World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document PROCUREMENT PLAN (Textual Part) Project information: Egypt Transforming Egypt's Healthcare System Project P167000 Project Implementation agency: Ministry of Health and Population Public Disclosure Authorized Date of the Procurement Plan: October 23, 2018 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan Public Disclosure Authorized for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. Public Disclosure Authorized Leased Assets: “Not Applicable” Procurement of Second Hand Goods: “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Other Relevant Procurement Information. NA Public Disclosure Authorized PROCUREMENT Egypt, Arab Republic of : Transforming Egypt's Healthcare System Project PLAN General Information Country: Egypt, Arab Republic of Bank’s Approval Date of the Original Procurement Plan: 2018-10-23 Revised Plan Date(s): (comma delineated, leave blank if none)2018-11-13 Project ID: P167000 GPN Date: Project Name: Transforming Egypt's Healthcare System Project Loan / Credit No: IBRD / 88950 Executing Agency(ies):Ministry of Health and Population WORKS Bid Evaluation Activity Reference No. Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOHP-83290-GO-RFQ / purchasing virus c drugs for abnub district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83293-GO-RFQ / purchasing virus c drugs for Abou Tiag district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83300-GO-RFQ / purchasing virus c drugs for El-fath district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83301-GO-RFQ / purchasing virus c drugs for alqawsiuh district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83303-GO-RFQ / purchasing virus c drugs for dayrout district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83287-GO-RFQ / purchasing virus c drugs for El dabaa district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400 mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83296-GO-RFQ / purchasing virus c drugs for Elbadari district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83277-GO-RFQ / purchasing virus c drugs for El hamam district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83299-GO-RFQ / purchasing virus c drugs for El-ghanaym district . the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83742-GO-RFQ / Purchasing hepatitis C medicines for Alriyad district. Pending the currently used Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 medicines through the Quotations One Envelope tion Egyptian national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83743-GO-RFQ / Purchasing hepatitis C medicines for Baltim district. Pending Request for Single Stage - the currently used IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Quotations One Envelope medicines through the tion Egyptian national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . Page 1 EG-MOHP-83618-GO-RFQ / purchasing hepatitis C medicines for Alkhalifuh district. the currently used Pending medicines through the Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Egyptian national Quotations One Envelope tion treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83621-GO-RFQ / Purchasing hepatitis C medicines for Alzaytun district. the currently used Pending medicines through the Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Egyptian national Quotations One Envelope tion treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83620-GO-RFQ / Purchasing hepatitis C medicines for Alssahil district. the currently used Pending medicines through the Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Egyptian national Quotations One Envelope tion treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83622-GO-RFQ / Purchasing hepatitis C medicines for Alsalam Atnin district. the Pending currently used medicines Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 through the Egyptian Quotations One Envelope tion national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83623-GO-RFQ / Purchasing hepatitis C medicines for Alsayidat Walqalea district. the currently used Pending Request for Single Stage - medicines through the IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Quotations One Envelope Egyptian national tion treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83625-GO-RFQ / Purchasing hepatitis C medicines for Alsharabia district. the currently used Pending Request for Single Stage - medicines through the IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Quotations One Envelope Egyptian national tion treatment program are combination of Sofosbuvir
Recommended publications
  • Pdf (925.83 K)
    Journal of Engineering Sciences, Assiut University, Vol. 37, No. 5, pp. 1193-1207, September 2009. EVALUATION OF GROUNDWATER AQUIFER IN THE AREA BETWEEN EL-QUSIYA AND MANFALUT USING VERTICAL ELECTRIC SOUNDINGS (VES) TECHNIQUE 1 2 3 Waleed S.S. , Abd El-Monaim, A, E. , Mansour M.M. and El-Karamany M. F.3 1 Ministry of Water Resources (underground water sector) 2 Research Institute for Groundwater 3 Mining & Met. Dept., Faculty of Eng., Assiut University (Received August 5, 2009 Accepted August 17, 2009). The studied area is located northwest of Assiut city which represents a large part of the Nile Valley in Assiut governorate. It lies between latitudes 27° 15ƍ 00Ǝ and 27° 27ƍ 00Ǝ N, and longitudes 30° 42ƍ 30Ǝ to 31° 00ƍ E, covering approximately 330 square kilometers. Fifteen Vertical Electrical soundings (VES) were carried out to evaluate the aquifer in the study area. These soundings were arranged to construct three geoelectric profiles crossing the Nile Valley. Three cross sections were constructed along these profiles to detect the geometry and geoelectric characteristics of the quaternary aquifer based on the interpretation of the sounding curves and the comparison with available drilled wells. The interpretation showed that the thickness of the quaternary aquifer in the study area ranges between 75 and 300 m, in which the maximum thicknesses are detected around Manfalut and at the west of El-Qusiya. INTRODUCTION During the two last decades, there is a continuous demand for big amount of water necessary for the land expansion projects in Egypt. So, the development of groundwater resources receives special attention, since the groundwater reservoir underlying the Nile Valley and its adjacent desert areas acting as auxiliary source of water in Egypt.
