World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
E1912 v2 Annex table 1 The Detail List of Construction Contents, Environmental Impacts and Mitigation Measures Tianlong fortress cultural heritage protection Serial Construction Construction Scale and Sub-items Location Environmental impacts Mitigation measures number type content quantity Traffic facility Public Disclosure Authorized Public Disclosure Authorized The alleys of Construction phase: the center street alteration will not impact on in the scenic the eco-environment, water area of Form regional Paved with Keep the pathway away from sensitive objects. environment, ambient air Tianlong road system block and It should minimize the area of construction. and acoustic environment. fortress; and local small cobble with Clean the temporary construction area and Operation phase: the 1 pathway alteration From square on the the length remove the temporary buildings. pathway in the villages will Zhengjiayuan base of of 2km and Loosen the compacted soil, fill and level up the not obstruct the passage of to Tianlong original the width of kar in construction area. animals and not impact on elementary pathway 3m Planting trees in time. the eco-environment, water school and environment, ambient air end at and acoustic environment. Jiudaokan. Water supply and sewerage facility and Sanitary facility Public Disclosure Authorized Public Disclosure Authorized Form Construction phase: the integrated Constructed alteration ditches with small drainage with block The sewage soil excavation and the system of with the ditches in the garbage transfer stations alteration ditches which length of alleys of located in the wasteland will The mud and solid waste generate during 2 sewage ditch new collect the 4km, the center-street not impact on the sewage ditch excavation shold be clean in time construction sewage and width of and eco-environment, water to prevent the impact on landscape and ambient rainwater 1m and the back-street environment, ambient air air. together with depth of and acoustic environment. The garbage should be collected and transport to changes in the 1m. Operation phase: the the disposal plant in time for innocent treatment. houses . construction of the items Plant vegetation on the stacking substrate 2 stations will enhance the drainage sludge. with the The scenic and garbage treatment Public Disclosure Authorized Public Disclosure Authorized garbage Constructed land new area of capability of the scenic area 3 transfer with block in occupation construction Tianlong which benefit to the station service area of 100 m2 fortress improvement of and the environmental quality. cubage of 1 Public Disclosure Authorized Public Disclosure Authorized 60 m3 for each Folk house protection External appearance maintenance 6 houses alteration Demonstrative Tianlong and sanitary with the 4.1 and new protection town facility area of construction alteration for 3660m2 the tourists The design scheme should be in accordance reception with the relevant standards and requirements as Repair, 5 houses alteration The implement of the items Priority Tianlong improvement with the well as the aesthetic ideas in order to make sure 4.2 and new will improve the protection town and area of the natural and beautiful of the structures. construction environmental status and maintenance 455m2 enhance the development of The construction material should be inartificial, External scenic areas. and the repaired structures should keep the appearance maintenance original style. and provide 60 houses Normal Repair and Tianlong petty loan for with the 4.3 protection maintenance town residents to area of improve 13231m2 tourists reception capacity. Public building Construction phase: because Backfill the construction waste, collect and remove the useless waste to the municipal the land occupation of the treatment station. items is small and located in Reuse the waste soil as possible and choose the wasteland or the original suitable site to dump the excess soil and carry structure area, it will not out protection measure for the stacked soil. The construction noise should be strictly keeped 5.1 Information new Behind the Mainly The land impact on the local within the standard of 55dB at the daytime and center construction fortress food provide occupation eco-environment. The 45dB at the nighttime. shop of information is 250m2 construction phase is short The construction activity should be paused from 22:00 to 06:00 if there is residential area nearby Tianlong consultation and the and the impacts on the water the construction areas within the distance of town service and structure environment, ambient air 300m. with the area is 2 function of 600m2. diet, Lodging, Constructed conference, by wood entertainment concrete structure. and acoustic environment With the style will be small. of local folk Operation phase: the house and The land sewage, exhaust air, solid includes folk occupation waste and noise will cause Fortress craftwork is 800m2 some impacts on the culture new Sanjiao 5.2 exhibition, and the environment. The impacts exhibition and