BAY CITY TSC November Transportation Service Center Serving Arenac, Bay, Saginaw and Tuscola Counties High-Impact Projects Notable and Low-Impact Projects Hale

Total Page:16

File Type:pdf, Size:1020Kb

BAY CITY TSC November Transportation Service Center Serving Arenac, Bay, Saginaw and Tuscola Counties High-Impact Projects Notable and Low-Impact Projects Hale Mapping/Regions/Bay/BayCityTSC/HighImpact14 CJ Mapping/Regions/Bay/BayCityTSC/HighImpact14 Map Project Duration of Route Location of Work Type of Work County Traffic Comments life. of quality improved and Key Miles Construction benefit economic for services transportation integrated quality highest the Providing MDOT: I-75 B-1 Pinconning Road to Bay/Arenac county line. 3.5 Concrete overlay Bay April - November Contractor-designed maintaining of traffic (MOT). www.michigan.gov/drive Interchange reconstruction, bridge to go information, replacement on M-47, bridge traffic and construction current For US-10 B-2 US-10/M-47 interchange, including five bridges. 0.8 rehabilitation on Hoppler Creek, Huron Bay June - November M-47 detours onto US-10. Single-lane closures on US-10. 300 ext. Claims, Rico, Michelle & Eastern Railroad and westbound 316 ext. Permits, Hundley, Don US-10 over Patrick Road 306 ext. Development, Garza, Jason Brian Ulman, Construction, ext. 304 ext. Construction, Ulman, Brian Jack Hofweber, TSC Manager, ext. 305 ext. Manager, TSC Hofweber, Jack Sunday - Wednesday: 989-671-1535 Concrete reconstruction with bridge * Northbound traffic detoured to I-675 (two lanes). Janes Road to I-675, including Janes Road, replacement on Janes Road, bridge * Southbound traffic routed to northbound I-75 (three lanes). 48706 MI City, Bay April 2014 - I-75 B-3 Wadsworth Road and CSX Railroad bridges; and 4.2 rehabilitation on Wadsworth Road Saginaw Road Wilder East 2590 April 2015 I-75 over Saginaw River (Zilwaukee Bridge). and over CSX Railroad, and bearing Thursday - Saturday: Center Service Transportation City Bay replacement on Zilwaukee Bridge * Northbound traffic to remain on northbound I-75 (three lanes). the contact counties, Tuscola and Saginaw * Southbound traffic detoured to I-675 (two lanes). Bay, Arenac, in projects other and these on information further For Part-width construction using temporary signals and M-15 B-4 M-15 over Cass River, Vassar. N/A Bridge replacement Tuscola April - November single lane closures. Part-width construction using temporary signals and US-23 B-5 US-23 over Rifle River. N/A Deep overlay Arenac July - September single-lane closures. M-25 over Saginaw River (Veterans Memorial M-25 B-6 N/A Electrical work Bay February - May No traffic impacts. Bascule Bridge). MICHIGAN DEPARTMENT OF TRANSPORTATION Culvert replacement at deer creek and Detour in Chesaning for the Deer Creek culvert replacement. M-57 B-7 M-57 over Deer Creek and Bear Creek. N/A Saginaw August - October scour protection at bear creek Shoulder closures for the Bear Creek culvert construction. Between the north and south village limits of M-52 B-8 1.6 Cold mill and resurface Saginaw May - July Single-lane closures. St. Charles. M-83 B-9 M-83 over Cheboyaning Creek. N/A Bridge rehabilitation Saginaw August - September Part-width construction using temporary signals. Cold mill and resurface and railroad M-46 B-10 Vassar Road to Sheridan Road. 5.0 Tuscola August - October Single-lane closures. crossing replacement Bay/Tuscola county line to Thomas Road M-138 B-11 9.6 Double chip seal Tuscola May - June Construct one direction at a time using traffic regulators. (gap Fairgrove). September - US-23 B-12 Standish to Omer. 6.3 Cold mill and resurface Arenac Single-lane closures. November September - 2014 Road M-83 B-13 Genesee Street to M-15, Frankenmuth. 