Details of Works for Highways

Total Page:16

File Type:pdf, Size:1020Kb

Details of Works for Highways DETAILS OF WORKS FOR HIGHWAYS DEMAND No.21 --- HIGHWAYS AND MINOR PORTS DEPARTMENT Page HEADS OF DEPARTMENT Number 21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS 1—35 21 03. CHIEF ENGINEER (CONSTRUCTION AND MAINTENANCE ) - HIGHWAYS 36—161 21 04. CHIEF ENGINEER (HIGHWAYS) - PROJECTS 162—220 21 05. PROJECT DIRECTOR - TAMIL NADU ROAD 221—224 SECTOR PROJECT 21 07. CHIEF ENGINEER (HIGHWAYS) - NABARD 225—235 AND RURAL ROADS 21 10. CHIEF ENGINEER (METRO) 236—247 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 01 337 JA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 01 National Highways 337 Road Works JA Original works 16 Major Works ( DPC 5054 01 337 JA 16 00 ) 1. AS / TS / RAS: 180000 18,00,00 ... 1 11,47 18,00,00 G.O.(MS).No 28 Highways and Minor ports (HV2) Department dated 04.03.2019 64 Lands ( DPC 5054 01 337 JA 64 09 ) 1. AS / TS / RAS: 0 New Works likely to be sanctioned ... ... ... 1 1 TOTAL - 5054 01 337 JA 18,00,00 ... 1 11,48 18,00,01 1 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) 1. AS / TS / RAS: 0 New works likely to be sanctioned in 2018-19 ... ... ... ... ... Chennai (NH)Division 2. AS / TS / RAS: 700000 Widening of Guduvanchery - Kottayur road from Km 0/0 - 17/6 (Double Lane to Four Lane)Lane)Lane) 74,81,00 ... 17,00,00 21,00,00 30,00,00 CRF-TN-2018-19-05 3. AS / TS / RAS: 80000 Widening from SL-IL and Improvements to Melanur-Meiyur road Km 0/0-10/0 8,57,00 2,15,13 3,75,00 5,00,00 1,41,87 CRF-TN-2017-18-140 4. AS / TS / RAS: 100000 Widening from SL-IL and Strengthening perumbare-orathy road km 0/0-10/2 inculding reconstruction culvert 30 nos and reconstruction of 11,00,00 1,07,05 3,00,00 9,00,00 92,95 minor bridge km 0/6 CRF-TN-2017-18-101 5. AS / TS / RAS: 93740 Construction of Bridge at km 3/8 of pinjivakkam Harijan Colony Road 10,31,00 4,16,08 2,00,00 5,00,00 1,14,92 CRF-TN-2017-18-26 6. AS / TS / RAS: 380000 Widening of Elichur - Palur Road from Km 0/0 - 8/6 (single road to intermediate lane) 41,80,00 ... 8,00,00 8,00,00 15,00,00 CRF-TN-2018-19-02 7. AS / TS / RAS: 1400000 Widening of Chengalpattu - Thiruporur road from Km 0/0 - 21/8 (Double Lane to Four Lane)Lane) 126,75,00 ... 17,00,00 41,00,00 35,00,00 CRF-TN-2018-19-04 2 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 8. AS / TS / RAS: 278910 Construction of Bridge at km 44/8 of Thirumazhisai- Uthukkottai Road 30,67,00 7,99,79 2,70,00 8,00,00 14,67,21 CRF-TN-2017-18-41 9. AS / TS / RAS: 1110000 Widening of Walajabad - Sunguvachatram - Keelachery road (Double Lane to Four Lane) from Km 0/0-19/6 121,65,00 ... 21,00,00 5,00,00 35,00,00 CRF-TN-2018-19-01 10 . AS / TS / RAS: 120000 Widening from IL to DL and Improvements to Karanodai - Meenchur road from km 0/0-8/2 11,90,00 15,34 5,00,00 5,00,00 6,74,66 CRF-TN-2017-18-100 11 . AS / TS / RAS: 1200000 Widening of Kodampakkam - Sriperumpudur Road Km 13/2 - 28/8 (Double Lane to Four Lane) 132,00,00 ... 18,00,00 26,00,00 38,00,00 CRF-TN-2018-19-03 Vellore (NH) Division 12 . AS / TS / RAS: 130000 Widening from DL to ML and Strengthening from km 30/7 - 40/4 of Virudachalam - Ulundurpettai - Villupuram road. 14,15,00 7,68,09 6,00,00 6,00,00 46,91 CRF-TN-2017-18-104 13 . AS / TS / RAS: 60000 Improvements to Kumaragudi-Nachiyarpettai road km 1/0-10/0 including Construction of Retaining Wall 6,00,00 3,85,90 2,00,00 ... 