QUEENS QUAY WEST Flagship Retail/Office Available with Wrap Around Views of Lake Ontario

Total Page:16

File Type:pdf, Size:1020Kb

QUEENS QUAY WEST Flagship Retail/Office Available with Wrap Around Views of Lake Ontario FOR LEASE 350 QUEENS QUAY WEST Flagship Retail/Office Available with Wrap Around Views of Lake Ontario Cushman & Wakefield ULC, Brokerage 161 Bay Street, Suite 1500 Toronto, ON M5J 2S1 CONTACT cushmanwakefield.com CARMEN SIEGEL* CAM STAJER* SAM BUCKLEY* Senior Associate Associate Senior Associate Urban Retail Services Urban Retail Services Office Leasing 416 359 2365 416 359 2712 416 359 2394 [email protected] [email protected] [email protected] Cushman & Wakefield ULC, Brokerage cushmanwakefield.com No warranty or representation, expressed or implied, is made as to the accuracy of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any specific listing condition, imposed by our principals. *Sales Representative 350 QUEENS QUAY WEST PROPERTY SUMMARY 350 Queens Quay West (The Quay) is located on the north side of Queens Quay West, just east of Spadina. After Coal Harbour Properties took ownership, The Quay underwent a $35,000,000 renova- tion in 2014. The Queens Quay area has been transformed in large part due to the efforts of Water- front Toronto, which is a public advocate and steward of the City’s waterfront revitalization created by the Governments of Canada, Ontario and the City of Toronto. Waterfront Toronto’s mandate is to transform Toronto’s waterfront by creating extraordinary new places to live, work, learn and play. Their commitment to enhance the waterfront has led to building renovations, new restaurants and additional attractions to the neighborhood, including Loch & Quay restaurant located right in The Quay. Access to the TTC streetcar is available adjacent to the building, which is serviced by the 509 Harbourfront (Union Station to Exhibition) and 510 Spadina (Union Sta- tion to Spadina Station) streetcars on dedicated, private lanes. The area is also serviced by dedicated bike lanes, wide pedestrian boulevards and easy access to Billy Bishop Airport. } OFFICE/RETAIL SPACE FOR LEASE RETAIL SPACE FOR LEASE 350 350 QUEENS QUEENS QUAY WEST QUAY WEST DETAILS DETAILS AVAILABLE SPACE: 6,300 SF AVAILABLE SPACE: 1,842 SF NET RENT: Negotiable NET RENT: Negotiable ADDITIONAL RENT: $17.50 PSF (2021 est). ADDITIONAL RENT: $17.50 PSF (2021 Est). AREA PARKING: $225.00/monthly based on availablity AREA PARKING: $225.00/monthly based on availablity AVAILABILITY: Immediate AVAILABILITY: Immediate • Street-front walkup and dedicated entrance • Builtout reception area • 4 treatment rooms / offices • In-suite men’s & woman’s washrooms with shower facilities • 2 team rooms / 2 large rooms } } OFFICE/RETAIL SPACE FOR LEASE RETAIL SPACE FOR LEASE 350 QUEENS QUAY WEST 350 QUEENS QUAY WEST HIGHLIGHTS HIGHLIGHTS • Large open space, easily divisible to provide the recommended 2 meter physical distancing Ontario guidelines • Clean and open floorplan • Filled with natural light from panoramic windows overlooking Lake Ontario • Filled with natural light from windows overlooking Lake Ontario • Dedicated walk-up entrance from Queens Quay West • Dedicated first come, first serve parking - Perfect for deliveries or for loading capabilities • Fully contained workplace environment without common ingress/egress or elevator • High ceilings • In suite restrooms • Ajjacacent amenities include HTO Park, HTO Beach and the Martin Goodman Trail • Ajjacacent amenities include HTO Park, HTO Beach and the Martin Goodman Trail • World-class transit (streetcar, subway and dedicated bike lanes) • World-class transit (streetcar, subway and dedicated bike lanes) } } FOR LEASE 350 QUEENS QUAY WEST AREA MAP TTC Streetcar Bike Lane Martin Goodman Trail 1. Sobey’s Urban Fresh Spadina 9. Tim Hortons 2. Fox and the Fiddle 10. Pizzaiolo Gourmet Pizza 3. Starbucks 11. Lick it Gelato 4. Rogers Centre 12. STeam Whistle Brewing / Biergarten 5. Starbucks 13. REC Room 6. Loch &Quay 14. Amsterdam Brewhouse 7. HTO Park West 15. The Slip} 8. HTO Park / HTO Beach CONTACT CARMEN SIEGEL* CAM STAJER* SAM BUCKLEY* Senior Associate Associate Senior Associate Urban Retail Services Urban Retail Services Office Leasing 416 359 2365 416 359 2712 416 359 2394 [email protected] [email protected] [email protected] Cushman & Wakefield ULC, Brokerage No warranty or representation, expressed or implied, is made as to the Cushman & Wakefield ULC, Brokerage accuracy of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, 161 Bay Street, Suite 1500 withdrawal without notice, and to any specific listing condition, imposed Toronto, ON M5J 2S1 by our principals. *Sales Representative cushmanwakefield.com.
