Tender Document

Total Page:16

File Type:pdf, Size:1020Kb

Tender Document :: TENDER DOCUMENT:: Tender No: 19/JREDA/CANALTOP/18-19. TENDER FOR DESIGN, ENGINEERING, PROCUREMENT & SUPPLY, CONSTRUCTION, COMMISSIONING & COMPREHENSIVE OPERATION AND M AINTENANCE FOR TEN (10) YEARS OF 2 MW (AC) GRID-CONNECTED CANAL-TOP SOLAR P HOTOVOLTAIC POWER PLANT AT SIKIDIRI CANAL, VILLAGE: SIKIDIRI, DISTRICT : RANCHI, STATE: JHARKHAND Issued by: Jharkhand Renewable Energy Development Agency (JREDA) 3rd Floor, SLDC Building, Kusai Colony, Doranda Ranchi-834 002, JH Phone: +91 651-2491 161 Email: [email protected] Web: www.jreda.com “Tender for Design, Engineering, Procurement & Supply, Construction, Commissioning And Comprehensive Operation & Maintenance For Ten (10) Years of 2 MW Grid-Connected Canal-top Solar Photovoltaic Power Plant at Sikidiri Canal, Ranchi, Jharkhand”, Ref. No. 19/JREDA/CANALTOP/18-19 Jharkhand Renewable Energy Development Agency (JREDA) (3rd Floor, SLDC Building, Kusai Colony, Doranda, Ranchi) Website: - www.jreda.com TENDER FOR DESIGN, ENGINEERING, PROCUREMENT & SUPPLY, CONSTRUCTION, COMISSIONING AND COMPREHENSIVE OPERATION & MAINTENANCE FOR TEN (10) YEARS OF 2 MW GRID-CONNECTED Canal-TOP SOLAR PHOTOVOLTAIC POWER PLANT AT SIKIDIRI CANAL, VILLAGE: SIKIDIRI, DISTRICT: RANCHI, STATE: JHARKHAND ISSUED BY: DIRECTOR, JHARKHAND RENEWABLE ENERGY DEVELOPMENT AGENCY (JREDA) (Sign and Seal of Bidder) Page 2 of 251 “Tender for Design, Engineering, Procurement & Supply, Construction, Commissioning And Comprehensive Operation & Maintenance For Ten (10) Years of 2 MW Grid-Connected Canal-top Solar Photovoltaic Power Plant at Sikidiri Canal, Ranchi, Jharkhand”, Ref. No. 19/JREDA/CANALTOP/18-19 Jharkhand Renewable Energy Development Agency 3rd Floor, SLDC Building, Kusai Colony, Doranda, Ranchi Website:- www.jreda.com; Email: [email protected] Telephone no.: 0651- 2491 165 Govt. of Jharkhand Energy Department Jharkhand Renewable Energy Development Agency (JREDA) 3rd Floor, S.L.D.C. Building, Kusai Colony, Doranda, Ranchi-834002. Ph.: 0651-2491161, Fax: 0651-2491165, E-mail: [email protected]; Website: www.jreda.com e-Procurement Notice Tender Reference No. : 19/JREDA/CANALTOP/18-19 Dated: 15.01.2019 1 Name of the work Design, Engineering, Procurement & Supply, Construction, Commissioning and Comprehensive Operation & Maintenance for Ten (10) Years of 2 MW Grid-Connected Canal-Top Solar Photovoltaic Power Plant at Sikidiri Canal, Village: Sikidiri, District: Ranchi, State: Jharkhand 2 Estimated Cost Rs. 16.44 Crores. 3 Time of completion 06 (Six) Months 4 Date of publication of NIT on website: 17.01.2019 (Thursday) http:// jharkhandtenders.gov.in 5 Date & time of Pre-bid meeting 25.01.2019 (Friday) at 1.00 P.M. 6 Last date & time for receipt of online bids 11.02.2019 (Monday) upto 05:00 PM 7 Submission of original copies of Bid fee & 11.02.2019 and 12.02.2019 up to 5.00 P.M. EMD (Offline) 8 Technical Bid Opening Date 13.02.2019 (Wednesday) at 03:00 PM 9 Name & address of office inviting tender Director, Jharkhand Renewable Energy Development Agency(JREDA) 3rd Floor, SLDC Building, Kusai, Doranda, Ranchi- 834002 (Jharkhand) 10 Contact no. of procurement officer 0651-2491167/68/61 11 Helpline no. of e-procurement 0651-2491167/68/61 Any change can be seen on website: http://jharkhandtenders.gov.in & www.jreda.com Further details can be seen on website: http://jharkhandtenders.gov.in & www.jreda.com Sd/- Director, JREDA, Ranchi (Sign and Seal of Bidder) Page 3 of 251 “Tender for Design, Engineering, Procurement & Supply, Construction, Commissioning And Comprehensive Operation & Maintenance For Ten (10) Years of 2 MW Grid-Connected Canal-top Solar Photovoltaic Power Plant at Sikidiri Canal, Ranchi, Jharkhand”, Ref. No. 19/JREDA/CANALTOP/18-19 NOTICE INVITING e-Tender SUB: “TENDER FOR DESIGN, ENGINEERING, PROCUREMENT & SUPPLY, CONSTRUCTION, COMISSIONING AND COMPREHENSIVE OPERATION & MAINTENANCE FOR TEN (10) YEARS OF 2 MW GRID-CONNECTED CANAL- TOP SOLAR PHOTOVOLTAIC POWER PLANT AT SIKIDIRI CANAL, RANCHI, JHARKHAND” Ref: 19/JREDA/CANALTOP/18-19. This e-Tender in two parts are invited on behalf of Jharkhand Renewable Energy Development Agency (JREDA), Ranchi from eligible parties for the work as under: Jharkhand Renewable Energy Development Agency (JREDA) invites interested parties to participate in this “Tender” for bidding and selection process for the appointment of Contractor for “Design, Engineering, Procurement & Supply, Construction, Commissioning and Comprehensive Operation and Maintenance for Ten (10) years of 2 MW Grid Connected Canal-Top Solar Photovoltaic Power Plant using PV technology at Sikdiri Canal, Village- Sikidiri, Ranchi in the State of Jharkhand” (the “Project”). The 2 MW grid-connected canal- top solar PV Project is to be developed at Sikidiri Canal located near Sikidiri village of Jharkhand state. Proposed site is located in close vicinity of Getalsud Dam being operated by Jharkhand Urja Utpadan Nigam Limited (JUUNL) at Village: Sikidiri, Block: Angara; District: Ranchi; State: Jharkhand. The site is located approximately 40 km from Ranchi, Jharkhand where a capacity of 2 MW Canal-top Solar PV power plant can be installed. Tender Documents may be downloaded from Website http://jharkhandtenders.gov.in & www.jreda.com. For view download and any other updates regarding this Tender, kindly check www.jreda.com. Tender Fee & EMD shall be paid along with online submission of Tender Documents shall be submitted before the due date along with the original documents. All the relevant documents of the Tender shall also be submitted physically by Registered Post A.D. or Speed Post or in Person only which shall be addressed to: Director, Jharkhand Renewable Energy Development Agency (JREDA), 3rd Floor, SLDC Building, Kusai Colony, Doranda, Ranchi-834 002, Jharkhand super scribing the envelope with Tender No. and Description. The bidder can submit the Tender in person to the office of Tender Issuing Authority before stipulated timeline. (Sign and Seal of Bidder) Page 4 of 251 “Tender for Design, Engineering, Procurement & Supply, Construction, Commissioning And Comprehensive Operation & Maintenance For Ten (10) Years of 2 MW Grid-Connected Canal-top Solar Photovoltaic Power Plant at Sikidiri Canal, Ranchi, Jharkhand”, Ref. No. 19/JREDA/CANALTOP/18-19 List of Important dates & details of Bids NIB No: 19/JREDA/CANALTOP/18-19 TABLE A: IMPORTANT DATES Sr. Event Date (and Time) i. : 17.01.2019 (Thursday) Date of upload of this Tender ii. Last date and time for receipt of : 28.01.2019 (Monday) questions/ queries/ clarifications iii. Site visit guided by JREDA/GERMI : 25.01.2019 iv. Pre-Bid Meeting : 25.01.2019 (Friday) at 1.00 P.M. v. Last date and time of On-line (e- : 11.02.2019 (Monday) upto 05:00 PM tendering) tender/offer submission (the “Bid Submission Deadline”) {This is mandatory} vi. Last date and time of Physical receipt of : 11.02.2019 and 12.02.2019 up to 5.00 all the relevant documents by RPAD or P.M. Speed Post or in person only {This is mandatory} vii. Bid Validity : One Hundred and Eighty (180) days from the date of opening of the Price Bid of this Tender viii. Opening of Technical Bid : 13.02.2019 (Wednesday) at 03:00 PM ix. Tentative date of opening of online : Shall be intimated later. Financial Bid x. Target date for Commissioning of Project : 180 days from Letter of Intent xi. Tentative Date for Operational : 210 days from Letter of Intent (Sign and Seal of Bidder) Page 5 of 251 “Tender for Design, Engineering, Procurement & Supply, Construction, Commissioning And Comprehensive Operation & Maintenance For Ten (10) Years of 2 MW Grid-Connected Canal-top Solar Photovoltaic Power Plant at Sikidiri Canal, Ranchi, Jharkhand”, Ref. No. 19/JREDA/CANALTOP/18-19 Acceptance Test xii. Performance Guarantee Testing Period : Performance Guarantee (PG) Test Period shall