Details of Works for Highways

Details of Works for Highways

DETAILS OF WORKS FOR HIGHWAYS DEMAND No.21 --- HIGHWAYS AND MINOR PORTS DEPARTMENT Page HEADS OF DEPARTMENT Number 21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS 1—35 21 03. CHIEF ENGINEER (CONSTRUCTION AND MAINTENANCE ) - HIGHWAYS 36—161 21 04. CHIEF ENGINEER (HIGHWAYS) - PROJECTS 162—220 21 05. PROJECT DIRECTOR - TAMIL NADU ROAD 221—224 SECTOR PROJECT 21 07. CHIEF ENGINEER (HIGHWAYS) - NABARD 225—235 AND RURAL ROADS 21 10. CHIEF ENGINEER (METRO) 236—247 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 01 337 JA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 01 National Highways 337 Road Works JA Original works 16 Major Works ( DPC 5054 01 337 JA 16 00 ) 1. AS / TS / RAS: 180000 18,00,00 ... 1 11,47 18,00,00 G.O.(MS).No 28 Highways and Minor ports (HV2) Department dated 04.03.2019 64 Lands ( DPC 5054 01 337 JA 64 09 ) 1. AS / TS / RAS: 0 New Works likely to be sanctioned ... ... ... 1 1 TOTAL - 5054 01 337 JA 18,00,00 ... 1 11,48 18,00,01 1 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) 1. AS / TS / RAS: 0 New works likely to be sanctioned in 2018-19 ... ... ... ... ... Chennai (NH)Division 2. AS / TS / RAS: 700000 Widening of Guduvanchery - Kottayur road from Km 0/0 - 17/6 (Double Lane to Four Lane)Lane)Lane) 74,81,00 ... 17,00,00 21,00,00 30,00,00 CRF-TN-2018-19-05 3. AS / TS / RAS: 80000 Widening from SL-IL and Improvements to Melanur-Meiyur road Km 0/0-10/0 8,57,00 2,15,13 3,75,00 5,00,00 1,41,87 CRF-TN-2017-18-140 4. AS / TS / RAS: 100000 Widening from SL-IL and Strengthening perumbare-orathy road km 0/0-10/2 inculding reconstruction culvert 30 nos and reconstruction of 11,00,00 1,07,05 3,00,00 9,00,00 92,95 minor bridge km 0/6 CRF-TN-2017-18-101 5. AS / TS / RAS: 93740 Construction of Bridge at km 3/8 of pinjivakkam Harijan Colony Road 10,31,00 4,16,08 2,00,00 5,00,00 1,14,92 CRF-TN-2017-18-26 6. AS / TS / RAS: 380000 Widening of Elichur - Palur Road from Km 0/0 - 8/6 (single road to intermediate lane) 41,80,00 ... 8,00,00 8,00,00 15,00,00 CRF-TN-2018-19-02 7. AS / TS / RAS: 1400000 Widening of Chengalpattu - Thiruporur road from Km 0/0 - 21/8 (Double Lane to Four Lane)Lane) 126,75,00 ... 17,00,00 41,00,00 35,00,00 CRF-TN-2018-19-04 2 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 8. AS / TS / RAS: 278910 Construction of Bridge at km 44/8 of Thirumazhisai- Uthukkottai Road 30,67,00 7,99,79 2,70,00 8,00,00 14,67,21 CRF-TN-2017-18-41 9. AS / TS / RAS: 1110000 Widening of Walajabad - Sunguvachatram - Keelachery road (Double Lane to Four Lane) from Km 0/0-19/6 121,65,00 ... 21,00,00 5,00,00 35,00,00 CRF-TN-2018-19-01 10 . AS / TS / RAS: 120000 Widening from IL to DL and Improvements to Karanodai - Meenchur road from km 0/0-8/2 11,90,00 15,34 5,00,00 5,00,00 6,74,66 CRF-TN-2017-18-100 11 . AS / TS / RAS: 1200000 Widening of Kodampakkam - Sriperumpudur Road Km 13/2 - 28/8 (Double Lane to Four Lane) 132,00,00 ... 18,00,00 26,00,00 38,00,00 CRF-TN-2018-19-03 Vellore (NH) Division 12 . AS / TS / RAS: 130000 Widening from DL to ML and Strengthening from km 30/7 - 40/4 of Virudachalam - Ulundurpettai - Villupuram road. 14,15,00 7,68,09 6,00,00 6,00,00 46,91 CRF-TN-2017-18-104 13 . AS / TS / RAS: 60000 Improvements to Kumaragudi-Nachiyarpettai road km 1/0-10/0 including Construction of Retaining Wall 6,00,00 3,85,90 2,00,00 ... 