World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Second Gansu Cultural and Natural Heritage Protection and Development Project (P149528) Executive Summary for ESIA Reports Public Disclosure Authorized of Two New Subprojects (Kangxian Subproject and Jingtai Subproject) proposed as part of the Project Restructuring June 9, 2020 1. Introduction In the restructuring of Second Gansu Cultural and Natural Heritage Protection and Development Project, two subprojects of Kongtong Mountain Scenic Area and Zhuanglang County Yunya Temple Scenic Area have been dropped due to environmental regulation Public Disclosure Authorized issues. At the same time, some new activities are added under two subprojects, one is the new Jingtai Yellow River Stone Forest Tourism and Community Development Project (simplified as Jingtai subproject below) and the other is the Kangxian County Tourism and Community Improvement Project (simplified as new Kangxian subproject below, expansion based on original Kangxian subproject). During restructuring, the Environmental Impact Assessment (EIA) was conducted to support the preparation of these two new subprojects following both domestic regulations and the World Bank’s safeguards policies, of which the key findings and recommendations are summarized in this Executive Summary. 2. Summary of the EIA report for Jingtai Subproject Public Disclosure Authorized 2.1 Project background Jingtai Yellow River Stone Forest is located in the southeast of Jingtai County in Baiyin City of Gansu Province, which is a national geologic park and a national 4A scenic tourism site as well as a provincial nature reserve for geological relics. Since its official establishment as the scenic site in 2004, the site has been developed as one of the most attractive tourism sites in Gansu as well as in China. By 2016, the annual tourists reached about 860,000. The Yellow River Stone Forest improvement was one of the subprojects under WB financed Phase I Gansu Cultural and Natural Heritage Protection and Development Project Public Disclosure Authorized (2008 - 2015), under which a 2.5 km access road, a 3000m2 parking lot and a 2500m2 museum was constructed/upgraded together with other supportive works. Since then, the Yellow River Stone Forest also experienced rapid tourist volume growth with the quadrupling of tourist volume from 2010 to 2016. The fast-growing tourist volume has put tremendous pressure on the current infrastructures and facilities in the scenic site. The existing facilities cannot accommodate the current large amount of the tourists. Meanwhile, the tourists not only visited the stone forest park, but also brought tremendous businesses 1 to the local communities from foods, sightsees, lodging, riverside activities, etc. The new subproject for Yellow River Stone Forest was therefore proposed to address the needs for both the improvements of scenic site facilities and the community development of Longwan Village. The estimated investment for the subproject is about $40.40 million, in which about $30.00 million will be financed by WB loan. The project activities are mainly small-scale civil works including the followings: a. Scenic area upgrades: i) Binhe Road and associated facilities; ii) tourist walkways; iii) No. 2 bridge near Yellow River watermill; iv) parking lots; v) tourist rest corridors; vi) landscaping; vii) tourist service center: viii) construction of the park gate; ix) waterfront platforms; x) tourist exchange stations; xii) tourist toilets; xiii) MSW management system; xiv) water, wastewater and power supply facilities; and xv) scenic area smart information system; b. Community development: i) Goat skin raft museum; ii) cultural heritage exhibition hall; iii) agricultural product display hall; iv) family play yard; v) water channel cleanup; vi) apple cold storage; and vii) village cultural market; c. Capacity development: i) village and tourism corporation and development study; and ii) community development training. 2.2 Key EIA findings During project preparation, the EIA was conducted by a qualified consulting team following both domestic regulations and the applicable World Bank’s safeguards policies (OP4.01 and OP4.04). The draft and final EIA was disclosed both online and locally, respective in August and September 2019. The key project stakeholders, including project- affected villagers and relevant authorities, were consulted during the EIA preparation, and the received comments and opinions have been included in the project design and EIA report. The project will focus on the improvements of tourism infrastructure in the scenic area, including roads, bridge, museum/exhibition hall, parking lots, tourist service center, entrance gate, etc. The project activities have been designed in compliance with existing tourism development plans, nature reserve management regulations and other applicable laws and regulations. Due to the geomorphic constraints, part of the project activities (a tourist service center and the entrance gate) will be situated in the experimental zone of the provincial nature reserve based on the results of alternative analysis. An independent ecological impact assessment has been conducted by qualified consultants to better understand the significance of potential project impacts on local ecosystem and concluded that the project would not involve any critical nature habitat and would not bring any significant and irreversible ecological impacts on the nature reserve. The measures to minimize and mitigate the adverse ecological impacts during project implementation have been recommended and included