The highlight of this reporting period was the Mongolian Red Cross national conference which brought together a variety of participants from around the country to discuss short- and long-term strategies for strengthening the society’s response to vulnerable people as a result of this, the National Conference was ratified and adopted the Mongolian Red Cross Society's strategy 2010. Operational Developments After four years of consecutive dzud, (a term that refers to severe winter conditions that, when combined with drought and poor summer conditions, destroys grazing material, preventing animals from access to food during the country’s long winter months), the summer of 2003 turned out to be the best in four years.
    [Show full text]
  • Revitalization of Mongolia's
    REVITALIZATION OF MONGOLIA’S Public Disclosure Authorized PROTECTED AREAS THROUGH EFFECTIVE FOREST MANAGEMENT OF BOGD KHAN UUL Environmental and Social Impact Assessment Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 May 27, 2010 2 Table of contents TABLE OF CONTENTS ........................................................................................................................... 3 CHAPTER 1: DESCRIPTION OF THE PROJECT .............................................................................. 9 Project development objective and key indicators ................................................................................................ 9 Project area ......................................................................................................................................................... 14 CHAPTER 2: DESCRIPTION OF THE BOGD KHAN UUL ENVIRONMENT ............................. 16 Bogd Khan Uul SPA .............................................................................................................................................. 16 Valley-by-Valley Description ................................................................................................................................ 18 Bogd Khan Uul as a Sacred Mountain .................................................................................................................. 33 Archaeology ........................................................................................................................................................
    [Show full text]
  • 3. Current Solid Waste Management the Study on Solid Waste Management Plan for Ulaanbaatar City in Mongolia JICA 3.1 Current Waste Stream KOKUSAI KOGYO CO., LTD
    3. Current Solid Waste Management The Study on Solid Waste Management Plan for Ulaanbaatar City in Mongolia JICA 3.1 Current Waste Stream KOKUSAI KOGYO CO., LTD. 3 Current Solid Waste Management 3.1 Current Waste Stream The waste stream of Ulaanbaatar in 2006 is elaborated in this Section based on the following survey results (see Chapter 2 of this report): x WACS in 2005 x Survey on medical waste management in 2005 x Survey on industrial waste management in 2005 x Study on construction waste in 2005 (estimation of generation amount is made for 2004) x Survey on final disposal amount in 2005 and 2006 3.1.1 Generation of Household Waste Based on the results of the waste amount and composition survey (WACS) in 2005, the generation rate and number of generation source (population) are estimated as described in the Section 4.1. The average generation rate (GR) in 2006 in the table below is calculated as follows: Average GR in 2006 = ((Apart area GR in 2006 x Apart area population in 2006) + (Ger area GR in 2006 x Ger area population in 2006))/Population of MUB in 2006 The table below presents household generation of Ulaanbaatar in 2006. Table 3-1: Household Waste Generation (2006) Number of Winter season Summer season Generation Source Generation Unit Generation Daily Generation Generation Daily Generation Source Rate (g//day) Amount (ton/day) Rate (g//day) Amount (ton/day) Apart 481,037 g/person/day 264 127.0 235 113.0 Household Ger 409,772 g/person/day 956 391.8 208 85.2 Waste Average 890,809 g/person/day 582 518.8 222 198.2 3.1.2 Generation of Business Waste Business wastes consist of those from commercial, office, market, school, hotel and public area cleaning.
    [Show full text]