DETAILS OF WORKS FOR HIGHWAYS

DEMAND No.21 --- HIGHWAYS AND MINOR PORTS DEPARTMENT

Page HEADS OF DEPARTMENT Number

21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS 1—35

21 03. CHIEF ENGINEER (CONSTRUCTION AND MAINTENANCE ) - HIGHWAYS 36—161

21 04. CHIEF ENGINEER (HIGHWAYS) - PROJECTS 162—220

21 05. PROJECT DIRECTOR - ROAD 221—224 SECTOR PROJECT

21 07. CHIEF ENGINEER (HIGHWAYS) - NABARD 225—235 AND RURAL ROADS

21 10. CHIEF ENGINEER (METRO) 236—247

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 01 337 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 01 National Highways 337 Road Works JA Original works

16 Major Works ( DPC 5054 01 337 JA 16 00 ) 1. AS / TS / RAS: 180000

18,00,00 ... 1 11,47 18,00,00 G.O.(MS).No 28 Highways and Minor ports (HV2) Department dated 04.03.2019

64 Lands ( DPC 5054 01 337 JA 64 09 ) 1. AS / TS / RAS: 0 New Works likely to be sanctioned ...... 1 1

TOTAL - 5054 01 337 JA 18,00,00 ... 1 11,48 18,00,01

1 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 1. AS / TS / RAS: 0 New works likely to be sanctioned in 2018-19 ......

Chennai (NH)Division 2. AS / TS / RAS: 700000 Widening of Guduvanchery - Kottayur road from Km 0/0 - 17/6 (Double Lane to Four Lane)Lane)Lane) 74,81,00 ... 17,00,00 21,00,00 30,00,00 CRF-TN-2018-19-05 3. AS / TS / RAS: 80000 Widening from SL-IL and Improvements to Melanur-Meiyur road Km 0/0-10/0 8,57,00 2,15,13 3,75,00 5,00,00 1,41,87 CRF-TN-2017-18-140

4. AS / TS / RAS: 100000 Widening from SL-IL and Strengthening perumbare-orathy road km 0/0-10/2 inculding reconstruction culvert 30 nos and reconstruction of 11,00,00 1,07,05 3,00,00 9,00,00 92,95 minor bridge km 0/6 CRF-TN-2017-18-101

5. AS / TS / RAS: 93740 Construction of Bridge at km 3/8 of pinjivakkam Harijan Colony Road 10,31,00 4,16,08 2,00,00 5,00,00 1,14,92 CRF-TN-2017-18-26

6. AS / TS / RAS: 380000 Widening of Elichur - Road from Km 0/0 - 8/6 (single road to intermediate lane) 41,80,00 ... 8,00,00 8,00,00 15,00,00 CRF-TN-2018-19-02

7. AS / TS / RAS: 1400000 Widening of - road from Km 0/0 - 21/8 (Double Lane to Four Lane)Lane) 126,75,00 ... 17,00,00 41,00,00 35,00,00 CRF-TN-2018-19-04

2 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) (NH)Division 8. AS / TS / RAS: 278910 Construction of Bridge at km 44/8 of - Uthukkottai Road 30,67,00 7,99,79 2,70,00 8,00,00 14,67,21 CRF-TN-2017-18-41 9. AS / TS / RAS: 1110000 Widening of - Sunguvachatram - Keelachery road (Double Lane to Four Lane) from Km 0/0-19/6 121,65,00 ... 21,00,00 5,00,00 35,00,00 CRF-TN-2018-19-01

10 . AS / TS / RAS: 120000 Widening from IL to DL and Improvements to - Meenchur road from km 0/0-8/2 11,90,00 15,34 5,00,00 5,00,00 6,74,66 CRF-TN-2017-18-100

11 . AS / TS / RAS: 1200000 Widening of Kodampakkam - Sriperumpudur Road Km 13/2 - 28/8 (Double Lane to Four Lane) 132,00,00 ... 18,00,00 26,00,00 38,00,00 CRF-TN-2018-19-03

Vellore (NH) Division 12 . AS / TS / RAS: 130000 Widening from DL to ML and Strengthening from km 30/7 - 40/4 of Virudachalam - Ulundurpettai - Villupuram road. 14,15,00 7,68,09 6,00,00 6,00,00 46,91 CRF-TN-2017-18-104 13 . AS / TS / RAS: 60000 Improvements to Kumaragudi-Nachiyarpettai road km 1/0-10/0 including Construction of Retaining Wall 6,00,00 3,85,90 2,00,00 ... 2,14,10 CRF-TN-2017-18-106

14 . AS / TS / RAS: 61000 Widening from Single lane to Intermediate lane and Improvements of Indili - Sembakurichi road (via) Pukkiravari road at km 19/0-27/510. 6,70,00 ... 5,00,00 5,00,00 1,70,00 CRF-TN-2018-19-25

3 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) (NH) Division 15 . AS / TS / RAS: 64000 Widening from SL to IL and Strengthening of Kachirapalayam - Pottiyam Road Km.0/0 - 8/8 6,40,00 3,54 3,00,00 5,50,00 86,46 CRF-TN-2017-18-63 16 . AS / TS / RAS: 170000 Widening from DL-ML and Improvements of Vridhachalam-Tholudur road at km 32/0-42/0 including CD works. (SH-171) 17,72,00 ... 8,00,00 3,40,00 9,00,80 CRF-TN-2018-19-22

17 . AS / TS / RAS: 105000 Wdg to SL to IL and Stg. From Km. 0/0-15/0 of Pagandai - X road to Mamandhur road 10,50,00 3,74,99 3,00,00 4,30,00 2,45,01 CRF-TN-2017-18 -12

18 . AS / TS / RAS: 66500 Improvements to Thittagudi-Sirupakkam road (via) Avatti.,Ma.Pudaiyur km 11/0-18/0 (Except cement road km 16/700- 7,10,00 4,71,00 3,00,00 1,50,00 89,00 17/100) CRF-TN-2017-18-105

19 . AS / TS / RAS: 85000 Widening from Single lane to Intermediate lane and Improvements from km 0/0-4/0 & Improvements from km 4/0 - 7/4 of Kumaratchi- 9,00,00 1,41,35 4,00,00 5,30,00 2,28,65 Puliyangudy road including Construction of Retaining Wall CRF-TN-2017-18-102

20 . AS / TS / RAS: 90000 Widening from SL - IL and Strengthening km.0/0 - 11/0 of Thiyagadurgam - Pudhukeni Road. 9,00,00 3,72 4,50,00 6,80,00 2,16,28 CRF-TN-2017-18-64

21 . AS / TS / RAS: 95000 Widening from DL-ML and Strengthening of Thirukoilur-Asanur Road km 29/100-35/7 9,90,00 3,46,26 4,00,00 3,20,00 3,23,74 CRF-TN-2017-18-103

4 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 22 . AS / TS / RAS: 55000 Widening from SL to IL and Strengthening from km 9/5 - 16/6 of Nattarmangalam - Thondur Road including CD works 5,94,00 5,17,60 1,75,00 60,00 16,40 CRF-TN-2017-18-143 23 . AS / TS / RAS: 140000 "Widening from IL to DL & Improvements from Km.2/4-15/8 including construction of minor bridge at km.13/2, CD works & retaining wall at 14,08,00 ... 5,00,00 6,50,00 7,58,00 Km.9/6-10/230 (L/s) and junction improvements of - Panchamadevi road (via) Madukkarai(MD-1114)" CRF-TN-2018-19-20 24 . AS / TS / RAS: 90000 Widening and Strengthening from km 28/0-32/0 of Vridhachalam - Thozhudur road. 9,00,00 4,93 4,50,00 1,80,00 7,15,07 CRF-TN-2017-18-135

25 . AS / TS / RAS: 125000 Widening and Strengthening from Km 10/2-13/0, 32/4-33/4,40/0-42/4, including CD works of Vellimedupettai- Pondy Road via Mailam 12,77,00 ... 6,00,00 11,00,00 1,77,00 CRF-TN-2018-19-27

26 . AS / TS / RAS: 125000 Widening from Intermediate lane to Double Lane in Km.6/0-10/170 & 11/220-20/2, Widening from Single lane to Double Lane in Km.10/170 - 13,74,00 ... 8,00,00 7,20,00 6,54,00 11/220 and Strengthening of Thiyagadurgam - Adari Road CRF-TN-2018-19-23

27 . AS / TS / RAS: 230000 Widening from DL-ML and Improvements of Vridhachalam-Tholudur road at km 10/0-17/0 and 18/2-26/6 Strengthening at km 17/0-18/2 24,15,00 ... 8,00,00 2,40,00 10,00,00 including CD works. (SH-171) CRF-TN-2018-19-21

28 . AS / TS / RAS: 200000 Widening from Km 21/6 - 48/2 including strengthening from km 21/6- 25/550, 30/2 -31/2, 35/6 -39/6 and 44/6 -48/2 including CD Works of 21,92,00 18,07,93 10,00,00 ... 3,84,07 Vellemedupettai- Pondy road (via) Mailam CRF-TN-2017-18-149

5 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 29 . AS / TS / RAS: 41000 Strengtheneing to Senganankollai-Thathanur road from km 0/0-10/8 4,50,00 2,96,68 2,25,00 1,50,00 3,32 CRF-TN-2017-18-107 30 . AS / TS / RAS: 100000 Widening from IL to DL and Improvements to AlanKuppam To Konerikuppam via Avanipur Km 4/0-21/0 including CD works. 11,00,00 ... 5,00,00 10,00,00 1,00,00 CRF-TN-2018-19-24

31 . AS / TS / RAS: 100000 Widening from Single Lane to Intermediate lane and Improvements of Odiyandhal - Kallipadi Road at Km.0/0-10/8 and including 10,54,00 ... 6,00,00 9,00,00 1,54,00 Reconstruction of culverts. CRF-TN-2018-19-26

Salem (NH) Division 32 . AS / TS / RAS: 130000 Widening IL to DL and Improvements of Muppaduvetti Kaniyanur Road, Km 0/0 - 11/6 including reconstruction of culverts and 14,10,00 5,27,16 5,00,00 7,40,00 1,42,84 construction of minor bridge. CRF-TN-2017-18-139 33 . AS / TS / RAS: 130000 Widening from Double Lane to Multi Lane and Improvements of - Singarapet Road at Km 1/0 - 7/0 including reconstruction of 14,12,00 ... 4,50,00 4,90,00 7,00,00 Bridge at Km 2/4 CRF-TN-2018-19-18

34 . AS / TS / RAS: 33950 Widening from IL to DL and Improvements to Km 0/0-2/0 & 7/8-10/6 of Patchur - Kothur Road to A.P. Border Road 3,67,23 2,52,52 ... 1,00,00 1 CRF-TN-2017-18-43

35 . AS / TS / RAS: 73000 Improvements of Madhanur - Road at Km 0/0 - 9/6 7,25,00 2,80,58 2,00,00 3,80,00 64,42 CRF-TN-2017-18-99

6 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Salem (NH) Division 36 . AS / TS / RAS: 80200 Widening from SL to DL and Improvements to Verayur - Thalayampallam Road km 0/0-8/5. 8,30,00 3,97,16 3,00,00 3,90,00 42,84 CRF-TN-2017-18-137 37 . AS / TS / RAS: 48000 Widening from SL to IL and Improvements to Thenkarimbalur - Kottaiyur - Valavachanur km 0/0-6/0. 5,20,00 2,41,14 ... 2,60,00 18,86 CRF-TN-2017-18-96

38 . AS / TS / RAS: 22000 Strengthening to Arcot- Road to Embalam Road at km 0/0 to 2/2 and 2/6 - 3/6 2,31,00 1,95,57 ... 25,00 1 CRF-TN-2017-18-95

39 . AS / TS / RAS: 70000 Widening and Improvements of - Sathgur Road at km 3/0 - 8/0 7,60,00 ... 4,50,00 2,10,00 4,50,00 CRF-TN-2018-19-17

40 . AS / TS / RAS: 175000 Improvements of Abdullapuram – Asanampattu - -Tirupattur Road at Km 22/500 - 25/8, 28/4 - 30/0, 48/4 - 56/0 & 64/0 - 65/0 with 19,21,00 ... 6,00,00 10,98,00 7,23,00 paved shoulder (SH 122) CRF-TN-2018-19-19

41 . AS / TS / RAS: 185000 Widening IL to DL from km 0/0 - 10/4 & SL to DL from km 10/4 - 12/4 and Improvements Km 0/0 - 12/4 of Walajah Valluvambakkam 18,00,00 8,00,76 3,00,00 8,60,00 1,39,24 Mahanipattu Road including reconstruction of culverts & construction of minor bridges CRF-TN-2017-18-97 42 . AS / TS / RAS: 100500 Widening from IL to DL and Improvements of Guruvarajapalayam - - Melarasampattu Road at km 0/0 - 9/0 8,50,00 6,60,05 2,00,00 1,50,00 39,95 CRF-TN-2017-18-98

7 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Salem (NH) Division 43 . AS / TS / RAS: 50050 Widening from SL to DL and Improvements to Km 2/0 - 8/0 of Jaffrabad - Velathigamanibenda Road 5,04,26 3,33,95 ... 1,20,00 1 CRF-TN-2017-18-42 44 . AS / TS / RAS: 100000 Improvements to Km 30/0-34/0, 46/6-48/4 & 56/0-64/0 of Abdullapuram - Asanampattu - Alangayam - Tirupattur road. 9,97,00 8,32,43 50,00 1,40,00 1 CRF-TN-2017-18-23

45 . AS / TS / RAS: 110000 Widening IL to DL and Strengthening of Ayal Anwarthikhanpet Road (M794) Km0/0-11/8 9,50,13 ... 3,00,00 8,50,00 1,00,13 CRF-TN-2018-19-15

46 . AS / TS / RAS: 10000 Improvements for curves at km 3/6 Realignment of Tank Bund Portion at km 13/6 of Tirupattur - Singarapet Road 1,02,40 74,77 ... 25,00 1 CRF-TN-2016-17-122

47 . AS / TS / RAS: 38600 Strengthening in Arcot-Tindivanam Road from Km 45/4-47/0 and Km 53/0-54/8. 3,70,00 3,42,98 ... 20,00 1 CRF-TN-2017-18-136

48 . AS / TS / RAS: 107000 Improvement of Gudiyattam- Gadambur- Kailasagiri - Road Km.22/570- 30/4 & 37/6 - 42/0 10,25,00 8,86,68 ... 90,00 1 CRF-TN-2016-17-116

49 . AS / TS / RAS: 60000 Widening from SL to IL and Improvements to Agaram - Porkunam Arpakkam Road km 0/0-3/0 & 6/0-11/0 6,27,00 4,17,01 2,00,00 1,80,00 29,99 CRF-TN-2017-18-138

8 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Salem (NH) Division 50 . AS / TS / RAS: 58200 Improvements to Arcot-Tindivanam Road Km 21/6-23/4 and Km 48/0- 50/0 and reconstruction of Minor bridge at Km 48/6 5,64,00 1,68,36 ... 3,60,00 35,64 CRF-TN-2017-18-94 51 . AS / TS / RAS: 106300 Strengthening from Km 11/0 - 19/8 & Improvements to Km 11/0 - 19/8 of Arcot-Tidivanam Road 10,74,00 8,89,52 ... 1,70,00 1 CRF-TN-2017-18-25

52 . AS / TS / RAS: 150000 Widening DL to three Lane and Strengthening of Road (SH 128) Km 6/4 -8/4, 17/150-20/030, 20/830- 15,26,00 ... 4,50,00 14,00,00 1,26,00 26/4 and Strengthening of ROB Approaches and service Road at Km 12/0-12/8 CRF-TN-2018-19-14 53 . AS / TS / RAS: 135000 Widening and Improvements of Jamunamarathur- Alangayam –Vaniyambadi Road at Km 54/6 - 62/0 (Forest), 62/0 - 63/0, 76/2 - 14,20,00 ... 4,50,00 1,70,00 8,00,00 76/6, 76/10, 77/0 - 78/0, 78/0 - 79/4 & 81/0 - 81/6 with paved shoulder (SH 215) CRF-TN-2018-19-16 54 . AS / TS / RAS: 60000 Improvements of Abdullapuram-Asanampattur-Alangayam-Tirupattur road Km 65/0-71/6 6,20,00 5,47,06 20,00 72,00 1 CRF-TN-2016-17-85

Coimbatore (NH)Division 55 . AS / TS / RAS: 80000 Widening from SL to IL and Improvments in km 6/0-17/4 of Sapp[anapatty to Panandur to Bandarahalli road inculding CD works 8,65,00 5,86,36 2,00,00 2,50,00 28,64 and protective works CRF-TN-2017-18-65 56 . AS / TS / RAS: 300000 Construction of flyover at Km 203/2 of NH 44 33,00,50 20,86 3,50,00 15,80,36 12,99,20 CRF-TN-2018-19-69

9 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) (NH)Division 57 . AS / TS / RAS: 35000 Construction of high level bridge atKm 5/10 of Puluthikuttai - Santhumalai road. 3,32,00 50 2,00,00 1,10,00 2,21,50 CRF-TN-2018-19-67 58 . AS / TS / RAS: 35000 Construction of high level bridge at km 43/10 of Ayothiyapattinam- Belur - kilakkadu road 3,23,00 75 2,00,00 2,41,65 80,60 CRF-TN-2018-19-66

59 . AS / TS / RAS: 72400 Widening from DL to FL from Km 0/0-2/4 of Harur Bypass 7,90,00 ... 3,50,00 7,80,00 10,00 CRF-TN-2018-19-40

60 . AS / TS / RAS: 80000 Widening and Strengthening of I L to DL at km 0/0-2/8 of Vadugapatty - Alanganatham road (M1178) , Construction of 7,51,00 2,00,36 3,00,00 5,49,64 1,00 Retainingwall at Km 2/4 - 2/8 and including Construction of bridge at km 2/2-4 in Lieu of Existing Bed level causeway. CRF-TN-2017-18-61 61 . AS / TS / RAS: 80000 Widening from SL to IL and Improvements in km 13/700-22/200 of Kadayampatti to sandaipettai to Thatravoar Ramamoorthy Nagar road 8,00,00 5,47,40 2,00,00 ... 2,52,60 including CD works and protective works CRF-TN-2017-18-129

62 . AS / TS / RAS: 350000 Construction of flyover at Km 32/4 of Thiruchengodu - Ariyanoor road (NH 47 Junction at Km 8/6) 45,00,00 1,89,79 ... 12,50,00 30,60,21 CRF-TN-2017-18-51

63 . AS / TS / RAS: 85000 Widening from IL to DL in km 13/0-17/0 and 17/150-22/0 and Strengthening in km 13/0-22/0 of Gajalnaickan patty - Panamarthupatti 8,50,00 2,29,53 3,00,00 ... 6,20,47 to Sechan Chavadi road including widening of CD works and construction of protective works CRF-TN-2017-18-130

10 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Coimbatore (NH)Division 64 . AS / TS / RAS: 350000 Construction of flyover at Km 0/2 of Magudanchevadi - Kumarapalayam (via) Edappady road(NH 47 Junction at Km 19/6 ) 45,00,00 1,91,37 ... 10,00,00 33,08,63 CRF-TN-2017-18-52 65 . AS / TS / RAS: 50000 Widening SL- DL in Km 1/2-1/8, 4/0-7/6 and Widening & Strengthening from SL to DL in Km.0/6-1/2 and 1/8-4/0 of 5,00,00 4,32,47 1,00,00 60,00 7,53 Pochampalli- Kallavi Road including CD Works CRF-TN-2017-18-62

66 . AS / TS / RAS: 85000 Widening from IL- DL in km 13/0-17/0 & 17/150-22/0 and Strenthening in Km 13/0-22/0 of Gajalnaickanpatty-Panamarathupatti-Sechansavadi 8,50,00 ... 3,00,00 ... 8,50,00 road including widening of CD works and constuction of Protective works CRF-TN-2017-18-130 67 . AS / TS / RAS: 126500 Widening from SL to IL & Strengthening of - Madhagondapalli Road Km 0/0-11/2 including CD Works and 13,19,50 1,12 4,50,00 12,00,00 1,18,38 Protective Works . CRF-TN-2018-19-39

68 . AS / TS / RAS: 50000 Reconstruction of Bridge @ km 0/6 including widening and strengthening from km 0/0-1/0 of Solakadu - Thinnanur road to 5,50,00 1,99 2,80,00 80,00 4,68,01 Valavanthi - Sellippatti road (via) Sakkaraipatti & Sithuruvi Road inculuding Protective wall. CRF-TN-2018-19-64 69 . AS / TS / RAS: 50000 Reconstruction of High Level Bridge at Km.0/6 of Salem - Ulundurpet Road to Ammampalayam Narikuravar Colonny Road (OSA209) 5,50,00 1,78 2,80,00 3,20,00 2,28,22 across Vasista River CRF-TN-2018-19-63

70 . AS / TS / RAS: 250000 Widening and Improvements from Two lane to four lane at Km 48/4- 55/4 of Hogenakkal - Pennagaram - - Thirupathur road 25,68,00 ... 5,50,00 15,00,00 8,00,00 including CD works, Minor Bridges, Construction of Drains & Retaining wall at KM 48/8-49/4) (SH 60) CRF-TN-2018-19-37

11 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Coimbatore (NH)Division 71 . AS / TS / RAS: 180000 Widening and Improvements from Two lane to four lane at Km 40/6- 45/2, 46/8-48/0 of Hogenakkal - Pennagaram - Dharmapuri - 18,95,80 ... 5,50,00 7,00,00 8,00,00 Thirupathur road including CD works (SH 60). CRF-TN-2018-19-36 72 . AS / TS / RAS: 40000 "Widening from SL to IL and Improvements at Km 5/6 - 11/6 of Vallipuram-Palapatty road (including CD Works)" 4,15,88 29,71 2,00,00 3,78,35 7,82 CRF-TN-2018-19-35

73 . AS / TS / RAS: 105000 Widening from SL to IL & Strengtheningn in Km 0/0-10/4 of Chinnabargur - Kanamoor road including CD works 11,14,50 ... 4,50,00 10,00,00 1,14,50 CRF-TN-2018-19-38

Madurai(NH) Division 74 . AS / TS / RAS: 300000 Improvement to Km 0/0-23/2 of Velliangadu - Pegumbellah including CD works 23,87,07 ... 8,00,00 8,52,30 8,00,00 CRF-TN-2018-19-47 75 . AS / TS / RAS: 35400 Widening from SL to IL In Km 0/0-4/6 and Improvements to Km 0/0- 3/8 Velliyankadu - Athimathayanur road 3,54,00 2,73,43 ... 30,41 50,16 CRF-TN-2016-17-94

76 . AS / TS / RAS: 35000 Strengthening in km 4/6 - 11/2 of Saravanampatti - Thennampalayam Road. (MDR - 678). 3,63,00 3,30,35 10,00 ... 1 CRF-TN-2017-18-132

77 . AS / TS / RAS: 74000 Widening from SL to DL and Improvements from Km 0/0 - 7/8 of Mettupalayam to K.Pungampalayam road via Kurunthamalai. 7,40,00 5,98,51 5,00,00 66,56 74,93 CRF-TN-2017-18-81

12 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) (NH) Division 78 . AS / TS / RAS: 129300 Widening Form Km 62/6-74/650 - Road 12,93,00 76,96 8,00,00 10,21,16 1,94,88 CRF-TN-2017-18-79 79 . AS / TS / RAS: 200000 Widening from Single lane to Double lane including Construction of Minor Bridge at km 0/6 Construction of Culverts , Retaining Wall , Dip 18,17,19 ... 10,00,00 11,30,12 5,00,00 Raising and improvements of Mettupalayam - Kitchagathur road (via) Moolathurai at Km 0/0 - 13/250 . CRF-TN-2018-19-45 80 . AS / TS / RAS: 14800 Construction of High level Bridge at Km 14/8 of Kamanaickenpalayam - Negamam - Chettipalayam road 1,48,00 1,24,13 ... 6,17 1 CRF-TN-2016-17-125

81 . AS / TS / RAS: 2300000 Construction of Fly Over including Beautification and Junction Improvements from Km 340/0-343/6 of NH 67 ( – 230,00,00 ... 30,00,00 45,26,17 89,36,31 Gudalur – Road - Ramanthapuram Junction & Sungam Junction in Coimbatore City) CRF-TN-2018-19-6 82 . AS / TS / RAS: 87200 Widening from SL to DL and Improvements to Km 0/0 - 12/0 of branching road from Km 58/6 of Erode - Road and join in Km 8,99,40 8,17,90 ... 14,92 1 282/6 & NH 7 (Via.) Attor - Moorthypalayam - Nanaparappu Road including construction of CD works CRF-TN-2017-18-32 83 . AS / TS / RAS: 47400 Widening from SL to IL and Improvements to Km 0/0 - 4/4 of Kothumudi - Ebbanadu Road. 4,74,00 4,40,43 ... 15,87 1 CRF -TN-2017-18-30

84 . AS / TS / RAS: 29700 Widening from SL to IL and improvements to Km.7/0-9/350 of Seripalayam-Thamaraikulam road 2,97,00 2,14,08 ... 18,91 1 CRF-TN-2016-17-95

13 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Madurai(NH) Division 85 . AS / TS / RAS: 600000 Construction of Fly Over including Beautification and Junction Improvements from km350/560-351/560 of NH 67 (Nagapattinam – 64,00,00 ... 15,00,00 7,76,28 27,00,00 Gudalur – Mysore Road - Junction in Coimbatore city)(including LA) CRF-TN-2018-19-7 86 . AS / TS / RAS: 103018 Widening and Improvements from 20/0-26/4 of - Road 10,30,18 9,20,66 ... 11,98 1 CRF-TN-2016-17-123

87 . AS / TS / RAS: 55000 Widening from SL to DL and Improvements from Km 0/0 - 5/4 of Irumborai - M.Goundampalayam Road. 5,32,00 2,92,72 1,50,00 1,69,18 70,10 CRF-TN-2017-18-82

88 . AS / TS / RAS: 57000 Rebuilding the road from Km 11/100-17/450 of Hellan -Yellamalai- Periyasholai Road 5,34,70 5,10,85 ... 19,41 1 CRF-TN-2017-18-31

89 . AS / TS / RAS: 60000 Widening from Single lane to Intermediate lane including widening culverts, Retaining wall, Dip Raising and improvements of 6,55,39 ... 5,00,00 5,76,98 78,41 Athipalayam - Vellamadai road at km 0/0 - 5/08. CRF-TN-2018-19-46

90 . AS / TS / RAS: 115000 Widening and Improvements from Intermediate Lane to Double Lane at Km 16/0-32/4 of Anaimalai-Poolankinar Road 11,25,00 3,02,95 7,00,00 4,52,35 3,69,70 CRF-TN-2017-18-83

91 . AS / TS / RAS: 225000 Widening to doublelane with hard shoulders of the road from km 122/0 of Dindugal - road to Nadupuni km 0/0 - 17/4 22,50,00 ... 8,00,00 19,94,83 2,00,00 CRF-TN-2018-19-48

14 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Madurai(NH) Division 92 . AS / TS / RAS: 108900 Improvements to Km 0/0 - 10/0 of Udhagai Kothagiri Mettupalayam Sathy Gobi Erode road including CD works & Protective works 10,89,00 9,93,64 ...... 1 CRF-TN-2016-17-89 93 . AS / TS / RAS: 100000 Widening from Double Lane to Three Lane at Km 33/0 - 40/0 of - Tirupur - - - Cochin (Via) Meenkarai 11,00,00 ... 5,00,00 8,80,04 2,00,00 Road (SH 19) CRF-TN-2018-19-41

94 . AS / TS / RAS: 50000 Widening and Improvements to Km 0/0 - 2/8 Including Construction of High level Bridge at Km 1/2 of Km 173/10 of Salem Cochin Road to 5,00,00 3,99,52 ... 41,53 58,95 Railway Station Road CRF-TN-2016-17-88

95 . AS / TS / RAS: 500000 Construction of Fly Over including Beautification and Junction Improvements from km 352/320-352/990 of NH 67 (Nagapattinam – 40,00,00 ... 8,00,00 17,52 20,00,00 Gudalur – Mysore Road - GN MILLS Junction in Coimbatore city ) (including LA) CRF-TN-2018-19 - 08 96 . AS / TS / RAS: 20000 Widening and Improvements of Km 8/0 of Coimbatore - Siruvani Road to Theethipalayam Road (via) Patchapalayam Road at Km 0/0 - 2/6. 2,00,00 40,39 50,00 1,43,55 1 CRF-TN-2017-18-85

97 . AS / TS / RAS: 18000 Widening and Improvements of Km 9/4 of Coimbatore - Siruvani Road to Theethipalayam Road at Km 0/0 - 2/4. 1,80,00 50,38 50,00 1,06,04 1 CRF-TN-2017-18-84

98 . AS / TS / RAS: 170000 Widening from DL to FL including improvements in Km 7/4-16/0 of Tiruppur - Kangeyam road (SH -172) 18,68,00 ... 8,00,00 15,27,92 3,40,08 CRF-TN-2018-19-42

15 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) (NH) Division 99 . AS / TS / RAS: 70000 Providing road safety measures including protective work and CD work from Km 0/0-5/2 of road. 7,55,20 ... 2,50,00 6,27,10 1,28,10 CRF-TN-2018-19-62 100 . AS / TS / RAS: 35000 Improvements to Km 2/0 -4/8 & Providing CC drain & Protective wall from Km 0/0 - 2/0 of Kookalthorai Road 3,26,00 2,28,44 1,00,00 68,49 29,07 CRF-TN-2017-18-87

101 . AS / TS / RAS: 7500 Wdg Minor Bridge at Km. 0/8 of - Bhavani Road 75,00 68,48 5,00 ... 6,52 CRF-TN-2017-18 -48

102 . AS / TS / RAS: 70000 Widening and improvements from Km 0-0-6/6 of Hallakarai road including protective and CD works 7,58,86 ... 3,00,00 6,45,93 1,12,93 CRF-TN-2018-19-51

103 . AS / TS / RAS: 195000 Widening from Km 19/2 - 39/0 of Erode - Perundurai - Kangeyam Road. (SH-96) 21,10,00 5,78,53 8,00,00 14,60,39 71,08 CRF-TN-2017-18-131

104 . AS / TS / RAS: 99920 Providing Hard Shoulders from Km 0/0-11/0 of Anthiyur -Ammapet road including reconstruction of Minor bridge at Km 9/2. 10,74,50 9,55,73 2,00,00 78,56 40,21 CRF-TN-2017-18-50

105 . AS / TS / RAS: 200000 Widening from Single Lane to Double Lane from Km 0/0 - 17/0 and Improvements in Km 2/8- 4/0 and 5/0-10/0 of Nellakottai - 9,90,00 1,43 6,00,00 8,91,06 97,51 Devala road including CD works and Protective works CRF-TN-2017-18-150

16 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Thanjavur (NH) Division 106 . AS / TS / RAS: 200000 Widneing from Two lane to Three lane and Improvements in Km 0/0- 15/0 of Bhavani - Anthiyur - Chellampalayam road (SH 175) 19,78,00 2,01,50 6,00,00 14,17,06 3,00,00 CRF-TN-2018-19-43 107 . AS / TS / RAS: 100000 Widening DL to ML and Improvements to Km 11/0-17/4 of Anthiyur - Ammapettai road (MD 28) 9,06,50 76,63 3,50,00 2,51,92 5,77,95 CRF-TN-2018-19-44

108 . AS / TS / RAS: 50000 Widening from SL to IL from Km 0/0 - 7/0 & Improvements at Km 4/0 - 7/0 of Buttercombai Kappachi (via) Thummanatty Road 3,58,00 2,91,67 1,00,00 20,00 46,33 CRF-TN-2017-18-88

109 . AS / TS / RAS: 250000 Improvement to Km 0/0-22/0 of Kundha - Pegumbellah road including CD works and hair pin bend iprovement (43 Nos.) 26,99,00 ... 5,00,00 7,68,49 8,00,00 CRF-TN-2018-19-50

110 . AS / TS / RAS: 45000 Improvements to Km 0/0 - 7/2 of Gudalur O' valley road 4,42,00 1,05 1,00,00 3,79,64 61,31 CRF-TN-2017-18-86

111 . AS / TS / RAS: 100000 Providing road safety measures from Km 14/0-21/0 of Udagai- Avalanchi-Kundha-Thai sola road 10,72,34 ... 3,50,00 9,03,93 1,68,41 CRF-TN-2018-19-61

112 . AS / TS / RAS: 150000 Widening from DL to ML and Improvements of Gobi - Uthukuli - Padiyur road (SH-81) at km 3/0 - 11/8, 12/4 - 13/6 and 14/2 - 16/8 16,48,00 2,21,32 3,50,00 12,73,43 1,53,25 including geomentrical improvements and construction of minor bridge at km 4/6. CRF-TN-2018-19-49

17 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Sivagangai(NH) Division 113 . AS / TS / RAS: 135000 Widening and Strengthening from Km 10/2-13/0, 32/4-33/4,40/0-42/4, including CD works of Vellimedupettai- Pondy Road via Mailam CRF- 14,45,00 12,82,32 3,00,00 1,00,00 62,68 TN-2017-18-08 2710 2710 0 0 2710 0 CRF-TN-2017-18-92 114 . AS / TS / RAS: 780000 Construction of Vaigai North River Bank Road from Road - Kuruvikaran Salai 81,48,00 ... 15,00,00 12,00,00 35,00,00 CRF-TN-2018-19-12

115 . AS / TS / RAS: 80000 Strengthening of Alampatti-Sedapatti road km 7/0-18/4. 8,67,00 6,20,86 2,00,00 2,20,00 26,14 CRF-TN-2017-18-148

116 . AS / TS / RAS: 1120000 Construction of Vaigai South River Bank Road from Dindigul Road - Theppakulam 117,00,00 ... 15,00,00 20,00,00 40,00,00 CRF-TN-2018-19-10

117 . AS / TS / RAS: 200000 Four Laning the Old Austinpatti Road in Km 0/0 - 2/0 21,20,00 ... 6,00,00 5,69,00 8,00,00 CRF-TN-2018-19-09

118 . AS / TS / RAS: 40000 Strengthening in km 32/4-34/4 and 39/2-41/8 of - Nainarkoil-Sivagangai- road including CD works & Construction 4,35,00 3,72,62 1,00,00 50,00 12,38 of brest wall CRF-TN-2017-18-108

119 . AS / TS / RAS: 19000 Providing Road Safety measures in in km 0/0-2/0, 7/0-15/4 of Thirumangalam- Pallapatti - Silukuvarpatti road inlcuding CD works 1,89,88 1,63,16 ... 10,00 16,72 and construction of retaining wall CRF-TN-2016-17-103

18 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Sivagangai(NH) Division 120 . AS / TS / RAS: 40000 IImprovements to Kavittinaikenpatti-Lakshmipuram road km 0/0-7/031 including CD works. 4,33,00 3,86,72 50,00 35,00 11,28 CRF-TN-2017-18-128 121 . AS / TS / RAS: 120000 Strengthening of Kumaram-Sholavandan road in km 0/0-15/320(MDR 955). 12,96,00 6,54,43 3,00,00 6,00,00 41,57 CRF-TN-2017-18-89

122 . AS / TS / RAS: 61500 Improvements to Uppur-Kottaiyur road from km 28/6-36/8. 6,65,00 5,78,40 1,00,00 70,00 16,60 CRF-TN-2017-18-121

123 . AS / TS / RAS: 45000 Construction of high level bridge at Km.44/4 of Vathalagundu-Peraiyur- Kariyapatti-Thiruchuli-Kamuthi-Sayalkudi road 3,89,00 ... 2,00,00 3,00,00 89,00 CRF-TN-2018-19-65

124 . AS / TS / RAS: 480000 Construction of Vaigai South River Bank Road from Theppakulam - Viraganoor 52,36,00 ... 10,00,00 18,00,00 25,00,00 CRF-TN-2018-19-11

125 . AS / TS / RAS: 177100 Widening from DL to ML and Strengthening at km 1/0-3/0, 3/6-4/0,5/0- 8/0, 8/4-12/0 and 13/6-17/0 of Thanichiyam-Seevagapatti road (via) 19,22,00 ... 8,00,00 8,00,00 8,00,00 Alanganallur-Vavidamaruthur road including CD Works.(MD 944) CRF-TN-2018-19-33

126 . AS / TS / RAS: 480000 Construction of Vaigai North River Bank Road from - Viraganoor 52,75,00 ... 10,00,00 20,00,00 18,00,00 CRF-TN-2018-19-13

19 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Sivagangai(NH) Division 127 . AS / TS / RAS: 100000 Widening from IL to DL in km 5/8 to 13/8 and Strengthening in km 2/4 to 13/8 of Pudupatti-Mangalrevu Road. 10,82,00 10,12,98 3,00,00 50,00 19,02 CRF-TN-2017-18-147 (NH) Division 128 . AS / TS / RAS: 70000 Widening from SL to IL and Improvements in Km 6/6 - 13/650 of Ayyalur-Kudikadu-Sathanur road including CD works. 7,30,00 5,95,74 3,00,00 1,01,34 32,92 CRF-TN-2017-18-127 129 . AS / TS / RAS: 370000 Strengthening of Kodavasal - Koradachery - Lakshmangudi - Mavoor road Km.3/6 - 12/6, 17/6 - 35/6 including Construction of Retaining wall 40,68,00 ... 10,00,00 6,00,00 20,00,00 and Box Culverts (MDR609) CRF-TN-2018-19-32

130 . AS / TS / RAS: 75000 Strengthening of Grand -Cauverypattinam Road Km 59/710- 62/6 and 64/6-70/0 7,94,00 3,04,56 2,50,00 4,85,00 4,44 CRF-TN-2017-18-113

131 . AS / TS / RAS: 102000 Widening IL to DL and Strengthening in Km 60/0-66/4 of - - Adhirampattinam road including CD 11,02,00 ... 6,00,00 2,50,00 5,52,00 works and Retaining wall CRF-TN-2018-19-31

132 . AS / TS / RAS: 110000 Improvements of Trichy - Pudukottai - - Mimisal Road at Km 96/4-97/8,99/0-102/4,103/0-103/6,104/0-107/0 and 108/0-111/0 11,69,00 2,74 7,00,00 9,00,00 2,66,26 (SH-26) Including Reconstruction of Pipe culvert at km 97/6,97/8,98/6,98/8,100/8,104/6 and 110/6 CRF-TN-2017-18-141 133 . AS / TS / RAS: 65000 Strengthening of Grand Anaicut-Cauverypattinam Road Km 89/6-96/0 6,90,00 1,98,34 4,00,00 4,90,00 1,66 CRF-TN-2017-18-111

20 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Tirunelveli (NH) Division 134 . AS / TS / RAS: 50000 Strengthening of Muthupet Voimedu Road Km 11/0-15/9 5,41,00 3,88 3,00,00 4,20,00 1,17,12 CRF-TN-2017-18-142 135 . AS / TS / RAS: 200000 Strengthening of Nagore-Vettar Road Km 15/0-23/0 including Reconstruction of Culvert at Km 19/8 and Construction of Retaining 21,90,00 5,73,23 9,00,00 5,50,00 8,66,77 wall at Km 15/2,15/4,15/6,16/10,17/10,18/2,8/4,18/6,18/8,18/10,21/10, 22/2,(SH 148) CRF-TN-2017-18-151 136 . AS / TS / RAS: 180000 Construction of ROB at Km.29/10 (LC 37) of NH 209 18,00,00 ... 6,00,00 ... 8,00,00 CRF-TN-2018-19-70

137 . AS / TS / RAS: 50000 Widening and Strengthening of Pudukottai-Killukottai Manayeripatti Road Km 5/0-10/0. 5,19,00 3,08 3,00,00 1,00,00 4,15,92 CRF-TN-2017-18-126

138 . AS / TS / RAS: 259200 Strengthening from Km 24/8- 37/0 & 38/4-47/8 of Kumbakonam - Mannargudi - road 25,92,40 21,28,93 1,00,00 4,63,00 47 CRF-TN-2017-18 -28

139 . AS / TS / RAS: 409200 Strengthening from Km 1/6 – 16/8 of Left Bank of work Vennar - Palliagraharam -Kalanchery road 45,00,00 29,16,69 3,50,00 11,42,00 4,41,31 CRF-TN-2017-18-38

140 . AS / TS / RAS: 90000 Widening and Strengthening IL to DL of Vadavalam to Pudupatti Road from Km 11/8-20/0 9,88,00 2,74 5,50,00 7,50,00 2,35,26 CRF-TN-2017-18-125

21 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) Tirunelveli (NH) Division 141 . AS / TS / RAS: 90000 Strengthening in km 10/6-20/4 of Mannargudy-Sethubavachatiram road including reconstruction of culverts and construction of protective 9,76,76 3,05,24 6,50,00 6,70,00 1,52 works(SH 146) CRF-TN-2017-18-109 142 . AS / TS / RAS: 50000 Widening and Strengthening SL to IL of Pudukottai - road to Karaiyur Road via Kiilikudi from km 0/0-5/0 5,22,00 3,08 3,50,00 5,00,00 18,92 CRF-TN-2017-18-124

143 . AS / TS / RAS: 120000 Strengthening of Thanjavur - Mannargudy - - – Kodiyakkarai road Km.39/0-49/6 (SH.63) 12,62,00 3,23 7,50,00 9,50,00 3,08,77 CRF-TN-2017-18-110

Nagercoil (NH) Division 144 . AS / TS / RAS: 130000 Improvements to Kodukkur -Kaduvetti Road Km 0/0-8/0 & 21/0-30/2. 14,10,00 11,18,33 7,00,00 2,75,90 15,77 CRF-TN-2017-18-112 145 . AS / TS / RAS: 80000 Widneing from IL to FL and improvements at Km 32/0-35/4 of - 8,70,00 10,88 4,00,00 6,45,82 2,13,30 CRF-TN-2017-18-114

146 . AS / TS / RAS: 150000 Widening from Intermediate lane to Two lane and Improvements in Km.6/2-10/0 and 15/6-20/8 of Veppanthattai-Neikuppai-GST Road 15,00,00 7,06 6,00,00 8,20,81 6,72,13 including CD works (MD-820) CRF-TN-2018-19-29

147 . AS / TS / RAS: 40000 Widening from SL to IL and Improvements in Km 3/0 - 7/0 of Karai- Therani-Ootathur road including CD works. 4,17,00 1,16,42 1,00,00 2,74,76 25,82 CRF-TN-2017-18-123

22 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) (NH) Division 148 . AS / TS / RAS: 97500 Widening from SL to IL and rebuilding - Senganthi road from km 0/0 - 10/60 10,69,00 8,71,58 4,00,00 1,21,58 75,84 CRF-TN-2016-17-106 149 . AS / TS / RAS: 100000 Widening from Single Lane to Intermediate Lane and Improvements of Puduvettaikudi - Labbaikudikadu road (via) Veppur at Km 12/2-18/220 10,00,00 6,00 5,00,00 5,45,09 4,48,91 including construction of slab culvert CRF-TN-2018-19-30

150 . AS / TS / RAS: 40000 Improvements to Poyyur-Sundakudi Road to Oriyur road Km 0/0-5/2 4,10,00 2,55,91 2,00,00 1,22,83 31,26 CRF-TN-2017-18-144

151 . AS / TS / RAS: 50000 Improvements to Trichy- Road to Velipringiyam Road Km 0/0-5/0. 5,40,00 2,02,67 2,00,00 3,00,14 37,19 CRF-TN-2017-18-145

152 . AS / TS / RAS: 20000 Widening from SL to IL in Km 0/0-2/0 of NH 45 to Thiruvilakurichi road including CD Works and side drain 2,16,00 1,76,56 80,00 34,34 5,10 CRF-TN-2017-18-122

153 . AS / TS / RAS: 180000 Widening Single Lane to Double Lane and Improvements of Andimadam - Devanur - Variyankaval road Km 0/0 - 15/2 18,00,00 ... 8,00,00 10,57,39 7,42,61 CRF-TN-2018-19-28

154 . AS / TS / RAS: 132000 Improvements to Km 10/0-30/0 of Thalaiyuthu-Kallimandayam- Edayakottai road including Reconstruction of culverts and 13,20,00 12,94,24 ... 30 25,46 Reconstruction of Retaining wall CRF-TN-2017-18-21

23 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 155 . AS / TS / RAS: 30000 Reconstruction of Minor Bridge at km 1/6(i) & (ii) of Poyyamani - Innungur road 1,95,00 1,74 1,50,00 65,72 1,27,54 CRF-TN-2018-19-68

156 . AS / TS / RAS: 55000 Strengthening from Km 0/0-11/4 of Ambilikkai-Kuthilippai road. (MDR 970). 5,93,00 4,96,04 3,00,00 88,86 8,10 CRF-TN-2017-18-120

157 . AS / TS / RAS: 15000 Strenthening to Ranganathapuram Km 0/0-3/8 1,25,00 93,79 50,00 14,00 17,21 CRF-TN-2017-18-78

158 . AS / TS / RAS: 90000 Strengthening of Natham-Pillaiyarnatham road km 8/2-19/6,21/6- 27/0,31/2-32/8. 9,18,70 2,89,49 6,50,00 5,66,44 62,77 CRF-TN-2017-18-134