in the EIA report together with other environmental and social mitigation measures. In general, the project implementation is anticipated with overall environmental and social benefits through infrastructure and environmental improvements of the scenic area. However, there will also be some negative environmental and social impacts during project 2 implementation, as summarized below. • Construction period: During construction, the anticipated adverse impacts will be temporary, site-specific and manageable; however, it is important to strengthen the construction management to minimize the construction nuisance within the project areas and to avoid any interference beyond the project scope. - Air pollution: Construction activities, such as site grading, earthwork excavation and piling, and transportation of construction materials and construction waste will generate dust pollution, particularly in windy days. Adequate mitigation measures have been proposed to address the impacts, including site watering, vehicle speed limit, avoiding construction in windy weather, etc. - Wastewater: Two construction camps are planned for the project, which will be used for the storage of construction equipment and materials but provide no accommodation because about 50 construction workers for the project will all be recruited locally. Therefore, domestic wastewater from construction workers (1.2m3/d) will be treated with existing toilets in the scenic areas and a 5m3 settling tank will be placed in the construction site for the treatment of construction wastewater from vehicle washing (1.5m3/d) before being fully reused on the site without discharge. - Noise: Construction noise mainly comes from construction machinery and various transportation vehicles. Some effectives and commonly used measures will be taken during construction to reduce the noise impacts on local villagers, such as reduced use of high-noise equipment, better scheduling of construction activities, installation of noise barriers. - Solid Waste: For construction phase, with only 50 construction workers locally recruited and without workers’ accommodation on site, the generation of domestic solid waste will be only 25kg/d, which will be collected and regularly transported by the local sanitation department to Baiyin Municipal Solid Waste Incinerator for disposal. The project construction is expected to have no spoil generation, and the generation of construction wastewater will be about 90.11t, which will be collected, recycled as far as possible and then disposed at the construction waste dumps designated by the construction management department for disposal. - Ecological Impacts: Due to geomorphic constraints, the proposed tourist service center and entrance gate will be situated in the experimental zone of the nature reserve, to be built/expanded based on the existing Nanshan Square. During project design, alternative analysis has been conducted to minimize potential impacts on the nature reserve. The ecological survey found no critical natural habitat and protected/rare wildlife in the project-affected areas. Following the "Regulations on the Management of Natural Reserves in Gansu Province", the project proposal has been reviewed by the Gansu Forestry and Grassland Bureau, who has issued the “Opinions on the Impact Assessment of the Project Impacts on geological relics in the Yellow River Stone Forest National Geopark (with the official letter No.: Gansu Forest Baobian (2019) No.97), indicating its official no-objection to proposed project activities within the natural reserve since none of the project activities is 3 located in the core zone and buffer zone where the construction and operation are forbidden and there is no important geological relic in the project-affected areas. Adequate mitigation measures have been proposed in the ecological impact assessment and included in the EIA to manage the temporary and site-specific adverse impacts on local geological conditions and landscapes
Recommended publications
  • World Bank Document
    WEN CHUAN EARTHQUAKE RECOVERY PROJECT Cheng County Moba Gorge Water Source Project in Gansu Province Public Disclosure Authorized Environmental Impact Assessment Public Disclosure Authorized Public Disclosure Authorized Moba Gorge Water Source Engineering Construction Management Department of Cheng County Lanzhou University Public Disclosure Authorized May 2012 1 Content 1 General Instructions ........................................................................................................................... 5 1.1 Project Background .................................................................................................................. 5 1.2 Evaluation Basis ....................................................................................................................... 6 1.3 Assessment Aim, Principles and Keys .................................................................................... 9 1.4 Functional Division of Assessment Area ............................................................................... 10 1.5 Assessment Time Intervals and Factors................................................................................ 11 1.6 Assessment Rating and Scope .............................................................................................. 11 1.7 Environmental Protection Goal .............................................................................................. 12 1.8 Assessment Standards .........................................................................................................