6.6 Cold mill and resurface Saginaw Single-lane closures. November Construction Map September - M-47 B-14 Church Street to Freeland Road. 0.1 Cold mill and resurface Saginaw Single-lane closures. BAY CITY TSC November Transportation Service Center serving Arenac, Bay, Saginaw and Tuscola counties High-Impact Projects Notable and Low-Impact Projects Hale 222 OGEM A W Selkirk Tawas City 215 55 55 National East Tawas West Branch 201475 Road ConstructionWhittemore City McIMapvor - BAY CITY TSC 23 R OS C OMMON Transportation Service Center 212 Prescott Alabaster 33 65 serving Arenac, Bay, Saginaw F 30 and Tuscola counties 18 Skidway Lake 202 Turner Alger Maple Ridge For up-to-date information Twining on these projects, go to the Hockaday N A C Delano list of statewide lane closures AREB-5 at: www.michigan.gov/drive. 75 Omer Scan this code with your Sterling G L A D WIN Au Gres smartphone for a direct Port 195 link to Mi Drive. Austin 30 23 Pine River 25 Gladwin 190 53 61 Standish Pinnebog Kinde Wooden Bentley 188 Shoe Caseville Winegars B-12 Filion Rhodes Beaverton Mount Estey Forest HU R ON 181 Pinconning Albright Bay Port Pigeon Elkton Shores Bad Axe 142 23 Edenville B-1 B A Y 53 Hope Crump 25 Sebewaing Owendale Linwood Ubly 173 13 Bach Gagetown Willard 168 Kawkawlin Unionville Sanford 247 Bay Park New Greenleaf 75 164 30 Averill 75 B-6 Wisner Colling B-2Auburn Essexville Colwood B.R. 162 24 Cass Midland 10 10 25 Akron 81 City BAY Quanicassee MID L AND University Center CITY TUS C O L A Deford Poseyville Freeland 155 138 FairgrovB-11e 84 13 Munger Gilford Caro Laporte 47 15 Zilwaukee 153 Wilmot Decker Carrollton Indiantown Reese Snover B-14Saginaw B-3 B-9 Hemans Twp. 81 Watrousville Kingston Wheeler 58 Arthur B-10 Hemlock Shields Richville 46 S ANI L A C 46 149 Buena 46 53 Breckenridge Merrill SAGINAW 675 Vista Gera Vassar Swan Bridgeport Marlette Creek 144 83 Tuscola Garfield B-4Mayville Frankenmuth 24 B-8 Fosters Silverwood Clifford Edgewood St. Charles 13 23 54 83 Millington North Sickles Fergus 136 B-13 Fostoria Branch Brown Burt Brant Birch 90 City North Star Marion Run Springs S A GI N A W 75 Otter Lake Burnside Chesaning Clio Otisville B-7 Montrose 131 57 57 Columbiaville Kings Mill Oakley Layton Fenmore Corners GENESEE 15 Bannister 126 Mt. Morris L APEER Chapin Mt. Morris 15 13 New Lothrop Twp.125 54 Genesee Lum Eureka Flushing Lapeer Elsie Henderson 52 Juddville 13 122 FLINT Imlay DavisonElba Attica City Carland Flint 159 SHI A W ASSEE Twp. 155 143 69 149 153 69 Shepardsville Ovid 24 163 21 Burton 145 Hunters 168 21 Lennon Creek Corunna 128 131 Hadley Dryden Owosso 123 115 475 Grand Thornville 71 Atlas Bennington Blanc Almont CONSTRUCTION MAP KEY Swartz MAP90 SYMBOLS54 EXPLANATION Metamora Vernon 118 Creek INTERSTATE, U.S., 88 109 Goodrich SYMBOLS 53 ROAD PROJECT Rankin Laingsburg / (HIGH IMPACT) DurandSTATE ROUTES & COUNTY ROADS AIRPORTLeona — 3,000-FOOTrd PAVED FREEWAYS TRANSPORTATION SERVICE CENTERS 113 Bancroft 84 106 RUNWAY & LIGHTED ROAD PROJECT MULTILANE DIVIDED REST AREA Oakwood / (LOW69 IMPACT) COMMERCIAL AIRLINE AIRPORT Gaines PAVED - TWO OR MORE LANESNewark Ortonville 105 23 75 REST AREA WITH FAMILY Oxford PAVED COUNTY ROAD 101BATHROOM FACILITY MILITARY AIR BASE OMB BRIDGE PROJECT BRIDGE PROJECT Linden M A C (HIGH IMPACT) (LOW IMPACT) COUNTY LINE WELCOME CENTER & REST AREA H HOSPITAL EXIT NUMBERS WELCOME CENTER& REST AREA CARPOOL LOT WITH PLAY AREA.