Recommended publications
  • Hto Park (Central Waterfront)
    HtO Park (Central Waterfront) http://urbantoronto.ca/forum/printthread.php?s=bdb9f0791b0c9cf2cb1d... HtO Park (Central Waterfront) Printable View Show 40 post(s) from this thread on one page Page 1 of 9 1 2 3 ... Last AlvinofDiaspar 2006-Nov-16, 14:09 HtO Park (Central Waterfront) From the Star: A vision beyond the urban beach Nov. 16, 2006. 01:00 AM CHRISTOPHER HUME Janet Rosenberg may be in a hurry, but unfortunately Toronto isn't. One of the city's leading landscape architects, Rosenberg desperately wants Toronto to get off its collective butt and get going. She's getting tired of waiting. Take HtO, for example, the "urban beach" at the foot of John St. at Queens Quay W. her firm designed three years ago. The project is underway and slated to open next spring, finally, only two years behind schedule. Much of that time has been spent jumping through bureaucratic hoops. Dealing with the various agencies alone was enough to slow construction to a crawl. Now, however, the results can be seen; the large concrete terraces that reach down to the very waters of Lake Ontario have been poured and the hole that will contain a huge sandpit has been dug and lined. Even a few of the bright yellow umbrellas have been installed. Eventually there will be 39, the bulk still to come. Willow trees have also been planted on mounds and benches installed. Of course, changes were made along the way. After West 8 of Rotterdam won the central waterfront redesign competition last summer, the beach was moved closer to Queens Quay in anticipation of reducing the street from four lanes to two.
    [Show full text]
  • Festival Guide
    FESTIVAL GUIDE DU GUÍA DEL GUIDE FESTIVAL FESTIVAL July 10–August 15, 2015 10 juillet au 15 août 2015 10 julio – 15 agosto 2015 LEAD PARTNER PARTENAIRE PRINCIPAL SOCIO PRINCIPAL PREMIER PARTNERS GRANDS PARTENAIRES SOCIOS PREMIERES OPENING CEREMONY CREATIVE PARTNER OFFICIAL BROADCASTER PARTENAIRE CRÉATIF POUR LA CÉRÉMONIE D’OUVERTURE DIFFUSEUR OFFICIEL SOCIO CREATIVO PARA LA CEREMONIA DE INAUGURACIÓN EMISORA OFICIAL OFFICIAL SUPPLIERS FOURNISSEURS OFFICIELS PROVEEDORES OFICIALES PROUD SUPPORTERS FIERS PARRAINEURS COLABORADORES PRINCIPALES Acklands-Grainger ATCO Structures & Logistics Ltd. Bochner Eye Institute BT/A Advertising Burnbrae Farms The Canadian Press Carbon60 Networks The Carpenters’ Union CGC Inc. Division Sports-Rep Inc. ELEIKO EllisDon-Ledcor Esri Canada eSSENTIAL Accessibility Freeman Audio Visual Canada Gateman-Milloy Inc. George Brown College Gerflor Gold Medal Systems La Presse LifeLabs Medical Laboratory Services MAC Cosmetics Minavox Modu-loc Fence Rentals Morningstar Hospitality Services Inc. Nautique Boats ONRoute Highway Service Centres Ontario Power Generation PortsToronto Riedel Communications Roots Rosetta Stone SpiderTech Sportsnet 590 The Fan S4OPTIK Starwood Hotels and Resorts TBM Service Group TLN Telelatino Toronto Port Lands Company UP Express VIA Rail Canada VOIT Vision Critical Waste Management Yonex YouAchieve ZOLL 407 ETR FUNDING PARTIES HOST CITY HOST FIRST NATION BAILLEURS DE FONDS VILLE HÔTE PREMIÈRE NATION HÔTE PROVEEDORES DE FINANCIAMIENTO CIUDAD ANFITRIONA PRIMERA NACIÓN ANFITRIONA Live Sites/Sites
    [Show full text]
  • Exhibition Place Master Plan – Phase 1 Proposals Report