    [Show full text]
  • World Bank Document
    The World Bank Report No: ISR16189 Implementation Status & Results Egypt, Arab Republic of Egypt National Railways Restructuring Project (P101103) Operation Name: Egypt National Railways Restructuring Project (P101103) Project Stage: Implementation Seq.No: 13 Status: ARCHIVED Archive Date: 01-Oct-2014 Country: Egypt, Arab Republic of Approval FY: 2009 Public Disclosure Authorized Product Line:IBRD/IDA Region: MIDDLE EAST AND NORTH AFRICA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 17-Mar-2009 Original Closing Date 30-Sep-2015 Planned Mid Term Review Date 30-Sep-2013 Last Archived ISR Date 15-Jun-2014 Public Disclosure Copy Effectiveness Date 24-Jun-2010 Revised Closing Date 31-Mar-2017 Actual Mid Term Review Date 07-Dec-2013 Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Project is to improve the reliability, efficiency and safety of the railways’ services on targeted sections ofthe rail network. Has the Project Development Objective been changed since Board Approval of the Project? ● Yes No Public Disclosure Authorized Component(s) Component Name Component Cost Component 1-1: Signaling Modernization - Cairo (Arab El Raml) to Alexandria 174.50 Component 2: Renewal of track 106.00 Component 3: Modernization of Management and Operating Practices 13.50 Component 1-2: Signaling Modernization - Beni Suef to Asyut 337.00 Contingencies and front end fees 14.00 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Public Disclosure Authorized Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status Overview Public Disclosure Copy A level I project restructuring was approved by the Board on June 25, 2014.
    [Show full text]
  • The Data on Periodical (Weekly) Market at the End of the 19Th Century in Egypt -The Cases of Qaliubiya, Sharqiya and Daqahliya Provinces
    The Data on Periodical (Weekly) Market at the End of the 19th Century in Egypt -The cases of Qaliubiya, Sharqiya and Daqahliya Provinces Hiroshi Kato Some geographers and historians are concerned with periodical market, which they define as the place of economic transactions peculiar to so called "peasant society. In Egypt, which is, as well known, a typical hydraulic society, periodical market, that is weekly market (α1- siiq al-usbu i) in the Islamic world, still has the important economic functions in rural areas at the present, as well as it had in the past. The author is now collecting the data on Egyptian weekly market from the 19th century to the present, based upon source materials on one hand, and field research on the other. The aim of this paper is to present some statistical and ge0- graphical data on Egyptian weekly market at the end of the 19th century to the researchers who are interested in periodical market in agrarian society, before the intensive study, which the author is planning in the future, on the economic functions of Egyptian weekly market and their transformation in the process of the modernization of Egyptian society. The source material from which the data are collected is A. Boinet, Geographie Econ0- mique et Administrative de I'Egypte, Basse-Egypte I, Le Caire, 1902. It is the results of the population census in 1897 and the agrarian census maybe took in 1898 and 1899, being annexed to the population census in the previous year. The data are arranged village by village, and contain the statistics on cultivated area, crops, planted trees, animals, industry, traffic by rail- road, and transportation by the Nile and canals, and the descriptive informations and remarks on school, canal, railroad, market, post office and so on.