start as under: A) If the Contractor successfully completes Operational Acceptance Test (OAT) in first attempt within 30 days from date of commissioning then PG Test Period and O&M Period will start from the date when the OAT was successfully Completed. (OR) B) In case the Contractor fails the OAT in the first attempt, the Contractor shall be allowed maximum 30 days for corrective actions and further next OAT shall start on completion of 30 days period or earlier as desired by the Contractor. The PG Test and the O&M period shall start from the date when of second OAT period is started. In case the Contractor fails in the second attempt as well, a penalty will be imposed at 1% of EPC Contract Price. In this case, irrespective of the result (whether pass or fail) of the OAT, the PG Test and O&M Period shall start at the beginning of the second OAT. The start of O&M and first year operation shall be considered after successful completion of operational acceptance test or 60 days from date of commissioning of 2 MW (AC) (Sign and Seal of Bidder) Page 6 of 251 “Tender for Design, Engineering, Procurement & Supply, Construction, Commissioning And Comprehensive Operation & Maintenance For Ten (10) Years of 2 MW Grid-Connected Canal-top Solar Photovoltaic Power Plant at Sikidiri Canal, Ranchi, Jharkhand”, Ref. No. 19/JREDA/CANALTOP/18-19 whichever is earlier. Further all the guarantees related to NEEGG / Incentive shall also be applicable. (OR) C) However, in case of failure of the second OAT, if the Contractor needs more time to further take corrective action at its own discretion, then the same may be allowed by JREDA without imposing any further penalty on the Contractor towards such subsequent (i.e. 3rd or 4th attempt) OATs. However, if the Contractor is successful in third attempt then the penalty deducted at the time of unsuccessful 2nd attempt of OAT shall be returned but if the Contractor fails in third attempt of OAT then penalty charged at the time of second unsuccessful attempt of OAT shall not be returned to the Contractor. xiii. Operation and Maintenance Period : Upon start of PG Test Period as per Clause No.
Recommended publications
  • Access Jharkhand-Obj07-04-2021-E-Book
    Index 01. Jharkhand Special Branch Constable (Close 16. JSSC Assistant Competitive Examination Cadre) Competitive Exam 01-09-2019 28.06.2015. 02. J.S.S.C. - Jharkhand Excise Constable Exam 17. Jharkhand Forest Guard Appointment Com- 04-08-2019 petitive (Prelims) Exam - 24.05.2015. 03. SSC IS (CKHT)-2017, Intermediate Level (For 18. Jharkhand Staff Selection Commission the post of Hindi Typing Noncommittee in Com- organized Women Supervisor competitive puter Knowledge and Computer) Joint Competi- Exam - 2014. tive Exam 19. Fifth Combined Civil Service Prelims Compet- 04. JUVNL Office Assistent Exam 10-03-2017 itive Exam - 15.12.2013. 05. J.S.S.C. - Post Graduate Exam 19-02-2017 20. Jharkhand Joint Secretariat Assistant (Mains) 06. J.S.S.C Amin Civil Resional Investigator Exam Examination 16.12.2012. 08-01-2017 21. State High School Teacher Appointment 07. JPSC Prelims Paper II (18.12.2016) Examination 29.08.2012. 08. JPSC Prelims Paper-I (Jharkhand Related 22. Jharkhand Limited Departmental Exam- Questions Only on 18.12.2016) 2012. 09. Combined Graduation Standard Competitive 23. Jharkhand Joint Secretariat Assistant Exam- (Prelims) Examinations 21.08.2016 2012. 10. Kakshpal appointment (mains) Competitive 24. Fourth Combined Civil Service (Prelims) Examination 10.07.2016. Competitive Examination - 2010. 11. Jharkhand Forest guard appointment (mains) 25. Government High School Teacher Appoint- Competitive Examination 16.05.2016. ment Exam - 2009. 12. JSSC Kakshpal Competitive (Prelims) Exam - 26. Primary Teacher Appointment Exam - 2008. 20.03.2016. 27. Third Combined Civil Service Prelims 13. Jharkhand Police Competitive Examination Competitive Exam - 2008. 30.01.2016. 28. JPSC Subsidiary Examination - 2007.
