CIOE 2020 Exhibitor Manual

Total Page:16

File Type:pdf, Size:1020Kb

CIOE 2020 Exhibitor Manual CIOE 2020 2020.9.9-11 深圳国际会展中心(宝安新馆) WWW.CIOE.CN 微信 Booth 8E71 New Fiber Optic Products Benchtop Intelligent Optical Broadband Polarization-Entangled Signal-to-Noise Ratio Generator (OSNR) Photon Source High Speed Polarization Evanescence Based Variable Super-Fast Erbium Doped Controller-Scrambler (OEM Version) Split Ratio Fiber Splitter/Coupler Fiber Amplifier (EDFA) Modulator Bias Controllers Fiber Optic Hermetic Benchtop Digital Feedthru for Multichannel Coherent Detection Attenuator 219 Westbrook Road, Ottawa, Ontario K0A 1L0 Canada | Toll free: 1-800-361-5415 Tel.: 1-613-831-0981 | Fax: 1-613-836-5089 | E-mail: [email protected] Tel.: 86-0573-82223078 | Fax: 86-0573-82223012 | E-mail: [email protected] Fiber Optic Products at Low Cost. Ask OZ How! J:\Marketing\Desktop Publishing\2020 trade show artwork\CIEO\4C Full Page Ad\New Products.indd 4 March 2020 THE 22nd CHINA INTERNATIONAL EXHIBITOR OPTOELECTRONIC EXPO MANUAL The 22nd China International Optoelectronic Expo (CIOE2020) Floor Plan South Plaza Outdoor 1 3 5 7 9 11 13 15 17 Exhibition South Lobby South Entrance 2 4 6 8 10 12 14 16 18 20 Hall 1 Hall 2 Hall 3, 5, 7 Hall 4, 6, 8 N EXHIBITOR REGISTRATION Ground-level parking lot 停车场位置分布图(地面) Ground Parking Lot P3 P2 P3 Gate2 Gate8 P5 P5 Gate10 Gate4 Gate9 P2 Gate1 8 9 Gate3 号楼 号楼 10号楼 Gate5 Gate20 P4 南广场 Gate7 South Plaza Gate6 North Lobby South Lobby 南登录大厅 北登录大厅 P1 1 3 5 7 9 11 13 15 17 西侧 西侧 Gate19 Gate11 南入口 South Entrance South Lobby 南登录大厅 North Lobby 北登录大厅 Gate18 南广场 东侧 东侧 Gate17 South Plaza 2 4 6 8 10 12 14 16 18 20 P1 Gate21 P7 Gate16 Gate15 Gate14 Gate13 P6 Gate12 P6 P9 P9 会展南 P8 P8 会展北 Shenzhen World South Shenzhen World Nouth 北 N 地面 车辆出口 出租车落客区 货车入口 Parking Exit TAXI Truck Entrance 地面 车辆出入口 VIP 停车区 货车轮候区 Parking Entrance / Exit VIP Parking Truck Marshaling Yard 地下室 车辆出入口 货车临时停车区 地铁站 Underground Garage Entrance / Exit Truck Temporary Parking Metro Station EXHIBITOR THE 22nd CHINA INTERNATIONAL MANUAL OPTOELECTRONIC EXPO TRAFFIC GUIDE CIOE2020 Traffic Guide Ů Shenzhen World Exhibition and Convention Center (hereinafter called Shenzhen World) is located at No. 1, Zhancheng Road, Fuhai Street, Bao'an District, Shenzhen with an obvious location advantage. It is located in the north of Shenzhen International Airport, adjacent to the Shenzhen Airport Ferry Terminal and close to the Guangzhou-Shenzhen Riverside Expressway, connecting the urban rail and the surrounding expressways. It is connected major cities in the Pearl River Delta within 2 hours by ferry, high-speed train and highways. Public transportation From Guangzhou, Dongguan Free Shuttle Bus (Within Shenzhen) • Shajingxi Station (Guangzhou-Shenzhen Intercity Railway) Shenzhen World (about 15 minutes) → • Fuyong Metro Station Shenzhen World (about 20 minutes) → • Pick-up location: Shajingxi Station, Exit A • Pick-up location: Line 11, Fuyong Metro Station, Exit B • Service hours: 08: 30-13: 30 • Service hours: 08: 00-14: 00 • Interval: 30 minutes • Interval: Every 15 minutes Ps: The route consists of 15 stations stretching from Guangzhou East