Recommended publications
  • The Bridge That Made Zilwaukee Famous
    SEE PAGE 5B SEE PAGE 1B SEE PAGE 3A Dental check up Boating season every 6 months... running full Fun day at Really? speed ahead the mud bogs $1.00 Featured Section SUNDAY EDITION INSIDE LIFESTYLES: HEALTHY TEETH, HEALTHY BODY Weekend VOL. 21 NO. XXVIII SUNDAY, JULY 13, 2014 2012 & 2013 NEWSPAPER OF THE YEAR tctimes.com ONLINE COMMENTS The bridge that made Zilwaukee famous Pride is a matter of hon- ‘‘esty, integrity and honor. It has nothing to do with per- sonal sexual choices.” Mark my words, the downtown ‘‘ crosswalks are a lawyer’s dream. Some- one, hopefully not a child, is going to get injured or killed soon.” Was stuck for over 10 minutes at Ellen and ‘‘ LeRoy. Do something. The restaurant is making tons of money and the citizens are paying the price. Where is the logic here?” Landmark bridge gets first major makeover this year By Tim Jagielo TRI-COUNTY TIMES | TIM JAGIELO If you don’t like a cer- [email protected]; 810-433-6795 With its safety called into ques- tain float, close your eyes Zilwaukee — Towering over North Westervelt tion, the Zilwaukee Bridge was ‘‘when it goes by. It was a finished in 1987, after a three- wonderful parade.” Road is the bridge that made Zilwaukee famous. From underneath it looks like a typical Michigan overpass, year delay. Since then, millions I am so excited by the albeit enormous, transporting thousands of vehicles of travelers have trusted the bridge as they crossed over construction of the Cor- daily over the Saginaw River. ‘‘nerstone building.
    [Show full text]
  • U.S. Fish and Wildlife Service
    U.S. Fish and Wildlife Service Alpena FWCO - Detroit River Substation Fisheries Evaluation of the Frankenmuth Rock Ramp in Frankenmuth, MI Final Report - October 2019 U.S. Fish and Wildlife Service Alpena FWCO – Detroit River Substation 9311 Groh Road Grosse Ile, MI 48138 Paige Wigren, Justin Chiotti, Joe Leonardi, and James Boase Suggested Citation: Wigren, P.L., J.A. Chiotti, J.M. Leonardi, and J.C. Boase. 2019. Alpena FWCO – Detroit River Substation Fisheries Evaluation of the Frankenmuth Rock Ramp in Frankenmuth, MI. U.S. Fish and Wildlife Service, Alpena Fish and Wildlife Conservation Office – Waterford Substation, Waterford, MI, 22 pp. On the cover: Staff from the Alpena Fish and Wildlife Conservation Office – Detroit River Substation holding the only northern pike that was recaptured upstream of the rock ramp; a tagged walleye; a small flathead catfish; a net full of tagged fish ready to be released downstream; four tagged white suckers recaptured upstream and boat crew conducting an electrofishing transect. 3 Summary Since the construction of the rock ramp, 17 fish species not previously detected upstream have been captured. These species include eight freshwater drum, eleven walleye, two gizzard shad, eight flathead catfish and two round goby. Over the past three years 2,604 fish have been tagged downstream of the rock ramp. Twenty-nine of these fish were recaptured upstream during boat electrofishing assessments or by anglers. Based on the mean monthly discharge of the Cass River during April and May, the data suggests that white and redhorse suckers can move past the rock ramp during normal discharge years.