    Acknowledgments The site of Exhibition Place has had a long tradition as a gathering place. Given its location on the water, these lands would have attracted Indigenous populations before recorded history. We acknowledge that the land occupied by Exhibition Place is the traditional territory of many nations including the Mississaugas of the Credit, the Anishnabeg, the Chippewa, the Haudenosaunee and the Wendat peoples and is now home to many diverse First Nations, Inuit and Metis peoples. We also acknowledge that Toronto is covered by Treaty 13 with the Mississaugas of the Credit, and the Williams Treaties signed with multiple Mississaugas and Chippewa bands. Figure 1. Moccasin Identifier engraving at Toronto Trillium Park The study team would like to thank City Planning Division Study Team Exhibition Place Lynda Macdonald, Director Don Boyle, Chief Executive Officer Nasim Adab Gilles Bouchard Tamara Anson-Cartwright Catherine de Nobriga Juliana Azem Ribeiro de Almeida Mark Goss Bryan Bowen Hardat Persaud David Brutto Tony Porter Brent Fairbairn Laura Purdy Christian Giles Debbie Sanderson Kevin Lee Kelvin Seow Liz McFarland Svetlana Lavrentieva Board of Governors Melanie Melnyk Tenants, Clients and Operators Dan Nicholson James Parakh David Stonehouse Brad Sunderland Nigel Tahair Alison Torrie-Lapaire 4 - PHASE 1 PROPOSALS REPORT FOR EXHIBITION PLACE Local Advisory Committee Technical Advisory Committee Bathurst Quay Neighbourhood Association Michelle Berquist - Transportation Planning The Bentway Swinzle Chauhan – Transportation Services
    [Show full text]
  • Improving Transit Service Options to Major Music Festivals
    Attachment 1 For Action Improving Transit Service to Major Music Festivals Date: May 8, 2018 To: TTC Board From: Chief Operating Officer Summary The purpose of this report is to respond to the Board’s request to report on how the TTC plans and co-ordinates service to special events, including major music festivals. Recommendations It is recommended that the Board: 1. Receive the report for information; and 2. Direct staff to forward this report to Councillor Mike Layton, City of Toronto Transportation Services, Toronto Music Advisory Council, Exhibition Place, Ontario Place and Metrolinx for information. Financial Summary This report has no financial impact. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Equity/Accessibility Matters The TTC has made significant progress in providing barrier-free, accessible transit services for all customers. Presently, all TTC bus services are operated using accessible, low-floor buses. New low-floor streetcars are currently being deployed and all routes will have accessible streetcars by 2019. All subway stations will be accessible by 2025. By providing public transit services to special events the TTC encourages and supports more spontaneous trip-making, which is an important part of making the conventional system attractive to potential new customers, such as Wheel-Trans registrants who are taking advantage of the TTC’s Family of Services, and to all travellers in Toronto. This Improving Transit Service to Major Music Festivals Page 1 of 5 supports the Accessibility for Ontarians with Disabilities Act (AODA) objectives of more- spontaneous travel options for customers with disabilities, and the City’s Poverty Reduction Strategy of making transit more accessible and attractive to everyone.