Tangwei Metro Station Shenzhen World (about 30 minutes) • • Railway Station to Shenzhen Airport. : Xintang Station, Zhongtang Pick-up location: Line 11,→ Tangwei Metro Station, Exit D • Station, Wangniudun Station, Dongguanxi Station, Hongmei Service hours: 07: 30-18: 30 • Station, Dongguangang Station, Houjie Station, Humen bei Station, Interval: 5-15 minutes • Humendong Station, Changanxi Station, Changan Station, Shajingxi Station, Fuhaixi Station, Shenzhenjichangbei Station, Shenzhenjichang Shenzhen Convention and Exhibition Center Metro Station • Station(Shenzhen Airport) Shenzhen World (about 60 minutes) → Pick-up location: Exit D of Shenzhen Convention and Exhibition • From Hong Kong Center Station Service hours: 08: 30-10: 30 Interval: Every 1 hour • Shenzhen Bay Port Shenzhen World (about 45 minutes) • → • Pick-up location: Shenzhen Bay Port Shenzhen Airport • Service hours: 08: 00-13: 30 • Interval: Every 1 hour • Shenzhen Airport Shenzhen World (about 45 minutes) Pick-up location: Airport,→ Gate 15, P3 parking lot, A5 bus stop • Hong Kong Airport Shenzhen Airport Ferry Terminal Shenzhen Service hours: 08: 00-17: 00 • • World (about 120 minutes)→ Step 1: Take the ferry from→ Hong Kong Interval: 20-30 minutes • Airport to Shenzhen Airport Ferry Terminal (about 1 hour) Step 2: Free shuttle bus from Ferry Terminal to Shenzhen International Airport (about 7 minutes) Step 3: Free shuttle bus from Gate 15, P3 parking lot, A5 bus stop to Shenzhen World (about 45 minutes) Return Shuttle Bus • Shenzhen World Fuyong Station • Shenzhen World Shajingxi Station (Guangzhou-Shenzhen Intercity → → • Pick-up location: Shenzhen World Exhibition and Convention Center Railway) • Service hours: 15: 00-17: 00 • Pick-up location: Shenzhen World Exhibition and Convention Center • Interval: Full and Go • Service hours: 15: 00-17: 30 • Interval: Full and go • Shenzhen World Tangwei Station → • Pick-up location: Shenzhen World, Convention South Station 1 • Shenzhen World Shenzhen Bay Port → • Service hours: 09: 30-19: 00 • Pick-up location: Shenzhen World Exhibition and Convention Center • Interval: 9-15 minutes • Service hours: 15: 00-17: 30 • Interval: Full and go • Shenzhen World Shenzhen Convention and Exhibition Center → • Pick-up location: Shenzhen World Exhibition and Convention Center • Service hours: 15: 30-17: 30 • Interval: Every 1 hour • Shenzhen World Shenzhen International Airport → • Pick-up location: Shenzhen World, Convention South Station 1 • Service hours: 09: 30-19: 00 • Interval: 12-20 minutes THE 22nd CHINA INTERNATIONAL EXHIBITOR OPTOELECTRONIC EXPO MANUAL Self-driving route • Warm reminder: Non- Shenzhen License vehicles are prohibited from driving in all areas in Shenzhen during rush hours on 07:00-09:00, 17:30-19:30. Please apply for the temporary pass in advance in accordance with the "Rules for the Temporary Pass for Non-Shenzhen Licensed Vehicles". Recommending Routes • 1) S3 Yanjiang Expressway Shenzhen World Exhibition and Convention Center Toll Station Fengtang Avenue Zhancheng Road Entrance P1, P2, P9 of the exhibition →to underground parking lot → → → • 2) S3 Yanjiang Expressway Fuhai Toll Station