    [Show full text]
  • THE MONUMENT CALLED “DARA” at MANFALUT OR the PYRAMID of KING KHUWI? Known Name: Pyramid of Khuwi
    THE MONUMENT CALLED “DARA” AT MANFALUT OR THE PYRAMID OF KING KHUWI? Known name: Pyramid of Khuwi. Arabic name: Dara. G-R name: North of Cynopolis. Geographical information of the site: The location of this monument is on the map of Egypt (1:100 000) MANFALUT portions of sheets 48/54 and 48/60 of 1932. Its coordinates on the UTM Kilometer grid are 508 N, 605 E (=27o 17/ N, 30o 54/ E). Eight km West of Manfalut, NW of Nag Arab el c Amayem (a small village N of El c Atamna). The shortest distance to the river is 10 km. The course of the Nile in this area between the City of Assuit and the Island of El Mac abdah, at the southern portion of the Abu Fouda cliffs, meanders creating 5 bends in a general NW direction. The monument is oriented by its sides to the cardinal points. It cannot be seen from the western road, very close to it, because of a grove of trees. Moreover Dara is the local name of the monument itself and not the name of the site. History of the exploration and dates. The monument Dara was first discovered by Ahmed Kamal Pasha in 1911. He describes the corridor and burial chamber. R. Weill cleared large parts of the superstructure and made drawings in 1946-1948. J.Vercoutter worked on the neighboring site in the early 1950s. Today the site is in a confused state. Body of the subject. Brick monuments come from all periods of Egyptian history and royal brick pyramids come from the sites of: Abu Rawash III Dyn., Fayum XII dyn., Dahshur XII and XIII Dyn.
    [Show full text]
  • Early Hydraulic Civilization in Egypt Oi.Uchicago.Edu
    oi.uchicago.edu Early Hydraulic Civilization in Egypt oi.uchicago.edu PREHISTORIC ARCHEOLOGY AND ECOLOGY A Series Edited by Karl W. Butzer and Leslie G. Freeman oi.uchicago.edu Karl W.Butzer Early Hydraulic Civilization in Egypt A Study in Cultural Ecology Internet publication of this work was made possible with the generous support of Misty and Lewis Gruber The University of Chicago Press Chicago and London oi.uchicago.edu Karl Butzer is professor of anthropology and geography at the University of Chicago. He is a member of Chicago's Committee on African Studies and Committee on Evolutionary Biology. He also is editor of the Prehistoric Archeology and Ecology series and the author of numerous publications, including Environment and Archeology, Quaternary Stratigraphy and Climate in the Near East, Desert and River in Nubia, and Geomorphology from the Earth. The University of Chicago Press, Chicago 60637 The University of Chicago Press, Ltd., London ® 1976 by The University of Chicago All rights reserved. Published 1976 Printed in the United States of America 80 79 78 77 76 987654321 Library of Congress Cataloging in Publication Data Butzer, Karl W. Early hydraulic civilization in Egypt. (Prehistoric archeology and ecology) Bibliography: p. 1. Egypt--Civilization--To 332 B. C. 2. Human ecology--Egypt. 3. Irrigation=-Egypt--History. I. Title. II. Series. DT61.B97 333.9'13'0932 75-36398 ISBN 0-226-08634-8 ISBN 0-226-08635-6 pbk. iv oi.uchicago.edu For INA oi.uchicago.edu oi.uchicago.edu CONTENTS List of Illustrations Viii List of Tables ix Foreword xi Preface xiii 1.