2,14,10 CRF-TN-2017-18-106 14 . AS / TS / RAS: 61000 Widening from Single lane to Intermediate lane and Improvements of Indili - Sembakurichi road (via) Pukkiravari road at km 19/0-27/510. 6,70,00 ... 5,00,00 5,00,00 1,70,00 CRF-TN-2018-19-25 3 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 15 . AS / TS / RAS: 64000 Widening from SL to IL and Strengthening of Kachirapalayam - Pottiyam Road Km.0/0 - 8/8 6,40,00 3,54 3,00,00 5,50,00 86,46 CRF-TN-2017-18-63 16 . AS / TS / RAS: 170000 Widening from DL-ML and Improvements of Vridhachalam-Tholudur road at km 32/0-42/0 including CD works. (SH-171) 17,72,00 ... 8,00,00 3,40,00 9,00,80 CRF-TN-2018-19-22 17 . AS / TS / RAS: 105000 Wdg to SL to IL and Stg. From Km. 0/0-15/0 of Pagandai - X road to Mamandhur road 10,50,00 3,74,99 3,00,00 4,30,00 2,45,01 CRF-TN-2017-18 -12 18 . AS / TS / RAS: 66500 Improvements to Thittagudi-Sirupakkam road (via) Avatti.,Ma.Pudaiyur km 11/0-18/0 (Except cement road km 16/700- 7,10,00 4,71,00 3,00,00 1,50,00 89,00 17/100) CRF-TN-2017-18-105 19 . AS / TS / RAS: 85000 Widening from Single lane to Intermediate lane and Improvements from km 0/0-4/0 & Improvements from km 4/0 - 7/4 of Kumaratchi- 9,00,00 1,41,35 4,00,00 5,30,00 2,28,65 Puliyangudy road including Construction of Retaining Wall CRF-TN-2017-18-102 20 . AS / TS / RAS: 90000 Widening from SL - IL and Strengthening km.0/0 - 11/0 of Thiyagadurgam - Pudhukeni Road. 9,00,00 3,72 4,50,00 6,80,00 2,16,28 CRF-TN-2017-18-64 21 . AS / TS / RAS: 95000 Widening from DL-ML and Strengthening of Thirukoilur-Asanur Road km 29/100-35/7 9,90,00 3,46,26 4,00,00 3,20,00 3,23,74 CRF-TN-2017-18-103 4 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 22 . AS / TS / RAS: 55000 Widening from SL to IL and Strengthening from km 9/5 - 16/6 of Nattarmangalam - Thondur Road including CD works 5,94,00 5,17,60 1,75,00 60,00 16,40 CRF-TN-2017-18-143 23 . AS / TS / RAS: 140000 "Widening from IL to DL & Improvements from Km.2/4-15/8 including construction of minor bridge at km.13/2, CD works & retaining wall at 14,08,00 ... 5,00,00 6,50,00 7,58,00 Km.9/6-10/230 (L/s) and junction improvements of Melpattampakkam- Panchamadevi road (via) Madukkarai(MD-1114)" CRF-TN-2018-19-20 24 . AS / TS / RAS: 90000 Widening and Strengthening from km 28/0-32/0 of Vridhachalam - Thozhudur road. 9,00,00 4,93 4,50,00 1,80,00 7,15,07 CRF-TN-2017-18-135 25 . AS / TS / RAS: 125000 Widening and Strengthening from Km 10/2-13/0, 32/4-33/4,40/0-42/4, including CD works of Vellimedupettai- Pondy Road via Mailam 12,77,00 ... 6,00,00 11,00,00 1,77,00 CRF-TN-2018-19-27 26 . AS / TS / RAS: 125000 Widening from Intermediate lane to Double Lane in Km.6/0-10/170 & 11/220-20/2, Widening from Single lane to Double Lane in Km.10/170 - 13,74,00 ... 8,00,00 7,20,00 6,54,00 11/220 and Strengthening of Thiyagadurgam - Adari Road CRF-TN-2018-19-23 27 . AS / TS / RAS: 230000 Widening from DL-ML and Improvements of Vridhachalam-Tholudur road at km 10/0-17/0 and 18/2-26/6 Strengthening at km 17/0-18/2 24,15,00 ..