Fuzhou Avenue Fuyuan First Road Qiaohe Road Zhancheng Road Entrance P1, P2, P9 of the exhibition to underground→ parking lot → → → → → • 3) Guangshen Highway Baoan Avenue Fuzhou Avenue Fuyuan 1st Road Qiaohe Road Zhancheng Road Entrance P1, P2, P9 of the exhibition to underground→ parking lot → → → → → Recommending routes: • From Guangzhou, Zhongshan, Dongguan: • 1) S3 Yanjiang Expressway Shenzhen World Exhibition and Convention Center → • 2) Guangshen Expressway 107 National Road Fengtang Avenue Shenzhen World → → → From Huizhou, Longgang, Shenzhen downtown: • 1) Guangzhou-Shenzhen Expressway Airport Road Baoan Avenue Fuzhou Avenue Shenzhen World → → → → • 2) Binhe Road Shahe West Road Dongbin Road Yanjiang Expressway Shenzhen → → → → Recommending Driving Routes : EXHIBITOR THE 22nd CHINA INTERNATIONAL MANUAL OPTOELECTRONICTraffic Master Plan EXPO 展馆交通总览图 Chang’an 穗莞深城际线lightrail Intercity 长安 Guangzhou-Dongguan-Shenzhen 北 N 国展立交 20 Metro Line 20 地铁20号线 Shajing 沙井 福海出口 沿江高速 沿江高速 11 P3入口 Metro Line 11 地铁11号线 2 辅道入口 上桥往9号门 滨江大道 1 1 往凤塘 3 穗莞深城际轻轨-福海西站 辅道出口 3 辅道入口 P3 P2 Gate2 P3 Gate8 Fuzhou Road P5 P5 Gate9 Gate10 Gate4 福洲大道 P2 Gate1 8 9 Gate3 号楼 号楼 10号楼 Gate5 Gate20 2 2 1 P4 南广场 Gate7 South Plaza Gate6 South Lobby 南登录大厅 North Lobby 北登录大厅 Bjinjiang Blvd 穗莞深城际轻轨-福海西站滨江大道 距离展馆约3公里 P1 1 3 5 7 9 11 13 15 17 S3 Highway 沿江高速 西侧 西侧 Gate19 Gate11 Bao’an Airport 南入口 2 Chang’an 宝安机场 South Lobby South Entrance 南登录大厅 North Lobby 北登录大厅 Gate18 长安 北 N 辅道出口 2 Pearl River 南广场 东侧 东侧 Gate17 South Plaza 珠江 South Airport Road 展云路 2 4 6 8 10 12 14 16 18 20 机场南路 穗莞深城际线lightrail Intercity Guangzhou-Dongguan-Shenzhen 4 P1 2 4 Gate21 20 Fuyong Port 辅道入口 P7 Metro Line 20 福永码头 地铁20号线 1 Shajing Metro Line 1 地铁1号线 Gate16 P9 P9 Gate15 Gate14 P8 P8 Gate13 P6 Gate12 P6 塘尾站 沙井 展览大道 重 会展南站 会展北站 BUS BUS 庆 1 辅道入口 2 辅道入口 2 辅道出口 辅道入口 Shenzhen-Zhongshan Tunnel 深中通道 路 4 3 3 4 展城路 11 Metro Line 11 4 4 4 4 展城路 地铁11号线 福 4 和 福永站 州 秀 4 展城桥 福 3 西 展丰路 Fuzhou Road 大 4 4 福洲大道 园 3 路 道 景 二 百 芳 4 川 路 路 重 4 4 路 庆 展景路 4 路 4 Bjinjiang Blvd 4 地铁11号线 塘尾站 距离展馆约6公里滨江大道 4 4 展景路 地铁11号线 福永站S3 Highway 距离展馆约6公里 和 沿江高速 秀 Bao’an Airport 展城路 景 桥 Chang’an 宝安机场 长安 芳 Waihuan Highway 外环高速 穗莞深城际线lightrail Intercity 桥 4 Guangzhou-Dongguan-Shenzhen 北 N 4 4 Pearl River 3 珠江 South Airport Road 4 20 机场南路 4 4 Metro Line 20 3 福园二路 地铁20号线 4 Shajing 18 4 沙井 Metro Line 18 4 地铁18号线 4 锦程路 会展北 Fuyong11 Port 和 Shenzhen World North Metro Line 11 桥 凤 福永码头地铁11号线 蚝 重 1 秀 景 会展南 Fuyong Shenzhen World South 业 和 塘 福永 Metro Line 1 庆 西 芳 地铁1号线 路 大 路 路 路 Fuzhou Road 路 道 福洲大道 Shenzhen-Zhongshan Tunnel 深中通道 福园一路与沙福路不相通, Jihe Highway 福园一路 沙福路接往松福大道。 机荷高速 Bjinjiang Blvd Shenzhen North Station 滨江大道 深圳北站 S3 Highway 沿江高速 Bao’an Airport 宝安机场 地面 车辆出口 BUS 出租车落客区 货车入口 智慧交通巴士 上客点 施工路段 该处可调头 Pearl River 珠江 South Airport Road Guangzhou-Shenzhen Highway Parking Exit 机场南路 TAXI Truck Entrance 广深高速 BUS Fuyong Port 福永码头 地面 车辆出入口 VIP 停车区 货车轮候区 智慧交通巴士 下客点 4 车道数+行驶方向 红绿灯路口 1 Metro Line 1 Parking Entrance / Exit VIP Parking Truck Marshaling Yard 地铁1号线 12 Xixiang Metro Line 12 地铁12号线 Shenzhen-Zhongshan Tunnel 西乡 地下室 车辆出入口 货车临时停车区 地铁12/20号线会展站 公交车站台 禁止调头 深中通道 Underground Garage Entrance / Exit Truck Temporary Parking Metro Station 深圳宝安国际机场 距离展馆约18公里 Ů Shenzhen World Exhibition and Convention Center - The Underground Parking Lot Ů There are two floors with 9,133 parking spaces. The parking lot entrance and exit instructions are as follows.