159 . AS / TS / RAS: 50000 Widening from Single lane to Intermediate lane of Vedasandur - Kovilur road from Km. 0/0 - 17/935 including Reconstruction / 5,38,00 5,16,79 ... 36 20,85 Widening of Culverts. CRF-TN-2017-18-22

160 . AS / TS / RAS: 65000 Strengthening in km 12/0-24/0 and Widening in km 15/8-24/0 of Vathalagundu-Thandikudi road 7,05,00 5,89 5,00,00 42,32 6,56,79 CRF-TN-2017-18-93

161 . AS / TS / RAS: 71000 Widening from SL to IL & Strengthening of Kallidaikurichi Railway Feeder road to Manimuthuar at Km 0/0-6/0. 5,61,40 90 2,00,00 5,50,00 10,50 CRF-TN-2017-18-115

24 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 162 . AS / TS / RAS: 80000 Widening and Strengthening of road branching from Km 112/2 of NH 208 to Sambavarvadakarai road in Km 0/0-8/6 including CD works. 7,95,10 7,44,71 ... 45,00 5,39 CRF-TN-2017-18-37

163 . AS / TS / RAS: 120000 Widening and Strengthening from Km 0/0-13/8 of Idaikal – Sendamaram road including CD works. 10,00,00 8,29,70 ... 1,60,00 10,30 CRF-TN-2017-18-16

164 . AS / TS / RAS: 120000 Widening from IL to DL and Strengthening in Km 0/0-9/6 of Kayathar - Kalugumalai Road 12,00,00 ... 7,00,00 11,50,00 50,00 CRF-TN-2018-19-57

165 . AS / TS / RAS: 120000 Widening IL to DL and Strengthening from km 23/6 to 36/0 of Reddiarpatti -Vijayanarayanam road. 12,00,00 1,52 8,00,00 10,00,00 1,98,48 CRF-TN-2017-18-146

166 . AS / TS / RAS: 125000 Widening IL to DL in Km 0/0-8/6 & km 9/8-15/880 and improvements in Km 0/0-8/6,9/8-11/8 & in km 14/8-15/880 of Paruvakudi-Sivagiri road 12,55,00 1,59 8,00,00 2,00,00 8,53,41 including construction of retaining wall and CD works. CRF-TN-2017-18-119

167 . AS / TS / RAS: 60000 Widening SL to IL and Strengthening of Vaithiyalingapuram Road in Km 0/0-7/8 6,49,00 ... 3,00,00 ... 5,00,00 CRF-TN-2018-19-58

168 . AS / TS / RAS: 70000 Strengthening in Km 0/0-6/8 of Paramankurichi - Udangudi Road Including Side Drain at Km 6/0-6/8. 6,64,00 3,25,91 4,00,00 3,20,00 18,09 CRF-TN-2017-18-117

25 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 169 . AS / TS / RAS: 90000 Widening SL to IL and Strengthening of Kavalkinaru to Radhapuram road at Km 5/450-14/2 including CD works. 9,76,00 1,14 6,00,00 7,50,00 2,24,86 CRF-TN-2017-18-116

170 . AS / TS / RAS: 260000 Widening from SL to DL and Improvements in km 0/0-17/400 of Kurunthamozhli - Kurinchankulam Road including widening of culverts, 26,76,40 ... 8,00,00 16,00,00 8,00,00 CD works and protective works. CRF-TN-2018-19-55

171 . AS / TS / RAS: 100500 Strengthening and Widening from SL to IL in Km 3/2-17/0 of Kadambur - Puliyampatty - Deivacheyalpuram road including CD works. 10,94,00 7,73,19 7,00,00 3,10,00 10,81 CRF-TN-2017-18-118

172 . AS / TS / RAS: 160000 Widening SL to DL of Subbayapuram-Thalayanai from Km 0/0-9/400 including CD works 17,60,00 ... 8,00,00 15,90,00 1,70,00 CRF-TN-2018-19-56

173 . AS / TS / RAS: 150000 Widening IL to DL in km 0/0-10/4 of Kulasekaramangalam - Valasai Road including widening of culverts, CD works, protective works and 16,32,00 ... 7,00,00 3,00,00 8,00,00 Junction Improvements at km 5/6 (Sendamaram) CRF-TN-2018-19-54

174 . AS / TS / RAS: 180000 Widening from SL to IL in Km. 6/0 - 17/8 and strengthening in Km. 6/0 - 15/0 & 15/8 - 17/0 Alagiyapandiyapuram - Keezhaveeranam Road 14,52,00 ... 7,00,00 14,00,00 52,00 including CD Works CRF-TN-2018-19-52

175 . AS / TS / RAS: 105000 Widening from SL – IL Km 0/0-17/0 and improvement to Km 0/0-4/6, 6/0-8/0, 11/0-14/0, 15/0-17/0 of Radhapuram – Idayankudi road 11,43,30 10,71,04 ... 60,00 12,26 including CD works. CRF-TN-2017-18-19

26 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 176 . AS / TS / RAS: 100000 Widening from SL to IL in Km 5/0-14/330 & Improvements in Km 0/0 - 6/0 & 8/100 - 12/0 of Panagudi to Kallikulam road including CD works. 10,00,00 1,27 6,00,00 9,00,00 98,73 CRF-TN-2017-18-152

177 . AS / TS / RAS: 160000 Widening and Strengthening from Km 0/0-18/120 of – Vasudevanallur road in including CD works 17,11,00 14,91,38 ... 2,10,00 9,62 CRF-TN-2017-18-18

178 . AS / TS / RAS: 100000 Widening & Strengthening of -Sundarapandipuram road in Km.0/0-9/2 including CD works 10,00,00 7,45,76 ... 2,00,00 54,24 CRF-TN-2016-17-112

179 . AS / TS / RAS: 350000 Widening DL to FL and strengthening in Km 0/0-8/650 of NH 49 (abandoned) to Ramanathapuram urban limit Road 38,25,80 2,32 7,00,00 27,63,00 8,60,48 CRF-TN-2018-19-34

180 . AS / TS / RAS: 130000 Strengthening in km 2/0-8/0, 9/0-9/2, 10/2-10/4 , 11/4-12/0, 13/0- 14/6,17/0-20/4, 25/0-29/6 of - Vembakottai Road 13,00,00 12,01,58 50,00 ... 1 CRF-TN-2016-17-66

181 . AS / TS / RAS: 70000 Widening SL to IL and Strengthening of Thenur- Kambali(via)Uvarkulam road km.0/0-7/900 including CD Works 7,70,00 ... 4,00,00 2,20,00 5,00,00 CRF-TN-2018-19-60

182 . AS / TS / RAS: 90000 Widening from IL - DL in Km 0/0 - 7/0 and Widening from SL-DL in Km 7/0-10/660 and Strengthening in Km 3/0 - 5/0 & Km 7/0-10/660 of 9,32,56 2,48,49 5,50,00 6,80,00 4,07 Aruppukottai - Kurunthamadam Road including reconstruction of culvert and Construction of retaining wall. CRF-TN-2017-18-133

27 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 183 . AS / TS / RAS: 96000 Widening SL - IL and Strengthening in Km 2/8-14/8 of - Nenmeni Road to Madurai - Road (via) Maniyampatti. 9,96,80 1,09,95 6,50,00 8,86,00 85 CRF-TN-2017-90

184 . AS / TS / RAS: 100000 Widening and Strengthening from Km 0/0-10/0 of Ramanathapuram- Keelakkarai road to Rengunathapuram road 8,85,00 7,06,79 50,00 80,00 98,21 CRF-TN-2017-18-20

185 . AS / TS / RAS: 100000 Widening SL to IL and Strengthening of Meenakshipuram-A.Mukkulam road km.0/0-12/6 including CD Works 11,00,00 ... 5,00,00 1,20,00 9,00,00 CRF-TN-2018-19-59

186 . AS / TS / RAS: 46000 Widening SL - IL and Strengthening in Km 1/2-6/965 of Malaipatti - Vellayapuram Road. 4,75,00 3,34,92 2,50,00 1,40,00 8 CRF-TN-2017-18-91

187 . AS / TS / RAS: 146300 Widening and Strengthening from Km 2/0-11/0 & Km 13/0-16/0. of Puthendal to Earwadi road 14,11,00 11,36,81 50,00 50,00 2,24,19 CRF-TN-2017-18-17

188 . AS / TS / RAS: 8400 Improvements to Km 0/0-2/0 of Manjalumoodu market road 84,00 68,61 ... 6,00 9,39 CRF-TN-2017-18-06

189 . AS / TS / RAS: 3000 Improvements to Puthenthurai road at km 0/0-0/8 28,70 1,16 ... 25,00 2,54 CRF-TN-2017-18-60

28 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 190 . AS / TS / RAS: 32500 Improvements to Neerodi - Erayumanthurai at km 0/0-2/6 & 4/4-8/965 3,43,00 2,30 ... 1,72,13 1,68,57 CRF-TN-2017-18-57

191 . AS / TS / RAS: 7500 Improvements to Maruthencode Road at km 3/0-4/6 78,40 72,47 ... 5,00 93 CRF-TN-2017-18-58

192 . AS / TS / RAS: 800000 Construction of flyover at Thuckalay 80,00,00 ... 7,00,00 ... 30,00,00 CRF-TN-2018-19-71

193 . AS / TS / RAS: 30000 Improvements to Parasalai - Kollencode Road km 4/0-7/6 2,96,00 1,24 ... 2,30,00 64,76 CRF -TN-2017-18-74

194 . AS / TS / RAS: 8500 Improvements to Kuzhithurai - Alancholai - Arukani Road Km 6/0-7/6 91,30 84,54 ... 5,00 1,76 CRF-TN-2017-18-56

195 . AS / TS / RAS: 70000 Widening SL to IL and Improvements to Thuckalay - Thadikkarankonam road km 8/6-17/2 7,00,00 3,34 3,00,00 ... 5,00,00 CRF-TN-2018-19-53

196 . AS / TS / RAS: 5000 Improvements to Aralvoimozhi - Nedumangadu road km 48/8-48-9 including reconstruction of culvert at km 48/9 42,50 69 ... 2,00 39,81 CRF-TN-2017-18-55

29 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 197 . AS / TS / RAS: 18800 Improvements to Km 4/0 - 6/8 of Marthandam - Karungal road 1,88,00 1,61,53 ... 10,00 16,47 CRF-TN-2017-18-01

198 . AS / TS / RAS: 2750 Improvements to Km 0/0-1/0 of Vadiveeswaram-Karuppukatti road( Via ootuvalmadam) 25,00 21,54 ... 1,00 2,46 CRF-TN-2017-18-11

199 . AS / TS / RAS: 2710 Improvements to Km 0/0-1/0 of Christober nagar road 27,10 21,34 ... 3,00 2,76 CRF-TN-2017-18-08

200 . AS / TS / RAS: 15000 Improvements to Km 0/0-2/2 of Kuzhivilai - Vilacheri road 1,50,00 99,03 ... 20,00 30,97 CRF-TN-2017-18-03

201 . AS / TS / RAS: 4750 Improvements to Km 11/0-11/5 of Kuzhithurai-Thengaipattinam road 47,50 35,40 ... 3,00 9,10 CRF-TN-2017-18-02

202 . AS / TS / RAS: 4500 Improvements to Km 9/8-10/0 & 12/2-12/8 of Kuzhithurai-Alancholai- Aarukani road including CD works 42,50 32,85 ... 4,00 5,65 CRF-TN-2017-18-04

203 . AS / TS / RAS: 12000 Improvements to Attoor - Moovathumugam - Charoor Road Km 0/0- 2/0 including CD works and Protective works. 1,15,42 2,55 ... 50,00 62,87 CRF -TN-2017-18-76

30 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 204 . AS / TS / RAS: 14000 Improvements to Maruthoorkuricy - Pazhayakadai Road Km 0/0- 2/8 1,43,00 48,26 25,00 28,00 66,74 CRF-TN-2017-18-66

205 . AS / TS / RAS: 2910 Improvements to Km 0/0-0/7 of Pantivaikal bridge -Rajakkamangalam thurai road 26,75 22,29 ... 3,00 1,46 CRF-TN-2017-18-10

206 . AS / TS / RAS: 10000 Improvements to Marungoor - Amaravathivilai Road Km 0/0-2/2 including Drain 95,06 87,59 ... 5,00 2,47 CRF -TN-2017-18-72

207 . AS / TS / RAS: 7000 Improvements to Mulagumoodu - Road km 0/0-1/0 including CD works. 67,70 61,05 ... 5,00 1,65 CRF -TN-2017-18-73

208 . AS / TS / RAS: 20000 Improvements to Km 6/0-8/2 of old veeranamangalam road. 2,00,00 1,48,91 ... 20,00 31,09 CRF-TN-2017-18-05

209 . AS / TS / RAS: 10000 Improvements to Maruthencode - Thiruthuvapuram Road Km 0/0- 1/8 including CD works and Protective works. 1,06,30 48,08 ... 55,00 3,22 CRF -TN-2017-18-77

210 . AS / TS / RAS: 10000 Widening Single Lane to Intermediate Lane and Improvements to Irumpili Road Km 0/0-1/8 including CD works and Protective works. 1,02,22 95 ... 92,00 9,27 CRF -TN-2017-18-75

31 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 211 . AS / TS / RAS: 4713 Improvements to Km 0/0-1/8 of Therkkutherivilai -Veerabagubathy road 45,00 36,27 ... 4,00 4,73 CRF-TN-2017-18-09

212 . AS / TS / RAS: 10000 Improvements to Vellipillaiyarkoil - Keezhkarai Road Km 0/0 - 1/6. 96,00 31,53 ... 51,00 13,47 CRF-TN-2017-18-68

213 . AS / TS / RAS: 10000 Improvements to Kanimadam - Kanagappapuam km 0/0-2/1 including CD works 96,51 87,12 ... 8,00 1,39 CRF-TN-2017-18-70

214 . AS / TS / RAS: 6000 Improvements to Kolvel - Perumkulam - Thetticode Road Km 0/0 - 1/246 55,97 1,46 ... 54,51 ... CRF-TN-2017-18-69

215 . AS / TS / RAS: 6000 Improvements to Melpalai - Kodukkachivilai- (via) Vadakkanvilagam Harijan Colony road at Km. 0/0-1/4 65,90 76 ... 16,16 48,78 CRF-TN-2017-18-59

216 . AS / TS / RAS: 6000 Improvements to Iynthumarikonam Road Km 0/0 - 1/6 60,59 2,14 5,00 40,00 18,45 CRF-TN-2017-18-67

217 . AS / TS / RAS: 11000 Improvements to Km 2/0-4/0 of Choozal-Nadaikavoo road 1,10,00 78,43 ... 10,00 21,57 CRF-TN-2017-18-07

32 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 05 800 SA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund

16 Major Works ( DPC 5054 05 800 SA 16 04 ) 218 . AS / TS / RAS: 52500 Improvements to Suchindrum - Marungoor road to Suchindrum Vellamadam link Road Km 0/0-1/0 including and Protective works 5,25,00 31,10 50,00 3,50,00 1,43,90 CRF-TN-2017-18-71

TOTAL - 5054 05 800 SA 3,199,63,05 545,68,61 800,00,00 1,050,00,00 928,29,21

33 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 80 800 JS [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JS Road Works under Bharath Nirman

16 Major Works ( DPC 5054 80 800 JS 16 06 ) 1. AS / TS / RAS: 32694 Bharat Nirman Phase IV Additional allotment for additional expenditure accorded by State Government of Tamilnadu. 3,26,94 46,07 57,02 36,21 1,05,00 G.O. (D) No.21, Rural Development & Panchayat Raj (CGS2) Department, dated 13.2.2015

2. AS / TS / RAS: 50988 Bharat Nirman Phase V Additional allotment for additional expenditure accorded by State Government of Tamilnadu. 5,09,88 ... 17,80 11,30 55,00 G.O. M.S No 105, Rural Development & Panchayat Raj (CGS2) Department, dated 21.9.2017

3. AS / TS / RAS: 14918 Bharat Nirman Phase V Additional allotment for additional expenditure accorded by State Government of Tamilnadu. 1,49,18 29,61 30,41 19,31 50,00 G.O. M.S No 90, Rural Development & Panchayat Raj (CGS2) Department, dated 01.8.2016.

4. AS / TS / RAS: 116825 Bharat Nirman Phase III Additional allotment for additional expenditure accorded by State Government of Tamilnadu. 11,68,25 4,51,79 3,98,12 2,53,18 ... G.O. (D) No.116, Rural Development & Panchayat Raj (CGS2) Department, dt.19.3.2013

TOTAL - 5054 80 800 JS 21,54,25 5,27,47 5,03,35 3,20,00 2,10,00

34 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

5054 80 800 UA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure UA Works under Economic Importance Scheme

16 Major Works ( DPC 5054 80 800 UA 16 01 ) 1. AS / TS / RAS: 0 G.O.(2D) No.36, HW&MP Dept, Dt.21.12.2017 10 ......

TOTAL - 5054 80 800 UA 10 ......

35 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

2059 80 053 AE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

2059 PUBLIC WORKS 80 General 053 Maintenance and Repairs AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways 17 Minor Works ( DPC 2059 80 053 AE 17 07 ) Villupuram (H) C&M Division 1. AS / TS / RAS: 100 Repairs to Head Draughting Officer Room in Villupuram (H) C&M Circle office. 1,00 ...... 1,00

2. AS / TS / RAS: 100 Providing Electrical works in Villupuram (H) C&M, Division Office. 1,00 ...... 1,00

3. AS / TS / RAS: 100 Providing Doors & Windows of Record room in Ist floor of Division Office building @ Villupuram 1,00 ...... 1,00

4. AS / TS / RAS: 100 Providing Sanitory facilities and Repairs to Septic Tank in the Division Office building, Villupuram. 1,00 ...... 1,00

5. AS / TS / RAS: 100 Providing sanitary arrangements in Assistant Divisional Engineer Quarters building and Assistant Engineer Quarters building in (H), 1,00 ...... 1,00 C&M Sub-division, Gingee.

6. AS / TS / RAS: 100 Re-Construction of Common Toilet / Bath room for Sub-Divisional Office, Vanur 1,00 ...... 1,00

7. AS / TS / RAS: 100 Repairs to Damaged Roofing at Suit -I of Traveller's Bungalow in (H), C&M Gingee Sub-division 1,00 ...... 1,00

36 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

2059 80 053 AE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

2059 PUBLIC WORKS 80 General 053 Maintenance and Repairs AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways 17 Minor Works ( DPC 2059 80 053 AE 17 07 ) Villupuram (H) C&M Division 8. AS / TS / RAS: 100 Providing sanitary arrangements in Traveller's Bungalow suit I & II (H), C&M Sub-division Office, Gingee 1,00 ...... 1,00

9. AS / TS / RAS: 100 Improvements to Flooring at Suit -II of Traveller's Bungalow in (H), C&M Gingee Sub-division 1,00 ...... 1,00

10 . AS / TS / RAS: 100 Improvements to Flooring at Suit -I of Traveller's Bungalow in (H), C&M Gingee Sub-division 1,00 ...... 1,00

11 . AS / TS / RAS: 100 Repairs to Damaged Roofing at Suit -II of Traveller's Bungalow in (H), C&M Gingee Sub-division 1,00 ...... 1,00

12 . AS / TS / RAS: 100 Providing water pipe line to Traveller's Bungalow suit I & II and Assistant Divisional Engineer, Assistant Engineer office building, 1,00 ...... 1,00 Gingee

13 . AS / TS / RAS: 100 Extension of Assistant Divisional Engineer's room in Sub-Divisional Office, Vanur 1,00 ...... 1,00

Cuddalore (H) C&M Division 14 . AS / TS / RAS: 100 Repairs to Damaged Roofing to QC Annexure Building, Vridhachalam 1,00 ...... 1,00

37 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

2059 80 053 AE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

2059 PUBLIC WORKS 80 General 053 Maintenance and Repairs AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways 17 Minor Works ( DPC 2059 80 053 AE 17 07 ) (H) C&M Division 15 . AS / TS / RAS: 100 Repairs to Damaged Roofing to Sub-Division Building 1,00 ...... 1,00

16 . AS / TS / RAS: 100 Providing Sanitary arrangement to QC Annexure Building,Vridhachalam 1,00 ...... 1,00

17 . AS / TS / RAS: 100 Repairs to Trevelors Bungalow at Bhuvanagiri of Kurinjipady (H) C&M Sub-Division (South side) 1,00 ...... 1,00

18 . AS / TS / RAS: 100 Flooring & Replacing of Doors and Windows in QC Annexure Building,Vridhachalam 1,00 ...... 1,00

19 . AS / TS / RAS: 100 Construction of common toilet for (H)C&M Office Building at Travelers Bangalow Compound 1,00 ...... 1,00

20 . AS / TS / RAS: 100 Reparing Compound Wall for panruti (H)C&M Travelers Bangalow (Right side) 1,00 ...... 1,00

21 . AS / TS / RAS: 100 Replacing of Doors and windows ,Improvements of Flooring panruti (H)C&M Office Building at Travelers Bangalow 1,00 ...... 1,00

38 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

2059 80 053 AE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

2059 PUBLIC WORKS 80 General 053 Maintenance and Repairs AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways 17 Minor Works ( DPC 2059 80 053 AE 17 07 ) Cuddalore (H) C&M Division 22 . AS / TS / RAS: 100 Construction of common toilet for panruti (H)C&M Office Building at Travelers Bangalow Compound 1,00 ...... 1,00

23 . AS / TS / RAS: 100 Repairs to Trevelors Bungalow at Bhuvanagiri of Kurinjipady (H) C&M Sub-Division (East Side) 1,00 ...... 1,00

24 . AS / TS / RAS: 100 Repairs to compound wall of Kurinjipady (H) C&M Sub-Division (Union Office side) 1,00 ...... 1,00

25 . AS / TS / RAS: 100 Reparing Compound Wall for panruti (H)C&M Travelers Bangalow(Left side) 1,00 ...... 1,00

26 . AS / TS / RAS: 100 Repairs to compound wall of Kurinjipady (H) C&M Sub-Division (North side) 1,00 ...... 1,00

Pollachi (H) C&M Division 27 . AS / TS / RAS: 100 Repairs to Compound wall in Assistant Divisional Engineer Quarters at Pollachi. 1,00 ...... 1,00

28 . AS / TS / RAS: 100 Repairs to Compound wall in Divisional Engineer Quarters at Pollachi. 1,00 ...... 1,00

39 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

2059 80 053 AE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

2059 PUBLIC WORKS 80 General 053 Maintenance and Repairs AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways 17 Minor Works ( DPC 2059 80 053 AE 17 07 ) Pollachi (H) C&M Division 29 . AS / TS / RAS: 100 Special Repairs to East Side Compound wall to Section Office at Sulthanpet Section 1,00 ...... 1,00

30 . AS / TS / RAS: 100 Special Repairs to North Side Compound wall to Section Office at Sulthanpet Section 1,00 ...... 1,00

31 . AS / TS / RAS: 100 Special Repairs to South Side Compound wall to Section Office at Sulthanpet Section 1,00 ...... 1,00

32 . AS / TS / RAS: 100 Repairs to Front Compound Wall Left Side at Anaimalai (H), C&M, Sub Division 1,00 ...... 1,00

33 . AS / TS / RAS: 100 Repairs to Front Compound Wall Right side at Anaimalai (H), C&M, Sub Division 1,00 ...... 1,00

34 . AS / TS / RAS: 100 Reconstruction of Compound wall to Superintents Quarters at Pollachi. 1,00 ...... 1,00

35 . AS / TS / RAS: 100 Repairs to Rear Compound Wall Left Side at Anaimalai (H), C&M, Sub Division 1,00 ...... 1,00

40 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

2059 80 053 AE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

2059 PUBLIC WORKS 80 General 053 Maintenance and Repairs AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways 17 Minor Works ( DPC 2059 80 053 AE 17 07 ) Pollachi (H) C&M Division 36 . AS / TS / RAS: 100 Repairs to Rear Compound Wall Right side at Anaimalai (H), C&M, Sub Division 1,00 ...... 1,00

Theni (H) C&M Division 37 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (south side part II) 1,00 ...... 1,00

38 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (East side part I) 1,00 ...... 1,00

39 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (west side part I) 1,00 ...... 1,00

40 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (West side part II) 1,00 ...... 1,00

41 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (North side part I) 1,00 ...... 1,00

42 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (North side part II) 1,00 ...... 1 1,00

41 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

2059 80 053 AE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

2059 PUBLIC WORKS 80 General 053 Maintenance and Repairs AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways 17 Minor Works ( DPC 2059 80 053 AE 17 07 ) Theni (H) C&M Division 43 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (south side part I) 1,00 ...... 1,00

Dindigul (H) C&M Division 44 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (West side part II) 1,00 ...... 1,00

45 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (west side part I) 1,00 ...... 1,00

46 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (North side part II) 1,00 ...... 1,00

47 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (North side part I) 1,00 ...... 1,00

48 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (south side part I) 1,00 ...... 1,00

49 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (south side part II) 1,00 ...... 1,00

42 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

2059 80 053 AE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

2059 PUBLIC WORKS 80 General 053 Maintenance and Repairs AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways 17 Minor Works ( DPC 2059 80 053 AE 17 07 ) Dindigul (H) C&M Division 50 . AS / TS / RAS: 100 Repair to compound wall in Natham sub division toward (East side part I) 1,00 ...... 1,00

TOTAL - 2059 80 053 AE 50,00 ...... 1 50,00

43 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 03 800 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 03 State Highways 800 Other Expenditure JA Construction

17 Minor Works ( DPC 3054 03 800 JA 17 07 ) Villupuram (H) C&M Division 1. AS / TS / RAS: 100 Reconstruction of body wall at km 58/4 (L/S) of - Ulundurpet - Villupuram road (SH 69) 1,00 ...... 1 1,00

2. AS / TS / RAS: 100 Providing Well Protective wall at Km 8/6 of Vellimedupet-Pondy (via) Mailam Road (SH 1,00 ...... 1,00 136)

3. AS / TS / RAS: 4800 New Sanction 48,00 ...... 48,00

TOTAL - 3054 03 800 JA 50,00 ...... 1 50,00

44 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JA District roads - Construction

17 Minor Works ( DPC 3054 04 337 JA 17 09 ) Villupuram (H) C&M Division 1. AS / TS / RAS: 100 Repairs to culvert at km 9/6 of Eraiyur - Kandappankurichi - Nallur road (MD-1118) 1,00 ...... 1,00

2. AS / TS / RAS: 100 Repairs to culvert at km 9/8 of Eraiyur - Kandappankurichi - Nallur road (MD-1118) 1,00 ...... 1,00

3. AS / TS / RAS: 100 Repairs to Culvert at km 11/8, 12/8, & 13/2 of Vridhachalam- Palakollai Road (MD-746) 1,00 ...... 1,00

4. AS / TS / RAS: 100 Repairs to culvert at km 3/4 of Eraiyur - Kandappankurichi - Nallur road (MD-1118) 1,00 ...... 1,00

5. AS / TS / RAS: 100 Repairs to culvert at km 26/2 & 29/10 of Thittagudy-Sirupakkam road (via) Avatti, Ma.Pudaiyur (MD-814) 1,00 ...... 1,00

6. AS / TS / RAS: 100 Repairs to Minor Bridge at km 1/4 & culvert at km 4/10 of of Thittagudy-Sirupakkam road (via) Avatti, Ma.Pudaiyur (MD-814) 1,00 ...... 1,00

7. AS / TS / RAS: 100 Repairs to Culvert at km 14/4, 15/4, 15/6, 16/6 & 17/4 of Vridhachalam- Palakollai Road (MD-746) 1,00 ...... 1,00

45 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JA District roads - Construction

17 Minor Works ( DPC 3054 04 337 JA 17 09 ) Villupuram (H) C&M Division 8. AS / TS / RAS: 100 Repairs to Culvert at km 13/8(i) & 13/8 (ii) of Vridhachalam- Palakollai Road (MD-746) 1,00 ...... 1,00

9. AS / TS / RAS: 100 Repair to Culvert at km 2/2 Kadampuliyur – Ulundurpettai Road (via) Sendamangalam – Perperiyankuppam Road Km 0/0 – 15/8 (MD 1,00 ...... 1,00 602)

10 . AS / TS / RAS: 100 Construction of Protective wall at Km 18/6 of Soorapattu-Ottampattu (via) -Anandapuram road (MD-807) 1,00 ...... 1 1,00

11 . AS / TS / RAS: 100 Repairs to culvert at Km. 9/8(i), 10/4 & 12/4 of Chidambaram - Pitchavaram tourism road (MD-1039) 1,00 ...... 1,00

12 . AS / TS / RAS: 100 Repairs to Culvert at km9/4, 9/6, & 10/4 of Vridhachalam- Palakollai Road 1,00 ...... 1,00

13 . AS / TS / RAS: 100 Repairs to culvert at Km. 3/10, 4/10,6/4, 6/6 & 7/6 of Chidambaram- Veeranam Tank Bund road (via) Keelnatham (MD-583) 1,00 ...... 1,00

14 . AS / TS / RAS: 100 Repairs to Culvert at km 2/6 & 5/2 of Vridhachalam- Palakollai Road (MD-746) 1,00 ...... 1,00

46 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JA District roads - Construction

17 Minor Works ( DPC 3054 04 337 JA 17 09 ) Villupuram (H) C&M Division 15 . AS / TS / RAS: 100 Repairs to Culvert at km 4/4, 5/8, & 5/10 of Vridhachalam- Palakollai Road (MD-746) 1,00 ...... 1,00

16 . AS / TS / RAS: 100 Repairs to Culvert at km 7/6 & 8/6 of Vridhachalam- Palakollai Road (MD-746) 1,00 ...... 1,00

17 . AS / TS / RAS: 100 Repairs to Culvert at km 6/2, 6/6,6/8, & 9/2 of Vridhachalam- Palakollai Road 1,00 ...... 1,00

18 . AS / TS / RAS: 100 Repairs to Culvert at km 2/10 & 3/8 of Vridhachalam- Palakollai Road (MD-746) 1,00 ...... 1,00

Dindigul (H) C&M Division 19 . AS / TS / RAS: 100 Construction of Retaining wall at km 28/105 - 28/110 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 1,00 ...... 1,00

20 . AS / TS / RAS: 100 Construction of Retaining wall at km 28/120- 28/125 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 1,00 ...... 1,00

21 . AS / TS / RAS: 100 Construction of Retaining wall at km 28/100 - 28/105 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 1,00 ...... 1,00

47 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JA District roads - Construction

17 Minor Works ( DPC 3054 04 337 JA 17 09 ) Dindigul (H) C&M Division 22 . AS / TS / RAS: 100 Construction of Retaining wall at km 28/110 - 28/115 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 1,00 ...... 1,00

23 . AS / TS / RAS: 100 Construction of Retaining wall at km 28/115 - 28/120 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 1,00 ...... 1,00

24 . AS / TS / RAS: 2700 New Sanction 27,00 ...... 27,00

TOTAL - 3054 04 337 JA 50,00 ...... 1 50,00

48 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JE Rural Roads

17 Minor Works ( DPC 3054 04 337 JE 17 01 ) Villupuram (H) C&M Division 1. AS / TS / RAS: 0 Providing Well Protectivewall at Km 3/6 of Nolampur - Avanipoor Road ...... 1,00

2. AS / TS / RAS: 0 Providing Well Protectivewall at Km 6/6 of Tindivanam - Olakkur Road ...... 1,00

3. AS / TS / RAS: 0 Providing Well Protectivewall at Km 10/2 of Tindivanam - Thengapakkam Road ...... 1,00

4. AS / TS / RAS: 0 Providing Well Protectivewall at Km 7/8 of Nolampur - Avanipoor Road ...... 1,00

5. AS / TS / RAS: 0 Providing Well Protectivewall at Km 2/6 of Tindivanam - Thengapakkam Road ...... 1,00

6. AS / TS / RAS: 0 Providing Well Protectivewall at Km 2/4 of the road from Mailam-Pondy road to NH-45 (via) Thennalapakkam, Padirapuliyur road ...... 1,00

7. AS / TS / RAS: 0 Construction of Protective wall at Km 0/4(L) of Melkalavai – Echur road (via) Neganur road ...... 1,00

49 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JE Rural Roads

17 Minor Works ( DPC 3054 04 337 JE 17 01 ) Villupuram (H) C&M Division 8. AS / TS / RAS: 0 Construction of Protective wall at Km 0/4(R) of Melkalavai – Echur road (via) Neganur road ...... 1,00

9. AS / TS / RAS: 0 Reconstruction of body wall at km 0/6 (L/S) of Kandampakkam- Marakathapuram road ...... 1,00

10 . AS / TS / RAS: 0 Construction of Protective wall at Km 0/8(ii) of Melkalavai – Echur road (via) Neganur road ...... 1,00

11 . AS / TS / RAS: 0 Construction of Protective wall at Km 0/8(i) of Melkalavai – Echur road (via) Neganur road ...... 1,00

12 . AS / TS / RAS: 0 Reconstruction of culvert at km 11/4 (R/S) of Vikiravandai-Nemur road ...... 1,00

13 . AS / TS / RAS: 0 Reconstruction of culvert at km 11/4 (L/S) of Vikiravandai-Nemur road ...... 1,00

14 . AS / TS / RAS: 0 Reconstruction of culvert at km 0/10 (R/S) of Anniyur - road to Elusempon road ...... 1,00

50 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JE Rural Roads

17 Minor Works ( DPC 3054 04 337 JE 17 01 ) Villupuram (H) C&M Division 15 . AS / TS / RAS: 0 Reconstruction of culvert at km 0/10 (L/S) of Anniyur - Surapattu road to Elusempon road ...... 1,00

Cuddalore (H) C&M Division 16 . AS / TS / RAS: 0 Repairs to culvert at Km.1/2, 1/4, 1/8 & 2/6 of Sakkankudi-Keelnatham road to Veeranam Tank Bund road (via) South Arirajapuram ...... 1,00

17 . AS / TS / RAS: 0 Repair to Bridge at Km 6/4 of The Road from Km 31/2 of Vikkiravandi – Kumbakonam – Thanjavour Road to C.N.Palayam (via) Sathipattu ...... 1,00 Road Km 0/0 – 8/9.

18 . AS / TS / RAS: 0 Repairs to Culvert at km 0/8, 0/10, 1/6 & 1/8 of The road from km 8/4 of Cuddalore - Chittoor road joints at km 7/10 of Cuddalore - ...... 1,00 Thirukoilur - Sankarapuram (via) Karamanikuppam

19 . AS / TS / RAS: 0 Repairs to Minor Bridge at km 1/2 of Chennai-Thiruchi-Dindugal road to Korakkai road ...... 1,00

20 . AS / TS / RAS: 0 Repairs to Minor Bridge at km 0/2 of Kattumailur-Kongarampalayam road ...... 1,00

21 . AS / TS / RAS: 0 Repairs to Minor Bridge at km 3/10 & 6/4 of Kattumailur- Kongarampalayam road ...... 1,00

51 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JE Rural Roads

17 Minor Works ( DPC 3054 04 337 JE 17 01 ) Cuddalore (H) C&M Division 22 . AS / TS / RAS: 0 Repairs to Minor Bridge at km 1/2 & 2/2 of -Vridhachalam road and Uchimedu link road (SCR) ...... 1,00

23 . AS / TS / RAS: 0 Repairs to culvert at Km.0/4, 0/10, 1/4 & 1/6 of The road from km.132/2 of Trichy-Chidambaram road to Elanangur road ...... 1,00

24 . AS / TS / RAS: 0 Repairs to Minor Bridge at km 4/2 of Pennadam-Vridhachalam road and Uchimedu link road (SCR) ...... 1,00

25 . AS / TS / RAS: 0 Repair to Bridge at Km 6/4 of The Road from Km 31/2 of Vikkiravandi – Kumbakonam – Thanjavour Road to C.N.Palayam (via) Sathipattu ...... 1,00 Road Km 0/0 – 8/9.

26 . AS / TS / RAS: 0 Repairs to culvert at Km.1/4, 5/6, 7/4 & 7/8 of Tank Bund road ...... 1,00

27 . AS / TS / RAS: 0 Repairs to Culvert at km 3/6, 4/2, 5/2, 5/2,of Maligaimedu - Melkumaramangalam road ...... 1,00

28 . AS / TS / RAS: 0 Repairs to Culvert at km 1/6, 1/4, 1/8, 2/4 of Marudhadu - Irandairavillagam road ...... 1,00

52 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JE Rural Roads

17 Minor Works ( DPC 3054 04 337 JE 17 01 ) Cuddalore (H) C&M Division 29 . AS / TS / RAS: 0 Repairs to Culvert at km 0/6, 0/8, 1/6, 1/8, 2/4, 2/6, 3/2, 3/4, of - Irandairavillagam road ...... 1,00

30 . AS / TS / RAS: 0 Repair to Culvert at km 1/8 ofThe Road from Km 33/4 of Cuddalore – Chithoor Road to Kamatchipettai Road ...... 1,00

Pollachi (H) C&M Division 31 . AS / TS / RAS: 0 Repairs to Parapet Wall at Km 3/4, 3/6, 10/6 of Ambarampalayam - Sethumadai road to Semmanampathi road...... 1,00

32 . AS / TS / RAS: 0 Repairs to Parapet Wall at Km 2/2, 4/6 (L/S), 4/6 (R/S) of ATPPC Road - Semmanampathi (via) Kelavanpudur road...... 1,00

Dindigul (H) C&M Division 33 . AS / TS / RAS: 0 Construction of Retaining wall at km 2/600 - 2/605 of Dindigul - road to Dindigul - Siluvathur road via veerachinampatti...... 1,00

34 . AS / TS / RAS: 0 Construction of Retaining wall at km 2/620 - 2/625 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti...... 1 1,00

35 . AS / TS / RAS: 0 Construction of Retaining wall at km 2/615 - 2/620of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti...... 1,00

53 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 04 District and Other Roads 337 Road Works JE Rural Roads

17 Minor Works ( DPC 3054 04 337 JE 17 01 ) Dindigul (H) C&M Division 36 . AS / TS / RAS: 0 Construction of Retaining wall at km 2/605 - 2/610 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti...... 1,00

37 . AS / TS / RAS: 0 Construction of Retaining wall at km 2/610 - 2/615 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti...... 1,00

47 Stores and Equipments( DPC 3054 04 337 JE 47 08 ) 1. AS / TS / RAS: 1300 New Sanction 13,00 ...... 13,00

TOTAL - 3054 04 337 JE 13,00 ...... 1 50,00

54 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 80 800 AX [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 80 General 800 Other Expenditure AX Construction of quarters for basic servants and drivers in circuit houses and Travellers Bungalows 17 Minor Works ( DPC 3054 80 800 AX 17 07 ) Villupuram (H) C&M Division 1. AS / TS / RAS: 100 Repairs to pump house in Gingee (H), C&M Sub-division, Gingee 1,00 ...... 1,00

2. AS / TS / RAS: 100 Repairs to Watchman quarters in Gingee (H), C&M Sub-division, Gingee 1,00 ...... 1,00

Pollachi (H) C&M Division 3. AS / TS / RAS: 100 Repairs to Parking Shed on Tea shop building at Rottikadai 1,00 ...... 1,00

4. AS / TS / RAS: 100 Repairs to Electrification works on Tea shop building at Rottikadai 1,00 ...... 1,00

5. AS / TS / RAS: 100 Repairs to Plumbing works on Tea shop building at Rottikadai 1,00 ...... 1,00

6. AS / TS / RAS: 100 Repairs to Sanitary arrangements on Tea shop building at Rottikadai 1,00 ...... 1,00

7. AS / TS / RAS: 100 Repairs to South side Compound wall of Tea shop building at Rottikadai 1,00 ...... 1,00

55 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 80 800 AX [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 80 General 800 Other Expenditure AX Construction of quarters for basic servants and drivers in circuit houses and Travellers Bungalows 17 Minor Works ( DPC 3054 80 800 AX 17 07 ) Pollachi (H) C&M Division 8. AS / TS / RAS: 100 Repairs to East and North side Compound wall of Tea shop building at Rottikadai 1,00 ...... 1,00

9. AS / TS / RAS: 100 Repairs to North side Compound wall of Tea shop building at Rottikadai 1,00 ...... 1,00

10 . AS / TS / RAS: 100 Repairs to Store shed Right side at Anaimalai (H), C&M, Sub Division 1,00 ...... 1,00

11 . AS / TS / RAS: 100 Repairs to Store shed Left Side at Anaimalai (H), C&M, Sub Division 1,00 ...... 1,00

12 . AS / TS / RAS: 100 Repairs to Parapat Wall of Store shed Building at Anaimalai (H), C&M, Sub Division 1,00 ...... 1,00

13 . AS / TS / RAS: 100 Repairs to Additional accomodations on Tea shop building at Rottikadai 1,00 ...... 1,00

14 . AS / TS / RAS: 100 Repairs to flooring around Tea shop building at Rottikadai 1,00 ...... 1,00

56 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

3054 80 800 AX [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

3054 ROADS AND BRIDGES 80 General 800 Other Expenditure AX Construction of quarters for basic servants and drivers in circuit houses and Travellers Bungalows 17 Minor Works ( DPC 3054 80 800 AX 17 07 ) Pollachi (H) C&M Division 15 . AS / TS / RAS: 100 Repairs to West side Compound wall of Tea shop building at Rottikadai 1,00 ...... 1,00

16 . AS / TS / RAS: 100 Repairs to Doors and Windows in Tea shop building at Rottikadai 1,00 ...... 1 1,00

17 . AS / TS / RAS: 100 Reconstruction of Compound wall to Basic Servants Quarters at Pollachi. 1,00 ...... 1,00

18 . AS / TS / RAS: 3300

33,00 ...... 33,00

TOTAL - 3054 80 800 AX 50,00 ...... 1 50,00

57 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

4059 01 051 KT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction KT Construction of Buildings - Chief Engineer (General) Highways

16 Major Works ( DPC 4059 01 051 KT 16 04 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 1300 Construction of covered parking shed for Two Advanced Data Collection Equipment (ADCE) vehicles and IT Cell Vehicles 13,00 13,00 1 ...... Part II.2014-15 2. AS / TS / RAS: 216100 Construction of Combined Highways Office Complex in Chennai for all Chief Engineer in Highways Department - Addle.Sanction 21,61,00 21,61,00 1 ... 1 Part II.2014-15

3. AS / TS / RAS: 13188 The upgradation of Highways Research Station like modernization of library and construction of compound wall at . 1,31,88 1,31,88 1 ... 1 G.O.Ms.No.134/H&M.P (HF.1) / dt.25.11.2015.

4. AS / TS / RAS: 141600 Construction of Trining Centre in the campus of Q.A&R of Highways Department, Guindy, Chennai. G.O.Ms.No.173/H&MP (HF.1) 14,16,00 14,16,00 1 ... 1 dept/dt.23.10.2013. Part-II-2013-14

5. AS / TS / RAS: 132129 Construction of Combined Highways Office Complex in Chennai for all Chief Engineer in Highways Department 13,21,29 13,21,29 1 ... 1 G.O.Ms.No.207, Highways and Minor Ports Department, dated:17-12- 2012

6. AS / TS / RAS: 35000 Infrastruture facilities to the training centre building in HRS campus, Chennai 3,50,00 ... 3,50,00 3,50,00 1 G.O.Ms.No.156/H&M.P (HF.1) / dt.20.09.2018.

Thiuvallur(H) C&M Division 7. AS / TS / RAS: 2500 Construction of Quality Control Sub-Division building at . (Part.2015-2016) 25,00 25,00 1 ...... G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

58 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

4059 01 051 KT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction KT Construction of Buildings - Chief Engineer (General) Highways

16 Major Works ( DPC 4059 01 051 KT 16 04 ) (H) C&M Division 8. AS / TS / RAS: 1500 Construction of Kalasapakkam Section Office building. 15,00 ... 15,00 15,00 1 G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018. 9. AS / TS / RAS: 3500 Construction of Thandrampattu Sub Division and Section Office building. 35,00 ... 35,00 35,00 1 G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.

Pudukottai (H) C&M Division 10 . AS / TS / RAS: 3500 Construction of Thirumayam Sub Division and Section Office building. 35,00 ... 35,00 35,00 1 G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018. 11 . AS / TS / RAS: 3500 Construction of Keeranur Sub Division and Section Office building. 35,00 ... 35,00 35,00 1 G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.

12 . AS / TS / RAS: 3500 Construction of Alangudi Sub Division and Section Office building. 35,00 ... 35,00 35,00 1 G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.