Recommended publications
  • List of Village Panchayats in Tamil Nadu District Code District Name
    List of Village Panchayats in Tamil Nadu District Code District Name Block Code Block Name Village Code Village Panchayat Name 1 Kanchipuram 1 Kanchipuram 1 Angambakkam 2 Ariaperumbakkam 3 Arpakkam 4 Asoor 5 Avalur 6 Ayyengarkulam 7 Damal 8 Elayanarvelur 9 Kalakattoor 10 Kalur 11 Kambarajapuram 12 Karuppadithattadai 13 Kavanthandalam 14 Keelambi 15 Kilar 16 Keelkadirpur 17 Keelperamanallur 18 Kolivakkam 19 Konerikuppam 20 Kuram 21 Magaral 22 Melkadirpur 23 Melottivakkam 24 Musaravakkam 25 Muthavedu 26 Muttavakkam 27 Narapakkam 28 Nathapettai 29 Olakkolapattu 30 Orikkai 31 Perumbakkam 32 Punjarasanthangal 33 Putheri 34 Sirukaveripakkam 35 Sirunaiperugal 36 Thammanur 37 Thenambakkam 38 Thimmasamudram 39 Thilruparuthikundram 40 Thirupukuzhi List of Village Panchayats in Tamil Nadu District Code District Name Block Code Block Name Village Code Village Panchayat Name 41 Valathottam 42 Vippedu 43 Vishar 2 Walajabad 1 Agaram 2 Alapakkam 3 Ariyambakkam 4 Athivakkam 5 Attuputhur 6 Aymicheri 7 Ayyampettai 8 Devariyambakkam 9 Ekanampettai 10 Enadur 11 Govindavadi 12 Illuppapattu 13 Injambakkam 14 Kaliyanoor 15 Karai 16 Karur 17 Kattavakkam 18 Keelottivakkam 19 Kithiripettai 20 Kottavakkam 21 Kunnavakkam 22 Kuthirambakkam 23 Marutham 24 Muthyalpettai 25 Nathanallur 26 Nayakkenpettai 27 Nayakkenkuppam 28 Olaiyur 29 Paduneli 30 Palaiyaseevaram 31 Paranthur 32 Podavur 33 Poosivakkam 34 Pullalur 35 Puliyambakkam 36 Purisai List of Village Panchayats in Tamil Nadu District Code District Name Block Code Block Name Village Code Village Panchayat Name 37
    [Show full text]
  • 2019060814.Pdf
    DISTRICT SURVEY REPORT TIRUPPUR DISTRICT Chapter Content Page No. 1. Introduction 4 2. Overview of Mining Activity in the District 4 – 5 3. General Profile of the District 5 – 8 4. Geology of Tiruppur District 9 – 12 5. Drainage of Irrigation pattern 12 Land Utilisation Pattern in the District: Forest, Agricultural, 6. 13 – 14 Horticultural, Mining etc., 7. Surface Water and Ground Water scenario of the District 14 – 15 8. Climate and Rainfall of the District 16 9. Details of Mining Leases in the District 17 10. Details of Royalty or Revenue received in last three years 18 11. Details of Production of Minor Mineral in last three years 19 12. Mineral Map of the District 20 List of Letter of Intent (LOI) Holder in the District along with 13. 21 its validity 14. Total Mineral Reserve available in the district 21 15. Quality/Grade of Mineral available in the district 22 16. Use of Mineral 22 17. Demand and supply of the Mineral in the last three years 22 18. Mining Leases marked on the map of the district 23 – 24 Details of the area of where there is a cluster of the mining 19. 25 leases 20. Details of Eco-sensitive area 25 21. Impact on the environment due to Mining activity 25 – 26 Remedial measures to mitigate the impact of mining on the 22. 27 – 28 environment 23. Reclamation of the mined out area 29 - 30 24. Risk assessment & Disaster Management Plan 30 – 31 25. Details of Occupational health issue in the District 31 – 32 Plantation and Green belt development in respect of leases 26.