    [Show full text]
  • – Kolab River 4)Indravati Dam – Indravati River 5)Podagada Dam – Podagada River 6)Muran Dam – Muran River 7)Kapur Dam – Kapur River
    DAMS IN INDIA WEST BENGAL 1)FARRAKA BARRAGE – GANGES RIVER 2)DURGAPUR BARRAGE – DAMODAR RIVER 3)MAITHON DAM –BARAKAR RIVER 4)PANCHET DAM – DAMODAR RIVER 5)KANGSABATI DAM – KANGSABATI RIVER UTTAR PRADESH 1)RIHAND DAM – RIHAND RIVER 2)MATATILA DAM – BETWA RIVER 3)RAJGHAT DAM – BETWA RIVER ODISHA 1)HIRAKUND DAM – MAHANADI 2)RENGALI DAM – BRAHMANI RIVER 3)UPPER KOLAB DAMwww.OnlineStudyPoints.com – KOLAB RIVER 4)INDRAVATI DAM – INDRAVATI RIVER 5)PODAGADA DAM – PODAGADA RIVER 6)MURAN DAM – MURAN RIVER 7)KAPUR DAM – KAPUR RIVER www.OnlineStudyPoints.com DAMS IN INDIA JHARKHAND 1)MAITHON DAM- BARAKAR RIVER 2)PANCHET DAM- DAMODAR RIVER 3)TENUGHAT DAM – DAMODAR RIVER 5)GETALSUD DAM – SWARNAREKHA RIVER MADHYA PRADESH 1)GANDHISAGAR DAM – CHAMBAL RIVER 2)TAWA DAM – TAWA RIVER 3)INDIRA SAGAR DAM – NARMADA RIVER 4)OMKARESHWAR DAM – NARMADA RIVER 5)BARGI DAM – NARMADA RIVER 6)BARNA DAM – BARNA RIVER 7)BANSAGAR DAM – SON RIVER CHHATTISGARH www.OnlineStudyPoints.com 1)MINIMATA BANGO DAM – HASDEO RIVER 2)DUDHWA DAM – MAHANADI 3)GANGREL DAM – MAHANADI 4)SONDUR DAM – SONDUR 5)TANDULA DAM – TANDULA RIVER 6)MONGRA BARRAGE – SHIVNATH www.OnlineStudyPoints.com DAMS IN INDIA MAHARASHTRA 1)KOYNA DAM – KOYNA RIVER 2)JAYAKWADI DAM – GODAVARI RIVER 3)ISAPUR DAM – PENGANA RIVER 4)WARNA DAM – VARNA RIVER 5)TOTLADOH DAM – PENCH RIVER 6)SUKHANA DAM – SUKHANA RIVER 7)UJJANI DAM – BHIMA RIVER JAMMU AND KASHMIR 1)SALAL DAM – CHENAB RIVER 2)BAGLIHAR DAM – CHANAB RIVER 3)PAKUL DUL DAM – CHENAB RIVER 3)URI DAM – JHELUM RIVER 4)NIMBOO BAZGO HYDROELECTRIC PLANT – INDUS RIVER
    [Show full text]
  • Actionaid Resource Rich Report.Pdf
    RESOURCE RICH TRIBAL POOR Displacing people, destroying identity in India’s indigenous heartland A Report by ActionAid India ActionAid R-7 Hauz Khas Enclave, New Delhi 110 016 Indian Social Institute (New Delhi) www.actionaidindia.org LAYA RESOURCE RICH TRIBAL POOR Displacing people, destroying identity in India’s indigenous heartland A Report by ActionAid Indian Social Institute (New Delhi) LAYA Resource Rich Tribal Poor All rights are reserved. The document may be freely reviewed, quoted, reproduced or translated, in part or in full, provided the source is acknowledged. The analysis and policy recommendations of this Report do not necessarily represent the views of ActionAid India. Copyright © ActionAid 2008 Research conducted in 2007 Report published in 2008 Designed and Printed by: New Concept Information Systems Pvt. Ltd. Email: [email protected] Foreword Even after six decades of national reconstruction process by way of agricultural, industrial, mineral, infrastructural and other related developments, India still suffers from low level of development and poor quality of life of its population. Incidence of poverty, malnutrition, morbidity and mortality, and non-literacy are still high among them. Much of these are attributed to slow and low pace of development, and rapid and accelerated pace is seen as a way out. It is however, doubtful if development as has been pursued in the last sixty years of independent India, offers the solution. If it did, tribal India would have been much better placed today than it had been in the past. After all, much of the development projects that India has witnessed in post-independent era have taken place in tribal regions, especially in regions adjoining the States of Andhra Pradesh, Chhattisgarh, Jharkhand and Orissa.