2,14,10 CRF-TN-2017-18-106 14 . AS / TS / RAS: 61000 Widening from Single lane to Intermediate lane and Improvements of Indili - Sembakurichi road (via) Pukkiravari road at km 19/0-27/510. 6,70,00 ... 5,00,00 5,00,00 1,70,00 CRF-TN-2018-19-25 3 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 15 . AS / TS / RAS: 64000 Widening from SL to IL and Strengthening of Kachirapalayam - Pottiyam Road Km.0/0 - 8/8 6,40,00 3,54 3,00,00 5,50,00 86,46 CRF-TN-2017-18-63 16 . AS / TS / RAS: 170000 Widening from DL-ML and Improvements of Vridhachalam-Tholudur road at km 32/0-42/0 including CD works. (SH-171) 17,72,00 ... 8,00,00 3,40,00 9,00,80 CRF-TN-2018-19-22 17 . AS / TS / RAS: 105000 Wdg to SL to IL and Stg. From Km. 0/0-15/0 of Pagandai - X road to Mamandhur road 10,50,00 3,74,99 3,00,00 4,30,00 2,45,01 CRF-TN-2017-18 -12 18 . AS / TS / RAS: 66500 Improvements to Thittagudi-Sirupakkam road (via) Avatti.,Ma.Pudaiyur km 11/0-18/0 (Except cement road km 16/700- 7,10,00 4,71,00 3,00,00 1,50,00 89,00 17/100) CRF-TN-2017-18-105 19 . AS / TS / RAS: 85000 Widening from Single lane to Intermediate lane and Improvements from km 0/0-4/0 & Improvements from km 4/0 - 7/4 of Kumaratchi- 9,00,00 1,41,35 4,00,00 5,30,00 2,28,65 Puliyangudy road including Construction of Retaining Wall CRF-TN-2017-18-102 20 . AS / TS / RAS: 90000 Widening from SL - IL and Strengthening km.0/0 - 11/0 of Thiyagadurgam - Pudhukeni Road. 9,00,00 3,72 4,50,00 6,80,00 2,16,28 CRF-TN-2017-18-64 21 . AS / TS / RAS: 95000 Widening from DL-ML and Strengthening of Thirukoilur-Asanur Road km 29/100-35/7 9,90,00 3,46,26 4,00,00 3,20,00 3,23,74 CRF-TN-2017-18-103 4 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Budget Revised Budget Estimate upto Estimate Estimate Estimate Details of Works Amount 31-03-2019 2019-2020 2019-2020 2020-2021 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 22 . AS / TS / RAS: 55000 Widening from SL to IL and Strengthening from km 9/5 - 16/6 of Nattarmangalam - Thondur Road including CD works 5,94,00 5,17,60 1,75,00 60,00 16,40 CRF-TN-2017-18-143 23 . AS / TS / RAS: 140000 "Widening from IL to DL & Improvements from Km.2/4-15/8 including construction of minor bridge at km.13/2, CD works & retaining wall at 14,08,00 ... 5,00,00 6,50,00 7,58,00 Km.9/6-10/230 (L/s) and junction improvements of Melpattampakkam- Panchamadevi road (via) Madukkarai(MD-1114)" CRF-TN-2018-19-20 24 . AS / TS / RAS: 90000 Widening and Strengthening from km 28/0-32/0 of Vridhachalam - Thozhudur road. 9,00,00 4,93 4,50,00 1,80,00 7,15,07 CRF-TN-2017-18-135 25 . AS / TS / RAS: 125000 Widening and Strengthening from Km 10/2-13/0, 32/4-33/4,40/0-42/4, including CD works of Vellimedupettai- Pondy Road via Mailam 12,77,00 ... 6,00,00 11,00,00 1,77,00 CRF-TN-2018-19-27 26 . AS / TS / RAS: 125000 Widening from Intermediate lane to Double Lane in Km.6/0-10/170 & 11/220-20/2, Widening from Single lane to Double Lane in Km.10/170 - 13,74,00 ... 8,00,00 7,20,00 6,54,00 11/220 and Strengthening of Thiyagadurgam - Adari Road CRF-TN-2018-19-23 27 . AS / TS / RAS: 230000 Widening from DL-ML and Improvements of Vridhachalam-Tholudur road at km 10/0-17/0 and 18/2-26/6 Strengthening at km 17/0-18/2 24,15,00 ..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    248 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us