    [Show full text]
  • World Bank Document
    The World Bank Loan Project Public Disclosure Authorized The World Bank Loan Natural Heritage Protection and Development II Project Social Assessment Report on Construction of Yangba Tea Culture Scenic Spot in Kang County Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Gansu Huigu Science &Technology Consulting Co. Ltd. April 2020 Social assessment Report for Sub-project of Yangba Tea Culture Scenic Spot in Kang County Report Editing Team Educational No. Name Major Position Background Environmental 1 Ding Wenguang Doctor of Science Director, Professor sociology 2 Jiang Xuehua Bachelor Social work General Manger 3 Gao Xuelian Master Social Security Project official 4 Yang Xiaoai Master Social Security Project official 5 Tang Yaping Bachelor Social work Project official Business 6 Shi Liuyan Bachelor Project official English 7 Li Weili Master Social Security Technician I Contents Abstract .................................................................Error! Bookmark not defined. Positive Impacts of the Project ............................................................................1 Negative Impacts of the Project ..........................................................................1 Potential Social Risks of the Project....................................................................2 Suggestions and Mitigation Measures: ................................................................2 1. Summary of Social Impact Assessment .......................................................5 1.1
    [Show full text]
  • History, Distribution, and Potential of the Olive Industry in China: a Review
    sustainability Review History, Distribution, and Potential of the Olive Industry in China: A Review ChunJiang Su 1, Junfeng Sun 2,3,* ID , Wanze Zhu 2 and Li Peng 1 ID 1 Institute of Mountain Hazards and Environment, Chinese Academy of Sciences, # 9, Block 4, Renminnan Road, Chengdu 610041, China; [email protected] (C.S.), [email protected] (L.P.) 2 University of Chinese Academy of Sciences, #19A Yuquan Road, Beijing 100049, China; [email protected] 3 School of Tourism, History, and Culture, South West Minzu University, # 16, South Section, 1st Ring Road, Chengdu 610041, China * Correspondence: [email protected]; Tel.: +86-28-8522-5378 Received: 7 April 2018; Accepted: 2 May 2018; Published: 4 May 2018 Abstract: China, as a non-Mediterranean country with non-Mediterranean climate, is taking olive cultivation as an important part of its agricultural development. In order to highlight some important facts about the history, status, distribution, and trends of the olive industry in China, we performed analyses based on Internet databases, online GIS software, and scientific papers. Results show that the olive industries have been concentrated in several key areas in Gansu, Sichuan, Yunnan, Chongqing, and Hubei. However, the business scope of olive enterprises is still narrow, the scale of enterprises is generally small, and individual or family management of farmers plays an important role. Thus, increased investment and policies are needed to enhance their capacities of R&D and production, and Chinese investigators should carry out socio-economic studies at the microcosmic level and take the initiative to innovate the products by cooperating with people in the same professions worldwide.
    [Show full text]
  • Environmental Impact Assessment
    WEN CHUAN EARTHQUAKE RECOVERY PROJECT Cheng County Moba Gorge Water Source Project in Gansu Province Public Disclosure Authorized Environmental Impact Assessment Public Disclosure Authorized Public Disclosure Authorized Moba Gorge Water Source Engineering Construction Management Department of Cheng County Lanzhou University Public Disclosure Authorized May 2012 1 Content 1 General Instructions ........................................................................................................................... 5 1.1 Project Background .................................................................................................................. 5 1.2 Evaluation Basis ....................................................................................................................... 6 1.3 Assessment Aim, Principles and Keys .................................................................................... 9 1.4 Functional Division of Assessment Area ............................................................................... 10 1.5 Assessment Time Intervals and Factors................................................................................ 11 1.6 Assessment Rating and Scope .............................................................................................. 11 1.7 Environmental Protection Goal .............................................................................................. 12 1.8 Assessment Standards .........................................................................................................