    [Show full text]
  • Environmental Assessment
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Environment and Social Impact Assessment Report (Scheme D, Volume 1) Public Disclosure Authorized Jharkhand Urja Sancharan Final Report Nigam Limited January 2018 www.erm.com The Business of Sustainability FINAL REPORT Jharkhand Urja Sancharan Nigam Limited Environment and Social Impact Assessment Report (Scheme D, Volume 1) 31 January 2018 Reference # 0402882 Reviewed by: Avijit Ghosh Principal Consultant Approved by: Debanjan Bandyapodhyay Partner This report has been prepared by ERM India Private Limited a member of Environmental Resources Management Group of companies, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at their own risk. TABLE OF CONTENTS EXECUTIVE SUMMARY I 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 PROJECT OVERVIEW 1 1.3 PURPOSE AND SCOPE OF THIS ESIA 2 1.4 STRUCTURE OF THE REPORT 2 1.5 LIMITATION 3 1.6 USES OF THIS REPORT 3 2 POLICY, LEGAL AND ADMINISTRATIVE FRAME WORK 5 2.1 APPLICABLE LAWS AND STANDARDS 5 2.2 WORLD BANK SAFEGUARD POLICY
    [Show full text]
  • Gvc 7R^Z]J Z Tyrcxvdyvve
    $ % @(# *; ) *; ; ()"*(+,-./ )-.-). / ()*& +, )*0 +1 # & =8 <82: 2 0" " $88$ &"<+8< <8A /=$ A &2%8 %+8//2 (8:+ :"%/09 +0#2: +" 2/8$92< <2/%+ <2#"< %+2/(=2<+ <82: 8$28 8A8/$0/ "/: '"/8 , $"#8< /=$ / #: (8+<2("/ +C(8<2 2( D'2C92(2 % !' ((& - B2 $ ) 8 2 0 1 .023,45 ,.6 $ ! Q R R %) 8( ) L M O N O '# /89 (8:+;(8+<2("/ “panic-stricken” Modi and fair trial rights override 2 ' Government is using “rehashed media rights and the court can 0 he ED’s supplementary insinuations” through its “pup- temporarily curtail the freedom N<=O N2#O N&2.O Tchargesheet in the pet” ED, which it dubbed as of the media to ) AgustaWestland chopper scam “Election Dhakosla” (sham) ensure that. . case raised the political tem- for “manufacturing lies”. = ) ( perature ahead of the Lok “A single uncertified Sabha polls with Prime page leaked by ED of a Minister Narendra Modi on purported chargesheet is a ) /89 (8:+ , " -+ $( Friday bringing it up to attack cheap election stunt to 0 N2#O the Congress even as alleged divert attention from mid speculation about her middleman Christian Michel imminent defeat of the N&2.O* N2#O 2 # N&2.O * + Acandidature from the claimed before a court he has Modi Government. The ED 2 # ? 9 ? . Indore Lok Sabha constituen- not named anyone during the Parade Ground in Dehradun. has become ‘Election Dhakosla’ cy and denial of ticket to vet- investigation. The Congress Reacting to Modi’s veiled of a Government manufactur- erans like LK Advani and MM called the ED move as “cheap reference to him, Ahmed Patel, ing a lie a day,” he told media Joshi, outgoing Lok Sabha political stunt” to divert people’s a senior Congress leader who in Delhi.
    [Show full text]
  • Jharkhand Urban Water Supply Improvement Project – Intake Arrangement for Water Supply System in Ranchi
    Initial Environmental Examination Document Stage: Draft for Consultation Project Number: 52028-004 April 2021 INDIA: Jharkhand Urban Water Supply Improvement Project – Intake Arrangement for Water Supply System in Ranchi Package No: JUWSIP/03 Prepared by Jharkhand Urban Infrastructure Development Co. Ltd. under guidance of the Urban Development and Housing Department, Government of Jharkhand for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 6 April 2021) Currency Unit = Indian rupees (₹) ₹1.00 = $0.013 $1.00 = ₹73.27 ABBREVIATIONS ADB – Asian Development Bank ASI – Archeological Survey of India CPCB – Central Pollution Control Board – Central Public Health and Environmental Engineering CPHEEO Organization 3rd Edition CTE – Consent to Establish CTO – Consent to Operate EAC – Expert Appraisal Committee EHS – Environmental, Health, and Safety EIA – environmental impact assessment EMP – environmental management plan GLSR – Ground Level Service Reservoir GOI – Government of India GOJ – Government of Jharkhand IEE – initial environmental examination MoHUA – Ministry of Housing and Urban Affairs MPN – most probable number MoEFCC – Ministry of Environment, Forest, and Climate Change NOC – no objection certificate O&M – operation and maintenance PIU – project implementation unit PMU – project management unit REA – rapid environmental assessment RMC – Ranchi Municipal Corporation SEIAA – State Environmental Impact Assessment Authority SPS – Safeguard Policy Statement, 2009 JSPCB – Jharkhand State Pollution Control Board JUWSIP – Jharkhand Urban Water Supply Improvement Project – Jharkhand Urban Infrastructure Development Company JUIDCO Limited WHO – World Health Organization ULB – urban local body WTP – water treatment plant WEIGHTS AND MEASURES m3 – cubic meter °C – degree Celsius Ha – hectare km – kilometer kWh – kilowatt hours L – liters – liters per capita per day LPCD m – meter MT – metric ton MCM – million cubic meters MLD – million liters per day mm – millimeter nos.