Salem (H) C&M Division 13 . AS / TS / RAS: 5000 Construction of Quality Control Division building at Salem. (Part.2015- 2016) 50,00 49,99 1 ...... G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015 14 . AS / TS / RAS: 2000 Construction of Quality Control Sub-Division building at Salem. (Part.2015-2016) 20,00 19,99 1 ...... G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

59 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

4059 01 051 KT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction KT Construction of Buildings - Chief Engineer (General) Highways

16 Major Works ( DPC 4059 01 051 KT 16 04 ) Sivaganga (H) C&M Division 15 . AS / TS / RAS: 3500 Construction of TB at Ilayankudi 41,00 35,00 ... 6,00 1 G.O.Ms.No.49/H&M.P (HP.2) / dt.30.05.2019. Tirunelveli (H) C&M Division 16 . AS / TS / RAS: 1500 Construction of Cheranmadevi Section Office building. 15,00 ... 15,00 15,00 1 G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018. 17 . AS / TS / RAS: 1500 Construction of Alangulam Section Office building. 15,00 ... 15,00 15,00 1 G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.

Tuticorin (H) C&M Division 18 . AS / TS / RAS: 2500 Construction of Quality Control Sub-Division building at Tutucorin. (Part.2015-2016) 25,00 25,00 ...... G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015 19 . AS / TS / RAS: 2500 Construction of Sub-Division Office and section Office(c&m) Building at Oddapidaram, District. 25,00 25,00 ...... Part II.2014-15

20 . AS / TS / RAS: 5500 Construction of Division Office building. 55,00 ... 55,00 55,00 1 G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.

21 . AS / TS / RAS: 8700 Construction of integrated office buildings for Highways(NABARD & Rural Roads) circle & Division offices at Salem. 87,00 ...... 5,00 1 G.O.Ms.No.

TOTAL - 4059 01 051 KT 59,06,17 52,23,15 5,90,08 6,01,00 15

60 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

4216 80 800 KB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

4216 CAPITAL OUTLAY ON HOUSING 80 General 800 Other Expenditure KB Highways Department

16 Major Works ( DPC 4216 80 800 KB 16 05 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 5000 Construction of Highways House at HRS campus, Guindy. 50,00 46,55 1 ...... G.O.Ms.No.26,H&M.P (HR.1) Department, dated.10.02.2016.

TOTAL - 4216 80 800 KB 50,00 46,55 1 ......

61 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 101 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JA Original works

16 Major Works ( DPC 5054 03 101 JA 16 07 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 237785 Construction of new 4 lane HLB at Km.69/300 of ECR across seaback at Illayankuppam near . 23,77,85 11,88,92 11,88,93 11,88,93 1 G.O.(RT).No.10/Hw&MP dept/dt.30.01.2018. Chengalpattu (H) C&M Division 2. AS / TS / RAS: 2560 Compensation payable to TNRDC for the Toll Revenue loss for Toll suspension at ECR for International Defence Expo'2018 ( Defexpo 25,60 25,60 ...... during 4days 11.04.2018 to 14.04.2018)

TOTAL - 5054 03 101 JA 24,03,45 12,14,52 11,88,93 11,88,93 1

62 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JE Construction of Palar Bridge in ECR executed by TNRDC

16 Major Works ( DPC 5054 03 101 JE 16 09 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 2721000 Widening of ECR from Two lane to Four lane from Akkarai to Mahabalipuram. 272,10,00 272,10,00 ......

2. AS / TS / RAS: 851900 Construction of High Level Bridges across at Km.76/000 in ECR. 85,19,00 85,19,00 ......

TOTAL - 5054 03 101 JE 357,29,00 357,29,00 ......

63 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 101 JF [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JF Construction of Flyover at Salem Junction - Yercaud Road

16 Major Works ( DPC 5054 03 101 JF 16 07 ) Salem (H) C&M Division 1. AS / TS / RAS: 3200000 Construction of Flyover at Salem junction -Yercaud road. 441,00,00 287,74,68 22,35,76 117,99,98 25,34,98 G.O.Ms.No.56/ H&M.P (HP.1) / dt.14.05.2015 & G.O.Ms.No.82/ H&M.P (HP.2) / dt.06.08.2019. 2. AS / TS / RAS: 1114000 Construction of combined flyover for Kuranguchavadi and AVR roundana junction. 111,40,00 72,20,63 1 1 1 G.O.Ms.No.7/ H&M.P (HP.1) / dt.07.01.2016.

3. AS / TS / RAS: 267700 Construction of Flyover in Thiruvagoundanur Junction in Salem City. 26,77,00 26,08,54 1 1 1 G.O.Ms.No.7/ H&M.P (HP.1) / dt.07.01.2016.

TOTAL - 5054 03 101 JF 579,17,00 386,03,85 22,35,78 118,00,00 25,35,00

64 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JA Original works

64 Lands ( DPC 5054 03 337 JA 64 07 ) Chengalpattu (H) C&M Division 1. AS / TS / RAS: 4300 L.A. compensation for Sadras surapan road 43,00 ...... 43,00 ... G.O.Ms.No.47, HW&M.P (HW2) dept dt.30.05.2019. Trichy (H) C&M Division 2. AS / TS / RAS: 845000 L. A Cost for Trichy - to Palpannai Rowndana. 84,50,00 84,50,00 1 1 ...

Thiruvarur (H) C&M Division 3. AS / TS / RAS: 50000 L.A cost for Thiruthuraipoondi Bye-pass 5,00,00 4,94,77 1 1,00 1 G.O.Ms.No.174, Highways(HP.2) Dept.dated. 08-07-2008. / G.O. MS. No.75 HW&MP Dept., Dt.23.09.17 Coimbatore (H) C&M Division 4. AS / TS / RAS: 18749 Widening from double lane to four lane in km 1/6-2/2 of Coimbatore - siruvani road 1,87,49 ...... 1,87,50 ... G.O.Ms.No.44, HW&M.P (HP2) dept dt.30.05.2019. 5. AS / TS / RAS: 24551 Land acquisition for the work of widening double lane to four lane in Km.1/6-2/2 of Coimbatore - Siruvani road. 2,45,51 2,45,51 ......

Sivaganga (H) C&M Division 6. AS / TS / RAS: 1770 L.A. compensation to Thiru.K.P.Selvam, contractor 17,70 ...... 17,69 ... G.O.Ms.No.84, HW&M.P (HQ.1) dept dt.08.08.2019. Tirupur (H) C&M Division 7. AS / TS / RAS: 70400 Land Acquisition for the work of improvements to geomatric curve in km.0/0-2/0 of Tiruppur-Somanur road (SH 169). 7,04,00 6,72,64 ...... GO Ms No.80, HW&M.P (HP.2) dept dt.25.05.2016.

65 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JA Original works

64 Lands ( DPC 5054 03 337 JA 64 07 ) Tirupur (H) C&M Division 8. AS / TS / RAS: 50200 Land Acquisition for the work of widening to four lane in km.0/0-2/0 (usha theatre to DSK Hospital) of Tiruppur-Kangeyam road (SH 172). 5,02,00 5,02,00 ...... GO Ms No.80, HW&M.P (HP.2) dept dt.25.05.2016.

TOTAL - 5054 03 337 JA 106,49,70 103,64,92 2 2,49,20 1

66 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JD [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways 16 Major Works ( DPC 5054 03 337 JD 16 02 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 144000 Construction of closed macro Drain at Km 0/530-1/180 of Bye pass road. 14,40,00 ...... 5,50,00 8,90,00 G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19 2. AS / TS / RAS: 51000 Improvement to Southern Sector of IRR at Km.3/3-4/8. 5,10,00 4,12,00 98,00 ...... G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

3. AS / TS / RAS: 444000 Improvements and construction of drain, footpath in Km.11/0 - 17/1 of Inner Ring Road in selected stretches including widening existing road 44,40,00 31,70,00 12,75,02 ...... for 6m width (ave) both side and stengthening in Km.16/5-17/1 (left side) (SHU 02) G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015. 4. AS / TS / RAS: 138600 Improvement to - Thoraipakkam road at Km.5/0-7/2 and 9/7-10/5. 13,86,00 12,38,02 1,47,98 50,00 50,00 G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

5. AS / TS / RAS: 93000 Improvement to GST road at Km.10/0 - 14/4. 9,30,00 8,29,99 1,00,00 ...... G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

6. AS / TS / RAS: 127000 Widening available width and Improvements at Km.0/0-2/9 and providing footpath at Km.0/0 - 5/0 of southern sector of Inner Ring road. 12,70,00 8,95,00 3,76,36 ...... G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

7. AS / TS / RAS: 45000 Widening of culvert and minor bridge at Km 6/6 and 7/4 of Marmalong bridge Irumbuliyur road including face lifting of MRTS bridge at Km 6/0 4,50,00 ...... 2,00,00 2,50,00 & grade separator at Km 8/4. G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19

67 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JD [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways 16 Major Works ( DPC 5054 03 337 JD 16 02 ) Chennai City Roads (H) C&M Division 8. AS / TS / RAS: 33000 Improvement to ECR at Km.11/8 - 12/6 (SH-49) 3,30,00 2,64,00 ...... G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016 9. AS / TS / RAS: 10000 Improvemets to Pallavaram-Thoraipakkam road at Km 10/190-10/4 including construction of drain and providing paver block. 1,00,00 ...... 92,56 7,44 G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19

10 . AS / TS / RAS: 30800 Construction of median and safety kerb at Km 0/9-3/8 of Southern sector of Inner Ring road. 3,08,00 ...... 2,89,65 18,35 G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19

11 . AS / TS / RAS: 252000 Improvements and construction of drain, footpath in selected stretches in Km.7/2 - 11/4 of GNT side in selected stretches including widening 25,20,00 21,00,00 4,28,00 ...... end to end and impts to road in Km.7/2-8/0, 10/4-11/4 and impts in Km.7/7-8/0 of GNT road (SHU87) G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015. 12 . AS / TS / RAS: 153000 Improvement to Marmalong Bridge - Irumbuliyur road at Km.5/0-5/7, 6/5-8/0 and 10/8-12/3. 15,30,00 13,24,00 3,78 50,00 50,00 G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

13 . AS / TS / RAS: 315000 Improvements and construction of drain, footpath in selected stretches in Km.11/7 - 16/9 including impts to Kathipara gradesseparator interior 31,50,00 24,80,00 6,85,59 ...... sservice roads, ROB approaches including service roads and impts in GST road Km.15/9-16/9(SHU88) G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015. 14 . AS / TS / RAS: 215000 impts to MRTS bridges and Grade Separator approaches incl service roads. Widening to Six lane at Km.8/540-9/0 (BS) 9/8- 21,50,00 16,20,00 4,72,50 ...... 10/0.10/410/6 LS,10/2-10/6 RS & footpath in selected stretches at Km.5/7-10/8 of Marmalong bridge Irumbuliyur road. G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

68 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JD [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways 16 Major Works ( DPC 5054 03 337 JD 16 02 ) Chennai City Roads (H) C&M Division 15 . AS / TS / RAS: 121400 Improvement to GNT road at Km.3/8 - 11/4. 12,14,00 9,59,16 ...... G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016 16 . AS / TS / RAS: 122000 Improvement to IRR road at Km.11/0 - 17/1. 12,20,00 10,20,00 2,00,00 ...... G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

17 . AS / TS / RAS: 241000 Construction of drain at Km 5/0-6/250 of Pallavaram-Thoraipakkam road including preparation of DPR 24,10,00 ...... 10,00,00 14,10,00 G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19

Thiuvallur(H) C&M Division 18 . AS / TS / RAS: 377000 Widening end to end and Construction of Storm Water Drain and Improvements to - Ambathur - Road at Km.6/4 - 37,70,00 ... 4,55,90 ... 1 10/0. G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015. 19 . AS / TS / RAS: 400000 Widening end to end and Construction of Storm Water Drain cum Duct in selected stretches and Improvements to Mount - - 40,00,00 ... 5,74,68 ... 1 Road at Km.0/0 - 5/9 and 6/8 - 7/0 G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

20 . AS / TS / RAS: 344000 Construction of storm water drain and crash barrier at Km 10/0-14/6 of Vanagaram--Puzhal road (SH205) 34,40,00 ...... 15,00,00 19,40,00 G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19

21 . AS / TS / RAS: 67000 Construction of storm water drain from Km 7/2-8/3 and Widening of culvert at Km7/4 of Mount-Poonamallee-Avadi road(SH55) 6,70,00 ...... 4,00,00 2,70,00 G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19

69 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JD [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways 16 Major Works ( DPC 5054 03 337 JD 16 02 ) Chengalpattu (H) C&M Division 22 . AS / TS / RAS: 93000 Widening end to end providing footbath cum drain in - Sriperumadur road at Km.5/0-6/7. 9,30,00 8,79,02 1 50,98 1 G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

TOTAL - 5054 03 337 JD 381,68,00 171,91,19 48,17,82 41,83,19 48,85,82

70 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JF [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways 16 Major Works ( DPC 5054 03 337 JF 16 08 ) Villupuram (H) C&M Division 1. AS / TS / RAS: 200 Reconstruction of Retaining wall at km 48/8 I (R/S-II) of Villupuram- Mambalapattu-Tirukoilur road (SH-7) 2,00 ...... 2,00

2. AS / TS / RAS: 200 Reconstruction of Retaining wall at km 48/8 I (R/S-I) of Villupuram- Mambalapattu-Tirukoilur road (SH-7) 2,00 ...... 2,00

3. AS / TS / RAS: 200 Reconstruction of Retaining wall at km 48/8 I (L/S-I) of Villupuram- Mambalapattu-Tirukoilur road (SH-7) 2,00 ...... 2,00

4. AS / TS / RAS: 200 Reconstruction of Retaining wall at km 48/8 I (L/S-II) of Villupuram- Mambalapattu-Tirukoilur road (SH-7) 2,00 ...... 2,00

Cuddalore (H) C&M Division 5. AS / TS / RAS: 200 Reconstruction of culvert 1/6 of Jail Hill - Vellakkarai - Kumalankualam road (SH 138) 2,00 ...... 2,00

Pollachi (H) C&M Division 6. AS / TS / RAS: 200 Repairs to Culvert at Km 92/2 of Avinashi - Tiruppur - Palladam - Pollachi - Cochin (Via) Meenkarai Road 2,00 ...... 2,00

Theni (H) C&M Division 7. AS / TS / RAS: 200 Construction of Protective wall at km 11/075-11/090 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228) 2,00 ...... 2,00

71 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JF [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways 16 Major Works ( DPC 5054 03 337 JF 16 08 ) Theni (H) C&M Division 8. AS / TS / RAS: 200 Construction of Protective wall at km 13/505-520 (R/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228) 2,00 ...... 1 2,00

9. AS / TS / RAS: 200 Construction of Protective wall at km 13/490-505 (R/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228) 2,00 ...... 2,00

10 . AS / TS / RAS: 200 Construction of Protective wall at km 13/285-13/300 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228) 2,00 ...... 2,00

11 . AS / TS / RAS: 200 Construction of Protective wall at km 0/115-130 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

12 . AS / TS / RAS: 200 Construction of Protective wall at km 0/120-135 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

13 . AS / TS / RAS: 200 Construction of Protective wall at km 13/255-13/270 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228) 2,00 ...... 2,00

14 . AS / TS / RAS: 200 Construction of Protective wall at km 0/055 - 070 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

72 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JF [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways 16 Major Works ( DPC 5054 03 337 JF 16 08 ) Theni (H) C&M Division 15 . AS / TS / RAS: 200 Construction of Protective wall at km 13/270-13/285 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228) 2,00 ...... 2,00

16 . AS / TS / RAS: 200 Construction of Protective wall at km 0/070 - 085 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

17 . AS / TS / RAS: 200 Construction of Protective wall at km 0/100-115 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

18 . AS / TS / RAS: 200 Construction of Protective wall at km 0/0- 15 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

19 . AS / TS / RAS: 200 Construction of Protective wall at km 0/75-90 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

20 . AS / TS / RAS: 200 Construction of Protective wall at km 0/90-105 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

21 . AS / TS / RAS: 200 Construction of Protective wall at km 11/060-11/075 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228) 2,00 ...... 2,00

73 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JF [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways 16 Major Works ( DPC 5054 03 337 JF 16 08 ) Theni (H) C&M Division 22 . AS / TS / RAS: 200 Construction of Protective wall at km 0/105-120 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

23 . AS / TS / RAS: 200 Construction of Protective wall at km 0/085-100 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220) 2,00 ...... 2,00

24 . AS / TS / RAS: 5400 New Sanction 54,00 ...... 54,00

TOTAL - 5054 03 337 JF 1,00,00 ...... 1 1,00,00

74 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JI Comprehensive Road Infrastructure Development Programme (CRIDP) - State Highways 16 Major Works ( DPC 5054 03 337 JI 16 02 ) 1. AS / TS / RAS: 9975400/9813400/70377/105649 CRIDP 2,685,94,00 ... 1,322,18,00 1,324,20,00 1,197,36,19 GO Ms No.6, H&M.P (HF.2) dept dt.13.01.2017, GO Ms No.86, HW&M.P (HF.2) dept dt.24.10.2017, GO.Ms.No.125,HW&MP(HF.2)dt.07.08.2018 and GO Ms No.88, HW&M.P (HF.2) dept dt.19.08.2019. TOTAL - 5054 03 337 JI 2,685,94,00 ... 1,322,18,00 1,324,20,00 1,197,36,19

75 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JJ Improvement of vital roads in developing industrial areas through Tamil Nadu Road Infrastructure Development Corporation 16 Major Works ( DPC 5054 03 337 JJ 16 00 ) TNRIDC 1. AS / TS / RAS: 2440000 / 2778000 / 3610000/-32994 Widening and Improvement of -Sriperumbuthur road and -Walajabad Road leading to Industrial Park by 357,70,06 344,18,00 1 1 13,52,02 TNRIDC GO Ms No.205, Highways (HW.2) dt.5.10.06 & G.O.Ms.No.48/H&M.P (HS.1)dept/28.03.12 & GO Ms No.80/H&MP (HS.1)/09.10.2017. 2. AS / TS / RAS: 866500 / 1086600 Widening and Improvement of four lane to six lane in Singaperumalkoil- Sriperumbuthur road Km 12/6 to 24/6- to Oragadam Industrial Park by 108,66,00 107,05,00 1,61,00 1 1,61,00 TNRIDC G.O.Ms.No.40, HW&MP Dept, dated:01--03--2011.

3. AS / TS / RAS: 1150000 Improvements from four laning to six laning of SingaperumalKoil- Sriperumpudur road Km.0/6-12/6 (SH-57) for a part of development of 115,00,00 114,00,00 1 1 1,00,00 Oragadam Industrial Corridor Project. GO Ms No.1, Highways (HS.1) dt02.01.2015

4. AS / TS / RAS: 1578100 Improvement of roads from Four Laning to Six Laning for a length of 20.00 Km. from Vandalur to Oragadam including formation of Bye pass 157,81,00 155,00,00 1 1 2,81,00 road to Village for a length of 3.80Km. G.O.Ms.No.8, HW&MP (HS.1) Dept, dated:07--01--2016.

5. AS / TS / RAS: 1800938 Improvement from Four lane to Six laning of Vandalur - Wallajabad road at Km.47/0 - 63/8. 180,09,38 30,00,00 100,00,00 101,61,00 48,48,38 G.O.Ms.No.94, HW&MP(HS.1) Dept, dated:21-11-2017.

64 Lands ( DPC 5054 03 337 JJ 64 09 ) TNRIDC 1. AS / TS / RAS: 560000 / 1868100/683000 Widening and Improvement of Singaperumalkoil-Sriperumbuthur road and Vandalur-Walajabad Road leading to Oragadam Industrial Park by 255,11,00 251,81,00 3,29,00 3,29,00 1 TNRIDC & G.O.Ms.No.48/H&M.P (H.S.1) dept/28.03.12. GO Ms No.205, Highways (HW.2) dt.5.10.06 & GO Ms No.80/H&MP (HS.1)/09.10.2017. 2. AS / TS / RAS: 320000 Improvement of roads from Four Laning to Six Laning for a length of 20.00 Km. from Vandalur to Oragadam including formation of Bye pass 32,00,00 ... 32,00,00 1 32,00,00 road to Padappai Village for a length of 3.80Km. G.O.Ms.No.8, HW&MP (HS.1) Dept, dated:07--01--2016.

76 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JJ Improvement of vital roads in developing industrial areas through Tamil Nadu Road Infrastructure Development Corporation

TOTAL - 5054 03 337 JJ 1,206,37,44 1,002,04,00 136,90,03 104,90,05 99,42,41

77 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JK [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JK Outer Ring Road

16 Major Works ( DPC 5054 03 337 JK 16 08 ) TNRDC 1. AS / TS / RAS: 8642200/10814000 Outer Ring Road (Project Support Fund) Phase-I 1,081,40,00 151,84,02 129,68,11 159,72,55 204,30,98 G.O.Ms.No.32, HW&MP Department, dated:25-02-2009, G.O.Ms.No.200, HW&MP Department, dated:08-10-2009, 64 Lands ( DPC 5054 03 337 JK 64 07 ) TNRDC 1. AS / TS / RAS: 3134300 Land acquisition for Outer Ring Road Project-Phase-I. 313,43,00 ... 1 103,76,47 1 G.O.Ms.No.42, HW&MP (HN.2) Department, dated:26-03-2013, G.O.Ms.No.97, HW&MP (HF.2) Department, dated:14-08-2015 and G.O.Ms.No.177, HW&MP (HF.2) Department, dated:13-10-2013. TOTAL - 5054 03 337 JK 1,394,83,00 151,84,02 129,68,12 263,49,02 204,30,99

78 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JM [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JM Widening to four lane of Madurai Ring Road through TNRIDC

16 Major Works ( DPC 5054 03 337 JM 16 04 ) TNRIDC 1. AS / TS / RAS: 8000000 Widening the Madurai Ring Road from double lane to four lane from 0/0 - 27/2. 800,00,00 12,00,00 18,59,71 18,59,71 7,29 G.O.Ms.No.76, HW&MP (HS.1) Dept, dated:25-09-2017 & G.O.Ms.No.82 HW&MP (HS.1) dept, dt.16.05.2018 64 Lands ( DPC 5054 03 337 JM 64 03 ) TNRIDC 1. AS / TS / RAS: 6714

67,14 ...... 67,14 ...

TOTAL - 5054 03 337 JM 800,67,14 12,00,00 18,59,71 19,26,85 7,29

79 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 JN [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JN Comprehensive Road Infrastructure Development Programme (CRIDP) - Performance based maintenance contract 16 Major Works ( DPC 5054 03 337 JN 16 02 ) (H) C&M Division 1. AS / TS / RAS: 7151790 Works of initial rectifications including widening strenthening improvement and PBMC in Virudhunagar. 715,17,90 ... 527,78,00 527,79,00 940,61,00 PBMC - G.O.No.Ms.No.106/HW&MP/dt.26.12.2017.

TOTAL - 5054 03 337 JN 715,17,90 ... 527,78,00 527,79,00 940,61,00

80 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 PA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works PA Bye-Pass at and Tiruporur in with JICA Assistance - TNIPP Phase-2 16 Major Works ( DPC 5054 03 337 PA 16 02 ) 1. AS / TS / RAS: 2437000 Formation of Bye-Pass at Kelambakkam and Tiruporur in Rajiv Gandhi Salai with JICA Assistance-TNIPP Phase-2 243,70,00 75,00,00 103,70,00 103,70,00 25,00,00 G.O. Ms No.67/ HW&MP Dept., (NW2) / 05.09.17

TOTAL - 5054 03 337 PA 243,70,00 75,00,00 103,70,00 103,70,00 25,00,00

81 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 03 337 PB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works PB Asian Development Bank assisted Chennai - Kanyakumari Industrial Corridor Project 16 Major Works ( DPC 5054 03 337 PB 16 00 ) 1. AS / TS / RAS: 64482400(438484+4803100) Widening from Intermediate lane to Four lane and Strengthening of - road with JICA Assistance - TNIPP Phase-2. 6,448,24,00 ... 300,00,00 30,00,00 500,00,00 G.O.Ms.No.28/HW&MP(HS.2)dept, dt.06.03.2018.

64 Lands ( DPC 5054 03 337 PB 64 09 ) 1. AS / TS / RAS: 15740900 Widening from Intermediate lane to Four lane and Strengthening of Puduvoyal - Pulicat road with JICA Assistance - TNIPP Phase-2. 1,574,09,00 ... 500,00,00 50,00,00 500,00,00 G.O.Ms.No.28/HW&MP(HS.2)dept, dt.06.03.2018.

TOTAL - 5054 03 337 PB 8,022,33,00 ... 800,00,00 80,00,00 1,000,00,00

82 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 101 JB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers 16 Major Works ( DPC 5054 04 101 JB 16 04 ) Cuddalore (H) C&M Division 1. AS / TS / RAS: 200 Construction of Drain at km3/2 of Meliruppu – Athirikuppam – Perperiyankuppam Road 2,00 ...... 2,00

2. AS / TS / RAS: 200 Widening of culvert at km 0/4 of Chennai-Thiruchi-Dindugal road to Korakkai road 2,00 ...... 2,00

3. AS / TS / RAS: 200 Widening of Pipe Culvert at km 2/4 of Seplanatham - Kottagam Road 2,00 ...... 2,00

4. AS / TS / RAS: 200 Widening of Pipe Culvert at km 0/10 of Pennadam-Vridhachalam road and Uchimedu link road (SCR) 2,00 ...... 2,00

5. AS / TS / RAS: 200 Construction of Retaining Wall at Km 3/4 of Gunamangalam - Gudalaiyathur road 2,00 ...... 2,00

6. AS / TS / RAS: 200 Construction of Retaining Wall at Km 3/2 of Gunamangalam - Gudalaiyathur road 2,00 ...... 2,00

7. AS / TS / RAS: 200 Construction of Retaining Wall at Km 0/4 of Gunamangalam - Gudalaiyathur road 2,00 ...... 2,00

83 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 101 JB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers 16 Major Works ( DPC 5054 04 101 JB 16 04 ) Cuddalore (H) C&M Division 8. AS / TS / RAS: 200 Construction of Drain at km3/2 of Meliruppu – Athirikuppam – Perperiyankuppam Road 2,00 ...... 2,00

9. AS / TS / RAS: 200 Construction of Drain at km3/2 of Meliruppu – Athirikuppam – Perperiyankuppam Road 2,00 ...... 2,00

10 . AS / TS / RAS: 200 Construction of Drain at km3/2 of Meliruppu – Athirikuppam – Perperiyankuppam Road 2,00 ...... 2,00

11 . AS / TS / RAS: 200 Repairs to Culvert at km 6/10 of Pennadam-Vridhachalam road and Uchimedu link road (SCR) 2,00 ...... 1 2,00

Dindigul (H) C&M Division 12 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/320 - 3/330 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

13 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/250 - 3/260 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

14 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/260 - 3/270 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

84 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 101 JB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers 16 Major Works ( DPC 5054 04 101 JB 16 04 ) Dindigul (H) C&M Division 15 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/270 - 3/280 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

16 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/280 - 3/290 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

17 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/290 - 3/300 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

18 . AS / TS / RAS: 200 Construction of Retaining wall at km 4/640 - 4/650 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

19 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/310 - 3/320 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

20 . AS / TS / RAS: 200 Construction of Retaining wall at km 4/600 - 4/610 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

21 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/330 - 3/340 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

85 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 101 JB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers 16 Major Works ( DPC 5054 04 101 JB 16 04 ) Dindigul (H) C&M Division 22 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/340 - 3/350 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

23 . AS / TS / RAS: 200 Construction of Retaining wall at km 4/610 - 4/620 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

24 . AS / TS / RAS: 200 Construction of Retaining wall at km 4/620 - 4/630 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

25 . AS / TS / RAS: 200 Construction of Retaining wall at km 4/630 - 4/640 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

26 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/300 - 3/310 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

27 . AS / TS / RAS: 4800 New Sanction 48,00 ...... 48,00

TOTAL - 5054 04 101 JB 1,00,00 ...... 1 1,00,00

86 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JE High density corridor

16 Major Works ( DPC 5054 04 337 JE 16 09 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 25000 Improvement to Taramani - road at 0/0-2/010. 2,50,00 2,14,50 35,50 ...... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015. 2. AS / TS / RAS: 66400 Providing Drain, footpath in selected stretches at Km.0/0-3/6 and widening to available width at Km.2/0-2/3 of - Velachery 6,64,00 4,50,06 2,13,94 50,00 ... road. G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

3. AS / TS / RAS: 38300 Rebuilding at Km.0/0-1/0 and providing footpath, drain and construction of culvert in selected stretches at Km.0/0-3/2 of MBI road 3,83,00 2,68,34 18,00 ...... to S.Kolathur road. G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

4. AS / TS / RAS: 80000 Providing Drain, footpath in selected strtches at Km.0/6-3/7 of Mount - road. 8,00,00 5,81,49 2,30,00 1,85,00 ... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

5. AS / TS / RAS: 19500 Improvements toTaramani- Perungudi Road at Km.0/0-0/7(RS) including Construction of drain cum footpath 1,95,00 ...... 1,79,79 15,21 G.O.Ms.No.60/H&M.P (HW.1)/dt.27.06.2019.

6. AS / TS / RAS: 32600 Providing foot path and improvements in selected stretches at Km.0/6- 2/3 of road. 3,26,00 1,39,75 1,86,25 ... 25,00 G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

7. AS / TS / RAS: 13900 Improvement to Puzhthivakkam road at Km. 0/0-1/2. 1,39,00 84,91 54,09 ...... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

87 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JE High density corridor

16 Major Works ( DPC 5054 04 337 JE 16 09 ) Chennai City Roads (H) C&M Division 8. AS / TS / RAS: 98300 Widening avalable width and improvements at Km.2/5-5/4 and providing drain and foot path in selected stretches at Km.2/5-5/4 of 9,83,00 7,01,65 2,81,35 ... 25,00 GST loop road. G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015. 9. AS / TS / RAS: 230000 Improvement to Medavakkam - road at Km. 0/0-2/6 & 3/5-4/5. 23,00,00 19,73,46 4,89,00 50,00 25,00 G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

10 . AS / TS / RAS: 15000 Improvement to Nanganallur road at Km.0/0-1/0. 1,50,00 1,27,82 22,18 ...... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

11 . AS / TS / RAS: 28600 Improvements at Km.1/2-1/850 and providing CC pavement at Km.1/2- 1/4 of Velachery bypass. 2,86,00 1,37,71 1,48,29 ... 25,00 G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

12 . AS / TS / RAS: 25800 Widening to available width and impts at Km.0/0-0/7 and providing drain and foot path in selected stretches at Km.0/0-0/7 of 2,58,00 1,28,57 1,29,43 ...... Chidambaram stroes to SBI colony road. G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Thiuvallur(H) C&M Division 13 . AS / TS / RAS: 110000 Improvements to Km.0/450-6/4 Ariyalur - Road. 11,00,00 ... 67 ...... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015. 14 . AS / TS / RAS: 27000 Improvement to - Chettimedy - Road Km.6/2-10/2. 2,70,00 ... 48 ...... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

88 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JE High density corridor

16 Major Works ( DPC 5054 04 337 JE 16 09 ) Thiuvallur(H) C&M Division 15 . AS / TS / RAS: 42000 Improvements to Road Km.0/0-1/8. 4,20,00 ... 88 ...... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015. 16 . AS / TS / RAS: 20000 Improvement to AVP Road to (Via) Kanniyampettai Km.0/0-2/0. 2,00,00 ... 53 ...... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

17 . AS / TS / RAS: 6100 Improvements to Cross Road Km.0/0-0/2. 61,00 ... 5,11 ...... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

18 . AS / TS / RAS: 43000 Providing paver block end to end and Constructionof Storm water drain cum footpath from Km0/0-1/0 of -Ramapuram Road 4,30,00 ...... 3,00,00 1,30,00 (via) Valluvar Nagar (MD 1020) . G.O.Ms.No.60/H&M.P (HW.1)/dt.27.06.2019.

19 . AS / TS / RAS: 25800 Constructionof Storm water drain and providing pavereblock end to end in Km0/0-1/8 of oragadam Road . 2,58,00 ...... 1,00,00 1,58,00 G.O.Ms.No.60/H&M.P (HW.1)/dt.27.06.2019.

20 . AS / TS / RAS: 95000 Widening IL to DL , impts in Km.0/0-3/4 of AVP road to Manali-Mathur road(via) kosapur road including Constructionof Storm water drain at 9,50,00 ...... 5,00,00 4,50,00 Km 0/0-2/0 G.O.Ms.No.60/H&M.P (HW.1)/dt.27.06.2019.

21 . AS / TS / RAS: 22000 Improvements to AMMroad to Road Km.0/0-2/135. 2,20,00 ... 51 ...... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

89 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JE High density corridor

16 Major Works ( DPC 5054 04 337 JE 16 09 ) Thiuvallur(H) C&M Division 22 . AS / TS / RAS: 82000 Providing pavement with block and constructionof Storm water drain in K.S.Road to MPA Road (via) Valluvar Nagar to Ramapuram Km0/0-1/4. 8,20,00 ... 76,38 ... 1 G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015. Chengalpattu (H) C&M Division 23 . AS / TS / RAS: 10000 Improvement mount Poonmallee road to Km0/7-1/0 including providing drain cum footpath and paved shoulders in Km0/0- 1,00,00 86,90 1 13,10 ... 1/0. G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015. 24 . AS / TS / RAS: 70500 Improvements in Chennai- Kodampakkam- road to Mugalivakkam road inculding paved shoulders and drain cum foorpath 7,05,00 6,10,81 1 94,19 ... in Km.0/0-2/3. G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

25 . AS / TS / RAS: 21500 Providing paved shoulder in Kodambakkam - Sriperumbudur road to (via) Kolapakkam at 3/2-5/6 (MDR1026) right side only. 2,15,00 1,55,00 1 60,00 ... G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

TOTAL - 5054 04 337 JE 124,83,00 56,60,97 18,92,62 15,32,08 8,53,22

90 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JG 16 05 ) Villupuram (H) C&M Division 1. AS / TS / RAS: 200 Raising the Dip portion at Km.6/2 of Moratandy-Bommiyapalayam road(MD-1115) 2,00 ...... 2,00

Pollachi (H) C&M Division 2. AS / TS / RAS: 200 Repairs to Culvert at Km 13/817 L/S of Anaimalai - Poolankinar road. 2,00 ...... 2,00

3. AS / TS / RAS: 200 Repairs to Retaining Wall at Km 2/8 R/S of Anaimalai - Poolankinar road. 15.00 m 2,00 ...... 2,00

4. AS / TS / RAS: 200 Repairs to Retaining Wall at Km 2/8 L/S of Anaimalai - Poolankinar road. 15.00 m 2,00 ...... 2,00

5. AS / TS / RAS: 200 Repairs to Retaining Wall at Km 2/6 R/S of Anaimalai - Poolankinar road. 15.00 m 2,00 ...... 2,00

6. AS / TS / RAS: 200 Repairs to Culvert at Km 13/817 R/S of Anaimalai - Poolankinar road. 2,00 ...... 2,00

7. AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 14/900 of Anaimalai - Poolankinar road. 2,00 ...... 2,00

91 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JG 16 05 ) Pollachi (H) C&M Division 8. AS / TS / RAS: 200 Repairs to Box Culvert at Km 15/2 of Ambarampalayam - Sethumadai road 2,00 ...... 2,00

9. AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 13/6 R/S of Ambarampalayam - Sethumadai road. 2,00 ...... 2,00

10 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 13/6 L/S of Ambarampalayam - Sethumadai road. 2,00 ...... 2,00

11 . AS / TS / RAS: 200 Reconstruction of Culvert at km 0/10 of Samathur - Devanurpudur road 2,00 ...... 2,00

12 . AS / TS / RAS: 200 Repairs to Retaining Wall at Km 2/6 L/S of Anaimalai - Poolankinar road. 15.00 m 2,00 ...... 2,00

Theni (H) C&M Division 13 . AS / TS / RAS: 200 Construction of Protective wall at km 5/845 - 5/860 (R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

14 . AS / TS / RAS: 200 Construction of Protective wall at km 0/940-0/955 (R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

92 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JG 16 05 ) Theni (H) C&M Division 15 . AS / TS / RAS: 200 Construction of Protective wall at km 0/955-0/970 (R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

16 . AS / TS / RAS: 200 Construction of Protective wall at km 0/970-0/985 (R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

17 . AS / TS / RAS: 200 Construction of Protective wall at km 5/800-5/815(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

18 . AS / TS / RAS: 200 Construction of Protective wall at km 5/755 - 5/770(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

19 . AS / TS / RAS: 200 Construction of Protective wall at km 5/740 - 5/755(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

20 . AS / TS / RAS: 200 Construction of Protective wall at km 4/4 of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

21 . AS / TS / RAS: 200 Construction of Protective wall at km 4/090-4/105(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

93 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JG 16 05 ) Theni (H) C&M Division 22 . AS / TS / RAS: 200 Construction of Protective wall at km 4/075-4/090(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

23 . AS / TS / RAS: 200 Construction of Protective wall at km 4/060-4/075(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

24 . AS / TS / RAS: 200 Construction of Protective wall at km 5/785-5/800(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

25 . AS / TS / RAS: 200 Construction of Protective wall at km 0/610-0/625(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

26 . AS / TS / RAS: 200 Construction of Protective wall at km 0/625-0/640(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

27 . AS / TS / RAS: 200 Construction of Protective wall at km 5/830 - 5/845 (R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

28 . AS / TS / RAS: 200 Construction of Protective wall at km 5/815-5/830(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

94 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JG 16 05 ) Theni (H) C&M Division 29 . AS / TS / RAS: 200 Construction of Protective wall at km 3/2 of kottur - kamatchipuram road (M 1186) 2,00 ...... 2,00

30 . AS / TS / RAS: 200 Construction of Protective wall at km 3/2 of kottur - kamatchipuram road (M 1186) 2,00 ...... 2,00

31 . AS / TS / RAS: 200 Construction of Protective wall at km 2/10 of kottur - kamatchipuram road (M 1186) 2,00 ...... 2,00

32 . AS / TS / RAS: 200 Construction of Protective wall at km 5/10 (R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

33 . AS / TS / RAS: 200 Construction of Protective wall at km 5/770-5/785(R/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

34 . AS / TS / RAS: 200 Construction of Protective wall at km 1/2 (L/S) of veerapandi - seeapalakottai road (M 735) 2,00 ...... 2,00

Dindigul (H) C&M Division 35 . AS / TS / RAS: 200 Construction of Retaining wall at km 32/200 - 32/210 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

95 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JG 16 05 ) Dindigul (H) C&M Division 36 . AS / TS / RAS: 200 Construction of Retaining wall at km 32/240 - 32/250 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

37 . AS / TS / RAS: 200 Construction of Retaining wall at km 32/230 - 32/240 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

38 . AS / TS / RAS: 200 Construction of Retaining wall at km 32/210 - 32/220 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

39 . AS / TS / RAS: 200 Construction of Retaining wall at km 32/250 - 32/260 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

40 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/290- 29/300 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 1 2,00

41 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/280- 29/290 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

42 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/270- 29/280 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

96 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JG 16 05 ) Dindigul (H) C&M Division 43 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/260- 29/270 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

44 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/250- 29/260 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

45 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/240- 29/250 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

46 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/230- 29/240 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

47 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/220- 29/230 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

48 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/210- 29/220 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

49 . AS / TS / RAS: 200 Construction of Retaining wall at km 29/200- 29/210 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

97 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JG 16 05 ) Dindigul (H) C&M Division 50 . AS / TS / RAS: 200 Construction of Retaining wall at km 32/220 - 32/230 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892) 2,00 ...... 2,00

TOTAL - 5054 04 337 JG 1,00,00 ...... 1 1,00,00

98 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JH 16 03 ) Villupuram (H) C&M Division 1. AS / TS / RAS: 200 Reconstruction of culvert at Km.3/4 Vellimedupettai –Puthur Road 2,00 ...... 2,00

2. AS / TS / RAS: 200 Reconstruction of culvert at Km. 2/8 Vellimedupettai –Puthur Road 2,00 ...... 2,00

3. AS / TS / RAS: 200 Reconstruction of culvert at Km. 1/2-2/8 Vellimedupettai –Puthur Road 2,00 ...... 2,00

4. AS / TS / RAS: 200 Reconstruction of culvert at Km. 1/6 Pelakuppam Road 2,00 ...... 2,00

5. AS / TS / RAS: 200 Reconstruction of Retaining wall at km 1/2 (L/S-II) of Vikkravandy- Reddikuppam road 2,00 ...... 2,00

6. AS / TS / RAS: 200 Reconstruction of Retaining wall at km 1/2 (L/S-I) of Vikkravandy- Reddikuppam road 2,00 ...... 2,00

7. AS / TS / RAS: 200 Reconstruction of Retaining wall at km 3/10 (R/S-II) of Nemur-Esalam road 2,00 ...... 2,00

99 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JH 16 03 ) Villupuram (H) C&M Division 8. AS / TS / RAS: 200 Reconstruction of Retaining wall at km 3/10 (R/S-I) of Nemur-Esalam road 2,00 ...... 2,00

9. AS / TS / RAS: 200 Providing CC Pavement of Kandampakkam-Maragathapuram road at km 3/8 (East side) 2,00 ...... 1 2,00

10 . AS / TS / RAS: 200 Providing CC Pavement of Kandampakkam-Maragathapuram road at km 3/8(South side) 2,00 ...... 2,00

Cuddalore (H) C&M Division 11 . AS / TS / RAS: 200 Widening of culvert at km 0/4 of Chennai-Thiruchi-Dindugal road to Korakkai road 2,00 ...... 2,00

12 . AS / TS / RAS: 200 Repairs to Culvert at km 6/10 of Pennadam-Vridhachalam road and Uchimedu link road (SCR) 2,00 ...... 2,00

13 . AS / TS / RAS: 200 Reconstruction of culvert 1/8 of Devanampattinam road 2,00 ...... 2,00

14 . AS / TS / RAS: 200 Reconstruction of culvert 10/6 of Thookkanampakkam - Keelkumaramangalam - Reddichavadi road 2,00 ...... 2,00

100 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JH 16 03 ) Cuddalore (H) C&M Division 15 . AS / TS / RAS: 200 Raising the dip at km 1/2 of The road from km 8/4 of Cuddalore - Chittoor road joints at km 7/10 of Cuddalore - Thirukoilur - 2,00 ...... 2,00 Sankarapuram (via) Karamanikuppam

16 . AS / TS / RAS: 200 Raising the dip at km 1/4 of The road from km 8/4 of Cuddalore - Chittoor road joints at km 7/10 of Cuddalore - Thirukoilur - 2,00 ...... 2,00 Sankarapuram (via) Karamanikuppam

17 . AS / TS / RAS: 200 Widening of Pipe Culvert at km 0/10 of Pennadam-Vridhachalam road and Uchimedu link road (SCR) 2,00 ...... 2,00

18 . AS / TS / RAS: 200 Widening of Pipe Culvert at km 2/4 of Seplanatham - Kottagam Road 2,00 ...... 2,00

Pollachi (H) C&M Division 19 . AS / TS / RAS: 200 Reconsrtuction of Culvrt at km 3/0 of Km.109/4 of Dindugal - Bangalore Road to Kanjampatti 2,00 ...... 2,00

20 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 1/6 of Uthukkuli - Thappattaikelavanputhur road 2,00 ...... 2,00

21 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 6/10 R/S of Uthukkuli - Thappattaikelavanputhur road 2,00 ...... 2,00

101 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JH 16 03 ) Pollachi (H) C&M Division 22 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 6/10 L/S of Uthukkuli - Thappattaikelavanputhur road 2,00 ...... 2,00

23 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 0/10 R/S of Ponnayur - Singanallur Road 2,00 ...... 2,00

24 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 1/4 of ATPPC Road to Manakkadavu. 2,00 ...... 2,00

25 . AS / TS / RAS: 200 Reconsrtuction of Culvrt at km 0/2 of Km.1/2 of Samathur - Devanurpudur Road to join at Km.7/4 of Pollachi - Road (via) 2,00 ...... 2,00 Ponnachiyur.