    [Show full text]
  • Gansu Provincial Highway Aviation Tourism Investment Group Co., Ltd
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. This announcement appears for information purposes only and does not constitute an invitation or offer to acquire, purchase or subscribe for securities or an invitation to enter into any agreement to do any such things, nor is it calculated to invite any offer to acquire, purchase or subscribe for any securities. This announcement and the listing document referred to herein have been published for information purposes only as required by the Listing Rules and do not constitute an offer to sell nor a solicitation of an offer to buy any securities. Neither this announcement nor anything referred to herein (including the listing document) forms the basis for any contract or commitment whatsoever. For the avoidance of doubt, the publication of this announcement and the listing document referred to herein shall not be deemed to be an offer of securities made pursuant to a prospectus issued by or on behalf of the issuer for the purposes of the Companies (Winding Up and Miscellaneous Provisions) Ordinance (Cap. 32) of Hong Kong nor shall it constitute an advertisement, invitation or document containing an invitation to the public to enter into or offer to enter into an agreement to acquire, dispose of, subscribe for or underwrite securities for the purposes of the Securities and Futures Ordinance (Cap.
    [Show full text]
  • World Bank Document
    Cheng County Moba Gorge Water Source Engineering of Gansu Province Public Disclosure Authorized Environmental Management Plan Public Disclosure Authorized Public Disclosure Authorized Construction Unit: Water Source Engineering Construction Management Department of Moba Gorge for City Water Supply of Cheng County Assessment unit: Lanzhou University Public Disclosure Authorized May 2012 Environmental Management Plan for Cheng County Moba Gorge Water Source Engineering of Gansu Province Cheng County Moba Gorge Water Source Engineering of Gansu Province Engineering of Gansu Province Project Name: Cheng County Moba Gorge Water Source Engineering of Gansu Province Commissioned By: Water Source Engineering Construction Management Department of Moba Gorge for City Water Supply of Cheng County Assessed By: Lanzhou University Supervisor: Wu Junnian Technical Director: Wu Junnian Major Establishment Strength: Wu Junnian, Liu Guannan Environmental Management Plan for Cheng County Moba Gorge Water Source Engineering of Gansu Province Directory 1. General Instruction………………………………………………………………………….1 1.1 Project Brief…………………………………………………………………………………..1 1.2 Objectives of Environmental Management Plan………………………………………….2 1.3 Compilation of Environmental Management Plan…………………………………………3 1.4 Design of Environmental Management Plan………………………………………………3 1.5 Details of Compilation Technology………………………………………………………….3 2. Policy, Law and Administrative Management Framework…………………………….5 2.1 Environmental Policies and Regulations Document………………………………………5 2.2 Environmental
    [Show full text]
  • 4.2.2 Development Plan of Project Scenic Spot
    The World Bank Loan Project Public Disclosure Authorized The World Bank Loan Natural Heritage Protection and Development II Project Social Assessment Report on Construction of Yellow River Stone Forest Scenic Spot in Jingtai County Public Disclosure Authorized Public Disclosure Authorized Gansu Huigu Science &Technology Consulting Co. Ltd. April 2020 Public Disclosure Authorized Social Assessment Report for Sub-project of Yellow River Stone Forest Scenic Spot in Jingtai County Report Editing Team Ding Wenguang Professor, Tutor for Doctor Degree, College of Earth and Environmental Sciences, Lanzhou University Expert of Think Tank, Gansu Huigu Science & Technology Consulting Co. Ltd. Jiang Xuehua General Manager, Gansu Huigu Science & Technology Consulting Co. Ltd. Gao Xuelian Technician, Gansu Huigu Science & Technology Consulting Co. Ltd. Yang Xiaoai Technician, Gansu Huigu Science & Technology Consulting Co. Ltd. Tang Yaping Technician, Gansu Huigu Science & Technology Consulting Co. Ltd. Yang Ting Technician, Gansu Huigu Science & Technology Consulting Co. Ltd. Li Weili Technician, Gansu Huigu Science & Technology Consulting Co. Ltd. Li Tiantian Technician, Gansu Huigu Science & Technology Consulting Co. Ltd. Mu Yangjie Technician, Gansu Huigu Science & Technology Consulting Co. Ltd. I Contents Abstract ....................................................................................................................1 Positive Social Impacts of the Project .........................................................................1 Negative
    [Show full text]
  • Vertical Facility List