    [Show full text]
  • Toronto Central Waterfront Public Forum #2
    TORONTO CENTRAL WATERFRONT PUBLIC FORUM #2 Queens Quay Revitalization EA Bathurst Street to Lower Jarvis Street Municipal Class Environmental Assessment (Schedule C) December 08, 2008 1 WATERFRONT TORONTO UPDATE 2 Central Waterfront International Design Competition 3 Waterfront Toronto Long Term Plan – Central Waterfront 4 Waterfront Toronto Long Term Plan – Central Waterfront 5 Waterfront Toronto Long Term Plan – Central Waterfront 6 Waterfront Toronto Long Term Plan – Central Waterfront 7 East Bayfront Waters Edge Promenade: Design Underway 8 Spadina Wavedeck: Opened September 2008 9 Spadina Wavedeck: Opened September 2008 10 Spadina Wavedeck: Opened September 2008 Metropolis Article 11 Rees Wavedeck: Construction Underway 12 Simcoe Wavedeck: Construction Underway 13 Spadina Bridge: Construction Early-2009 14 What Have We Been Doing for the Past 11 Months? • Consider and follow up on comments from Public Forum 1 • Assess baseline technical feasibility of design alternatives – Over 90 meetings in total: • City and TTC technical staff • Partner agencies •Stakeholders • Landowners/Property Managers • Adjacent project efforts • Advanced transit and traffic modelling • Develop Alternative Design Concepts and Evaluation (Phase 3) • Coordination with East Bayfront Transit EA 15 Study Area: Revised 16 Overview • Review of EA Phases 1 & 2 from Public Forum #1: January 2008 • EA Phase 3: Alternative Design Alternatives – Long list of Design Alternatives – Evaluation of Design Alternatives • Next Steps – Evaluation Criteria for Shortlisted Design
    [Show full text]
  • Transit Notice April 18, 2018
    Transit Notice April 18, 2018 Harbourfront streetcar tunnel General maintenance Date: April 21 to April 23, 2018 Content/timeline accurate at time of printing Work description and purpose During the April 21 weekend, TTC staff will be working inside the Harbourfront streetcar tunnel to conduct rail and overhead inspections/maintenance and cleaning debris/sand along the tracks. TTC crews will be working at the Spadina/Queens Quay Loop to upgrade cables in the substation. City crews will be working in the streetcar right of way on Queens Quay to inspect underground hydro vaults. The City is also planning maintenance work on the Gardiner Expressway. Transit service changes (from 2 a.m. April 21 to 5 a.m. April 23) Temporary changes will be made to the 510/310 Spadina and 509 Harbourfront streetcar services and replacement buses will be employed to accommodate these work activities. 509 Harbourfront Replacement buses will operate over entire 509 Harbourfront route. 510/310 Spadina Streetcar 510/310 Streetcars will operate on Spadina Avenue from Spadina Station (at Bloor) to the Charlotte Loop. Some streetcars will operate to the King / Church intersection via King Street. 510/310 Spadina Buses See map for route details or visit ttc.ca for more information. 510 Spadina bus service will operate from Charlotte Loop to Spadina Loop via Bremner Boulevard and Rees Street. 310 Spadina bus service will operate from Charlotte Loop to King/Yonge intersection via Bay Street. Work hours Work will be around-the-clock to ensure the resumption of transit service on Monday morning. Efforts will be made to keep noise level to a minimum; noise will be evident when some equipment is in full operation.
    [Show full text]
  • Rees Street Park Design Brief
    MAY 15 2018 // INNOVATIVE DESIGN COMPETITION REES STREET PARK Design Competition Brief > 2 TABLE OF CONTENTS 1. INTRODUCTION 4 2. GOALS (FROM THE RFQ) 7 3. PROGRAM FOR REES STREET PARK 8 3.1 Required Design Elements: 8 3.2 Site Opportunities and Constraints 14 3.3 Servicing & infrastructure 18 3 Rees Street Park and Queens Quay, looking southeast, April 2018 4 1. INTRODUCTION Waterfront Toronto and the City of Toronto Parks Forestry and Recreation Department are sponsoring this six-week design competition to produce bold and innovative park designs for York Street Park and Rees Street Park in the Central Waterfront. Each of these sites will become important elements of the Toronto waterfront’s growing collection of beautiful, sustainable and popular public open spaces along Queens Quay. Five teams representing a range of different landscape design philosophies have been selected to focus on the Rees Street Park site based on the program set out in this Competition Brief. The program consists of nine Required Design Elements identified through community consultation, as well as a number of physical site opportunities and constraints that must be addressed in the design proposals. The design competition will kick off on May 15, 2018 with an all-day orientation session – at which the teams will hear presentations from Waterfront Toronto, government officials, and key stakeholders – and a tour of the site. At the end of June, completed proposals will be put on public exhibition during which time input will be solicited from stakeholders, city staff, and the general public. A jury comprised of distinguished design and arts professionals will receive reports from these groups, and then select a winning proposal to be recommended to Waterfront Toronto and City of Toronto Parks Forestry and Recreation.