Recommended publications
  • Joint Announcement: Connected Transaction
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 深 圳 高 速 公 路 股 份 有 限 公 司 SHENZHEN EXPRESSWAY COMPANY LIMITED (Incorporated in Bermuda with limited liability) (a joint stock limited company incorporated in the People's (Stock Code: 00152) Republic of China with limited liability) (Stock Code: 00548) JOINT ANNOUNCEMENT CONNECTED TRANSACTION SUPPLEMENTAL AGREEMENT TO THE ENTRUSTED CONSTRUCTION MANAGEMENT AGREEMENT IN RELATION TO GUANGSHEN COASTAL EXPRESSWAY SHENZHEN SECTION References are made to the joint announcements of Shenzhen International Holdings Limited (“Shenzhen International”) and Shenzhen Expressway Company Limited (“Shenzhen Expressway”, a 50.889%-owned subsidiary of Shenzhen International) dated 6 November 2009 and 9 September 2011 (the “Announcement”), respectively, the circular of each of Shenzhen International and Shenzhen Expressway dated 4 October 2011, and the announcement of Shenzhen Expressway dated 19 August 2014. Unless the context otherwise requires, capitalized terms used in this announcement shall have the same meanings as those defined in the Announcement. Introduction According to the Entrusted Construction Management Agreement (the “Entrusted Construction Management Agreement”) dated 9 September
    [Show full text]
  • China Toll Roads Morgan Stanley Asia (Singapore) Chin Y
    MORGAN STANLEY RESEARCH ASIA/PACIFIC Morgan Stanley Asia Limited+ Andy Meng, CFA [email protected] +852 2239 7689 Edward H Xu, CFA [email protected] +852 2239 1521 Tommy Wong January 14, 2010 [email protected] Ying Guo [email protected] Industry View China Toll Roads Morgan Stanley Asia (Singapore) Chin Y. Lim, CFA In-Line Pte.+ +65 6834 6858 Driven by China’s Long-term Economic Growth: In-Line Rating & Price Target Company Ticker Rating Price Target Conclusion: We initiate coverage of China’s toll road Zhejiang Exp. 576.HK Overweight HKD 8.96 industry with an In-Line view. We believe the industry is Sichuan Exp. 107.HK Overweight HKD 4.96 well positioned to benefit from long-term economic Jiangsu Exp. 177.HK Equal-weight HKD 7.59 growth and rising car consumption in China. Aggressive toll road network expansion by the government might Anhui Exp. 995.HK Equal-weight HKD 5.87 lead to traffic migration away from existing toll roads, in Shenzhen Exp. 548.HK Equal-weight HKD 4.17 addition to declining IRR, but we actually expect limited HHI 737.HK Equal-weight HKD 5.26 impact on the listed companies. Of them, we view Source: Morgan Stanley Research Zhejiang Expressway as the largest beneficiary of a potential export recovery in 2010, while Sichuan Toll Road Traffic Continues to Recover Expressway will be a good proxy for a strong economy 1,200 25% in southwest China, in our view. 2008 2009 YoY Growth (RHS) 1,000 18% 20% Aggressive road expansion not a major concern: 17% 800 15% We hold this non-consensus view for three reasons.