26 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 7/0 of Anaimalai - Periyapothu road 2,00 ...... 2,00

27 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 0/10 L/S of Ponnayur - Singanallur Road 2,00 ...... 2,00

28 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 5/2 of Kottur - Thenkaiparai road to Pongaliyur. 2,00 ...... 2,00

102 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JH 16 03 ) Pollachi (H) C&M Division 29 . AS / TS / RAS: 200 Repairs to Culvert at Km 2/8 of Kottur - Thenkaiparai road to Pongaliyur. 2,00 ...... 2,00

30 . AS / TS / RAS: 200 Repairs to Retaining Wall at km 2/6 L/S of Anaimalai - Periyapothu road. 15.00 m 2,00 ...... 2,00

31 . AS / TS / RAS: 200 Repairs to Retaining Wall at km 2/6 R/S of Anaimalai - Periyapothu road. 15.00 m 2,00 ...... 2,00

32 . AS / TS / RAS: 200 Repairs to Pipe Culvert at Km 1/8 of Uthukkuli - Thappattaikelavanputhur road 2,00 ...... 2,00

Theni (H) C&M Division 33 . AS / TS / RAS: 200 Construction of Protective wall at km 4/585 - 4/600 (R/S) of Aranmanaipudur - vayalpatti road 2,00 ...... 2,00

34 . AS / TS / RAS: 200 Construction of Protective wall at km 0/015 - 0/030 (R/S)of venkatachalapuram - kattunaickanpatti road 2,00 ...... 2,00

35 . AS / TS / RAS: 200 Construction of Protective wall at km 1/920 -1/930 of Thappugundu - Poomalaigundu road 2,00 ...... 2,00

103 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JH 16 03 ) Theni (H) C&M Division 36 . AS / TS / RAS: 200 Construction of Protective wall at km 1/910 -1/920 of Thappugundu - Poomalaigundu road 2,00 ...... 2,00

37 . AS / TS / RAS: 200 Construction of Protective wall at km 1/780-795 of Thappugundu - Poomalaigundu road 2,00 ...... 2,00

38 . AS / TS / RAS: 200 Construction of Protective wall at km 1/765-780 of Thappugundu - Poomalaigundu road 2,00 ...... 2,00

39 . AS / TS / RAS: 200 Construction of Protective wall at km 1/750-765 of Thappugundu - Poomalaigundu road 2,00 ...... 2,00

40 . AS / TS / RAS: 200 Construction of Protective wall at km 0/5 - 0/20 of Ayyanarpuram Balakrishnapuram road 2,00 ...... 2,00

41 . AS / TS / RAS: 200 Construction of Protective wall at km 1/930 -1/940 of Thappugundu - Poomalaigundu road 2,00 ...... 2,00

42 . AS / TS / RAS: 200 Construction of Protective wall at km 4/570-4/585 (R/S) of Aranmanaipudur - vayalpatti road 2,00 ...... 2,00

104 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JH 16 03 ) Theni (H) C&M Division 43 . AS / TS / RAS: 200 Construction of Protective wall at km 3/6 (R/S) of Thadicheri - veerapandi road 2,00 ...... 2,00

44 . AS / TS / RAS: 200 Construction of Protective wall at km 0/0 - 0/015 (R/S)of venkatachalapuram - kattunaickanpatti road 2,00 ...... 2,00

45 . AS / TS / RAS: 200 Construction of Protective wall at km 0/20 - 0/35 of Ayyanarpuram Balakrishnapuram road 2,00 ...... 2,00

Dindigul (H) C&M Division 46 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/200 - 3/210 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

47 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/220 - 3/230 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

48 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/230 - 3/240 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

49 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/240 - 3/250 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

105 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) 16 Major Works ( DPC 5054 04 337 JH 16 03 ) Dindigul (H) C&M Division 50 . AS / TS / RAS: 200 Construction of Retaining wall at km 3/210 - 3/220 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti. 2,00 ...... 2,00

TOTAL - 5054 04 337 JH 1,00,00 ...... 1 1,00,00

106 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JP [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JP Improvements to Chennai Radial Roads

16 Major Works ( DPC 5054 04 337 JP 16 07 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 53360 Award amount and cost of Arbitration to the claimant M/s National Asphalt Products and Construction Company 5,33,60 5,33,60 ...... G.O. Ms. No. 285, Highways and Minor Ports (HS-1) Department, Dated: 28.11.2018. 2. AS / TS / RAS: 13360 Outstanding interest payment to contractor Thiru.P.Janakiraman, as per judgement in E.P.No.60 of 2015 in CS No.406/2009. 1,33,60 1,33,60 1 ... 1 G.O. Ms. No. 194, Highways and Minor Ports (H.W.1) Department dated:27.11.2018.

TOTAL - 5054 04 337 JP 6,67,20 6,67,20 1 ... 1

107 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JT Comprehensive Road Infrastructure Development Programme (CRIDP) - Major District Roads 16 Major Works ( DPC 5054 04 337 JT 16 09 ) 1. AS / TS / RAS: 4854600/6073500/60794/86756 CRIDP 1,092,81,00 617,27,00 707,42,30 712,29,00 847,91,97 GO Ms No.6, H&M.P (HF.2) dept dt.13.01.2017 and GO Ms No.86, HW&M.P (HF.2) dept dt.24.10.2017 and GO Ms No.125, HW&M.P (HF.2) dept dt.07.08.2018, GO Ms No.88, HW&M.P (HF.2) dept dt.19.08.2019. TOTAL - 5054 04 337 JT 1,092,81,00 617,27,00 707,42,30 712,29,00 847,91,97

108 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 JU [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JU Comprehensive Road Infrastructure Development Programme (CRIDP) - Other District Roads 16 Major Works ( DPC 5054 04 337 JU 16 07 ) 1. AS / TS / RAS: 8118700/11794500/ 19913200/114592/131023 CRIDP 1,991,32,00 1,193,46,00 1,413,04,70 1,413,05,00 1,650,94,84 GO Ms No.6, H&M.P (HF.2) dept dt.13.01.2017 ,GO Ms No.86, HW&M.P (HF.2) dept dt.24.10.2017 and GO Ms No.125, HW&M.P (HF.2) dept dt.07.08.2018 TOTAL - 5054 04 337 JU 1,991,32,00 1,193,46,00 1,413,04,70 1,413,05,00 1,650,94,84

109 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KB Schemes implemented under State Infrastructure and Amenities Fund - Controlled by Chief Engineer (Construction and 16 Major Works ( DPC 5054 04 337 KB 16 04 ) (H) C&M Division 1. AS / TS / RAS: 89900 Widening of Ramanaickaneri Tank Bund portion in Km.0/0-0/7 of -Denkanikottai road (via) Thally (0/0-42/2) 8,99,00 2,00,00 1,79,80 6,99,00 1 G.O.Ms.No.91/HW&MP(HQ.1), dt.28.05.2018. 2. AS / TS / RAS: 7000 Improvements to the Junction at Km.39/6 of -Kaniyakumari road, Hosur town limit. 70,00 ... 1 70,00 1 G.O.Ms.No.91/HW&MP(HQ.1), dt.28.05.2018.

3. AS / TS / RAS: 39000 Widening from end to end at Km.0/0-1/3 and providing drain cumfoot path in Km.0/0-1/3 of Hosur Town to Hosur Railway station road. 3,90,00 ... 78,00 3,90,00 1 G.O.Ms.No.91/HW&MP(HQ.1), dt.28.05.2018.

Madurai (H) C&M Division 4. AS / TS / RAS: 150000 widening from Double lane to Multilane and Strengthening of Madurai- Thondi road at Km.3/6-10/0 including Reconstruction/Widening of 15,00,00 4,98,50 10,00,00 10,01,50 1 culverts and minor bridges construction or retaining wall and drain. G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018. 5. AS / TS / RAS: 150000 Widening from double lane to to four lane and strengthening in Km.4/4- 6/8 and 12/4-15/0 of Madurai-Alagakoil-Melur road including Bus lay- 20,00,00 2,02,25 15,00,00 17,97,75 1 byes, reconstruction/widening of culverts and minor bridges, construction of retaining wall drain. G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018. Theni (H) C&M Division 6. AS / TS / RAS: 35300 Widening from Double lane to Multilane and Improvements at Km.0/0- 2/8 of Theni byepass road including junction improvements at Km.0/2, 3,53,00 1,68,38 3,03,00 1,84,62 1 construction of drain at Km.0/2, widening the existing slab culvert at Km.0/4. G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018. 7. AS / TS / RAS: 13000 Improvements of Kodai-Cochin road at Km.58/4-61/4. 1,30,00 1,30,00 1 1 ... G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.

110 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KB Schemes implemented under State Infrastructure and Amenities Fund - Controlled by Chief Engineer (Construction and 16 Major Works ( DPC 5054 04 337 KB 16 04 ) Theni (H) C&M Division 8. AS / TS / RAS: 20500 Improvemets of Devathanapatty-Varusanadu road at Km.20/0-21/0 and Km.45/0-46/4 including construction of drainage at Km.19/10,20/2 and 2,05,00 2,04,56 1 1 1 45/6,45/8,45/10 and reconstruction of culvert at Km.45/8. G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018. 9. AS / TS / RAS: 8400 Widening from double lane to multilane and strengthening of Andipatti- Velapparkoil and at Km.0/0-0/8 including construction of drainage at 84,00 84,00 1 1 ... km.0/4 and 0/6. G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.

10 . AS / TS / RAS: 23500 Improvements of Palayam-Bodi road at Km.12/2-14/0, Km.24/900-25/8 including widening at Km.12/2-12/6 and construction of drainage at 2,35,00 2,30,01 1 1 1 Km.24/6, 24/8 and 25/4. G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.

11 . AS / TS / RAS: 13600 Improvements of Sankarapuram-Chinnamanur road at Km.4/2-5/4 including widening at Km.4/525-5/050 and only widenig at Km.7/850- 1,36,00 1,36,00 1 1 ... 8/300 and drainage at Km.4/8 and Km.7/10. G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.

12 . AS / TS / RAS: 20000 Improvements of Theni-Chinnamanur road (via) Venkatachalapuram at Km.20/0-23/0 including construction of retaining wall and drain. 2,00,00 2,00,00 1 1 1 G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.

Sivaganga (H) C&M Division 13 . AS / TS / RAS: 65000 Widening and Improvements of Karaikudi college campus road at Km.3/2-6/435 including construction of centre median. 6,50,00 6,36,06 1 13,94 ... G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018. 14 . AS / TS / RAS: 117000 Widening from double lane to Three lane and strenthening of Thanjavur-Manamadurai road at Km.93/8-100/4 (Thirupathur Urban) 11,70,00 9,88,68 1 1,81,32 ... andKm.105/0-106/4 (Thirukostiyur Urban) G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.

111 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KB Schemes implemented under State Infrastructure and Amenities Fund - Controlled by Chief Engineer (Construction and 16 Major Works ( DPC 5054 04 337 KB 16 04 ) Perambalur (H) C&M Division 15 . AS / TS / RAS: 39600 Construction of Bridge at Km.11/4 of Palaiyur Anukkur vaalikanpuram road including improvement of road at Km.1/6 , 12/0 under state 3,96,00 2,38,80 1,54,20 1,57,20 ... infrastructure Amenities fund. G.O.Ms.No.9/HW&MP(HP.2), dt.24.01.2018. 16 . AS / TS / RAS: 806371

80,63,71 ... 30,62,91 ......

TOTAL - 5054 04 337 KB 164,81,71 39,17,24 62,78,00 44,95,39 9

112 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KC [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KC Acquisition of Lands for Bye Passes

16 Major Works ( DPC 5054 04 337 KC 16 02 ) Trichy (H) C&M Division 1. AS / TS / RAS: 221500 Formation of byepass road to Manachanallur town 22,15,00 ...... 1 5,00,00 G.O.Ms.No.54, Highways and Minor Ports (HP.2) Department, dated:13-06-2019. Pudukottai (H) C&M Division 2. AS / TS / RAS: 214700 Formation of Bye pass road to Illuppur town in Km.0/0-5/4 in Pudukottai District. 21,47,00 ... 6,47,00 1 15,00,00 G.O.Ms.No.53, Highways and Minor Ports (HP.1) Department, dated:04-03-2016. Coimbatore (H) C&M Division 3. AS / TS / RAS: 1954400 Extension of Flyover along Athupalam & Ukkadam upto Oppanakkara street in Coimbatore city 195,44,00 ...... 5,00,00 1 G.O.Ms.No.163, HW&MP (HS.2), dt:19.12.2019 4. AS / TS / RAS: 1218200 Construction of Fly over along Athupalam and Ukkadam juntion up to Oppanakara Street in Coimbatore City 121,82,00 46,02,00 61,82,00 25,00,00 45,24,57 G.O.Ms.No.59, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.

Pollachi (H) C&M Division 5. AS / TS / RAS: 206300 Formation of Eastern Bye pass to Pollachi town starting from Thippampatty at Km.111/4 of NH-209 and ending Achipatty @ 20,63,00 20,29,60 1 33,39 1 km.124/8 of NH-209 (Via) Alampalayam, Rasakkapalaya, Kullakkapalaym to a length of 15.40 km. G.O.Ms.No.61, Highways and Minor Ports (HS.2) Department, dated:04-03-2016. 64 Lands ( DPC 5054 04 337 KC 64 01 ) Vellore (H) C&M Division 1. AS / TS / RAS: 388200 Land Acquisition for the formation of Ring Road to Vellore 38,82,00 4,95,09 33,86,91 5,00,00 15,00,00 G.O.Ms.No.29, Highways and Minor Ports (HQ.2) Department, dated:12-04-2017.

113 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KC [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KC Acquisition of Lands for Bye Passes

64 Lands ( DPC 5054 04 337 KC 64 01 ) Thanjavur (H) C&M Division 2. AS / TS / RAS: 41800 Land aquisition for the formation of Bye pass to Thirukkattupalli town. 4,18,00 ...... 50,00 3,68,00

3. AS / TS / RAS: 280000 Land aquisition for formation of Kumbakonam bypass in Km.0/0-9/420 Phase.II in Thanjavur Dt. 28,00,00 ... 23,00,00 1,00,00 10,00,00 G.O.Ms.No.135, Highways and Minor Ports (HP.2) Department, dated:26-11-2015.

Thiruvarur (H) C&M Division 4. AS / TS / RAS: 31400 Land aquisition for formation of bypass to Valaingaima town in Tiruvarur Dt. 3,14,00 ... 2,84,00 10,00 2,74,00 G.O.Ms.No.136, Highways and Minor Ports (HP.2) Department, dated:26-11-2015. Coimbatore (H) C&M Division 5. AS / TS / RAS: 3200000 Land aquisition for formation of Western Ring road to Coimbatore city.. 320,00,00 83,63,00 20,00,00 97,44 25,00,00 G.O.Ms.No.52, Highways and Minor Ports (HS.2) Department, dated:04-03-2016. 6. AS / TS / RAS: 700000 Extension of Flyover along Athupalam & Ukkadam upto Oppanakkara street in Coimbatore city 70,00,00 ...... 1 G.O.Ms.No.163, HW&MP (HS.2), dt:19.12.2019

7. AS / TS / RAS: 993500 Land aquisition for the formation of Bye pass to Mettupalayam town. 99,35,00 16,62,00 99,25,00 52,57 20,00,00 G.O.Ms.No.46, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.

Pollachi (H) C&M Division 8. AS / TS / RAS: 335700 Land aquisition for the widening and ground level improvement of Dindigul Bangalore road (NH-209), Pollachi Palaghat road (SH-78A), 33,57,00 21,56,99 11,03,01 1,00,00 25,00,00 Municipal bus route road (ODR) and new scheme road (Pollachi Municipal road) in Pollachi town. G.O.Ms.No.60, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.

114 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KC [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KC Acquisition of Lands for Bye Passes

64 Lands ( DPC 5054 04 337 KC 64 01 ) Madurai (H) C&M Division 9. AS / TS / RAS: 1642800 Land aquisition for Construction of Fly over at Goripalayam junction in Madurai town.. 164,28,00 22,00 159,28,00 1,00,00 49,99,99 G.O.Ms.No.47, Highways and Minor Ports (HS.1) Department, dated:04-03-2016. TOTAL - 5054 04 337 KC 1,142,85,00 193,30,68 417,55,93 40,43,42 216,66,59

115 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KF [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KF Improvement of Road Quality under Comprehensive Road Infrastructure Development Programme (CRIDP) 16 Major Works ( DPC 5054 04 337 KF 16 06 ) Theni (H) C&M Division 1. AS / TS / RAS: 85000/103978 Improvement of road Quality under Comprenshive Road Infrastruture Development Programme. 400,00,00 5,87,79 400,00,00 400,00,00 645,74,00 G.O.Ms.No.88/H&MP(HF.2)/dt.19.08.2019.

TOTAL - 5054 04 337 KF 400,00,00 5,87,79 400,00,00 400,00,00 645,74,00

116 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KG Project for the Construction of Chennai Peripheral Ring Road Project (CPRR) with JICA Assistance 16 Major Works ( DPC 5054 04 337 KG 16 04 ) 1. AS / TS / RAS: 26734200 Projects for the construction of Chennai Peripheral Ring Road Project with JICA Assistance 2,673,42,00 ...... 18,00,00 500,00,00 G.O Ms No.37, HW&M.P (HW.2) dept dt.08.03.2019.

TOTAL - 5054 04 337 KG 2,673,42,00 ...... 18,00,00 500,00,00

117 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KH Widening and improving the road to industries

16 Major Works ( DPC 5054 04 337 KH 16 02 ) Chengalpattu (H) C&M Division 1. AS / TS / RAS: 31217 Widening from single lane to two lane and improvements to Thodur- Kannanthangal road in Km.6/8-7/2 and Kannanthangal Panchayat 3,12,17 ...... 2,00,00 1,12,17 Union road. G.O.Ms.No.73/HW&MP(HS.1), dt.16.07.2019. 2. AS / TS / RAS: 291847 Providing land acquisition for Pallur-Sogandy road in Km.16/8-23/8 (MDR-651), Thodur-Kannanthangal road in Km.6/8-7/2 and 29,18,47 ...... 1 50,00 Kannanthangal Panchayat Union road. G.O.Ms.No.73/HW&MP(HS.1), dt.16.07.2019.

3. AS / TS / RAS: 309595 Widening from intermediate lane to four lane of pallur-sogandy in Km.16/8-23/8 (MDR-651), Thodur-Kannanthangal road in Km.6/8-7/2 30,95,95 ...... 1 1 and Kannanthangal Panchayat Union road. G.O.Ms.No.73/HW&MP(HS.1), dt.16.07.2019.

TOTAL - 5054 04 337 KH 63,26,59 ...... 2,00,02 1,62,18

118 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Coimbatore (H) C&M Division 1. AS / TS / RAS: 542 Flood damage repairs to the approaches of the minor bridge at Km.2/8 of Thondamuthur Madampatty Road 5,42 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 2. AS / TS / RAS: 8150 Repairs to Flood damaged Retaining wall at Km 0/8 & 0/10 of Puthupathi to Chinnampathi Road 81,50 ...... 1,00,00 14,06 G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

3. AS / TS / RAS: 1362 Construction of Retaining wall at Km.5/4 of Iruttupallam Poondi road 13,62 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

4. AS / TS / RAS: 1352 Construction of retaining wall at Km.1/2 of Perur Vedapatty road 13,52 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

Pollachi (H) C&M Division 5. AS / TS / RAS: 1785 Construction of retaining wall at km 33/8 of Pollachi - Valparai road 17,85 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 6. AS / TS / RAS: 4560 Construction of Retaining wall at Km 0/4 of Iyerpady Branch road 45,60 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

7. AS / TS / RAS: 2659 Construction of Retaining wall in Km 47/8 of Pollachi Valparai road 26,59 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

119 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 8. AS / TS / RAS: 1415 Construction of Retaining wall in Km 29/10(i) of Pollachi Valparai road 14,15 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 9. AS / TS / RAS: 1834 Construction of Retaining wall in Km 29/2 of Pollachi Valparai road 18,34 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

10 . AS / TS / RAS: 777 Construction of Breast wall in Km 0/2 of Iyerpady Btanch road 7,77 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

11 . AS / TS / RAS: 3620 Construction of Breast wall in Km 44/8 of Pollachi Valparai road 36,20 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

12 . AS / TS / RAS: 728 Construction of 1m x 1 m of Box culvert at km 16/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi 7,28 ...... main road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

13 . AS / TS / RAS: 777 Construction of Breast wall in Km 0/4of Iyerpady Btanch road 7,77 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

14 . AS / TS / RAS: 644 Construction of 1m x 1 m of Box culvert at km 2/2 of Anaimalai loop road 6,44 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

120 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 15 . AS / TS / RAS: 1037 Construction of Breast wall in Km 0/6 of Iyerpady Btanch road 10,37 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 16 . AS / TS / RAS: 2636 Construction of Retaining wall in Km 30/2 of Pollachi Valparai road 26,36 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

17 . AS / TS / RAS: 6790 Construction of Retaining wall in Km1/8, 1/10,2/4, 4/4 of km 1/8 of Castle craft road to join Stanmore Sirukundra road 67,90 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

18 . AS / TS / RAS: 1812 Construction of Retaining wall IN Km 14/4 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road 18,12 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

19 . AS / TS / RAS: 13693 Construction of Breast wall at Km 4/2,4/8,5/2,5/6 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi 1,36,93 ...... main road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

20 . AS / TS / RAS: 644 Construction of 1m x 1 m of Box culvert at km 3/6 of Anaimalai loop road 6,44 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

21 . AS / TS / RAS: 9998 Construction of Breast wall at km 43/6, 44/2,44/6,44/8 of Pollachi - Valparai road 99,98 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

121 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 22 . AS / TS / RAS: 6781 Construction of Retaining wall at km 47/2 , 48/6 of Pollachi - Valparai road 67,81 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 23 . AS / TS / RAS: 1823 Construction of pipe culvert in Km 1/4,2/6, 3/6,4/4 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road( 4 nos x 5.00) 18,23 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

24 . AS / TS / RAS: 1410 Construction of Retaining wall in Km 55/10 of Pollachi Valparai road 14,10 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

25 . AS / TS / RAS: 1658 Construction of Retaining wall in Km 47/4 of Pollachi Valparai road 16,58 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

26 . AS / TS / RAS: 1099 Construction of Retaining wall in Km 0/2 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road 10,99 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

27 . AS / TS / RAS: 687 Construction of Retaining wall in Km 1/10 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road 6,87 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

28 . AS / TS / RAS: 1099 Construction of Retaining wall in Km 2/6 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road 10,99 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

122 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 29 . AS / TS / RAS: 2187 Construction of Breast wall in Km 4/8 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road 21,87 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 30 . AS / TS / RAS: 2077 Construction of Breast wall in Km 1/4 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road 20,77 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

31 . AS / TS / RAS: 2081 Construction of Breast wall in Km 2/6 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road 20,81 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

32 . AS / TS / RAS: 473 Construction of 1m x 1 m of Box culvert at km 35/4 of Pollachi Valparai road 4,73 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

33 . AS / TS / RAS: 1541 Construction of Breast wall in Km 8/4 of Valparai Manikakurungumudi road 15,41 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

34 . AS / TS / RAS: 473 Construction of 1m x 1 m of Box culvert at km 47/4 of Pollachi Valparai road 4,73 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

35 . AS / TS / RAS: 473 Construction of 1m x 1 m of Box culvert at km 42/2(i), of Pollachi Valparai road 4,73 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

123 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 36 . AS / TS / RAS: 2008 Construction of Breast wall in Km 1/10 of Animalai loop road 20,08 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 37 . AS / TS / RAS: 473 Construction of 1m x 1 m of Box culvert at km 42/2(ii), of Pollachi Valparai road 4,73 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

38 . AS / TS / RAS: 3822 Construction of Retaining wall in Km 6/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road 38,22 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

39 . AS / TS / RAS: 3170 Construction of Breast wall in Km 0/2 of Valparai Manikakurungumudi road 31,70 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

40 . AS / TS / RAS: 473 Construction of 1m x 1 m of Box culvert at km47/8 of Pollachi Valparai road 4,73 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

41 . AS / TS / RAS: 1496 Construction of Breast wall in Km 3/4 of Animalai loop road 14,96 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

42 . AS / TS / RAS: 1763 Construction of Breast wall in Km 2/2 of Animalai loop road 17,63 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

124 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 43 . AS / TS / RAS: 764 Construction of 1m x 1 m of Box culvert at km 12/2 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi 7,64 ...... main road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 44 . AS / TS / RAS: 764 Construction of 1m x 1 m of Box culvert at km 12/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi 7,64 ...... main road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

45 . AS / TS / RAS: 1510 Construction of Breast wall in Km 1/8 of Valparai Manikakurungumudi road 15,10 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

46 . AS / TS / RAS: 1640 Construction of retaining wall at km 29/10of Pollachi - Valparai road 16,40 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

47 . AS / TS / RAS: 5229 Construction of Retaining wall in Km 1/4, 1/6, of Iyerpadi to Join Km.3/2 of Stanmore - Sirukundra road 52,29 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

48 . AS / TS / RAS: 3668 Construction of Breast wall in Km 5/4of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road 36,68 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

49 . AS / TS / RAS: 4008 Construction of Breast wall in Km 0/2 of Valparai - Manikakurungumudi road 40,08 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

125 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 50 . AS / TS / RAS: 1057 Construction of Retaining wall at Km 0/2 of Iyerpady Branch road 10,57 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 51 . AS / TS / RAS: 3185 Construction of Breast wall in Km 45/10 of Pollachi Valparai road 31,85 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

52 . AS / TS / RAS: 4090 Construction of Retaining wall at km 52/2 & 54/4 of Pollachi - Valparai road 40,90 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

53 . AS / TS / RAS: 2096 Construction of protective wall at km 16/10, 21/4 of Pollachi - Valparai road 20,96 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

54 . AS / TS / RAS: 3015 Construction of Breast wall in Km 42/8 of Pollachi Valparai road 30,15 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

55 . AS / TS / RAS: 3918 Construction of Retaining wall in Km 5/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road 39,18 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

56 . AS / TS / RAS: 914 Construction of Breast wall in Km 3/4 Km 1/8 of castle craft road to join Stanmore Sirikundra road 9,14 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

126 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 57 . AS / TS / RAS: 15649 Construction of Breast wall at km 44/10,45/4,45/8,45/10,46/2 of Pollachi - Valparai road 1,56,49 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 58 . AS / TS / RAS: 2720 Construction of retaining wall at km 29/6 of Pollachi - Valparai road 27,20 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

59 . AS / TS / RAS: 3744 Construction of Retaining wall km 7/6, 8/2Valparai Manikakurungumudi road 37,44 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

60 . AS / TS / RAS: 3184 Construction of retaining wall at km 30/4 of Pollachi - Valparai road 31,84 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

61 . AS / TS / RAS: 8184 Construction of Retaining wall km 6/8,7/2 of Anaimalai loop road 81,84 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

62 . AS / TS / RAS: 2205 Construction of Breast wall at km 33/4 of Pollachi - Valparai road 22,05 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

63 . AS / TS / RAS: 2684 Construction of Breast wall at Km 0/8,0/10 of Iyerpady Branch road 26,84 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

127 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 64 . AS / TS / RAS: 2921 Construction of Breast wall at km 34/2 of Pollachi - Valparai road 29,21 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 65 . AS / TS / RAS: 1613 Construction of Retaining wall in Km 6/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road 16,13 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

66 . AS / TS / RAS: 1728 Construction of Retaining wall in Km 40/8 of Pollachi Valparai road 17,28 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

67 . AS / TS / RAS: 14103 Construction of Breast wall at Km6/4,6/8,6/10,7/2 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi 1,41,03 ...... main road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

68 . AS / TS / RAS: 1157 Construction of Retaining wall in Km 38/4 of Pollachi Valparai road 11,57 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

69 . AS / TS / RAS: 1462 Construction of Retaining wall in Km7/4 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road 14,62 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

70 . AS / TS / RAS: 1825 Construction of protective wall at km 24/2 of Pollachi - Valparai road 18,25 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

128 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 71 . AS / TS / RAS: 773 Construction of Retaining wall in Km 0/6(i) Km 1/8 of castle craft road to join Stanmore Sirikundra road 7,73 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 72 . AS / TS / RAS: 330 Construction of pipe Culvert at km 53/4, of Pollalchi Valparai road 3,30 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

73 . AS / TS / RAS: 12542 Construction of 1m x 1m Box Culvert at km 28/6, 31/8, 34/6, 35/4, 36/8, 44/6 ,44/10, 45/2, 47/4, of Pollalchi Valparai road 1,25,42 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

74 . AS / TS / RAS: 13662 Construction of Breast walll at km 48/8,49/10,50/10,51/6,51/10 of Pollachi - Valparai road 1,36,62 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

75 . AS / TS / RAS: 9754 Construction of 1m x 1m Box Culvert at km 51/8, 52/2, 53/4, 53/10, 54/8, 55/2,58/2, of Pollalchi Valparai road 97,54 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

76 . AS / TS / RAS: 10036 Construction of Breast wall at Km 11/10,12/2,14/4 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi 1,00,36 ...... main road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

77 . AS / TS / RAS: 3814 Construction of Retaining wall in Km 5/6 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road 38,14 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

129 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 78 . AS / TS / RAS: 625 Construction of Breast wall in Km 36/10 of Pollachi Valparai road 6,25 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 79 . AS / TS / RAS: 4095 Construction of Breast wall in Km 0/2, 2/8 of km 1/8 castle craft road to join of Stanmore - Sirukundra road 40,95 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

80 . AS / TS / RAS: 10685 Construction of Retaining wall & 2 x 2 m Box Culvert at km 0/4, 0/6,0/10,1/4 of Anaimalai loop road (8 Nos.) 1,06,85 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

81 . AS / TS / RAS: 1698 Construction of Retaining wall in Km 19/10 of Pollachi Valparai road 16,98 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

82 . AS / TS / RAS: 10685 Construction of Retaining wall & 2 x 2 m Box Culvert at km 1/10,2/4,2/10,3/4 of Anaimalai loop road (8 Nos.) 1,06,85 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

83 . AS / TS / RAS: 1873 Construction of Retaining wall in Km 0/10 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road 18,73 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

84 . AS / TS / RAS: 6360 Construction of Breast wall at km 53/6,53/8,53/10,54/4 of Pollachi - Valparai road 63,60 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

130 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 85 . AS / TS / RAS: 1583 Reconstruction of culvert at Km 0/2 of Iyerpady Branch road 15,83 ...... 15,00,00 16,59,55 G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 86 . AS / TS / RAS: 2165 Construction of Breast wall in Km 43/10 of Pollachi Valparai road 21,65 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

87 . AS / TS / RAS: 1390 Reconstruction of culvert at Km 0/4 of Iyerpady Branch road 13,90 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

88 . AS / TS / RAS: 13665 Construction of Breast wall at km 52/2, 52/6,52/8,52/10,53/4 of Pollachi - Valparai road 1,36,65 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

89 . AS / TS / RAS: 4404 Construction of Breast wall in Km 6/4 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road 44,04 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

90 . AS / TS / RAS: 4672 Construction of Breast wall in Km 1/6, 1/8 of Iyerpadi to Join Km.3/2 of Stanmore - Sirukundra road 46,72 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

91 . AS / TS / RAS: 9124 Construction of Breast wall in Km 5/2,5/4,5/6,5/8 of Iyerpadi to Join Km.3/2 of Stanmore - Sirukundra road 91,24 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

131 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Pollachi (H) C&M Division 92 . AS / TS / RAS: 507 Construction of Retaining wall in Km 0/6(i) Km 1/8 of castle craft road to join Stanmore Sirikundra road 5,07 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. (H) C&M Division 93 . AS / TS / RAS: 1468 Permanent Restoration to Flood Damaged Pipe Culverts at km 5/8,6/4,6/6 & 6/8 of Palada Lovedale Road including CC Drain 14,68 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 94 . AS / TS / RAS: 4448 Permanent Restoration to Flood Damaged Pipe Culvert, Protective wall, CC Drain including InterLocking Paver Block Pavement at km 0/2 44,48 ...... of Belithala Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

95 . AS / TS / RAS: 4340 Permanent Restoration to Flood Damaged Protective wall at km 1/4 of Belithala Road including CC Drain 43,40 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

96 . AS / TS / RAS: 7970 Permanent Restoration to Flood Damaged Protective wall at km 1/10 of Ithalar Bembatty Road including CC Drain 79,70 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

97 . AS / TS / RAS: 3536 Permanent Restoration to Flood Damaged Protective wall at km1/6 & 2/4 of Palada Lovedale Road including CC Drain 35,36 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

98 . AS / TS / RAS: 2067 Permanent Restoration to Flood Damaged Protective wall at km 0/8 of Attuboil Road including CC Drain 20,67 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

132 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 99 . AS / TS / RAS: 8069 Permanent Restoration to Flood Damaged Protective wall at km 2/2,2/4 of Ithalar Bembatty Road including CC Drain 80,69 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 100 . AS / TS / RAS: 5959 Permanent Restoration to Flood Damaged Protective wall at km 0/10,1/2, 2/8 of M. Palada B.Manihatty(via) Kallakorai Hada 59,59 ...... Gandhinagar Road including CC Drain G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

101 . AS / TS / RAS: 3152 Permanent Restoration to Flood Damaged Protective wall at km 0/6 & 0/8 of Porthiyada Bykada Road including CC Drain 31,52 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

102 . AS / TS / RAS: 3368 Permanent Restoration to Flood Damaged Protective wall at km 2/8 of Ithalar Bembatty Road including CC Drain 33,68 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

103 . AS / TS / RAS: 7030 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/6,1/2,1/4,1/6 of Pandalur Uppatti via Koomola 70,30 ...... Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

104 . AS / TS / RAS: 3153 Permanent Restoration to Flood Damaged Protective wall at km 2/2 & 2/8 of B.Manihatty Road including CC Drain 31,53 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

105 . AS / TS / RAS: 4664 Permanent Restoration to Flood Damaged Protective wall at km 0/2, 0/4,4/4, of Palada Lovedale Road including CC Drain 46,64 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

133 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 106 . AS / TS / RAS: 9047 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/10,1/2,1/4- of Road from KM 25/4 of Gudalur 90,47 ...... 41,14,00 38,19,33 Sulthan Bathery to Palamvayal Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 107 . AS / TS / RAS: 9038 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/2,0/4 of May Field Road 90,38 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

108 . AS / TS / RAS: 7504 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/2,0/4,0/6 of Sand Hills Road 75,04 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

109 . AS / TS / RAS: 9042 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 3/8,4/10,5/8,8/6,10/4 of Gudalur O valley Road 90,42 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

110 . AS / TS / RAS: 9068 Permanent Restoration to Flood Damaged High level Bridge at km 9/10 of Hellan Yellamalai Periasholai Road 90,68 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

111 . AS / TS / RAS: 7480 Construction of Protective wall at Km 0/4, 0/10 of Lovedale Ketty (via) Achanakkal road. 74,80 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

112 . AS / TS / RAS: 4998 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 3/6,5/2 of Hellan Yellamalai Periasholai Road 49,98 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

134 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 113 . AS / TS / RAS: 1955 Permanent Restoration to Flood Damaged Protective wall at km 2/2,2/6 of Melkowatty Road. 19,55 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 114 . AS / TS / RAS: 9428 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 13/8,14/4,14/6,15/8,16/4 of Nellakottai Devala 94,28 ...... Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

115 . AS / TS / RAS: 13605 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/2,0/6,1/2,1/8,4/6 of Nellakottai Devala Road 1,36,05 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

116 . AS / TS / RAS: 9000 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/4,0/6 of Calicut Vythiri Gudalur Road to 90,00 ...... Ayyankolly via Kolappali Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

117 . AS / TS / RAS: 7408 Construction of Protective wall at Km 0/6 ,1/6 & 1/8 of Selas Kolacombai road. 74,08 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

118 . AS / TS / RAS: 7125 Construction of Protective wall at Km 0/4, 0/6 of Kaikatty Kolacombai road. 71,25 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

119 . AS / TS / RAS: 7540 Construction of Protective wall at Km 8/6 of Dolphin's Nose road. 75,40 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

135 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 120 . AS / TS / RAS: 2053 Permanent Restoration to Flood Damaged Protective wall at km 0/10 of Kundah Kotagiri Road 20,53 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 121 . AS / TS / RAS: 16049 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 3/10,4/2,4/8,5/6,6/6 of Devala Atikunna Uppatti 1,60,49 ...... Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

122 . AS / TS / RAS: 6553 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 7/2,7/6,7/8 ,7/10 of Hellan Yellamalai 65,53 ...... Periasholai Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

123 . AS / TS / RAS: 16101 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 18/2,18/6,18/8,19/4,19/6,19/10,20/2 of Sulthan 1,61,01 ...... Bathery Cherambadi Road(MDR). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

124 . AS / TS / RAS: 11901 Permanent Restoration to Flood damaged Protective wall at Km 6/2, 6/4, 6/6 and 6/8 of Cannimara Road 1,19,01 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

125 . AS / TS / RAS: 4953 Permanent Restoration to Flood Damaged Protective wall at km 4/6, 5/6, 6/4 of Udhagai Kaikatty Road including CC Drain 49,53 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

126 . AS / TS / RAS: 7999 Permanent Restoration to Flood Damaged Protective wall at km 26/2, 26/6,28/6 & 29/4 of Udhagai Avalanchi Kundha Thaishola Road 79,99 ...... Including CC drain G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

136 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 127 . AS / TS / RAS: 12053 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 14/6,14/10,15/2,15/8 of Sulthan Bathery 1,20,53 ...... Cherambadi Road(MDR). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 128 . AS / TS / RAS: 13644 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 16/2,16/8,17/6,17/8 of Sulthan Bathery 1,36,44 ...... Cherambadi Road(MDR). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

129 . AS / TS / RAS: 7493 Permanent Restoration to Flood Damaged Protective wall at km 21/4, 21/6,23/6 & 23/8 of Udhagai Avalanchi Kundha Thaishola Road 74,93 ...... including CC drain G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

130 . AS / TS / RAS: 4485 Permanent Restoration to Flood Damaged Protective wall at km 20/2,20/4 &20/6 of Udhagai Avalanchi Kundha Thaishola Road 44,85 ...... including CC drain G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

131 . AS / TS / RAS: 7041 Construction of Protective wall at Km 8/4 of Dolphin's Nose road. 70,41 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

132 . AS / TS / RAS: 6055 Construction of Protective wall at Km 2/8 of Selas Kolacombai road. 60,55 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

133 . AS / TS / RAS: 5981 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 105/2,105/4 of Calicut Vythiri Gudalur road (SH 59,81 ...... 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

137 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 134 . AS / TS / RAS: 18927 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 14/6,14/8,14/10,15/2,16/10 of Gudalur Sulthan 1,89,27 ...... Bathery Road(SH 98). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 135 . AS / TS / RAS: 16910 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 9/10,11/6,12/4,13/6, of Gudalur Sulthan Bathery 1,69,10 ...... Road(SH 98). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

136 . AS / TS / RAS: 11937 Permanent Restoration to Flood damaged Slab culvert, Pipe culvert and Protective wall at Km 5/10 of T.R. Bazaar Terrace estate Road 1,19,37 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

137 . AS / TS / RAS: 11429 Permanent Restoration to Flood damaged Pipe culvert, CC Drain and Protective wall at Km 5/2, 5/4, 5/6 and 5/8 of T.R. Bazaar Terrace 1,14,29 ...... estate Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

138 . AS / TS / RAS: 10933 Permanent Restoration to Flood damaged Protective wall at Km 1/6 - 1/8 of Udhagai Sholur Road 1,09,33 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

139 . AS / TS / RAS: 1482 Construction of Protective wall at Km 3/8 of Wellington kotagiri road. 14,82 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

140 . AS / TS / RAS: 9050 Permanent Restoration to Flood Damaged Protective wall at km 4/2 of Palada Lovedale Road including CC Drain and Paver Block Pavement 90,50 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

138 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 141 . AS / TS / RAS: 9257 Permanent Restoration to Flood damaged Protective wall at Km 5/2, 6/2, 6/6, 8/4, 8/6, 14/10 and 15/10 of Ooty Kotagiri Mettupalayam 92,57 ...... Sathy Gobi Erode Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 142 . AS / TS / RAS: 5003 Construction of Protective wall at Km 5/2 & 5/6 of Wellington kotagiri road. 50,03 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

143 . AS / TS / RAS: 7465 Construction of Protective wall at Km 6/2 of Ketty Palada Selas road. 74,65 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

144 . AS / TS / RAS: 3974 Permanent Restoration to Flood Damaged Protective wall at km 29/4,29/6 of Kundha Road Including CC Drain 39,74 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

145 . AS / TS / RAS: 4153 Permanent Restoration to Flood Damaged Protective wall at km 28/4 & 28/6 of Coonoor Kundha Road Including CC Drain 41,53 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

146 . AS / TS / RAS: 3948 Permanent Restoration to Flood Damaged Protective wall at km 24/10 & 26/2 of Coonoor Kundha Road including CC Drain 39,48 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

147 . AS / TS / RAS: 3384 Permanent Restoration to Flood Damaged Protective wall at km 20/4 & 20/6 of Coonoor Kundha Road 33,84 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

139 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 148 . AS / TS / RAS: 4459 Permanent Restoration to Flood Damaged Protective wall at km 7/4,7/6 of Udhagai Kaikatty Road including CC Drain 44,59 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 149 . AS / TS / RAS: 12084 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 96/6,96/8,96/10,97/4,97/6 of Calicut Vythiri 1,20,84 ...... Gudalur road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

150 . AS / TS / RAS: 10054 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 4/8,4/10,6/6,7/10,8/2,8/4 of Gudalur Sulthan 1,00,54 ...... Bathery Road(SH 98). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

151 . AS / TS / RAS: 1937 Permanent Restoration to Flood Damaged Protective wall at km 19/6 & 19/8 of Coonoor Kundha Road including CC Drain 19,37 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

152 . AS / TS / RAS: 7796 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 103/8,103/10,104/2 of Calicut Vythiri Gudalur 77,96 ...... road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

153 . AS / TS / RAS: 9635 Permanent Restoration to Flood damaged Protective wall at Km 0/8, 0/10, 1/2, 1/4, 1/8, 1/10 and 4/10 of Ooty Kotagiri Mettupalayam Sathy 96,35 ...... Gobi Erode Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

154 . AS / TS / RAS: 4765 Permanent Restoration to Flood Damaged Protective wall at km 18/10 & 19/2 of Coonoor Kundha Road 47,65 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

140 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 155 . AS / TS / RAS: 2966 Construction of Retaining wall at Km 7/10 of Wellington kotagiri road. 29,66 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 156 . AS / TS / RAS: 4782 Permanent Restoration to Flood Damaged Protective wall at km 14/10 &15/2 of Udhagai Kaikatty Road 47,82 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

157 . AS / TS / RAS: 2532 Permanent Restoration to Flood Damaged CC Drain and Culverts at km 9/6,9/8 & 10/2 of Udhagai Kaikatty Road 25,32 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

158 . AS / TS / RAS: 4775 Permanent Restoration to Flood Damaged Protective wall at km 13/2 & 13/4 of Udhagai Kaikatty Road including CC Drain 47,75 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

159 . AS / TS / RAS: 8068 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 115/6,115/8,115/10 of Calicut Vythiri Gudalur 80,68 ...... road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

160 . AS / TS / RAS: 5949 Permanent Restoration to Flood damaged Pipe culvert and Protective wall at Km 7/8,7/10 of Udhagai Sholur Road 59,49 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

161 . AS / TS / RAS: 15069 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 105/6,105/8 of Calicut Vythiri Gudalur road (SH 1,50,69 ...... 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

141 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 162 . AS / TS / RAS: 4889 Permanent Restoration to Flood Damaged Culvert at km 3/2 of New Avalanchi Duck Bungalow Road including Protective works 48,89 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 163 . AS / TS / RAS: 14638 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 116/6,117/2,117/4,117/6 of Calicut Vythiri 1,46,38 ...... Gudalur road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

164 . AS / TS / RAS: 4889 Permanent Restoration to Flood Damaged Culvert at km 6/10 of New Avalanchi Duck Bungalow Road including Protective works 48,89 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

165 . AS / TS / RAS: 4889 Permanent Restoration to Flood Damaged Culvert at km 7/4 of New Avalanchi Duck Bungalow Road including Protective works 48,89 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

166 . AS / TS / RAS: 4458 Permanent Restoration to Flood Damaged Protective wall at km 1/4 & 2/4 of New Avalanchi Duck Bungalow Road 44,58 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

167 . AS / TS / RAS: 3931 Permanent Restoration to Flood Damaged Protective wall at Km 3/6 , 4/4 and Pipe Culvert at km 4/2 of Theetukal Kuruthukuli Nanjanad 39,31 ...... Road G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

168 . AS / TS / RAS: 4436 Permanent Restoration to Flood Damaged Protective wall at km 0/10 & 1/2 of New Avalanchi Duck Bungalow Road including CC Drain 44,36 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

142 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 169 . AS / TS / RAS: 4759 Permanent Restoration to Flood Damaged Slab Culvert at km 4/6 of MelKundha Bikkatty Emerald Road 47,59 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 170 . AS / TS / RAS: 10056 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works and Interlocking paver block at km 107/4 of Calicut 1,00,56 ...... Vythiri Gudalur road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

171 . AS / TS / RAS: 7070 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works and Interlocking paver block at km 107/2 of Calicut 70,70 ...... Vythiri Gudalur road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

172 . AS / TS / RAS: 7482 Permanent Restoration to Flood Damaged Protective wall at km 3/6,4/4 of MelKundha Bikkatty Emerald Road including CC Drain 74,82 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

173 . AS / TS / RAS: 5599 Permanent Restoration to Flood Damaged Protective wall at km 5/6 of MelKundha Bikkatty Emerald Road including CC Drain 55,99 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

174 . AS / TS / RAS: 6689 Permanent Restoration to Flood Damaged Protective wall at km 3/8 of Thangadu Edakadu Road including CC Drain 66,89 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

175 . AS / TS / RAS: 8168 Permanent Restoration to Flood Damaged Protective wall at km 4/6,4/8 , 5/6, & 6/2 of Thangadu Edakadu Road including CC Drain 81,68 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

143 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 176 . AS / TS / RAS: 2950 Permanent Restoration to Flood Damaged Protective wall at km 2/8 & 6/6 of New Avalanchi Duck Bungalow Road 29,50 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 177 . AS / TS / RAS: 7743 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 129/4,129/6,129/8,129/10,133/4 of Calicut 77,43 ...... Vythiri Gudalur road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

178 . AS / TS / RAS: 12470 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/10,3/2,3/6 of Gudalur Sulthan Bathery 1,24,70 ...... Road(SH 98). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

179 . AS / TS / RAS: 9956 Permanent Restoration to Flood damaged Protective wall at Km 6/8, 6/10, 7/2 and 8/4 of Cannimara Road 99,56 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

180 . AS / TS / RAS: 9440 Permanent Restoration to Flood damaged Protective wall at Km 6/4, 6/8, 6/10, 7/4 and 7/6 of Dhavani Road 94,40 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

181 . AS / TS / RAS: 11571 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 106/4,106/6,107/4,108/2 of Calicut Nilambur 1,15,71 ...... Gudalur road (SH 11). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

182 . AS / TS / RAS: 14145 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 103/10,104/8,104/10,106/2 of Calicut Nilambur 1,41,45 ...... Gudalur road (SH 11). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

144 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 183 . AS / TS / RAS: 8953 Permanent Restoration to Flood damaged Protective wall at Km 4/10, 5/2 and 5/6 of Kagguchi Kookal Kookalthorai Road 89,53 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 184 . AS / TS / RAS: 8447 Permanent Restoration to Flood damaged Protective wall at Km 7/8, 7/10, 8/2 and 9/8 of Kagguchi Kookal Kookalthorai Road 84,47 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

185 . AS / TS / RAS: 9480 Permanent Restoration to Flood damaged Protective wall at Km 1/4, 3/6 and 3/10 of Buttercombai Kappachi Road 94,80 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

186 . AS / TS / RAS: 9226 Permanent Restoration to Flood damaged Protective wall at Km 0/2, 0/4 and 0/8 of Thummantty T.Manihatty Road 92,26 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

187 . AS / TS / RAS: 8231 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 82,31 ...... 101/2,101/4,101/6,101/8,101/10,102/4,102/8,102/10of Calicut Vythiri Gudalur road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 188 . AS / TS / RAS: 6399 Flood damage repairs to Protective wall / Cross Drainage works at km 125/4,125/10,126/2,126/4,127/2,127/4,127/10 of Calicut Vythiri 63,99 ...... Gudalur road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

189 . AS / TS / RAS: 9748 Permanent Restoration to Flood damaged Protective wall at Km 2/2, 2/8 and 2/10 of Thummantty T.Manihatty Road 97,48 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

145 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 190 . AS / TS / RAS: 9039 Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 122/4,122/6,122/8,123/8,124/8 of Calicut Vythiri 90,39 ...... Gudalur road (SH 12). G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 191 . AS / TS / RAS: 6949 Permanent Restoration to Flood damaged Protective wall at Km 2/6 of Windcap Road 69,49 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

192 . AS / TS / RAS: 2459 Permanent Restoration to Flood Damaged Protective wall at km 5/6 of Thaishola KoraKundha Road 24,59 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

193 . AS / TS / RAS: 4444 Permanent Restoration to Flood Damaged Protective wall at km 0/6 & 0/8 of New Avalanchi Duck Bungalow Road 44,44 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

194 . AS / TS / RAS: 13930 Permanent Restoration to Flood damaged Protective wall at Km 10/2, 10/10 and 11/4 of Iduhatty Kattabettu Road 1,39,30 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

195 . AS / TS / RAS: 6936 Permanent Restoration to Flood Damaged Protective wall at km 1/4,1/10,2/4 &2/6 of Udhagai Avalanchi Kundha Thaishola Road 69,36 ...... including CC drain G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

196 . AS / TS / RAS: 2955 Permanent Restoration to Flood Damaged CC Drain at km 7/4,7/8,8/2 ,8/6,8/10 of Udhagai Avalanchi Kundha Thaishola Road 29,55 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

146 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KI Permanent Flood Restoration of Works

16 Major Works ( DPC 5054 04 337 KI 16 00 ) Ooty (H) C&M Division 197 . AS / TS / RAS: 4960 Permanent Restoration to Flood Damaged Protective wall at km 16/10, 19/2,19/4 & 19/10 of Udhagai Avalanchi Kundha Thaishola Road 49,60 ...... including CC Drain G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019. 198 . AS / TS / RAS: 1172 Permanent Restoration to Flood Damaged Pipe Culverts at km 21/6,21/8 & 21/10 Udhagai Avalanchi Kundha Thaishola Road 11,72 ...... including CC Drain G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

199 . AS / TS / RAS: 8476 Permanent Restoration to Flood damaged Protective wall at Km 5/6, 5/8 and 5/10 of Doddabetta Iduhatty Kattabettu Road 84,76 ...... G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

200 . AS / TS / RAS: 4755 Permanent Restoration to Flood Damaged Protective wall at km 9/2 & 9/4 of Udhagai Avalanchi Kundha Thaishola Road Including 47,55 ...... Interlocking Paver Block Pavement and CC drain G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.