    [Show full text]
  • TO360 Year One Round Two Consultation Report
    Consultation Report TO360 Wayfinding Strategy (Phase III) – Year One, Round Two Consultation, March 2018 Table of Contents BACKGROUND ...................................................................................................................................1 DETAILED FEEDBACK: AREAS 1 & 2 .....................................................................................................6 DETAILED FEEDBACK: AREA 3 ........................................................................................................... 12 DETAILED FEEDBACK: AREA 4 ........................................................................................................... 20 DETAILED FEEDBACK: AREAS 5 & 6 ................................................................................................... 28 This Consultation Report documents feedback shared in the March 2018 Local Mapping Open Houses for TO360 — Phase III. It was shared with participants for review before being finalized. Background Toronto 360 (TO360) is an effort to help people find their way by making streets, neighbourhoods, and the city more legible. Following the successful completion of a pilot project in the Financial District in 2015, the City began a five-year city-wide rollout in 2017. This rollout is focused on developing a map database that will support the future production of wayfinding maps. In Year One of the rollout, the TO360 team is developing the map database in an area bounded roughly by Lake Ontario, Royal York Road, St. Clair Avenue, and Warden Avenue. In
    [Show full text]
  • Authority: Board of Health Item 26.15, As Adopted by City of Toronto Council on November 30, December 1, 2, 4 and 7, 2009 Adopted by Council: December 4, 2009
    Authority: Board of Health Item 26.15, as adopted by City of Toronto Council on November 30, December 1, 2, 4 and 7, 2009 Adopted by Council: December 4, 2009 CITY OF TORONTO BY-LAW No. 1236-2009 To amend City of Toronto Municipal Code Chapter 441, Fees and Charges, to update fees in respect of Municipal Code Chapter 738, Street Food, Healthier. WHEREAS City Council, at its meeting of December 1, 2 and 3, 2008, adopted Executive Committee Item 26.21, establishing Municipal Code Chapter 738, Street Food, Healthier, and authorizing a pilot program for the vending of healthier foods in locations on City streets and other City property; and WHEREAS Chapter 738 provides that the Medical Officer of Health shall prepare an annual report on the status of the pilot project and shall have the authority to make adjustments in the program as may be required during the pilot program, provided that any adjustments made shall be reported as part of the required annual report; and WHEREAS City Council has, after consideration of the annual report, approved certain recommended amendments to the pilot program, including up-dating the location fees to be charged under the pilot program; The Council of the City of Toronto HEREBY ENACTS as follows: 1. Appendix “C” to Chapter 441, Fees and Charges, of the Municipal Code of the City of Toronto is amended by deleting the reference to annual location fees for the Toronto a la Cart program (entry 17) under Schedule 9 (Toronto Public Health) and adding the following in numerical order to Schedule 9 (Toronto Public
    [Show full text]
  • Waterfront Toronto Rolling Five-Year Strategic Plan
    December 6, 2018 2019/20–2023/24 Waterfront Toronto / Rolling Five-Year Strategic Plan / Past · Present · Future Toronto is at a critical juncture. It has a strong and diversified economy, The Opportunity a thriving cultural life, and has earned a growing international reputation for Toronto, as a welcoming destination for visitors and new immigrants. At the same time, like other cities around the world Toronto is working to address an Ontario, array of challenges associated with economic inequality, affordability, and Canada mobility and environmental sustainability. The challenges many cities face today are products of their growth and success. Urbanization is a major global trend: 55% of humanity already lives in cities, and the UN projects that this figure will reach 68% by 2050. The Greater Toronto Area is home to nearly half of Ontarians (48.3%), a share that’s expected to keep growing. Toronto’s assets and systems —from housing to roads to transit—are strained precisely because so many people want to live and work here. In addition to facing challenges associated with its growth, Toronto is navigating trends that are shaping life across many jurisdictions. Toronto’s neighbourhoods have become more fractured along lines of income and identity. Opportunities related to technological and economic change have been unevenly distributed. Variations in social capital and trust leave some residents at increased risk of isolation. And extreme weather is becoming more frequent, raising concerns about the resilience of our built environment. Over the next five years, Toronto—and by extension Ontario and Canada, whose economies and reputations are tied to their largest city—has an opportunity to address some of the pressing urban problems of our time, growing economically while thriving socially and culturally.