    [Show full text]
  • Annual Report
    行 The Chinese character “行” (pronounced as “xing”) denotes the idea of going forward( 前 行). The annual report this year is centred on the theme of “行”, which on the first level of significance, refers to the relentless efforts made by the Company to go forward despite numerous challenges and pressure on the operating results in the near future. “行” also has the meaning of action. On another level, the theme this year reflects the actions of * The Ming philosopher, Wang Shouren the Company to continuously enhance its (Yangming)(王守仁(陽明)), advocated the executive power based on meticulous analysis philosophy of uniting knowledge (“知”) with of external opportunities and challenges as well action (“行”) for achievement of virtue (“善”), as recognition of its own advantages and which exemplifies the inseparability of the shortcomings, with the aim of achieving the unity theoretic knowledge and actual actions. of knowledge and action( 知行合一)*. In the future, the Company will insist on the market- oriented principle, continuously develop the expressway industry business and strengthen the exploring of relative business of entrusted construction management and entrusted operation management, realising a synergistic growth in both of scale and return. The character “行” can also mean “capability”. With the recovery of economy, support of the national policies and ceaseless self-improvement of the Company, we firmly believe that the Company is embracing a bright future. The Chronicle of Yan Zi(晏子春秋) says: “the one who works completes his mission, the
    [Show full text]
  • A Hybrid Method for Predicting Traffic Congestion During Peak Hours In
    sensors Article A Hybrid Method for Predicting Traffic Congestion during Peak Hours in the Subway System of Shenzhen Zhenwei Luo 1, Yu Zhang 1, Lin Li 1,2,* , Biao He 3, Chengming Li 4, Haihong Zhu 1,2,*, Wei Wang 1, Shen Ying 1,2 and Yuliang Xi 1 1 School of Resources and Environmental Science, Wuhan University, Wuhan 430079, China; [email protected] (Z.L.); [email protected] (Y.Z.); [email protected] (W.W.); [email protected] (S.Y.); [email protected] (Y.X.) 2 RE-Institute of Smart Perception and Intelligent Computing, Wuhan University, Wuhan 430079, China 3 School of Architecture and Urban Planning, Shenzhen University, Shenzhen 518000, China; [email protected] 4 Chinese Academy of Surveying and Mapping, 28 Lianghuachi West Road, Haidian Qu, Beijing 100830, China; [email protected] * Correspondence: [email protected] (L.L.); [email protected] (H.Z.); Tel.: +86-27-6877-8879 (L.L. & H.Z.) Received: 11 October 2019; Accepted: 23 December 2019; Published: 25 December 2019 Abstract: Traffic congestion, especially during peak hours, has become a challenge for transportation systems in many metropolitan areas, and such congestion causes delays and negative effects for passengers. Many studies have examined the prediction of congestion; however, these studies focus mainly on road traffic, and subway transit, which is the main form of transportation in densely populated cities, such as Tokyo, Paris, and Beijing and Shenzhen in China, has seldom been examined. This study takes Shenzhen as a case study for predicting congestion in a subway system during peak hours and proposes a hybrid method that combines a static traffic assignment model with an agent-based dynamic traffic simulation model to estimate recurrent congestion in this subway system.