    [Show full text]
  • Dakahliya ESMP
    41 1.5 Million Natural Gas Connections Project in 11 Governorates Environmental and Social Management Plan Kafr Shukr and Qaha Districts / Qalyubia, Governorate Final Report EGAS August, 2019 Egyptian Natural Gas Holding Company Developed by ‛‛Petrosafe’’ Petroleum Safety & Environmental Services EcoConServ Environmental Solutions Company EGAS-1.5M.-Phase2- Qalyubia. ESMP-PETROSAFE-Env Mohamed Saad. Mohamed. Abdel Moniem. O. Kamal - Final EGAS ESMP: NG Connection for Qalyubia (Kafr Shukr and Qaha Districts) Petrosafe List of acronyms and abbreviations AFD Agence Française de Développement (French Agency for Development) CAPMAS Central Agency for Public Mobilization and Statistics CDA Community Development Association EEAA Egyptian Environmental Affairs Agency EGAS Egyptian Natural Gas Holding Company EIA Environmental Impact Assessment ESIA Environmental and Social Impact Assessment ESMF Environmental and Social Management framework ESMP Environmental and Social Management Plan FGD Focus Group Discussion GoE Government of Egypt GPS Global Positioning System HH Households HSE Health Safety and Environment IFC International Finance Corporation LDC Local Distribution Companies LGU Local Governmental Unit LPG Liquefied Petroleum Gas mBar millibar NG Natural Gas NGO Non-Governmental Organizations P&A Property and Appliance Survey PE Poly Ethylene Project districts Kafr Shukr and Qaha cities PRS Pressure Reduction Station SDO Social Development Officer SIA Social Impact Assessment Egypt Gas Egypt Gas(LDC) WB The World Bank WHO World Health Organization $ United States Dollars € Euros Exchange Rate: US$ = 16.59 EGP as of August, 2019 Exchange Rate: € = 18.55 EGP as of August 2019 2 / 98 EGAS -1.5M.-Phase2- Qalyubia. ESMP-PETROSAFE-Env Mohamed Saad. Mohamed. Abdel Moniem. O. Kamal - Final EGAS ESMP: NG Connection for Qalyubia (Kafr Shukr and Qaha Districts) Petrosafe Contents 0.
    [Show full text]
  • National Feasibility Study & Roadmap for Riverbank
    SUPPORTING INNOVATION IN WATER & WASTEWATER IN EGYPT NATIONAL FEASIBILITY STUDY & ROADMAP FOR RIVERBANK FILTRATION IN EGYPT CAIRO 2018 (REVISED) 2020 RBF Unit, Sohag, Egypt - ©2021 COPYRIGHT AND DISCLAIMER Copyright © United Nations Human Settlements Programme (UN-Habitat) 2020 All rights reserved United Nations Human Settlements Programme (UN-Habitat) P.O. Box 30030 00100 Nairobi GPO KENYA Tel: 254-020-7623120 (Central Office) www.ar.unhabitat.org DISCLAIMER The designations employed and the presentation of material in this publication do not imply the expression of any opinion whatsoever on the part of the secretariat of the United Nations concerning the legal status of any county, territory, city or area or its authorities, or concerning the delimitation of its frontiers or boundaries regarding its economic system or degree of development. Excerpts may be reproduced without authorization, on condition that the source is indicated. Views expressed in this publication do not necessarily reflect those of the United Nations Human Settlements Programme, the United Nations and its member states. i National Feasibility Study and roadmap for River Bank Filtration in Egypt NATIONAL FEASIBILITY STUDY AND ROADMAP FOR RIVER BANK FILTRATION IN EGYPT FEASIBILITY STUDY REPORT PARTNERS COORDINATORS The initial version of this report was produced under Hyat Inclusive and Sustainable Local Economic Development Project in partnership with the Egyptian Ministry for Local Development, the Egyptian Ministry for Housing, Utilities and Urban Communities, the Egyptian Holding Company for Water and Wastewater and the United Nations Human Settlement’s Programme (UN Habitat). Funded by the United Nations Trust Fund for Human Security and UN Habitat. CONTACT DETAILS Holding Company for Water and Wastewater (HCWW) Prof.