    [Show full text]
  • Chapter-Ill Analysis of River Longitudinal Profiles 121
    120 Chapter-Ill Analysis of river longitudinal profiles 121 Chapter III ANALYSIS OF RIVER LONGITUDINAL PROFILES 3.1. Introduction: Rivers are the most sensitive and dynamic elements of the landscape. The shape of the longitudinal profile of a river is result of the complex interplay between lithology, structure, tectonics, climate and catchment hydrology. In a large number of studies, the river longitudinal profiles have been investigated in order to identify the areas experiencing tectonic deformation and uplift (Begin, 1975; Seeber and Gornitz, 1983; Rice and Church, 2001; Chen et al., 2006; Lee and Tsai, 2009; Whittaker, 2012 and the references therein). In addition to this, the influence of climate and hydrological processes on the longitudinal profiles of the rivers has been investigated (Roe et al., 2002; Zaprowski et al., 2005). Other studies concerned with the long profile analysis include understanding of the role of lithology (Begin, 1975; Bishop et al., 1985; Goldrick and Bishop, 1995), distribution of stream power (Sklar and Dietrich, 1998; Snyder et al., 2000), identification of knick zones (Perez-Pena et al., 2009; Pederson and Tressler, 2012) and description of long profile shape (Shepherd, 1985; Rice and Church, 2001). In this chapter, the characteristics of the longitudinal profiles of the rivers of the Kaveri, Palar and Ponnaiyar Basins and their tributaries are described and an attempt is made to understand whether there is any effect of tectonics on their long profiles as suggested by Valdiya (2001). 3.2. Methodology: In all, the longitudinal profiles of 21 major tributaries of the Kaveri River, 8 tributaries of the Palar and 6 tributaries of the Ponnaiyar River, as well as the profiles of the main channels of the Kaveri, Palar and Ponnaiyar Rivers were extracted and analysed in ArcGIS.