    Facility List The Walt Disney Company is committed to fostering safe, inclusive and respectful workplaces wherever Disney-branded products are manufactured. Numerous measures in support of this commitment are in place, including increased transparency. To that end, we have published this list of the roughly 7,600 facilities in over 70 countries that manufacture Disney-branded products sold, distributed or used in our own retail businesses such as The Disney Stores and Theme Parks, as well as those used in our internal operations. Our goal in releasing this information is to foster collaboration with industry peers, governments, non- governmental organizations and others interested in improving working conditions. Under our International Labor Standards (ILS) Program, facilities that manufacture products or components incorporating Disney intellectual properties must be declared to Disney and receive prior authorization to manufacture. The list below includes the names and addresses of facilities disclosed to us by vendors under the requirements of Disney’s ILS Program for our vertical business, which includes our own retail businesses and internal operations. The list does not include the facilities used only by licensees of The Walt Disney Company or its affiliates that source, manufacture and sell consumer products by and through independent entities. Disney’s vertical business comprises a wide range of product categories including apparel, toys, electronics, food, home goods, personal care, books and others. As a result, the number of facilities involved in the production of Disney-branded products may be larger than for companies that operate in only one or a limited number of product categories. In addition, because we require vendors to disclose any facility where Disney intellectual property is present as part of the manufacturing process, the list includes facilities that may extend beyond finished goods manufacturers or final assembly locations.
    [Show full text]
  • Environment Monitoring Report PRC: Lanzhou
    Environment Monitoring Report Project Number: 35354-013 December 2011 PRC: Lanzhou - Chongqing Railway Development Project Prepared by Beijing OASIS Environmental Protection Technology Co., Ltd. This Environment Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Director, Management or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environment Monitoring Report On New Lanzhou-Chongqing Railway Development Project by Using Asian Development Bank Loan (Year 2011) Beijing OASIS Environmental Protection Technology Co., Ltd. December 2011 Environment Monitoring Report on New Lanzhou-Chongqing Railway Development Project in Year 2011 Table of Contents 1. FOREWORD ............................................................................................................................................................ 1 1.3 ENVIRONMENT MONITORING .............................................................................................................................. 3 2. PROJECT PROGRESS ........................................................................................................................................... 4 2.1 PROJECT IMPLEMENTATION UNIT, CONSTRUCTION
    [Show full text]
  • Constitution, the Cornerstone of a Nation a Symposium Is Held to Commemorate China’S Second National Constitution Day in Beijing on December 4, 2015
    ISSUE 4 · 2015 《中国人大》对外版 NPC National People’s Congress of China CONSTITUTION, THE CORNERSTONE OF A NATION A symposium is held to commemorate China’s second national Constitution Day in Beijing on December 4, 2015. Sheng Jiapeng SPECIAL REPOrT China, Laos pledge to 6 further develop ties Contents Special Report In-depth 6 22 China, Laos pledge to further The Anti-terrorism Law timely develop ties enacted 8 Legislation Enforcement of the Constitution key to China’s rule of law 26 The Law on National Medals 10 and National Honorary Titles Constitution, the cornerstone of a nation Focus 30 China’s first law against domestic violence 18 Mapping out success New five-year blueprint lays 32 down specific objectives for Farewell to one-child policy a prosperous China with law amended 4 NATiOnAL PeOpLe’s COnGRess OF CHinA NPC Constitution, 10 the cornerstone of a nation Mapping out success New five-year blueprint lays down specific 18 objectives for a prosperous China 42 Xinjiang’s rise Six decades of development makes the autonomous region a promising land ISSUE 4 · 2015 Nationality 42 Xinjiang’s rise Six decades of development makes the autonomous region a promising land NPC General Editorial Supervision Office Address: 23 Xijiaominxiang, Xicheng District Beijing 100805,P.R.China 34 Tel: (86-10)6309-8540 When ‘audit storm’ blows again (86-10)8308-3891 E-mail: [email protected] Topic ISSN 1674-3008 CN 11-5683/D COVER: Volunteers answer Constitution- Price:RMB35 related queries raised by passersby during Edited by The People’s Congresses Journal 38 an activity marking China’s second national A bigger role to play Constitution Day in Yongchuan District of Published by The People’s Congresses Journal Measures taken to improve performance Chongqing Municipality on December 4, Printed by Beijing Zhong Ke Printing Co., Ltd.