construction temple non-material structure can be mitigated with the study center study and area is treatment facility and the training, expert 540m2. environmental management work station of scenic area. and so on. Power supply facility The From electrical Zhengjiayuan wire with The maintenance and maintenance to Tianlong the length power supply alteration activity will not 6 and elementary of 3km and Set observable notice board to prevent accident. facility impact on the environment alteration school and the of scenic area. end at sectional Jiudaokan area of 6mm2 The implement of the items Non-material cultural heritage protection Tianlong See the special will not impact on the (include training) town subject environment of scenic area. Remark: There are 4 historic ancient town protection sub-projects in which the Jiuzhou ancient town in Anshun city is the typical example of fortress culture,the Jiuzhou ancient town in Huangping county is the typical example of integration culture of Miao and Han, the Shidong ancient town is the typical example of silver decoration and port culture, the Longli ancient town is the typical example of fortress culture of Han. Most of the sub-projects 3 contents are similar except of the different construction scale. In light of the comparability and short construction period, the sub-projects have similar adverse impacts in the construction phase and will benefit to the environment development of the regions in construction phase, therefore, it will not repeat the environmental impacts and mitigation measures for other ancient town protection sub-projects. 4 Guanling national geological park heritage protection Serial Construction Construction Sub-items Location Scale and quantity Environmental impacts Mitigation measures number type content Traffic facility From No.1 ancient Construct site regional road Construction phase: the exhibition system on the pathway alteration and the hall to base of original Paved with slab and board car park locate in the Exhibition new sight 1.1 pathway and with the length of 2km and wasteland will not impact pathway construction platform minimize the the width of 1.5m on the eco-environment. Keep the pathway and car park away from and sensitive objects. It should minimize the destruction of Operation phase: the scientific area of construction. vegetation as pathway in the villages Clean the temporary construction area and research much as possible. will not obstruct the remove the temporary buildings. work Loosen the compacted soil, fill and level up passage of animals. The station the kar in construction area. exhaust gas of car park the joint of Planting trees in time. will impact on the No.320 Construct It will contain 150 car ambient air, and it can be national ecological car positions and paved with new mitigated with the traffic 1.2 car park highway park coordinated block and sand. The land construction control in scenic area. and the with the entrance occupation will be 5000 geological of the park m2 park sanitary facility distinctive Construction phase: Rubbish Extensive Geological Distribute the garbage cans suitably. 2.1 wooden rubbish 10 cans because the land can set park Request the tourists not to discard garbage can occupation of the items is randomly. Clear the garbage collection Constructed with one dump site with the small and located in the facility and remove the garbage to the Rubbish new Behind the 2.2 blocks in service land occupation of 400m2 wasteland or the original disposal site for treatment in time dump site construction museum The garbage and waste caused by toilets area. and the scale of 500m3. structure area, it will not 5 Serial Construction Construction Sub-items Location Scale and quantity Environmental impacts Mitigation measures number type content impact on the local should be collected and transport to the eco-environment. The disposal plant in time for innocent impacts on the water treatment. environment, ambient air layout with and acoustic environment 2 toilets with the land reasonable are also small. new Geological occupation of 320m2, the 2.3 Public toilet consideration and Operation phase: the construction park capacity of 20 persons, one regional style in construction of the items floor and the height of 4m service area. will enhance the treatment capability of the sanitary facility and benefit to the improvement of environmental quality. Public building Provide service Construction phase: The design scheme should be in The land occupation is accordance with the relevant standards and the foot of for scientific because the land Scientific 300m2 and the structure requirements as well as the aesthetic ideas new Wolong research and occupation of the items is 3.1 work area is 600m2 with 2 in order to make sure the natural and construction hillock in communication small and located in the beautiful of the structures. station wooden floors and local the park and the visit of wasteland or the original Preserve and remove the greensward and concrete frame structure trees of the occupied land before tourists. structure area, it will not construction.