TOTAL - 5054 04 337 KI 112,06,94 ...... 57,14,00 54,92,94

147 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 PB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works PB Widening from Intermediate lane to Four lane and Strengthening of Puduvoyal - Pulicat road with JICA Assistance - TNIPP Phase - 16 Major Works ( DPC 5054 04 337 PB 16 09 ) Thiuvallur(H) C&M Division 1. AS / TS / RAS: 450000 Widening from Intermediate lane to Four lane and Strengthening of Puduvoyal - Pulicat road with JICA Assistance - TNIPP Phase-2. 45,00,00 13,72,97 25,78,74 ... 31,27,03 G.O.Ms.No.67, HW&MP dept, dt.05.09.2017.

TOTAL - 5054 04 337 PB 45,00,00 13,72,97 25,78,74 ... 31,27,03

148 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 337 PC [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works PC Acquisition of lands for formation of Chennai Peripheral Ring Road (CPRR) with JICA Assistance 64 Lands ( DPC 5054 04 337 PC 64 06 ) 1. AS / TS / RAS: 26033200 Extenally Aided Project PC-Acquisition of lands for Formation of Chennai Peripheral Ring Road with JICA Assistance 2,603,32,00 ... 660,00,00 10,00,00 500,00,00 G.O.Ms.No.74/HW & MP (HW.2)/ dt.09.05.2018.

TOTAL - 5054 04 337 PC 2,603,32,00 ... 660,00,00 10,00,00 500,00,00

149 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 789 JC [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 789 Special Component Plan for Scheduled Castes JC Comprehensive Road Infrastructure Development Programme (CRIDP) - Other District Roads under Special Component Plan 16 Major Works ( DPC 5054 04 789 JC 16 06 ) 1. AS / TS / RAS: 2051200/2318600/22831/24741 CRIDP 231,86,00 2,56,79 200,00,00 200,00,00 217,42,00 GO Ms No.6, H&M.P (HF.2) dept dt.13.01.2017,GO Ms No.86, HW&M.P (HF.2) dept dt.24.10.2017 , GO Ms No.125, HW&M.P (HF.2) dept dt.07.08.2018 & GO Ms No.88, HW&M.P (HF.2) dept dt.19.08.2019. TOTAL - 5054 04 789 JC 231,86,00 2,56,79 200,00,00 200,00,00 217,42,00

150 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 800 JC [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 800 Other Expenditure JC District and other roads

64 Lands ( DPC 5054 04 800 JC 64 09 ) Thiuvallur(H) C&M Division 1. AS / TS / RAS: 98 L.A Compensation for Vengal-Seethanchery-Kannigaipe road at Km.18/8 - 21/6. 98 97 1 ...... G.O. (D). No. 135, Highways and Minor Ports (H.W.2) Department dated:01.06.18. Tiruvannamalai (H) C&M Division 2. AS / TS / RAS: 90 Land Acquisition- compensaton-Thiruvannamalai Dt-Pollur Tk - Padiyamputhur village - Chinna Kallananthal to Mansurabath road. 90 90 ...... GO Ms No.134, Highways (HQ.2) dt.27.06.2016 Cuddalore (H) C&M Division 3. AS / TS / RAS: 3000 Cuddaloredivision - payment of Land Acquisition compensation for the land acquired in Thiruchopuram-Agaram-Kambalimedu. 30,00 26,10 1 3,90 ... G.O. (D). No. 168, Highways and Minor Ports (H.P.1) Department dated:28.06.2018. TOTAL - 5054 04 800 JC 31,88 27,97 2 3,90 ...

151 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 800 Other Expenditure JJ Rehabilitation of Distressed Bridges

16 Major Works ( DPC 5054 04 800 JJ 16 06 ) Kallakurichi (H) C&M Division 1. AS / TS / RAS: 23019 Rehabilitation of High Level Bridge across Thenpennaiyar River at Km.0/2 of Pennaiyar Bridge approach road (SHU-47) 2,30,19 ...... 10,00 1,20,19 G.O.Ms.No.115/HW&MP(HP.1), dt.17.10.2019.

TOTAL - 5054 04 800 JJ 2,30,19 ...... 10,00 1,20,19

152 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 800 JK [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 800 Other Expenditure JK Acquisition of Lands for Bye Passes

64 Lands ( DPC 5054 04 800 JK 64 03 ) Thiuvallur(H) C&M Division 1. AS / TS / RAS: 116100 Land acquistion for forming by-pass to Tirutani Town 11,61,00 10,61,00 ...... GO.Ms.No.210/H w& M.P department /dated.17-12-2012 2. AS / TS / RAS: 404925 Enhanced Compensation - EMRIP Work 40,49,25 40,49,25 1 ...... G.O.Ms.No.88/H&M.P (HV.2) / dt.25.05.2018.

3. AS / TS / RAS: 168003 Enhanced Compensation - EMRIP Work 16,80,03 16,80,03 ...... G.O.Ms.No.107/H&M.P (HV.2) / dt.29.06.2018.

4. AS / TS / RAS: 185222 Enhanced Compensation - EMRIP Work 18,52,22 18,52,22 ...... G.O.Ms.No.182/H&M.P (HV.2) / dt.07.11.2018.

5. AS / TS / RAS: 5040 Payment of Compensation to the Petitioners in W.P.No.22829 & 22830 of 2010 50,40 ...... 50,40 ... G.O.Ms.No.93/H&MP (HV.1) / dt.04.09.2019.

6. AS / TS / RAS: 3509 Enhanced Compensation - W.P.No.448/2017 35,09 ...... 35,09 ... G.O.(D).No.129/H&M.P (HW.1) / dt.25.07.2019.

7. AS / TS / RAS: 1680000 Acquisition of land for the work widening to six lane in Km.59/6 - 81/6 of Chennai - Tiruthani - Renigunda road. 168,00,00 ... 25,00,00 ... 10,00,00 GO Ms No.151, Highways(HW.2)dept/dt.04.10.2013.

153 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 800 JK [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 800 Other Expenditure JK Acquisition of Lands for Bye Passes

64 Lands ( DPC 5054 04 800 JK 64 03 ) Chengalpattu (H) C&M Division 8. AS / TS / RAS: 770000 Forming of ring road to Uthiramerur. 77,00,00 ... 5,00,00 1 1,00,00 GO Ms No.158, Highways(HW.2)dept/dt.10.10.2013. 9. AS / TS / RAS: 663300 Forming bypass road to Walajabad Town at Km.49/2 of SCKAT. 66,33,00 ... 1 1 10,00,00 G.O.Ms.No.49/H&M.P (HV.2) / dt.23.04.2015.

Kallakurichi (H) C&M Division 10 . AS / TS / RAS: 168 L.A. Compensation 1,68 ...... 1,68 ... G.O.(D).No.78/H&M.P (HP.1) / dt.29.05.2019. Trichy (H) C&M Division 11 . AS / TS / RAS: 144000 Acquisition of Lands for formation of bypass to Mannachanallur town starting from km 2/2 of Trichy-Thuraiyur road (SH-62) and ends at km 14,40,00 5,00,00 1 1 1 4/6 of the same road GO.Ms.No.209/H w& M.P department /dated.17-12-2012 Pudukottai (H) C&M Division 12 . AS / TS / RAS: 136000 Acquisition of land for forming circular and semi circular road to Pudukottai town. 13,60,00 3,60,00 1 1 1 GO Ms No.90, Highways(HP.1)dept/dt.11.06.2013. Thanjavur (H) C&M Division 13 . AS / TS / RAS: 144100 Acquisition of Lands for forming bye-pas road in Thanjavur town. 14,41,00 14,41,00 1 ...... GO.Ms.No.230/H & M.P/(HV.2) department /dated.25.09.08 Thiruvarur (H) C&M Division 14 . AS / TS / RAS: 100600 Acquisition of Lands for forming ring road to Mannargudi town branching and merging at km 35/2 of Kumbakonam-Mannargudi- 10,06,00 9,67,68 1 1 1 Adhiramapattinam road (SH-66) GO.Ms.No.208/H w& M.P department /dated.17-12-2012

154 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 800 JK [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 800 Other Expenditure JK Acquisition of Lands for Bye Passes

64 Lands ( DPC 5054 04 800 JK 64 03 ) Thiruvarur (H) C&M Division 15 . AS / TS / RAS: 101000/470000 Acqusition of Lands for forming bye-pass road in Tiruvarur Town. G.O.Ms.No.307/Highways (HP.2)dept/dt.06.12.2010. 47,00,00 10,00,00 55,00 1 1 RAS-GO.Ms.No.43/H w& M.P (HP.2)department /dated.14-06-2017. (H) C&M Division 16 . AS / TS / RAS: 41007 / 71179/92811/165700 Forming of Byepass Road to -Namakkal Dt. 36,57,00 36,57,00 1 1 1 GO Ms No.90, Highways(H&MP)dept/dt.20.05.09 & RAS G.O.No.8/H&M.P (HQ.2)/dt.21.01.2014 & G.O.Ms.No.80/H&m.P (HP.2)/25.05.2016 & G.O.Ms.No.25/H&MP9HP.2)/dt.27.02.2018. Krishnagiri (H) C&M Division 17 . AS / TS / RAS: 1198 L.A. Compensation 11,98 ...... 11,98 ... G.O.No.62/H&M.P (HQ.2) / dt.02.07.2019. Karur (H) C&M Division 18 . AS / TS / RAS: 770000 Forming of ring road to Karur. 77,00,00 ... 21,13,55 5,00 30,00,00 GO Ms No.164, Highways(HP.2)dept/dt.18.10.2013. Coimbatore (H) C&M Division 19 . AS / TS / RAS: 886100 Acqusition of Land and shifting of utilities for the construction of flyover along Athupalam and Ukkadam junction in Coimbatore. 88,61,00 49,72,59 1 1,44,00 30,00,00 G.O.Ms.No.103/H&M>P (HS.2) / dt.26.08.2015. Madurai (H) C&M Division 20 . AS / TS / RAS: 380000 Acqusition of Lands for Construction of flyover in Madurai City bus stand to Sethupathi High school. 38,00,00 14,18 37,50,00 5,00 15,00,00 G.O.Ms.No.48/23.04.2015. Dindigul (H) C&M Division 21 . AS / TS / RAS: 547100 Acquisition of land for formation of bypass to Dindigul Town at Km.0/0 - 19/250. 54,71,00 ...... 5,00,00 G.O.Ms.No.209/H&M.P (HS.2) / dt.12.12.2018.

155 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 04 800 JK [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 800 Other Expenditure JK Acquisition of Lands for Bye Passes

64 Lands ( DPC 5054 04 800 JK 64 03 ) Tuticorin (H) C&M Division 22 . AS / TS / RAS: 49000/RAS97500 Acqusition of Land and shifting work for construction of flyover at VVD junction in Thoothukudi Dt. 4,90,00 4,90,00 1 75,00 4,00,00 RAS.G.O Ms No.59, Highways(HP.2)dept/dt.25.04.2018. Virudhunagar (H) C&M Division 23 . AS / TS / RAS: 824500 Acquisition of land for formation of outer ring road to Town. 82,45,00 ... 43,50,00 1 20,00,00 GO Ms No.145, Highways(HS.1)dept/dt.24.01.2013. Ras-GO Ms No.143, Highways(HP.2)dept/dt.14.06.2017. TOTAL - 5054 04 800 JK 881,45,65 220,44,95 132,68,64 3,28,23 125,00,05

156 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 80 004 AA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 004 Research and Development AA Investigation/ Estimation of project work under Roads and Bridges

16 Major Works ( DPC 5054 80 004 AA 16 09 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 213398 Investigation/Estimation of project work under Roads and Bridges-LS provision ( Revolving Fund ) 21,33,98 ... 10,84,26 11,14,26 18,92,40

TOTAL - 5054 80 004 AA 21,33,98 ... 10,84,26 11,14,26 18,92,40

157 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 80 800 JX [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JX Upgradation of IT Highways in Chennai City

16 Major Works ( DPC 5054 80 800 JX 16 06 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 1081300 Upgradation of IT Highways in Chennai - Rajiv Gandhi Phase II. G.O.Ms.No.79/H&M.P (H.W.2) dept/27.03.2007. 108,13,00 ...... 10,00,00 ... G.O.Ms.No.151/H &M.P (HW.2) dept, dt.29.11.2019 64 Lands ( DPC 5054 80 800 JX 64 05 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 2946800/4651300 Upgradation of IT Highways in Chennai - Rajiv Gandhi Phase II. G.O.Ms.No.79/H&M.P (H.W.2) dept/27.03.2007. 465,13,00 465,13,00 1 ...... G.O.Ms.No.130/H&M.P (H.Q.2) dept/20.07.2012. & RAS.G.O.Ms.No.43/H&M.P (H.P.2) dept/14.06.2017. TOTAL - 5054 80 800 JX 573,26,00 465,13,00 1 10,00,00 ...

158 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 80 800 KI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure KI Chennai Outer Ring Road - Phase II

16 Major Works ( DPC 5054 80 800 KI 16 05 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 10750000 Chennai Outer Ring Road Phase-II formation of road connecting NH 205, NH-5 and -Ponneri-Panchetty road from Nemilichery to 1,075,00,00 ... 236,70,00 236,70,00 274,49,00 under Public Private Partnership - Annuity basis with Project Support Fund - Tamil Nadu Road Development Company G.O.Ms.No.10, HW&MP Department, dated:23-01-2012 64 Lands ( DPC 5054 80 800 KI 64 04 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 10750000 Chennai Outer Ring Road Phase-II formation of road connecting NH 205, NH-5 and Tiruvottiyur-Ponneri-Panchetty road from Nemilichery to 1,075,00,00 ... 25,00,00 175,00,00 52,62,00 Minjur under Public Private Partnership - Annuity basis with Project Support Fund - Tamil Nadu Road Development Company G.O.Ms.No.10, HW&MP Department, dated:23-01-2012 TOTAL - 5054 80 800 KI 2,150,00,00 ... 261,70,00 411,70,00 327,11,00

159 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 80 800 KN [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure KN Development of Northern Port Access Road Project

16 Major Works ( DPC 5054 80 800 KN 16 05 ) Thiuvallur(H) C&M Division 1. AS / TS / RAS: 24000 Management Associate fee to the TNRDC Ltd for Northening Port Access Road Project 2,40,00 ... 25,00 25,00 1 G.O.Ms.No.126, HW&MP(HF.2) Department, dated:28-12-2016. 64 Lands ( DPC 5054 80 800 KN 64 04 ) Thiuvallur(H) C&M Division 1. AS / TS / RAS: 9510000 Acquisition of private lands and transfer of Government Lands comparised in 15 villages of in Thiruvallur District. 951,00,00 ... 200,00,00 ... 200,00,00 G.O.Ms.No.33, HW&MP Department, dated:19-02-2016.

TOTAL - 5054 80 800 KN 953,40,00 ... 200,25,00 25,00 200,00,01

160 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

5054 80 800 KO [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure KO Special Project for attending Road Safety

16 Major Works ( DPC 5054 80 800 KO 16 03 ) Chennai City Roads (H) C&M Division 1. AS / TS / RAS: 2340000 Special Project for Attending to Road Safety 234,00,00 95,33,45 100,00,00 85,00,00 100,00,00

TOTAL - 5054 80 800 KO 234,00,00 95,33,45 100,00,00 85,00,00 100,00,00

161 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 03 101 JB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JB Construction of Bridges with Loan Assistance from HUDCO

64 Lands ( DPC 5054 03 101 JB 64 04 ) Salem Division (Projects) 1. AS / TS / RAS: 9708 Land acquired to an extent of 19293 sq.ft from Bhavani Municipality to form approach road to the Bridges on 97,08 97,08 1 1 1 Cauvery river between Bhavani and Kumarapalayam by the Highways Department compensation LA G.O.(Ms) No. 90 Highways and Minor Ports (HS1)dated 04.08.2015 TOTAL - 5054 03 101 JB 97,08 97,08 1 1 1

162 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 03 101 JD [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JD Construction of Road over Bridges in Area for Traffic Management 16 Major Works ( DPC 5054 03 101 JD 16 01 ) Chennai Division-I(Projects) 1. AS / TS / RAS: 806800 Construction of ROB at GNT road in . CE PROJECTS R.A.S. G.O.Ms.No. 222, Highways and Minor Ports Department datted: 80,68,00 77,62,98 1 60,60 1,55,14 22.9.2008. G.O.Ms.No.229, Highways (HN 1) Department dated: 14.11.2005. C.E. Metro 2. AS / TS / RAS: 495500 Construction of Grade Separator at Moolakkadai Junction at Km 8/6 of GNT road. CE METRO 49,55,00 47,11,37 1 1 ... G.O.Ms.No. 248, Hihways (HN1) Department dt. 30.7.2010 3. AS / TS / RAS: 90000/130096/151210 Construction of Three Lane Bridge adjacent to the Thiru-Vi-Ka bridge at Chennai. CE METRO 15,12,10 13,86,12 1 1 ... G.O.Ms.No. 248, HiGhways (HN1) Department dt. 30.7.2010

4. AS / TS / RAS: 540000/540000/580500 Providing a Grade Separator at Kodambakkam- Sriperumpudur road intersecting with Mount Poonamallee road at . CE METRO 58,05,00 48,70,48 10,00 50,00 1 G.O.Ms.No. 127, Highways and Minor Ports Department dated: 7.7.2009. RAS G.O.MS.No.75/HW&MP Dept./Dt.23.09.17

5. AS / TS / RAS: 807065 Construction of Grade Separator in the intersection of NSK Road () and Inner Ring Roat at . CE METRO 80,70,65 73,62,85 10,00 1,12,65 ... G.O.Ms.No. 103, Highways and Minor Ports Department dated: 12.6.2012 / G.O.MS.NO.26/HW&MP (HP2)Dept./Dt.11.04.17

6. AS / TS / RAS: 526600 Providing a high level bridge across creek to connecting Ennore Express way road with Thermal power plant. CE 52,66,00 51,48,63 1 1 1 METRO G.O.(D) No. 235, Highways and Minor Ports Department dt. 9.12.2010

7. AS / TS / RAS: 602300 Construction of Grade Separator at the Intersection of Anna Nagar second avenue and road with IRR at Thirumangalam. CE 60,23,00 58,01,97 1 1 ... METRO G.O.(D) No. 235, Highways and Minor Ports Department dt. 9.12.2010

163 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 03 101 JD [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JD Construction of Road over Bridges in Chennai Metro Area for Traffic Management 16 Major Works ( DPC 5054 03 101 JD 16 01 ) C.E. Metro 8. AS / TS / RAS: 166100 River Bridge across Coovum river at road connecting GNT road at Km 11/2 and Mugappair. CE METRO 16,61,00 16,45,96 1 1 ... G.O.(D) No. 127, Highways and Minor Ports Department dt. 7.7.2009

TOTAL - 5054 03 101 JD 413,60,75 386,90,36 20,06 2,23,30 1,55,16

164 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 03 101 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JG Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 03 101 JG 16 05 ) Vellore Division(Projects) 1. AS / TS / RAS: 219600/229600 Construction of ROB in lieu of existing L.C.No.123 at Railway km.147/100-200 in between Vellore contonment and Kaniyampadi 22,96,00 12,20,22 1,00,00 10,00 20,00 Railway stations at km.4/0 of Vellore.. G.O. Ms. No. 54, Highways (HQ-2) Department, dt. 04.03.2016 2. AS / TS / RAS: 160400 Construction of ROB at KM 7/6 of Keelvithi-Ameerpet road in lieu of existing LC No 37 at Railway Km 80/6-8 near Anvarthiganpet Railway 16,04,00 ... 8,50,00 20,00 5,00,00 Station G.O.(MS)No.125/ Highways and Minor Ports (HQ2) Department Dated:28.12.2016 Cuddalore Division(Projects) 3. AS / TS / RAS: 19650 Improvements to Jawans Bhavan road 0/0 to Km 1/8 as a diversion road for the construction of ROB at LC 157 in Kammiyampettai 1,96,50 ... 1,96,48 10,00 1,86,50 G.O. Ms. No. 128, Highways (HQ-2) Department, dt. 23.08.2018 Thanjavur Division (Projects) 4. AS / TS / RAS: 276000 Construction of ROB in lieu of existing L.C.No.34 at km.2/4 of Tiruvarur- Mannargudi-Muthupettai road (SH 202). 27,60,00 ... 12,00,00 1 4,05,00 G.O. Ms. No. 56, Highways (HP-2) Department, dt. 04.03.2016 (Projects) 5. AS / TS / RAS: 484824 Construction of ROB km 1/8 of Pollachi– Palakkad Road in lieu of existing LC.No. 122 at Railway Km 123/1-2 in between Pollachi and 48,48,24 ... 12,00,00 10,68,82 29,31,18 Kinathukadavu G.O. Ms. No. 168 /H&MP (HQ2) dept dt. 12.10.2018 6. AS / TS / RAS: 261070 Construction of ROB and LUS at km 1/6 of Thudiyalur – Kovilpalayam road and Railway Km 8/000-100 in lieu of existing LC.No.5 in between 26,10,70 ... 8,61,72 5,10,00 20,86,82 Coimbatore North and Karamadai Railway stations(16 major works) G.O. Ms. No. 180 /H&M (HQ2) dept dt. 30.1.2018

Salem Division (Projects) 7. AS / TS / RAS: 134237 Construction of ROB at Km.12/8 of Suramangalam-Omalur road (via) Muthunaicken patty (MDR 696) in lieu of existing LC 7 at Railway 13,42,37 ... 10,00,00 5,44,00 10,50,47 Km.6/4-5 in between Magnesite and Omalur Railway Stations.(16 Major Works) G.O. (Ms)No.169/ Highways & Minor Ports(HP1) Dept., Dt. 16.10.2018

165 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 03 101 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JG Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 03 101 JG 16 05 ) Salem Division (Projects) 8. AS / TS / RAS: 201500 Construction of Limited Use Subway at km 14/2 of Kumarapalayam- Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road (SH-198) 20,15,00 8,73,78 2,85,00 8,12,04 1 near SPB Mills at Pallipalayam near Cauvery Railway station. G.O.Ms.No.23/Highways & Minor Ports (HQ2) department Dated.03.04.2017 9. AS / TS / RAS: 184435 Construction of ROB at Km.7/2 of Tholasampatty road in lieu of existing LC 15 at Railway Km.15/13-14 in between Tholasampatty and 18,44,35 ... 8,61,72 5,53,00 12,91,35 Mecheri Railway Stations.(16 Major Works) G.O. (Ms)No.164/ Highways & Minor Ports(HQ2) Dept., Dt. 28.09.2018

10 . AS / TS / RAS: 120750/132500 Construction of ROB at km.144/2 in lieu of existing L.C.No.38 at Railway km.60/100-200 in between Shivadi and Dharmapuri Railway 13,25,00 82,48 26,54 3,14,93 1,01,46 stations. G.O. Ms. No. 51, Highways (HQ-2) Department, dt. 04.03.2016

11 . AS / TS / RAS: 193355 Construction of ROB at Km.40/8 of Sankari-Mecheri raod(via) road(SH223) at Railway Km.23/17-18 in lieu of exisitng LC 19,33,55 ... 8,61,72 3,38,93 15,94,62 No.18 at Railway Km.24/10-11 at Mecheri Road yard. (16 Major Works) G.O. (Ms)No.178/ Highways & Minor Ports(HQ2) Dept., Dt. 29.10.2018

Madurai Divison (Projects) 12 . AS / TS / RAS: 181800/197600 Construction of ROB at km.0/8 of Sholavandhan-Valayapatti road (via Andipatty) in lieu of existing L.C.No.346 at Railway km.473/600-700 in 19,76,00 11,37,35 6,35,50 5,76,59 1,50,93 between Madurai and Dindigul Railway stations. G.O. Ms. No. 50, Highways (HQ-2) Department, dt. 04.03.2016 Tirunelveli Division (Projects) 13 . AS / TS / RAS: 232483/262850 Construction of Road Over Bridge at Km 0/8 of Rajapalayam- Vembakottai Road (SHU-186) in lieu of existing Level Crossing No 449 26,28,50 ... 7,03,99 2,97,01 19,50,00 at railway Km 591/900-592/0 near Rajapalayam railway Station - 16 Major Works G.O. Ms. No. 117 Highways and Minor Ports(HQ2) Department Dated 12.07.2018 (FS) 64 Lands ( DPC 5054 03 101 JG 64 04 )

166 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 03 101 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JG Construction of over and under bridges in lieu of Existing level crossings 64 Lands ( DPC 5054 03 101 JG 64 04 ) Vellore Division(Projects) 1. AS / TS / RAS: 17800 Construction of ROB at Km 3/0 ofGoodanagaram-Anakanallur Road in lieu of existing LC No 67 at Railway km 160/2-4 in between Melalathur 1,78,00 ... 1,53,67 74,00 1,00,00 and Valathur Railway Stations (Land Acquisition) (64 Lands) G.O. Ms. No. 4 Highways and Minor Ports(HQ2) Department Dated 02.01.2019 2. AS / TS / RAS: 17400 Construction of ROB at Km 0/2 of Lakshmi Ammalpuram to Navithampatti Road in lieu of existing LC No 72 at Railway km 168/12- 1,74,00 ... 1,74,00 48,00 1,00,00 14 in between Melpatti and Valathur Railway Stations (Land Acquisition) (64 Lands) G.O. Ms. No. 3 Highways and Minor Ports(HQ2) Department Dated 02.01.2019 Coimbatore Division (Projects) 3. AS / TS / RAS: 151700 Land Acquisition for Construction of ROB at km 1/8 of Pollachi- Pallakkad road in lieu of existing level crossing No.122 at Railway Km. 15,17,00 ... 8,50,01 1,00,00 1 123/1-2 in between Pollachi and Kinathukadavu Railway Stations (64 Lands) G.O. Ms. No. 134 H&MP (HS2) Dept. dt. 31.08.2018 4. AS / TS / RAS: 82000 Land Acquisition for Construction of ROB at km 0/10 of Thudiyalur - Saravanampatti road in lieu of existing LC.No.4 at Railway Km 6/800- 8,20,00 ... 6,20,00 3,00,00 5,20,00 900 in between Coimbatore North and Karamadai Railway stations (64 Lands) GO.(MS) No. 111/H & M (HS2) Dept dt. 05.07.2018 (FS) 5. AS / TS / RAS: 147500 Construction of ROB at Km 0/2 of Sedapalayam–Vaikkalpalayam TP road branching at km 2/6 of the road from road to 14,75,00 ... 1 1 1 Vadukankalipalayam at Railway Km 457/9-11 in lieu of existing LC.No. 137 in between Vanjipalayam and somanur Railway Station (64 Lands) GO.(MS) No. 111/H & M (HS2) Dept dt. 05.07.2018 (FS) 6. AS / TS / RAS: 205200 Land Acquisition for Construction of ROB at km 1/6 of Thudiyalur – Kovilpalayam road in lieu of existing LC.No.5 at Railway km 8/000-100 20,52,00 ... 1 2,00,00 2,36,81 in between Coimbatore North and Karamadai Railway Stations (64 Lands GO.(MS) No. 111/H & M (HS2) Dept dt. 05.07.2018 (FS)

167 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 03 101 JG [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 101 Bridges JG Construction of over and under bridges in lieu of Existing level crossings 64 Lands ( DPC 5054 03 101 JG 64 04 ) Coimbatore Division (Projects) 7. AS / TS / RAS: 165883 Land Acquisition for Construction of ROB @ Railway km 26/500-600 in liue of existing LC No.11 and construction of LUS at railway km 26/100- 16,58,83 ... 15,17,00 1 1 200 in between karamadai and Mettupalayam stations. (64 Lands) G.O. Ms. No. 110 H&MP (HS2) Dept. dt. 05.07.2018. 8. AS / TS / RAS: 50000 LA for Construction of ROB at km 3/2 of the road branching at km 133/8 of Salem - Cochin road to Karavazhi Madhappur (Via) Kaniyur in 5,00,00 ... 1 2,00,00 2,96,79 lieu of existing LC.No.141 at Railway Km 463/23-25 in between Somanur and Railway stations (64 Lands) GO.(MS) No. 111/H & M (HS2) Dept dt. 05.07.2018 (FS) Salem Division (Projects) 9. AS / TS / RAS: 25210 Construction of ROB at Km.12/8 of Suramangalam-Omalur road (via) Muthunaicken patty (MDR 696) in lieu of existing LC 7 at Railway 2,52,10 ... 2,52,11 2,52,10 1 Km.6/4-5 in between Magnesite and Omalur Railway Stations. (64 LANDS) G.O. (Ms)No.169/ Highways & Minor Ports(HP1) Dept., Dt. 16.10.2018 Tirunelveli Division (Projects) 10 . AS / TS / RAS: 186500/197150 Construction of Road Over Bridge at Km 0/8 of Rajapalayam- Vembakottai Road (SHU-186) in lieu of existing Level Crossing No 449 19,71,50 ... 4,51,32 6,30,65 13,19,18 at railway Km 591/900-592/0 near Rajapalayam railway Station - 64 Lands G.O. Ms. No. 117 Highways and Minor Ports(HQ2) Department Dated 12.07.2018 (FS) 11 . AS / TS / RAS: 0 Construction of Road Over Bridge at Km 1/8 of Marthandam - Karungal Road(MDR-250) in lieu of existing Level Crossing No 15B at Railw;ay 8,42,56 ...... 1 8,42,56 km 259/500-600 in between Kuzhitural and Eraniel Railway Stati;ons at Viricode.(64 lands) G.O. Ms. No. 80 Highways and Minor Ports(HQ2) Department Dated 06.08.2019 TOTAL - 5054 03 101 JG 388,21,20 33,13,83 128,00,81 68,60,11 156,83,72

168 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 03 337 JO [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 03 State Highways 337 Road Works JO Comprehensive Road Infrastructure Development Programme (CRIDP) - Formation of Bye-Passes 16 Major Works ( DPC 5054 03 337 JO 16 00 ) Coimbatore Division (Projects) 1. AS / TS / RAS: 401776 Formation of Western Bypass to Pollachi Town starting from Zameen Uthukuli @ Km 81/0 of SH-19 to Achipatti @ Km 26/6 of NH-83(Via) 40,17,76 ... 30,20,00 1 15,00,00 Nallur, Thallakarai and R.Ponnapuram(16 Major Works) G.O. Ms. No. 183 Highways and Minor Ports(HS2) Department Dated 08.11.2018 2. AS / TS / RAS: 628851 Windening to Double lane from Km.19/10 of coimbatore/ Nagapattinam Road (NH 83) to Km 31/2 of Paladam - Coachin frontier road (SH - ...... 1 1 163)(Via) Mullupadi, Myleripalayam and Chettipalayam(Alternate route from Pollachi to Coimbatore) (16 Major) G.O. Ms. No.96Highways and Minor Ports(HS2) Department Dated 09.09.2019 64 Lands ( DPC 5054 03 337 JO 64 09 ) Coimbatore Division (Projects) 1. AS / TS / RAS: 56617 Formation of Western Bypass to Pollachi Town starting from Zameen Uthukuli @ Km 81/0 of SH-19 to Achipatti @ Km 26/6 of NH-83(Via) 5,66,17 ... 5,66,17 5,66,17 50,01 Nallur, Thallakarai and R.Ponnapuram(64 Lands) G.O. Ms. No. 183 Highways and Minor Ports(HS2) Department Dated 08.11.2018 2. AS / TS / RAS: 862823 Construction of Bypass-Forming by-Pass road to Thiruvallur town Km 0/0-6/546.(Land Acquistion Works) (64 Lands) ...... 50,00 1,00,00 G.O. Ms. No. 100 Highways and Minor Ports(HW1) Department Dated 01.10.2019

TOTAL - 5054 03 337 JO 45,83,93 ... 35,86,17 6,16,19 16,50,02

169 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JE Construction / Reconstruction of Bridges

16 Major Works ( DPC 5054 04 101 JE 16 08 ) Cuddalore Division(Projects) 1. AS / TS / RAS: 225700/225700 Reconstruction of High level Bridge across Vellar river at KM 104/2 of abandoned NH 45A near Bhuvangiri in 22,57,00 15,63,41 1,00,00 23,24 1,00 G.O.(Ms.) No. 137 Highways and Minor Ports (HP 1) Department dated: 26.11.2015. 2. AS / TS / RAS: 100600/110000 Construction of High Level Bridge across Uppanar river connnecting KM 6/8 of Chidambaram T.S. Pettai Road and Km 161/8 of PWD 11,00,00 5,64,09 10,00 31,50 61,00 Coleroon river left bund road (Kodiyampalayam road) in Cuddalore District G.O.(Ms.) No. 79 Highways and Minor Ports (HP 1) Department dated: 20.07.2015. Thanjavur Division (Projects) 3. AS / TS / RAS: 10761 Reconstruction of HLB across Veeracholan River at Km 6/4 of Kuthalam - Komal road 1,07,61 1,07,61 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003 4. AS / TS / RAS: 20530 106 Bridges Consultancy Services for Package No. V & VI Arbitration fees Arbitration Award for M/S. STUP Consultancy Services. 2,05,30 2,05,30 1 1 ... G.O.Ms.No. 75, Highways and Minor (HP2) Department dt. 23.4.2012

5. AS / TS / RAS: 598697/650000 construction of High Level Bridge across the river coleroon at Kallanai connecting Thiruvanaikoil road and Grant Anaicut road. (16 Major 65,00,00 42,40,73 4,59,28 6,85,19 1,26,55 Work) G.O.Ms.No. 55, Highways (H.P.2) department dt. 04.03.2016.

6. AS / TS / RAS: 42919 Reconstruction of High Level Bridge across at Km 20/6 of -Thiruthuraipoondi Road. (Poonthottam) RAS 4,29,19 4,29,00 1 1 ... G.O.Ms.No. 240, Hihways and Minor Ports Department dated 22.12.2009 G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003 7. AS / TS / RAS: 29249 Construction of a bridge at Km 7/4 of Vaitheeswarankovil - Thirupananthal road 2,92,49 2,92,49 1 1 ... G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

170 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JE Construction / Reconstruction of Bridges

16 Major Works ( DPC 5054 04 101 JE 16 08 ) Thanjavur Division (Projects) 8. AS / TS / RAS: 196 Consturction of High Level Bridge aross Mulliyar River including forming approaches in Thiruthuraipoondi Byepass Road. 1,96 1,96 1 1 ... G.O.Ms.No. 79, Highways and Minor Ports (HP2) Department dated: 24.4.2012. 9. AS / TS / RAS: 23296 Reconstruction of High level Bridge across Mudikondan River at Km 26/10 of Mayiladuthurai-Thiruthuraipoondi Road. (Sa nnanallur) 2,32,96 1,91,62 1 1 ... G.O.Ms.No. 120, Highways (HS2) Department dt. 30.6.2009

10 . AS / TS / RAS: 34935 Reconstruction of a bridge at Km 3/2 of Kumbakonam - Mannargudi road 3,49,35 3,45,34 1 1 ... G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

11 . AS / TS / RAS: 48796 Construction of bridge at Km59/8 of Perambalur - Manamadurai road 4,87,96 4,87,96 1 1 ... G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

12 . AS / TS / RAS: 21565 Reconstruction of HLB across Mudikondan River at Km 12/10 of Nagore - - Nachiyarkovil road 2,15,65 2,15,64 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

13 . AS / TS / RAS: 19044 Arbitration 106 Bridges scheme Package VIII Construction of 4 bridges in Payment of Award Amount with interest to 1,90,44 1,90,56 ...... Thiru S.P.Lakshmanan, Contractor G.O.(D) No. 50, Highways and Minor Ports (HQ 2) Department dated: 28.04.2014 14 . AS / TS / RAS: 13200 Reconstruction of HLB at Km 34/8 of Mannargudi - Orathanad - Thiruvanom Road 1,32,00 82,00 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

171 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JE Construction / Reconstruction of Bridges

16 Major Works ( DPC 5054 04 101 JE 16 08 ) Thanjavur Division (Projects) 15 . AS / TS / RAS: 44089 Construction of High Level Bridge across Kudamuruti River connecting Manathidal and Valapakudi Village Road (Balance Work) 4,40,89 4,29,49 1 1 1 G.O.Ms.No. 120, Highways (HS2) Department dt. 30.6.2009 16 . AS / TS / RAS: 4506 Reconstruction of a bridge Palayaru at Km 11/2 of Mannargudi - Orathanadu road (Palayaru) 45,06 45,06 1 1 ... G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

17 . AS / TS / RAS: 72342 Construction of bridge at Km 58/4 of Perambalur - Manamadurai road 7,23,42 7,11,76 1 1 ... G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

Trichy Division(Projects) 18 . AS / TS / RAS: 8700 Construction of a bridge at KM 11/8 of Arimalamthirumayam road. 87,00 46,40 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003 19 . AS / TS / RAS: 9000 Reconstruction of a bridge at KM 1/2 of Kulamangalam Rarapuram road. 90,00 55,07 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

20 . AS / TS / RAS: 6000 Reconstruction of a bridge at KM 88/8 of Perambalur Manamadurai road. CR 1/04-2005 60,00 31,97 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

21 . AS / TS / RAS: 8800 Construction of a bridge at KM 16/2 of Thanjavur Nanjikkottai road. 88,00 87,53 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

172 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JE Construction / Reconstruction of Bridges

16 Major Works ( DPC 5054 04 101 JE 16 08 ) Trichy Division(Projects) 22 . AS / TS / RAS: 6000 Reconstruction of a bridges at KM 34/6 of Namanasaudran Ponnamaravathy road. 60,00 37,34 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003 23 . AS / TS / RAS: 5300 Construction of a bridge at KM 21/8 of Thanjavur Nanjikkottai road. 53,00 41,96 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

24 . AS / TS / RAS: 113700 Construction of Foot Over Bridge with Escalator near Bus Stand Karur 11,37,00 8,30 1 1 ... G.O. Ms.No. 82, Highways and Minor Ports (HP 2) Department dated: 22.07.2015

25 . AS / TS / RAS: 188170/168400 Construction of High level across pampar river with approaches near Chithrambur in Pudukottai district. 16,84,00 7,64,89 3,51,31 4,24,21 1,88,53 G.O.Ms.No.138, Highways (HQ.1) department dt. 26.11.2015.

26 . AS / TS / RAS: 7000 Reconstruction of a bridge at KM 22/2 of Thanjavur Nanjikkottai road. 70,00 54,57 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

27 . AS / TS / RAS: 6613 Reconstruction of a Bridge at KM 20/10 of Perumanadu Konnaiyur road. 66,13 64,03 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

28 . AS / TS / RAS: 7000 Reconstruction of a bridge at KM 31/6 of Karaiyur Oliyamangalam road. 70,00 35,15 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

173 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JE Construction / Reconstruction of Bridges

16 Major Works ( DPC 5054 04 101 JE 16 08 ) Trichy Division(Projects) 29 . AS / TS / RAS: 3000 Reconstruction of a bridge at KM 120/2 of Perambalur Manamadurai road. 30,00 21,30 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003 30 . AS / TS / RAS: 14000 Reconstruction of a High level Brige at KM 10/4 of Musiri Thuraiyur- Authoor road in lieu of flood damaged Arch bridge. 1,40,00 88,18 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

31 . AS / TS / RAS: 4000 Reconstruction of a bridge at KM 9/10 of Emball road. 40,00 35,84 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Coimbatore Division (Projects) 32 . AS / TS / RAS: 80900/88900 Construction of Foot Over bridge with Escalator Near Railway stations at Coimbatore city 8,89,00 28,55 2,00,00 20,00 2,80,00 G.O.(Ms) No. 91, Highways and Minor Ports Department dated: 04.08.2015. 33 . AS / TS / RAS: 107200 Construction of Foot Over Bridge with Escalator near Nanjundapuram Junction at Coimbatore City 10,72,00 2,67 1 1 ... G.O.(Ms) No. 81, Highways and Minor Ports Department dated: 22.07.2015.

Salem Division (Projects) 34 . AS / TS / RAS: 43862 Construction of Grade Separator at Km 1/8 of Erode Perundurai Kankeyam road (near Government Hospital)(16 Major)(Preliminary 4,38,62 65,76 1 40,00 3,10,07 Sanctioned) G.O. Ms.No. 5, Highways and Minor Ports (HS 1) Department dated: 20.1.2014 35 . AS / TS / RAS: 72500/76000 Construction of High Level Bridge at Km 4/8 of Pappireddipatti Mallapuram road (M328) across Vaniyar River in 7,60,00 4,57,21 10 1 ... G.O.(Ms) No. 89, Highways and Minor Ports (HQ 2) Department dt. 3.8.2015.