    [Show full text]
  • Basic Information of Toll Highways
    Basic Information of Toll Highways 50 Shenzhen Expressway Company Limited Basic Information of Toll Highways The principal assets of the Group and its jointly controlled entities Extension in Shenzhen City, Jiangzhong Expressway and GZ W2 and associated companies are all toll highway projects, of which Expressway in other areas of Guangdong Province as well as Nanjing Meiguan Expressway, Jihe East, Jihe West, Yanba A & B in Shenzhen Third Bridge in Jiangsu Province are under construction or planning. City, Yangmao Expressway and Guangwu Expressway in other areas Apart from investment, operation and management of toll highway of Guangdong Province, Changsha Ring Road in Hunan Province projects, the Group has been entrusted by the government to be as well as Geputan Bridge in Hubei Province are in operations and responsible for the construction and management of Nanping Project Yanpai Expressway, Nanguang Expressway, Yanba C and Shuiguan and Hengping Project. Length Interests No. of Toll Highways Location (km) Held Lane(s) Condition Operation Period Meiguan Expressway Shenzhen 19.30 95% 6/4 Operation May 1995 – Mar 2027 Jihe East Shenzhen 23.30 55% 6 Operation Oct 1997 – Mar 2027 Jihe West Shenzhen 21.00 100% 6 Operation May 1999 – Mar 2027 Yanba A&B Shenzhen 18.80 100% 6 Operation Apr 2001 – Dec 2031 Shuiguan Expressway Shenzhen 20.14 40% 6 Operation Feb 2002 – Dec 2025 Yangmao Expressway Guangdong 79.76 25% 4 Operation Nov 2004 – Jul 2027 Guangwu Expressway* Guangdong 36.50 30% 4 Operation Dec 2004 – Nov 2027 Changsha Ring Road Hunan
    [Show full text]
  • 廣東康華醫療股份有限公司 GUANGDONG KANGHUA HEALTHCARE CO., LTD.* (A Joint Stock Company Incorporated in the People’S Republic of China with Limited Liability) GLOBAL OFFERING
    Project Nightingale_cover_E25_OP.indd 2 24/10/2016 下午9:28 IMPORTANT If you are in any doubt about any of the contents of this prospectus, you should seek independent professional advice. 廣東康華醫療股份有限公司 GUANGDONG KANGHUA HEALTHCARE CO., LTD.* (A joint stock company incorporated in the People’s Republic of China with limited liability) GLOBAL OFFERING Number of Offer Shares under : 84,000,000 H Shares (subject to the the Global Offering Over-allotment Option) Number of Hong Kong Offer Shares : 8,400,000 H Shares (subject to reallocation) Number of International Offer Shares : 75,600,000 H Shares (subject to reallocation and the Over-allotment Option) Maximum Offer Price : HK$14.50 per Offer Share plus brokerage of 1.0%, SFC transaction levy of 0.0027% and Hong Kong Stock Exchange trading fee of 0.005% (payable in full on application in Hong Kong dollars and subject to refund) Nominal Value : RMB1.00 per H Share Stock Code : 3689 Sole Sponsor and Sole Global Coordinator Joint Bookrunners Hong Kong Exchanges and Clearing Limited, The Stock Exchange of Hong Kong Limited and Hong Kong Securities Clearing Company Limited take no responsibility for the contents of this prospectus, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this prospectus. A copy of this prospectus, having attached thereto the documents specified in “Appendix VII — Documents Delivered to the Registrar of Companies in Hong Kong and Available for Inspection”, has been registered by the Registrar of Companies in Hong Kong as required by Section 342C of the Companies (Winding Up and Miscellaneous Provisions) Ordinance (Chapter 32 of the Laws of Hong Kong).