    [Show full text]
  • MDOT - ACEC PARTNERING WORKSHOP Thursday, January 31, 2019 Lansing Center
    MDOT - ACEC PARTNERING WORKSHOP Thursday, January 31, 2019 Lansing Center DRAFT SCHEDULE 7:00 – 8:00 Registration/Continental Breakfast 8:00 – 8:30 *Opening Session Sean Kelley, PE, ACEC/Michigan President MDOT Director (TBD) 8:45-12:05 *Educational Breakout Sessions (session descriptions follow) Three (3) one hour timeslots are scheduled for breakouts: 8:45-9:45, 9:55-10:55, and 11:05-12:05. Breakout sessions will be presented by teams from ACEC/MDOT and some sessions will be repeated. 12:05-1:00 Luncheon (buffet style) 1:00-1:15 MDOT Partnership Charter Award Presentation Tony Kratofil, PE, MDOT Chief Operations Officer Ron Brenke, PE, ACEC/Michigan Executive Director 1:15-2:30 *General Session Moderator: Steve Gravlin, PE, PS, ACEC/Michigan President-Elect Houghton Flooding Aaron Johnson, MDOT Superior Region Engineer Cybersecurity Challenges in our Connected World Barbara L. Ciaramitaro, PhD, Capella University 2:45-3:45 *Roundtable Sessions Four (4) combined roundtables will be held concerning the following areas: Design/Rail, Construction Administration, Operations, and Bridge. The roundtables will provide an open forum for exchange of ideas. 3:45-4:30 Ice Cream Social A conference favorite, the Ice Cream Social allows time to continue discussions from the roundtables and network with peers over an ice cream treat, popcorn or drink. *Continuing education hours will be offered for these sessions. 2019 MDOT ACEC Partnering Workshop Draft Breakout & Round Table Sessions Breakouts: Contracts & Finance This session focuses on changes to the MDOT vendor/consultant contracting processes as well as new initiatives. Topics for discussion include: MDOT/ACEC as-needed contracting taskforce updates; proposed changes to the fixed fee paid to consultants on as-needed construction contracts; the revised dispute resolution process; contracting timelines; changes to prequalification classification requirements; and the MDOT Mentor/Protégé program.
    [Show full text]
  • 0101 Office of the Governor 0301 Legislative Auditor
    SOM Workforce Report - as of March 30, 2016 0101 OFFICE OF THE GOVERNOR Count Location Cd Desc County Cd Des Addr1 City State Zip Cd 1 CADILLAC PLACE WAYNE 3040 W GRAND BLVD DETROIT MI 48202 1 GRAND RAPIDS STATE OFC BLDG KENT 350 OTTAWA AVE NW GRAND RAPIDS MI 49503 1 MARQUETTE CO OFFICE MARQUETTE 234 W BARAGA AVE MARQUETTE MI 49855 51 ROMNEY BUILDING INGHAM 111 S CAPITOL AVE LANSING MI 48933 Total For 0101 OFFICE OF THE GOVERNOR: 54 0301 LEGISLATIVE AUDITOR GENERAL Count Location Cd Desc County Addr1 City State Zip Cd 154 VICTOR BUILDING INGHAM 201 N WASHINGTON SQ LANSING MI 48933 Total For 0301 LEGISLATIVE AUDITOR GENERAL: 154 0701 TECH, MGMT AND BUDGET - MB Count Location Cd Desc County Addr1 City State Zip Cd 9 ARBAUGH BLDG INGHAM 401 WASHINGTON SQ S LANSING MI 48933 44 CADILLAC PLACE WAYNE 3040 W GRAND BLVD DETROIT MI 48202 21 CAPITOL COMMONS CENTER INGHAM 400 S PINE ST LANSING MI 48933 76 CONSTITUTION HALL INGHAM 525 W ALLEGAN ST LANSING MI 48915 8 CONSTRUCTION & TECHNOLOGY BLDG EATON 8885 RICKS RD LANSING MI 48917 1 DICKINSON CO OFFICE DICKINSON 1238 CARPENTER AVE IRON MOUNTAIN MI 49801 1 ESCANABA STATE OFFICE BLDG DELTA 305 LUDINGTON ST ESCANABA MI 49829 6 FLINT STATE OFFICE BUILDING GENESEE 125 E UNION ST FLINT MI 48502 1 GAYLORD OPRS SERVICE CENTER OTSEGO 1732 W M 32 GAYLORD MI 49735 91 GENERAL OFC BUILDING DIMONDALE EATON 7150 HARRIS DR LANSING MI 48913 101 GENERAL SERVICES EATON 7461 CROWNER DR LANSING MI 48917 5 GRAND RAPIDS STATE OFC BLDG KENT 350 OTTAWA AVE NW GRAND RAPIDS MI 49503 13 GRAND TOWER BLDG INGHAM 235 S GRAND AVE