174 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JE Construction / Reconstruction of Bridges

16 Major Works ( DPC 5054 04 101 JE 16 08 ) Salem Division (Projects) 36 . AS / TS / RAS: 693000/762000 Formation of Outer Ring Road for Erode Town (Phase III) KM 7/6-14/8 including Construction of Road Over Bridge at KM 11/2-11/6 in Jeeva 76,20,00 64,72,97 1,87,85 1,87,85 8,78,02 Nagar G.O.(Ms) No. 172, Highways and Minor Ports Deparment dated: 23.10.2013 Madurai Divison (Projects) 37 . AS / TS / RAS: 18164 Construction of bridge at 5/6 of Sivakasi -Kalugumalai road. 1,81,64 1,80,89 1 ...... GO.Ms.No.242 Highways (HQ1) Department dt.25.11.2005. 38 . AS / TS / RAS: 8829 Construction /Reconstruction of 6 bridges under Packages 11 in Madurai, Theni and Dindigul districts (Arbitration Case) 88,29 88,29 1 1 ... G.O.Ms.No. 116, Highways and Minor Ports (HS1) Deparrtment dated: 19.7.2013

39 . AS / TS / RAS: 7500 Construction of bridge at – Palakanuthu Oddanchatram – Dharapuram – Kangeyam road. 75,00 70,75 1 ...... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

40 . AS / TS / RAS: 16500 Construction of a bridge at Km.0/0 -4 of Karkudi road to meet Ramnad – Nainarkoil Andakudi- Ilayankudi Sivagangai – Melur road. 1,65,00 1,34,67 1 ...... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

41 . AS / TS / RAS: 510900/560000 Construction of Grade Separator at Km 3/2 of Madurai thondi road at Km 2/4 of Madurai Ring Road Junction 56,00,00 ... 20,00,00 20,00,00 31,36,45 GO.Ms.No.118 Highways (HS1) Department dt.17.07.2018.

42 . AS / TS / RAS: 11998 Construction of bridge at 3/8 of Sivakasi -Kalugumalai road. 1,19,98 1,19,98 1 ...... G.O.Ms.No. 240, Highways and Minor Ports (HQ.2) department dt. 22.12.2009

175 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JE Construction / Reconstruction of Bridges

16 Major Works ( DPC 5054 04 101 JE 16 08 ) Tirunelveli Division (Projects) 43 . AS / TS / RAS: 33577 Arbitration in the work of Construction/Reconstruction of bridges in Sivagangai Virudhunagar and Ramnad ... 2,96,75 ... 3,35,77 ... G.O (M.S) No.89 HMP(HQ1) Dept, Dt:19.08.2019 44 . AS / TS / RAS: 29093 Construction of a High level bridge at Km 10/2 of Palayamkottai road. 2,90,93 2,90,92 1 1 ... G.O.Ms.No. 240, Highways and Minor Ports (HQ.2) department dt. 22.12.2009

45 . AS / TS / RAS: 185740 Construction of High Level Bridge across the River Kosathalaiyar at km. 11/7 of Tiruttani – Nagalapuram road (MDR 719) in lieu of existing ...... 7,42,96 causeway.

46 . AS / TS / RAS: 4500 Reconstruction of a High level bridge at Km10/4Amba samudram- Alankulam road 45,00 38,52 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

47 . AS / TS / RAS: 38900 Reconstruction of bridge at Km 32/6 of Palayamkottai - Ambasamudram road 3,89,00 2,96,75 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

48 . AS / TS / RAS: 7200 Reconstruction of a High level bridge at Km 62/4 of Rajapalayam - Sankarankoil - Tirunelveli road. 72,00 68,12 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

49 . AS / TS / RAS: 2200 Reconstruction of a High level bridge at Km 41/8 of Cheramadevi - Panagudi road 22,00 19,46 1 1 ... G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

176 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JE Construction / Reconstruction of Bridges

16 Major Works ( DPC 5054 04 101 JE 16 08 ) Tirunelveli Division (Projects) 50 . AS / TS / RAS: 121557 Reconstruction of High Level Bridge at Km 0/4 of Ayyampettai - Ganapathyagraharam road (O-658) across River Kudamuruti (branch ...... 4,86,23 of River Cauvery)

51 . AS / TS / RAS: 177500 Construction of Flyover at Km 3/8 of Tirunelveli Byepass road at Vannarpettai in Palayamkottai 17,75,00 16,25,14 1 1 ... G.O.Ms.No. 293, Highways (HS.2) Department dated: 4.12.2007

52 . AS / TS / RAS: 0 Construction of High LevelBridge at km 6/10 - 7/2 of Villupuram - kavanipakkam road across Malatar River.(16 major works) ...... 4,38,65 11,06,54 G.O.Ms.No.117, Highways (HP1) department dt. 25.10.2019

64 Lands ( DPC 5054 04 101 JE 64 07 ) Cuddalore Division(Projects) 1. AS / TS / RAS: 998 Land Compensation-106 Bridges Construction of Bridge across Thamiraparani River at Ganapathiyan Kadavu (CHARGED) 9,98 ...... G.O. Ms No 97/ Highways and Minor Ports (HS2) Department Dated 12.08.2016 2. AS / TS / RAS: 0 Construction of High LevelBridge at km 6/10 - 7/2 of Villupuram - kavanipakkam road across Malatar River.(64 lands) ...... 44,39 93 G.O.Ms.No.117, Highways (HP1) department dt. 25.10.2019

Thanjavur Division (Projects) 3. AS / TS / RAS: 20000 Land Acquisition for construction of High Level Bridge across the river coleroon at Kallani connecting Thiruvanaikoil road and Grant Anaicut 2,00,00 26,00 1 1,57,64 1 road. G.O.Ms.No. 55, Highways (H.P.2) department dt. 04.03.2016. Trichy Division(Projects) 4. AS / TS / RAS: 234500 Land Acquisition for forming and improving the road connecting NH7 (Sukkaliyur ) and NH 67 (Thaneerpandal) in Karur including 23,45,00 ... 1 1 ... Construction of HLB across Amaravathi river G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017 177 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JE Construction / Reconstruction of Bridges

64 Lands ( DPC 5054 04 101 JE 64 07 ) Trichy Division(Projects) 5. AS / TS / RAS: 23700 Land Acquisition for Construction of High Level bridge across the river cauvery in between unniyur in Tiruchirappali District and Nerur in Karur 2,37,00 ... 1 2,28,44 1 District G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017 6. AS / TS / RAS: 2300 Land Acquisition for Construction of High Level Bridge across Tributary of the river Maruthayar at Km 4/8 of NH 45 to Kalapdi road (64 Lands 23,00 ... 23,00 23,00 1 G.O. Ms. No. 97 Highways and Minor Ports(HQ2) Department Dated 08.06.2018

Salem Division (Projects) 7. AS / TS / RAS: 185400 Construction of Grade Separator at Km 1/8 of Erode Perundurai Kankeyam road (near Government Hospital)(64 Lands)(Preliminary 18,54,00 6,00,00 ... 1 ... Sanctioned) G.O. Ms.No. 5, Highways and Minor Ports (HS 1) Department dated: 20.1.2014 Tirunelveli Division (Projects) 8. AS / TS / RAS: 354000 Land Acquisition for forming and Improving Western bye pass Road to Aruppukottai Town From NH 45B-NH 45 B Including Construction of 35,40,00 ... 5,00,01 2,00,00 13,00,00 ROB G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017 TOTAL - 5054 04 101 JE 451,98,85 223,59,95 38,31,97 48,40,25 86,18,32

178 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 101 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JJ

16 Major Works ( DPC 5054 04 101 JJ 16 08 ) Coimbatore Division (Projects) 1. AS / TS / RAS: 16213000 CONSTRUCTION OF ELEVATED HIGHWAY ALONG AVINASHI ROAD IN COIMBATORE CITY FROM UPPILIPALAYAM TO ...... 200,00,00 CHINNIYAMPALAYAM-KALAPATTI AIRPORT. New work yet tobe issued TOTAL - 5054 04 101 JJ ...... 200,00,00

179 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 337 JQ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JQ Construction/ Reconstruction of bridges and improvement of roads with loan assistance from NABARD 16 Major Works ( DPC 5054 04 337 JQ 16 05 ) Cuddalore Division(Projects) 1. AS / TS / RAS: 577600 Construction of High level bridge across Coleroon river in between Muttam village of Cuddalore District and Manalmedu village 57,76,00 56,17,37 1 ...... Nagapattinam District R.A.S G.O. Ms.No.240/ Highways and Minor Ports (HQ2) Department Dated.22.12.2009 G.O. Ms.No.240/ Highways and Minor Ports (HQ2) Department Dated 22.12.2009 Thanjavur Division (Projects) 2. AS / TS / RAS: 20727 Reconstruction of bridge across Vettar River at Km 10/4 of Saliyamangalam - Raod (Papanasam Taluk) 2,07,27 2,12,53 ...... G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003 3. AS / TS / RAS: 406000 Construction of High Level Bridge across Coleroon River connecting Neelathanallur () and Madhanathur (Perambalur 40,60,00 40,48,18 ...... District). G.O. No.126, Highways and Minor Ports (HP 2) Department Dated.10.07.2012 4. AS / TS / RAS: 27134 Reconstruction of of Bridge across Koraiyar river at Km 9/2 of Mannargudi - Thiruvarur road. 2,71,34 2,42,61 ...... G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003

5. AS / TS / RAS: 12550 Reconstruction of Bridge across Palayar at Km 5/8 of Kuthalam - Pandanallur Road 1,25,50 1,62,81 ...... G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003

6. AS / TS / RAS: 2547 Construction of Bridge across Vikraman river at KM 6/10 of Maapadugai-Kadalangudi 25,47 ...... G.O.(D) No. 147, Highways and Minor Ports (HP1) Department dt. 2.8.2012

7. AS / TS / RAS: 14988 Reconstruction of of Bridge across Vellaiyar river at Km 14/8 of Mannargudi - Thiruvarur road. RAS G.O. Ms.No. 240, Highways and 1,49,88 97,87 1 1 1 Minor Ports Department dated: 22.12.2009. G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003

180 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 04 337 JQ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JQ Construction/ Reconstruction of bridges and improvement of roads with loan assistance from NABARD 16 Major Works ( DPC 5054 04 337 JQ 16 05 ) Thanjavur Division (Projects) 8. AS / TS / RAS: 30830/34188 Reconstruction of Bridge across Vettar River at Km 29/4-6 of Kumbakonam - Kudavasal - Koradachery - Mavoor road RAS G.O. 3,41,88 2,96,49 1 1 1 Ms.No. 120, Highways and Minor Ports Department dated: 30.6.2009. G.O.MS. No.82, Highways and Minor Ports (HP 2) Department Dated.25.05.2016. 9. AS / TS / RAS: 16154 Reconstruction of of Bridge across Sullan river at Km 1/2 of Govindakkudi-Mellattur ( Thittai - Dharasuram road) 1,61,54 98,16 ...... G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003

Trichy Division(Projects) 10 . AS / TS / RAS: 20300 Construction of a High level bridge at KM 7/8 of Sannasinallur Thamaraipoondi road across Odai. 2,03,00 2,54,20 1 ...... G.O.Ms.No. 1, Highways (HW1) Department dated: 3.1.2005 11 . AS / TS / RAS: 56000 Improvement to the badly damaged stretches from Sannasinallur - Thamaraipoondi road Km 4/0-10/0 including construction of minor 5,60,00 5,57,10 1 ...... bridge across Uppu odai at Km 5/4 of Sannasinallur - Thamaraipoondi road. G.O.Ms.No. 1, Highways (HW1) Department dated: 3.1.2005 Salem Division (Projects) 12 . AS / TS / RAS: 435000 Construction of High Level Bridge across Cauvery river Connecting Mohanur (Namakkal Dist.) and Vangal (Karur Dist) 43,50,00 42,74,27 ... 4,00 50 G.O.Ms.No. 38, Highways Department dt. 6.2.2008.

TOTAL - 5054 04 337 JQ 162,31,88 158,61,59 5 4,02 52

181 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Chennai Division-I(Projects) 1. AS / TS / RAS: 287200 Construction of ROB in lieu of existing LC.No.13 at Railway km 31/12- 14 in between Thirunindravur and Railway Stations. 28,72,00 12,87,85 12,03,51 3,88,86 7,58,92 G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 2. AS / TS / RAS: 11140 Construction of Road Over Bridge at Km 5/4 of Puduvayalpulikat Road in lieu of existing Level Crossing No. 26 at Railway Km 35/5-7 in 1,11,40 42,17 1 15,01 1 between Ponneri and Railway Stations (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 3. AS / TS / RAS: 10167 Construction of Road Over Bridge at Km 0/6 of Nandiyambakkam Road in lieu of existing Level Crossing No. 14 at Railway Km 22/14-16 1,01,67 30,00 1 1 1 in bettween Attipatttu and Nandiyambakkam Railway Stations (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 Chengalpattu Division (Projects) 4. AS / TS / RAS: 494220/543600 Construction of four Lane Road Over Bridge at Km 72/10 of Chennai- Ponnerikarai Kancheepuram road in lieu of existing Level Crrossing 54,36,00 25,96,41 1 5,52,00 3,70,01 No. 29 near Kancheepuram Railwlay Station (16 Major Works) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 5. AS / TS / RAS: 323000 Construction of ROB in lieu of existing LC No.75 at Railway Km 97/15- 16 in between and railway staions on 32,30,00 6,32,60 10,05,00 1,00 5,02,00 Acharapakkam-Periakallakadi Raod (inculding Land Acquistion) G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 6. AS / TS / RAS: 295000 Construction of ROB in lieu of existing LC No.64 at Railway Km 81/2-4 in between Padalam and Railway stations of Kinar- 29,50,00 5,80,79 10,05,00 3,00 8,10,00 Keevalam road (including Land Acquisition) G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

182 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Chengalpattu Division (Projects) 7. AS / TS / RAS: 304000 Construction of ROB in ieu ofexistingLC No.59 at Railay Km 68/16-18 in between Chengalpet and Ottivakkam Railway Stations 30,40,00 7,10,62 12,00,00 32,74 8,10,00 Thirukalivakkam Raoad via Ponvilainthakalathur for Old GST Road (including Land Acquistion) G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. Vellore Division(Projects) 8. AS / TS / RAS: 7124 Construction of Road Over Bridge in lieu of existing Level Crossing No. 59 at Railway Km 142/16-18 between Latheri-Virinjipuram stations 71,24 12,22 6,12 1 1 and at Km 0/4 of T.K.V.Kottah road to Virinjipuram Road (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 9. AS / TS / RAS: 278700 Construction of Road Over Bridge in lieu of existing Level Crossing No. 80 at Railway Km 99/100-200 between Polur-Arni Railway Stations at 27,87,00 ... 10,00,00 2,44,26 10,43,55 Km 141/4 of Cuddalore-Chittoor Road (16 Major Works) (For Work) G.O.Ms.No.39/Highways& Minor Ports(HQ2)Dept/dt:- 20.03.2018

10 . AS / TS / RAS: 222689 Construction of Road Over Bridge in lieu of existing Level Crossing No. 59 at Railway Km 142/16-18 between Latheri-Virinjipuram stations 22,26,89 ... 15,30,00 3,17,36 7,43,14 and at Km 0/4 of T.K.V.Kottah road to Virinjipuram Road (16 Major Works) (For Work) G.O.2(D)No.12/HW&MP Dept/Dt.23.02.18 11 . AS / TS / RAS: 253000/278000 Construction of ROB in lieu of existing L.C.No. 78 at Railway Km 186/12-14 at Kannadikuppam - Iyyanur road 27,80,00 3,61,26 8,30,00 20,00 5,15,00 G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

12 . AS / TS / RAS: 3200 Construction of Road Over Bridge at KM 7/6 of Keelvithi Ameerpet road in lieu of existing LC No. 37 at Railway KM 80/6-8 near 32,00 22,10 4,68 4,68 5,22 Anvarhiganpet Railway Station (16 MAJOR WORKS) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

183 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Vellore Division(Projects) 13 . AS / TS / RAS: 110000 Construction of ROB in lieu of existing L.C.No. 40 at Km . 14/0 of Sholinghur –Kaveripakkam road near Sholinghur Railway station. 11,00,00 9,59,75 ...... G.O.Ms.No. 112, Highways (HQ2) Dept. Dt. 19.07.2006. 14 . AS / TS / RAS: 162000 Construction of ROB in Km. 49/2 of Wallajah – Sholinghur – Kaveripakkam road lieu of existing L.C.No.685-B (Railway 16,20,00 10,29,36 ...... Km. P.P.No. 1020-22) and L.C. No. 32-A ( Railway Km 10/44-46) G.O.Ms.No. 172, Highways (HQ2) Department, dt 23.08.2005.

15 . AS / TS / RAS: 12868 Construction of Road Over Bridge in lieu of existing Level Crossing No. 123 at Railway Km 147/100-200 between Vellore cantonment and 1,28,68 27,23 1 1 1 Kaniyambadi Railway Stations at Km 4/0 of Vellore-Hosur Road (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 16 . AS / TS / RAS: 12992 Construction of Road Over Bridge in lieu of existing Level Crossing No. 55 at Railway Km 67/100-200 in between Thandari and 1,29,92 14,72 25,20 1,40,72 58 Thiruvannamalai Railway Stations and at Km 103/8 of Pondy Krishnagiri Road (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 17 . AS / TS / RAS: 363800/365000 Construction of ROB in lieu of existing L.C.No. 126 at Railway Km 149/9-10 and L.C. 127 at Railway Km 150/9-10 36,50,00 14,16,52 1,20,00 5,00 20,00 G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

18 . AS / TS / RAS: 387400 Construction of ROB in liew of existing LC No.55 at Railway Km 67/100-200 in between Thandarai and Thrivannamalai Railway Station 38,74,00 ... 7,00,00 9,09,51 19,41,75 (For Work) G.O.Ms.No.63/Highways& Minor Ports(HQ2)Dept/dt:- 25.04.2017

19 . AS / TS / RAS: 141000 Construction of ROB in lieu of existing L.C.No. 70 at Railway Km 4/8 of Ulli- Valathur Road 14,10,00 2,14,53 7,25,00 1,83,37 5,15,00 G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

184 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Vellore Division(Projects) 20 . AS / TS / RAS: 9500 Construction of ROB at Bethlegam area in Ambur Town between Ambur and Vaniyambadi Railway Stations 16 Major Works (Preliminary 95,00 23,87 10,00 51,57 18,14 Sanctioned) G.O.Ms.No. 40, Highways and Minor Ports (HQ 2) Department dated: 19.12.2013 21 . AS / TS / RAS: 9344 Construction of Road Over Bridge in lieu of existing Level Crossing No. 80 at Railway Km 99/100-200 between Polur-Arni Railway Stations at 93,44 49,69 33,75 1 1 Km 141/4 of Cuddalore-Chittoor Road (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 22 . AS / TS / RAS: 255000/281020 Construction of ROB in lieu of existing L.C.No. 80 at Railway Km 195/28-30 at Valayampet - Vaniyambadu road . 28,10,20 10,33,17 5,30,00 20,00 5,15,00 G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Cuddalore Division(Projects) 23 . AS / TS / RAS: 9900 Construction of Road Over Bridge at KM 21/6 of Cuddalore-Chitttur road in lieu of exising L.C. No. 138 at Railway KM 185/3-4 in between 99,00 8,28 76,07 10,00 10,00 Panrutti and Railway Stations (16 MAJOR WORK) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 24 . AS / TS / RAS: 226300/248900 Construction of ROB at km 44/6 of Cuddalore – Chittur road in lieu of existing LC No. 144 at Railway km 182/4-5 in between 24,89,00 ... 11,00,01 12,27,22 11,89,73 Thiruvennainallur and Parikkal Railway Stations in Chennai-Trichy chord line (16 Major Works) (For Work) G.O.(2D) No. 40, Highways and Minor Ports (HQ2) Department dated: 20.03.2018 25 . AS / TS / RAS: 224300/245700 Construction of ROBat km 21/0 of Vellimedupettai - Mailam road in lieu of existing LC No. 102 at Railway km 134/28-30 in between Mailam 24,57,00 14,51,35 10,00 1,00,00 1,00 and Perani Railway stations G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

185 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Cuddalore Division(Projects) 26 . AS / TS / RAS: 209600 Construction of ROB at km 1/6 of Olakkur – feeder road in lieu of existing LC No. 88 at Railway km 114/4-6 in between Olakkur and 20,96,00 31,94 10,24,00 9,95,88 9,52,75 Tindivanam Railway stations G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 27 . AS / TS / RAS: 202000/215000 Construction of ROB at km 0/4 of - Nemur road in lieu of existing LC No. 111 at Railway km 150/12-14 in between 21,50,00 12,41,42 10,00 50,00 1,00 Mundiampakkam and Vikravandi Railway stations. G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 28 . AS / TS / RAS: 7868 Construction of ROB at km 44/6 of Cuddalore – Chittur road in lieu of existing LC No. 144 at Railway km 182/4-5 in between 78,68 10,10 1 1 1 Thiruvennainallur and Parikkal Railway Stations in Chennai-Trichy chord line (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 Thanjavur Division (Projects) 29 . AS / TS / RAS: 26788 Construction of ROB in lieu of LC No. 20 at km 52/4 of Nagai-Gudalore- Mysore road in between Railway km 27/700-900 at Needamangalam 2,67,88 96,25 1 50 1,60,40 yard in Needamangalam Railway Station of Thanjavur-Nagore- Section(16 Major Works)(Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 30 . AS / TS / RAS: 5946 Construction of RoadOverBridge in lieu of Level CrossingNo. 16 at Km 16/8 of Mayiladuthurrai-Thiruvarur-Thiruthuraipoondi road between 59,46 29,19 19,27 2,00 27,22 Railway Km15/500-15/600 atPeralam RailwayStationYardof MayiladuthuraiTthiruvarur Section (16Major) (Prleiminary) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 31 . AS / TS / RAS: 5468 Construction of ROB in lieu of LC No. 34 at km 2/4 of Thiruvarur – Mannargudi - Muthupettai road in between Railway km 50/800 – 54,68 21,58 23,10 1 25,91 50/900 between Kuzhikarai – Thiruvarur Railway Stations of Thanjavur- Nagore-Karaikal Section (16 Major Works) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

186 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Thanjavur Division (Projects) 32 . AS / TS / RAS: 17404 Construction of ROB in lieu of existing LC No. 48 at Railway km 77/700- 800 between Nagore and Nagapattinam Railway Stations at km 0/2 of 1,74,04 34,99 1 10,00 1,22,78 Nagapattinam - Akkaraipettai – Velankkanni Road (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 Trichy Division(Projects) 33 . AS / TS / RAS: 160000 Construction of ROB in lieu of existing LC.No.85 between Palakarai and Fort stations. 16,00,00 13,97,64 1 1 ... G.O.Ms.No. 171/Highways (HP2) Department Dated: 24- 06-99 34 . AS / TS / RAS: 70500 Construction of Road Over Bridge at KM 0/4 of Cauvery road in lieu of exising LC No. 249 at Railway Km 331/7-8 in between and 7,05,00 15,69 6,41,91 1,00 6,82,69 Trichy Town Railway Stations (16 MAJOR WORKS)(Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 35 . AS / TS / RAS: 82350 Construction of Road Over Bridge at Km 1/8 of Keelakalkandar Kottai road in lieu of existing Level Crossing No. 323 at Railway Km 399/500- 8,23,50 11,80 8,05,63 1,13,83 6,96,82 600 between Manjathidal and Railway Stations (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 36 . AS / TS / RAS: 130000 Construction of a ROB in lieu of LC.No.246 at Km 326/16-17 between Trichy and Srirangam Stations. 13,00,00 6,05,72 1 1 ... G.O.Ms.No. 171/Highways (HP2) Department Dated: 24- 06-99

37 . AS / TS / RAS: 33272 Construction of Road Over Bridge at Km 1/6 of Sirudhaiyur- Sengaraiyur road in lieu of existing Level Crossing No. 226 at Railway 3,32,72 20,10 2,87,18 3,00 3,21,80 Km 311/800-900 between Kattur and Lalgudy Stations (16 Major Works)(Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

187 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Trichy Division(Projects) 38 . AS / TS / RAS: 110000 Construction of ROB in lieu of existing LC.No.241 of Uthamarkoil. 11,00,00 5,71,94 1 1 ... G.O.Ms.No. 171/Highways (HP2) Department Dated: 24- 06-99 39 . AS / TS / RAS: 110000 Construction of a ROB in lieu of existing LC.No.84 between Palakarai and Fort stations in Thennur High road. 11,00,00 9,14,35 1 1 ... G.O.Ms.No. 171/Highways (HP2) Department Dated: 24- 06-99

Coimbatore Division (Projects) 40 . AS / TS / RAS: 195400 Construction of ROB at km. 20/6 of Kamanakenpalayam- Annur –road in lieu of existing LC.No. 139 at Railway km. 459/29-31 at Somanur. 19,54,00 16,32,95 3,00,00 1 1 R.A.S G.O.Ms.No. 98, Highways and Minor Ports Department dated: 11.6.2012 G.O.Ms.No. 172, Highways (HQ2) Department, dt 23.08.2005. 41 . AS / TS / RAS: 267000 Construction of ROB in lieu of existing LC No.3 at Railways km.2/9-11 between Coimbatore and Irugur Railway stations on km.0/4 of 26,70,00 5,44 10,05,00 10,00 1 Ramachandra Naidu street (Coimbatore Corporation Road) G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 42 . AS / TS / RAS: 226000/248600 Construction of ROB in lieu of existing LC.No.162 at Railway km.160/3 between podanur-Chettipalayam Railway stations on km.10/8 of North 24,86,00 15,16,76 6,47,26 85,00 1 Coimbatore-Ramanathapuram-Podanur-Chettipalayam Road G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 43 . AS / TS / RAS: 322300 Construction of ROB in lieu of existing LC No.3 at Railways km.2/1-2 between Pollachi-Anamalai Railway stations on km.81/4 of Avinashi- 32,23,00 23,73,66 1,51,87 2,66,98 1 Tiruppur-Palladam-Pollachi-(Via) Cochin Road G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 44 . AS / TS / RAS: 414000 Construction of ROB in lieu of existing L.C.No.10 at Railway km.25/6- between Periyanaikkenpalayam and Karamadai Railway stations on 41,40,00 30,66,45 1,33,16 7,98,26 1 km.373/6 of Nagappattinam-Gudalore-Mysore Road G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

188 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Coimbatore Division (Projects) 45 . AS / TS / RAS: 4100 Construction of Road Over Bridge with Rotary at km 0/2 of Rasipalayam – Thennampalayam road in lieu of existing LC No. 142A 41,00 10,08 2,00 1 1 at Railway km 466/21-23 in between Somanur and Sulur Railway Stations (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 Salem Division (Projects) 46 . AS / TS / RAS: 341600/ 356500 Construction of Rrailway Over Bridge in State Highways 79 at chainage 90/2 in Namakkal District 16 MAJOR WORKS 35,65,00 29,90,26 2,00,00 1,64,92 2,34,19 G.O.(2D) No. 21, Highways and Minor Ports (HQ2) Department dated 02.09.2013 47 . AS / TS / RAS: 830000 Construction of ROB at Km.1/8 of Hasthampatty Cherry road in lieu of existing LC No.184 (Railway Km.190/300-400) and LC.185 (Railway 83,00,00 49,14,03 16,59,80 5,51,98 18,37,58 Km.190/400-500) in between Salem Market & Salem Town Railway Stations. (Cherry road LC.184) G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 48 . AS / TS / RAS: 226000/212200 Construction of Road Over Bridges at KM 45/6 of Hogenakkal- Pennagaram-Dharmapuri-Thiruppatur in lieu of existing L.C. No. 43 at 22,60,00 16,80,24 1 1 2,89,13 Railway KM 67/700-800 between Dharmapuri and Palacode Railway Stations. (16 MAJOR WORKS) G.O.(D) No. 146, Highways and Minor Ports (HQ 2) Department dated: 09.12.2015 49 . AS / TS / RAS: 2100 Construction of Road Over Bridges at Km 3/4 of Haledharmapuri- Papparapatty in lieu of existing LC No. 46 at railway Km 71/600-700 21,00 13,58 1 1 1 between Dharmapuri and Palcodu Railway Station (16 MAJOR WORKS)(Preliminary Sanctioned) G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012 50 . AS / TS / RAS: 129400 Construction of Road Over Bridges at KM 45/6 of Hogenakkal- Pennagaram-Dharmapuri-Thiruppatur in lieu of existing L.C. No. 43 at 12,94,00 ... 1 1 1 Railway KM 67/700-800 between Dharmapuri and Palacode Railway Stations. (16 MAJOR WORKS) (Preliminary Sanctioned) G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

189 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Salem Division (Projects) 51 . AS / TS / RAS: 456300 Construction of ROB at Km.2/2 of Salem New Bye pass in lieu of existing LC No.183 Railway Km.189/400-500 between Salem Town 45,63,00 15,33,49 4,52,00 8,47 34,41,25 and Salem East Railway Stations. G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 52 . AS / TS / RAS: 203100/189000 Construction of Road Over Bridges at Km 3/4 of Haledharmapuri- Papparapatty in lieu of existing LC No. 46 at railway Km 71/600-700 20,31,00 16,53,33 1 1 1,76,63 between Dharmapuri and Palcodu Railway Station (16 Major Works) (For Work) G.O.(Ms) No. 146, Highways and Minor Ports (HQ 2) Department dated: 09.12.2015 53 . AS / TS / RAS: 9920 Construction of Road Over Bridge at L.C. No. 159 at Railway KM 164/600-700 in between Valappady and Minnampalli Railway Stations 99,20 13,41 5,00 3,49 76,38 in Salem District G.O.(D) No. 27, Highways and Minor Ports (HQ 2) Department dated: 12.12.2013 54 . AS / TS / RAS: 2000 Construction of Road Over Bridges at KM 144/4 of Old NH 7 in lieu of existing LC No. 38 at Railway KM 60/100-200 between Sivadi and 20,00 6,28 1 1 1 Dharmapuri Railway Station (16 Major works) (Preliminary Sanctioned) G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012 55 . AS / TS / RAS: 463500 Construction of ROB at Km.203/2 of VCC road in lieu of existing LC No.187 (Railway Km.192/300-400) in between Salem Junction and 46,35,00 32,31,48 1,86,02 4,16,89 8,89,06 Salem Market Railway Stations G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 56 . AS / TS / RAS: 3000 Construction of Road Over Bridges at KM 0/8 of Vennampatty in lieu of existing LC No. 41 at Railwlay Km 65/600-700 between Sivadi and 30,00 6,47 13,53 6,70 13,44 Dharmapuri Railway Stations. (16 Major works) (Preliminary Sanctioned) G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

190 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Salem Division (Projects) 57 . AS / TS / RAS: 17500 Construction of ROB at km 0/6 of Bretts road in lieu of existing LC No. 185 at Railway km 190/400-500 in between Salem Market and Salem 1,75,00 13,29 1 6,47 1,48,73 Town Railway Stations (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 Madurai Divison (Projects) 58 . AS / TS / RAS: 371500/408500 Construction of Road Over Bridge at km 203/2 of Tanjavur – Pattukottai – Aranthangi – Karaikudi – Kallal – Kalayarkoil – 40,85,00 28,02,33 71,00 71,00 1 Maravanmangalam – Ilayankudi – – Mudukulathur – Sayalkudi – road – (SH-29) in lieu of existing LC.No.473 in railway km 578 G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 59 . AS / TS / RAS: 23200 Construction of ROB at Km 0/8 of Sholavanthan-Valayapatty road (via) Andipati in lieu of existing L.C. 346 of Railway KM 473/500-600 in 2,32,00 71,29 1 1 1 between Madurai-Dindigul Railway Stations (16 MAJOR WORKS) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 60 . AS / TS / RAS: 5650 Construction of ROB @ KM 0/2 of Ramanathapuram-Keelakarai road in lieu of existing L.C. No. 501 at Railway KM 615/200-300 in between 1,56,50 1,27,27 1 1 1 Ramanathapuram and Ucchupuli Railway Stations (16 MAJOR WORKS) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 61 . AS / TS / RAS: 19500 Construction of Limited Use Subway at KM 0/4 of Dindivul Gujiliamparai Karur road in lieu of existing L.C. No. 6 at Railway KM 1,95,00 45,51 1 1 1 3/200-300 in between Dindigul and Akkaraipatti Railwlay Stations. (16 MAJOR WORKS) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 62 . AS / TS / RAS: 9100 Construction of ROB in at Km 375/2 of BCC road in lieu of existing L.C No. 8 at Railway KM 5/300-400 in between Dindigul and Akkaraipatty 91,00 31,74 1 1 1 Railway stations instead of Railway Km 5/700-800 (16 Major Works) Preliminary Sanctioned G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

191 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Madurai Divison (Projects) 63 . AS / TS / RAS: 598000/657500 Construction of ROB at Km.1/500-2/700 of Dindigul – Manakkattur road in lieu of existing LCNo.2 @ Railway Km.1/10-11 in between 65,75,00 42,92,95 17,78,66 8,42,79 14,08,08 Dindigul & Akkaraipatty stations) and LC No.27 at Railway km.72/200- 300 in between Eriodu & Dindigul stations and LC 308 G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 64 . AS / TS / RAS: 161800 Construction of Limited Use Subway at KM 0/4 of Dindigul Gujiliamparai Karur road in lieu of existing L.C. No. 6 at Railway KM 17,15,00 ... 13,59,80 7,58,79 4,89,10 3/200-300 in between Dindigul and Akkaraipatti Railwlay Stations. (16 MAJOR WORKS) (For Work) G.O.Ms.No. 104/ Highways & Minor ports (HQ2) Dept.dated: 22.12.2017 65 . AS / TS / RAS: 233900/256000 Construction of ROB @ KM 0/2 of Ramanathapuram-Keelakarai road in lieu of existing L.C. No. 501 at Railway KM 615/200-300 in between 25,60,00 ... 8,00,01 8,00,01 13,80,70 Ramanathapuram and Ucchupuli Railway Stations (16 Major) (For Work) G.O.Ms.No. 65/ Highways & Minor ports (HQ2) Dept.dated: 27.04.2018 66 . AS / TS / RAS: 203500 Construction of ROB in at Km 375/2 of BCC road in lieu of existing L.C No. 8 at Railway KM 5/300-400 in between Dindigul and Akkaraipatty 20,35,00 12,98,51 6,13,49 3,01,79 2,49,94 Railway stations instead of Railway Km 5/700-800 (16 MAJOR WORKS) G.O.Ms.No. 83/ Highways & Minor ports (HQ2) Dept.dated: 22.07.2015 Tirunelveli Division (Projects) 67 . AS / TS / RAS: 22726 Construction of ROB at km 14/6-8 of Nanguneri – Ervadi – Valliyoor – Vijayapathy Road in lieu of existing LC No. 82B at Railway km 322/9- 2,27,26 31,24 10 1 1 323/0 between Nanguneri and Valliyoor Railway Stations (16 Major Works) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 68 . AS / TS / RAS: 145200 Construction of ROB at km 14/6-8 of Nanguneri – Ervadi – Valliyoor – Vijayapathy Road in lieu of existing LC No. 82B at Railway km 322/9- 14,52,00 5,63 6,24,88 5,15,72 7,86,08 323/0 between Nanguneri and Valliyoor Railway Stations (16 Major Works) (For Work) G.O. (Ms) No.103, Highways and Minor Ports (HQ2) Department Dated 22.12.2017

192 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) Tirunelveli Division (Projects) 69 . AS / TS / RAS: 37300 Construction of ROB at KM 0/8 of Palayamkottai Sivanthipatti road in lieu of existing L.C. No. 6 at Railway KM 6/600-700 in beween 3,73,00 3,40,27 10 1,00 1 Palayamkottai Seidhungaanallur railway station. (16 MAJOR WORKS.) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 70 . AS / TS / RAS: 80000/111139 Construction of ROB at Km.0/0 - 8/0 AruppukottaiVir udhunagr Extension road lieu of existing level crossing 406 Km. 539/12-13 at 11,11,39 10,84,48 1 1 1 Vpt - Tenkasi section G.O. Ms. No 9 Highways Department dated 8.01.1998

71 . AS / TS / RAS: 295 Chief Engineer (General) - Providing lighting arrangements to the over bridge at Km. ¼ of Tirunelveli - Shencottai road. 2,95 ... 1 1 1 G.O.Ms. No.1071, P.W. dated 6th August 1974

72 . AS / TS / RAS: 327000 Construction of ROB at Km.60/2 of Tirunchendur - Palayamkottai - Ambasamudram - Tenkasi - Courtalam - Shencottai Road in lieu of 32,70,00 16,56,09 1,00,00 16,00 5,01,00 existing L.C. 118A at Railway Km. 357/ 400-500 in between Melapalayam and Sengulam Railway station. G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 73 . AS / TS / RAS: 239100 Construction of ROB at KM 0/8 of Palayamkottai Sivanthipatti road in lieu of existing L.C. No. 6 at Railway KM 6/600-700 in beween 23,91,00 6,51,19 2,00,00 1,05,22 13,40,00 Palayamkottai Seidhungaanallur railway station. (16 MAJOR WORKS.) G.O.Ms.No. 32/ Highways & Minor ports (HQ2) Dept.dated: 18.02.2016 Paramakudi Division (N&RR) 74 . AS / TS / RAS: 105300 Construction of Limited Use Subway (LUS) at Virudhunagar- Aruppukottai road as deposit work in lieu of temporary level crossing 10,53,00 10,16,25 1 1 ... constructed during the construction of ROB at LC No.406. G.O.(MS) No. 83, Highways and Minor Ports (HP.2) Department, dated: 25.05.2016

193 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 16 Major Works ( DPC 5054 80 800 JJ 16 04 ) C.E. Metro 75 . AS / TS / RAS: 283200 Construction of ROB at km 0/4 of Minjur - Kattur - Thirupalaivanam road in lieu of existing LC.No.16 at Railway km 24/16-18 in between 28,32,00 30,67 18,01,33 8,00,00 1,10,00 Nandiyambakkam and Minjur Railway Station CE METRO G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011. 64 Lands ( DPC 5054 80 800 JJ 64 03 ) Chennai Division-I(Projects) 1. AS / TS / RAS: 417 To make compensation Payment to Thiru.Gurusamy towards Land Acquisition for Construction of ROB in lieu of existing LC No 28 at 4,17 ...... Railway km 26/1-2 in between Chrompet and Tamabram Railway Stations C.P No. 2317/17and W.P No 18441/2017 (64 Lands) (Charged) G.O. (D) No. 234 Highways and Minor Ports Department (HW2) Dated 03.09.2018 2. AS / TS / RAS: 107167 Construction of Road Over Bridge at Km 0/6 of Nandiyambakkam Road in lieu of existing Level Crossing No. 14 at Railway Km 22/14-16 10,71,67 8,84,68 1 25,35 1,61,64 in bettween Attipatttu and Nandiyambakkam Railway Stations (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 3. AS / TS / RAS: 68140 Construction of Road Over Bridge at Km 5/4 of Puduvayalpulikat Road in lieu of existing Level Crossing No. 26 at Railway Km 35/5-7 in 6,81,40 6,47,24 1 20 1,80 between Ponneri and Kavaraipettai Railway Stations (64 Lands)(Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 Chengalpattu Division (Projects) 4. AS / TS / RAS: 30000 Construction of four Lane Road Over Bridge at Km 72/10 of Chennai- Ponnerikarai Kancheepuram road in lieu of existing Level Crrossing 3,00,00 ... 1 1 ... No. 29 near Kancheepuram Railwlay Station (64 Lands) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

194 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 64 Lands ( DPC 5054 80 800 JJ 64 03 ) Vellore Division(Projects) 5. AS / TS / RAS: 20000 Construction of Road Over Bridge in lieu of existing Level Crossing No. 55 at Railway Km 67/100-200 in between Thandari and 2,00,00 ... 2,00,00 10,00 1,12,58 Thiruvannamalai Railway Stations and at Km 103/8 of Pondy Krishnagiri Road ( 64 Lands ) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 6. AS / TS / RAS: 35000 Construction of Road Over Bridge in lieu of existing Level Crossing No. 59 at Railway Km 142/16-18 between Latheri-Virinjipuram stations and 3,50,00 1,00,00 1,49,99 10,00 2,40,00 at Km 0/4 of T.K.V.Kottah road to Virinjipuram Road (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 7. AS / TS / RAS: 30200 Construction of Road Over Bridge at KM 7/6 of Keelvithi Ameerpet road in lieu of existing LC No. 37 at Railway KM 80/6-8 near 3,02,00 2,25,00 50,00 10,00 67,00 Anvarhiganpet Railway Station (64 LANDS) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 8. AS / TS / RAS: 43000 Construction of Road Over Bridge in lieu of existingg Level Crossing No. 80 at Railway Km 99/100-200 between Polur-Arni Railway Stations 4,30,00 ... 1 10,00 4,20,00 at Km 141/4 of Cuddalore-Chittoor Road (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 9. AS / TS / RAS: 55000 Construction of ROB at Bethlegam area in Ambur Town between Ambut and Vaniyambadi Railway Stations 64 LANDS (Preliminary 5,50,00 ... 1 10,00 1,00,00 Sanctioned) G.O.Ms.No. 40, Highways and Minor Ports (HQ 2) Department dated: 19.12.2013 10 . AS / TS / RAS: 50000 Construction of Road Over Bridge in lieu of existing Level Crossing No. 123 at Railway Km 147/100-200 between Vellore cantonment and 5,00,00 ... 1 1 1 Kaniyambadi Railway Stations at Km 4/0 of Vellore-Hosur Road (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

195 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 64 Lands ( DPC 5054 80 800 JJ 64 03 ) Cuddalore Division(Projects) 11 . AS / TS / RAS: 11100 Construction of Road Over Bridge at KM 21/6 of Cuddalore-Chitttur road in lieu of exising L.C. No. 138 at Railway KM 185/3-4 in between 1,11,00 ... 81,00 1,00 1,10,00 Panrutti and Nellikuppam Railway Stations (64 LANDS) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 12 . AS / TS / RAS: 12500 Construction of ROB at km 44/6 of Cuddalore – Chittur road in lieu of existing LC No. 144 at Railway km 182/4-5 in between 1,25,00 ... 1 10,01 20,00 Thiruvennainallur and Parikkal Railway Stations in Chennai-Trichy chord line (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 Thanjavur Division (Projects) 13 . AS / TS / RAS: 158250 Construction of Road Over Bridge in lieu of Level Crossing No. 16 at Km 16/8 of Mayiladuthurrai-Thiruvarur-Thiruthuraipoondi road between 15,82,50 16,32 1 1 1 Railway Km 15/500-15/600at Peralam Railway StationYard ofMayiladuthurai-Thiruvarur Section(64lands)(Prleiminary work) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 14 . AS / TS / RAS: 220000 Construction of ROB in lieu of existing LC No. 48 at Railway km 77/700- 800 between Nagore and Nagapattinam Railway Stations at km 0/2 of 22,00,00 9,63,90 1 1,00,00 11,21,72 Nagapattinam - Akkaraipettai – Velankkanni Road (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 15 . AS / TS / RAS: 202550 Construction of ROB in lieu of LC No. 34 at km 2/4 of Thiruvarur – Mannargudi - Muthupettai road in between Railway km 50/800 – 20,25,50 7,00,00 1 50,00 12,75,50 50/900 between Kuzhikarai – Thiruvarur Railway Stations of Thanjavur- Nagore-Karaikal Section (64 Lands) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 16 . AS / TS / RAS: 100000/ 80000 Construction of ROB in lieu of LC No. 20 at km 52/4 of Nagai – Gudalore - Mysore road in between Railway km 27/700 – 900 at 8,00,00 4,21,49 1 1 3,75,66 Needamangalam yard in Needamangalam Railway Station of Thanjavur – Nagore – Karaikal Section. (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 196 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 64 Lands ( DPC 5054 80 800 JJ 64 03 ) Trichy Division(Projects) 17 . AS / TS / RAS: 200000 Construction of Road Over Bridge at Km 1/8 of Keelakalkandar Kottai road in lieu of existing Level Crossing No. 323 at Railway Km 399/500- 20,00,00 2,30,00 1,00,00 1 17,64,37 600 between Manjathidal and Thiruverumbur Railway Stations (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 18 . AS / TS / RAS: 170000 Construction of Road Over Bridge at Km 1/6 of Sirudhaiyur- Sengaraiyur road in lieu nof existing Level Crossing No. 226 at Railway 17,00,00 ... 2,00,00 10,00 16,90,00 Km 311/800-900 between Kattur and Lalgudy Stations ( 64 Lands ) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 19 . AS / TS / RAS: 100000 Consruction of Road Over Bridge at KM 0/4 of Cauvery road in lieu of exising LC No. 249 at Railway Km 331/7-8 in between Srirangam and 10,00,00 10,00,00 1 1 1 Trichy Town Railway Stations (64 LANDS)(Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 Coimbatore Division (Projects) 20 . AS / TS / RAS: 43650 Construction of Road Over Bridge with Rotary at km 0/2 of Rasipalayam – Thennampalayam road in lieu of existing LC No. 142A 4,36,50 4,31,50 1 1 1 at Railway km 466/21-23 in between Somanur and Sulur Railway Stations (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 Salem Division (Projects) 21 . AS / TS / RAS: 418500 Construction of ROB at km 0/6 of Bretts road in lieu of existing LC No. 185 at Railway km 190/400-500 in between Salem Market and Salem 41,85,00 41,85,00 1 1 1 Town Railway Stations (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 22 . AS / TS / RAS: 129400 Construction of Road Over Bridges at KM 45/6 of Hogenakkal- Pennagaram-Dharmapuri-Thiruppatur in lieu of existing L.C. No. 43 at 12,94,00 ... 1 1 1 Railwlay KM 67/700-800 between Dharmapuri and Palacode Railway Stations. (64 Lands) (Preliminary Sanctioned) G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

