RAILROAD UPDATE – El , CA

Presentation developed for:

March 8th 2018 BJRR’S COMMODITIES DESERT LINE CONCESSION ACQUISITION UPDATE

• MTS and BJRR sign a 99 year lease agreement.

• BJRR determines to include an Environmental Committee for permit supervision.

• Negotiations take place with US & MX Port authorities to determine location and specs of each facility. TECATE - CAMPO CROSSING Exclusive Railway port of entry

USA inspection facility • One rail vacis equipment • Inspection Dock (4,500 sqft) and Canopy (7,000 sqft)

• 4,000 sqft unified processing support building • Exterior lighting shall meet table 11 – 1 requirements • Security • Bullet laminated glazing and walls to 8’ (Ul-752-95 level 3) • 10’ Iron perimeter fencing with 12” barbed wire • Surveillance camera system • Voice and Data Industrial quality

MEXICO inspection facility

• Inspection Dock (4,500 sqft) and canopy (7,000 sqft) • 4,000 sqft unified processing support building • Exterior Ligthing Shall meet table 11-1 requirements • Security • Bullet laminated glazing and walls to 8’ (Ul-752-95 level 3) • 10’ Iron Perimeter fencing with 12” barbed wire • Surveillance camera system • Voice and data industrial quality TECATE - CAMPO JOINT INSPECTION Exclusive Railway port of entry

MEXICO USA Inspection facility Inspection facility

• Inspection Dock (4,500 sqft) • One rail vacis equipment and canopy (7,000 sqft) • Inspection Dock (4,500 sqft) and • 4,000 sqft unified processing Canopy (7,000 sqft) support building • 4,000 sqft unified processing • Exterior Ligthing Shall meet support building table 11-1 requirements • Exterior lighting shall meet • Security table 11 – 1 requirements • Bullet laminated glazing • Security and walls to • Bullet laminated glazing 8’ (Ul-752-95 level 3) and walls to 8’ (Ul-752-95 • 10’ Iron Perimeter level 3) fencing with 12” • 10’ Iron perimeter fencing barbed wire with 12” barbed wire • Surveillance camera • Surveillance camera system system • Voice and data industrial • Voice and Data Industrial quality quality TECATE - CAMPO JOINT INSPECTION Exclusive Railway port of entry

CUSTOMS FACILITIES BINATIONAL CUSTOM RAIL CARGO INSPECTION POINT

ADUANA MEXICO Inspection Dock 4,500 sqf ADUANA MEXICO Inspection Building

CBP Km Unified Processing 70.9 Support Building Rail VACIS 4,000 sqf

CBP Inspection Dock 4,500 sqf

Inspection 10 ft hight Spur (450') Perimeter fence 5,250 ft

COPYRIGHT © 2016 Baja Railroad. 100' All rights reserved. 100' This material can't be reproduced or transmit in any way without the consent of the owner.

PLEASE SWITCH TO Plan B CBP-Adumex (English version) TECATE, BC – CAMPO, CA JOINT INSPECTION FACILITY

Inspection site of potential locations of the Customs & facility

Date: January 24th, 2018 Place: Campo Ca & Division Ca.

TECATE, BC – CAMPO, CA JOINT INSPECTION FACILITY

Inspection site of the potential location of the Customs & Borders facility .

Date: January 24th, 2018 Place: Campo Ca & Division Ca. DESERT LINE BENFITS On the right track, strengthening our region

Exclusive Benefits:

• Exclusive Railroad crossing 24/7 • Connectivity with class 1 railroads • Capability to transport in “Double Stack” • Intermodal facility • Reduce of Border-crossing times • Lower logistical costs • Optimizing delivery times • Reduce traffic on highways and freeways

The full operation of the desert line will reduce the emmision of 7.5 million tons of CO2 per year. SBC STAKEHOLDERS COMMITEE JOINT INSPECTION FACILITY

Who is involved? How can you help?

• Industrial Sector • Adding your LOI to increase demand and awareness for this service

• US & MX Government • Follow up with particular agencies government agencies

• Civil & Business organizations • Promoting this project with Stakeholders and other organizations WHAT’S NEXT?

March 19 – 22 • Inspection in Division CA delivered by the Enviromental commitee

April 8 - 10 • Visit to CBP’s facility in Eagle Pass & Laredo Tx.

April 15 – 22 • Mission to CDMX along with Regional Chamber of Commerce

June 2018 • Follow up on Binational Bridges & Cross Borders group meeting