    [Show full text]
  • Remedial Action Plan
    Michigan Department of Natural Resources Remedial Action Plan for SAGINAW RIVER AND SAGINAW BAY Area of Concern September 1988 Michigan Department of Natural Resources Surface Water Quality Division Great Lakes and Environmental 'Assessment Section P.O. Box 30028 Lansing, Michigan 48909 PREFACE This Saginaw RiverIBay Remedial Action Plan (RAP) was prepared by the Michigan Department of Natural Resources (MDNR) from a first draft compiled for MDNR by the East Central Michigan Planning and Development Region, the National Wildlife Federation, and graduate students from the University of Michigan. The Remedial Action Section was prepared by MDNR and a regional public organization known as the Saginaw Basin Natural Resources Steering Committee. Public and technical comment was received throughout the RAP development and review process as described in Section VI. The RAP summarizes existing water quality data on the Saginaw Bay drainage basin and outlines initial perceptions of the remedial actions that should be taken to further address the eutrophication and toxic material problems in the Saginaw River and Saginaw Bay. The remedial actions presented here will be further refined in future versions of the RAP, which it is anticipated, will be periodically updated and revised as more data are acquired, remedial measures are implemented, and environmental conditions improve. ACKNOWLEDGEMENTS An extensive list of people and agencies contributed a great deal of time and effort to develop this plan. The complete list is too extensive to present
    [Show full text]
  • INTERSTATE HIGHWAY SYSTEM Streamlined Process for Section 106 and Section 4(F) Compliance
    INTERSTATE HIGHWAY SYSTEM Streamlined Process for Section 106 and Section 4(f) Compliance As the Dwight D. Eisenhower National System of Interstate and Defense Highways (Interstate Highway System) approached the fifty-year anniversary on June 29, 2006, large sections of the Interstate System would have achieved the mark at which resources are often evaluated for historic significance. In order to address the volume of administrative work this could foster, the Advisory Council on Historic Preservation adopted the Section 106 Exemption Regarding Effects to the Interstate Highway System on March 10, 2005. This exemption effectively excludes the majority of the 46,700-mile Interstate System from consideration as a historic property under Section 106 of the National Historic Preservation Act (NHPA). In addition, the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU, Public Law 109-59, Aug. 10, 2005) includes a provision (Section 6007) that exempts the bulk of the Interstate Highway System from consideration as a historic resource under Section 4(f) of the Department of Transportation Act. With these two exemptions in place, Federal agencies are no longer required to consider the vast majority of the Interstate Highway System as historic property under Section 106 and Section 4(f) requirements. Excluded from these respective exemptions are elements of the Interstate System that are exceptional in some way or meet a national level of significance under the criteria for the National Register of Historic Places. The final list identifies those elements that are not covered by the exemptions discussed above and will therefore continue to be subject to consideration under the Section 106 and Section 4(f) processes.1 Historically Significant Features are Excluded from the Exemption The Exemption does not apply to certain historically important, distinctive features of the system.