    [Show full text]
  • RAVI SIR About Jharkhand  Jharkhand, State of India, Located in the Northeastern Part of the Country
    ALL ABOUT STATE Jharkhand BY:- RAVI SIR About Jharkhand Jharkhand, state of India, located in the northeastern part of the country. झारखंड, भारत राज्य, देश के पूर्वोत्तर भाग मᴂ स्थित है। Jharkhand which came into being on 15 November 2000 as the 28th State of the Union is the homeland. of the tribals who had dreamed of a separate state for a long time from bihar. झारखंड, जो 15 नर्वंबर 2000 को 28 र्वᴂ राज्य के 셂प मᴂ अस्ित्व मᴂ आया, उन आददर्वादियों की मातृभूदम है, दजꅍोंने लंबे िमय तक दबहार िे अलग राज्य का िपना देखा िा . About Jharkhand Jharkhand is bound by West Bengal in the east, Uttar Pradesh and Chhattisgarh in the west, Bihar in the north and Odisha in the south. झारखंड पूर्वव मᴂ पदिम बंगाल, पदिम. मᴂ उत्तर प्रदेश और छत्तीिगढ़, उत्तर मᴂ दबहार और ददिण मᴂ ओदडशा िे बंधा हुआ है। About Jharkhand Capital (राजधानी ) Ranchi/रांची Largest city (िबिे बडा शहर) Jamshedpur/जमशेदपुर State(राज्य) 15 November 2000 Governor(राज्यपाल) Draupadi Murmu/द्रौपदी मुमूव 1st Governor(पहले राज्यपाल) Prabhat. Kumar/प्रभात कुमार Chief Minister(मुख्यमंत्री) Hemant Soren/ हेमंत िोरेन(JMM) 1st CM(पहले मुख्यमंत्री) Babulal Marandi / बाबूलाल मरांडी Number of Districts (दिले) 24 About Jharkhand Legislature Unicameral Assembly/दर्वधानिभा (81seats) दर्वधादयका एकिदनात्मक Parliamentary constituencies िंिदीय िेत्र Rajya Sabha (6 seats) Lok Sabha (14 seats) .
    [Show full text]
  • 3VU Tc`Huz X Y`Dazer]D¶ Hz UWR]] 'HOKL *RYW
    4 / @ #$+#A #A A 52!6'#5 &"0/)7 56 ! 5!7 %5!89 +653 $ D '56 E'5 :578 45: 85 N 4E G ( 87 (878E6877 57'874;6 >'; 7>'> 456 : 684>7;6 <&.0,</:D:; 8 '57 84 % 84 G : 4'8: 8 : ' 48% :' 5': 4 'E5: > (89 E6 7 '43, 55& 3<= B # 5 #$ ( /(+*+*89 0+. , ' & R( !" 45657'8 admit such cases in the future. &R ) “Fever and coughing nly five per cent of patients would fall under mild symp- & ( Oaffected by Covid-19 toms. If a person’s breathing require hospitalisation, Indian rate is more than 15 counts in /0 1 Council of Medical Research a minute, it indicates moderate Director-General Balram Covid-19 infection whereas Bhargava said on March 22. over 30 breathing counts in a 11 45657'8 The Union Health minute would fall into the Ministry slightly revised the severe category,” the Delhi elhi Chief Minister Arvind figure on May 21. At a Press Health Minister said at a Press DKejriwal on Sunday briefing, Joint Secretary in the conference on Saturday. announced that the hospitals Health Ministry Lav Agarwal It’s shocking that the hos- run by the Delhi Government said out of the total number of pitals kept admitting such cases and private entities will only active Covid-19 cases in the when the Union Health treat Delhiites during the coro- country, 6.39 per cent needed Ministry on May 14 issued a set navirus crisis while the city’s $ ) * ./ % # hospital support. Out of these, of revised discharge guidelines borders will be reopened from $ %& about 2.94 per cent needed which said Covid-19 patients Monday.