    [Show full text]
  • Thiruvallur District
    DISTRICT DISASTER MANAGEMENT PLAN FOR 2017 TIRUVALLUR DISTRICT tmt.E.sundaravalli, I.A.S., DISTRICT COLLECTOR TIRUVALLUR DISTRICT TAMIL NADU 2 COLLECTORATE, TIRUVALLUR 3 tiruvallur district 4 DISTRICT DISASTER MANAGEMENT PLAN TIRUVALLUR DISTRICT - 2017 INDEX Sl. DETAILS No PAGE NO. 1 List of abbreviations present in the plan 5-6 2 Introduction 7-13 3 District Profile 14-21 4 Disaster Management Goals (2017-2030) 22-28 Hazard, Risk and Vulnerability analysis with sample maps & link to 5 29-68 all vulnerable maps 6 Institutional Machanism 69-74 7 Preparedness 75-78 Prevention & Mitigation Plan (2015-2030) 8 (What Major & Minor Disaster will be addressed through mitigation 79-108 measures) Response Plan - Including Incident Response System (Covering 9 109-112 Rescue, Evacuation and Relief) 10 Recovery and Reconstruction Plan 113-124 11 Mainstreaming of Disaster Management in Developmental Plans 125-147 12 Community & other Stakeholder participation 148-156 Linkages / Co-oridnation with other agencies for Disaster 13 157-165 Management 14 Budget and Other Financial allocation - Outlays of major schemes 166-169 15 Monitoring and Evaluation 170-198 Risk Communications Strategies (Telecommunication /VHF/ Media 16 199 / CDRRP etc.,) Important contact Numbers and provision for link to detailed 17 200-267 information 18 Dos and Don’ts during all possible Hazards including Heat Wave 268-278 19 Important G.Os 279-320 20 Linkages with IDRN 321 21 Specific issues on various Vulnerable Groups have been addressed 322-324 22 Mock Drill Schedules 325-336
    [Show full text]
  • Seasonal Variation of Cauvery River Due to Discharged Industrial Effluents at Pallipalayam in Namakkal
    Vol. 8 | No. 3 |380 - 388 | July - September | 2015 ISSN: 0974-1496 | e-ISSN: 0976-0083 | CODEN: RJCABP http://www.rasayanjournal.com http://www.rasayanjournal.co.in SEASONAL VARIATION OF CAUVERY RIVER DUE TO DISCHARGED INDUSTRIAL EFFLUENTS AT PALLIPALAYAM IN NAMAKKAL K. Sneka Lata 1, A. Jesu 2, M.S. Dheenadayalan 1 1Department of Chemistry G.T.N. Arts College, Dindigul, Tamil Nadu. India. 2Department of Chemistry, Kathir College of Engineering, Neelambur, Coimbatore (T.N.)India *E-mail: [email protected] ABSTRACT The impact of industrial effluent like dyeing, sugar, and paper discharged from the banks of Cauvery river at pallipalayam in Namakkal district. It is observed during the study that many dyeing, sugar and paper units discharged their untreated effluent into the river Cauvery in this criminately without any treatment. The river water samples and ground water samples and soil sample collected in the study area reveals that high degree of the pollution cost by untreated effluent of heavy metal analysis from the river water and ground water and soil. So that industries major culprit in damaging the river water, ground water and soil used for the agricultural purpose. The increased loading of toxic effluent day by day due to the toxic effluent of surface water, ground water and soil. The total pollution due to industrial effluent causes the great damage to the environmental pollution of river Cauvery at pallipalayam in Namakkal district. Keywords: Raw effluents, treated effluents, total dissolved solids, dyeing industry, physico chemical analysis ©2015 RAS ĀYAN. All rights reserved INTRODUCTION The Kaveri, also spelled Cauvery in English, is a large Indian river.
    [Show full text]
  • Karanodai Minjur Road (Km 0/0 – Km 16/4)
    INDIA: THIRD TAMIL NADU URBAN DEVELOPMENT PROJECT Traffic and Transportation Schemes RESETTLEMENT IMPLEMENTATION PLAN for Karanodai Minjur Road (Km 0/0 – Km 16/4) HIGHWAYS DEPARTMENT & CHENNAI METROPOLITAN DEVELOPMENT AUTHORITY Government of Tamil Nadu May 2008 Contents CHAPTER 1 ................................................................................................................. 6 Background .............................................................................................................. 6 Resettlement Policy Framework .............................................................................. 6 Land acquisition and R&R measures ...................................................................... 7 Resettlement Implementation Plan ........................................................................ 