    [Show full text]
  • Group-Owned Brands Guangdong Provincial Communication Group Co., Limited 2019
    Group-owned brands Guangdong Provincial Communication Group Co., Limited 2019 Guangdong Provinicial Guangdong Expressway Yueyun Transportation Guangdong-Hong Kong Communication Group Co., Ltd. Pass App Yuexing App Bus Cross-the-Border WeChat Public Account WeChat Public Account WeChat Public Account WeChat Public Account Designer: Guangdong Highway Media Co. Ltd. About this Report To improve readability and for ease of writing, we have used terms such as Provincial Communication Group, the Group, the Company and We interchangeably in this report. English translation for the Group's name is GUANGDONG PROVINCIAL COMMUNICATION GROUP CO., LTD. Quality Assurance Processes About this Edition and Procedures By releasing and distributing questionnaires on our This report is the ninth annual Corporate Social official website, we had better communication with our Responsibility (CSR) report published by Guangdong stakeholders, helping them fully understand our business Provincial Communication Group Co., Ltd. goals as well as needs and expectations of interested parties, which allows the Group to better assume its social responsibilities. Scope of Coverage References and Standards Communications, leading to a better life Period of This Report includes information from State-owned Assets Supervision and Administration reporting: January 1, 2019 to December 31, 2019, with Commission of the State Council some information beyond this period of time. Guiding Opinions on the Performance of Social Responsibility Scope of Guangdong Provincial Communication by Central Enterprises reporting: Group Co., Ltd, its subsidiaries and branches. Chinese Academy of Social Sciences Data Data and descriptions in this report are from Guidelines on the Formulation of Chinese Corporate Social sources: the Group's Yearbook and other official Responsibility Reports (CASS-CSR3.0) documents.
    [Show full text]
  • GUANGDONG KANGHUA HEALTHCARE CO., LTD.* 廣東康華醫療股份有限公司 (A Joint Stock Limited Company Incorporated in the People’S Republic of China with Limited Liability)
    The Stock Exchange of Hong Kong Limited and the Securities and Futures Commission take no responsibility for the contents of this Application Proof, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this Application Proof. Application Proof of GUANGDONG KANGHUA HEALTHCARE CO., LTD.* 廣東康華醫療股份有限公司 (a joint stock limited company incorporated in the People’s Republic of China with limited liability) WARNING The publication of this Application Proof is required by The Stock Exchange of Hong Kong Limited (the “Exchange”) and the Securities and Futures Commission (the “Commission”) solely for the purpose of providing information to the public in Hong Kong. This Application Proof is in draft form. The information contained in it is incomplete and is subject to change that can be material. By viewing this document, you acknowledge, accept and agree with Guangdong Kanghua Healthcare Co., Ltd. (the “Company”), its sponsor, advisers or member of the underwriting syndicate that: (a) this document is only for the purpose of providing information about the Company to the public in Hong Kong and not for any other purposes. No investment decision should be based on the information contained in this document; (b) the publication of this document or supplemental, revised or replacement pages on the Exchange’s website does not give rise to any obligation of the Company, its sponsor, advisers or members of the underwriting syndicate to proceed with an offering in Hong Kong or any other jurisdiction.
    [Show full text]
  • Working Paper No. 47 Transport Assessment for the Stage 4 Development Scenarios
    This subject paper is intended to be a research paper delving into different views and analyses from various sources. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not necessarily represent the views of the HKSARG. WORKING PAPER NO. 47 TRANSPORT ASSESSMENT FOR THE STAGE 4 DEVELOPMENT SCENARIOS PURPOSE 1. The purpose of this paper is to summarize the transport assessments for the Stage 4 Development Scenarios and the transport infrastructure requirements. BACKGROUND 2. Stage 3 of the Study had formulated two development options, namely the Consolidation and Decentralisation Options, with matched strategic transport infrastructure development programme for consultation. The Stage 4 of the Study has finalized a preferred development option, taking into account comments received and extracting the more desirable elements from the previous options to form the Reference Scenario. A set of “What If” Scenarios has also been developed to cater for possible changes in population and economic growth, but for transport infrastructure requirement assessment, only the High Population and High Economic Growth Scenario (HPGS) is worth for testing. A series of transport assessments has been carried out to examine if the transport infrastructure development programme as recommended in Stage 3 can satisfy the travel demand of the preferred development scenarios. 3. The Stage 4 transport assessment has also incorporated the latest plans and reports
    [Show full text]
  • Research Article Traffic Allocation Mode of PPP Highway Project: a Risk Management Approach
    Hindawi Advances in Civil Engineering Volume 2018, Article ID 7193948, 12 pages https://doi.org/10.1155/2018/7193948 Research Article Traffic Allocation Mode of PPP Highway Project: A Risk Management Approach Jie Li , Peng Mao, Zhaohua Dai, and Jing Zhang School of Civil Engineering, Nanjing Forestry University, Nanjing, Jiangsu 210037, China Correspondence should be addressed to Jie Li; [email protected] Received 20 April 2018; Revised 8 July 2018; Accepted 5 August 2018; Published 24 September 2018 Academic Editor: Bill Zhao Copyright © 2018 Jie Li et al. )is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Highway projects are the favorites of public-private partnership (PPP) investors because of their stable cash flow. However, there are high uncertainties in terms of traffic volume, resulting in unpredictable revenues, which has drawn major concern of PPP investors. For a road in a network, the traffic volume is determined by the traffic allocation rate, which is affected not only by the total traffic volume in the region but also by other traffic risk factors, such as travel time, toll rates, and travelling comfort. )e conventional traffic allocation forecasting technique predominantly depends on the travel time, overlooking other risk factors. Consequently, traffic allocation forecasting is usually inaccurate. To improve the accuracy of traffic allocation forecasting in PPP road projects, this paper proposes to consider the effect of traffic risks together with traffic time by using the mean utility. Multinomial logit (MNL) model based on mean utility is used to predict the traffic allocation rate.