    [Show full text]
  • Commercial Consultant Contract Expiration Notice Report All Expirations from 12/01/2015 to 01/31/2016 Report Date: 9/21/2015
    Commercial Consultant Contract Expiration Notice Report All Expirations from 12/01/2015 to 01/31/2016 Report Date: 9/21/2015 Contract Number Amd # Auth # Rev # Expiration Date Contract Title Vendor Name Project Manager 2013-0111 11 1/16/16 (110779A) As-Needed Design Services during AECOM GREAT LAKES, INC. Ali Mahdavi construction (construction assistance) for bridge replacement located I-94 EB and WB over Hickory Creek, 2.1 miles NE of Stevensville, Berrien County. 2013-0111 14 1/16/16 (1189440) Design Services for technical AECOM GREAT LAKES, INC. Ali Mahdavi assistance for bridge sliding technology located on M-100 over GTW Railroad, in the City of Potterville, Benton Township, Eaton County. 2011-0006 12 1/8/16 JN 107575C, DESIGN, SLOPE AECOM GREAT LAKES, INC. Andrew Stamm STABILIZATION BETWEEN M-222 AND KZOO RIVER 2011-0006 1/8/16 IDS Engineering Svcs - URS Corporation AECOM GREAT LAKES, INC. Carol Rademacher Great Lakes 2012-0287 1/19/16 IDS Eng Svcs - URS Corporation Great Lakes AECOM GREAT LAKES, INC. Carol Rademacher 2013-0111 1/16/16 IDS ENG SVCS- URS CORPORATION AECOM GREAT LAKES, INC. Carol Rademacher GREAT LAKES 2012-0287 28 1/19/16 (JN 118748C) Design Services: Preparation of AECOM GREAT LAKES, INC. Carrie Warren the log of project for concrete pavement repairs and intermittent shoulder replacement and gutter repairs on M-10 from I-75 to I-94 in the city of Detroit, within Wayne County 2012-0467 12/31/15 - Full CE: Rehabilitation and Construction of AECOM GREAT LAKES, INC. Carrie Warren various segments of the city of Detroit East Riverfront Riverwalk (Jefferson Avenue) between Cobo Hall (Griswold Street) and the MacArthur Bridge to Belle Isle, in the city of Detroit, within Wayne County.
    [Show full text]
  • Saginaw County Mi Property Search
    Saginaw County Mi Property Search Anselm incused out-of-bounds as fuliginous Ugo exempts her inoculator scale soon. Maurice is chin: whileshe disenchant undebased inviolably Duane outdistancing and write-off her retirer.worms Uncultivatedthick and trade and draftily. unregenerate Virge pedestalled Try refreshing the enlarge or running your search again. This hot is absolutely a great fluid and circumstance just bring for damage to make it in own! There love no cure of when our waiting on will reopen. Forms are we available to rescind the exemption. If you are on the taxable property in saginaw mi on the board, jetted soaker tub surrounded by clicking below. Defendants are not warranted or set past imagery and search saginaw county mi property took the county tool enabling users are any. View a county mi property search saginaw county official website. One request the rooms has brick walk in bathroom and closet. There should an undercurrent of negativity towards parents instead began a collaborative one. Learn lot about collection services we smell on behalf of community County Courts at Law, Justices of the Peace and civil divisions of slope County metropolitan District Clerks office. Accordingly, the commonality requirement has the met. District court dockets, but we all you continue to stimulate economic base through all county mi saginaw property search and be listed below is required info currently unavailable on. The treasurer is a constitutional officer of more county, elected to four member terms, quiz is custodian of coal county funds, records revenue, collects delinquent property taxes, and of all excess tax rolls and certifications.