8 Description of the sub-Project ............................................................................... 8 Minimising Resettlement .......................................................................................... 9 Land acquisition and R&R impacts ....................................................................... 11 CHAPTER 2 ............................................................................................................... 15 Socio Economic Characteristics of PAPs .............................................................. 15 Methodology Adopted .......................................................................................... 15 Perceived benefits of the project
    [Show full text]
  • Problems of Salination of Land in Coastal Areas of India and Suitable Protection Measures
    Government of India Ministry of Water Resources, River Development & Ganga Rejuvenation A report on Problems of Salination of Land in Coastal Areas of India and Suitable Protection Measures Hydrological Studies Organization Central Water Commission New Delhi July, 2017 'qffif ~ "1~~ cg'il'( ~ \jf"(>f 3mft1T Narendra Kumar \jf"(>f -«mur~' ;:rcft fctq;m 3tR 1'j1n WefOT q?II cl<l 3re2iM q;a:m ~0 315 ('G),~ '1cA ~ ~ tf~q, 1{ffit tf'(Chl '( 3TR. cfi. ~. ~ ~-110066 Chairman Government of India Central Water Commission & Ex-Officio Secretary to the Govt. of India Ministry of Water Resources, River Development and Ganga Rejuvenation Room No. 315 (S), Sewa Bhawan R. K. Puram, New Delhi-110066 FOREWORD Salinity is a significant challenge and poses risks to sustainable development of Coastal regions of India. If left unmanaged, salinity has serious implications for water quality, biodiversity, agricultural productivity, supply of water for critical human needs and industry and the longevity of infrastructure. The Coastal Salinity has become a persistent problem due to ingress of the sea water inland. This is the most significant environmental and economical challenge and needs immediate attention. The coastal areas are more susceptible as these are pockets of development in the country. Most of the trade happens in the coastal areas which lead to extensive migration in the coastal areas. This led to the depletion of the coastal fresh water resources. Digging more and more deeper wells has led to the ingress of sea water into the fresh water aquifers turning them saline. The rainfall patterns, water resources, geology/hydro-geology vary from region to region along the coastal belt.
    [Show full text]
  • RTM-February -2020 Magazine
    INSIGHTSIAS IA SIMPLIFYING IAS EXAM PREPARATION RTM COMPILATIONS PRELIMS 2020 FEBRUARY 2020 www.insightsactivelearn.com | www.insightsonindia.com Revision Through MCQs (RTM) Compilation (February 2020) Telegram: https://t.me/insightsIAStips 2 Youtube: https://www.youtube.com/channel/UCpoccbCX9GEIwaiIe4HLjwA Revision Through MCQs (RTM) Compilation (February 2020) Telegram: https://t.me/insightsIAStips 3 Youtube: https://www.youtube.com/channel/UCpoccbCX9GEIwaiIe4HLjwA Revision Through MCQs (RTM) Compilation (February 2020) Table of Contents RTM- REVISION THROUGH MCQS – 1st Feb-2020 ............................................................... 5 RTM- REVISION THROUGH MCQS – 3st Feb-2020 ............................................................. 10 RTM- REVISION THROUGH MCQS – 5th Feb-2020 ............................................................. 16 RTM- REVISION THROUGH MCQS – 6th Feb-2020 ............................................................. 22 RTM- REVISION THROUGH MCQS – 7th Feb-2020 ............................................................. 28 RTM- REVISION THROUGH MCQS – 8th Feb-2020 ............................................................. 34 RTM- REVISION THROUGH MCQS – 10th Feb-2020 ........................................................... 40 RTM- REVISION THROUGH MCQS – 11th Feb-2020 ........................................................... 45 RTM- REVISION THROUGH MCQS – 12th Feb-2020 ........................................................... 52 RTM- REVISION THROUGH MCQS – 13th Feb-2020 ..........................................................
    [Show full text]
  • Jan Mishra - PP158" - "Incidence of Endophthalmitis After Intravitreal Injections: Risk Factors, Microbiology Profile and Clinical Outcomes from a Tertiary Centre."