    [Show full text]
  • Traveling in Shenzhen Destination Address Arrival by Public
    Traveling in Shenzhen Destination Address Arrival by public transportation The nearest metro station to Shenzhen World Convention & Exhibition Center is Weitang MTR Station on Line11. Take exit D of the station. Take Line 11 and get off at Weitang MTR Station (Exit D), board the free “World Convention & Exhibition” shuttle bus to Exhibition Center. Shenzhen Subway Map: (https://www.travelchinaguide.com/images/map/guangdong/shenzhen-metro.jpg ) From Shenzhen Airport (1) Go to the Shenzhen International Airport P3 Parking lot and take the shuttle bus, which takes you directly to the exhibition center. (2) Go to Airport metro station. From Shenzhen Airport station take line 11 towards Bitou. Get off at Tangwei station. Take Line 11 and get off at Weitang MTR Station (Exit D), board the free “World Convention & Exhibition” shuttle bus to Exhibition Center. (3) Take a taxi from the airport to Shenzhen World Convention & Exhibition Center in Bao’an District. Use the official taxi line. Official taxis are blue electric vehicles. From Shenzhen North Train Station (1) Take the free shuttle bus at Shenzhen North Railway Station West Square. (2) Take Line 5 from Shenzhen North metro station towards Chiwan. Get off at Bao’an Center and switch to Line 1 towards to Luohu. Get off at Bao’an Center and switch to Line 1 towards to Luohu. Get off at Qianhaiwan and switch to Line 11. Take Line 11 and get off at Weitang MTR Station (Exit D), board the free “World Convention & Exhibition” shuttle bus to Exhibition Center. (3) Take a taxi from the train station.
    [Show full text]
  • 24.Summary of Highways-30024E
    Business Structure and Highway Projects The Company is principally engaged in the investment, construction, operation and management of toll highways and roads. The Company adheres to the development strategy of focusing on toll highway operations as its core business and the investment strategy of expanding towards the Pearl River Delta region as well as other economically developed regions in the PRC through establishing a foothold in Shenzhen. It aims at bringing ever- improving returns to its shareholders and providing premier and efficient services to the public and government at reasonable costs. The toll highway projects, which were operated and invested in by the Group, located in Shenzhen City, other regions of Guangdong Province and other provinces in the PRC. Apart from operation of and investment in toll highway projects, the Group is also responsible for the project administration of certain municipal roads entrusted by the government. As at the date of this report, the principal business structure of the Company is as follows: The toll highways operated and invested in by the Company in Shenzhen region and other regions of Guangdong Province are major components of the national or provincial trunk highway networks. These toll highways not only connect the main ports, the airport, customs checkpoints and industrial zones that form a complete highway network in Shenzhen, but also constitute part of the major road passages between Shenzhen and Hong Kong leading towards the Pearl River Delta region. They have become important infrastructures especially after the implementation of CEPA and the establishment of the Pan Pearl River Delta Economic Zone.
    [Show full text]