197 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 64 Lands ( DPC 5054 80 800 JJ 64 03 ) Salem Division (Projects) 23 . AS / TS / RAS: 60000 Construction of Road Over Bridge at L.C. No. 159 at Railway KM 164/600-700 in between Valappady and Minnampalli Railway Stations 6,00,00 2,70,00 1 1 3,29,99 in Salem District 64 LANDS (Preliminary Sanctioned) G.O.(D) No. 27, Highways and Minor Ports (HQ 2) Department dated: 12.12.2013 24 . AS / TS / RAS: 21900 Construction of Road Over Bridges at KM 144/4 of Old NH 7 in lieu of existing LC No. 38 at Railway KM 60/100-200 between Sivadi and 2,19,00 ... 1 14,00 2,04,95 Dharmapuri Railway Station (64 Lands) (Preliminary Sanctioned) G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012 25 . AS / TS / RAS: 60000/85000 Construction of Railway Over Bridge in State Highways 79 at chainage 90/2 in Namakkal District 64 LANDS 8,50,00 7,23,54 1 1 1,26,46 G.O.(2D) No. 21, Highways and Minor Ports (HQ2) Department dated 02.09.2013

26 . AS / TS / RAS: 30900 Construction of Road Over Bridges at Km 3/4 of Haledharmapuri- Papparapatty in lieu of existing LC No. 46 at railway Km 71/600-700 3,09,00 ... 1 1 1 between Dharmapuri and Palcodu Railway Station (64 LANDS) (Preliminary Sanctioned) G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012 27 . AS / TS / RAS: 116000 Construction of Road Over Bridges at KM 0/8 of Vennampatty in lieu of existing LC No. 41 at Railwlay Km 65/600-700 between Sivadi and 11,60,00 ... 8,60,00 1,50,00 10,10,00 Dharmapuri Railway Stations. (64 Lands) (Preliminary Sanctioned) G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012 Madurai Divison (Projects) 28 . AS / TS / RAS: 120540 Construction of ROB at Km 0/8 of Sholavanthan-Valayapatty road (via) Andipati in lieu of existing L.C. 346 of Railway KM 473/500-600 in 12,05,40 1,32,70 1 1 1 between Madurai-Dindigul Railway Stations (64 LANDS.)(Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

198 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JJ Construction of over and under bridges in lieu of Existing level crossings 64 Lands ( DPC 5054 80 800 JJ 64 03 ) Madurai Divison (Projects) 29 . AS / TS / RAS: 6925 Construction of ROB in at Km 375/2 of BCC road in lieu of existing L.C No. 8 at Railway KM 5/300-400 in between Dindigul and Akkaraipatty 69,25 ... 1 1 1 Railway stations instead of Railway Km 5/700-800 (64 Lands) (Preliminary sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 30 . AS / TS / RAS: 67500 Construction of ROB @ KM 0/2 of Ramanathapuram-Keelakarai road in lieu of existing L.C. No. 501 at Railway KM 615/200-300 in between 6,75,00 5,14,00 1,60,96 1 1 Ramanathapuram and Ucchupuli Railway Stations (64 Lands) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 31 . AS / TS / RAS: 154250 Construction of Limited Use Subway at KM 0/4 of Dindigul Gujiliamparai Karur road in lieu of existing L.C. No. 6 at Railway KM 15,42,50 ... 70,00 1 1 3/200-300 in between Dindiul and Akkaraipatti Railwlay Stations. (64 LANDS) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 Tirunelveli Division (Projects) 32 . AS / TS / RAS: 31500 Construction of ROB at KM 0/8 of Palayamkottai Sivanthipatti road in lieu of existing L.C. No. 6 at Railway KM 6/600-700 in beween 3,15,00 52,42 10 10,00 1 Palayamkottai Seidhunganallur railway station. (64 LANDS.) (Preliminary Sanctioned) G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012 33 . AS / TS / RAS: 100000 Construction of ROB at km 14/6-8 of Nanguneri – Ervadi – Valliyoor – Vijayapathy Road in lieu of existing LC No. 82B at Railway km 322/9- 10,00,00 88,32 1,00 1 8,20,00 323/0 between Nanguneri and Valliyoor Railway Stations (64 Lands) (Preliminary Sanctioned) G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013 TOTAL - 5054 80 800 JJ 1,590,94,59 672,39,93 279,03,94 123,54,97 360,83,73

199 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JN [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JN Provision for Road Works

16 Major Works ( DPC 5054 80 800 JN 16 06 ) Chennai Division-I(Projects) 1. AS / TS / RAS: 8567 To make payment to Thiru.P.Ramankutty, contractor as per court award for the work of forming Northern Extension of Inner Ring Road 85,67 ...... from km.17/5-25/6 to meet Thiruvottiyur-TPP road at km.5/2 and improvements to TPP road from km.5/2-4/6 phase-I. GO.Ms.No.57, HW&MP (HW.2) Department, dt.04.03.2016 2. AS / TS / RAS: 679100 Forming Southern Sector of Inner Ring Road from Km 14/1 of NH 45 to meet Chennai Mahabalipuram road at km 14/4 in Chennai. (Works) 67,91,00 67,00,00 ...... GO.Ms.No.7, PW, dt.3.6.1992

64 Lands ( DPC 5054 80 800 JN 64 05 ) Chennai Division-I(Projects) 1. AS / TS / RAS: 135314 Enhanced compensation payable to Tmt. Vallidevi and 17 others as per the orders of the sub-court for the work of const of ROB 13,53,14 ...... in lieu of LC No 26 btw Chrompet and Pallavrm Rlystn vaishnava clg at palavaram radial rd 64 Lands Charged G.O No 79 Highways and Minor Ports HW2 Department Dated 11.04.2017 2. AS / TS / RAS: 20491 Land Acquisition for construction of Southern Sector of Inner Ring road between Velachery to St.Thomas Mount( Payment of Enhanced 2,04,91 ...... Compensation amount LAOP No 89/2013 Filled by Tmt. Chandramthi Muthaiah) (64 Lands Charged) G.O.(D) No.236/HW&MP Dept/Dt.13.10.17 3. AS / TS / RAS: 605000 Forming Southern Sector of inner Ring Road from Km14/1 of NH45 to meet Chennai Mahabalipuram road at Km 14/4 in Chennai (64 Lands) 60,50,00 ...... (LA Work) GO.Ms.No.07,PW Department, dt.03.06.1992

Trichy Division(Projects) 4. AS / TS / RAS: 200000 Land Acquisition for forming Thuraiyur By-pass Phase -II (64 Lands) 20,00,00 ... 15,00,00 6,55 10,00,00 G.O.(Ms) No. 113, Highways and Minor Ports (HP2) Departmentt dated: 06.07.2018

200 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JN [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JN Provision for Road Works

64 Lands ( DPC 5054 80 800 JN 64 05 ) Coimbatore Division (Projects) 5. AS / TS / RAS: 39000 Widening to Double Lane from km 19/10 of Coimbatore-Nagapattinam road (NH 83) to km 31/2 of Palladam-Cochin Frontier road (SH 163) 3,90,00 ... 1 1 1 (Via) Mullupadi, Myleripalayam and Chettipalayam (Alternate route from Pollachi to Coimbatore) (64 Lands) G.O. Ms. No. 3 Highways and Minor Ports(HS2) Department Dated 10.01.2018 Salem Division (Projects) 6. AS / TS / RAS: 18254 Land Acquisition for forming of By pass road to Shoolagiri town at Km 0/0 - 2/4 (64 Lands) 1,82,54 ... 1 10,00 1,72,54 G.O. Ms. No. 140 Highways and Minor Ports(HQ2) Department Dated 07.09.2018 Tirunelveli Division (Projects) 7. AS / TS / RAS: 136772 Construction of ROB at Km1/10 of Hosur- Thenkanikttai (via) Thally road (SH17B) in lieu of existing LC104 at railway Km160/0-100 in ...... 4,00,00 5,00,00 between Hosur Anekkal railway stations. (64 Lands) G.O. Ms. No. 210 Highways and Minor Ports(HQ2) Department Dated 12.12.2018 8. AS / TS / RAS: 798300 Land Acquisition for Forming and Improving Western bye pass Road to Tirunelveli 79,83,00 ... 5,00,00 50,00 10,00,00 G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017

TOTAL - 5054 80 800 JN 250,40,26 67,00,00 20,00,02 4,66,56 26,72,55

201 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Chennai Division-I(Projects) 1. AS / TS / RAS: 236700 Construction of ROB in lieu of existing LC.No. 34 at Railway Km.34/5-6 in between - . 23,67,00 22,51,41 ...... G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 2. AS / TS / RAS: 149000/ 257400 Construction of Road Over Bridge in lieu of existing LC. No.21 at Railway Km.47/14-16 in between and 25,74,00 18,94,91 2,42,85 2,64,95 2,87,99 Railway Stations (Near Kadambathur Railway station) G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006. RAS G.O 27 dated 11.04.2017 3. AS / TS / RAS: 445400 Construction of ROB connecting Pallavaram - Thuraipakkam Radial Road with NH-45 in lieu of the proposed ROB at the existing LC.No.26 44,54,00 38,14,14 3,90,01 20,50 1,20,50 near Vaishnava College G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 240, Highways and Minor Ports Department dated: 22.12.2009 4. AS / TS / RAS: 233700 Construction of Road Over Bridge in Obalapuram – Sunnambukkulathur Road at km 0/2 in lieu of existing LC. No.38 at 23,37,00 20,55,56 1,56,64 20,00 35,51 Railway Km.52/8-10 in between and Akkampettai Railway Station. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008 5. AS / TS / RAS: 127800 Construction of Road Over Bridge in lieu of existing LC No.10 at Railway Km.25/ 3-5 at Km.11/2of Poonamallee - Thandarai Road near 12,78,00 10,41,67 1 1 1 Railway Stations. G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

6. AS / TS / RAS: 390000 Construction of Road Over Bridge in lieu of existing at LC. No.33 at Railway km.44/28-30 near Railway Station. 39,00,00 17,24,66 ...... G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

7. AS / TS / RAS: 8000 Construction of Pedestrian subway in lieu of existing LC.No.20 at Railway Km.20/5-6 (Near DGQA CO-OPTEX). 80,00 23 ...... G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

202 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Chennai Division-I(Projects) 8. AS / TS / RAS: 296800 Construction of ROB in lieu of existing LC.No.37 at Railway Km.37/1-2 in Km.0/4 of Railway gate road near Urapakkam Railway Station. 29,68,00 25,92,96 1 1 1 G.O. Ms. No. 71 Highways and Minor Ports (HW2) Dept., Dt.18.4.2012 9. AS / TS / RAS: 160000 Construction of ROB in lieu of existing LC No 29 at Km 2/2 of road at Railway Km 27/7-8 near 16,00,00 14,60,61 1 1 1 Railway Stations G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

10 . AS / TS / RAS: 93000 Construction of ROB in lieu of existing LC No 19 at Railway Km 19/14- 15 between pazhavanthangal & meenambakkam Railway Stations 9,30,00 7,79,58 1 1 1 G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

11 . AS / TS / RAS: 137800 Construction of Road Over Bridge in lieu of Existing LC.No. 12 at Railway Km.28/ 21-23 at Km.6/0 of - Thirunindravur- 13,78,00 9,81,48 ...... Periyapalayam Road in between Pattabiram and Thirunindravur Railway Stations G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 12 . AS / TS / RAS: 188200 Construction of Road Over Bridge in lieu of existing LC No.10 at Railway Km. 13/2-3 between Ennore and Railway 18,82,00 17,80,56 1 1 1 Stations. G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

13 . AS / TS / RAS: 200000 Construction of ROB connecting Pallavaram - Thuraipakkam Radial Road with NH-45 in lieu of the proposed ROB at the existing LC.No.26 20,00,00 15,83,00 1 1 1 near Vaishnava College Land Acquisition. G.O. Ms. No. 118, Highways (HW2) Department Dt.12.06.2003

14 . AS / TS / RAS: 170000 Construction of Road Over Bridge in lieu of existing at LC. No.37 at Railway Km.49/4-6 in between Gummidipoondi and Elavur Railway 17,00,00 14,71,69 1 1 1 Stations. G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

203 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Chennai Division-I(Projects) 15 . AS / TS / RAS: 245000 Construction of Road Over Bridge in lieu of existing LC. No.15 at Railway Km.35/30-32 in between Sevvapet and Putlur Railway stations 24,50,00 12,26,54 1,00,01 1,00,00 4,17,27 G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 Chengalpattu Division (Projects) 16 . AS / TS / RAS: 319400 Construction of ROB between Vandalur- Guduvanchery Railway Station in lieu of existing of LC.No.40. near Guguvanchery Railway 31,94,00 20,47,43 3,00,00 2,12,00 30,00 Station in between Vandalur and Guduvanchery Railway Stations G.O. Ms. No. 60, Highways (HQ2) Department, dt.06.03.2008 17 . AS / TS / RAS: 439252 existing LC.No.54 at Railway Km.61/1-2 in between Chengalpattu - Thirumani Railway stations at Km.27/0 of Sathurangapattinam - 43,92,52 43,92,43 8 8 1 Kancheepuram road in Chengalpattu town. G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / RAS G.O.(2D) No. 7 Highways and Minor Ports Department dated: 1.3.2011 18 . AS / TS / RAS: 345800 Construction of ROB in lieu of LC.No.1 at Railway Km.1/700-800 in between Chengalpet and Old Seevaram railway station in Old GST 34,58,00 28,06,59 1 1 1 road (Near Chengalpet) G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

19 . AS / TS / RAS: 379500 Construction of ROB in lieu of existing LC.No.36 in between Vandalur - Gduvanchery Railway Station at Railway Km.36/12 - 14 (Near 37,95,00 25,16,07 3,00,00 2,00,00 3,00,00 Urapakkam). G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

20 . AS / TS / RAS: 581790 Construction of ROB between Guduvanchery - Singaperumal Koil Railway Station in lieu of existing LC.No.47. 58,17,90 2,71,35 20,00,00 1,00 50,00,00 G.O. Ms. No. 60, Highways (HQ2) Department, dt.06.03.2008

Vellore Division(Projects) 21 . AS / TS / RAS: 185000 Construction of a ROB in lieu of existing LC.No.69 near Valathur Yard at Railway Km,163/15-17 on Ulli - Kakathoppu Road at Km.0/2 (Near 18,50,00 17,75,31 1 1 74,68 Ulli). G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

204 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Vellore Division(Projects) 22 . AS / TS / RAS: 130000 Construction of RUB in lieu of existing LC.No.81 in between Vaniyambadi - Keethandipatti Railway Stations near Vaniyambade 13,00,00 4,31,36 5,00,00 2,30 1,00,00 Railway Yard at Railway Km.197/36-198 (Near Town Road). G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 23 . AS / TS / RAS: 122600 Construction of ROB in lieu of existing LC.No.50 in Km.4/4 of Tiruvalam road at Railway Km.120/14-16 between and 12,26,00 9,24,96 1 1 1 Tiruvalam Railway Station. G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

24 . AS / TS / RAS: 133700 Construction of Road Over Bridge at Km.56/0 of Dharmapuri - Tirupathur Road in lieu of existing LC.No.91 at Railway Km.223/0-1 13,37,00 6,31,70 1 1 1 between Tirupathur and Moolakaranpatti G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

25 . AS / TS / RAS: 133700 Construciton of ROB in lieu of existing LC.No.33 at Railway Km.71A/36- 38 in between Arakkonam and Thirutani Railway Stations. 13,37,00 7,41,90 1 1 1 G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

26 . AS / TS / RAS: 163810 Construction of ROB in lieu of existing LC.No.88 at Km.0/4 in Tirupathur - Natranpalli road at railway Km.217/8 - 10 in between 16,38,10 16,10,58 1 1 1 Jolarpet - Tirupathur Railway stations. G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / R.A.S. G.O.Ms.No. 43, Highways and Minor Ports Department dated: 26.3.2013 27 . AS / TS / RAS: 155000 Construction of ROB in lieu of existing LC.No.45A & 45B at Railway Km.101/17-19 & 101/18-20 near Walajah railway station at Km.4/3 of 15,50,00 11,97,57 1 1 1 Walajah Sholingar Arrakonam road (SH). G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

28 . AS / TS / RAS: 195400/199500 Construction of ROB in lieu of existing LC.No.82 at Km.55/6 of Krishnagiri - road at Railway Km.198/34-36 of Vaniyambadi 19,95,00 19,84,27 1 1 1 Kethandapattti Railway Stations. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

205 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Vellore Division(Projects) 29 . AS / TS / RAS: 137700 Construction of Road Over Bridge at Km. 5/4 of - road in lieu of existing LC.No.64 at Railway Km.154/2-14 13,77,00 7,43,81 1 1 1 between Gudiyatham and Melalathur Railway Stations. G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 30 . AS / TS / RAS: 226100/533500 Construction of ROB in lieu of existing LC.No.128 at Km.118/8 of Krishnagiri - Ranipet Railway Km.151/12-13 between vellore and 53,35,00 5,76,47 1,40,00 8,27 1,00,00 Katpadi Railway Station. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

31 . AS / TS / RAS: 116300 Construction of Road Over Bridge at Km. 23/8 of Tirupathur - Bargur road in lieu of existing LC.No.90 at Km.222/7-9 between Tirupathur - 11,63,00 5,15,13 1 1 1 Moolakaranpatti Railway Stations. G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

32 . AS / TS / RAS: 193400 Construction of ROB between Kavanoor and Gudiyatham Railway Station in lieu of existing LC.No.63 at Km.8/2 of Kavanur Rusha 19,34,00 12,44,87 1 1 1 Hospital to Pasumathur road. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

33 . AS / TS / RAS: 234500 Construction of ROB in lieu of existing LC.No.89 at Km.0/6 of Thirupathur Vallakkalnatham road at Railway Km.218/32-219/2 in 23,45,00 2,23,59 1 1 1,09,40 between Jolarpet Thirupathur Railway Stations. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

34 . AS / TS / RAS: 105000/115500/142640 Construction of RUB in lieu of existing LC.No.66 in between Melathur Vallathur Railway Station near Railway Yard. 14,26,40 12,58,06 1 1 1 G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 G.O. Ms. No. 27, Highways Department, dt. 11.04.17

35 . AS / TS / RAS: 237200 Construction of ROB in lieu existing LC.No.86 at Km.1/8 of Jolarpet - Natarpalli road at Railway Km.211/4-6 of Jolarpet - Kethandapatti 23,72,00 15,91,06 1,92,00 71,05 4,00,00 Railway Stations. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

206 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Cuddalore Division(Projects) 36 . AS / TS / RAS: 224400 Construction of ROB at Km.1/9 of Cuddalore – Thirukoilur Anaikut road in lieu of L.C.No.159 &160 near Railway station. 22,44,00 22,44,00 1 1 1 G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 240, Highways and Minor Ports Department dated: 22.12.2009 37 . AS / TS / RAS: 212500/233600 Contruction of ROB at Km.27/6 of Vikiravandi – Kumbakonam – Tanjavur road in lieu of existing L.C.No.135A at Railway Km.182/1-2 23,36,00 16,66,12 1,55,00 2,44,73 10,00 of Villupupram – Trichy main line . (Thiruthuraiyur – Panruti) G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

38 . AS / TS / RAS: 230000 Construction of ROB at Km.19/10 of Vridhachalam – Tholudur road in lieu of existing L.C.No.181 at Railway Km.236/1-2 of Villupuram – 23,00,00 21,86,69 1 ...... Trichy Junction Chord line (Pennadam – Mathur road ) near Pennadam Sugar factory G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 39 . AS / TS / RAS: 163500 Construction of ROB at Km.0/6 of Cuddalore – Vridhachalam – Salem road in lieu of existing L.C.No.166A at Railway Km.211/4-5 of 16,35,00 ...... Villupuram – TPJ main line G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

40 . AS / TS / RAS: 245000 Contruction of ROB at Km.0/10 of Salavathi road in lieu of existing L.C.No.93 at Railway Km.124/2-3 in Villupupra – Trichy main line 24,50,00 14,00,32 10,00 1,32,00 1,00 (Olakur – Thindivanam road) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

41 . AS / TS / RAS: 250000 Construction of ROB at km.194/2 of NH 45 (MTD ROAD) in lieu of existing L.C.No.156 at Railway km.190/800-900 of Ulundurpet – 25,00,00 25,00,00 ...... Puvanur Card line. (near Ulundurpet) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

42 . AS / TS / RAS: 105000 Construction of ROB at 0/10 of Chidambaram – Sivapuri – Gavarapattu road in lieu of LC.202 at Railway Km.247/2-3 between Villupuram and 10,50,00 15,21,51 1 ...... TPJ main line. G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 311, Highways and Minor Ports Department dated: 30.12.2008

207 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Thanjavur Division (Projects) 43 . AS / TS / RAS: 269900 Construction of ROB in Nagai - Gudalore - Mysore Road in lieu of LC No. 302 at Railway at KM 351/7-8 in between Thanjavur and Thittai 26,99,00 23,54,08 1 1 ... Railway Stations. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008 44 . AS / TS / RAS: 184400 Construction of ROB at KM 0/8 of Thanjavur – Pattukottai – Road in lieu of LC No. 303 at Railway KM 353/1-2 in between Thanjavur and 18,44,00 18,25,37 1 1 ... Thittai Railway Stations. RAS G.O.Ms.No. 143, Highways and Minor Ports Department dated: 22.4.2010 G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 45 . AS / TS / RAS: 179000 Construction of ROB in lieu of LC No. 309 at Railway KM 372/7-8 in between Budalur and Ayyanapuram Railway Stations. 17,90,00 13,16,81 1 1 ... G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

46 . AS / TS / RAS: 284000/ 312300 Construction of ROB at KM 26/2 of Perambalur - Manamadurai Road in lieu of LC No.201 at Railway KM 270/0-100 in between Ariyalur and 31,23,00 18,44,34 3,64,40 6,25,68 3,24,87 Sillakgudi Railway Stations. GO Ms. No.236 / Highways (HQ -2) Department Dated. 3.10.2008

47 . AS / TS / RAS: 290000 Construction of ROB at KM 40/4 of Trichy - Chidambaram Road in lieu of LC No.206 at Railway KM 284/9 to 285/0 in between Sillakgudi and 29,00,00 28,93 18,14,00 8,75,00 19,82,54 Kallagam Railway Stations. GO Ms. No.272 / Highways (HQ -2) Department Dated. 13.11.2007

Trichy Division(Projects) 48 . AS / TS / RAS: 1155877 Reconstruction of at Km 0/2 of M.S.P. Camp road near Thiruchirappalli Railway Junction in lieu of existing Old Bridge at Railway Km 340/4-5 115,58,77 68,72,82 15,74,76 6,42,05 2,83,47 (Bridge No.1136) in Trichy-Dindigul Section (For WORKS) G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011. 49 . AS / TS / RAS: 560000 Reconstruction of Bridge (with Four - lane Carriageway) at Km 314/10 of Chennai -Trichy - Dindigul road near Thiruvanaikoil in lieu of Old 56,00,00 37,09,93 4,27,13 10,38,96 2,88,77 bridge (Bridge No.380-A) at Railway Km 329/10-11. (For WORKS) G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011.

208 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Trichy Division(Projects) 50 . AS / TS / RAS: 215300 Construction of R.O.B. in lieu of existing L.C.No.281 at Railway Km377/100 - 200 in between Manaparai and Chettiapatti Railway 21,53,00 15,90,92 1 1 1 Stations at Km 1/4 of Old G.S.T. Road. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008 51 . AS / TS / RAS: 445200/495000 Construction of ROB in lieu of L.C.No.248 in between Srirangam - Trichy Railway station at Railway Km 331/0-1 on Cauveri South Bank 49,50,00 47,96,70 1 1,96 1 Road at Km 0/4 (Near Trichy Town Railway Town) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

52 . AS / TS / RAS: 144000 Construction of ROB at KM 3/10 of Trichy Chidambaram road in lieu of existing LC.No. 234 at the Railway KM 321/6-7 between Valadi and 14,40,00 7,47,06 1 1 ... Pitchandarkoil Stations. G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

53 . AS / TS / RAS: 205000/266000 Construction of ROB in lieu of L.C.No.228 in between Kattur - Railway station at Railway Km 313/3-4 on Siruthaiyur - Kollidam 26,60,00 25,12,56 1 9,30 1 Anaicut Road at Km 0/4 (Lalgudi Town) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 / G.O. Ms. No. 82, Highways Department, dt. 25.05.16 54 . AS / TS / RAS: 285800/402000 Construction of R.O.B. in lieu of existing L.C.No.325 at Railway Km 406/13-14 in between Trichy and Kumaramangalam Railway Stations 40,20,00 33,71,20 1 31,26 1 at Km 1/4 of NH 45 - B. (Trichy - Viralimalai, Madurai Aruppukottai and Thuthukudi road) G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008 55 . AS / TS / RAS: 280000 Construction of ROB in lieu of L.C.No.279 in between Samuthiram - Manapparai Railway station at Railway Km 375/8-9 on Musiri - 28,00,00 14,98,84 1 1 1 - Pattukotai - Alankudi - Sethupavasathiram Road at Km 41/2 (Manapparai Town) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 Coimbatore Division (Projects) 56 . AS / TS / RAS: 133700 Construction of ROB at km 11/6 of Tiruppur – Vijayamangalam Road L.C.No.129 between Uthukuli – Tiruppur Railway Station. 13,37,00 9,63,91 1 1 1 G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

209 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Coimbatore Division (Projects) 57 . AS / TS / RAS: 140000/ 154000 Construction of ROB at km 1/2 of Valankulam bypass road in lieu of existing LC.No.20 at Railway km 18/23-25 between Coimbatore and 15,40,00 15,43,32 1 1 1 Podanur Railway stations G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 58 . AS / TS / RAS: 154000 Construction of RUB. at km.0/2 of Gandhiji salai (Theirettery) to Kannapan Nagar road in lieu of existing L.C.No.13 at Railway 15,40,00 7,69,47 3,24,58 3,24,58 1 km.13/25-27 in between Peelamedu and Coimbatore North Railway station. G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 59 . AS / TS / RAS: 159035 Construction of ROB. at km.0/10 of Pollachi-Valparai road in lieu of existing L.C.No.118 at Railway km.120/7-8 in between Gomangalam- 15,90,35 12,31,39 1,00,01 35,00 1 Pollachi Railway stations.Location: Pollachi Town. G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

60 . AS / TS / RAS: 122500/111600/127991 Construction of ROB. at km.2/10 of Sulur-Nilambur road in lieu of existing L.C.No.143 at Railway km.468/18-20 in between Somanur and 12,79,91 11,87,36 1 20,00 1 Sulur road Railway stations. G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / G.O. Ms. No. 74, Highways Department, dt. 29.03.17 61 . AS / TS / RAS: 165000 Construction of ROB at km 334/6 of Nagapattinam – Gudalore – Mysore road in lieu of existing L.C.No.145 at Railway km.477/10-12 16,50,00 16,45,64 1 1 1 within Coimbatore Corporation limit (Ondipudur). G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

62 . AS / TS / RAS: 133700 Construction of ROB at Km 35/8 of Gobi – Uthukuli Kangeyam Road L.CNo.128 in between Uthukuli – Tiruppur Railway station. 13,37,00 8,57,29 1 1 1 G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

63 . AS / TS / RAS: 140500 Construction of ROB. at km.2/10 of Kuruchi - Nachipalayam road in lieu of existing L.C.No.151 at Railway km.450/1-12 in between Podanur 14,05,00 14,04,96 1 1 1 – Madukkarai stations. G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

210 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Coimbatore Division (Projects) 64 . AS / TS / RAS: 270920 Construction of ROB. at km.0/10 of Irugur and Chinniampalayam road in lieu of existing L.C.No.144 at Railway km.475/22-24 in between 27,09,20 21,15,16 1,00,01 2,01,50 1 Irugur – Podanur Railway stations. RAS GO 170 Dated 29.06.2018 G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / R.A.S. G.O.Ms.No: 190, Highways Dept. Dated: 11.10.2010 65 . AS / TS / RAS: 328720 Construction of ROB. at km.0/6 of Singanallur - Vellalore road in lieu of existing L.C.No.146 at Railway km.476/22-24 in between Irugur and 32,87,20 28,30,83 3,50,00 1,83,88 1,88,12 Podanur Railway station. RAS GO No. 105 Dated 28.06.2018 G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

66 . AS / TS / RAS: 330300 Construction of ROB. at km.1/0 of Rathinapuri – Sanganur road Gandhipuram 7th street in lieu of existing L.C.No.11 at Railway 33,03,00 21,45,32 1,05,00 1 1 km.12/19-21 in between Peelamedu and Coimbatore North Railway station. G.O. Ms. No. 82, HW&MP (HQ2) Department, dt. 25.05.2016 67 . AS / TS / RAS: 170000 Construction of ROB at km. 0/2 of Coolipalayam RS to Vavipalayam road in lieu of LC.No.130 at Railway km. 435/12-14 in between 17,00,00 11,19,75 1 1 1 Uthukuli – Tiruppur Railway station. G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

68 . AS / TS / RAS: 170000 Construction of ROB at km. 2/0 of Mangalam Avinashi road in lieu of LC.No. 134 at Railway km. 450/13-15 at Vanchipalayam yard. 17,00,00 17,22,84 1 1 1 G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

69 . AS / TS / RAS: 239400 Construction of ROB. at km.1/2 of Udumalpet-Chinnar road in lieu of existing L.C.No.95 at Railway km.92/16-17 in between Udumalapettai- 23,94,00 18,66,39 60,00 1 1 Gomangalam Railway stations. RAS G.O.(2D) No. 7 Highways and Minor Ports Department dated: 1.3.2011 G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 70 . AS / TS / RAS: 172200 Construction of ROB. at km.3/10 of Ramanathapuram- Podanur road in lieu of existing L.C.No.21 at Railway km.21/43-45 (B.G) Km.162/14- 17,22,00 12,59,97 1 1 1 15 (M.G) in between Coimbatore and Podanur junction. G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

211 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Salem Division (Projects) 71 . AS / TS / RAS: 129500 Construction of ROB at Km. 0/10 of Omalur-Sankagiri road in lieu of existing LC. No.9 at Railway Station. 12,95,00 7,40,11 1 1 ... G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 72 . AS / TS / RAS: 133700 Construction of ROB at Km.17/4 of Edapady Magudan-chavadi road in lieu of existing LC.116 at Railway Km.354/32-34 between Magudan- 13,37,00 2,62,54 1 1 ... chavadi – Maveli-palayam station G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

73 . AS / TS / RAS: 225000 Construction of ROB at km. 6/8 of Suramangalam Road in lieu of Existing LC. 113 Railway Km. 332/8-10 Between Salem Junction and 22,50,00 12,38,34 1 1 ... Magnesite stations)And also lies in Salem corporation limits) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

74 . AS / TS / RAS: 106300/110000 Construction of RUB at Km.9/6 of Jandamedu-Puliyur Road in lieu of Existing LC.No.98 Railway Km.247/17-19 between Samalpatty - 11,00,00 9,72,02 1 1 ... Dasampatty Station G.O. Ms. No. 236, Highways (HQ2)Department dt. 03.10.20008

75 . AS / TS / RAS: 106000 Construction of ROB at Km. 1/8 of Mallapuram-Mookanur Road in lieu of Existing LC.No. 105 Railway Km. 288/8-10 in between 10,60,00 9,86,63 1 1 ... Buddi reddipatty Railway Station. G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

76 . AS / TS / RAS: 243900/268000 Construction of RUB at Km.176/4 of Pondy-Krishnagiri Road (NH-66) in lieu of Existing LC.No.96 Railway Km.243/20-22 between 26,80,00 26,85,97 1 1 ... Kakkangarai-Samalpatty Station. G.O. Ms. No. 236, Highways (HQ2)Department dt. 03.10.20008

Madurai Divison (Projects) 77 . AS / TS / RAS: 289887 Construction of ROB at Km.438/6 of BCC road (SH) in lieu of existing L.C.No.363 at Railway Km.494/4 of Madurai - Dindigul section near 28,98,87 28,97,99 1 1 1 Sellur. G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

212 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Madurai Divison (Projects) 78 . AS / TS / RAS: 220000 Construction of ROB in Thirupparan-kundram town road in lieu of existing LC No.370 at Railway Km.500/6-7 between Madurai – 22,00,00 21,47,32 10,14 22,53 1 Thirupparan-kundram Railway station. G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 79 . AS / TS / RAS: 176500 Construction of ROB at Km.419/4 of Chennai-Trichy-Dindigul road in lieu of existing LC.No.5 at Km.3/100-200 in between Dindigul- 17,65,00 16,15,56 38,46 38,46 1 Akkaraipatty Railway Station. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Tirunelveli Division (Projects) 80 . AS / TS / RAS: 160500 Construction of ROB at 132/6 of Madurai Tuticorin road SH in lieu of Existing L.C.No.485 at Railway Km.651/12-13 at Tuticorin between 16,05,00 16,04,91 2 2 2 Meelavitan and Tuticorin stations G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 45, Highways and Minor Ports Department dated: 26.3.2013 81 . AS / TS / RAS: 255100 Construction of ROB at Km 153/10 of Madurai Kanyakumari (NH7) in lieu of existing LC.4 at Railway Km 4/8-9 at Tirunelveli & 25,51,00 13,20,50 1,02 2,77 12,27,73 Seithunganallur Railway Stations. G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

82 . AS / TS / RAS: 129500 Construction of ROB at Km. 91/4 of Madurai - Kanyakumari road S.H in lieu of L.C. No. 437 at Railway Km. 586/1-2 at in between 12,95,00 5,11,37 ...... Kovilpatti and Nalli Railway stations. G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

83 . AS / TS / RAS: 129500 Construction of ROB at Km. 94/2 of Madurai - Kanyakumari road SH in lieu of existing L.C. No. 440 at Raillway Km. 588/9-10 between 12,95,00 6,95,17 1 46,79 1 Kovilpatti and Kumarapuram Railway stations G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

84 . AS / TS / RAS: 275000 Construction of ROB in lieu of LC. No. 486 &487 in between Milavittan - Tuticorin Railway station at Railway Km. 652/11-12 and 27,50,00 17,62 5,02 1,00 1,00 653/6-7 G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

213 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Tirunelveli Division (Projects) 85 . AS / TS / RAS: 214000 Construction of ROB at Km 1/4 of Nagercoil - Balamore road in lieu of existing L.C. No 32B at Railway Km 280/6-7 between Nagercoil 21,40,00 20,93,12 1 1 1 Junction and Nagercoil Town (Eraniel) G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 86 . AS / TS / RAS: 245000 Construction of ROB at Km 0/8 of Tenkasi - Madurai road in lieu of existing L.C. No. 502 at Railway Km. 660/8-9 between Tenkasi and 24,50,00 16,58,80 52 1 1 Shencottai Railway stations G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Chenglepet Division (N&RR) 87 . AS / TS / RAS: 85500 Construction of RUB in lieu of existing L.C.No. 9 at Railway Km 23/22- 4 in between Avadi - Pattabiram Railways Stations (Near Hindu 8,55,00 5,06,01 1,00,00 5,55,92 9,32,44 College Railway station) (CE N & RR) G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 88 . AS / TS / RAS: 156000/529800 Construction of ROB in lieu of existing L.C.No. 7 at Railway Km 17/34- 18/2 in between Ambattur - Avadi Railways Stations (Near 52,98,00 25,01,79 2,00,00 15,15,46 7,74,89 Railway station) (CE N & RR) G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / G.O. Ms. No. 27, Highways Department, dt. 11.04.17 89 . AS / TS / RAS: 334800/521100 Construction of Road Over Bridge in lieu of existing L.C.No.2 at Railway Km.1034-1035 between Pattabiram and Pattabiram West 52,11,00 7,44,35 20,00,00 6,22,18 35,10,05 Railway Station at Km.67/4 of Tirupathi -Chennai road (NH.205) (CE N & RR) G.O. Ms. No. 39/Highways & Minior Ports (HQ2) Dept. dated 01.03.11 / G.O. Ms. No. 27/Highways & Minior Ports (HP2) Dept. dated 11.04.17 90 . AS / TS / RAS: 104200/330900 Construction of RUB in lieu of existing L.C.No. 16 at Railway Km 38/22- 4 near Putlur Railway station at Km.1/4 of Kakkalur Putlur 33,09,00 4,78,49 20,00,00 9,25,26 19,00,05 road. (CE N & RR) G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 / G.O.Ms.No.27, Highways and Minor Ports Dept. dated 11.04.17

214 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Cuddalore Division (N&RR) 91 . AS / TS / RAS: 347500 Construction of ROB in lieu at L.C.No.2 at Railways Km 2/2-3 between Villupuram-Venkatesapuram railway of Villupuram Katpadi section at 34,75,00 26,14,30 1 3,00,00 1,54,00 road Km.158/8 of NH.45A towards Villupuram town. (CE N & RR) G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 Thanjavur Division (N&RR) 92 . AS / TS / RAS: 428500/521200 Consultancy services for preparation of Detailed project report for the work of Construction of RUB in lieu of existing LC No.304 at Railway 52,12,00 48,89,85 1 1 ... KM.354/4-5 between Thanjavur Railway station and Railway yard. (CE N & RR) RAS GO No 27 H&MP Dated 11.04.2017 G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 Nagapattinam Division (N&RR) 93 . AS / TS / RAS: 231900/231900/271700 Construction of ROB at Km.50/220 of NH67 (Nagapattinam-Gudalore- Mysore road) in lieu of existing L.C.No.22 in Railway Km.31/3-4 in 27,17,00 20,41,87 3 5,00 ... Koradachery Station. (CE N & RR) G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 / G.O.Ms.No.78,Highways (HP2) and Minor Ports Dept. dated 28.09.17 Coimbatore Division (N&RR) 94 . AS / TS / RAS: 126500 Construction of ROB at Km 0/6 of Thaneerpandal road in lieu of existing L.C.No.6 at Raiway Km 6/15-17 in between Singanallur - 12,65,00 4,95 1 9,77 1,63,53 Peelamedu Railway Stations (CE N & RR) G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 95 . AS / TS / RAS: 225500/547000 Construction of ROB in lieu of existing LC No.9 in between Peelamedu - Coimbatore North Railway station at Railway Km 10/19- 54,70,00 22,21,82 15,00,00 12,28,82 7,02,47 20 on Ganapathy - Avarampalayam Road at Km 0/8 (Avarampalayam). (CE N & RR) RAS GO No 56 H&MP Dept Dated 25.04.2018 G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 96 . AS / TS / RAS: 186900/278600 Construction of ROB at Km 0/2 of Irugur Town Panchayat office road in lieu of L.C.No.2 at Railway Km 1/11-13 in between Irugur - 27,86,00 21,26,23 1,00,00 6,87 3,74,58 Peelamedu Railway station. (CE N & RR) G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

215 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Coimbatore Division (N&RR) 97 . AS / TS / RAS: 119000 Construction of LUS in lieu of LC No.10 at Km 11/33-35 in between Peelamedu Coimbatore North section in Irugur Coimbatore section. 11,90,00 2,29 1 ... 1 (CE N & RR) G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 98 . AS / TS / RAS: 211600 Construction of RUB in lieu of LC No.4 at Km 3/3-5 in between Irugur- Peelamedu station in Irugur Coimbatore section. (CE N & RR) 21,16,00 17,77,96 1 1,47,54 1,89,59 G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010

99 . AS / TS / RAS: 305000 Construction of ROB in lieu of LC No.7 at Km 8/1-3 in between Irugur- Peelamedu station in Irugur Coimbatore section. (CE N & RR) 30,50,00 29,18,66 1 5,00 1,11,88 G.O. Ms. No. 39/Highways & Minior Ports (HQ2) Dept. dated 01.03.11

100 . AS / TS / RAS: 170000/585200 Construction of ROB in lieu of existing L.C.No.5 in between Irugur - Peelamedu Railway station at Railway Km 3/21-23 on Neelikonam 58,52,00 27,03,12 1 2,00 1,57,95 palayam - SIHS Colony Road at Km 1/6 Near SIHS Colony (CE N & RR) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 / G.O. Ms. No. 27, Highways Department, dt. 11.04.17 Erode Division (N&RR) 101 . AS / TS / RAS: 482565 Construction of ROB in lieu of existing LC No.132 in between Uthukuli - Tiruppur Railway station at Railway Km 440/26-28 on 48,25,65 39,12,57 3,60,00 74,42 2,67,58 Tiruppur - Vavipalayam Km Road at Km 0/2 SRC Mill Gate) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 102 . AS / TS / RAS: 181890/ 133800 Construction of ROB at Km.1/2 of Munarai-Thotti Mannarai Road in lieu of L.C. 131 at Railway Km.438/4-6 in between Uthukuli and 18,18,90 4,10,47 7,20,00 ... 14,02,30 Tiruppur Railway Station. (CE N & RR) G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 / G.O.Ms.No.27, Highways (HP2) and Minor Ports Dept. dated 11.04.17

216 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Erode Division (N&RR) 103 . AS / TS / RAS: 276800 Construction of ROB in lieu of existing LC No.133 in between Uthukuli - Tiruppur Railway station at Railway Km 441/9-11 on 27,68,00 24,26,89 1,20,00 35,00 1 Tiruppur Kongu Main Road At Km 0/2 (Kongu Nagar) (CE N & RR) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 104 . AS / TS / RAS: 100980 Construction of ROB in at Railway Km 394/10-12 in between Erode and Thottipalayam railway station in lieu of L.C.No.124 of Erode 10,09,80 8,82,41 1 1,98 1 Chennimalai road to Periyasadayampalayam Road at Km.0/2. (CE N & RR) G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 Madurai Division (N&RR) 105 . AS / TS / RAS: 245300 Construction of ROB in lieu of L.C. No.371 at km 1/2 of Thiruparamkundram Municipal road at Railway Km 501/400-500 in 24,53,00 16,02,57 1,16,43 10,00 3,07,43 between Madurai Tiruparankundram Railway Stations G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008 106 . AS / TS / RAS: 264000 Construction of RUB at Dindigul Hanumanthanagar in lieu of existing L.C. No.309 at Railway Km.431/900-432 in Dindigul yard. (CE N 26,40,00 17,17,50 3,77,62 2,77,50 3,23,00 & RR) G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 107 . AS / TS / RAS: 330000/462750 Construction of ROB at Km 0/2 of Madurai - Kanyakumari road in lieu of existing L.C. No.366 at Railway Km 496/18-497/1 at Palanganatham 46,27,50 32,97,98 8,28,53 50,00 12,79,52 between Madurai junction and Tiruparankundram Railway Stations (CE N & RR) G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / G.O. Ms. No. 78, Highways Department, dt.28.09.17 Paramakudi Division (N&RR) 108 . AS / TS / RAS: 205300/267520 Construction of ROB at railway Km 538/500-600 in lieu of existing LC No. 403 between Virudhunagar and Thulukkapatti Rly stations 26,75,20 14,97,52 1 1,91,73 1 (Virudhunagar Town) (CE N & RR) G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008 / G.O. Ms. No. 71, Highways Department, dt. 10.10.17

217 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) Tirunelveli Division (N&RR) 109 . AS / TS / RAS: 129500 Construction of a RUB in lieu of existing L.C.No. 439 at Railway Km 587/6-7 between Kovilpatti and Kumarapuram Railway stations at Km 12,95,00 10,20,03 2,24,97 1 3,40,21 40/2 of paruvakudi - kovilpatti - Ettayapuram road (SH.44) G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 110 . AS / TS / RAS: 291200 Construction of ROB at Km.147/8 of NH-7 (Madurai-Kanniyakumari Section) in lieu of existing L.C.No.18 of Railway Km 27/500-600 29,12,00 19,00,18 9,61,82 1 10,11,89 between Tirunelveli Junction and Yard. G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 (C&M) 111 . AS / TS / RAS: 170000/232970 Construction of ROB in lieu of Existing LC No.13 in between Ennore and Railway station at Railway KM 29/28-30 (near Athipattu 23,29,70 20,01,06 1,00,00 1 3,24,64 Station) CE (C & M) G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 C.E. Metro 112 . AS / TS / RAS: 280000 Construction of RUB in LC.No.4 in between Thiruvotriyur - Ennore (near Thiruvotriyur Railway Stations) CE (METRO) 28,00,00 13,61,91 50,00 15,74 5,20,00 G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010. 113 . AS / TS / RAS: 255000 Construction of RUB in LC.No.6 in between Thiruvotriyur - Wimco Nagar Railway Station. CE (METRO) 25,50,00 13,43,72 50,00 12,26 5,20,00 G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.