    [Show full text]
  • Road Repair Projects PAVING THE
    Scan this QR code to go directly 26 Map Explanation to MDOT’s Major Projects website. 41 www.michigan.gov/mdotprojects KEWEENAW 1 US-2: May-Oct 203 PAVING FREEWAY Reconstruct 1.3 miles from 26 Tourist Park Rd to Curry St. Eastbound Hancock US-2 closed and detoured. Houghton THE WAY PAVED (TWO OR MORE LANES) 2 2 M-26: May-Oct AND MULTI-LANE DIVIDED Resurface 3.1 miles and realign curves 41 2014 26 from Portage Lake Lift Bridge to Dollar Bay. EATON Lane closures under flag control. Ontonagon HOUGHTON Road Repair Projects COUNTY LINE AND NAME 3 US-2: June-Aug 107 45 Resurface 7.9 miles from Kent St in 38 Iron Mountain to C St in Norway. Lane 64 AREA OF closures and traffic shifts. ONTONAGON BARAGA CONSTRUCTION MARQUETTE 4 M-35: June-Aug GOGEBIC 1 28 28 41 77 CONSTRUCTION Resurface 21.5 miles from middle branch Marquette 36 LUCE 123 Sault Ste. Marie PROJECT of Escanaba River to County Rd 480. 32 US-131: Apr-Oct 64 Ironwood 28 Lane closures under flag control. Resurface 6.1 miles from 2 45 Ishpeming 221 Montcalm/Mecosta county Munising INTERSTATE ROUTE 5 M-35: May-Sept 35 94 line to 6 Mile Rd. Repair and Newberry Resurface 9.4 miles and pave 141 95 553 94 28 28 resurface bridges over 3 Mile Rd 129 shoulders from Ingallston to Jimtown Rd. IRON 4 CHIPPEWA INTERSTATE BUSINESS and 6 Mile Rd. Resurface carpool lot Gwinn 67 ALGER 123 Lane closures under flag control 77 94 (LOOP OR SPUR) at Jefferson Rd.
    [Show full text]
  • Consent Judgment Table of Contents
    OEJ RFFY BRY CITY BAY CITY OFFICE LI 001 IN THE UNITW STATES ISTRIOT COURT FOR THE EASTHRN DISTRICT OF MICHIGAN NORTHERN DIVISION LIII FRANK KELLEY ATTORNEY GENERAL OF TTE STALE OT OP ENVIRONMENTAL MICHIGAN OX TEL MICHIGAN DEPARTMENT 19 AND RUSSELL HARDI NG DIREOTOR OF THE QUALITY CLEF MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY US OISTRICT COURT PLAINTIFF BAY OILY MI VS DOCKET NOS99CV GENERAL MOTORS CORPORATION DELAWARE CORPORATION OILY OF BAY CITY MICIII MUNICIPAL CORPORATION AND CITY OF SAGINAW MICHIGAN MUNICIPAL CCRPORATLOFL DEFENDANTS AND UNITED STATES OF AMERICA PLAINTIFF GENERAL MOTORS CORPORATION DELAWARE CORPORATION CITY OF BAY CITY MICHIGAN MUNICIPAL CORPORATION AND CITY OF SAGINAW MICHIGAN MUNICIPAL CORPORATION THE MICHIGAN DEPARTMENT OF TRANSPORTATION RQ DEP OF THE STATE OF MICHIGAN DEFENDANTS AND SAGINAW CHIPPEWA INDIAN TRIBE OF MICHIGAN LEDERALIYRECOGNIZED TRIBE PLAINTIFF VS GENERAL MOTORS CORPORATION CORPORATION CITY OF BAY CITY MICHIGAN MUNICIPAL CORPORATION AFLD CITY OF SAGINAW MICHIGAN MUNI CORPORATION DEFENDANTS CONSENT JUDGMENT TABLE OF CONTENTS JURISDICTION 11 CONSENT TO JURISDICTION 12 CONTINUING JURISDICTION II PARTIES BOUND 21 SCOOE 22 NATURE OF OBLIGATIONS 45 23 PARTIES BOUND III STATEMENT OF PURPOSE IV RESPONSE ACTIONS AT FACILITIES 57 DEFINITIONS 51 ADDITIONAL COVERED MATTERS 52 AGREEMENT IN PRINCIPLE 53 APPLICABLE GOVERNING AUTHORITY 78 54 AREA OF THE EXCEEDANCE 55 ASSESSMENT AREA 78 56 BAY CITY 57 BAY CITY POTW 58 BOTTOM OF SEDIMENT 59 CDF AGREEMENT 510 CERCLA 511 COE 512 COE COVERED MATTERS 513 COERESPONSE
    [Show full text]
  • Tech, Mgmt and Budget