    [Show full text]
  • Draft Annual Plan, 1987-88
    5iei^ !l3r^ GOVERNMENT OF BIHAR DRAFT ANNUAL PLAN, 1987-88 VOLUME I NIEPA DC IIID 03480 PLANNING DEPARTMENT NrHc'"--.'’ Jr>Kr'r..^,-p ^ f P',' ’ p- ' ‘'r * * -.,/ :x,'" ■ »n i:-': " i-s^H^r-^-^4i.c}tei.ll001ii CORRIGENDA »ial Page no. Para/Item Line/Column For Read no. figure/word 1 2 3 4 5 • 6 1 i 1 3 light high 2 in 4 3 allevietion alleviation 3 iv 4 3 ebivent evident 4 iv 2 5 937 932.21 5 iv 5 2 2182.75 2177.96 6 iv 5 3 2917.25 2922.04 7 iv 5 6 1353.84 1358.14 8 x x ii 9 5 • .• 403.75 9 XXV Total 3 51000,00 510000.00 10 52 Anticipated 1 29.61 28.45 Expenditure 11 53 Do. 3 140.08 172.03 12 53 Do. 5 108.56 94.41 13 53 Do. 9 33.93 49.56 14 53 Do. 11 65.73 64.48 16 53 Anticipated 12 475.00 506.00 Expenditure Total 16 79 AI 5 167.00 194.00 ' A ll 5 182.00 209.00 18 80 3 5 65.00 122.00 19 80 9(c) 5 15.00 25,00 20 80 Total 5 900.00 994.00 21 129 A nti 9.00 10.20 expenditure >> 22 129 13.9 13.91 23 129 37.91 39.11 24 129 B.4 5 0.00 101.60 25 157 1 4087.00 3468.00 26 175 . 5 150.00 626.00 27 175 5 647.00 922.00 28 176 3.1 2 150.00 100.00 29 176 3.1 5 150.00 626.00 30 178 5 2 207.60 297.50 31 178 vi 1 Sjraopsia Synoposia 32 241 9 Total 2158.75 2187.75 33 247 6 680.00 1116.47 34 247 Total .
    [Show full text]
  • River Action Plan Subarnrekha
    ACTION PLAN FOR REJUVENATION OF SUBARNAREKHA RIVER IN JHARKHAND JHARKHAND STATE POLLUTION CONTROL BOARD, DHURWA, RANCHI, JHARKHAND-834004 pg. 1 CONTENT CHAPTER I ❖ BACKGROUND ❖ INTRODUCTION ❖ PHYSIOGRAPHY ❖ WATER RESOURCES & RAINFALL ❖ ANNUAL RAINFALL ❖ DEVIATION OF RAINFALL ❖ SEASONAL RAINFALL ❖ RAINFALL TREND IN RABI SEASON ❖ AVERAGE MOTHLY RAINFALL ❖ MOVING AVERAGE OF THE RAINFALL ❖ EXTREME EVENT ANALYSIS ❖ SURFACE WATER RESOURCES ❖ GROUND WATER RESOURCES ❖ DRAINAGE SYSTEM AND MAPS ❖ RIVERS AND RIVER BASINS CHAPTER II ❖ THE SUBARNAREKHA RIVER ❖ SUBARNAREKHA RIVER BASIN ❖ WATER QUALITY GOALS AS PER THE EXISTING PROVISIONS OR GUIDELINES/ SPECIFICATIONS OF CENTRAL POLLUTION CONTROL BOARD (CPCB) ❖ RIVER COURSE AND MAJOR TRIBUTARIES ❖ SOCIO-ECONOMIC IMPORTANCE ❖ WATER RESOURCES AND ITS USES ❖ MINING AND INDUSTRIAL ACTIVITIES ❖ NATURAL AND ANTHROPOGENIC HAZARDS ❖ IDENTIFIED STRETCHES FOR REDUCING POLLUTION pg. 2 CHAPTER III- VISION MISSION AND STRATEGY FOR SUBARNAREKHA RIVER ❖ VISION STATEMENT OF JHARKHAND STATE POLLUTION CONTROL BOARD ❖ VISION STATEMENT FOR CLEAN RIVERS IN JHARKHAND ❖ MISSION STATEMENT FOR CLEAN RIVERS CHAPTER IV-CURRENT STATUS AND TRENDS OF WATER QUALITY IN JHARKHAND RIVERS ❖ IDENTIFICATION OF MONITORING LOCATIONS ❖ CENTRAL POLLUTION CONTROL BOARD'S NORMS FOR DESIGNATED BEST USE CHAPTER V-SOURCES OF WATER POLLUTION IN RIVERS ❖ MAJOR DRAINS ❖ SEWAGE/SULLAGE GENERATED FROM URBAN AREAS ❖ SEWAGE/SULLAGE GENERATED FROM RURAL AREAS ❖ INDUSTRIAL SOURCES IN THE CATCHMENT AREA OF RIVER SWARNREKHA ❖ SOLID WASTE CHAPTER VI-MEASURES FOR CONTROL OF POLLUTION AND TIMELINES ❖ SETTING UP OF NEW TREATMENT FACILITIES ❖ SETTING UP OF ONLINE EFFLUENT MONITORING SYSTEMS FOR STPS AND ETPS ❖ TIMELINES FOR PROJECTS ❖ STEPS TO CLEAN RIVERS OF JHARKHAND:- ACHIEVABLE WATER QUALITY GOALS WITH SPECIFIC TIMELINES ❖ CHAPTER VII- ACTION PLAN ❖ ACTION PLAN- SHORT TERM AND LONG TERM ACTION AND THE IDENTIFIED AUTHORITIES FOR INITIATING ACTIONS AND THE TIME LIMITS FOR ENSURING COMPLIANCE pg.