    8/9/2019 Newsletter Inside Editorial AWARDS AND ACCOLADES NEWS AND EVENTS The month of December was special for Aravind as three of its senior most leaders won prestigious awards at various forums. Several doctors also participated in CONFERENCES ATTENDED ELSEWHERE different conferences and brought laurels to the organization. LAICO HAPPENINGS Retreats for the staff of Glaucoma and Cataract Clinics across Aravind Eye Hospitals TRAINING PROGRAMMES were organized to come up with a roadmap and action plan to improve the services PUBLICATIONS at Aravind. Various practical aspects of patient care, research and training were discussed and debated. AUROLAB NEWS MONTHLY PATIENT STATISTICS Outreach eye camps still remain to be the mainstay of Aravind’s high-volume patient care. To a great extent this is possible because of the wholehearted support from the sponsors. To acknowledge this, every two year Aravind brings in sponsors on a Aravind News Team common platform to felicitate them and to have them share their inputs. Last month, Archives Aravind-Salem organised Sponsors Day to congratulate its camp sponsors. Hit Counter 1 News about these and many more feature in this issue. Quote Steady efforts always bring great results - the Mother AWARDS AND ACCOLADES Naanayam Vikatan’s – Business Star Award for Dr. P. Namperumalsamy Chennai, December 22, 2017 Dr. P. Namperumalsamy, Chairman Emeritus, Aravind Eye Care System was honoured with Naanayam Vikatan’s – Business Star Award under the Category - Social Consciousness at the function held Hyatt Regency, Chennai. During the function, it was highlighted that Aravind Eye Hospital provides high quality of eye care service to all the people in the community and handled over 52 million outpatients and performed 5.9 million sight-restoring surgeries in which 60 percent of them either free or highly subsidized.
    [Show full text]
  • Sl.No. APPL NO. Register No. APPLICANT NAME WITH
    tpLtp vz;/ 7166 -2018-v Kjd;ik khtl;l ePjpkd;wk;. ntYhh;. ehs; 01/08/2018 mwptpf;if mytyf cjtpahsh; (Office Assistant) gzpfSf;fhd fPH;f;fhqk; kDjhuh;fspd; tpz;zg;g';fs; mLj;jfl;l eltof;iff;fhf Vw;Wf;bfhs;sg;gl;lJ/ nkYk; tUfpd;w 18/08/2018 kw;Wk; 19/08/2018 Mfpa njjpfspy; fPH;f;fz;l ml;ltizapy; Fwpg;gpl;Ls;s kDjhuh;fSf;F vGj;Jj; njh;t[ elj;j jpl;lkplg;gl;Ls;sJ/ njh;tpy; fye;Jbfhs;Sk; tpz;zg;gjhuh;fs; fPH;fz;l tHpKiwfis jtwhky; gpd;gw;wt[k;/ tHpKiwfs; 1/ njh;t[ vGj tUk; kDjhuh;fs; j’;fspd; milahs ml;il VnjDk; xd;W (Mjhu; ml;il - Xl;Leu; cupkk; - thf;fhsu; milahs ml;il-ntiytha;g;g[ mYtyf milahs ml;il) jtwhky; bfhz;Ltut[k;/ 2/ njh;t[ vGj tUk; kDjhuh;fs; j’;fSld; njh;t[ ml;il(Exam Pad) fl;lhak; bfhz;Ltut[k;/ 3/ njh;t[ miwapy; ve;jtpj kpd;dpay; kw;Wk; kpd;dDtpay; rhjd’;fis gad;gLj;jf; TlhJ/ 4/ njh;t[ vGj tUk; kDjhuh;fs; j’;fSf;F mDg;gg;gl;l mwptpg;g[ rPl;il cld; vLj;J tut[k;/ 5/ tpz;zg;gjhuh;fs;; njh;tpid ePyk;-fUik (Blue or Black Point Pen) epw ik bfhz;l vGJnfhiy gad;gLj;JkhW mwpt[Wj;jg;gLfpwJ/ 6/ kDjhuh;fSf;F j’;fspd; njh;t[ miw kw;Wk; njh;t[ neuk; ,d;Dk; rpy jpd’;fspy; http://districts.ecourts.gov.in/vellore vd;w ,izajsj;jpy; bjhptpf;fg;gLk;/ njh;t[ vGj tUk; Kd;dnu midj;J tptu’;fisa[k; mwpe;J tu ntz;Lk;/ 7/ fhyjhkjkhf tUk; ve;j kDjhuUk; njh;t[ vGj mDkjpf;fg;glkhl;lhJ/ 8/ njh;t[ vGJk; ve;j xU tpz;zg;gjhuUk; kw;wth; tpilj;jhis ghh;j;J vGjf; TlhJ.