    [Show full text]
  • (C) Metro Route Atlas 2021 Eagle (C) Metro Route Atlas 2021 Mulock (C) Metro Route Atlas 2021 Savage (C) Metro Route Atlas 2021
    Barrie Line to Bradford and Allandale Waterfront Toronto (C)(+ York Region) Metro Route Atlas 2021 (C)East Gwillimbury Metro Route Atlas 2021 Canada Newmarket Huron Main Heights Highway 404 Newmarket Terminal Longford Southlake Leslie Jul 2021 Yonge & Davis (C) Metro Route Atlas 2021 Eagle (C) Metro Route Atlas 2021 Mulock (C) Metro Route Atlas 2021 Savage (C) Metro Route Atlas 2021 Orchard Heights (C) Metro Route Atlas 2021 Wellington (C)Aurora Metro Route Atlas 2021 Golf Links (C) Metro Route Atlas 2021 Henderson (C) Metro Route Atlas 2021 Bloomington Bloomington Regatta Barrie Line Lincolnville (C) Metro Route Atlas 2021 King (C) Metro Route Atlas 2021 Gormley King City Stouffville Jefferson (C) Metro Route Atlas 2021 19th-Gamble (C) Metro Route Atlas 2021 Bernard Terminal Elgin Mills (C) Metro Route Atlas 2021 Crosby (C) Metro Route Atlas 2021 Maple Major Mackenzie Richmond Hill Weldrick Mount Joy (C) Metro Route AtlasRutherford 2021 16th-Carrville (C) Metro Route Atlas 2021 Markham Stouffville Line Centennial Bantry-Scott Richmond Hill West East Village Main Street Bathurst & Hwy 7 Centre Terminal Langstaff Chalmers Beaver Creek Beaver Creek Woodbine Town Centre Parkway Unionville Bullock Galsworthy Wootten Way (C) Metro Route Atlas 2021 (C)Bayview ValleymedeMetroLeslie Allstate RouteMontgomery Warden SciberrasAtlasKennedy/ McCowan2021Main Street Markham Parkway Hwy 7 Markham Stouffville Hospital 1 Royal Orchard Cedarland Post Rivis Vaughan Atkinson Metropolitan Martin Grove Islington Pine Valley Weston Centre Keele Taiga Warden/ Centre
    [Show full text]
  • Ontario by Bike Ride Toronto Trails & Ravines
    ONTARIO BY BIKE RIDE TORONTO TRAILS & RAVINES What You Need to Know THE ESSENTIALS Total Ride Distance: 85km Suggested Ride Time: 2 days, 1 nights - OR - 1 day Experience Level: Moderate Route Surfaces: Off-road paved multi-use trails, with some on-road connections that require caution. Suitable for all types of bikes. Note cautions below. Ride Start / Finish Location & Parking: This is a looped ride route. It is possible to complete ride in a single day but to make the most of the Toronto route and attractions a 2 day ride is recommended. Suggested start location near Keele Ave & Finch Avenue. If in a group or parking more than a day ensure you receive parking permission or permit. There are a number of hotels on Norfinch and Finch Ave that if asked would allow for overnight parking. For our group ride we parked with permission at James Cardinal McGuigan Catholic High School, 1440 Finch Ave West. Your Bike: Ensure you arrive to start with a bicycle in good working order, appropriate outerwear for conditions, and refreshments. Helmets are recommended. There are several bike shops in the Harbourfront area should you require any major repairs. Ride Options & Digital Maps: Ride in 1 day - Starting from north end, Finch Avenue - (85km) www.ridewithgps.com/routes/34019030 Ride in 1 day - Starting from south end, downtown, Harbourfront - (85km) www.ridewithgps.com/routes/34019054 Ride in 2 days, with overnight stay downtown - (85km) www.ridewithgps.com/ambassador_routes/1551-toronto-trails-ravines-2-day-tour Paper Map: Plot the route on the City of Toronto Cycling Map.
    [Show full text]