    [Show full text]
  • Gram Panchayat Spatial Development Plan Neori Gram Panchayat, Ranchi District
    GRAM PANCHAYAT SPATIAL DEVELOPMENT PLAN NEORI GRAM PANCHAYAT, RANCHI DISTRICT for Ministry of Panchayati Raj, Government of India NOVEMBER 2020 DEPARTMENT OF ARCHITECTURE BIRLA INSTITUTE OF TECHNOLOGY, MESRA, RANCHI Gram Panchayat Spatial Development Plan of Neori, Ranchi District 2020 i THE STUDY TEAM The study team of Department of Architecture, Birla Institute of Technology, Mesra consist of: Principal Investigator 1 Dr. Satyaki Sarkar Associate Professor and Head, Department of Architecture, Co- Principal Investigators 2 Ms. Ritu Agrawal Assistant Professor, Department of Architecture 3 Dr. Smriti Mishra Assistant Professor, Department of Architecture 4 Dr. Bimal Chandra Roy Assistant Professor, Department of Architecture 5 Dr. Rajan Chandra Assistant Professor, Department of Architecture Sinha 6 Mr. Anuj Toppo Assistant Professor, Department of Architecture 7 Mr. Apurv Ashish Assistant Professor, Department of Architecture 8 Ms. Anila Surin Assistant Professor, Department of Architecture 9 Mr. Pavan Kr. Tiwari Assistant Professor, Department of Architecture 10 Ms. Anjali Pathak Assistant Professor, Department of Architecture 11 Mr. Rizwan Kazmi Assistant Professor, Department of Architecture 12 Ms. Shama Parween Assistant Professor, Department of Architecture The study team of RRSC and NRSC consist of: 13 Mr. Y K Srivastava RRSC-East, NRSC 14 Mr. Prabhat K. Routh RRSC-East, NRSC 15 Ms. Khushboo Mirza RRSC-North 16 Dr. Vinod Kr. Sharma RRSC-North 17 Mr. Shankar Ram N R RRSC-North Overall Technical Guidance 1 Dr. C. S. Jha, Outstanding Scientist & CGM, RCs, NRSC 2 Dr. V. M. Chowdary RRSC-North 3 Dr. K. Chandrasekar NRSC 4 Dr. D. Dutta RRSC-East, NRSC Cover page design: Ms. Riddhi Sharma, B.
    [Show full text]
  • Chapter-VIII: Other Non Tax Receipts
    Chapter-VIII: Other Non Tax Receipts CHAPTER-VIII: Other Non Tax Receipts 8.1 Results of audit Test check of records of the following receipts conducted during 2005-06, revealed loss/non recovery of revenue etc. amounting to Rs 177.78 crore in 92 cases, which broadly fall into the following categories: (Rupees in crore) Sl. No. of Category Amount No. cases FOREST RECEIPTS 1. Loss of revenue due to departmental lapses 34 20.19 2. Less raising of demand 7 58.98 3. Undue financial aid to commercial undertakings 1 13.50 4. Loss of revenue due to delay in initiation of certificate 5 0.52 cases 5. Other cases 30 4.50 Total 77 97.69 POLICE RECEIPTS 1. Review on Police Receipts 1 43.12 Total 1 43.12 WATER RATES 1. Loss of revenue due to non achievement of target of 4 0.02 irrigation 2. Non realisation of water rates 6 36.94 3. Delay in assessment of water rates 4 0.01 Total 14 36.97 Grand Total 92 177.78 During 2005-06, the concerned departments accepted loss of revenue of Rs 126.98 crore involved in 1,673 cases of which 1,351 cases involving Rs 95.57 crore were pointed out in audit during 2005-06 and rest in earlier years. A few illustrative cases including Review on Police Receipts involving Rs 81.06 crore are given in the following paragraphs: 63 8.2 Review on Police Receipts 8.2.1 Highlights • Demand of Rs 36.03 crore, representing GRP cost was not raised against Railway.
    [Show full text]