    [Show full text]
  • Decentralization in the Course of Political Transformation
    ECONOMIC AND SOCIAL COMMISSION FOR WESTERN ASIA (ESCWA) INSTITUTIONAL DEVELOPMENT AND TRANSITION: DECENTRALIZATION IN THE COURSE OF POLITICAL TRANSFORMATION United Nations Distr. GENERAL E/ESCWA/ECRI/2013/3 22 October 2013 ORIGINAL: ENGLISH ECONOMIC AND SOCIAL COMMISSION FOR WESTERN ASIA (ESCWA) INSTITUTIONAL DEVELOPMENT AND TRANSITION: DECENTRALIZATION IN THE COURSE OF POLITICAL TRANSFORMATION United Nations New York, 2013 13-0256 Acknowledgements This study was authored by Asya El-Meehy based on primary research. Mohamed Nada at UN-Habitat Cairo drafted the analysis of Egypt’s local administration system (chapter III). Excellent research and writing support were provided by Rabi Bashour, Neige Pointet, Maria Ortiz Perez and Asima Ghazi-Boullion. Youssef Chaitani’s input at various stages of the research as well as discussions with Adib Nemeh enriched this work. Last, but not least, valuable feedback by members of the publications committee benefited the study. iii iv CONTENTS Page Acknowledgements .............................................................................................................................. iii Executive summary .............................................................................................................................. vii Introduction .......................................................................................................................................... 1 Chapter I. REVISITING THE DECENTRALIZING DEBATE POST ARAB UPRISINGS 3 A. The “local” in Arab uprisings............................................................................................
    [Show full text]
  • MOST ANCIENT EGYPT Oi.Uchicago.Edu Oi.Uchicago.Edu
    oi.uchicago.edu MOST ANCIENT EGYPT oi.uchicago.edu oi.uchicago.edu Internet publication of this work was made possible with the generous support of Misty and Lewis Gruber MOST ANCIE NT EGYPT William C. Hayes EDITED BY KEITH C. SEELE THE UNIVERSITY OF CHICAGO PRESS CHICAGO & LONDON oi.uchicago.edu Library of Congress Catalog Card Number: 65-17294 THE UNIVERSITY OF CHICAGO PRESS, CHICAGO & LONDON The University of Toronto Press, Toronto 5, Canada © 1964, 1965 by The University of Chicago. All rights reserved. Published 1965. Printed in the United States of America oi.uchicago.edu WILLIAM CHRISTOPHER HAYES 1903-1963 oi.uchicago.edu oi.uchicago.edu INTRODUCTION WILLIAM CHRISTOPHER HAYES was on the day of his premature death on July 10, 1963 the unrivaled chief of American Egyptologists. Though only sixty years of age, he had published eight books and two book-length articles, four chapters of the new revised edition of the Cambridge Ancient History, thirty-six other articles, and numerous book reviews. He had also served for nine years in Egypt on expeditions of the Metropolitan Museum of Art, the institution to which he devoted his entire career, and more than four years in the United States Navy in World War II, during which he was wounded in action-both periods when scientific writing fell into the background of his activity. He was presented by the President of the United States with the bronze star medal and cited "for meritorious achievement as Commanding Officer of the U.S.S. VIGILANCE ... in the efficient and expeditious sweeping of several hostile mine fields.., and contributing materially to the successful clearing of approaches to Okinawa for our in- vasion forces." Hayes' original intention was to work in the field of medieval arche- ology.
    [Show full text]
  • The Impact of the Arab Conquest on Late Roman Settlementin Egypt
    Pýý.ý577 THE IMPACT OF THE ARAB CONQUEST ON LATE ROMAN SETTLEMENTIN EGYPT VOLUME I: TEXT UNIVERSITY LIBRARY CAMBRIDGE This dissertation is submitted for the degree of Doctor of Philosophy in the University of Cambridge, March 2002 ALISON GASCOIGNE DARWIN COLLEGE, CAMBRIDGE For my parents with love and thanks Abstract The Impact of the Arab Conquest on Late Roman Settlement in Egypt Alison Gascoigne, Darwin College The Arab conquest of Egypt in 642 AD affected the development of Egyptian towns in various ways. The actual military struggle, the subsequent settling of Arab tribes and changes in administration are discussed in chapter 1, with reference to specific sites and using local archaeological sequences. Chapter 2 assesseswhether our understanding of the archaeological record of the seventh century is detailed enough to allow the accurate dating of settlement changes. The site of Zawyet al-Sultan in Middle Egypt was apparently abandoned and partly burned around the time of the Arab conquest. Analysis of surface remains at this site confirmed the difficulty of accurately dating this event on the basis of current information. Chapters3 and 4 analysethe effect of two mechanismsof Arab colonisation on Egyptian towns. First, an investigation of the occupationby soldiers of threatened frontier towns (ribats) is based on the site of Tinnis. Examination of the archaeological remains indicates a significant expansion of Tinnis in the eighth and ninth centuries, which is confirmed by references in the historical sources to building programmes funded by the central government. Second, the practice of murtaba ` al- jund, the seasonal exploitation of the town and its hinterland for the grazing of animals by specific tribal groups is examined with reference to Kharibta in the western Delta.