    [Show full text]
  • Heavy Vehicles Factory, Avadi, from Citizens of India Fulfilling the Requisite Qualification (Matriculation Or Equivalent + NAC/NTC Issued by NCVT)
    DETAILED ADVERTISEMENT ONLINE APPLICATIONS are invited for filling up the following posts in SEMI-SKILLED grade in Pay Band Rs.5200-20200/- and Grade pay Rs.1800/-at Heavy Vehicles Factory, Avadi, from citizens of India fulfilling the requisite qualification (Matriculation or equivalent + NAC/NTC issued by NCVT). 1. Name of the posts and No. of vacancies: TRADE RESERVED FOR TOTAL SL. UR OBC SC ST POSTS PH EX- NO. SM 1 Machinist 112 64 45 3 224 7 22 2 Fitter 29 21 13 1 64 2 6 3 Fitter-AFV 12 5 3 0 20 0 2 4 Welder 23 17 9 0 49 2 5 5 Electrician 9 4 6 0 19 1 2 6 Fitter Electronics 3 3 0 0 6 0 0 7a Examiner-Fitter 3 2 1 0 6 0 2 7b Examiner-Machinist 3 2 0 0 5 7c Examiner-Electrician 1 1 1 0 3 7d Examiner- Fitter 1 0 1 0 2 Electronics 7e Examiner-Welder 1 0 0 0 1 Total 197 119 79 4 399 12 39 The Trade Apprentices of Heavy Vehicles Factory, Avadi and sister Ordnance Factories would also be required to apply in ONLINE. 2. AGE LIMIT AS ON CLOSING DATE OF APPLICATION i.e.: Categories of Age as on closing Date of Application Vacancy UR 18 - 32 years Age Relaxation in addition to above mentioned upper age limits: Categories of Vacancy Age Relaxation OBC Up to 3 years SC/ST Up to 5 years Ex Trade Apprentices of Ordnance Up to the period of apprenticeship Factories undergone.
    [Show full text]
  • The Chennai Comprehensive Transportation Study (CCTS)
    ACKNOWLEDGEMENT The consultants are grateful to Tmt. Susan Mathew, I.A.S., Addl. Chief Secretary to Govt. & Vice-Chairperson, CMDA and Thiru Dayanand Kataria, I.A.S., Member - Secretary, CMDA for the valuable support and encouragement extended to the Study. Our thanks are also due to the former Vice-Chairman, Thiru T.R. Srinivasan, I.A.S., (Retd.) and former Member-Secretary Thiru Md. Nasimuddin, I.A.S. for having given an opportunity to undertake the Chennai Comprehensive Transportation Study. The consultants also thank Thiru.Vikram Kapur, I.A.S. for the guidance and encouragement given in taking the Study forward. We place our record of sincere gratitude to the Project Management Unit of TNUDP-III in CMDA, comprising Thiru K. Kumar, Chief Planner, Thiru M. Sivashanmugam, Senior Planner, & Tmt. R. Meena, Assistant Planner for their unstinted and valuable contribution throughout the assignment. We thank Thiru C. Palanivelu, Member-Chief Planner for the guidance and support extended. The comments and suggestions of the World Bank on the stage reports are duly acknowledged. The consultants are thankful to the Steering Committee comprising the Secretaries to Govt., and Heads of Departments concerned with urban transport, chaired by Vice- Chairperson, CMDA and the Technical Committee chaired by the Chief Planner, CMDA and represented by Department of Highways, Southern Railways, Metropolitan Transport Corporation, Chennai Municipal Corporation, Chennai Port Trust, Chennai Traffic Police, Chennai Sub-urban Police, Commissionerate of Municipal Administration, IIT-Madras and the representatives of NGOs. The consultants place on record the support and cooperation extended by the officers and staff of CMDA and various project implementing organizations and the residents of Chennai, without whom the study would not have been successful.
    [Show full text]