    [Show full text]
  • Oxfam Express MAY 2016 樂施・四十 共創・無窮 FOUR DECADES, ONE MISSION: END POVERTY
    Issue 55 oxfam express MAY 2016 樂施・四十 共創・無窮 FOUR DECADES, ONE MISSION: END POVERTY Left-behind children need our support www.oxfam.org.hk OxfamHongKong (852) 3120 5000 [email protected] OXFAM HONG KONG: 17/F, China United Centre, 28 Marble Road, North Point, Hong Kong Tel: (852) 3120 5000 Fax: (852) 2590 6880 Oxfam Hong Kong – Macau Office: Alameda Dr. Carlos d'Assumpção, No.258, Praça Kin Heng Long, 18 Andar F, Macau (Toll Free Hotline: 0800 809) Oxfam Hong Kong Interactive Education Centre: 9/F, China United Centre, 28 Marble Road, North Point, Hong Kong Printed on recycled paper The Oxfam Shop: LG 8, Jardine House, 1 Connaught Place (Tel: 2522 1765) using soy oil-based ink World without poverty Oxfam’s global inequality report found that, in 2016, the world’s richest 1 per cent has as much wealth as the poorest 99 per cent. Many of the poorest countries around the world have made great progress in the struggle against poverty. But this progress is being threatened by rising inequality. Oxfam’s global inequality report found that, in 2016, the world’s richest 1 per cent has as much wealth as the poorest 99 per cent. The widening gap between the richest and poorest is damaging economies and pushing more people into poverty. In Hong Kong, though extreme poverty is not an issue, inequality has been a persistent problem. The gap between rich and poor has continued to widen over the years, so much so that the current Gini coefficient stands at 0.537 – one of the highest among the world’s developed economies.
    [Show full text]
  • Providing Emergency Response to Sichuan Earthquake (Financed by the Asian Development Bank)
    Technical Assistance Consultant’s Report Project Number: 42150 December 2008 People's Republic of China: Providing Emergency Response to Sichuan Earthquake (Financed by the Asian Development Bank) Prepared by Ms. Jiang Lingling Mr. Wang Jiexiu Mr. Liu Lianyou People's Republic of China For Ministry of Civil Affairs This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. Technical Assistance Consultant’s Report PROVIDING EMERGENCY RESPONSE TO WENCHUAN EARTHQUAKE ADB TA 7081-PRC SUBMITTED TO: MINISTRY OF CIVIL AFFAIRS, P.R.CHINA ASIAN DEVELOPMENT BANK 15 December 2008 SUBMITTED BY: MS. JIANG LINGLING MR. WANG JIEXIU MR. LIU LIANYOU ADB TA7081-PRC-Providing Emergency Response to Wenchuan Earthquake EXECUTIVE SUMMARY The Technical Assistance Project (TA-7081-PRC): Providing Emergency Response to Wenchuan (Sichuan) Earthquake was initiated following a request for emergency assistance from the Government of the People’s Republic of China (PRC) after a massive earthquake measuring 8.0 on the Richter scale struck southwest PRC on 12th May 2008. The Wenchuan Earthquake caused extensive damage and heavy losses in Sichuan, Gansu and Shaanxi Provinces, as well as causing some damage and losses in another seven provinces. The total amount of direct economic losses caused by the earthquake are estimated at RMB852,309 million, and losses in Sichuan, Shanxi and Gansu Provinces alone are estimated to be RMB845,136 million, making up to 99.16% of the total. The TA was undertaken three months after the earthquake occurred and approximately two months after the cessation of emergency response activities.
    [Show full text]