    [Show full text]
  • Food Safety Inspection in Egypt Institutional, Operational, and Strategy Report
    FOOD SAFETY INSPECTION IN EGYPT INSTITUTIONAL, OPERATIONAL, AND STRATEGY REPORT April 28, 2008 This publication was produced for review by the United States Agency for International Development. It was prepared by Cameron Smoak and Rachid Benjelloun in collaboration with the Inspection Working Group. FOOD SAFETY INSPECTION IN EGYPT INSTITUTIONAL, OPERATIONAL, AND STRATEGY REPORT TECHNICAL ASSISTANCE FOR POLICY REFORM II CONTRACT NUMBER: 263-C-00-05-00063-00 BEARINGPOINT, INC. USAID/EGYPT POLICY AND PRIVATE SECTOR OFFICE APRIL 28, 2008 AUTHORS: CAMERON SMOAK RACHID BENJELLOUN INSPECTION WORKING GROUP ABDEL AZIM ABDEL-RAZEK IBRAHIM ROUSHDY RAGHEB HOZAIN HASSAN SHAFIK KAMEL DARWISH AFKAR HUSSAIN DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. CONTENTS EXECUTIVE SUMMARY...................................................................................... 1 INSTITUTIONAL FRAMEWORK ......................................................................... 3 Vision 3 Mission ................................................................................................................... 3 Objectives .............................................................................................................. 3 Legal framework..................................................................................................... 3 Functions...............................................................................................................
    [Show full text]
  • Kerdasa: State Policy Toward Rural Egypt and the Reproduction of Local Injustice
    CASE ANALYSIS Kerdasa: State Policy Toward Rural Egypt and the Reproduction of Local Injustice Hani Awwad | December 2013 Kerdasa: State Policy Toward Rural Egypt and the Reproduction of Local Injustice Series: Case Analysis Hani Awwad | December 2013 Copyright © 2013 Arab Center for Research and Policy Studies. All Rights Reserved. ____________________________ The Arab Center for Research and Policy Studies is an independent research institute and think tank for the study of history and social sciences, with particular emphasis on the applied social sciences. The Center’s paramount concern is the advancement of Arab societies and states, their cooperation with one another and issues concerning the Arab nation in general. To that end, it seeks to examine and diagnose the situation in the Arab world - states and communities- to analyze social, economic and cultural policies and to provide political analysis, from an Arab perspective. The Center publishes in both Arabic and English in order to make its work accessible to both Arab and non-Arab researchers. Arab Center for Research and Policy Studies PO Box 10277 Street No. 826, Zone 66 Doha, Qatar Tel.: +974 44199777 | Fax: +974 44831651 www.dohainstitute.org Table of Contents Introduction 1 The Village Where the Memory of Persecution was Born 2 The State as a Guest: Kerdasa Village Narrative and Blaming the Outsider 8 Collective Punishment Against the Countryside: Kerdasa 12 Conclusion 15 KERDASA: STATE POLICY TOWARD RURAL EGYPT Introduction The violent break-up of the protest camps at Rabia al-Adawiya and al-Nahda on August 14, 2013 not only has dire consequences for the political process in Egypt, but it also indicates that heavy-handed security measures might open the country up to the possibility of civil unrest that might take on an extreme tribal, regional, or religious form.
    [Show full text]