114 . AS / TS / RAS: 140000 Construction of RUB in liew of existing LC.No.22 at Railway Km 21/10- 11 near Trisulam Railway station. CE (METRO) 14,00,00 5,05 10,00 1 10,00 G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

115 . AS / TS / RAS: 295000 Construction of R.O.B. in lieu of L.C. 14 in between Tirunindravur Tiruvallur (Near Veppampattu railway station) CE (METRO) 29,50,00 6,89,78 1,00,00 1 22,60,21 G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.

218 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

16 Major Works ( DPC 5054 80 800 JT 16 04 ) C.E. Metro 116 . AS / TS / RAS: 760000 Constuction of ROB in LC.No. 32 & 33 in lieu of L.C. 33 in between Tambaram Vandalore Railway Stations (Near Standard 76,00,00 24,54,53 41,45,47 15,00,00 65,00,98 Motors) CE (METRO) G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010. 117 . AS / TS / RAS: 199700/219600 Construction of Road under Bridge in Lieu of existing LC No. 4 at Railway Km 11/32-34 near Korattur. (CE METRO) 21,96,00 5,31,27 3,94,73 9,21,70 1 G.O. Ms. No. 60, Highways (HQ2) Department, dt.06.03.2008

118 . AS / TS / RAS: 470000/ 580500 Construction of ROB in LC - 3 in between Thandayarpet -Thiruvotriyur Railway Station near Thiruvotriyur Mattumandai CE (METRO) 58,05,00 47,66,01 7,43,24 1,63,00 1 G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010. / G.O.MS.No. 75, Highways (HP1) Department dt. 23.09.17

119 . AS / TS / RAS: 350000 Construction of ROB at LC No.5 in between & Ambatthur Railway Stations Near Pattravakkam CE (METRO) 35,00,00 34,78,36 1 1 16,15 G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.

120 . AS / TS / RAS: 147600 Construction of Limited use RUB in lieu of existing LC No.27 at Chrompet Radha Nagar main road near chrompet Railway 14,76,00 6,80,14 6,00,00 2,56,47 5,20,09 station. CE (METRO) G.O.Ms.No.245 Highways Department Dt: 5.12.03

64 Lands ( DPC 5054 80 800 JT 64 03 ) Cuddalore Division(Projects) 1. AS / TS / RAS: 33396 Construction of ROB at Km.1/9 of Cuddalore – Thirukoilur Anaikut road in lieu of L.C.No.159 &160 near Thirupathiripuliyur Railway station. (64 3,33,96 3,33,96 ...... Lands) CHARGED G.O. (D) No 78 &96 Highways and Minor Ports (HP-1) Department Dated 11.04.2017& 26.04.2017 2. AS / TS / RAS: 22540 Construction of ROB at Km.1/9 of Cuddalore – Thirukoilur Anaikut road in lieu of L.C.No.159 &160 near Thirupathiripuliyur Railway station. (64 2,25,40 49,24 1 ...... Lands) G.O.Ms.No. 92, Highways and Minor Ports Department dated: 15.11.2017

219 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

5054 80 800 JT [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JT Construction of Railway Over Bridges /Railway Under Bridges

64 Lands ( DPC 5054 80 800 JT 64 03 ) Trichy Division(Projects) 3. AS / TS / RAS: 105600 Reconstruction of at Km 0/2 of M.S.P. Camp road near Thiruchirappalli Railway Junction in lieu of existing Old Bridge at Railway Km 340/4-5 10,56,00 10,56,00 ... 18,22,94 7,41,48 (Bridge No.1136) in Trichy-Dindigul Section. 64 LANDS (Land Acquisition) G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011. 4. AS / TS / RAS: 690000 Reconstruction of Bridge (with Four - lane Carriageway) at Km 314/10 of Chennai -Trichy - Dindigul road near Thiruvanaikoil in lieu of Old 69,00,00 4,60,00 63,91,76 38,56,10 1 bridge (Bridge No.380-A) at Railway Km 329/10-11 (Land Acquisition) 64 LANDS LA GO No 161 H&MP Dated 28.09.2018 G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011. Madurai Divison (Projects) 5. AS / TS / RAS: 2792 Construction of ROB at Km.438/6 of BCC road (SH) in lieu of existing L.C.No.363 at Railway Km.494/4 of Madurai - Dindigul section near 27,92 ...... Sellur.(Court Case)(Charged)(64 Lands) G.O. Ms. No. 212, Highways (HS1)Department dt. 12.12.2018 TOTAL - 5054 80 800 JT 3,179,41,25 2,036,54,12 319,56,87 198,90,81 366,00,30

220 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 5 Project Director, Tamil Nadu Road Sector Project

5054 80 800 PB [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure PB Tamil Nadu Road Sector Project

16 Major Works ( DPC 5054 80 800 PB 16 04 ) 1. AS / TS / RAS: 462677 Institutional Strengthing 44,26,77 44,08,48 ...... G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.

2. AS / TS / RAS: 5245079 Maintenance Component 498,50,79 493,20,13 ...... G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.

3. AS / TS / RAS: 277928 Others ( R & R works and Misc.items) 60,49,28 60,20,93 ...... G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.

4. AS / TS / RAS: 17220000/ 17639987 Upgradation Component 1,708,13,00 1,699,65,02 1 1 1 G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010. G.O.(D) No.283 HW&MP Dept / Dt.13.12.17

5. AS / TS / RAS: 693804 Consultancy 75,55,04 75,53,77 ...... G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.

64 Lands ( DPC 5054 80 800 PB 64 03 ) 1. AS / TS / RAS: 0 Lands (Charged) ...... 35,77 1

2. AS / TS / RAS: 520812 Lands 55,08,12 53,86,72 1 1 1 G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010. G.O.(D) No.168 / HW&MP Dep. Dt.20.07.17 G.O.(D) No.280 / HW&MP Dep. Dt.08.12.17 TOTAL - 5054 80 800 PB 2,442,03,00 2,426,55,05 2 35,79 3

221 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 5 Project Director, Tamil Nadu Road Sector Project

5054 80 800 PC [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure PC Tamil Nadu Road Sector Project Phase - II

16 Major Works ( DPC 5054 80 800 PC 16 02 ) 1. AS / TS / RAS: 3428170 Four lanning and Strengthening of Mettupalayam-Sathy-Gopi-Erode Road (SH 15) Km 123/000 to Km 153/400 (30.40 Km) (PPP 01) 342,81,70 30,45,25 22,60,10 72,50 148,03,60 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

2. AS / TS / RAS: 1200000 Road Safety 120,00,00 10,85,70 32,42,50 22,38,60 51,94,30 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

3. AS / TS / RAS: 800510 Upgrading Mohanur-Namakkal-Senthamangalam-Rasipuram Road (SH 95) Km 0/000 to 13/100 (13.10 Km) (EPC 07) 80,05,10 78,02,80 55,00 1,25,80 63,30 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

4. AS / TS / RAS: 1327100 Consultancy Services 132,71,00 60,02,68 6,11,10 10,88,30 6,05,00 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

5. AS / TS / RAS: 2390000 Maintenance of Output and Performance Based Road Contract (642kms) 239,00,00 170,06,18 33,91,90 34,38,00 12,66,60 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

6. AS / TS / RAS: 2542060 Upgrading Road (SH116) Km 14/500 Km 36/900 (22.40 Km) & Upgrading Sadras - Chengalpattu - 254,20,60 212,99,30 5,38,20 12,87,50 2,55,00 Kanchipuram - Arakkonam-Thiruthani Road (SH 58) Km 0/000 to Km 26/800 (26.143) (EPC 01) G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015. 7. AS / TS / RAS: 1463900 Upgrading Omalur-Sankari-Thiruchengode-Paramathi Road (SH 86) Km 54/800 to Km 81/000 (26.20 Km) (EPC 05) 146,39,00 102,61,80 2,69,02 3,23,97 1,09,19 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

222 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 5 Project Director, Tamil Nadu Road Sector Project

5054 80 800 PC [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure PC Tamil Nadu Road Sector Project Phase - II

16 Major Works ( DPC 5054 80 800 PC 16 02 ) 8. AS / TS / RAS: 660000 Institutional Capacity Enhancement 66,00,00 5,02,90 23,96,20 11,82,80 29,48,60 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

9. AS / TS / RAS: 4980920 Upgrading Arcot-Villupuram Road (SH4) Km 29/800 to Km 110/200 and Km 113/200 to Km 114/200 and Km 113/200 to Km 114/600 498,09,20 321,64,80 32,49,40 20,63,60 3,55,00 (82.444 Km) (EPC 02) G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

10 . AS / TS / RAS: 2950970 Upgrading Malliyakari-Rasipuram-Thiruchengode-Erode Road (SH 79) Km 0/000 to Km 30/600 and Km 51/400 to Km 71/300 (50.50 Km) 295,09,70 242,29,70 5,42,00 5,42,00 2,18,00 (EPC 06) G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

11 . AS / TS / RAS: 1807060 Upgrading Nanguneri Bharathavaram - Ovari Road (SH 89) upto ECR Junction Km 0/000 to Km 35/200 (35.20 Km) (EPC 08) 180,70,60 161,20,28 73,50 1,08,50 1,21,20 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

12 . AS / TS / RAS: 4179940 Upgrading Rajapalayam-Sankarankoil-Tiruneveli Road (SH 41) Km 2/000 to Km 28/000 and Km 33/800 to Km 82/800 (75.20 Km) (EPC 10) 417,99,40 346,31,20 1,71,20 2,74,80 1,66,60 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

13 . AS / TS / RAS: 1376150 Upgrading Cuddalore-Chithoor Road (SH 4) Km 41/700 to Km 44/000 and Km 45/000 to Km 66+190 and Construction of New Link Road 137,61,50 102,13,20 81,80 8,16,90 75,40 between SH9 and SH 137 ( 28.45 Km) (EPC 03) G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

14 . AS / TS / RAS: 5142430 Strengthening and widening of Thirunelveli--Kollam Road (SH 39) Km 5/000 to Km 50/600 (45.60 Km) (PPP 03) 514,24,30 38,70 15,76,40 1,09,00 66,56,40 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

223 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 5 Project Director, Tamil Nadu Road Sector Project

5054 80 800 PC [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure PC Tamil Nadu Road Sector Project Phase - II

16 Major Works ( DPC 5054 80 800 PC 16 02 ) 15 . AS / TS / RAS: 69500 Contingencies 6,95,00 79,40 6,00 10,80 13,00 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

16 . AS / TS / RAS: 2076280 Upgrading Viruthachalam-Parankipettai Road (SH 70) Km 0/000 to Km 35/800 (35.80 Km) (EPC 04) 207,62,80 53,70,36 28,97,30 4,25,20 30,00,00 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

17 . AS / TS / RAS: 1965010 Upgrading Paruvakudi-Kovilpatti-Ettayapuram-Vilathikulam-Vembar Road (SH 44) Km 22/500 to Km 38/750 and Km 41/300 to Km 196,50,10 165,42,10 2,80,50 4,07,90 1,55,00 56/700 (EPC 09) G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

18 . AS / TS / RAS: 6420000 Four lanning and Strengthening of Ottanchathiram-Tharapuram- Thiruppur Road (SH 37) Km 37/400 to Km 126/200 (88.80 Km) 642,00,00 149,05,30 143,31,50 232,00,00 234,00,00 (PPP 02) G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

64 Lands ( DPC 5054 80 800 PC 64 01 ) 1. AS / TS / RAS: 4570000 Lands 693,00,00 184,43,34 100,00,00 100,00,00 20,00,00 G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

TOTAL - 5054 80 800 PC 5,171,00,00 2,397,44,99 459,73,62 477,16,17 614,06,19

224 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 337 JI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JI Improvements to Rural Roads with loan assistance from NABARD

16 Major Works ( DPC 5054 04 337 JI 16 01 ) 1. AS / TS / RAS: 122726 Improvements to Rural Roads with loan assistance from NABARD L.S Provision 12,27,26 4,33,36 1 31,97 3,83,90 G.O.Ms.No. 6, Highways (HW1)Dept., DT.4.1.2008 G.O.MS.No.76/HW&MP Dept./23.04.12 G.O.Ms.No. 57 / HW&MP (HP2) Dept, dated 25.04.2018 64 Lands ( DPC 5054 04 337 JI 64 00 ) 1. AS / TS / RAS: 23421 Improvemets to Rural Roads with loan assistance from NABARD under Rural Roads Scheme - Land L.S Provision. 2,34,21 ... 1 3,80,00 1 G.O.Ms.No. 2.3. AND 4, Highways (HQ2) Dept. dt. 3.1.2017.

2. AS / TS / RAS: 23421 Enhanced compensation payable to the land owners for the acquisition of lands in Agaramcheri, Chinnacheri and Kollamangalam villages. 2,34,21 ...... G.O.Ms.No. 2,3 and 4, Highways (HQ2) Dept. dt. 3.1.2017

TOTAL - 5054 04 337 JI 16,95,68 4,33,36 2 4,11,97 3,83,91

225 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 337 JJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JJ Improvement to Bus Routes with loan assistance from NABARD

16 Major Works ( DPC 5054 04 337 JJ 16 09 ) 1. AS / TS / RAS: 0

...... 1 ......

64 Lands ( DPC 5054 04 337 JJ 64 08 ) 1. AS / TS / RAS: 0

...... 1 ......

TOTAL - 5054 04 337 JJ ...... 2 ......

226 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 337 JK [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JK Improvement to District and other Roads with loan assistance from NABARD 16 Major Works ( DPC 5054 04 337 JK 16 07 ) 1. AS / TS / RAS: 1192700 Improvement and Strengthening of 46 road works with loan assistance from NABARD . 119,27,00 115,95,59 11 45,22 ... Improvements of 32 road works with loan assistance from NABARD G.O.Ms.No.9, Highways (HW1)Dept., DT.08.01.2016 G.O.Ms.No. 116, Highways (HW1) Dept dt. 25.11.2016 64 Lands ( DPC 5054 04 337 JK 64 06 ) 1. AS / TS / RAS: 0

...... 1 ......

2. AS / TS / RAS: 368 Enhanced compensation payble to the land owners for the acquisition of lands in Markampatti Village and Naraikinaru village. 3,68 ...... G.O.Ms.No. 107, Highways (HS1) Dept dt. 04.10.2016.

TOTAL - 5054 04 337 JK 119,30,68 115,95,59 12 45,22 ...

227 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 337 JX [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JX Construction / Reconstruction of bridges and improvement of roads with loan assistance from NABARD 16 Major Works ( DPC 5054 04 337 JX 16 01 ) 1. AS / TS / RAS: 88700 Reconstruction of High Level Bridge at km.0/8 of Sadras-Chengalpattu- Kanchipuram-Arakkonam-Thiruthani road. 8,87,00 8,78,85 1 8,15 ... G.O.Ms.No. 78, Highways (HW1)Dept., DT.26.05.2006 G.O.Ms.No.83, Highways (HP.2)Dept., Dated:.25.05.2016

TOTAL - 5054 04 337 JX 8,87,00 8,78,85 1 8,15 ...

228 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 337 JZ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD 16 Major Works ( DPC 5054 04 337 JZ 16 07 ) 1. AS / TS / RAS: 15843228 Construction/ Reconstruction of New Bridges with loan assistance from NABARD - L.S Provision, Projects-127 RIDF-XV,141 RIDF-XVI, 1,584,32,28 1,138,75,21 299,60,00 260,00,00 323,01,14 1) G.O.Ms.No. 188 / HW&MP (HW1) Dept, dt. 8.11.12 2) G.O.Ms.No. 201 / HW&MP (HW1) Dept, dt. 19.12.13 3) G.O.Ms.No. 9 / HW&MP (HW1) Dept, dt. 29.01.15 4)G.O.Ms.22, HWMP(HW.1)Dept.,dt 20.2.15 5) G.O.Ms.28,HW&MP(HW1)Dept dt11.2.16 6) G.O.Ms.116,HW&MP(HW1)Dept dt.25.11.16 7) G.O.(Ms)No. 20,HW&MP(HW1) Dept dt. 3.4.2017 8) G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018 9) G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18 10 ) G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18 11) G.O.Ms.No. 18 / HW&MP (HP2) Dept, dt. 21.01.2020 12) G.O.Ms.No. 21 / HW&MP (HP2) Dept, dt. 24.01.2020 64 Lands ( DPC 5054 04 337 JZ 64 06 ) 1. AS / TS / RAS: 713 Acquisition of Lands 7,13 28,91 1 1 1

G.O.(D) No.92, HW&MP Dept., dt.24.04.17

TOTAL - 5054 04 337 JZ 1,584,39,41 1,139,04,12 299,60,01 260,00,01 323,01,15

229 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 337 KA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KA Bye Pass Works

64 Lands ( DPC 5054 04 337 KA 64 05 ) 1. AS / TS / RAS: 3866745 Land Acquisition for forming 11 Bye pass. 386,67,45 107,95,99 11,32,00 9,49,70 105,49,57 G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012 G.O.Ms.No.82, Highways (HP.2)Dept., Dated:.25.05.2016 G.O.(Ms)No.43, Highways (HP.2)Dept., Dated:.30.05.2019 G.O.Ms.No.21, Highways &MP (HP2) Dept, dt. 24.01.2020 G.O.Ms.No.78 / HW&MP(HV2) Dept, dt 28.09.2017 TOTAL - 5054 04 337 KA 386,67,45 107,95,99 11,32,00 9,49,70 105,49,57

230 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 337 KD [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KD Upgradation of Panchayat Union Roads / Panchayat Roads

16 Major Works ( DPC 5054 04 337 KD 16 00 ) 1. AS / TS / RAS: 0 New Works Likely to be Sanctioned ......

2. AS / TS / RAS: 27724800 Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard 2,772,48,00 551,26,00 1,050,00,00 1,050,00,00 1,050,00,00 G.O.(Ms) No. 88, Highways and Minor Ports (HF 1) Dept dt. 27.10.2017 G.O.(2D)No.85, HW&MP(HF1) Dept, dt.27.11.2018 G.O.(2D) No.46, Highways and Minor Ports (HF 1) Dept dt. 15.10.19 G.O.(2D) No.45,Highways and Minor Ports (HF 1) Dept dt. 15.10.2019 G.O.(2D)No.49,Highways and Minor Ports (HF 1) Dept dt. 29.10.2019 G.O.(2D)No.50, Highways and Minor Ports (HF 1) Dept dt. 29.10.2019 G.O.(2D)No.3, Highways and Minor Ports (HF 1) Dept dt. 31.01.2020 TOTAL - 5054 04 337 KD 2,772,48,00 551,26,00 1,050,00,00 1,050,00,00 1,050,00,00

231 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 337 KE [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KE Upgradation of Panchayat Union Roads / Panchayat Roads under NABARD Assistance 16 Major Works ( DPC 5054 04 337 KE 16 08 ) 1. AS / TS / RAS: 0 Upgradation of Panchayat Union Roads/Panchayat Roads under NABARD Loan Assistance ...... 1 ......

TOTAL - 5054 04 337 KE ...... 1 ......

232 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 337 KJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 337 Road Works KJ Construction / Re-Construction of Bridges under State Fund

16 Major Works ( DPC 5054 04 337 KJ 16 08 ) 1. AS / TS / RAS: 0 Construction of HLB at Gudiyatham-Gadambur-Kailasagiri- Vaniyambadi Road across Malattaru River under State Fund ...... 6,77,20 New Work Yet to be Issued

TOTAL - 5054 04 337 KJ ...... 6,77,20

233 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 04 789 JA [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 789 Special Component Plan for Scheduled Castes JA Improvement to Rural Roads with loan assistance from NABARD under Special Component Plan 16 Major Works ( DPC 5054 04 789 JA 16 00 ) 1. AS / TS / RAS: 0 Improvemets to Rural Roads with loan assistance from NABARD under Special Component Plan- Land L.S Provision...... 1 ......

64 Lands ( DPC 5054 04 789 JA 64 09 ) 1. AS / TS / RAS: 0 Improvemets to Rural Roads with loan assistance from NABARD under Special Component Plan- Land L.S Provision...... 1 ......

TOTAL - 5054 04 789 JA ...... 2 ......

234 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

5054 80 800 RN [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure RN Construction of Bridges under Tsunami Emergency Assistance Project (TEAP) with Loan assistance from Asian Development 16 Major Works ( DPC 5054 80 800 RN 16 08 ) 1. AS / TS / RAS: 243 Lands Lumpsum provision 2,43 1,57 1 1,57 1,57 GO Ms No.583 & 132, Revenue (NC-IV) dept., dt.20.10.2005 & 23.2.2006.

TOTAL - 5054 80 800 RN 2,43 1,57 1 1,57 1,57

235 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 04 101 JH [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JH Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City 16 Major Works ( DPC 5054 04 101 JH 16 02 ) CMDP Division-II 1. AS / TS / RAS: 582200/640000 Construction of Grade Separator at the Intersection of Mount- Medavakkam and Pallavaram-Thuraipakkam road near Kilkattalai. 64,00,00 20,38,05 36,59,27 30,00,00 13,61,95 G.O.Ms. No.144, Highways and Minor Ports (HW 2) dated: 27.11.2015 2. AS / TS / RAS: 110278 widening the existing Railway over bridge at Km 20/8 of Mount Poonamalle Avadi road 11,02,78 ...... G.O.Ms.No. 78, H&MP (HQ2), Dt. 31.07.2019.

64 Lands ( DPC 5054 04 101 JH 64 01 ) CMDP Division-II 1. AS / TS / RAS: 31000/74000 Construction of High level bridge across coovam river connecting Km 14/4 of Mount -Poonamallee-Avadi road and Paruthipattu - 7,40,00 3,00,23 5,00 4,30,00 ... Thiruverkadu Municipal road. G.O.Ms. No.140, Highways and Minor Ports (HW 2) dated: 26.11.2015. RAS G.O. (Ms).No. 17, H&MP (HP2) Dept., Dt. 25.02.2019. TOTAL - 5054 04 101 JH 82,42,78 23,38,28 36,64,27 34,30,00 13,61,95

236 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 04 101 JI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JI Construction of Bridges and Roads under Chennai City Traffic Decongestion Projects (CCTDP). 64 Lands ( DPC 5054 04 101 JI 64 09 ) CMDP Division-I 1. AS / TS / RAS: 337900 Construction of Grade Separator at KM 4/4 of Inner Ring Road and P.T.Rajan Salai Junction. 33,79,00 ...... 3,00 G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 2. AS / TS / RAS: 1229400 Construction of Grade Separator at the intersection of ECR and Kalaignar Karunanidhi salai at Akkarai. 122,94,00 ...... 3,00 G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020

CMDP Division-II 3. AS / TS / RAS: 1030000 Construction of Grade separator at Marmalong Bridge- Irumbuliyur Road covering Madampakkam road Junction, Tambaram Eastern 103,00,00 ...... 3,00 Bypass and Camp Road Junction near G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 4. AS / TS / RAS: 336000 Construction of Multi level Grade Separator on Mount-Poonamallee- Avadi road from MIOT Hospital to Mugalivakkam via Ramapuram, L&T 33,60,00 ...... 3,00 and DLF G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020

5. AS / TS / RAS: 135000 Construction of Road Over Bridge at Km 75/6 of Chennai – Thiruttani- Renigunta Road (SHU148) in lieu of existing two lane ROB 13,50,00 ...... 3,00 G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020

6. AS / TS / RAS: 708800 Construction of Grade Separator along Chennai - Thiruthani - Renigunta Road at the intersection of Mount Poonamallee Avadi Road 70,88,00 ...... 3,00 at Km 68/2 and at the intersection of Road at Km 69/0 at Avadi G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 7. AS / TS / RAS: 469000 Construction of Grade Separator at the Junction of Rajiv Gandhi Salai with Sardar Patel road at . 46,90,00 ...... 3,00 G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020

237 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 04 101 JI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JI Construction of Bridges and Roads under Chennai City Traffic Decongestion Projects (CCTDP). 64 Lands ( DPC 5054 04 101 JI 64 09 ) CMDP Division-II 8. AS / TS / RAS: 20000 Construction of High Level Bridge across Coovam river at Padikuppam in lieu of existing bed level causeway connecting PadiKuppam road to 2,00,00 ...... 3,00 Poonamallee High Road G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 CMDP Division-III 9. AS / TS / RAS: 305100 Construction of Grade Separator at the Junction of Km 4/2 of Redhills road and Km 19/100 of Inner Ring Road 30,51,00 ...... 3,00 G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 CMDP Division-IV 10 . AS / TS / RAS: 200000 Construction of Grade Separator at Km 6/5 of Marmalong Bridge – Irumbuliyur road near Kaiveli, Madipakkam 20,00,00 ...... 3,00 G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 11 . AS / TS / RAS: 60000 Providing Skywalk, Escalator and other accessories connecting to West Tambaram with Multi Model Integration 6,00,00 ...... 3,00 connectivity to existing Bus stand, including improvements to existing Bus stand G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 12 . AS / TS / RAS: 1564000 Construction of Grade Separator at the intersection of Mount - Poonamallee - Avadi road, Chennai – Chittoor - Bangalore road & 156,40,00 ...... 3,00 Poonamallee - - pallavaram road at in Poonamallee. G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 13 . AS / TS / RAS: 1180000 Construction of Grade Separator at the Intersection of Kodambakkam - Sriperumbudur road and Poonamallee - Kundrathur - Pallavaram 118,00,00 ...... 3,00 Road, including providing connectivity to ORR via Erikkarai Road at Kundrathur G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 14 . AS / TS / RAS: 362500 Construction of Vehicular Underpass at the junction of Mount Medavakkam road & Southern sector of Inner Ring Road near 36,25,00 ...... 3,00 Madipakkam G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020

238 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 04 101 JI [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 04 District and other Roads 101 Bridges JI Construction of Bridges and Roads under Chennai City Traffic Decongestion Projects (CCTDP). 64 Lands ( DPC 5054 04 101 JI 64 09 ) CMDP Division-V 15 . AS / TS / RAS: 1368000 Providing Four lane Grade Separator at Km. 76/8 of Chennai- Thiruthani-Renigunta Road at the junction of Km.6/4 of Vanagaram – 136,80,00 ...... 3,00 Ambattur Road G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020 16 . AS / TS / RAS: 1910000 Construction of Grade Separator at Km 80/7 in Chennai – Thiruthani – Renigunta Road and Korattur Road. 191,00,00 ...... 3,00 G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020

TOTAL - 5054 04 101 JI 1,121,57,00 ...... 48,00

239 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 80 800 JW [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City 16 Major Works ( DPC 5054 80 800 JW 16 08 ) CMDP Division-I 1. AS / TS / RAS: 158500 Widening the (ECR) to Six lane for Km 14/550 – 15/700 at Village...... 25,00 6,24,00 G.O.(Ms) No. 157, H&MP (HW1) Dept., Dt., 16.12.2019. 2. AS / TS / RAS: 333563 Formation of Tambaram Eastern By-pass road branching from Km 17/4 of Marmalong Bridge - Irumbuliyur road from Rajakizhpakkam 36,69,00 38,51 34,19,00 18,61,65 17,68,83 (via) Agaramthen road towards Perungalathur at Km 5/450 - 8/080 G.O (D) No: 61, HW & MP (HW2) Dept., dt. 21.03.2018.

3. AS / TS / RAS: 10000 /10000 / 755040 Formation of Tambaram Eastern By-Pass road Km 0/0-8/4(Land Acquistion only) 75,50,49 63,58,11 11,79,35 11,92,37 1 G.O(Ms) No. 264/ Highways (HW1) Dept dated: 23.09.2004. RAS G.O.Ms.No.104/ HW&MP (HP2) Dept, dated.26.08.2015

4. AS / TS / RAS: 35000/38500/295606 Widening from two lane to four lane and strengthening of Mount- Madipakkam Road @ km 4/4-6/6 29,56,06 29,32,16 1 ...... G.O.Ms.No.98/ Highways (HW1) Dept, dated: 09.04.2007. RAS I G.O (2D) No.8 HW&MP (HW2) Dept, dated: 20.09.2010. RAS II G.O.Ms.No.104/HW&MP (HP2) Dept, dated: 26.08.2015. 5. AS / TS / RAS: 27500/27500/252517 Widening from two lane to four lane and strengthening of Mount- Madipakkam Road @ km 0/0-2/0. 25,25,17 17,67,18 5,57,99 10,00 10,00 G.O.Ms.No.98/ Highways(HW1) Dept, dated: 09.04.2007. RAS I G.O (2D) No.8 HW&MP (HW2) Dept, dated: 20.09.2010. RAS II G.O.Ms.No.104/HW&MP (HP2) Dept, dated: 26.08.2015. 6. AS / TS / RAS: 250000/275000 Forming link road from Chennai Marmallong bridge I rumbuliyur road at Km 17/4 to Agaramthen salai in Land acquistion 27,50,00 27,07,10 1 ...... completed portions of Tambaram Eastern By-pass. G.O.Ms.No.64/ HW&MP(HW1) dated.16.04.2012.

7. AS / TS / RAS: 20000/22000/155420 Widening from two lane to four lane and strengthening of Mount- Madipakkam Road @ km 1/6-3/0 15,54,20 15,54,20 1 ...... G.O.Ms.No.98/ Highway(HW1) Dept, dated: 09.04.2007. RAS I G.O (2D) No.8 HW&MP (HW2) Dept, dated: 20.09.2010. RAS II G.O.Ms.No.104/HW&MP (HP2) Dept, dated: 26.08.2015.

240 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 80 800 JW [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City 16 Major Works ( DPC 5054 80 800 JW 16 08 ) CMDP Division-II 8. AS / TS / RAS: 167835 Construction of High level bridge across Coovam River connecting Km 14/4 of Mount - Poonamallee - Avadi Road and Paruthipattu - ...... 1,00,00 Thiruverkadu Municipal Road. G.O.(Ms) No. 123, H&MP (HW1) Dept., Dt., 05.11.2019. 9. AS / TS / RAS: 2199200 Construction of Grade Separator at the intersection of lattice bridge road and east coast road at junction ...... 10,00 G.O.(Ms) No. 19, H&MP (HW1) Dept., Dt., 21.01.2020.

10 . AS / TS / RAS: 85000/85000/131316 Widening from two lane to four lane and Strengthening of Thirumazhisai - Sathyavedu Road KM 5/0-10/0 (SH-50) (Nemam - 13,13,16 12,95,47 1 ...... Kadapakkam) G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(2D)No.8/ Highways & Minor Ports (HW2) Dept, dated: 20.09.2010. 11 . AS / TS / RAS: 1331000/1464100 Construction of Grade Separator connecting Medavakkam - Sholinganallur road junction, Medavakkam - Mambakkam road junction 146,41,00 47,10,02 50,31,00 50,31,00 41,88,93 and Mount - Medavakkam road junction in Marmalong bridge - irumbuliyur road at Medavakkam. G.O.Ms. No.100 /Highways & Minor Port/HW2/Dept.dt. 14.08.2015. 12 . AS / TS / RAS: 19900/19900/39660 Widening from two lane to four lane and Strengthening of Thirumazhisai - Sathyavedu Road KM 1/0-2/0 (SH-50) (Udayavarkoil- 3,96,60 3,88,73 1 ...... Thirumazhisai). G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(Ms)No. 136/H & MP (HW2) Dept, dated: 16.04.2010. 13 . AS / TS / RAS: 67500/67500/118071 Widening to two lane to four lane and Strengthening of Singaperumal koil - Sriperumbudur - Tiruvallur Redhills Road KM 64/8-69/4 (SH-57) 11,80,71 11,79,87 1 ...... G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(2D)No.8/ Highways & Minor Ports (HW2) Dept, dated: 20.09.2010.

14 . AS / TS / RAS: 120000/183062 Widening from two lane to four lane and strengthening of Chennai - Chithoor - Bangalore road km 18/0 - 22/6 18,30,62 17,53,91 76,70 1 1 G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(2D)No.8/ Highways & Minor Ports (HW2) Dept, dated: 20.09.2010.

241 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 80 800 JW [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City 16 Major Works ( DPC 5054 80 800 JW 16 08 ) CMDP Division-II 15 . AS / TS / RAS: 200000/220000 Forming of New Link Road connecting Puzhal in Chennai GNT Road and Aamullaivoyal in Inner Ring Road at 22,00,00 4,20 1 ...... KM 20/8 G.O.Ms.No.64/Highways & Minor Ports (HW-1) Dept, dated: 16.04.2012. 16 . AS / TS / RAS: 135000/260711/260711 Widening to two lane to four lane and Strengthening of Singaperumal koil -Sriperumbudur - Tiruvallur -Redhills Road KM 43/0-51/8 (SH-57) 26,07,11 26,07,11 1 ...... (Tiruvallur - Keelanur). G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(2D)No.8/ Highways & Minor Ports (HW2) Dept, dated: 20.09.2010. 17 . AS / TS / RAS: 16000/16000 Widening and Strengthening to double lane of Malayambakkam road km 0/0-3/3 1,60,00 98,60 1 ...... G.O.Ms.No.229/ Highways (HW-1) dated 14-11-2005

18 . AS / TS / RAS: 982200/1080000 Construction of Grade Separator at the intersection of Tambaram Road, Tambaram Velachery Road and Velachery Byepass Road at 108,00,00 82,39,36 22,29,84 20,60,63 5,00,00 Velachery - Vijayanagaram G.O.Ms. No.120/ Highways & Minor Ports/HWI/Dept.dt. 29.06.2012

CMDP Division-III 19 . AS / TS / RAS: 1170000/1225000 Construction of Grade Separator in Periyar EVR Salai connecting the junction of Nelson Manickam Road and Anna Nagar Third Avenue near 122,50,00 97,35,19 15,00,00 17,00 50,00 . G.O.(D).No.222/HW&MP (HW-1) dated 18-11-2010 20 . AS / TS / RAS: 228400 Formation of new link road connecting (DGS Dinakaran Salai) with Durgabhai Deshmukh road through Tamil Nadu ...... 5,00,00 ... Music College G.O. (Ms) No.76, H & MP (HW1) Dept., Dt. 24.07.2019.

CMDP Division-IV 21 . AS / TS / RAS: 807400/826600 Providing Grade Separator at the intersection of Kundrathur and Santhai Road @ Pallavaram 82,66,00 36,78,60 41,72,30 25,53,63 20,33,76 G.O.Ms. No.120/ Highways & Minor Port/HWI/Dept.dt. 29.6.12

242 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 80 800 JW [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City 16 Major Works ( DPC 5054 80 800 JW 16 08 ) CMDP Division-V 22 . AS / TS / RAS: 25000/27500/98600 Widening from two lane to four lane and strengthening of Chennai – Ennore Road in km 11/0 – 12/0 (SH – 114) (Ajax busstand - Vimco 9,86,00 8,06,38 1 ...... Nagar) G.O.Ms. No. 98, Highways (HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.70/HW&MP(HW 1)/ dated. 18.04.2012 23 . AS / TS / RAS: 527200/552500 Construction of Grade Separator (LHS) and Pedestrian subway near Kolathur in Irattai Eri at the Junction of Perumbur Redhills Road in 55,25,00 35,55,76 3,72,00 3,67,16 16,02,07 Inner Ring Road. G.O.Ms. No.120/Highways and Minor Ports (HW 1) Dept dated. 29.06.2012 24 . AS / TS / RAS: 291287/320300/ 410750 Construction of Grade separator in the Right Hand Side in Kolathur Irattai Eri at the junction of Perumbur Redhills road and Inner Ring 41,07,50 18,57,22 7,57,48 7,57,48 1 Road. G.O.Ms. No.12/Highways and Minor Ports (HW 2) Dept dated: 11.01.2016 (AS). G.O.Ms. No.35/Highways and Minor Ports (HP 2) Dept dated: 07.03.2019. 25 . AS / TS / RAS: 80000/85700/292223 Widening from two lane to four lane and strengthening of Madhavaram - Red hills road Km 4/2-9/6. 29,22,23 28,84,46 37,37 1 1 G.O.Ms. No. 98, Highways (HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.2D (8) HW&MP (HWI) / dated. 20.09.2010

26 . AS / TS / RAS: 32000/33700/ 270150 Widening from two lane to four lane and strengthening of Chennai – Ennore Road in km 9/0 – 11/0 (SH – 114) (Kaladipet - Ajax Bus Stand) 27,01,50 26,70,17 1 ...... G.O.Ms. No. 98, Highways(HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.70/HW&MP(HW 1)/ dated. 18.04.2012

27 . AS / TS / RAS: 20000/22000/47060 Widening from two lane to four lane and strengthening of Chennai – Ennore Road in km 12/0 – 13/0 (SH – 114) (Vimco Nagar - Ernavur) 4,70,60 4,70,60 1 ...... G.O.Ms. No. 98, Highways (HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.70/HW&MP(HW 1)/ dated. 18.04.2012

28 . AS / TS / RAS: 23000/25300/48900 Widening from two lane to four lane and strengthening of Chennai – Ennore Road in km 8/0 – 9/0 (SH – 114) (Toll gate - Kaladipet) 4,89,00 4,49,81 1 ...... G.O.Ms. No. 98, Highways (HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.70/HW&MP(HW 1)/ dated. 18.04.2012

243 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 80 800 JW [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City 16 Major Works ( DPC 5054 80 800 JW 16 08 ) CMDP Division-V 29 . AS / TS / RAS: 533100 /586400 Re-Construction of High level bridge across "B" Canal at Km 0/6 of T.P.P road (SH-56) 58,64,00 14,66,97 26,20,00 21,23,95 22,73,07 G.O.Ms.No.13/Highways and Minor Ports (HW-2) Dept dated: 13.01.2016 64 Lands ( DPC 5054 80 800 JW 64 07 ) CMDP Division-I 1. AS / TS / RAS: 100000/3546600/7780000 Forming six lane of ECR from km 11/8-23/2 Thiruvanmiyur to Akkarai (LA). 354,66,00 354,65,95 1 200,00,00 223,34,05 G.O.Ms. No.229/Highways and Minor Ports (HW1) Dept dated: 14.11.2005 (AS). G.O.Ms.No.104/ Highways&MP (HW1) Dept, dated.12.06.2012 (RAS I). G.O.(Ms).No. 48/ Highways & Minor Ports (HP2) Dept., Dated. 30.05.2019 (RAS II). 2. AS / TS / RAS: 33000/110749 Widening from two lane to four lane and strengthening of Mount- Madipakkam Road @ km 6/6-8/6. 11,07,49 8,21,09 1 1 1 G.O.Ms.No.98/ Highways (HW1) Dept, dated: 09.04.2007 and G.O.Ms. No.100/Highways(HWI)/ dated. 11.06.2012

3. AS / TS / RAS: 24500/166530 Widening from two lane to four lane and strengthening of Mount- Madipakkam Road @ km 3/0-4/4. 16,65,30 16,65,30 1 1 ... G.O.Ms.No.98/ Highways (HW1) Dept, dated: 09.04.2007 and G.O.Ms. No.100/Highways(HWI)/ dated. 11.06.2012

CMDP Division-II 4. AS / TS / RAS: 580000 Construction of Grade Separator at Junction of ECR and Lattice Bridge Road at Thiruvanmiyur (LA only) 58,00,00 27,44 57,73,02 20,00 57,52,56 G.O.Ms. No.99/Highways & MP Dept (HW2)/ dated. 14.08.2015 5. AS / TS / RAS: 360000 Construction of HLB across coovam River at Road junction in NH 4 (LA only) 36,00,00 35,88,63 1 1 1 G.O.Ms. No.98/Highways & MP Dept (HW2)/ dated. 14.08.2015

TOTAL - 5054 80 800 JW 1,473,54,74 1,047,78,10 277,26,22 365,19,92 412,47,33

244 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 80 800 KJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure KJ Works executed by Chief Engineer (Metro), Highways from State Infrastructure and Amenities Fund 16 Major Works ( DPC 5054 80 800 KJ 16 03 ) CMDP Division-I 1. AS / TS / RAS: 35000/38500 Construction of Pedestrian subway in Jawaharlal Nehru road at Km 2/7 near Kasi theatre. 3,85,00 9,53 1 ...... G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12 2. AS / TS / RAS: 2042000 Forming Link Road and Construction of bridge across connecting Rajiv Gandhi Salai and East Coast Road at 204,20,00 31,34 202,78,89 4,00,00 199,88,65 Go (Ms).No: 70/Highways & Minor Ports (HW2) Dept /dt. 19.06.2014

3. AS / TS / RAS: 35000 Construction of Pedestrian subway in GST road at the junction of Guindy and MKN road 3,50,00 6,01 1 ...... G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

4. AS / TS / RAS: 35000/38500 Construction of Pedestrian subway in Jawaharlal Nehru road at Km 1/6 near Ekkattuthangal Malladi company. 3,85,00 23,66 1 ...... G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

5. AS / TS / RAS: 50000 Construction of Pedestrian subway at Km 7/7 near Koyembedu Bus terminous. 5,00,00 6,39 1 ...... G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

6. AS / TS / RAS: 35000 Construction of Pedestrian subway in GST road near Little Mount AG church 3,50,00 5,96 1 ...... G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

CMDP Division-II 7. AS / TS / RAS: 90000 Construction of high level bridge at KM 14/4-14/8 at Karanodai - Minjur Road (2012 - 13) 9,00,00 5,49 1 ...... G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

245 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 80 800 KJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure KJ Works executed by Chief Engineer (Metro), Highways from State Infrastructure and Amenities Fund 16 Major Works ( DPC 5054 80 800 KJ 16 03 ) CMDP Division-III 8. AS / TS / RAS: 935000/935000 Construction of Grade Separator at the inter section of Kaliyamman Koil Street and City Bus entrance of CMBT with Jawaharlal Nehru Salai 93,50,00 20,03,93 40,00,00 28,74,35 30,00,00 (IRR) at G.O. Ms No.118/ H&MP (HW-1) D/ dt.28.06.12 & RAS G.O. Ms No.95/ HM&P (HP2) D /dt.11.08.2015 9. AS / TS / RAS: 80000/80000/111000 Construction of additional three Lane bridge across Coovam River in EVR Salai at Km 6/6 near Aminjikarai (Upstream side) 11,10,00 9,61,86 1 43,00 1 G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.2012 RAS G.O. Ms No. 75/ H&MP (HP-2) D/ dt.23.09.2017

CMDP Division-IV 10 . AS / TS / RAS: 10000/10000 Widening of the existing bridge at Km 3/4 of Mount - Poonamallee - Avadi road (SH-55) 1,00,00 79,65 1 1 1 G.O.Ms. No.118/Highways&Minor Ports/HWI/Dept.dt. 28.6.2012 11 . AS / TS / RAS: 194900/197500 Construction of FOB and sky walk with escalator at Km 26/8 of Grand Southern Trunk road Tambaram , Chennai 19,75,00 2,36,66 14,92,43 12,51,01 1,00,00 G.O.Ms. No.72/Highways&Minor Port/HW2/Dept.dt. 13.07.2015

12 . AS / TS / RAS: 154600/170000 Widening of High level bridge across Adayar river at Km 2/6 from Mount Poonamallee Avadi road near Ramapuram 17,00,00 13,16,59 2,59,98 83,96 1,00 G.O.Ms. No.75/Highways&Minor Port/HW2/Dept.dt. 14.07.2015

CMDP Division-V 13 . AS / TS / RAS: 20000/21000 Construction of Additional two lane high level bridge at Km 62/2 of Singaperumal Koil - Sriperumbudur - Tiruvallur - Red hills Road (2012 - 2,10,00 1,66,13 1 1 ... 13) G.O.(Ms)No. 118, Highways and Minor Ports (HW 1) Dept dated: 28.06.2012. 14 . AS / TS / RAS: 50000/55000/60263 Construction of Additional two lane high level bridge at KM 15/8 of Mount - Poonamallee - Avadi Road (2012 - 13) 6,02,63 5,50,34 1 1 ... G.O.(Ms)No. 118, Highways and Minor Ports (HW 1) Dept dated: 28.06.2012. RAS G.O.(Ms)No. 27, Highways and Minor Ports (HP 2) Dept dated: 11.04.2017

246 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

5054 80 800 KJ [ ` in Thousands]

Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 80 General 800 Other Expenditure KJ Works executed by Chief Engineer (Metro), Highways from State Infrastructure and Amenities Fund 16 Major Works ( DPC 5054 80 800 KJ 16 03 ) CMDP Division-V 15 . AS / TS / RAS: 20000/21000 Construction of High Level Bridge at Km 16/6 of Tambaram- Road (SH 113) 2,10,00 2,10,00 1 1 ... G.O.(Ms)No. 118, Highways and Minor Ports (HW 1) Dept dated: 28.06.2012. TOTAL - 5054 80 800 KJ 385,47,63 56,13,54 260,31,41 46,52,36 230,89,67

247