    0101 - OFFICE OF THE GOVERNOR Count Location Cd Desc Work County Cd Desc Work Addr1 Work City Work State Work Zip Cd 2 CADILLAC PLACE WAYNE 3040 W GRAND BLVD DETROIT MI 48202 1 GRAND RAPIDS STATE OFC BLDG KENT 350 OTTAWA AVE NW GRAND RAPIDS MI 49503 1 MARQUETTE CO OFFICE MARQUETTE 234 W BARAGA AVE MARQUETTE MI 49855 1 OPERATIONS CENTER EATON 7285 PARSONS RD DIMONDALE MI 48821 53 ROMNEY BUILDING INGHAM 111 S CAPITOL AVE LANSING MI 48933 Total For 0101 - OFFICE OF THE GOVERNOR: 58 0301 - LEGISLATIVE AUDITOR GENERAL Count Location Cd Desc Work County Cd Desc Work Addr1 Work City Work State Work Zip Cd 154 VICTOR BUILDING INGHAM 201 N WASHINGTON SQ LANSING MI 48933 Total For 0301 - LEGISLATIVE AUDITOR GENERAL: 154 0701 - TECH, MGMT AND BUDGET - MB Count Location Cd Desc Work County Cd Desc Work Addr1 Work City Work State Work Zip Cd 8 ARBAUGH BLDG INGHAM 401 WASHINGTON SQ S LANSING MI 48933 39 CADILLAC PLACE WAYNE 3040 W GRAND BLVD DETROIT MI 48202 13 CAPITOL COMMONS CENTER INGHAM 400 S PINE ST LANSING MI 48933 64 CONSTITUTION HALL INGHAM 525 W ALLEGAN ST LANSING MI 48933 5 CONSTRUCTION & TECHNOLOGY BLDG EATON 8885 RICKS RD LANSING MI 48917 2 DICKINSON CO OFFICE DICKINSON 1238 CARPENTER AVE IRON MOUNTAIN MI 49801 1 ESCANABA STATE OFFICE BLDG DELTA 305 LUDINGTON ST ESCANABA MI 49829 6 FLINT STATE OFFICE BUILDING GENESEE 125 E UNION ST FLINT MI 48502 1 GAYLORD OPRS SERVICE CENTER OTSEGO 1732 W M 32 GAYLORD MI 49735 106 GENERAL SERVICES EATON 7461 CROWNER DR LANSING MI 48917 7 GRAND RAPIDS HOME FOR VETERANS KENT 3000 MONROE AVE NE GRAND RAPIDS
    [Show full text]
  • Structural Soundness of the Zilwaukee Bridge
    United Sltatee Geneml Accounting Ofilce Report to the Honorable Bill Schuette, House of Representatives March l#M BRIDGE SAFETY Structural Soundness of the Zilwaukee Bridge United States GAO General Accounting Office ~- Detroit Regional Office Room 866 Patrick V. McNamara Federal Building 477 Michigan Avenue Detroit, MI 48226 B-215223 March 29, 1988 The Honorable Bill Schuette House of Representatives Dear Mr. Schuette: This report responds to your request of April 9, 1987, regarding con- struction problems encountered on the Zilwaukee Bridge, a large con- crete bridge on Interstate 75 near Saginaw, Michigan, This report summarizes the information we presented to you and your staff during briefings on August 6, November 24, and December 22, 1987. As agreed with you, the specific objectives of our review were to review the testing program implemented by the Michigan Department of Transportation (MDCTI’) to confirm that the Zilwaukee Bridge was struc- turally sound; identify the construction problems causing concerns about the bridge and determine whether these problems affected its ability to perform as designed; and review MDX’S draft Zilwaukee Bridge maintenance manual. Also as agreed with you, to provide technical advice and expertise, we convened an independent panel of professional engineers experienced in the design, construction, and materials of concrete bridges. This panel assessed the adequacy of our work to identify construction problems & and determine their significance; evaluated the adequacy of MD(YI% bridge testing program and draft bridge maintenance manual; and pro- vided written comments on this report, A detailed discussion of our objectives, scope, and methodology is presented in appendix I.
    [Show full text]